The meeting minutes summarized the following:
1) The group meeting was held on 15 September 2014 from 2:00-3:00pm to distribute subtopics on spontaneous potential logging tools among the group members.
2) Subtopics 1-2 were given to Khairulamiren, 3-5 to Farah, and subtopic 4 to Arif.
3) Farah was responsible for creating a slide presentation with information from the group members, and Arif would print the slides for their presentation submission.
The meeting minutes summarized the following:
1) The group meeting was held on 15 September 2014 from 2:00-3:00pm to distribute subtopics on spontaneous potential logging tools among the group members.
2) Subtopics 1-2 were given to Khairulamiren, 3-5 to Farah, and subtopic 4 to Arif.
3) Farah was responsible for creating a slide presentation with information from the group members, and Arif would print the slides for their presentation submission.
The meeting minutes summarized the following:
1) The group meeting was held on 15 September 2014 from 2:00-3:00pm to distribute subtopics on spontaneous potential logging tools among the group members.
2) Subtopics 1-2 were given to Khairulamiren, 3-5 to Farah, and subtopic 4 to Arif.
3) Farah was responsible for creating a slide presentation with information from the group members, and Arif would print the slides for their presentation submission.
O 1. CHAIRPERSON SPEECH All the members take the Meeting started by reciting Ummu Everyone responsibility during the Kitab al-Fatihah. The chairperson meeting welcomed all the members who attend the meeting. 2. SUBTOPICS DISTRIBUTION
Five subtopics on Spontaneous
Potential logging tools are distributed among the members:
2.1 Subtopics 1 and 2
These two subtopics are given to
Khairulamiren. He needs to take Khairulamir particular action to complete the en task. All the members take the responsibility during the meeting 2.2 Subtopics 3 and 5
These two subtopics are given to
Farah. She has to take particular Farah action to complete the task. 2.3 Subtopic 4
This subtopic is given to Arif. He Arif
will take the responsibility to complete the task. 3. SLIDE PRESENTATION Farah does the slides All required information on Farah after getting the info Spontaneous Potential logging from other members tools must be presented in the form of slides. 4. HARDCOPY PRESENTATION
The slide presentation will be Arif Arif prints the slide
printed for the submission during presentation presentation session. 5. CLOSING TIME