Beruflich Dokumente
Kultur Dokumente
com
Stone Energy
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Digitally signed by
Digitally signed by
James
James Pyland Digitally signed by Shahryar
Shaoch Shahryar
Shaochun Tan Kashani
DN: cn=James Pyland,
o, ou, DN: cn=Shaochun Tan, DN: cn=Shahryar Kashani,
Pyland
email=james.pyland@
un Tan
email=shaochun.tan@
Kashani
subsea7.com, c=US email=shahryar.kashani@su
Date: 2014.09.19 subsea7.com, c=US bsea7.com, c=US
10:09:22 -05'00' Date: 2014.09.19 Date: 2014.09.19 11:00:24
10:12:44 -05'00' -05'00'
TC1057-ENG-10004
Production PLEM Structural Design Report Page 2 of 118
Rev 0
This document is the property of Subsea 7 and its affiliates and subsidiaries and copying and/or disclosure of the
information it contains is prohibited without the permission of Subsea 7. It has been reviewed and approved in accordance
with Management System requirements and where applicable an audit trail is available within the relevant document
management system. The most recently approved version is regarded as the controlled copy with all other copies being for
information only. It is the holders responsibility to ensure that they hold the latest approved version. Subsea 7, 2014
TC1057-ENG-10004
Production PLEM Structural Design Report Page 3 of 118
Rev 0
TABLE OF CONTENTS
1. INTRODUCTION........................................................................................................ 6
1.1 PROJECT DESCRIPTION....................................................................................... 6
1.2 DEFINITIONS AND ABBREVIATIONS ..................................................................... 7
1.3 UNITS .............................................................................................................. 8
1.4 SCOPE OF DOCUMENT ........................................................................................ 8
2. REFERENCES .......................................................................................................... 10
2.1 COMPANY SPECIFICATIONS ............................................................................... 10
2.2 COMPANY REFERENCE DRAWINGS...................................................................... 10
2.3 CONTRACTOR REFERENCE DOCUMENTS .............................................................. 11
2.4 CONTRACTOR REFERENCE DRAWINGS ................................................................ 12
2.5 CODES AND STANDARDS .................................................................................. 12
3. SUMMARY & CONCLUSIONS ................................................................................... 14
4. STRUCTURAL DESIGN BASIS .................................................................................. 17
4.1 STRUCTURAL OVERVIEW ................................................................................... 17
4.2 ASSUMPTIONS ................................................................................................. 19
4.3 PHS CONSTRAINT ............................................................................................ 19
4.4 MATERIALS ..................................................................................................... 20
4.5 ALLOWABLE STRESSES ..................................................................................... 21
4.6 SOIL DATA ...................................................................................................... 21
4.7 JUMPER LOADS ................................................................................................ 21
4.8 INSTALLATION LOADS ...................................................................................... 21
4.9 ROV GRAB BARS .............................................................................................. 21
4.10 MUDMAT SIZE ................................................................................................. 21
4.11 MUDMAT VENTING ........................................................................................... 21
4.12 MUDMAT CURBS AND STOPPERS ........................................................................ 21
4.13 SOFTWARE PACKAGES ...................................................................................... 22
5. STRUCTURAL GLOBAL ANALYSIS-PLEM STRUCTURE............................................... 23
5.1 LOADINGS ...................................................................................................... 23
5.2 LIFT ANALYSIS ................................................................................................ 23
5.3 ANALYSIS OF STRUCTURE IN PHS ...................................................................... 27
5.4 INSTALLATION ANALYSIS .................................................................................. 34
5.5 OPERATION ANALYSIS ...................................................................................... 45
6. STRUCTURAL GLOBAL ANALYSIS-MUDMAT ............................................................ 49
6.1 LOADINGS ...................................................................................................... 49
6.2 INSTALLATION ANALYSIS .................................................................................. 50
6.3 PLACEMENT OF CONCRETE MATTRESSES............................................................. 59
6.4 OPERATION ..................................................................................................... 62
7. PIPING DESIGN AND ANALYSIS ............................................................................. 77
7.1 PIPING DESIGN SUMMARY ................................................................................ 77
7.2 PIPING ANALYSIS METHODOLOGY ...................................................................... 78
7.3 PIPING ANALYSIS RESULTS ............................................................................... 82
TC1057-ENG-10004
Production PLEM Structural Design Report Page 4 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 5 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 6 of 118
Rev 0
1. INTRODUCTION
1.1 PROJECT DESCRIPTION
The Cardona Field is located in Mississippi Canyon approximately 70miles SE of New
Orleans, LA. This is the first deepwater project executed by Stone Energy, made possible
by the purchase of the Pompano asset from BP. At this time, 3 wells have been identified
with the No. 4 and No. 5 wells be initially developed. The production system has been
designed to accommodate at least four (4) wells in total. A schematic of the field can be
seen below:
The bounds of the Subsea 7 Scope of Work are from the production risers and gas lift
umbilical hang-off to the jumper connection at the subsea trees. It includes the
engineering, procurement, and installation of the flowlines and risers and engineering and
fabrication of the PLEMs, inline sleds, and gas lift sleds. It also includes the installation
associated flying leads and jumpers and precommissioning of the system.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 7 of 118
Rev 0
Terms Definition
COMPANY Stone Energy
CONTRACTOR Subsea 7
Table 1-1: Definitions
1.2.2 Abbreviations
The following abbreviations are used in the present document:
Abbreviation Definition
NB Nominal Bore
A&R Abandonment & Recovery
AISC American Institute of Steel Construction
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
CoG Center of Gravity
CP Cathodic Protection
DNV Det Norske Veritas
EFL Electrical Flying Lead
ERW Electric Resistance Welding
FEA Finite Element Analysis
FJC Field Joint Coating
FL Flying Lead
GL ILS Gas Lift In-line Sled
GSPU Glass-Syntactic PolyUrethane
HFL Hydraulic Flying Lead
ILS In-Line Sled
ILT In-Line Tee
ISO International Organization for Standardization
LAT Lowest Astronomical Tide
MAOP Maximum Allowable Operating Pressure
MeOH Methanol
MPI Magnetic Particle Inspection
TC1057-ENG-10004
Production PLEM Structural Design Report Page 8 of 118
Rev 0
1.3 UNITS
US customary units are used in this document. The units will be clearly stated as US
customary [SI] for all input data and analysis results.
1.4 SCOPE OF DOCUMENT
The purpose of this document is to define design input, methodology/processes, results,
and other relevant information that were used to carry out the design and engineering of
the PLEM structure of the Cardona Project.
This document focuses on the structural analysis and design results taking into account the
installation interface requirements, structural, piping, and foundation of the system. It
describes the loads, assumptions, and methodology used for the design of the structures.
Figure 1-1 illustrates the location and orientation of PLEM and adjacent wellheads (Ref
[B3]).
TC1057-ENG-10004
Production PLEM Structural Design Report Page 9 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 10 of 118
Rev 0
2. REFERENCES
2.1 COMPANY SPECIFICATIONS
Ref. Document Reference Rev. Title
A1 J6549-SECA-TB-A-001 C Basis Of Design
A2 J6549-SECA-RT-U-001 0 Subsea Layout Report
A3 J6549-SECA-SF-L-005 0 Forged Flanges Procurement Specification
Surface Preparation and Protective Coating
A4 J6549-SECA-SF-U-001 0
(Paint) Specification
A5 J6549-SECA-SF-U-006 0 Well & Pigging Jumpers Functional Specification
A6 J6549-SECA-SF-U-007 0 Subsea Sled and PLEM Functional Specification
A7 J6549-SECA-SF-U-009 0 ROV Tooling and Interface Specification
A8 J6549-SECA-LM-U-001 1 Material Take-off (MTO)
Table 2-1: Company Specifications
TC1057-ENG-10004
Production PLEM Structural Design Report Page 11 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 12 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 13 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 14 of 118
Rev 0
Max Report
Analysis Member Location
UR Section
Lifting 0.61 W8x28 Rear Attachment 5.2
In PHS 0.44 W16x57 Vertical support under hub 5.3
Stage 1 Above Yoke support member on 5.4
0.97 W16x57
Splash Zone structure side
Stage 2 Below V member supporting anchor 5.4
0.86 W16x57
Waterline forging
Stage 4 Pre- Vertical member framing into the 5.4
0.55 W8x28
touchdown front V
Vertical member framing into the 5.5
Operation 0.74 W8x28
front V
Table 3-1: Summary of Global Frame Structural Analysis
TC1057-ENG-10004
Production PLEM Structural Design Report Page 15 of 118
Rev 0
Report
Analysis Max UR Member Location
Section
Lifting Analysis-Shop Handling 0.375 in plate
0.83 Skirt Bulkhead 6.2
Horizontal
Lifting Analysis-Shop Handling 0.375 in plate Handling eye base
0.44 6.2
Vertical coped into bulkhead
Lifting Analysis-Upending to 60 0.375 in plate
0.80 Skirt Bulkhead 6.2
degrees
Lifting Analysis-Splash Zone @ 0.375 in plate 6.2
0.31 Skirt Bulkhead
60 degrees
Lifting Analysis-Pre Touchdown 0.375 in plate 6.2
0.50 Skirt Bulkhead
@ 30 degrees
Lifting Analysis-Touchdown 0.375 in plate 6.2
0.56 Outer Skirt Bulkhead
@30 degrees
Lifting Analysis- 0.375 in plate 6.2
0.61 Skirt Bulkhead
Recovery/Reposition
Concrete Mattress 0.64 0.375 in plate Skirt Bulkhead 6.3
Position 1 0.35 0.5 plate Top plate 6.4
0.54 0.375 plate Bulkhead 6.4
Position 2 0.91 0.5 plate Top plate 6.4
0.72 0.375 plate Bulkhead 6.4
Position 3 0.76 0.5 plate Top plate 6.4
0.68 0.375 plate Bulkhead 6.4
Position 4 0.27 0.5 plate Top plate 6.4
0.62 0.375 plate Bulkhead 6.4
Table 3-2: Summary of Global Mudmat Structural Analysis
Code Stress
Value Stress Report
Load Cases
Type Ksi Ratio Section
[MPa]
Offshore Hydrotest Combined 49.7 [343] 61.0 7.3
Offshore Lift Longitudinal 5.0 [34.5] 52.0 7.3
Installation Longitudinal 46.2 [319] 52.0 7.3
Operating Hoop 40.2 [277] 46.8 7.3
Table 3-3: Piping Analysis Stress Results
TC1057-ENG-10004
Production PLEM Structural Design Report Page 16 of 118
Rev 0
Report
Item Description Max UR
Section
Lift eye 0.73 9.1
Sliding Mechanism 0.93 9.2
Hub Support 0.42 9.4
Flying Lead Support Plate 0.67 9.3
Buoyancy Main Padeye 0.88 9.5
Buoyancy Hinge Pin 0.35 9.5
Buoyancy Hinge Eye Structure Side 0.90 9.5
Buoyancy Hinge Eye Yoke Side 0.86 9.5
A/R Yoke Padeye 0.99 9.7
A/R Yoke Pin 0.68 9.7
A/R Yoke Hinge Eye Structure Side 0.73 9.7
A/R Yoke Hinge Eye Yoke Side 0.90 9.7
Anchor Forging Attachment 0.89 9.9
Table 3-5: Detailed Design Summary for PLEM
Report
Item Description Max UR
Section
Lift eye-Mudmat-Handling Eyes, worst case of
Shop Handling Horizontal and Shop Handling 0.84 10.1
Vertical
Lift eye-2 Main Leg Installation Upending to 10.1
0.95
60 Degrees
Lift eye-Recovery/Reposition 0.81 10.1
Lift eye-Mudmat-Sacrificial Sling in Splash 10.1
0.52
Zone @ 60 Degrees
Lift eye-Sacrificial Sling-Upending to 60 10.1
0.79
Degrees
Panel Plate Stress 0.83 6.2
Panel Buckling 0.92 10.2
Table 3-6: Detailed Design Summary for Mudmat
TC1057-ENG-10004
Production PLEM Structural Design Report Page 17 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 18 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 19 of 118
Rev 0
4.2 ASSUMPTIONS
Analyses assumptions are taken from Ref [C1]. The following assumptions are taken for
design and analysis purposes of each structure:
Buoyancy will not prevent PLEM from rotating during first 100m of water column;
The coefficient of friction between the PLEM and the mudmat sliding UHMW-PE
covered steel beam is conservatively considered to be 0.2;
No recovery of the PLEM is required;
Contingency recovery/replacement of mudmat;
No marine growth considered for these structures;
PLEM will be positioned within predetermined target box;
Mudmat is level during operation, with effect of level tolerance negligible for
structural design;
Mud resting on top of mudmat will not prevent lateral or longitudinal sliding;
Both production and pigging jumper load based on extreme positions due to target
box and piping expansion from conservative design;
PLEM lands on mudmat on one front foot in worst case;
Buoyancy yoke to be recovered, A/R yoke to be left in place;
During installation, before buoyancy is fully active, the PLEM could rotate 180
degrees,
4.3 PHS CONSTRAINT
Each PLEM will be installed with the Seven Navica PHS Standard Cradle. The PHS consists
of a rectangle of four (4) tubular corner guide posts projecting from the lay ramp at right-
angles to its main structure (see Figure 4.1). The Standard Cradle into which the PLEM is
seafastened onto can be hydraulically raised/lowered on these corner posts. The Standard
Cradle serves to assist the alignment of the PLEM/Sled with the pipe end, Ref [D2].The
PLEM/Sled will be loaded out and seafastened on the four cradle brackets for
welding/NDE/FJC before paying out.
Figure 4-3: Seven Navica Ramp (Left) and Standard PHS Cradle (Right)
TC1057-ENG-10004
Production PLEM Structural Design Report Page 20 of 118
Rev 0
4.4 MATERIALS
The PLEM frame, mudmat and all of its structural components are to be constructed out of
the following materials:
Structural W Shapes
ASTM A992 Gr. 50
Structural Channel
ASTM A992 Gr. 50
Structural Angle
ASTM A36
Structural Plate
ASTM A572 Gr. 50
API 2H Gr. 50
Round Structural Tubing and Pipe 24 with inch Outer Diameter and under
TC1057-ENG-10004
Production PLEM Structural Design Report Page 21 of 118
Rev 0
ASTM A53
ASTM 5L X52 SMLS
Hinge Pins
AISI 4140 70ksi [483]
Structural member sizes and plate thicknesses are in accordance with the PLET and PLET
Basis of Design, Ref [C1].
4.5 ALLOWABLE STRESSES
The AISC ASD code was utilized to perform global check of the structural integrity of the
structures, Ref [E1]. For piping analysis, allowable stresses were used according to API,
Ref [E10]), and ASME, Ref [E12].
4.6 SOIL DATA
The structures are designed for soil conditions of the Cardona field development.
Geotechnical data found in PLEMs and Sleds Foundations Geotechnical Design Brief, Ref
[C5]. Full geotechnical analysis can be found in PLEMs Foundation Geotechnical Design
Report, Ref [C6].
4.7 JUMPER LOADS
Jumper loads are provided in Jumper Structural Design Report, Ref [C8].
4.8 INSTALLATION LOADS
A full description of the installation and anchor forging reaction loads are provided in the
Pipeline and Riser Installation Analysis Report, Ref [C9]. To enhance stability during
installation, dynamic buoyancy of 10 Te will be used.
4.9 ROV GRAB BARS
Grab bars for ROV intervention are installed near each ROV manipulation target. Grab bars
are typical from ROV Interfaces, Ref [E5].
4.10 MUDMAT SIZE
The mudmat size was determined by the sliding distances along the pipeline axis predicted
in the thermal expansion report, Ref [C7], and in the lateral direction, as predicted in Ref
[C8]. Geotechnical design was also checked in PLEMs and Sleds Foundations Geotechnical
Design Brief, Ref [C5].
4.11 MUDMAT VENTING
A 3% vent hole area was provided in the top surface of the mudmat to allow water flow
under the mudmat.
4.12 MUDMAT CURBS AND STOPPERS
A curb has been provided to prevent ingress of sediment onto the mudmat, and holes have
been added to allow sediment to be pushed out in case there is a buildup of sediment. Pipe
rails have been added to prevent the flying leads from snagging on the mudmat anodes.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 22 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 23 of 118
Rev 0
Dynamic installation loads at the anchor forging are calculated in the Pipeline and Riser
Installation Analysis Report, Ref [C9]. Installation loads are already dynamic loads and do
not require any DAF. An extra analysis factor has been applied to ensure a conservative
design in the face of constantly changing design inputs. Thus it is not necessary to re-run
any analysis as long as the new loads are less than those obtained by using the global
analysis factor. No weight contingency was used during operation, because this will
produce conservative results in terms of overturning. All externally applied loads use a
global analysis factor of 1.1, as shown inTable 5-1.
5.1.2 Model
The global analysis is performed using STAAD.Pro to model the structural members and
plates. Specific detailed analysis is performed using ANSYS to model critical members,
critical plates, and connections, see Sections 0 and 10.
5.2 LIFT ANALYSIS
TC1057-ENG-10004
Production PLEM Structural Design Report Page 24 of 118
Rev 0
The PLEM is designed to be lifted offshore by means of a spreader bar as shown in Figure
5-1. A spreader bar is required in order to lift the structure without the lift rigging
interfering with the pressure caps and buoyancy yoke.
Fixed Direction
Weak Springs
When on the Seven Navica, the PLEM will have to be lifted at a 20 degree angle to match
the PHS angle. This will be accomplished by removing short slings from two of the slings.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 25 of 118
Rev 0
Fixed Direction
Weak Springs
TC1057-ENG-10004
Production PLEM Structural Design Report Page 26 of 118
Rev 0
5.2.3 Results
The results show that PLEMs are adequately designed for lifting. Figures below show the
highest stressed members highlighted in red. For detailed STAAD analysis report see
Attachment 1. All members connected to lifting points passed the API/AISC check.
The results for the level lift case and inclined lift are shown below in Figure 5-3 and Figure
5-4, respectively.
0.000477
0.0997
0.000477 0.0283
0.223
0.0282
0.0997
0.00948
0.00941 0.193
0.175
0.159
0.144 0.0344
0.0147 0.0102
0.00982
0.0105 0.129
0.116
0.0193 0.0326 0.522
0.0183
0.023 0.0138
0.0172
0.0208 0.0887 0.0171 0.0326 0.131
0.00138
0.128 0.084
0.129
0.0265
0.0312 0.0235
0.0266 0.060.0652 0.0159
0.0193 0.129 0.0739
0.131
0.0343
0.036
0.0405 0.041
0.0631
0.0668
0.00141
0.0532 0.3510.0292
0.0166 0.02630.159 0.135
0.139
0.144 0.2280.0661
0.00955
0.0265
0.0129 0.0485
0.0557 0.124
0.0522 0.0296
0.0241 0.0243 0.15 0.0795
0.0128 0.0308
0.0164
0.0197
0.0242 0.0619
0.0675 0.119 0.0238 0.158
0.161 5.57e-005
0.0364 0.428 0.0862
0.00863
0.00676 0.0318
0.0355 0.0725
0.0755 0.105 0.17
0.0234 0.02390.036
0.0102 0.0212
0.0375
0.037 0.0806
0.0852
0.114 0.128 0.189
0.0248 0.02630.0389 0.0843
0.0271
0.027 5.57e-005
0.0496
0.05930.116 0.141 0.0143
0.0418 0.0299
0.0494 0.0835
0.101 0.0817 0.125
0.00897
0.0284
0.0276 0.0134
0.059
0.0604 0.123 0.139 0.0158
0.03850.0132 0.0319
0.0531 0.087 0.0718
0.0322
0.0462 0.0645 0.129 0.133 0.0193 0.221
0.2
0.181 0.00235
0.0212 0.0803 0.0416
0.0069
0.0617 0.0736
0.0776
0.0238
0.0802 0.00816 0.157 0.0361 0.162
0.0216
0.147
0.131 0.0541 0.0924
0.586
0.0839
0.129
0.0863 0.115
0.131 0.0528
0.000341
0.006730.04 0.0171
0.01270.00391
0.0104
0.167 0.108 0.14 0.254 0.101
0.07380.0338 0.145 0.0533
0.0442 0.144
0.142
0.142
0.144
0.0421
0.0146 0.00382
0.00911 0.17 0.143 0.0673
0.0706 0.0322
0.0949 0.0337 0.403 0.0407
0.143 0.148
0.153
0.00659 0.0147
0.00776
0.00611 0.161 0.121 0.0701
0.0748
0.0625
0.0468 0.0457 0.158
0.164
0.171
0.0456
0.011
0.0131 0.00697 0.133 0.0608
0.0642
0.072 0.0316
0.0275
0.0249 0.181
0.178
0.0136
0.00634
0.0169 0.01180.00661
0.0855
0.00619 0.137 0.0783
0.084 0.0212
0.017 0.0354 0.063
0.181
0.24 0.486
0.0136 0.00433 0.146
0.128 0.0874
0.0917
0.097 0.001150.013
0.0126 0.136
0.0399 0.192
0.2110.001370.00233
0.183
0.0174 0.00465 0.114
0.00161
0.0448
0.0556 0.0119
0.0118
0.0129 0.015
0.074 0.0735 0.13
0.00761
0.02250.0123 0.05740.0615
0.0304
0.05390.03160.00915 0.0182
0.0234 0.00233 0.0666
0.0174 0.0642
0.0738 0.0587 0.0318
0.0292
0.0215 0.0286
0.0344 0.077
0.0229 0.0816
0.0309
0.0922
0.0981 0.0457
0.0156
0.05750.0128 0.0413
0.0466 0.077
0.0369
0.0999
0.106
0.137 0.0501
0.0106
0.0578
0.0108
0.119 0.143 0.129 0.0712
0.283
0.166
0.0814
0.0501 0.0572
0.0231 0.0569
0.0468 5.57e-005 0.0571
0.0343
0.168
0.00115
0.032
0.00342
0.0242 0.029 0.0263
0.0566
0.0391 0.0254 0.0733 0.152
0.164
0.000341
0.0198
0.3550.0163 0.0597
0.02650.0642 0.179 0.1 0.088
0.157
0.0159
0.0151
0.0147 0.0774 0.0149 0.0834
0.151
0.0674 0.0585 0.146
0.247
0.0694
0.145 0.0897 0.157 0.158 0.0213
0.142
0.0699 0.0832
0.101
0.14 0.157 0.07910.00235
0.00326
0.001370.142 0.11
0.00233 0.077 0.102 0.00825
0.06050.148 0.085 0.000284
0.0821 0.0684
0.131 0.166 0.00233
0.000341
0.00137
0.00233 0.0573
0.172 0.0164
0.11 0.00233
0.11 0.391 0.0175 0.0566 0.0964
0.0056
0.01180.0411 0.000284 0.08 0.0203 0.029
0.0871 0.0585
0.00127
0.0003530.0186 0.112 0.0579 0.026
Y 0.00342
0.0933
X 0.0818
Z 0.00326 0.00233
0.000341
0.00137
0.00233
TC1057-ENG-10004
Production PLEM Structural Design Report Page 27 of 118
Rev 0
0.09520.025
0.000803 0.025
0.215 0.542
0.0954
0.0703
0.068
0.0752
0.0626 0.118 0.036
0.0803
0.0867 0.0557 0.03
0.0033
0.094
0.102 0.0626
0.394
0.0806
0.0683
0.11
0.119 0.0667
0.185
0.0359
0.169
0.154 0.129
0.14 0.0643
0.0609
0.139
0.126 0.0331
0.033 0.000107
0.0372
0.141
0.037 0.00469
0.02
0.216
0.000727 0.0682
0.605
0.000803 0.0197
0.113 0.314
0.0171 0.151
0.0295 0.039 0.155
0.141
0.136 0.075 0.124
0.08790.0155
0.0191 0.0265
0.163
0.0244 0.049 0.143 0.0751
0.0805
0.0122
0.0122
0.013
0.0133 0.0665 0.0161
0.030.1830.024 0.0519
0.0529 0.0907 0.0873
0.00241
0.0952
0.0167
0.0127
0.0209
0.0190.0252
0.02860.0539 0.0238
0.0424
0.0235 0.027 0.0517 0.229
0.052
0.003010.104
0.113
0.0177 0.447
0.0241
0.0306 0.0325
0.0615
0.0489
0.0783
0.0674 0.0232
0.0308
0.0256 0.0304
0.0323 0.0429 0.123
0.133
0.0621
0.0487 0.0674
0.0356 0.112
0.0672
0.106 0.0304
0.0925
0.0139
0.229
0.0156 0.0404
0.210.140.0024
0.19 0.144
0.0449
0.157
0.0421
0.0467 0.0632
0.0591 0.0939 0.0286
0.0128
0.172
0.019
0.154
0.0352 0.0685
0.158
0.0498 0.079 0.00338
0.0615
0.0705 0.115 0.132 0.126 0.0215
0.14 0.373 0.168
0.0287 0.0802
0.0559 0.127 0.152 0.085
0.00866
0.0161
0.0111
0.0372
0.0354
0.0139
0.0163
0.0204
0.028
0.0239
0.0856
0.0938
0.103
0.125
0.12 0.0982
0.0733 0.0309
0.201
0.0341 0.0826 0.0691
0.181
0.0308
0.0313
0.000107
0.107
0.0977
0.0306
0.0438 0.125 0.103
0.126 0.0599 0.0825 0.142
0.236
0.0201
0.0142
0.0103 0.0732 0.114 0.067
0.129
0.0136 0.00382 0.0749 0.0752
0.00469
0.0077 0.08960.00823
0.0803 0.121
0.148 0.115 0.0848
0.0843
0.0532
0.036
0.0767
0.0309 0.243 0.01770.00241
0.009820.102
0.0255 0.00377 0.16 0.0763
0.0669
0.0398 0.028
0.137
0.0237
0.019
0.0145 0.0614 0.162 0.00301
0.000659
0.0256
0.00833
0.0269
0.0261 0.12 0.00342 0.164
0.155 0.134 0.0722 0.0141
0.0133
0.0133
0.0821 0.0148 0.125
0.0822
0.0326
0.0465
0.00643 0.128
0.0299
0.136
0.0648 0.00708
0.0194
0.146 0.09060.125 0.00161
0.0916
0.151
0.154
0.00606 0.0139
0.00998
0.0465 0.01 0.126 0.0989
0.107
0.0234 0.02120.107
0.0276 0.0984 0.0024
0.0122
0.00592
0.0196 0.00805
0.00503 0.117
0.0273
0.117
0.112 0.0392
0.111 0.0339
0.0198
0.0149
0.00569 0.00666
0.196
0.00638 0.0299
0.0606
0.0747
0.0692
0.0407
0.00701 0.041
0.049 0.182
0.0177
0.01650.0062
0.00564 0.00111 0.0418
0.0727
0.0419
0.0586
0.07670.0384
0.0286 0.0167
0.02540.178
0.0553
0.0617 0.00044
0.01880.00669
0.0105 0.0859
0.315 0.05 0.0596
0.0205
0.0166
0.0144
0.049
0.0510.0693
0.0145 0.160.0953
0.0232 0.01650.1
0.0442
0.114
0.00382
0.0227 0.0513 0.0745
0.000107
0.00241
0.0616
0.0683 0.0908
0.0295 0.134
0.0388
0.149
0.0296 0.0679
0.0147
0.0552
0.00191
0.0858 0.0553
0.161
0.0473
0.181
0.174
0.209 0.04550.103
0.0546 0.0717 0.0166 0.0195
0.0991
0.206
0.0584
0.194
0.04 0.0302
0.179 0.119
0.057 0.02
0.133 0.0475
0.03730.0024
0.166
0.0281
0.155
0.0231
0.018 0.148
0.0168
0.143 0.0355
0.0176
0.0163
0.0654 0.143
0.149 0.174
0.0604 0.0209
0.0617
0.1840.0751
0.346 0.0672
0.132 0.0246
X 0.00044 0.0386 0.00701
0.0856
0.03430.0689
0.0111 0.0764 0.00241
0.0132 0.0147
0.00191
0.00111 Load 10
0.00129
0.000332 0.0024
Figure 5-4: Maximum Utilization Ratio for Inclined Lift
TC1057-ENG-10004
Production PLEM Structural Design Report Page 28 of 118
Rev 0
Fixed Direction
TC1057-ENG-10004
Production PLEM Structural Design Report Page 29 of 118
Rev 0
Fixed Direction
TC1057-ENG-10004
Production PLEM Structural Design Report Page 30 of 118
Rev 0
For laydown, four load cases were considered: heave combined with roll, and heave
combined with pitch. During laydown, only the maximum downward vertical force is
required.
For PHS transportation, the structure in the PHS at 20 degrees was assumed to experience
loads according to DNV, Ref [C11]. In this case heave acceleration was checked at
gheave acceleration to capture the highest uplift forces.
5.3.3 Results
The results show that PLEMs are adequately designed for handling and transportation in
the PHS. Figures below show the highest stressed members highlighted in red. For detailed
STAAD analysis report see Attachment 2.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 31 of 118
Rev 0
0.0393
0.0338
0.0335 0.0317
0.0296 0.0283 0.000104
0.0439 0.00334
0.0266 0.042 0.1580.0147
0.0242 0.0219 0.0434 0.000725 0.0541
0.000641 0.00522
0.0220.00594 0.119 0.0186 0.0433 0.0417 0.102
0.0485
0.0165 0.00718 0.02
0.044 0.0506 0.11
0.0103
0.0166 0.0139 0.00989 0.052 0.021 0.0529 0.0351 0.0
0.0169
0.0174
0.0174 0.0169 0.0217
0.0166 0.0191 0.00747 0.0537
0.0235
0.0279 0.0153 0.0449
0.00692 0.0266 0.0525 0.188
0.0313
0.0232 0.032 0.00293
0.0159 0
0.0302 0.03680.0167
0.0437 0.00817
0.0501 0.0335 0.0446 0.02
0.0373 0.0533 0.0172 0.0413 2 0.0293
0.115
0.027
0.0926 0.0327
0.007690.104 0.0401
0.0453 0.0313
0.0444 0.0264 0.0873 0.131
0.00846 0.0373 0.0495
0.0518 0.024 0.0245
0.00535 0.0325 0.124 0.00325 0.0338
0.0207 0.0709 0.00481 0.029 0.0452
0.0594 0.026
0.0254
0.00401 0.0429
0.0669 0.02 0.00288 0.0776 0.0678 0.0237
0.0214 0.0859 0.0217 0.0262 0.114 0.0440.0461
0.0733 0.0224
0.0251
0.027 0.0225 0.0854 0.0172 0.0378 0.0451
0.0581
0.03940.0277 0.0461
0.035
0.042 0.0224 0.081 0.0167 0.0464
0.0665
0.0133 0.0325 0.0492
0.0562 0.0208 0.0807
0.0642
0.073 0.000104
0.085
0.107 0.0197 0.0425
0.01710.0831 0.116 0.0987
0.00515 0.0176 0.0898 0.0348
0.02190.1020.0229
0.00338
0283 0.00895
0.0111 0.0885 0.0963 0.0562
0.034
0.0444
0.00979 0.106 0.02940.0365
0.0308 0.119
0.00358 0.111 0.028 0.0274
0.0681
0.0233 0.1
0.00863 0.00366 0.079 0.0221 0.019
0.0166 0.0558
0.114 0.0247 0.0163
0.0157
0.0076 0.109 0.122 0.0258 0.0158 0.1760.0621
0.0109
0.00463 0.00631
4 0.0155 0.0917 0.00123 0.0267 0.0157
0.02230.00633
585 0.272 0.0267
0787
0.0314
8 0.00679
0.00789 0.0987 0.0259 0.0221
0.056 0.00568 0.0918 0.125
0.101 0.0291 0.0832 0.106
0.00523 0.023 0.0969 0.036
0.0079
71 0.033 0.00662 0.111 0.106
0.0221 0.0028 0.177 0.0428 0.142
00746
255 0.103
0.00275 0.0731
0.0175
0.122
0.0643 0.0497
0.0171 0.0063
0.000983 0.0151 0.056 0.0577
0.00584 0.0486
0.0962
0.0415 0.180.05690.0181 0.121
0.0179 0.0109 0.0127 0.07 0.0345
0.0272 0.0643 0.000344
0.0188 0.00911 0.0107 0.113 0.0272
0.0259
0.0704 0.0537 0.163
0.0102 0.346
0.00915 0.0537 0.0256
0.0201 0.0112 0.00702 0.1430.327 0.0611 0.000104
0.00325
0.0695 0.0843 0.057
0.0259 0.0107 0.00338 0.0886
0.00689
0.00952 0.0112
0.0404 0.0107 0.0567
0.00255
4 0.117 0.0698
0.0176 0.0447
0.0706
0.0304 0.0437 0.1670.146 0.0722
0.0756
0.12
0.0597
0.113 0.176 0.125
0.0476
0.104
0.0385 0.0937 0.0307 0.207 0.059 0.0935
0.0315 0.00324
0.0843 0.0537
0.0257
0.0203 0.0748
0.0202
0.02 0.01960.0655
0.0561
0.047
0.0709
0.0187 0.0394 0.331 0.101
0.129 0.0468 0.18
0.0677 0.156
0.436 0.122
0.163
0.0965
0.000344 0.129
0.0063
0.334
0.062 0.132 0.00325
0.0163 0.165 5 0.0112
0.0153 0.00273
0.000983
0.000942
0.000243
0.00324
TC1057-ENG-10004
Production PLEM Structural Design Report Page 32 of 118
Rev 0
0.00836
0.00814
0.0261
0.00553
0.00545
0.0166
0.019 0.000876
0.0152 0.0954
0.0902 0.0253
0.000736 0.0663
0.0603 0.07240.331
0.0593 0.0628
0.0545
0.0454 0.0548
0.0443
0.000863 0.0552 0.0493 0.00108
0.00254
0.00299
0.0671
0.00311 0.0007
0.0827 0.0432 0.1810.0266
0.0385 0.0347 0.0388
0.02720.295 0.0846
0.0396 0.317 0.0160.00456
0.0248 0.077 0.0396
0.0749 0.12
0.02170.0157 0.0679 0.0402
0.0192 0.000162
0.0185
0.018 0.0612
0.01850.057 0.0917
0.1610.0191 0.00107
0.0319 0.0187 0.0228 0.0542
0.00108
0.0225 0.0568
0.0188 0.0173 0.0205
0.0257 0.183 0.0463
0.00286
0.01760.00254
0.0138 0.0813 0.397
0.017 0.0119 0.0335 0.07440.016 0.0758
0.0558
0.0104 0.0228 0.0496
0.00456
0.276 0.0378
0.000627
0.0176 0.0424 0.114 0.0296
0.01320.0183 0.0391 0.029
0.0183 0.0392 0.0356
0.0259
0.0166 0.0157
0.0126 0.0531
0.0343
0.0465
0.0736 0.0216 0.0289
0.0124
0.0125
0.0115 0.00107 0.0215
0.0377
0.0382
0.0257
0.31
0.0374 0.004980.0121 0.176 0.0212
0.00388 0.0274
0.0298 0.0334 0.00996 0.0246
0.02150.227 0.0380.0406
0.0132 0.0161
0.0158 0.0157
0.00707 0.0581
0.00953
0.0113
0.00443
0.0116 0.223 0.0123 0.228
0.0193 0.0124
0.0128
0.0127 0.0524
0.0127
0.0156 0.0139
0.0172
0.0203
0.00843 0.02340.0128
0.0263
0.029 0.252
0.0311
0.0493
0.03920.0634 0.0182
0.000736 0.0088 0.0382 0.0523 0.18 0.0489
0.0378 0.00418
0.0511 0.0232
0.0137 0.0311
0.0284
0.14
0.0344 0.0521 0.0291
0.191
0.0447 0.0519 0.216 0.0751
0.0353
0.0243
0.0514 0.08
0.032 0.00321
0.0514 0.0574 0.0413
0.0236
0.0351
0.0185
0.0151 0.0586
0.0133
0.0114
0.00946 0.166 0.0484 0.000437
0.008
0.00796
0.00778 0.028 0.0619 0.0556
0.0703
0.00806 0.0227 0.109 0.0648 0.193
0.0625
0.00829 0.023 0.163 0.0666 0.02260.0208
0.0517
0.0235
0.0778 0.15
0.0249 0.0307
0.0608 0.000162
0.015
0.0008340.0293
0.0354 0.0309
0.0331
0.0114 0.02880.08330.0417
0.048
0.0554 0.0908
0.0267 0.0627
0.0285 0.0705 0.0435 0.018 0.144
0.0149 0.0275 0.0294 0.0405 0.0408 0.0471 0.0104
0.0186 0.0303 0.0111 0.00489 0.00108
0.0293 0.0307 0.0313
0.01320.0559 0.0309 0.0548 0.008120.00123
0.0225 0.0305 0.0252 0.00515
0.0189 0.23 0.04290.044 0.208
0.307
0.00502
0.0267 0.0306
0.0266 0.0539
0.0255 0.154
0.0315 0.0371 0.0374 0.00935 0.00668
0.00149
0.0774 0.00351
0.1570.0202 0.1310.172
0.03650.0347 0.0533
0.089
0.0465
0.0401
0.0186
0.0716 0.385
0.0135
0.0299
0.0246
0.0196 0.054 0.0171 0.0393
0.0129
0.0416
0.0194
0.0182
0.0178 0.013 0.0368
0.0236 0.00511
0.000162 0.0102 0.0278
0.0411 0.118 0.0207
0.00893 0.124
0.0239
0.0209
0.0112 0.202
0.0177 0.00107
0.0415 0.0546 0.0089
0.00948 0.0223
0.0963
0.00418 0.0199
0.0205
0.0224
0.00799 0.0698 0.0085 0.0286
0.00108
0.0291 0.01
0.00866
0.0862
0.00489 0.0635 0.0411
0.0379
0.0653 0.00946
0.0327 0.00619 0.003010.15 0.06030.0928 0.0850.00916 0.0229
0.0041
0.00815 0.00812
0.0361 0.00891
0.00497 0.00701 0.02290.114
0.195 0.00667
0.00736
0.00797 0.0289 0.0285
0.0181 0.00456
0.0245 0.00545
0.0072
0.00665 0.03460.00123
0.0176
0.00905 0.0557 0.0175
0.0412
0.0483 0.198
0.000437
0.0177
0.0168 0.0133 0.0187
0.0631
0.0703 0.0991
0.0256
0.0773
0.0834
0.0234
0.0486
0.0888
0.0458 0.00107
0.0343
0.0262
0.0205
.009960.0164
0.0134
0.0104 0.0734
0.00977
0.00983
0.00933
0.0496
0.0186
Figure 5-8: PLEM in PHS at 85 degrees from Horizontal, Supported at Top
TC1057-ENG-10004
Production PLEM Structural Design Report Page 33 of 118
Rev 0
29 0.0199
0.0387 0.026 0.0248 0.0308
0.0271 0.0231 0.0228
0.0433 0.0271 0.0235
0.0252 0.0238 0.0133
0.0596 0.0856 0.0196 0.0766
0.0225
0.0193
0.0828 0.0154 0.0237
0.0183
0.205
0.0406
0.02 0.0305 0.0382
0.036 0.0164 0.0214 0.0528
0.032 0.0144 0.0333
0.0281 0.0114 0.0127
0.0228 0.0392
0.0246 0.00904 0.00772 0.041
0.00726 0.0166 0.0447 0.0236
0.00436
0.0213 0.00970.0628
0.00326 0.0143 0.0264
0.004
0.0148 0.00286 0.0186 0.0485 0.03660.0593 0.0856 0.208
0.00664 0.0209
0.00438 0.0967 0.0806
.0153 0.00466 0.0251
0.00507 0.0478
0.0101 0.0428 0.000431
019 0.00409
0.00574 0.0383
0.00396
0.0372 0.03350.00413 0.0712
0.0784
0.00518 0.001070.0665 0.0383
8
024
81 0.0295
0.00721 0.143
23
0309 0.0905
0.0144
0167 0.0256 0.114 0.0676
0.00121
01380.0149
0.0163 0.0177 0.00147
115 0.00801 0.0066 0.0411 0.0474
0.0197 0.0312
0977 0.0228 0.0176 0.449
0.0674 0.198
0924 0.0241 0.0456
0.0218 0.0225 0.036
0878 0.00106
0.016 0.0808 0.0213 0.07
0768 0.000856 0.0384 0.0438 0.0485
0.0177 0.0293
8680.00269 0.017 0.0306 0.143
0.00608
1 0.184
0.0905
04 0.00286 0.0884 0.0425 0.0268
0.0177
0.019
0.0128 0.079
0.219
0.0109
0.00975 0.0527
11 0.0154 0.00831
00159
16 0.0067 0.0010
187 0.00503 0.171
86 0.0128 0.00552
0.00546
0.00532
0.0247
1 0.0106 0.005450.013
6040.0249
0.00698 0.06850.1120.185
0.0299 0.00978 0.00559 0.0831
0.0308 0.00876 0.0079 0.469 0.00659
0.0045
59
0.00831 0.0313 0.00757 0.000431
0.0298 0.0104 0.103 0.0823 0.00801
97 0.0567
0.0239 0.00702 0.0131 0.00121
0.00934 0.02570.00765 0.00413 0.00106
5 0.07770.219
0.00333
0329 0.00736 0.0158
0.0208 0.169
23 0.07480.106
0.09
0.01930.0219 0.0184 0.06
0.0454
0.0351
0.0254 0.0347
44
8 0.0281
0.0411 0.0215
941 0.0328
0.029
00414 0.00659
0.0252 0.102
0.0217 0.0243
.00422
0.00406
0.0184
0.00446 0.0151
0.0121 0.01670.0263
5 0.00394 0.0121
0.0267 0.01840.0114
0.00341 0.01140.0111
0.000159
146 0.00313
0.0029 0.0201 0.011
0.00926 0.00404 0.00259 0.0267 0.0216
0.00699 0.00576 0.00197 0.0251 0.000312
0.00444
0.00678 0.00454 0.00144 0.0211 0.0286
0.00669 0.00466
0.00415
0.00209 0.0322
0.00693 0.00369 9.1e-005
0.009490.00356 0.03610.0159
0.0062
0.0142 0.0396
Y 0.0424 0.0109
0.0108
0.0244
X 0.0247
0.0194
Z 0.0154
0.0124
0.0102
0.00843
0.00667
0.00656
0.00647
0.0065
0 00616
Figure 5-9: PLEM in PHS at 85 degrees from Horizontal, Supported at Bottom
TC1057-ENG-10004
Production PLEM Structural Design Report Page 34 of 118
Rev 0
4
6
Fixed Moment
3
Fixed Direction
Weak Springs
TC1057-ENG-10004
Production PLEM Structural Design Report Page 35 of 118
Rev 0
Fixed Moment
Fixed Direction
Weak Springs
TC1057-ENG-10004
Production PLEM Structural Design Report Page 36 of 118
Rev 0
Fixed Moment
Fixed Direction
Weak Springs
Figure 5-12: Stage 2 Model at 85 degrees from Horizontal, Rotated 180 degrees
TC1057-ENG-10004
Production PLEM Structural Design Report Page 37 of 118
Rev 0
The first critical stage is after the structure exits the PHS cradle with the pipeline welded to
anchor forging. The PLEM leaves the cradle and enters the splash zone. The pipeline is at
maximum tension and buoyancy uplift has not taken effect on structure. During this time
the catenary loads are passed through the structure, into the A&R yoke and into the winch.
The next case is below the splash zone when the buoyancy is added. The PLEM hangs by
the A&R yoke and buoyancy is added. It is expected that before the buoyancy can engage,
the PLEM could rotate 180 degrees about the pipeline axis.
The final installation load case is before seabed touchdown. The PLEM structure is at an
angle of 18 degrees. The extendable legs have been pulled out and locked into place.
Pipeline bending moment is at its greatest. Refer to below for summary of installation.
PLEM above splash zone (Stage 1): unsubmerged structure plus maximum
tension, ramp angle 85 degrees;
PLEM below splash zone (Stage 2): buoyancy uplift takes effect as the PLEM is
lowered down the catenary, ramp angle 85 degrees;
PLEM just before seabed touchdown (Stage 4): maximum bending, and legs
extended.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 38 of 118
Rev 0
5.4.3 Results
The results show that the production PLEMs are adequately designed for installation. The
table below summarizes structural member analysis for the PLEMs. Figures below show the
highest stressed members highlighted in red. For detailed STAAD analysis report see
TC1057-ENG-10004
Production PLEM Structural Design Report Page 39 of 118
Rev 0
Attachment 3. Detailed FEA has been performed on anchor forging connection to the
structure.
It is noted that in many of the load cases, the pup piece extending from the anchor forging
fails the code check. This is because the STAAD program cannot properly check piping
components, which have much higher allowed stresses. Piping is checked in Section 7, the
anchor forging is checked in Section 8.
The results in Table 5-9 show the worst utilizations of either the highest tension or bending
moment loads.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 40 of 118
Rev 0
0.672
0.853 0.712
TC1057-ENG-10004
Production PLEM Structural Design Report Page 41 of 118
Rev 0
0.464
0.548 0.493
0.27 0.00222
0.00115 0.573
0.00402 0.00716
0.00169 4 0.0251
0.07830.01120.118
0.0152
0.0582 0.0331
0.0225
0.0153
0.0486 0.00222
0.58 0.0145
0.0396 0.115
0.326 0.5 0.0389 0.0154
0.016 0.0499
0.0388 0.0156
0.0385 0.0143 0.0151 0.00222
0.0378 0.00165
0.0159 5
0.0383 0.01730.0823 0.447
0.121 0.1240.0351
0.0382 0.151 0.12
0.143 0.0593 0.0247
0.0239
0.303
0.0388 0.0969
0.0753
0.0499 0.0107 0.00716
0.000248
0.00452
0.00874 0.246 0.0402 0.0583
0.0528
0.00887 0.0374 0.0468
0.00104
0.355 0.00981 0.00368
0.00103
0.0724 0.0127 0.0385 0.0341 0.00222
0.0137 0.03660.0416
0.0924 0.0141 0.0135 0.0378
0.03850.053 0.129
0.1130.364 0.0105 0.0364
0.00994
0.229 0.0957 0.0436
0.00938 0.0976
0.22
0.127 0.207 0.0572
0.199
0.105 0.271
0.18 0.142 0.111
0.1620.0835 0.0802 0.0744
0.5150.367
0.148 0.0651 0.0501
0.0156 0.0495 0.1080.0954 0.396
0.0132
0.135
0.0126 0.041
0.23
0.01390.0406 0.172
0.13 0.433
0.1120.0109
0.021 0.0489 0.49 0.239 0.127
0.01380.0772
0.1270.291 0.144
0.0931 0.0120.0119 0.2
0.015
0.008130.17 0.000614
0.0156
0.0162
0.0161
0.01590.0741 0.01 0.142
0.0163
0.0205
0.0246 0.0121
0.3660.13
0.0165 0.535
0.303
0.00614
0.0163
0.0287
0.0621
0.0321
0.0391 0.121
0.0157 0.455 0.118 0.366
0.00222
0.0226 0.05 0.111 0.724
0.105
0.113
0.03 0.107 0.0839 0.001930.308
0.285
0.0378 0.104 0.0827 0.0889 0.00716
0.0127 0.00932 0.0991
0.0459 0.1040.0845
0.087 0.0691 0.272 0.08790.0737
0.213 0.834
0.0536 0.1 0.0817 0.221
0.0614 0.105 0.0904 0.071 0.0864
0.00222
0.103 0.113 0.2940.365
0.2 0.181 0.53 0.731
0.0691 0.103 0.00889 0.125 0.00133
0.0737 0.148 0.457
0.076
0.04630.0183
0.0299 0.124
0.117
0.0375 0.0879
0.726
0.0683
0.0299
0.03230.1050.00992 0.0279
0.227 0.0727
0.0232
0.525
0.0212 0.491
0.0354
0.0413 0.116
0.0414
0.000248 0.0187
0.0688
0.0159
0.0129 0.14
0.0478
0.00466
0.0549
0.0732
0.061 0.01810.37 0.0723 0.0115
0.0114 0.00222
0.15
0.00104 0.0138
0.0679
0.0759
0.0641
0.08830.0702 0.07 0.0111 0.0198
0.0114 0.375
0.266 0.103
0.0524 0.0249
0.0798 0.07350.0719 0.0117 0.397
0.00574 0.0441 0.0819 0.0166 0.00893
0.104 0.00716
0.0302
0.0861 0.0724 0.021 0.438 0.000614 0.0125
0.00486 0.0401 0.217 0.0815 0.0737 0.352
0.037 0.03470.0646 0.0741
0.0719 0.0262
0.00614 0.660.46
0.00193
0.00222
0.0177 0.0123
0.0122 0.0833
0.0621 0.0319 0.162 0.291
0.01260.012
0.0122
0.0338 0.124 0.134
0.109
0.086
0.0382
0.0653
0.0729
0.0255
0.0204
0.0189 0.00692
0.0344 0.0914
0.111
0.131
0.151 0.045 0.122
0.018
0.02 0.0117
0.038 0.0739
0.065
0.0571
0.02810.0131
0.0492
0.0461 0.0125
0.0674
0.0865 0.0116
0.0564
0.0483
0.0522 0.0981
0.041
0.0336
0.0439
0.0272 0.3210.459
0.0116
0.111 0.00968 0.0385 0.0269
0.0582
0.0252
0.0246
0.000248 0.136
0.107
0.0625 0.00967 0.0293 0.0576 0.119 0.156
0.0383 0.012
0.0173 0.131 0.589
0.0348 0.01450.0235 0.145
0.0343 0.0155
0.0179
0.0174 0.0456
0.159
0.0343 0.0151
0.0142 0.172
0.03470.0138
0.0208 0.0346 31.69
0.185
0.0364 0.197
0.032
0.0598
0.2070.024
0.0564
0.109
0.0802 Load 10
0.0549
0.0386
0.0299
0.0237
0.0194
0.015
0.0142
0.0139
0.014
0.0133
TC1057-ENG-10004
Production PLEM Structural Design Report Page 42 of 118
Rev 0
0.505
0.499
0.716
0.715
0.00145
0.372
0.00704
0.0274 0.000934
0.00145 0.0983 0.00407
0.104 0.168
0.373 0.226
0.318 0.102 0.00143
0.0955 0.0947
0.00125
0.0272
0.00704 0.128
0.372
0.0301 0.0382
0.03570.0767
0.00101 0.23 0.1060.00127 0.0304 0.0637
0.0313
0.0315
0.00392
0.00143 0.0248
0.0251 0.0517
0.0284
0.0293
0.0743 0.4870.628
0.0515
0.06190.118 0.167 0.0524 0.387
0.0510.102 0.132
0.144 0.0493
0.04450.08630.154
0.156 0.0506
0.04490.0707 0.321 0.0511
0.131 0.0451 0.0558 0.0482
0.398
0.0446 0.00456 0.0497
0.0444
0.0454 0.0174 0.0219
0.0162
0.0659
0.04540.0146 0.01990.0174
0.0183
0.04590.01430.0177 0.0892
0.0144
0.000248 0.253 0.00104
0.386 0.0633 0.114 0.405
0.0911
0.0806 0.319
0.137 0.14
0.105 0.213 0.0632 0.123
0.0912
0.178 0.0218
0.03690.285 0.312
0.131 0.0581
0.0804 0.67
0.0363
0.131 0.0935
0.08410.218
0.000617 0.0686
0.0557
0.0451 0.202
0.145 0.228 0.035
0.0345 0.255 0.186
0.038
0.041
0.0459 0.631 0.169
0.148 0.154
0.016
0.0181
0.5 0.106
0.135 0.014
0.0173
0.015
0.0259 0.139
0.166 0.1190.127 0.0153
0.012
0.0104
0.0146
0.111 0.407
0.00955
0.00145
0.00953
0.00608
0.0101
0.0128 0.5 0.112
0.183 0.0173 0.407
0.512 0.103
0.122 0.716 0.18 0.0865
0.164
0.5 0.082 0.404
0.00217 0.0733
0.0107 0.00193
0.2450.715 0.1540.13
0.00145 0.185 0.154
0.0627 0.179
0.186 0.0127 0.0738 0.0106
0.0109
0.011
0.0117
0.1730.0841
0.0947 0.0147
0.0177
0.0204
0.0235
0.0314
0.0504 0.0109
0.0601 0.00143 0.0852 0.0606
0.0731
0.0961 0.0112
0.36
0.0875
0.00217 0.403
0.08160.09
0.0893 0.0916
0.0201 0.096 0.0156
0.0107 0.167 0.187 0.0578
0.0595 0.0711
0.0628
0.111 0.0606
0.0601
0.0359
0.0279 0.0208
0.00193
0.0127 0.0229
0.0203
0.0173
0.0144
0.0114
0.0114
0.0117 0.0013
0.0687 0.0928 0.0264
0.0114
0.001430.358 0.012 0.0602 0.158 0.0952 0.0319
0.0509
0.329 0.55 0.0972
0.0124 0.244
0.368 0.0958 0.0368
0.0172 0.0516
0.000617 0.221
0.0529 0.148
0.187 0.0977 0.0419
0.522
0.0229 0.06 0.158
0.131 0.0989 0.0468
0.02930.324 0.0622 0.868 0.107
0.0047
0.09580.11 0.0515
0.0357 0.0648 0.0588 0.0844
0.083
0.0809
0.0819 0.000249
0.0204
0.021
0.0225
0.0818
0.0986 0.166
0.112 0.0236
0.0296
00.0348
.04
0.0469
0.836 0.388 0.0659
0.0416 0.00608 0.102
0.101
0.0962
0.0807 0.04220.146 0.0552
0.0661
0.0698 0.0516
0.00191 0.0673
0.0477 0.000248 0.0748
0.079 0.04440.0569 0.041
0.00212
0.00471
0.05420.154
0.00915
0.0181
0.156
0.0947
0.0822
0.0478 0.00104
0.0498
0.00401 0.0604
0.0355 0.0717
0.0614
0.186
0.0533
0.0449
0.0363
0.0334
0.112
0.033 0.0381 0.05280.0385 0.0301
0.0305 0.0567
0.0318
0.106
0.0346 0.0297
0.641
0.00594 0.0249 0.0197
0.0609
0.027 0.0265
0.0646
0.00790.01111.69 0.0252
0.00547
0.0069
0.00918 0.0122
0.00783
0.0089
0.00989 0.0684
0.00387 0.011
0.0117 0.0122
0.011 0.0116 0.0115
0.0121
0.012
0.0119
0.00988 3 0.0234 0.0139
0.0118
0.0108 0.0723
0.0186 0.0144
0.0175
0.0203
0.0232
0.0286
0.0372
0.0094
0.00879
0.00537 0.0408
0.0248
0.0182
0.003740.0019 0.02650.0241 0.0151
0.015 Load 10
0.0038 0.0298 0.0159
0.0165
0.018
0.00384
0.00392
0.00501 0.0223
0.0352
0.0371
0.0327
0.0103
0.00402
0.00929
0.00894 0.0232
0.0169
0.0125
0.00896
TC1057-ENG-10004
Production PLEM Structural Design Report Page 43 of 118
Rev 0
0.517
0.826 0.545
0.379
0.824
0.00174 0.58
0.00222 0.0204
0.0906 0.324 0.5
0.00103
0.0037 0.114 0.018
0.0745
0.0167
0.271
0.183 0.0605 0.0182
0.00716
0.0241 0.0571 0.0205
0.441 0.0586 0.0195
0.0983 0.0555
0.108 0.0571 0.0165 0.302
0.02110.00177 0.00104
0.00222 0.0579 0.0249
0.0258
0.00452
0.0547 0.169 0.089
0.353
0.0993 0.0562 0.1620.119
0.149 0.074
0.011
0.141
0.0723 0.528 0.0607
0.184 0.1290.0123
0.165
0.00222 0.0546
0.0128 0.0547
0.449 0.0989
0.443
0.0979
0.113 0.0174
0.0249 0.2730.0192 0.0545
0.128 0.019
0.0948
0.00716 0.0186 0.0537
0.0740.1580.292 0.004 0.01440.0544
0.001150.206
0.0999 0.0543
0.0139 0.271
0.0513 0.190.0886
0.0549
0.0134
0.363 0.206
0.00222 0.175 0.0736
0.000248
0.0356 0.168 0.15 0.159 0.0591
0.0721
0.0940.146
0.0144
0.0175
0.0463
0.0348
0.133
0.0429 0.0949
0.0181
0.0818 0.0231
0.0203 0.031
0.115 0.0387
0.123 0.0387
0.123 0.124 0.0227 0.0594
0.0927
0.212 0.18
0.101 0.0175
0.0144 0.0992
0.581 0.153
0.0862 0.371
0.0254 0.189
0.353 0.00805 0.0886 0.01330.162
0.0082
0.571
0.00826
0.0082 0.468
0.00915 0.138
0.0144
0.0163
0.0111
0.0128
0.0084 0.127
0.0177
0.0148
0.0789
0.0182
0.0267 0.117
0.0182
0.473 0.0122 0.0494
0.168
0.149 0.106
0.144 0.0162
0.409 0.00614
0.119 0.169
0.124
0.02030.111 0.15 0.0807
0.000614 0.02480.113 0.125
0.2920.149 0.0711
0.531 0.144 0.36
0.291 0.03070.122 0.153
0.683 0.03670.131 0.154 0.07
0.527 0.135 0.148 0.00104
0.00222 0.357 0.0198
0.04220.143 0.118
0.0686
0.00193 0.0482 0.11
0.00466
0.0493
0.0126 0.142 0.2510.000248
0.0213 0.146
0.667
0.0218 0.0406
0.11
0.0366
0.0317
0.0233
0.0489 0.146
0.0237
0.02930.134 0.186
0.409 0.0267
0.0966
0.0221
0.018
0.00716
0.1120.302
0.00895 0.246 0.0358
0.159 0.107
0.0431
0.247
0.051 0.09450.0179
0.0182
0.0177
0.0853 0.140.243 0.0393 0.06030.12
0.00133
0.0719
0.197 0.0952 0.0182
0.397 0.17
0.169 0.181
0.1730.099 0.112 0.0936
0.263 0.539
0.169
0.185
0.212
0.24 0.6460.0793 0.132 0.0184
0.277 0.685 0.139 0.101
0.00222 0.680.4360.529 0.02990.0673 0.137 0.102 0.0261
0.0957 0.2
0.295 0.406
0.02120.0523 0.132 0.105 0.0336
0.147 0.0418 0.113 0.0422
0.159 0.10.109 0.0507
0.175 0.0126
0.194
0.00222 0.481 0.0318 0.111
0.122
0.000248
0.308
0.214
0.011 0.024 0.135 0.0595
0.673 0.235
0.0115
0.0115 0.0188
0.00614
0.255 0.0305
0.0141 0.109 0.0683
0.08470.0951 0.0192
0.276
0.024 0.0207
0.0483
0.0241 0.0978
0.0876
0.0529
0.601 0.0093 0.0331
0.294
0.0483
0.0726
0.085 0.291
0.0213 0.0773
0.077
0.0684
0.0601
0.424
0.00716 0.0126
0.31
0.000614 0.352 0.160.0197
0.11 0.0191
0.0116
0.0525
0.04480.0444
0.0849
0.0369
0.0316
0.097
0.895 0.00193 0.0876 0.00591 0.0624
0.0413
0.0388
0.0262 0.0479
0.0536 0.0132
0.0103
0.015
0.00222 0.0512 0.0148
0.01640.03420.0173
0.0506
0.329 0.0182
0.0191
0.0506
0.4550.576 0.0174
0.0514
0.0275 0.0356
0.0106
0.04360.00866
0.0557
0.137 0.0562
0.091
0.0763
0.183 0.03890.162
0.104
0.1230.00849
0.671 0.04890.0637
0.0382
0.0267
0.0274
0.0305 Load 10
0.0303
0.0366
0.0475
1.72 0.0582 0.0226
0.0217
0.0212
0.0213
0.0212
3
TC1057-ENG-10004
Production PLEM Structural Design Report Page 44 of 118
Rev 0
0.113
0.142 0.122
0.307
0.1860.227
0.0413 0.135
0.143
0.194 0.000567
0.00231
0.0183
0.0256
0.0194
0.024
0.0203
0.021 0.0209
0.00228
0.0215
0.0218 0.0254
0.0507
0.11 0.0219
0.0217 0.0286
0.0416
0.0367
0.0386
0.035 0.0215
0.112
0.0213 0.0284
0.0276
0.000567 0.0312
0.0277 0.0329
0.0277 7.69e-005
0.0413
0.0472 0.00371 0.0229
0.00312
0.0244 0.0668
0.00369 0.0236
0.04880.0415 0.0365
0.000574 0.0268
0.00228
0.00344
0.0368
0.0174 0.00256 0.0204
0.0498 0.0405
0.0515 0.0303
0.0107 0.0295
0.0246
0.00262
0.00353
0.00237
0.002
0.00494
0.00178 0.0144 0.00256
0.0039 0.017
0.0509
0.015 0.0557 0.0289
4
0.0204 0.0256
0.0262
0.0062 0.001620.0168
0.00123
0.00198
0.00393 0.00312
0.0232
0.00274 0.0167 0.0566 0.0267
0.00209
0.0266
0.0071
0.00788 0.0215
0.00624
0.00878
0.0415 0.00242
0.0284
0.00213 0.0182 0.0548 0.0148
0.032
0.00219
0.0447
0.01350.0261
0.0258 0.06
0.00837 0.193
0.0399
0.185 0.00287
0.0176
0.00409 0.0348
0.0381 0.0455 0.02510.0201
0.0418
0.0094 0.0318
0.0102 0.0347
0.002340.166 0.102 0.0324
0.00475
0.0173
0.0279
0.00617 0.0469 0.0103
0.0238
0.0485
0.0225
0.0124 0.0358
0.0152 0.0349 0.197 0.0599 0.0267 0.0274
0.00565
0.0272
0.0185 0.00209
0.0567
0.0486
0.0227
0.024
0.00858
0.0188
0.0244 0.0363
0.0354 0.214
0.213 0.0237 0.08310.058
0.0201 0.0519
0.0308
0.002770.0374
0.0437
0.0141 0.0322
0.028
0.0493 0.196 0.0215 0.03230.0594 0.02710.0417
5
0.0565
7.7e-005 0.0519
0.0719
0.0512
0.185
0.22
0.0643
0.0737
0.001540.00996
0.0233 0.189 0.1360.1860.22 0.0201
0.0168
0.224 0.0514 0.0106
0.0222
0.00203 0.0189 0.19
0.006530.224 0.142 0.0445 0.00261
0.0205
0.0608
0.0163 0.0474
0.0145 0.016
0.00842 0.0135 0.00353 0.235 0.04890.0133
0.0525
0.0115
0.011
0.00989 0.0903
0.136 0.0247
0.00371
0.0106
0.00683
0.0103
0.0101 0.0113 0.00355 0.237 0.0376
0.0383
0.141 0.00841
0.0472
0.00681
0.00651 0.0451 0.01330.00209
0.0106
0.012
0.00645 0.0126
0.00235
0.0151
0.0206 0.00656
0.00447 0.226
0.188 0.165
0.0403 0.00619
0.00622 0.0402
0.0557 0.00219
0.000531
0.0192
0.036
0.0248
0.00624 0.005
0.00968 0.252 0.201 0.0409
0.00124
0.0404 0.00665 0.00579 0.0447
0.0261
0.01410.00499
0.00484 0.0378
0.19
0.0342
0.084 0.008150.026
0.00615
0.0128
0.00950.0064
0.00502 0.0779
0.203 0.0513
0.141 0.00986
0.0119 0.00209
0.00602
0.0159 0.0717
0.0041
0.007660.00334 0.0148
0.138
0.0222
0.0939
0.0116
0.0112
0.0221
0.00522 0.0104 0.0155 0.268
0.006270.00247
0.00143 0.000837
0.0190.0871
0.00917
0.006790.0191
0.00477
0.0804 0.0367
0.04370.0194
0.0219 0.0723
0.006810.00165
0.00796 0.0149
0.0121
0.307
0.00151 0.00437
0.00434
0.0245
0.0751
0.03090.00449 0.000312
0.00955 0.0094
0.00142
0.00261
0.00697 0.025
0.144 7.7e-005
0.0709
0.0238
0.1790.0855
0.00209 0.07750.103
0.01090.00191
0.0054 0.00162 0.0673
0.0214
0.0645
0.00505
0.0157
0.0059
0.027
0.0214 0.0115
0.0177 0.0627 0.121
0.0237
0.0205
0.0203
0.0195
0.0171 0.0319 0.253
0.0612
0.0131 0.0618
0.0187
0.0143 0.0843 0.0788
0.0186
0.0114
0.00981
0.0182
0.00209
0.00949
0.0186
0.00861
0.00918 0.231 0.034 0.154
0.0084 0.0188
0.0193
0.18 0.0222
0.623 0.0616
0.0236
0.0479 0.196 0.321
0.044
0.0571 0.1090.253
0.954
0.000312 0.217
0.443
0.0368 0.00518
0.073
0.0571
0.037 0.264
0.585 0.0115 0.00209
0.00162
0.000837
1.57
3 0.00209
TC1057-ENG-10004
Production PLEM Structural Design Report Page 45 of 118
Rev 0
0.307
0.1860.227
0.135
0.194 0.000567
TC1057-ENG-10004
Production PLEM Structural Design Report Page 46 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 47 of 118
Rev 0
Loading Description
O-1 Structure Self Weight
O-2 Pigging Jumper Loads-Near
O-3 Pigging Jumper Loads-Far
O-4 Well Jumper-Near
O-5 Well Jumper-Far
O-6 MeOH Flying Lead Unitech Connector Loads
O-7 J-Plate Flying Lead Oceaneering Loads (SFL)
O-8 Electrical Flying Lead Loads (EFL)
O-9 ROV Torque Tool Loads
O-10 Freespan Loads
Table 5-10: Operation Load Cases
TC1057-ENG-10004
Production PLEM Structural Design Report Page 48 of 118
Rev 0
MY MZ
FX FY FZ MX
Load Kip ft [kN Kip ft [kN
Kip [kN] Kip [kN] Kip [kN] Kip ft [kN m]
m] m]
Pigging
-1.9 -3.9 2.9 64.5 -42 42
Jumpernear
-8.5 -17.5 13.1 87.5 -57 57
(O2)
Pigging
-1.9 -3.6 -2.9 -53.8 -42 42
JumperFar
-8.5 -16.2 -12.8 -73 -57 57
(O3)
WellJumper
-1.4 -4.4 -1.5 -23.7 30.7 11.8
Near
-6.4 -19.7 -6.7 -32.1 41.6 16
(O4)
WellJumper
-1.4 -3.8 1.8 19.3 31 11.8
Far
-6.4 -16.7 7.9 26.1 42 16
(O5)
MeOHFL -0.1 0.1 0.4 0
-- --
(O6) -0.3 0.2 0.5 0
HFL -0.6 -0.5 -3.9 0
-- --
(O-7) -2.6 -2.3 -5.2 0
EFL -0.1 -0.1 -0.4 0
-- --
(O-8) -0.3 -0.2 -0.5 0
ROV 0.9 -0.2 -1.1 1.2 4.5
--
(O-9) 3.8 -1 -5.1 1.6 6.1
Freespan -6.1 -1.8 17.8
-- -- --
(O-10) -27 -8.1 24.1
Table 5-12: Operational Loads
5.5.3 Results
The results show that PLEMs are adequately designed for operational load cases. Figures
below show the highest stressed members highlighted in red. For detailed STAAD analysis
report see Attachment 4
TC1057-ENG-10004
Production PLEM Structural Design Report Page 49 of 118
Rev 0
0.000141
0.0403
0.0207
0.0461 0.0207
0.000141
0.04
0.000957
0.0804
0.0713
0.0732 0.153
0.117
0.152
0.0655
0.0603
0.0563 0.141
0.127 0.0377
0.103
0.0416
0.0429
0.0431 0.0166
0.0527 0.0628 0.11
0.123
0.0433
0.0606 0.0426
0.047 0.0391 0.0137 0.0529 0.135
0.141 0.119
0.10.0794 0.0576
0.0675 0.0411 0.0145
0.302 0.0393 0.15
0.0239 0.145 0.223 0.121
0.121 0.0766
0.0855 0.0442 0.0196 0.0376 1.75e-005
0.247
0.252 0.0459 0.135 0.0523
0.142
0.166 0.102
0.0496
0.128 0.0441 0.236 0.0357
0.19 0.0413
0.0806
0.0393 0.226 0.0369
0.0126 0.241 0.18
0.212
0.205 0.0408
0.041 0.0151
0.0668 0.00464
0.224 0.0364 0.23 0.124 0.0148
0.146
0.205 0.0389
0.05130.609
0.21
0.213
0.218 0.0356
0.0324
0.0476 0.048 0.0114
0.0707 0.044
0.0194
0.0479 0.238
0.00815 0.517 0.124 0.0145
0.0229 0.301 0.224
0.23 0.0531 0.051 0.021
0.0461 0.00404
0.056 0.306 0.486 0.0968
0.0266 0.238
0.247 0.0573
0.124
1.75e-005 0.0405 0.0245 0.265
0.000733
0.06630.0267 0.000947
0.105
0.0972 0.0593 0.2580.0726
0.0481 0.107 0.033 0.0149 0.0402
0.0856
0.00823 0.404 0.17
0.2 0.0349 0.0433 0.288 0.013 0.0792 0.26
0.0736
0.0692 0.0856 0.169
0.15
0.18
0.116
0.175 0.0299
0.0639 0.163
0.0473 0.0587 0.02970.0108
0.066 0.255 0.139
0.141
0.182
0.192 0.0232 0.0931 0.0635
0.000733 0.335 0.159
0.0860.223 0.0189 0.104 0.0461 0.0303
0.0524 0.246 0.251 0.188 0.176
0.0377
0.260.0431
0.0149
0.04 0.0465 0.102 0.191
0.326 0.0641 0.0326 0.0415 0.04060.32 0.0612 0.278 0.197
0.295
0.208 0.303
0.07 0.317
0.0635 0.0248
0.17 0.05090.0611
0.0262 0.11 0.0703
0.0434
0.112 0.264
0.0664
0.0482
0.029
0.11 0.0291 0.062
0.0566
0.0536 0.0578 0.251
0.192
0.234
0.0615 0.0449 0.115 0.0536
0.0546 0.0467 0.0735 0.245
0.1 0.07920.02970.516 0.1060.0887 0.04150.000341
0.0475 0.0409
0.0365 0.252
0.204
0.0575 0.0602 0.0205 0.285
0.109 0.0435 0.0314
0.0258
0.149 0.0165 0.000492 0.0481
0.0529 0.023
0.0229 0.183
0.0461
0.246 0.0213 0.0955 0.0533
0.0855
0.0504 0.0223
0.0228
0.04550.0297 0.106
0.151 0.0875 0.023
0.0331 0.165 0.235
0.04760.0327 0.0346
0.218
0.02420.132 0.0441 0.143
0.322 0.106
0.034 0.0191 0.114
0.2790.1660.0974 0.0553
0.0668 0.14 0.0326
0.05860.0315
0.0274 0.0152
0.192
0.012 0.0818
0.236
0.067 0.0803
0.223
0.0856
0.0564 0.436
0.0103 0.167
0.0234
0.0143 0.1130.0548
0.0542 0.0936 0.129
0.107
0.0509
0.12 0.0148
0.0776
0.148 0.0234
0.0389 0.0623 0.119
0.0498
1.75e-005 0.171 0.00792
0.634
0.0717
0.000733
0.248 0.1390.000341
0.267 0.108 0.117
0.131 0.0193 0.085 0.256 0.0148
0.0696 0.104
0.0794
0.2480.289 0.104 0.0936
0.155 0.121
0.062
0.390.0497
0.226 0.0714
0.0406
0.429
0.203
0.0314 0.0497 0.204 0.158
0.000733 0.573 0.0299
0.18
0.03 0.152
0.0302 0.254 0.191 0.3240.00312
0.0284
0.157 8.39e-005 0.0595
0.135 0.305
0.602 0.113 0.3580.208
0.0922 0.134 0.117 0.0528 0.000733
0.288 0.0735
0.15 0.00375
0.569 0.279 0.107
0.211 0.103 0.105 0.16 0.0923 0.000733
0.325 0.735
0.477
0.0244 8.39e-005 0.256 0.112 0.175 0.082
0.16
0.1330.0297 0.36 0.419
0.208
0.326 0.215
0.469
0.632
0.0545
0.631
0.254 0.000733
0.067
0.000733
TC1057-ENG-10004
Production PLEM Structural Design Report Page 50 of 118
Rev 0
6.1.2 Models
The global analysis is performed using ANSYS APDL to model the structural members and
plates. Specific detailed analysis is performed using hand calculations.
6.1.3 Assumptions
Analyses assumptions are taken from the design basis, Ref [C1]. The following
assumptions are taken for design and analysis purposes of this structure:
Mud will not be covering sliding rails;
It will be necessary to re-position the mudmat
6.2 INSTALLATION ANALYSIS
The mudmat undergoes the following lifting orientations (Ref C12):
Splash zone at 60 degrees from horizontal
First sacrificial sling cut, mudmat to 30 degrees from horizontal
Touchdown on seabed at 30 degrees
Second sacrificial sling cut, mudmat level on seabed
Reposition/reposition
TC1057-ENG-10004
Production PLEM Structural Design Report Page 51 of 118
Rev 0
Before installation, the mudmat must also withstand the following scenarios:
Shop handling, upending
Shop handling, hanging
Initiation of 60 degree lift
Of these, the initiation of the 60 degree lift is the most onerous for the padeye to which
the sacrificial slings are attached.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 52 of 118
Rev 0
Twolines
W
W
Figure 6-2: Initiation of Shop Lift, left, and Vertical Hanging
Oneline
(sacrificialline)
W
Figure 6-3: Initiation of 60 degree lift
TC1057-ENG-10004
Production PLEM Structural Design Report Page 53 of 118
Rev 0
Deflection, Allowable
Analysis Max UR Location
in [mm] Stress
Lifting Analysis-Shop
11.8 [300] 0.6Fy 0.83 Skirt Bulkhead
Handling Horizontal
Lifting Analysis-Shop Handling eye base coped
0.6 [15.2] 0.6Fy 0.44
Handling Vertical into bulkhead
Lifting Analysis-Upending
1.5 [38.1] 0.6Fy 0.80 Skirt Bulkhead
to 60 degrees
Lifting Analysis-Splash
0.7 [17.8] 0.6Fy 0.31 Skirt Bulkhead
Zone @ 60 degrees
Lifting Analysis-Pre
1.0 [25.4] 0.6Fy 0.50 Skirt Bulkhead
Touchdown @ 30 degrees
Lifting Analysis-
0.3 [7.62] 0.75Fy 0.56 Edge Skirt Side Plates
Touchdown @30 degrees
Lifting Analysis-
0.9 [22.9] 0.6Fy 0.61 Skirt Bulkhead
Recovery/Reposition
*The deflection of the mudmat in the shop handling-upending occurs because flat structures without diagonal
reinforcement are very flexible in torsion
Table 6-2: Utilization Ratios and Deflections of Mudmat Plates-Stress
TC1057-ENG-10004
Production PLEM Structural Design Report Page 54 of 118
Rev 0
Stress plots for the various lifting load cases are shown in the following figures.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 55 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 56 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 57 of 118
Rev 0
Figure 6-11: Lifting Analysis-Touchdown @30 degrees, Stress on Landing End, DAF =2
TC1057-ENG-10004
Production PLEM Structural Design Report Page 58 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 59 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 60 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 61 of 118
Rev 0
6.3.3 Results
The results of mattress load case are shown in Table 6-4. Stress criteria are 0.6Fy along
the bottom edges of the bulkheads.
Structural
Total Deflection
Placement Deflection Location Max UR
in [mm]
in [mm]
Transverse 5.9 [150] 0.64 [16.3] Skirt Bulkhead 0.64
Longitudinal 5.9 [150] 0.49 [12.4] Skirt Bulkhead 0.36
Table 6-4: Results of Mattress Placement Analysis
TC1057-ENG-10004
Production PLEM Structural Design Report Page 62 of 118
Rev 0
6.4 OPERATION
The mudmat carries the loads from the feet of the PLEM into the foundation, prevents the
PLEM from sinking into the soil, and provides a smooth surface for the PLEM to slide
without the soil preventing lateral motion. The loads come from the self-weight, jumpers,
flying leads and freespan pipeline load.
6.4.1 Model and Assumptions
The structure is assumed to be supported on an elastic foundation provided by the soil. A
soil foundation modulus was computed from the settlement and foundation pressure
values provided in the geotechnical design report, Ref [C6].
6.4.2 Loads and Load Combinations
The entire structure is modeled and checked. The mudmat was checked with the PLEM in
four different locations. The most highly loaded foot was placed on locations that were
chosen by inspection to produce the highest stresses in the top plate and bulkheads.
6.4.3 Results
The analysis results show that the mudmat is adequately designed for the operational
loads. For detailed analysis results are given below.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 63 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 64 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 65 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 66 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 67 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 68 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 69 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 70 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 71 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 72 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 73 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 74 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 75 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 76 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 77 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 78 of 118
Rev 0
The piping design is in compliance with ASME, Ref [E12] and API, Ref [E10]. CAESAR II
version 2011 is used to perform piping stress analysis according to ASME, Ref [E12]. Pipe
collapse and buckling check for external hydrostatic pressure is done with MathCAD
version 15 in accordance with API, Ref [E10].
Piping stress analysis results for the most severe load cases are presented inTable 7-1.
The maximum code stresses per ASME, Ref [E12] allowable stresses, and stress ratios are
listed. The piping design also passes the external pressure check per API, Ref [E10], as
presented in Attachment 5. It is concluded that the PLEM piping is adequately designed to
sustain all temporary and in-place loads.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 79 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 80 of 118
Rev 0
Static analysis is performed for the PLEM piping analysis. Dynamic load occurred during
offshore installation is modeled as equivalent static force. The PLEM piping is protected by
the structural frame, therefore, accidental load is not considered. The dynamic fatigue
effect of the piping is minor and can be neglected. The boundary conditions at the piping /
frame interfaces are assigned as follows:
Description DX DY DZ RX RY RZ
Anchor 263 71.5
Fixed Fixed Fixed Fixed
forging kN/mm kN*m/deg
6.625 Pipe 71.6 kN/mm
Released Released Released Released Released
Support +Y only
2.375 Pipe
Released +DY Released Fixed Released Released Released
Support
CVC Hub
Fixed 219 kN/mm Fixed Fixed Fixed Fixed
(Branch line)
CVC Hub
Fixed 219 kN/mm Fixed Fixed Fixed Fixed
(Pigging)
Table 7-3: Piping Restraints Summary
TC1057-ENG-10004
Production PLEM Structural Design Report Page 81 of 118
Rev 0
Load Cases
Load Offshore Offshore
Installation Operating
Hydrotest Lift
Piping Weight X X X X
Fluid/Gas Weight X
Water Weight X X X
Lifting (DAF = 2) X
Hydrotest Pressure X
Design Pressure X
Hydrostatic Pressure X
Design Temperature X
Corrosion X
Freespan Loads X
Jumper Loads X
Installation Loads X
Table 7-4: Production PLEM Piping Analysis Load Matrix
MX MY MZ
FX FY FZ
Load Kip*ft Kip*ft Kip*ft
Kip [kN] Kip [kN] Kip [kN]
[kN*m] [kN*m] [kN*m]
Well 1.4 3.8 1.8 19.3 31.0 11.8
Jumper [6.4] [16.7] [7.9] [26.1] [42] [16]
Pigging 1.9 3.6 2.9 53.8 42.0 42.0
Jumper [8.5] [16.2] [12.8] [73] [57] [57]
6.1 0 0 0 0 17.8
Freespan
[275] [0] [0] [0] [0] [24.1]
Table 7-5: Operational Piping Loads
The worst case installation loads for the piping occur at Stage 1, maximum bending, and
are shown below.
Pipe Tension Pipe Shear Pipe Bending
Load
Kip [kN] Kip [kN] Kip*ft [kN*m]
Installation 117.8 [524] 10.3 [46] 88.5 [120]
Table 7-6: Stage 1, Max. Bending Piping Loads
TC1057-ENG-10004
Production PLEM Structural Design Report Page 82 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 83 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 84 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 85 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 86 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 87 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 88 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 89 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 90 of 118
Rev 0
Location X Y Z RX RY RZ
A 0 0 0 Free Free Free
B Free 0 0 Free Free Free
C 0 0 0 0 0 Free
D 0 0 0 0 0 Free
Table 8-3: Constraint Conditions for the PLEM
TC1057-ENG-10004
Production PLEM Structural Design Report Page 91 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 92 of 118
Rev 0
Actual Allowable
Analysis Max UR
[ksi] [ksi]
Hoop 38.6 46.8 0.83
Longitudinal 35.6 52.0 0.69
Combined 42.5 58.5 0.73
Table 8-6: Operational Anchor Forging results
TC1057-ENG-10004
Production PLEM Structural Design Report Page 93 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 94 of 118
Rev 0
8.3.2 Hydrotest
Hydrotest will include onshore hydrotest and offshore hydrotest. During offshore hydrotest
anchor forging will withstand free span loads due to flow line. Therefore only offshore
hydrotest has been analyzed.
The results show that the anchor forging is adequately designed for the hydrotest loads.
Actual Allowable
Analysis Max UR
[ksi] [ksi]
Hoop 48.2 62.0 0.78
Longitudinal 40.4 62.0 0.65
Combined 52.5 62.0 0.85
Table 8-7: Hydrotest Anchor Forging results
TC1057-ENG-10004
Production PLEM Structural Design Report Page 95 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 96 of 118
Rev 0
8.3.3 Installation
Table 8-8 summarizes the combined stress at different installation stages. The results
show that the highest combined stress only occurs in Maximum Bending Moment stage.
The maximum combined stress value of 74.8 ksi (516 MPa) has exceeded the allowable
combine stress and is not within yield strength of 65 ksi (448 MPa). Therefore, the stress
linearization method is applied to evaluate local membrane stress and local bending stress
according to Ref [E14].
Figure 8-12 and Figure 8-13 show that the local area above allowable is only 0.3 inch away
from the end of anchor forging. Therefore the stress classification lines (SCL) is located
right next to this area (shown on Figure Figure 8-14). This area is the designated weld
area between pup piece and anchor forging. Table 8-9 and Table 8-10 summarize the local
membrane and local membrane plus bending stress at Maximum Bending Moment Stage 2.
Both local membrane and local membrane plus bending stress are within allowable.
Allowable Local
PLEM WD = Anchor Forging
Max Stress Membrane Plus Bending Max UR
650
Stress, SPL
m (2133 ft)
MPa ksi MPa ksi -
Stage 2, max
508.6 73.8 607.5 88.1 0.84
bending moment
TC1057-ENG-10004
Production PLEM Structural Design Report Page 97 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 98 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 99 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 100 of 118
Rev 0
Description Value
Design Load 25.6 [11.6]
Safe Working Load (SWL) 12.8 [5.8]
Shackle Size 29.8 [13.5]
Table 9-1: Padeye Capacity
TC1057-ENG-10004
Production PLEM Structural Design Report Page 101 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 102 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 103 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 104 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 105 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 106 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 107 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 108 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 109 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 110 of 118
Rev 0
Table 9-6 shows the maximum vertical deflections experienced by the structure. The
deflections have been checked for clashing with critical components and the deflections will
not affect serviceability.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 111 of 118
Rev 0
Value
Location
in [mm]
C8x18.75 0.27 [6.9]
W4x13 0.35 [8.9]
W8x28 0.16 [4.1]
Top plate 0.09 [2.3]
Valve plate 0.57 [14.5]
Table 9-6: Maximum Dropped Object Deflections
TC1057-ENG-10004
Production PLEM Structural Design Report Page 112 of 118
Rev 0
Max
Analysis Allowable Location
UR
Stage 2 max moment 0.66Fy 0.64 W16x57, V beam
0.66Fy 0.87 Plate under anchor forging
Stage 2 max moment, 90 deg 0.75Fy 0.89 W16x57, V beam
0.66Fy 0.46 Front plate of anchor forging
Table 9-7: Anchor Forging Structural Results
As seen in Table Table 9-7, one local portion of the forging has an allowable stress of
0.75Fy. This is because the stress is due to weal axis bending, and the section is the weak
axis of an I-beam.
TC1057-ENG-10004
Production PLEM Structural Design Report Page 113 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 114 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 115 of 118
Rev 0
TC1057-ENG-10004
Production PLEM Structural Design Report Page 116 of 118
Rev 0
Value
Description
Kip [Te]
Design Load 39.2 [17.8]
Safe Working Load (SWL) 19.6 [8.9]
Shackle Size 26.5 [12.0]
Table 10-1: Mudmat Padeye 1 Capacity
Value
Description
Kip [Te]
Design Load 27.8 [12.6]
Safe Working Load (SWL) 13.9 [6.3]
Shackle Size 26.5 [12.0]
Table 10-2: Mudmat Padeye 2 Capacity
TC1057-ENG-10004
Production PLEM Structural Design Report Page 117 of 118
Rev 0
Value
Description
Kip [Te]
Design Load 37.7 [17.1]
Safe Working Load (SWL) 18.7 [8.5]
Shackle Size 26.5 [12.0]
Table 10-3: Mudmat Handling Padeye Capacity
TC1057-ENG-10004
Production PLEM Structural Design Report Page 118 of 118
Rev 0
11.2 PLEM A
Weights for different configurations of PLEM A are shown in Table 11-3Table 11-2. Detailed
weight control and COG locations are provided in Attachment 15.
Caps Buoyancy A/R yoke
Weight
Included? Yoke Included?
Kip [Te]
Included?
Y N N 31.8 [14.43]
Y N Y 35.8 [16.25]
Y Y Y 36.6 [16.60]
N N Y 31.8 [14.42]
Table 11-2: PLEM A Weights
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
20 degree installation into PHS
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
308 0.200 - - - - -
318 0.200 - 0.200 - - -
331 - - 0.200 - - -
4621 Fixed Fixed Fixed - - -
4622 Fixed Fixed Fixed - - -
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
1 of 28
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Y
X
Z Load 10
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
2 of 28
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Min FX 4622 1000:LA_1CAT -0.507 21.613 -0.000 0.000 0.000 0.000
Max FY 4622 1000:LA_1CAT -0.507 21.613 -0.000 0.000 0.000 0.000
Min FY 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Max FZ 331 1000:LA_1CAT 0.000 0.000 0.001 0.000 0.000 0.000
Min FZ 318 1000:LA_1CAT 0.506 0.000 -0.001 0.000 0.000 0.000
Max MX 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Min MX 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Max MY 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Min MY 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Max MZ 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Min MZ 308 1000:LA_1CAT 0.507 0.000 0.000 0.000 0.000 0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.000 1.000 0.000 SHEAR -Y 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.001 1.000 0.001 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.034 1.000 0.034 AISC- H2-1 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.132 1.000 0.132 AISC- H2-1 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.060 1.000 0.060 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.057 1.000 0.057 AISC- H2-1 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.072 1.000 0.072 AISC- H2-1 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.055 1.000 0.055 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.091 1.000 0.091 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.178 1.000 0.178 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.107 1.000 0.107 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.061 1.000 0.061 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.155 1.000 0.155 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.074 1.000 0.074 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.111 1.000 0.111 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.134 1.000 0.134 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.115 1.000 0.115 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.003 1.000 0.003 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.075 1.000 0.075 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.082 1.000 0.082 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.083 1.000 0.083 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
3 of 28
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
4 of 28
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
5 of 28
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
6 of 28
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
7 of 28
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
8 of 28
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
9 of 28
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
10 of 28
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
11 of 28
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
12 of 28
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
13 of 28
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:19 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
14 of 28
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Horizontal lifting
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Combination 1000 LA_1CAT_API_DYN
Combination 2000 LA_2CAT_API_STAT
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
308 0.200 - - - - -
318 0.200 - 0.200 - - -
331 - - 0.200 - - -
4621 Fixed Fixed Fixed - - -
4622 Fixed Fixed Fixed - - -
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
15 of 28
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
Y
X
Z Load 10
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
16 of 28
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 318 40:DW_ARYOK 0.216 0.000 -0.000 0.000 0.000 0.000
Min FX 4622 40:DW_ARYOK -0.216 0.946 -0.000 0.000 0.000 0.000
Max FY 4622 1000:LA_1CAT -0.005 21.614 -0.000 0.000 0.000 0.000
Min FY 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Max FZ 318 1000:LA_1CAT 0.011 0.000 0.002 0.000 0.000 0.000
Min FZ 331 1000:LA_1CAT 0.000 0.000 -0.002 0.000 0.000 0.000
Max MX 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Min MX 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Max MY 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Min MY 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Max MZ 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Min MZ 308 10:DW_PIPING -0.146 0.000 0.000 0.000 0.000 0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.000 1.000 0.000 SHEAR -Y 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.001 1.000 0.001 AISC- H1-3 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.041 1.000 0.041 AISC- H2-1 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.110 1.000 0.110 AISC- H2-1 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.110 1.000 0.110 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.057 1.000 0.057 AISC- H2-1 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.068 1.000 0.068 AISC- H2-1 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.085 1.000 0.085 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.077 1.000 0.077 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.157 1.000 0.157 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.157 1.000 0.157 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.100 1.000 0.100 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.101 1.000 0.101 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.083 1.000 0.083 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.119 1.000 0.119 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.146 1.000 0.146 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.108 1.000 0.108 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.001 1.000 0.001 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.000 1.000 0.000 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.057 1.000 0.057 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.071 1.000 0.071 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.077 1.000 0.077 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
17 of 28
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
18 of 28
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
19 of 28
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
20 of 28
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
21 of 28
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
22 of 28
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
23 of 28
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
24 of 28
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
25 of 28
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
26 of 28
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
27 of 28
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:17 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
28 of 28
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
PHS vertical with laydown vessel accelerations, suspended from top bracket
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_X
Primary 70 LAT_AG_Z
Combination 1000 PHS_1
Combination 2000 PHS_2
Combination 3000 PHS_3
Combination 4000 PHS_4
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
355 Fixed - Fixed - - -
356 Fixed - Fixed - - -
357 Fixed Fixed Fixed - - -
358 Fixed - Fixed - - -
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
1 of 43
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_X
70 LAT_AG_Z
Y
X
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
2 of 43
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 357 1000:PHS_1 13.672 20.858 -2.432 0.000 0.000 0.000
Min FX 355 2000:PHS_2 -11.434 0.000 1.740 0.000 0.000 0.000
Max FY 357 1000:PHS_1 13.672 20.858 -2.432 0.000 0.000 0.000
Min FY 357 70:LAT_AG_Z 1.858 -0.000 -1.459 0.000 0.000 0.000
Max FZ 356 1000:PHS_1 3.396 0.000 3.603 0.000 0.000 0.000
Min FZ 357 4000:PHS_4 13.415 20.858 -3.069 0.000 0.000 0.000
Max MX 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Min MX 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Max MY 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Min MY 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Max MZ 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Min MZ 355 10:DW_PIPING -3.236 0.000 0.413 0.000 0.000 0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.000 1.000 0.000 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.000 1.000 0.000 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.050 1.000 0.050 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.099 1.000 0.099 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.085 1.000 0.085 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.039 1.000 0.039 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.037 1.000 0.037 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.043 1.000 0.043 AISC- H1-3 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.047 1.000 0.047 AISC- H1-3 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.070 1.000 0.070 AISC- H1-3 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.075 1.000 0.075 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.052 1.000 0.052 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.077 1.000 0.077 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.055 1.000 0.055 AISC- H1-3 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.041 1.000 0.041 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.061 1.000 0.061 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.109 1.000 0.109 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.003 1.000 0.003 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.021 1.000 0.021 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.021 1.000 0.021 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.029 1.000 0.029 AISC- H1-3 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
3 of 43
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
4 of 43
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
5 of 43
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
6 of 43
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
7 of 43
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
8 of 43
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
9 of 43
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
10 of 43
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
11 of 43
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
12 of 43
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
13 of 43
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:34 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
14 of 43
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
PHS ramp transportation acclerations
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_X
Primary 70 LAT_AG_Z
Combination 1000 PHS_1
Combination 2000 PHS_2
Combination 3000 PHS_3
Combination 4000 PHS_4
Combination 10000 PHS_10
Combination 20000 PHS_20
Combination 30000 PHS_30
Combination 40000 PHS_40
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 15
15 of 43
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
355 Fixed Fixed Fixed - - -
356 Fixed Fixed - - - -
357 - Fixed Fixed - - -
358 - Fixed - - - -
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_X
70 LAT_AG_Z
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 15
16 of 43
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Y
X
Z Load 10
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 15
17 of 43
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 355 1000:PHS_1 3.234 11.692 0.237 0.000 0.000 0.000
Min FX 356 60:LAT_AG_X -6.255 -3.003 0.000 0.000 0.000 0.000
Max FY 356 4000:PHS_4 -0.141 13.418 0.000 0.000 0.000 0.000
Min FY 357 70:LAT_AG_Z 2.409 -5.409 -6.210 0.000 0.000 0.000
Max FZ 355 3000:PHS_3 0.323 12.831 5.450 0.000 0.000 0.000
Min FZ 355 70:LAT_AG_Z 2.084 -3.251 -8.583 0.000 0.000 0.000
Max MX 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Min MX 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Max MY 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Min MY 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Max MZ 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Min MZ 355 10:DW_PIPING 0.136 2.646 0.059 0.000 0.000 0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.000 1.000 0.000 SHEAR -Y 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.001 1.000 0.001 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.062 1.000 0.062 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.096 1.000 0.096 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.047 1.000 0.047 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.054 1.000 0.054 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.072 1.000 0.072 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.070 1.000 0.070 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.057 1.000 0.057 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.121 1.000 0.121 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.083 1.000 0.083 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.056 1.000 0.056 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.054 1.000 0.054 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.084 1.000 0.084 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.106 1.000 0.106 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.122 1.000 0.122 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.096 1.000 0.096 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.003 1.000 0.003 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.035 1.000 0.035 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.042 1.000 0.042 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.046 1.000 0.046 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 15
18 of 43
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 15
19 of 43
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 15
20 of 43
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 15
21 of 43
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 15
22 of 43
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 15
23 of 43
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 15
24 of 43
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 15
25 of 43
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 15
26 of 43
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 15
27 of 43
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 15
28 of 43
Job No Sheet No Rev
15 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:36 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 15 of 15
29 of 43
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
PHS supported from bottoom brackets
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_X
Primary 70 LAT_AG_Z
Combination 1000 PHS_1
Combination 2000 PHS_2
Combination 3000 PHS_3
Combination 4000 PHS_4
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
355 Fixed Fixed Fixed - - -
356 Fixed Fixed - - - -
357 Fixed - Fixed - - -
358 Fixed - Fixed - - -
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
30 of 43
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_X
70 LAT_AG_Z
Y
X
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
31 of 43
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 357 70:LAT_AG_Z 5.955 0.000 -3.126 0.000 0.000 0.000
Min FX 358 70:LAT_AG_Z -5.955 0.000 -3.112 0.000 0.000 0.000
Max FY 356 3000:PHS_3 -2.179 10.600 0.000 0.000 0.000 0.000
Min FY 356 70:LAT_AG_Z -3.803 -0.480 0.000 0.000 0.000 0.000
Max FZ 355 3000:PHS_3 -4.081 9.962 2.307 0.000 0.000 0.000
Min FZ 355 70:LAT_AG_Z 3.803 0.480 -8.555 0.000 0.000 0.000
Max MX 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Min MX 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Max MY 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Min MY 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Max MZ 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Min MZ 355 10:DW_PIPING -1.217 2.819 0.066 0.000 0.000 0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.000 1.000 0.000 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.000 1.000 0.000 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.026 1.000 0.026 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.078 1.000 0.078 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.083 1.000 0.083 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.053 1.000 0.053 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.044 1.000 0.044 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.036 1.000 0.036 AISC- H1-3 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.041 1.000 0.041 AISC- H1-3 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.067 1.000 0.067 AISC- H1-3 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.081 1.000 0.081 AISC- H1-3 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.053 1.000 0.053 AISC- H1-3 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.043 1.000 0.043 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.021 1.000 0.021 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.031 1.000 0.031 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.042 1.000 0.042 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.088 1.000 0.088 AISC- H1-3 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.003 1.000 0.003 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.004 1.000 0.004 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.013 1.000 0.013 AISC- H1-3 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.023 1.000 0.023 AISC- H1-3 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.031 1.000 0.031 AISC- H1-3 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
32 of 43
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
33 of 43
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
34 of 43
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
35 of 43
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
36 of 43
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
37 of 43
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
38 of 43
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
39 of 43
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
40 of 43
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
41 of 43
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
42 of 43
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:37 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
43 of 43
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 1
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 100 STAGE1-TENSION
Primary 200 STAGE1-MOMENT
Combination 1000 INSTALLATION_STAGE1_POS_TENSION
Combination 2000 INSTALLATION_STAGE1_POS_MOMENT
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
308 11.420 - - - - -
318 11.420 - - - - -
722 Fixed Fixed Fixed - - -
4614 11.420 - - - - -
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
1 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
100 STAGE1-TENSION
200 STAGE1-MOMENT
4
6
Y
X
3
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
2 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 722 1000:INSTALLA 10.039 110.855 -5.324 0.000 0.000 0.000
Min FX 10 1000:INSTALLA -5.643 0.494 -7.025 -5.280 -60.355 0.000
Max FY 722 1000:INSTALLA 10.039 110.855 -5.324 0.000 0.000 0.000
Min FY 10 200:STAGE1-M 3.280 -0.287 0.000 -0.002 -0.022 0.000
Max FZ 10 50:DW_ALL -2.307 0.202 0.095 -0.021 -0.242 0.000
Min FZ 10 60:LAT_AG_PO -0.000 0.000 -9.436 -6.788 -77.589 0.000
Max MX 10 30:DW_BYOKE -0.102 0.009 0.003 0.014 0.161 -0.000
Min MX 10 60:LAT_AG_PO -0.000 0.000 -9.436 -6.788 -77.589 0.000
Max MY 10 30:DW_BYOKE -0.102 0.009 0.003 0.014 0.161 -0.000
Min MY 10 60:LAT_AG_PO -0.000 0.000 -9.436 -6.788 -77.589 0.000
Max MZ 10 60:LAT_AG_PO -0.000 0.000 -9.436 -6.788 -77.589 0.000
Min MZ 10 30:DW_BYOKE -0.102 0.009 0.003 0.014 0.161 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 1.694 1.000 1.694 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.679 1.000 0.679 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.462 1.000 0.462 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 1.005 1.000 1.005 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.517 1.000 0.517 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.234 1.000 0.234 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.161 1.000 0.161 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.134 1.000 0.134 AISC- H1-3 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.154 1.000 0.154 AISC- H1-3 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.183 1.000 0.183 AISC- H1-3 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.177 1.000 0.177 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.127 1.000 0.127 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.157 1.000 0.157 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.008 1.000 0.008 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.170 1.000 0.170 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.152 1.000 0.152 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.137 1.000 0.137 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.188 1.000 0.188 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.006 1.000 0.006 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.008 1.000 0.008 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.034 1.000 0.034 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.026 1.000 0.026 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.046 1.000 0.046 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
3 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
4 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
5 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
6 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
7 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
8 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
9 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
10 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
11 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
12 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
13 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:39 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
14 of 84
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 2
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 70 BUOYANCY
Primary 100 STAGE2-TENSION
Primary 200 STAGE2-MOMENT
Combination 1000 INSTALLATION_STAGE2_POS_TENSION
Combination 2000 INSTALLATION_STAGE2_POS_MOMENT
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
308 11.420 - - - - -
318 11.420 - - - - -
722 Fixed Fixed Fixed - - -
4614 Fixed - - - - -
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
15 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
70 BUOYANCY
100 STAGE2-TENSION
200 STAGE2-MOMENT
Y
X
3
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
16 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 10 2000:INSTALLA 8.116 -0.710 -4.669 -3.316 -37.900 0.000
Min FX 318 70:BUOYANCY -3.164 0.277 -0.000 0.000 0.000 0.000
Max FY 722 1000:INSTALLA -0.000 80.748 -4.005 0.000 0.000 0.000
Min FY 722 70:BUOYANCY 0.000 -20.394 -0.415 0.000 0.000 0.000
Max FZ 10 50:DW_ALL -1.569 0.137 0.077 -0.014 -0.155 0.000
Min FZ 10 60:LAT_AG_PO 0.000 -0.000 -7.948 -4.704 -53.769 0.000
Max MX 10 100:STAGE2-T 4.718 -0.413 0.000 0.000 0.000 -0.000
Min MX 10 60:LAT_AG_PO 0.000 -0.000 -7.948 -4.704 -53.769 0.000
Max MY 10 100:STAGE2-T 4.718 -0.413 0.000 0.000 0.000 -0.000
Min MY 10 60:LAT_AG_PO 0.000 -0.000 -7.948 -4.704 -53.769 0.000
Max MZ 10 60:LAT_AG_PO 0.000 -0.000 -7.948 -4.704 -53.769 0.000
Min MZ 10 100:STAGE2-T 4.718 -0.413 0.000 0.000 0.000 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 1.691 1.000 1.691 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.589 1.000 0.589 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.310 1.000 0.310 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.660 1.000 0.660 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.288 1.000 0.288 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.097 1.000 0.097 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.181 1.000 0.181 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.086 1.000 0.086 AISC- H1-3 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.099 1.000 0.099 AISC- H1-3 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.118 1.000 0.118 AISC- H1-3 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.144 1.000 0.144 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.111 1.000 0.111 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.151 1.000 0.151 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.200 1.000 0.200 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.148 1.000 0.148 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.117 1.000 0.117 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.227 1.000 0.227 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.005 1.000 0.005 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.053 1.000 0.053 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.042 1.000 0.042 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.030 1.000 0.030 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
17 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
18 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
19 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
20 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
21 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
22 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
23 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
24 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
25 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
26 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
27 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
28 of 84
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 2 rotated 90 degrees
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 70 BUOYANCY
Primary 100 STAGE2-TENSION
Primary 200 STAGE2-MOMENT
Combination 1000 INSTALLATION_STAGE2_POS_TENSION
Combination 2000 INSTALLATION_STAGE2_POS_MOMENT
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
722 Fixed Fixed Fixed - - -
4614 - - Fixed - - -
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
29 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
70 BUOYANCY
100 STAGE2-TENSION
200 STAGE2-MOMENT
Y
X 3
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
30 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 722 1000:INSTALLA 5.961 80.182 -0.543 0.000 0.000 0.000
Min FX 722 70:BUOYANCY -0.745 -20.374 4.659 0.000 0.000 0.000
Max FY 722 1000:INSTALLA 5.961 80.182 -0.543 0.000 0.000 0.000
Min FY 722 70:BUOYANCY -0.745 -20.374 4.659 0.000 0.000 0.000
Max FZ 722 70:BUOYANCY -0.745 -20.374 4.659 0.000 0.000 0.000
Min FZ 10 60:LAT_AG_PO -0.000 -0.000 -7.929 0.490 5.597 -0.000
Max MX 10 70:BUOYANCY 0.235 -0.021 -4.659 1.646 18.817 -0.000
Min MX 10 50:DW_ALL -0.548 0.048 1.120 -0.591 -6.755 0.000
Max MY 10 70:BUOYANCY 0.235 -0.021 -4.659 1.646 18.817 -0.000
Min MY 10 50:DW_ALL -0.548 0.048 1.120 -0.591 -6.755 0.000
Max MZ 10 50:DW_ALL -0.548 0.048 1.120 -0.591 -6.755 0.000
Min MZ 10 70:BUOYANCY 0.235 -0.021 -4.659 1.646 18.817 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 1.691 1.000 1.691 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.641 1.000 0.641 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.154 1.000 0.154 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.324 1.000 0.324 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.329 1.000 0.329 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.187 1.000 0.187 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.084 1.000 0.084 AISC- H2-1 200 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.130 1.000 0.130 AISC- H1-3 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.122 1.000 0.122 AISC- H1-3 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.106 1.000 0.106 AISC- H1-3 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.131 1.000 0.131 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.091 1.000 0.091 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.156 1.000 0.156 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.095 1.000 0.095 AISC- H1-3 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.058 1.000 0.058 AISC- H1-3 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.158 1.000 0.158 AISC- H1-3 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.244 1.000 0.244 AISC- H1-3 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.005 1.000 0.005 AISC- H2-1 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.044 1.000 0.044 AISC- H2-1 200 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.056 1.000 0.056 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.071 1.000 0.071 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
31 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
32 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
33 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
34 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
35 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
36 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
37 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
38 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
39 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
40 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
41 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:40 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
42 of 84
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 2 rotated 180 degrees
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 70 BUOYANCY
Primary 100 STAGE2-TENSION
Primary 200 STAGE2-MOMENT
Combination 1000 INSTALLATION_STAGE2_POS_TENSION
Combination 2000 INSTALLATION_STAGE2_POS_MOMENT
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
722 Fixed Fixed Fixed - - -
4614 Fixed - - - - -
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
43 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
70 BUOYANCY
100 STAGE2-TENSION
200 STAGE2-MOMENT
Y
X
Z Load 10
3
Whole Structure
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
44 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 722 1000:INSTALLA 8.792 79.979 -3.610 0.000 0.000 0.000
Min FX 10 70:BUOYANCY -3.766 0.330 -0.095 0.586 6.697 -0.000
Max FY 722 1000:INSTALLA 8.792 79.979 -3.610 0.000 0.000 0.000
Min FY 722 70:BUOYANCY 3.767 -20.724 -0.414 0.000 0.000 0.000
Max FZ 722 50:DW_ALL -0.487 12.472 0.077 0.000 0.000 0.000
Min FZ 10 60:LAT_AG_PO 0.000 -0.000 -7.959 7.817 89.347 -0.000
Max MX 10 60:LAT_AG_PO 0.000 -0.000 -7.959 7.817 89.347 -0.000
Min MX 10 200:STAGE2-M 1.175 -0.103 0.000 -0.000 -0.000 0.000
Max MY 10 60:LAT_AG_PO 0.000 -0.000 -7.959 7.817 89.347 -0.000
Min MY 10 200:STAGE2-M 1.175 -0.103 0.000 -0.000 -0.000 0.000
Max MZ 10 200:STAGE2-M 1.175 -0.103 0.000 -0.000 -0.000 0.000
Min MZ 10 60:LAT_AG_PO 0.000 -0.000 -7.959 7.817 89.347 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 1.715 1.000 1.715 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.671 1.000 0.671 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.455 1.000 0.455 AISC- H1-3 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.895 1.000 0.895 AISC- H1-3 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.673 1.000 0.673 AISC- H1-3 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.295 1.000 0.295 AISC- H1-3 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.263 1.000 0.263 AISC- H1-3 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.140 1.000 0.140 AISC- H1-3 60 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.142 1.000 0.142 AISC- H1-3 60 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.144 1.000 0.144 AISC- H1-3 60 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.144 1.000 0.144 AISC- H1-3 60 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.093 1.000 0.093 AISC- H1-3 60 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.169 1.000 0.169 AISC- H1-3 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.243 1.000 0.243 AISC- H1-3 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.159 1.000 0.159 AISC- H1-3 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.134 1.000 0.134 AISC- H1-3 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.186 1.000 0.186 AISC- H1-3 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.005 1.000 0.005 AISC- H2-1 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 SHEAR -Y 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.001 1.000 0.001 SHEAR -Y 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.006 1.000 0.006 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.036 1.000 0.036 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.051 1.000 0.051 AISC- H1-3 60 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.074 1.000 0.074 AISC- H1-3 60 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
45 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
46 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
47 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
48 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
49 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
50 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
51 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
52 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
53 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
54 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
55 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:41 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
56 of 84
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 4 max Bending
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 70 BUOYANCY
Primary 100 STAGE4
Combination 1000 INSTALLATION_STAGE4_POS
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
308 11.420 - - - - -
318 11.420 - - - - -
722 Fixed Fixed Fixed - - -
4614 Fixed - - - - -
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
57 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
70 BUOYANCY
100 STAGE4
Y
X
Z Load 10
3
Whole Structure
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
58 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 722 1000:INSTALLA 1.553 19.955 -1.160 0.000 0.000 0.000
Min FX 308 60:LAT_AG_PO -1.198 3.688 -0.000 0.000 0.000 0.000
Max FY 722 1000:INSTALLA 1.553 19.955 -1.160 0.000 0.000 0.000
Min FY 722 70:BUOYANCY -0.703 -8.034 -0.482 0.000 0.000 0.000
Max FZ 10 50:DW_ALL -0.663 2.039 0.037 -2.342 -0.761 0.000
Min FZ 722 60:LAT_AG_PO 0.000 0.000 -8.336 0.000 0.000 0.000
Max MX 10 60:LAT_AG_PO 0.000 -0.000 -5.503 115.406 37.498 -0.000
Min MX 10 50:DW_ALL -0.663 2.039 0.037 -2.342 -0.761 0.000
Max MY 10 60:LAT_AG_PO 0.000 -0.000 -5.503 115.406 37.498 -0.000
Min MY 10 50:DW_ALL -0.663 2.039 0.037 -2.342 -0.761 0.000
Max MZ 10 50:DW_ALL -0.663 2.039 0.037 -2.342 -0.761 0.000
Min MZ 10 60:LAT_AG_PO 0.000 -0.000 -5.503 115.406 37.498 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 1.565 1.000 1.565 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.585 1.000 0.585 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.443 1.000 0.443 AISC- H2-1 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.954 1.000 0.954 AISC- H2-1 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.623 1.000 0.623 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.231 1.000 0.231 AISC- H2-1 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.253 1.000 0.253 AISC- H2-1 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.121 1.000 0.121 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.085 1.000 0.085 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.072 1.000 0.072 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.026 1.000 0.026 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.040 1.000 0.040 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.036 1.000 0.036 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.179 1.000 0.179 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.141 1.000 0.141 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.165 1.000 0.165 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.142 1.000 0.142 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.002 1.000 0.002 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.047 1.000 0.047 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.051 1.000 0.051 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.052 1.000 0.052 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
59 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
60 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
61 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
62 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
63 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
64 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
65 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
66 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
67 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
68 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
69 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:42 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
70 of 84
Job No Sheet No Rev
1 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
Stage 4 maximum tension
Primary 10 DW_PIPING
Primary 20 DW_FRAME
Primary 30 DW_BYOKE
Primary 40 DW_ARYOKE
Primary 50 DW_ALL
Primary 60 LAT_AG_POS
Primary 70 BUOYANCY
Primary 100 STAGE4
Combination 1000 INSTALLATION_STAGE4_POS
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
10 - Fixed Fixed Fixed - -
308 11.420 - - - - -
318 11.420 - - - - -
722 Fixed Fixed Fixed - - -
4614 Fixed - - - - -
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 14
71 of 84
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
60 LAT_AG_POS
70 BUOYANCY
100 STAGE4
Y
X
Z 3
Load 10
Whole Structure
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 14
72 of 84
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 722 1000:INSTALLA 46.647 21.051 -0.762 0.000 0.000 0.000
Min FX 722 70:BUOYANCY -2.929 -1.183 -0.309 0.000 0.000 0.000
Max FY 722 1000:INSTALLA 46.647 21.051 -0.762 0.000 0.000 0.000
Min FY 10 100:STAGE4 1.258 -3.871 0.000 0.002 0.001 -0.000
Max FZ 10 50:DW_ALL -1.780 5.479 0.024 -3.190 -1.037 0.000
Min FZ 10 60:LAT_AG_PO 0.000 -0.000 -8.226 -55.182 -17.930 0.000
Max MX 10 100:STAGE4 1.258 -3.871 0.000 0.002 0.001 -0.000
Min MX 10 60:LAT_AG_PO 0.000 -0.000 -8.226 -55.182 -17.930 0.000
Max MY 10 100:STAGE4 1.258 -3.871 0.000 0.002 0.001 -0.000
Min MY 10 60:LAT_AG_PO 0.000 -0.000 -8.226 -55.182 -17.930 0.000
Max MZ 10 60:LAT_AG_PO 0.000 -0.000 -8.226 -55.182 -17.930 0.000
Min MZ 10 100:STAGE4 1.258 -3.871 0.000 0.002 0.001 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.421 1.000 0.421 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.271 1.000 0.271 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.135 1.000 0.135 AISC- H2-1 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.344 1.000 0.344 AISC- H2-1 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.269 1.000 0.269 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.138 1.000 0.138 AISC- H2-1 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.042 1.000 0.042 SHEAR -Y 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.045 1.000 0.045 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.052 1.000 0.052 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.118 1.000 0.118 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.071 1.000 0.071 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.049 1.000 0.049 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.080 1.000 0.080 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.114 1.000 0.114 AISC- H2-1 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.122 1.000 0.122 AISC- H2-1 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.092 1.000 0.092 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.080 1.000 0.080 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.002 1.000 0.002 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.001 1.000 0.001 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.003 1.000 0.003 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.061 1.000 0.061 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.067 1.000 0.067 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.068 1.000 0.068 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 14
73 of 84
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 14
74 of 84
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 14
75 of 84
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 14
76 of 84
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 14
77 of 84
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 14
78 of 84
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 14
79 of 84
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 14
80 of 84
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 14
81 of 84
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 14
82 of 84
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 14
83 of 84
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 08:43 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 14
84 of 84
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Job Information
Engineer Checked Approved
Comments
In-Place
Supports
Node X Y Z rX rY rZ
(kip/in) (kip/in) (kip/in) (kip-ft/deg) (kip-ft/deg) (kip-ft/deg)
363 Fixed - Fixed - - -
364 Fixed - Fixed - - -
373 Fixed - Fixed - - -
374 Fixed - Fixed - - -
801 Fixed Fixed Fixed Fixed Fixed Fixed
802 Fixed Fixed Fixed Fixed Fixed Fixed
803 Fixed Fixed Fixed Fixed Fixed Fixed
804 Fixed Fixed Fixed Fixed Fixed Fixed
4614 - Fixed - - - -
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 1 of 15
Job No Sheet No Rev
2 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
10 DW_PIPING
20 DW_FRAME
30 DW_BYOKE
40 DW_ARYOKE
50 DW_ALL
100 OP_PIGGING_NEAR
110 OP_PIGGING_FAR
120 OP_WELL_NEAR
130 OP_WELL_FAR
200 OP_MEOH
210 OP_HFL
220 OP_EFL
230 OP_ROVINTERFACE
240 OP_FREESPAN
1000 PIG_NEAR_WELL_NEAR
2000 PIG_NEAR_WELL_FAR
3000 PIG_FAR_WELL_NEAR
4000 PIG_FAR_WELL_FAR
40000 PIG_FAR_NO_WELL
50000 PIG_NEAR_NO_WELL
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 15
Job No Sheet No Rev
3 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Y
X
Z Load 10
Whole Structure
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 3 of 15
Job No Sheet No Rev
4 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(Mton) (Mton) (Mton) (kN-m) (kN-m) (kN-m)
Max FX 364 2000:PIG_NEA 3.174 0.000 -6.584 0.000 0.000 0.000
Min FX 373 50000:PIG_NE -0.643 0.000 0.194 0.000 0.000 0.000
Max FY 801 3000:PIG_FAR 0.000 14.382 0.000 0.000 0.000 0.000
Min FY 363 1000:PIG_NEA 0.015 0.000 4.883 0.000 0.000 0.000
Max FZ 363 3000:PIG_FAR 2.583 0.000 7.128 0.000 0.000 0.000
Min FZ 364 2000:PIG_NEA 3.174 0.000 -6.584 0.000 0.000 0.000
Max MX 363 1000:PIG_NEA 0.015 0.000 4.883 0.000 0.000 0.000
Min MX 804 1000:PIG_NEA -0.000 0.853 0.000 -0.000 0.000 -0.000
Max MY 804 1000:PIG_NEA -0.000 0.853 0.000 -0.000 0.000 -0.000
Min MY 363 1000:PIG_NEA 0.015 0.000 4.883 0.000 0.000 0.000
Max MZ 803 1000:PIG_NEA -0.000 0.085 0.000 -0.000 0.000 0.000
Min MZ 804 1000:PIG_NEA -0.000 0.853 0.000 -0.000 0.000 -0.000
Utilization Ratio
Beam Analysis Design Actual Allowable Ratio Clause L/C Ax Iz Iy Ix
Property Property Ratio Ratio (Act./Allow.) (in2) (in4) (in4) (in4)
10 PIP6X0.75 PIP6X0.75 0.326 1.000 0.326 AISC- H2-1 000 13.845 60.727 60.727 121.454
11 8IN_AF 8IN_AF 0.133 1.000 0.133 AISC- H2-1 000 31.685 214.541 214.541 429.081
12 8IN_AF 8IN_AF 0.160 1.000 0.160 AISC- H2-1 000 31.685 214.541 214.541 429.081
13 PIP6X0.75 PIP6X0.75 0.325 1.000 0.325 AISC- H2-1 000 13.845 60.727 60.727 121.454
14 PIP6X0.75 PIP6X0.75 0.211 1.000 0.211 AISC- H2-1 000 13.845 60.727 60.727 121.454
15 PIP6X0.75 PIP6X0.75 0.150 1.000 0.150 AISC- H2-1 000 13.845 60.727 60.727 121.454
18 PIP6X0.75 PIP6X0.75 0.134 1.000 0.134 AISC- H2-1 000 13.845 60.727 60.727 121.454
19 PIP6X0.75 PIP6X0.75 0.208 1.000 0.208 AISC- H2-1 000 13.845 60.727 60.727 121.454
20 PIP6X0.75 PIP6X0.75 0.191 1.000 0.191 AISC- H2-1 000 13.845 60.727 60.727 121.454
23 PIP6X0.75 PIP6X0.75 0.158 1.000 0.158 AISC- H2-1 000 13.845 60.727 60.727 121.454
24 PIP6X0.75 PIP6X0.75 0.121 1.000 0.121 AISC- H2-1 000 13.845 60.727 60.727 121.454
25 PIP6X0.75 PIP6X0.75 0.120 1.000 0.120 AISC- H2-1 000 13.845 60.727 60.727 121.454
28 PIP6X0.75 PIP6X0.75 0.517 1.000 0.517 AISC- H2-1 000 13.845 60.727 60.727 121.454
131 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
132 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
181 PIP6X0.75 PIP6X0.75 0.152 1.000 0.152 AISC- H1-3 000 13.845 60.727 60.727 121.454
182 PIP6X0.75 PIP6X0.75 0.236 1.000 0.236 AISC- H1-3 000 13.845 60.727 60.727 121.454
183 PIP6X0.75 PIP6X0.75 0.285 1.000 0.285 AISC- H2-1 000 13.845 60.727 60.727 121.454
184 PIP6X0.75 PIP6X0.75 0.326 1.000 0.326 AISC- H2-1 000 13.845 60.727 60.727 121.454
185 6IN_CVC_H 6IN_CVC_H 0.015 1.000 0.015 AISC- H1-3 000 107.105 11.1E+3 11.1E+3 22.3E+3
186 ST_PRESSU ST_PRESSU 0.000 1.000 0.000 AISC- H1-3 000 152.645 9.15E+3 9.15E+3 18.3E+3
231 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H2-1 000 150.094 5.33E+3 5.33E+3 10.7E+3
232 HYDRAULIC HYDRAULIC 0.000 1.000 0.000 AISC- H1-3 000 150.094 5.33E+3 5.33E+3 10.7E+3
271 PIP6X0.75 PIP6X0.75 0.143 1.000 0.143 AISC- H2-1 000 13.845 60.727 60.727 121.454
272 PIP6X0.75 PIP6X0.75 0.165 1.000 0.165 AISC- H2-1 000 13.845 60.727 60.727 121.454
273 PIP6X0.75 PIP6X0.75 0.183 1.000 0.183 AISC- H2-1 000 13.845 60.727 60.727 121.454
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 4 of 15
Job No Sheet No Rev
5 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 5 of 15
Job No Sheet No Rev
6 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 6 of 15
Job No Sheet No Rev
7 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 7 of 15
Job No Sheet No Rev
8 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 8 of 15
Job No Sheet No Rev
9 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 9 of 15
Job No Sheet No Rev
10 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 10 of 15
Job No Sheet No Rev
11 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 11 of 15
Job No Sheet No Rev
12 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 12 of 15
Job No Sheet No Rev
13 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 13 of 15
Job No Sheet No Rev
14 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 14 of 15
Job No Sheet No Rev
15 1
Part PLEM
Software licensed to Subsea 7
Job Title Cardona Ref
Print Time/Date: 27/08/2014 10:13 STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 15 of 15
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
RESTRAINTS Len MU
GAP YIELD Dir
NODE TYPE CNODE STIF1 STIF2 FORCE Vectors
-------+-------+------+----------+----------+----------+---------------------
10 X 263000 1.000 .000 .000
10 Y .000 1.000 .000
10 Z .000 .000 1.000
10 RZ 7143 .000 .000 1.000
10 RX 1.000 .000 .000
10 RY .000 1.000 .000
110 +Y 71500 .000 1.000 .000
200 RY .000 1.000 .000
200 RZ .000 .000 1.000
200 X 1.000 .000 .000
200 Y 220000 .000 1.000 .000
200 Z .000 .000 1.000
200 RX 1.000 .000 .000
1040 RY .000 1.000 .000
1040 RZ .000 .000 1.000
1040 X 1.000 .000 .000
1040 Y 220000 .000 1.000 .000
1040 Z .000 .000 1.000
1040 RX 1.000 .000 .000
2030 X 1.000 .000 .000
2030 +Y .000 1.000 .000
3020 +Y .000 1.000 .000
3020 X 1.000 .000 .000
p. 2
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
110 Flex +Y
1(HYD) 0 -8066 0 0 0 0
3(SUS) 0 -70181 0 0 0 0
4(OCC) 0 -20421 0 0 0 0
MAX -70181/L3
Rigid RY;
Rigid RZ;
Rigid X;
200
Flex Y;
Rigid Z;
Rigid RX
1(HYD) -4941 -5530 -228 216 -147 -985
3(SUS) 79656 -1298 -12856 -72825 -56953 106280
4(OCC) -12607 -14585 -620 587 -401 -2501
MAX 79656/L3 -14585/L4 -12856/L3 -72825/L3 -56953/L3 106280/L3
Rigid RY;
Rigid RZ;
Rigid X;
1040
Flex Y;
Rigid Z;
Rigid RX
1(HYD) 486 -18980 1112 358 78 314
3(SUS) 5470 27205 9456 26308 41874 23266
4(OCC) 1255 -48158 3022 969 214 806
MAX 5470/L3 -48158/L4 9456/L3 26308/L3 41874/L3 23266/L3
Rigid X;
2030
Rigid +Y
1(HYD) 87 -1823 0 0 0 0
3(SUS) 5803 -2256 0 0 0 0
4(OCC) 223 -4819 0 0 0 0
p. 3
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Rigid +Y;
3020
Rigid X
1(HYD) 115 -2024 0 0 0 0
3(SUS) 3139 -2975 0 0 0 0
4(OCC) 299 -5316 0 0 0 0
MAX 3139/L3 -5316/L4
p. 4
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
10 1.21 6.94 -0.50 0.00 8.21 1.000 1.000 8.15 358.54 2.27
VIII
B31.8-
20 1.21 22.51 0.50 0.00 23.75 1.000 1.000 23.73 358.54 6.62
VIII
B31.8-
20 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 1.21 21.05 -0.50 0.00 22.29 1.000 1.000 22.26 358.54 6.21
VIII
p. 5
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
50 1.21 14.76 0.50 0.00 16.00 1.000 1.000 15.97 358.54 4.45
VIII
B31.8-
50 1.21 14.76 -0.50 0.00 16.00 1.000 1.000 15.97 358.54 4.45
VIII
B31.8-
60 1.21 6.48 0.50 0.00 7.76 1.000 1.000 7.69 358.54 2.15
VIII
B31.8-
60 1.21 6.48 -0.47 0.00 7.75 1.000 1.000 7.69 358.54 2.15
VIII
B31.8-
70 1.21 4.30 0.47 0.00 5.59 1.000 1.000 5.51 358.54 1.54
VIII
B31.8-
70 1.21 4.30 -0.47 0.00 5.59 1.000 1.000 5.51 358.54 1.54
VIII
B31.8-
80 1.21 12.63 0.47 0.00 13.88 1.000 1.000 13.84 358.54 3.86
VIII
B31.8-
80 1.35 15.82 -0.52 0.00 17.21 1.000 1.000 17.17 358.54 4.79
VIII
B31.8-
90 1.35 12.41 0.52 0.00 13.80 1.000 1.000 13.76 358.54 3.84
VIII
B31.8-
90 1.35 12.41 -0.52 0.00 13.80 1.000 1.000 13.76 358.54 3.84
VIII
B31.8-
100 1.35 11.42 0.52 0.00 12.81 1.000 1.000 12.77 358.54 3.56
VIII
B31.8-
100 1.35 11.42 -0.52 0.00 12.81 1.000 1.000 12.77 358.54 3.56
VIII
B31.8-
110 1.35 9.19 0.52 0.00 10.60 1.000 1.000 10.55 358.54 2.94
VIII
p. 6
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
110 1.38 8.90 0.43 0.00 10.32 1.000 1.000 10.28 358.54 2.87
VIII
B31.8-
120 1.38 4.47 -0.43 0.00 5.91 1.000 1.000 5.85 358.54 1.63
VIII
B31.8-
120 1.38 4.47 0.43 0.00 5.91 1.000 1.000 5.85 358.54 1.63
VIII
B31.8-
130 1.38 12.91 -0.43 0.00 14.31 1.000 1.000 14.29 358.54 3.99
VIII
B31.8-
130 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 1.38 25.63 0.43 0.00 27.02 1.000 1.000 27.01 358.54 7.53
VIII
B31.8-
160 1.38 22.49 -0.43 0.00 23.89 1.000 1.000 23.87 358.54 6.66
VIII
B31.8-
160 1.38 22.49 0.43 0.00 23.89 1.000 1.000 23.87 358.54 6.66
VIII
B31.8-
170 1.38 18.15 -0.43 0.00 19.55 1.000 1.000 19.53 358.54 5.45
VIII
B31.8-
170 1.41 18.69 0.03 0.00 20.10 1.000 1.000 20.10 358.54 5.61
VIII
180 1.41 13.87 -0.03 0.00 15.28 1.000 1.000 15.28 358.54 4.26 B31.8-
p. 7
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
180 1.41 13.87 0.03 0.00 15.28 1.000 1.000 15.28 358.54 4.26
VIII
B31.8-
188 1.41 1.14 -0.03 0.00 2.55 1.000 1.000 2.55 358.54 0.71
VIII
B31.8-
188 1.41 1.14 0.03 0.00 2.55 1.000 1.000 2.55 358.54 0.71
VIII
B31.8-
189 2.00 10.91 0.12 0.00 12.91 1.000 1.000 12.91 358.54 3.60
VIII
B31.8-
189 2.00 10.91 -0.12 0.00 12.91 1.000 1.000 12.91 358.54 3.60
VIII
B31.8-
190 1.59 2.55 0.67 0.00 4.35 1.000 1.000 4.14 358.54 1.15
VIII
B31.8-
190 1.59 2.55 -0.67 0.00 4.35 1.000 1.000 4.14 358.54 1.15
VIII
B31.8-
200 1.63 8.56 0.67 0.00 10.28 1.000 1.000 10.19 358.54 2.84
VIII
B31.8-
80 2.98 3.55 0.36 0.00 6.57 1.000 1.000 6.53 358.54 1.82
VIII
B31.8-
1000 3.02 3.24 -0.36 0.00 6.30 1.000 1.000 6.26 358.54 1.75
VIII
B31.8-
1000 3.02 3.24 0.36 0.00 6.30 1.000 1.000 6.26 358.54 1.75
VIII
B31.8-
1010 3.14 5.56 -0.36 0.00 8.72 1.000 1.000 8.69 358.54 2.42
VIII
1010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00 B31.8-
p. 8
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 5.26 8.03 0.36 0.00 13.31 1.000 1.000 13.29 358.54 3.71
VIII
B31.8-
1040 5.39 4.20 -0.36 0.00 9.62 1.000 1.000 9.59 358.54 2.67
VIII
B31.8-
60 0.04 0.28 0.00 0.00 0.33 1.000 1.000 0.33 358.54 0.09
VIII
B31.8-
62 0.02 0.04 -0.00 0.00 0.06 1.000 1.000 0.06 358.54 0.02
VIII
B31.8-
62 0.02 0.04 0.00 0.00 0.06 1.000 1.000 0.06 358.54 0.02
VIII
B31.8-
64 0.00 0.00 -0.00 0.00 0.00 1.000 1.000 0.00 358.54 0.00
VIII
B31.8-
110 0.00 21.57 1.06 0.00 21.68 1.000 1.000 21.57 358.54 6.02
VIII
B31.8-
112 0.00 15.25 -1.06 0.00 15.40 1.000 1.000 15.25 358.54 4.25
VIII
B31.8-
112 0.00 15.25 1.06 0.00 15.40 1.000 1.000 15.25 358.54 4.25
VIII
B31.8-
114 0.00 18.32 -1.77 0.00 18.66 1.000 1.000 18.32 358.54 5.11
VIII
p. 9
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
170 0.00 16.48 -2.85 0.00 11.82 1.000 1.000 11.82 403.36 2.93
VIII
B31.8-
172 0.00 11.57 2.85 0.00 9.23 1.000 1.000 9.23 403.36 2.29
VIII
B31.8-
172 0.00 11.57 -2.85 0.00 9.23 1.000 1.000 9.23 403.36 2.29
VIII
B31.8-
174 0.00 14.42 4.76 0.00 12.96 1.000 1.000 12.96 403.36 3.21
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
35 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
145 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1025 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
114 0.00 18.32 1.77 0.00 18.66 1.000 1.000 18.32 358.54 5.11
VIII
B31.8-
1998 0.00 8.80 -1.77 0.00 6.43 1.000 1.000 6.43 403.36 1.59
VIII
B31.8-
1998 0.00 8.80 1.77 0.00 6.43 1.000 1.000 6.43 403.36 1.59
VIII
p. 10
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
1999 0.11 2.49 -0.17 0.00 2.63 1.000 1.000 2.60 358.54 0.73
VIII
B31.8-
1999 0.11 2.49 0.17 0.00 2.63 1.000 1.000 2.60 358.54 0.73
VIII
B31.8-
2000 0.16 1.64 -0.00 0.00 1.80 1.000 1.000 1.80 358.54 0.50
VIII
B31.8-
2000 0.16 1.64 0.00 0.00 1.80 1.000 1.000 1.80 358.54 0.50
VIII
B31.8-
2010 0.16 34.18 -0.00 0.00 34.34 1.000 1.000 34.34 358.54 9.58
VIII
B31.8-
2010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
174 0.00 14.42 -4.76 0.00 12.96 1.000 1.000 12.96 403.36 3.21
VIII
B31.8-
2998 0.00 3.55 4.76 0.00 9.75 1.000 1.000 9.75 403.36 2.42
VIII
p. 11
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
2998 0.00 3.55 -4.76 0.00 9.75 1.000 1.000 9.75 403.36 2.42
VIII
B31.8-
2999 0.28 11.08 3.69 0.00 10.11 1.000 1.000 10.11 403.36 2.51
VIII
B31.8-
2999 0.28 11.08 -3.69 0.00 10.11 1.000 1.000 10.11 403.36 2.51
VIII
B31.8-
3000 0.21 11.05 -0.00 0.00 11.26 1.000 1.000 11.26 358.54 3.14
VIII
B31.8-
3000 0.21 11.05 0.00 0.00 11.26 1.000 1.000 11.26 358.54 3.14
VIII
B31.8-
3010 0.21 13.45 -0.00 0.00 13.66 1.000 1.000 13.66 358.54 3.81
VIII
B31.8-
3010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
p. 12
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
10 80.15 79.53 -0.18 274.07 273.45 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
20 80.15 36.40 0.18 274.07 230.32 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
20 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 80.15 1.61 -0.18 274.07 195.53 1.000 1.000 274.07 322.69 84.93
VIII
p. 13
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
50 80.15 7.06 0.18 274.07 200.98 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
50 80.15 7.06 -0.18 274.07 200.98 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
60 80.15 14.81 0.18 274.07 208.73 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
60 80.15 14.81 -0.17 274.07 208.73 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
70 80.15 22.49 0.17 274.07 216.41 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
70 80.15 22.49 -0.17 274.07 216.41 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
80 80.15 30.10 0.17 274.07 224.02 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
80 81.42 5.36 -0.45 274.07 198.01 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
90 81.42 21.37 0.45 274.07 214.02 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
90 81.42 21.37 -0.45 274.07 214.02 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
100 81.42 26.65 0.45 274.07 219.31 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
100 81.42 26.65 -0.45 274.07 219.31 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
110 81.42 39.07 0.45 274.07 231.73 1.000 1.000 274.07 322.69 84.93
VIII
p. 14
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
110 82.07 39.55 -0.15 274.07 231.55 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
120 82.07 25.09 0.15 274.07 217.10 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
120 82.07 25.09 -0.15 274.07 217.10 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
130 82.07 14.53 0.15 274.07 206.54 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
130 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 82.07 22.95 -0.15 274.07 214.95 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
160 82.07 28.48 0.15 274.07 220.48 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
160 82.07 28.48 -0.15 274.07 220.48 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
170 82.07 35.85 0.15 274.07 227.85 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
170 82.42 36.87 0.20 274.07 228.53 1.000 1.000 274.07 322.69 84.93
VIII
180 82.42 44.42 -0.20 274.07 236.07 1.000 1.000 274.07 322.69 84.93 B31.8-
p. 15
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
180 82.42 44.42 0.20 274.07 236.07 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
188 82.42 62.87 -0.20 274.07 254.53 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
188 82.42 62.87 0.20 274.07 254.53 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
189 84.20 23.14 -0.23 274.07 213.01 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
189 84.20 23.14 0.23 274.07 213.01 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
190 90.90 127.30 -0.08 274.07 310.47 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
190 57.76 107.16 0.07 205.55 254.96 1.000 1.000 205.55 322.69 63.70
VIII
B31.8-
200 92.52 174.13 -0.07 277.35 293.23 1.000 1.000 293.23 403.36 72.70
VIII
B31.8-
80 86.51 32.91 -0.21 274.07 220.47 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
1000 86.53 27.51 0.21 274.07 215.05 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
1000 86.53 27.51 -0.21 274.07 215.05 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
1010 86.58 12.44 0.21 274.07 199.93 1.000 1.000 274.07 322.69 84.93
VIII
1010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00 B31.8-
p. 16
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 87.50 6.35 -0.21 274.07 192.91 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
1040 87.56 23.41 0.21 274.07 209.92 1.000 1.000 274.07 322.69 84.93
VIII
B31.8-
60 43.56 0.12 -0.00 173.48 130.04 1.000 1.000 173.48 322.69 53.76
VIII
B31.8-
62 43.57 0.02 0.00 173.48 129.93 1.000 1.000 173.48 322.69 53.76
VIII
B31.8-
62 43.57 0.02 -0.00 173.48 129.93 1.000 1.000 173.48 322.69 53.76
VIII
B31.8-
64 51.34 0.00 -0.00 189.69 138.35 1.000 1.000 189.69 322.69 58.79
VIII
B31.8-
110 74.62 99.64 -2.53 237.67 262.73 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
112 74.62 72.82 2.53 237.67 235.92 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
112 74.62 72.82 -2.53 237.67 235.92 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
114 63.12 89.48 4.22 214.06 240.57 1.000 1.000 214.06 322.69 66.34
VIII
p. 17
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
170 74.62 57.79 -7.48 237.67 221.34 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
172 74.62 43.26 7.48 237.67 206.85 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
172 74.62 43.26 -7.48 237.67 206.85 1.000 1.000 237.67 322.69 73.65
VIII
B31.8-
174 63.12 54.80 12.50 214.06 207.26 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
35 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
145 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1025 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
114 63.12 89.48 -4.22 214.06 240.57 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
1998 63.12 27.49 4.22 214.06 178.63 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
1998 63.12 27.49 -4.22 214.06 178.63 1.000 1.000 214.06 322.69 66.34
VIII
p. 18
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
1999 60.23 10.02 3.31 214.06 163.98 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
1999 60.23 10.02 -3.31 214.06 163.98 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2000 59.04 9.98 -0.00 214.06 165.01 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2000 59.04 9.98 0.00 214.06 165.01 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2010 59.04 18.59 -0.00 214.06 173.61 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
174 63.12 54.80 -12.50 214.06 207.26 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2998 63.12 14.99 12.50 214.06 167.80 1.000 1.000 214.06 322.69 66.34
VIII
p. 19
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 13:26
Job: C:\USERS\SS7A0729\DESKTOP\PIPING UPDATE\PRODUCTION PLEM
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
2998 63.12 14.99 -12.50 214.06 167.80 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2999 64.68 18.21 8.36 214.06 168.42 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
2999 64.68 18.21 -8.36 214.06 168.42 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
3000 65.33 22.66 -0.00 214.06 171.40 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
3000 65.33 22.66 0.00 214.06 171.40 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
3010 65.33 17.67 -0.00 214.06 166.41 1.000 1.000 214.06 322.69 66.34
VIII
B31.8-
3010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
p. 20
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
10 116.08 2.55 -0.18 342.62 229.09 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
20 116.08 9.13 0.18 342.62 235.67 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
20 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 116.08 8.53 -0.18 342.62 235.07 1.000 1.000 342.62 448.18 76.45
VIII
p. 21
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
50 116.08 5.95 0.18 342.62 232.49 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
50 116.08 5.95 -0.18 342.62 232.49 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
60 116.08 2.55 0.18 342.62 229.09 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
60 116.08 2.55 -0.17 342.62 229.09 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
70 116.08 1.68 0.17 342.62 228.22 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
70 116.08 1.68 -0.17 342.62 228.22 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
80 116.08 5.09 0.17 342.62 231.63 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
80 116.14 6.34 -0.17 342.62 232.83 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
90 116.14 4.96 0.17 342.62 231.44 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
90 116.14 4.96 -0.17 342.62 231.44 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
100 116.14 4.55 0.17 342.62 231.04 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
100 116.14 4.55 -0.17 342.62 231.04 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
110 116.14 3.64 0.17 342.62 230.12 1.000 1.000 342.62 448.18 76.45
VIII
p. 22
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
110 116.15 3.54 0.13 342.62 230.01 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
120 116.15 1.79 -0.13 342.62 228.26 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
120 116.15 1.79 0.13 342.62 228.26 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
130 116.15 5.25 -0.13 342.62 231.73 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
130 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 116.15 10.33 0.13 342.62 236.80 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
160 116.15 9.02 -0.13 342.62 235.49 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
160 116.15 9.02 0.13 342.62 235.49 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
170 116.15 7.21 -0.13 342.62 233.69 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
170 116.16 7.42 0.01 342.62 233.88 1.000 1.000 342.62 448.18 76.45
VIII
180 116.16 5.47 -0.01 342.62 231.93 1.000 1.000 342.62 448.18 76.45 B31.8-
p. 23
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
180 116.16 5.47 0.01 342.62 231.93 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
188 116.16 0.39 -0.01 342.62 226.85 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
188 116.16 0.39 0.01 342.62 226.85 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
189 116.39 4.32 0.04 342.62 230.56 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
189 116.39 4.32 -0.04 342.62 230.56 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
190 116.21 0.99 0.25 342.62 227.40 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
190 116.21 0.99 -0.25 342.62 227.40 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
200 116.22 3.36 0.25 342.62 229.76 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
80 116.81 1.37 0.13 342.62 227.18 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
1000 116.82 1.25 -0.13 342.62 227.05 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
1000 116.82 1.25 0.13 342.62 227.05 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
1010 116.86 2.08 -0.13 342.62 227.84 1.000 1.000 342.62 448.18 76.45
VIII
1010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00 B31.8-
p. 24
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 117.69 2.96 0.13 342.62 227.89 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
1040 117.73 1.59 -0.13 342.62 226.48 1.000 1.000 342.62 448.18 76.45
VIII
B31.8-
60 54.47 0.07 0.00 216.87 162.48 1.000 1.000 216.87 448.18 48.39
VIII
B31.8-
62 54.47 0.01 -0.00 216.87 162.41 1.000 1.000 216.87 448.18 48.39
VIII
B31.8-
62 54.47 0.01 0.00 216.87 162.41 1.000 1.000 216.87 448.18 48.39
VIII
B31.8-
64 64.18 0.00 0.00 237.14 172.96 1.000 1.000 237.14 448.18 52.91
VIII
B31.8-
110 93.29 7.06 0.35 297.11 210.89 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
112 93.29 5.05 -0.35 297.11 208.88 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
112 93.29 5.05 0.35 297.11 208.88 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
114 78.91 6.12 -0.58 267.61 194.82 1.000 1.000 267.61 448.18 59.71
VIII
p. 25
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
170 93.29 3.43 -1.09 297.11 207.26 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
172 93.29 2.47 1.09 297.11 206.31 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
172 93.29 2.47 -1.09 297.11 206.31 1.000 1.000 297.11 448.18 66.29
VIII
B31.8-
174 78.91 3.05 1.83 267.61 191.78 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
35 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
145 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1025 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
114 78.91 6.12 0.58 267.61 194.82 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
1998 78.91 1.83 -0.58 267.61 190.53 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
1998 78.91 1.83 0.58 267.61 190.53 1.000 1.000 267.61 448.18 59.71
VIII
p. 26
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
1999 78.87 0.83 -0.04 267.61 189.56 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
1999 78.87 0.83 0.04 267.61 189.56 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2000 78.85 0.60 -0.00 267.61 189.36 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2000 78.85 0.60 0.00 267.61 189.36 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2010 78.85 12.76 -0.00 267.61 201.52 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
174 78.91 3.05 -1.83 267.61 191.78 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2998 78.91 0.79 1.83 267.61 189.52 1.000 1.000 267.61 448.18 59.71
VIII
p. 27
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
2998 78.91 0.79 -1.83 267.61 189.52 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2999 78.97 2.60 1.41 267.61 191.26 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
2999 78.97 2.60 -1.41 267.61 191.26 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
3000 78.99 4.21 -0.00 267.61 192.82 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
3000 78.99 4.21 0.00 267.61 192.82 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
3010 78.99 5.17 -0.00 267.61 193.79 1.000 1.000 267.61 448.18 59.71
VIII
B31.8-
3010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
p. 28
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
p. 29
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 30
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 31
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 32
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 11:33
Job: C:\USERS\SS7A0729\DESKTOP\PIPI...\PRODUCTION PLEM 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 33
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
RESTRAINTS Len MU
GAP YIELD Dir
NODE TYPE CNODE STIF1 STIF2 FORCE Vectors
-------+-------+------+----------+----------+----------+---------------------
10 X 1.000 .000 .000
10 Y 263000 .000 1.000 .000
10 Z .000 .000 1.000
10 +RZ 71400 .000 .000 1.000
10 RX 1.000 .000 .000
10 RY .000 1.000 .000
110 -X 71580 1.000 .000 .000
200 RX 1.000 .000 .000
200 RZ .000 .000 1.000
200 Y .000 1.000 .000
200 X 219000 1.000 .000 .000
200 Z .000 .000 1.000
200 RY .000 1.000 .000
1040 RX 1.000 .000 .000
1040 RZ .000 .000 1.000
1040 Y .000 1.000 .000
1040 X 219000 1.000 .000 .000
1040 Z .000 .000 1.000
1040 RY .000 1.000 .000
2030 Y .000 1.000 .000
2030 -X 1.000 .000 .000
3030 Y .000 1.000 .000
3030 -X 1.000 .000 .000
110 Flex -X
1(OCC) 10518 0 0 0 0 0
Rigid RX;
Rigid RZ;
Rigid Y;
200
Flex X;
Rigid Z;
Rigid RY
1(OCC) -6117 1363 225 -88 -54 -1161
Rigid RX;
Rigid RZ;
Rigid Y;
1040
Flex X;
Rigid Z;
Rigid RY
1(OCC) 68359 -17461 185 1440 -111 -6746
Rigid Y;
2030
Rigid -X
1(OCC) 0 -3225 0 0 0 0
Rigid Y;
3030
Rigid -X
1(OCC) 694 -2997 0 0 0 0
p. 35
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
10 2.96 315.80 -0.04 0.00 318.76 1.000 1.000 318.76 358.54 88.91
VIII
B31.8-
20 2.91 215.00 0.04 0.00 217.91 1.000 1.000 217.91 358.54 60.78
VIII
B31.8-
20 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
40 1.25 82.38 -0.04 0.00 83.63 1.000 1.000 83.63 358.54 23.33
VIII
p. 36
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
50 1.24 56.21 0.04 0.00 57.45 1.000 1.000 57.45 358.54 16.02
VIII
B31.8-
50 1.24 56.21 -0.04 0.00 57.45 1.000 1.000 57.45 358.54 16.02
VIII
B31.8-
60 1.22 21.25 0.04 0.00 22.47 1.000 1.000 22.47 358.54 6.27
VIII
B31.8-
60 1.21 21.22 -0.04 0.00 22.43 1.000 1.000 22.43 358.54 6.26
VIII
B31.8-
70 1.19 13.86 0.04 0.00 15.05 1.000 1.000 15.05 358.54 4.20
VIII
B31.8-
70 1.19 13.86 -0.04 0.00 15.05 1.000 1.000 15.05 358.54 4.20
VIII
B31.8-
80 1.17 48.80 0.04 0.00 49.98 1.000 1.000 49.98 358.54 13.94
VIII
B31.8-
80 2.06 9.30 -0.32 0.00 11.37 1.000 1.000 11.36 358.54 3.17
VIII
B31.8-
90 2.04 11.67 0.32 0.00 13.73 1.000 1.000 13.72 358.54 3.83
VIII
B31.8-
90 2.04 11.67 -0.32 0.00 13.73 1.000 1.000 13.72 358.54 3.83
VIII
B31.8-
100 2.04 12.39 0.32 0.00 14.44 1.000 1.000 14.43 358.54 4.02
VIII
B31.8-
100 2.04 12.39 -0.32 0.00 14.44 1.000 1.000 14.43 358.54 4.02
VIII
B31.8-
110 2.02 14.07 0.32 0.00 16.11 1.000 1.000 16.09 358.54 4.49
VIII
p. 37
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
110 2.07 15.64 -0.32 0.00 17.73 1.000 1.000 17.72 358.54 4.94
VIII
B31.8-
120 2.05 13.06 0.32 0.00 15.13 1.000 1.000 15.11 358.54 4.21
VIII
B31.8-
120 2.05 13.06 -0.32 0.00 15.13 1.000 1.000 15.11 358.54 4.21
VIII
B31.8-
130 2.04 11.12 0.32 0.00 13.18 1.000 1.000 13.16 358.54 3.67
VIII
B31.8-
130 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
150 0.38 20.26 -0.32 0.00 20.66 1.000 1.000 20.65 358.54 5.76
VIII
B31.8-
160 0.37 18.33 0.32 0.00 18.71 1.000 1.000 18.70 358.54 5.22
VIII
B31.8-
160 0.37 18.33 -0.32 0.00 18.71 1.000 1.000 18.70 358.54 5.22
VIII
B31.8-
170 0.35 15.75 0.32 0.00 16.11 1.000 1.000 16.10 358.54 4.49
VIII
B31.8-
170 0.39 15.94 0.25 0.00 16.34 1.000 1.000 16.33 358.54 4.56
VIII
180 0.37 13.03 -0.25 0.00 13.41 1.000 1.000 13.40 358.54 3.74 B31.8-
p. 38
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
180 0.37 13.03 0.25 0.00 13.41 1.000 1.000 13.40 358.54 3.74
VIII
B31.8-
188 0.33 5.77 -0.25 0.00 6.12 1.000 1.000 6.09 358.54 1.70
VIII
B31.8-
188 0.33 5.77 0.25 0.00 6.12 1.000 1.000 6.09 358.54 1.70
VIII
B31.8-
189 0.66 3.39 -0.16 0.00 4.07 1.000 1.000 4.06 358.54 1.13
VIII
B31.8-
189 0.66 3.39 0.16 0.00 4.07 1.000 1.000 4.06 358.54 1.13
VIII
B31.8-
190 0.69 4.60 -0.15 0.00 5.29 1.000 1.000 5.29 358.54 1.47
VIII
B31.8-
190 0.69 4.60 0.15 0.00 5.29 1.000 1.000 5.29 358.54 1.47
VIII
B31.8-
200 0.69 3.87 -0.15 0.00 4.57 1.000 1.000 4.56 358.54 1.27
VIII
B31.8-
80 7.66 39.64 1.64 0.00 47.41 1.000 1.000 47.30 358.54 13.19
VIII
B31.8-
1000 7.66 35.83 -1.64 0.00 43.61 1.000 1.000 43.49 358.54 12.13
VIII
B31.8-
1000 7.66 35.83 1.64 0.00 43.61 1.000 1.000 43.49 358.54 12.13
VIII
B31.8-
1010 7.66 24.61 -1.64 0.00 32.43 1.000 1.000 32.26 358.54 9.00
VIII
1010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00 B31.8-
p. 39
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1030 7.66 4.67 -2.40 0.00 13.22 1.000 1.000 12.32 358.54 3.44
VIII
B31.8-
1040 7.66 22.47 2.40 0.00 30.51 1.000 1.000 30.13 358.54 8.40
VIII
B31.8-
60 0.00 0.19 0.00 0.00 0.19 1.000 1.000 0.19 358.54 0.05
VIII
B31.8-
62 0.00 0.03 -0.00 0.00 0.03 1.000 1.000 0.03 358.54 0.01
VIII
B31.8-
62 0.00 0.03 0.00 0.00 0.03 1.000 1.000 0.03 358.54 0.01
VIII
B31.8-
64 0.00 0.00 -0.00 0.00 0.00 1.000 1.000 0.00 358.54 0.00
VIII
B31.8-
110 0.00 14.25 -9.17 0.00 20.40 1.000 1.000 20.40 403.36 5.06
VIII
B31.8-
112 0.00 10.81 9.17 0.00 19.55 1.000 1.000 19.55 403.36 4.85
VIII
B31.8-
112 0.00 10.81 -9.17 0.00 19.55 1.000 1.000 19.55 403.36 4.85
VIII
B31.8-
114 0.00 14.01 15.31 0.00 31.79 1.000 1.000 31.79 403.36 7.88
VIII
p. 40
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
170 0.00 14.84 1.02 0.00 14.98 1.000 1.000 14.84 358.54 4.14
VIII
B31.8-
172 0.00 11.24 -1.02 0.00 11.43 1.000 1.000 11.24 358.54 3.14
VIII
B31.8-
172 0.00 11.24 1.02 0.00 11.43 1.000 1.000 11.24 358.54 3.14
VIII
B31.8-
174 0.00 14.36 -1.71 0.00 14.76 1.000 1.000 14.36 358.54 4.01
VIII
B31.8-
30 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
35 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
140 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
145 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
1025 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
114 0.00 14.01 -15.31 0.00 31.79 1.000 1.000 31.79 403.36 7.88
VIII
B31.8-
1998 0.00 4.51 15.31 0.00 30.74 1.000 1.000 30.74 403.36 7.62
VIII
B31.8-
1998 0.00 4.51 -15.31 0.00 30.74 1.000 1.000 30.74 403.36 7.62
VIII
p. 41
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
1999 0.55 35.49 10.82 0.00 30.83 1.000 1.000 30.83 403.36 7.64
VIII
B31.8-
1999 0.55 35.49 -10.82 0.00 30.83 1.000 1.000 30.83 403.36 7.64
VIII
B31.8-
2000 0.43 30.61 -0.00 0.00 31.04 1.000 1.000 31.04 358.54 8.66
VIII
B31.8-
2000 0.43 30.61 0.00 0.00 31.04 1.000 1.000 31.04 358.54 8.66
VIII
B31.8-
2010 0.55 30.61 -0.00 0.00 31.16 1.000 1.000 31.16 358.54 8.69
VIII
B31.8-
2010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
2040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
174 0.00 14.36 1.71 0.00 14.76 1.000 1.000 14.36 358.54 4.01
VIII
B31.8-
2998 0.00 6.56 -1.71 0.00 5.26 1.000 1.000 5.26 403.36 1.30
VIII
p. 42
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Max
Axial Bending Torsion Hoop Code Allowable
Stress SIF In SIF Out Piping
NODE Stress Stress Stress Stress Stress Stress Ratio %
Intensity Plane Plane Code
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
N/mm2
B31.8-
2998 0.00 6.56 1.71 0.00 5.26 1.000 1.000 5.26 403.36 1.30
VIII
B31.8-
2999 0.46 4.11 -1.89 0.00 4.67 1.000 1.000 4.67 403.36 1.16
VIII
B31.8-
2999 0.46 4.11 1.89 0.00 4.67 1.000 1.000 4.67 403.36 1.16
VIII
B31.8-
3000 0.35 6.71 0.00 0.00 7.06 1.000 1.000 7.06 358.54 1.97
VIII
B31.8-
3000 0.35 6.71 -0.00 0.00 7.06 1.000 1.000 7.06 358.54 1.97
VIII
B31.8-
3010 0.39 13.32 0.00 0.00 13.70 1.000 1.000 13.70 358.54 3.82
VIII
B31.8-
3010 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3030 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3020 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
B31.8-
3040 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.00 0.00 0.00
VIII
p. 43
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
Piping Code: B31.8-VIII = B31.8 Chapter VIII -2007, November 30, 2007
p. 44
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 45
CAESAR II 2011 R1 Ver.5.31.00.0000, (Build 120525) Date: AUG 8, 2014 Time: 12:45
Job: C:\USERS\SS7A0729\DES...\PRODUCTION PLEM VERTICAL 03.12.2014
Licensed To: ACERGY -- ID #1005689
p. 46
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 1 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
TABLE OF CONTENTS
4.0 BUCKLING CHECK DUE TO COMBINED BENDING AND EXTERNAL PRESSURE (4.3.2.2)
p. 47 Page 1
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 2 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
Dmax D min
Ovality 0.01
Dmax D min
SMYS S 65 ksi
t tcor
Buckling Strain under Pure Bending: b 0.046
2D
t tcor 4
Yield Pressure at Collapse: Py 2S 1.209 10 psi
D
3
t tcor
Elastic Collapse Pressure: 2E
D 4
5.124 10 psi
1 2
Pe
Py Pe 4
Pipe Collapse Pressure: Pc 1.176 10 psi
2 2
Py Pe
p. 48 Page 2
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 3 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
Check OK
4.0 BUCKLING CHECK DUE TO COMBINED BENDING AND EXTERNAL PRESSURE (4.3.2.2)
1
Collapse Reduction Factor: g 0.833
1 20
Check OK
p. 49 Page 3
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 1 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
TABLE OF CONTENTS
4.0 BUCKLING CHECK DUE TO COMBINED BENDING AND EXTERNAL PRESSURE (4.3.2.2)
p. 50 Page 1
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 2 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
Dmax D min
Ovality 0.01
Dmax D min
SMYS S 65 ksi
t tcor
Buckling Strain under Pure Bending: b 0.044
2D
t tcor 4
Yield Pressure at Collapse: Py 2S 1.149 10 psi
D
3
t tcor
Elastic Collapse Pressure: 2E
D 4
4.406 10 psi
1 2
Pe
Py Pe 4
Pipe Collapse Pressure: Pc 1.112 10 psi
2 2
Py Pe
p. 51 Page 2
Subsea7 STONE ENERGY CARDONA Document No.
Structural Engineering Division Page 3 of 3
North America Region COLLAPSE AND BUCKLING CHECK FOR
Prepared By: EJO
6'' PLEM PIPING
Checked By: STA
Check OK
4.0 BUCKLING CHECK DUE TO COMBINED BENDING AND EXTERNAL PRESSURE (4.3.2.2)
1
Collapse Reduction Factor: g 0.833
1 20
Check OK
p. 52 Page 3
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
TC1057-TN-00005
1. INTRODUCTION
1.1 BACKGROUND
For this project, Subsea 7 has been contracted the Scope of Work from the production risers
and gas lift umbilical hang-off to the jumper connection at the subsea trees. It includes the
engineering, procurement, and installation of the flowlines and risers and engineering and
fabrication of the PLEMs, inline sleds and gas lift sleds. It also includes the installation
associated flying leads and jumpers and precommissioning of the system.
1.2 OBJECTIVE
This technical note presents the PLEM anchor flange strength check by using finite element
method.
The basic objectives of this document can be listed as given below:
To check the structural adequacy of the anchor flange for Stone Energy Cardona Subsea
PLEM at both flowline A and B.
The structural strength of the forged flange is checked for hydro-test, operating and
multiple installation condition. The pup piece strength analyses were covered in the
flowline installation analysis.
This analysis has been carried out using ANSYS Workbench, a Finite Element Analysis program.
1.4 REFERENCES
2. SCOPE OF WORK
This technical note present the details of FEA structural integrity check of the anchor flange,
which is subjected to the multiple loading conditions and design data that are given in this
report. And, this is a local strength analyses to account for the localized stresses around the
forged flange area (refer to Figure 2.1). The pup piece strength analysis were covered in the
flowline installation analysis, which is not included in this technical note.
Figure 2.2 illustrates the simplified FEA model while conducting the analyses.
Table 2.1 presents the summary of the maximum tensions and bending moments from OrcaFlex
installation analysis under dynamic condition. These are the chosen highest loading conditions
to be used in FEA strength check of the anchor flange.
3. EXECUTIVE SUMMARY
The local strength analysis of the PLEM anchor flange is fit for hydro-test, operating and
installation conditions. Table 3.1 presents the anchor flange structural strength base on hoop
stress, longitudinal stress and combine stress performance. Table 3.2 summaries the
anchor flange structure strength during installation phases by its utilization factor.
Table 3.1 - Anchor Flange Structural Strength during Hydto-test and Operation
PLEM Maximum Hoop Allowable Hoop Utilization
WD = 650 Stress Stress Factor
m (2133 ft)
MPa psi MPa psi -
Hydro-test 306.6 44474.4 427.5 62003.6 0.72
Operation 238.5 34588.6 324.0 46992.2 0.74
Maximum
PLEM Allowable Utilization
Longitudinal
WD = 650 Longitudinal Stress Factor
Stress
m (2133 ft)
MPa psi MPa psi -
Hydro-test 272.6 39541.6 427.5 62003.6 0.64
Operation 119.3 17300.1 360.0 52213.6 0.33
PLEM Maximum Allowable Combine Utilization
WD = 650 Combine Stress Stress Factor
m (2133 ft)
MPa psi MPa psi -
Hydro-test 336.5 48806.6 427.5 62003.6 0.79
Operation 295.7 42890.6 405.0 58740.3 0.73
Note:
1. The strutural strength for pup piece is not covered in this technical note.
The steel properties for Finite Element Analysis are assumed as follows:
5. ALLOWABLE LIMITS
SH = SY X F1
SL = SY X F2
The combine (Von Mises) stress criteria for operating and installation conditions is tabulated
as follows:
Sc = SY X i
For hydro-test condition, the hoop, longitudinal and combine stress criteria is tabulated as follow:
S Hydro = SY X i
The acceptance criteria for general primary membrane stress, local primary membrane
stress and local primary membrane plus bending stress is according to ASME Section VIII
Division 2, it is shown as follows:
S= SY X i
Therefore;
And;
Where;
Therefore;
In evaluating the results of the analysis, the Pm , PL and PL + Pb equivalent stresses occurs
at the transition area of anchor flange.
SPL is used as the acceptance criteria for stress linearization at anchor flange high
stress area, which is the transition area between pipe and flange. The combined stress
criteria is based on Von Mises stress criterion.
6. ANALYSIS METHODOLGY
6.1 GENERAL
The FE model of the simplified PLEM model was developed using ANSYS Workbench based
on the appropriate meshing. All elements are modelled using 20-node 6 DOFs hexahedral
elements. And, mesh size is as small as 5 X 5 mm (0.2 X 0.2 in) at the anchor flange area
(as shown in Figure 6.1 and Figure 6.2).
The loading and boundary conditions are shown in Figure 6.3. This is only for the load case
at Stage 1 (maximum tension). Because other load case has shared common boundary
conditions, but different loading conditions.
In Section 2, Table 2.1 already illustrated the summary of loading conditions that were
applied on the anchor flange area.
Global
Coordinate
system as
reference
Figure 6.3 - Loading and Boundary Conditions for Stage 1 (Max. Tension)
Table 6.1 illustrates the summary of constraint conditions of the PLEM structure.
Figure 6.4 illustrates the maximum tension and bending moment were applied on anchor
flange intersection surface, which is highlighted in red color.
Global
Coordinate
system as
reference
The loading and boundary conditions are shown in Figure 6.5. Because of both hydro-test
and operating conditions shared a similar constraint, therefore only hydro-test condition
is illustrated.
Table 6.2 illustrates the summary of loading conditions that were applied on the anchor
flange area.
Table 6.3 illustrates the summary of constraint conditions of the PLEM structure.
In the ASME Sec. VIII Div. 2 part 5 provides the requirements for design by analysis. The
analysis is performed for the anchor flange is according to elastic stress analysis method.
The anchor flange is assumed to be made of a perfectly elastic material, which means the
relation between the strains and stresses is a linear curve.
Material strength derating factor is not accounted for this design factor, because this anchor
flange analysis is only subjected to installation phases only.
For high stress region at geometry transition area, stress linearization is conducted through
the thickness as per ASME Sec. VIII Div. 2.
In ASME Sec. VIII Div. 2 defines Stress Classification Lines (SCLs), i.e. lines through the
piece, perpendicular to skin or to neutral fibre, along whose the stress is plotted. From these
plots, one can define a value for each category of stress. The primary membrane stress is
defined as the average stress through the thickness. The Y-intercept of the regression line
associated to the plotted stress gives the value ofthe primary local membran plus bending
equivalent stress. Primary local membrane stress is a primary membrane stress, but localized
in a small region (refer to Figure 6.6).
7. RESULT DISCUSSION
Table 7.1 presents the anchor flange structural strength base on hoop stress, longitudinal
stress and combine stress performance. Table 7.2 summarize the PLEM anchor flange
structural strength for multiple installation conditions. Whilst, the result for pup piece will
not be covered in this technical note.
Table 7.1 - Anchor Flange Structural Strength during Hydto-test and Operation
PLEM Maximum Hoop Allowable Hoop Utilization
WD = 650 Stress Stress Factor
m (2133 ft)
MPa psi MPa psi -
Hydro-test 306.6 44474.4 427.5 62003.6 0.72
Operation 238.5 34588.6 324.0 46992.2 0.74
Maximum
PLEM Allowable Utilization
Longitudinal
WD = 650 Longitudinal Stress Factor
Stress
m (2133 ft)
MPa psi MPa psi -
Hydro-test 272.6 39541.6 427.5 62003.6 0.64
Operation 119.3 17300.1 360.0 52213.6 0.33
PLEM Maximum Allowable Combine Utilization
WD = 650 Combine Stress Stress Factor
m (2133 ft)
MPa psi MPa psi -
Hydro-test 336.5 48806.6 427.5 62003.6 0.79
Operation 295.7 42890.6 405.0 58740.3 0.73
In Table 7.2, it can be noticed that all stages with bending moment conditions show high
combine stress, which exceeds the allowable combine stress. Therefore, in the subsequent
sections, stress linearization method is used to further justify the forged flange structural
strength.
According to Table 7.2, the highest combine stress of 515.7 MPa is recorded in stage 2 at
bending moment condition. Hence, in the result discussion, both the combine stress and
stress linearization results for stage 2 at bending moment condition is presented.
Although, only the bending moment condition has shown high combine stress, but other
conditions are also further checked with stress linearization method. The stress linearization
is conducted on the SCL, which is near to transition weld area between pup piece and
forged flange area (Refer to Figure 7.5). This SCL location on the left in Figure 7.5 is the
area of high combine stress more than 90% of yield strength.
According to ASME Section VIII Division 2, local primary membrane stress and local primary
membrane plus bending stress are tabulated along SCL, which is near to the pup piece
(on the left in Figure 7.5). Whilst, general primary membrane stress is also tabulated from
the same SCL.
In this section, the stress result of stage 2 at maximum bending moment condition is
presented, because this is the load condition that shows the highest stress among the all
the loading conditions. And, stress linearization result for this load condition is also
illustrated in Section 7.2.
Figure 7.1 illustrates the combine stress distribution for stage 2 at maximum bending
moment condition.
Figure 7.3 illustrates the width of the high stress region, which is about 109 mm (4.3 in).
Figure 7.4 illustrates the depth of the high stress region, which is about 18 mm (0.7 in).
Stress linearization location for general primary membrane stress and local primary membrane
plus bending stress at forged flange section is shown in Figure 7.5.
Pup piece
Forged flange
The SCL on the left side, it is the stress linearization for combined stress more than 90% of
yield strength (toward pup piece).
Figure 7.6 shows the stress linearization locations at forged flange high stress area.
Figure 7.7 shows the stress linearization plot for both local primary membrane plus bending
stress on anchor flange SCL.
600
550
Local Membrane Stress
508.62
Local Membrane + Bending Stress
500
Stress ( MPa )
450
400
397.21
350
300
0 2 4 6 8 10 12 14 16 18 20
Distance ( mm )
Figure 7.7 - Stress Linearization Results Plot at Forged Flange Transition Area
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 76 mm
a2 = 30 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 57 kN
True in plane angle [0, 180] = 0.0 deg
True out of plane angle [0, 90] = 0.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 38 mm
Design load factor (including all factors)* DLF = 2.0
Design load (F x DLF) fdl = 114.00 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 10 mm
Lower bracket : s2 10 mm
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN PLEM lift eye
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By JPY the 7/29/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.22
Hertz pressure ratio = 0.73
shear stress ratio = 0.31
Tension stress ratio = 0.25
Tear stress ratio = 0.21
cheek weld stress ratio = 0.28
CONCLUSION
EYE CHECK
Bearing stress
Ap Bearing area = 1692 mm
fp Bearing stress = 67.4 MPa OK
uc1 Bearing stress ratio = 0.22
Shear stress
Av Shear area = 2915 mm
fv Shear stress = 43.0 MPa OK
uc3 Shear stress ratio = 0.31
Tension stress
At Tension area = 2915 mm
ft Tension stress = 39.1 MPa OK
uc4 Tension stress ratio = 0.25
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -12.7 204.7 0.0 -49.0 19.7 0.0 0.0 0.0 0.0 -29.2 0.0 0.0 29.2 0.13
2 0.0 204.7 0.0 -49.0 0.0 0.0 0.0 0.0 0.0 -49.0 0.0 0.0 49.0 0.22
3 12.7 204.7 0.0 -49.0 -19.7 0.0 0.0 0.0 0.0 -68.7 0.0 0.0 68.7 0.30
4 -12.7 0.0 0.0 49.0 19.7 0.0 0.0 0.0 0.0 68.7 0.0 0.0 68.7 0.30
5 0.0 0.0 0.0 49.0 0.0 0.0 0.0 0.0 0.0 49.0 0.0 0.0 49.0 0.22
6 12.7 0.0 0.0 49.0 -19.7 0.0 0.0 0.0 0.0 29.2 0.0 0.0 29.2 0.13
7 -12.7 102.4 0.0 0.0 19.7 1.6 32.9 0.0 0.0 19.7 1.6 32.9 60.3 0.27
8 0.0 102.4 0.0 0.0 0.0 1.6 32.9 0.0 0.0 0.0 1.6 32.9 57.0 0.25
9 12.7 102.4 0.0 0.0 -19.7 1.6 32.9 0.0 0.0 -19.7 1.6 32.9 60.3 0.27
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
TABLE OF CONTENTS
1.0 REFERENCES
2.0 INPUT DATA
3.0 CALCULATION
4.0 RESULTS
1.0 REFERENCES
Z:\Structural\1. Job Files\Cardona (Stone Energy)\_PLEM Design\Excel and Mathcad\legs\springs\springs hard drawn wire.xmcd
Subsea7 PRODUCTION PLEM Page 2 of 3
Structural Engineering Division Prepared By: JPY
North America Region Checked By:STA
OD 2.125 in OD 53.975 mm
Coil outside diameter
D OD d 1.99 in D 50.546 mm
n s 1.2
factor of safety on solid height
mex .19
hard drawn wire
ref. 1, Table 10-4 Aex 1783MPa
Aex
Sut
mex 3
Sut 1.411 10 MPa
d
mm
E 198GPa
G 80.7GPa
L o 20.5in
free length L o 20.5 in
N a 24
number of active coils
N e 2
number of end coils ground and closed
compression at position 1 L 1 6.84in
L s d Nt ns
minimum compressed length L s 4.212 in L s 106.985 mm
L o 2d
p
pitch Na p 0.843 in
Force at pos.1
F1 L 1 k 17.575 lbf
Force at pos. 2
F2 L 2 k 39.26 lbf
Z:\Structural\1. Job Files\Cardona (Stone Energy)\_PLEM Design\Excel and Mathcad\legs\springs\springs hard drawn wire.xmcd
Subsea7 PRODUCTION PLEM Page 3 of 3
Structural Engineering Division Prepared By: JPY
North America Region Checked By:STA
2 C 1
Ks 1.034
Shear stress correction factor 2 C
8 Fmax D
Ks 83.605 ksi
Shear stress 3
d
4.0 RESULTS
UR
Stress utilization all UR 0.908
Z:\Structural\1. Job Files\Cardona (Stone Energy)\_PLEM Design\Excel and Mathcad\legs\springs\springs hard drawn wire.xmcd
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
2.0 REFERENCES
5.0 LOADS
6.0 DIMENSIONS
7.0 CALCULATIONS
1.0 DEFINITIONS
Force Unit: kip 1000 lbf
te 2.205kip
kN 224.8 lbf
kip
Stress Unit: ksi 1
2
in
MPa 0.145 ksi
lbf
psf 1
2
ft
Modulus of Elasticity E 29000ksi
lb
Density of Steel s 490
3
ft
2.0 REFERENCES
1. Roark and Young; "Formulas for Stress and Strain", 7th Edition.
2. AISC - Allowable Stress Design, 9th Edition
3. AWS D1.1 Welding Code
Subsea7 SFL MOUNTING Page 2 of 4
Structural Engineering Division Prepared By: JPY
North America Region PLATE DESIGN
Checked By:DDU
6.0 DIMENSIONS
r o otherwise
1A 0.238 1B 0.078
2A 0.7542 2B 0.8940
ax
b A
1 1A 1B 1A 0.238 A 0.0611 B 0.0706
xB xA
ax
ax b A
b A 2 2A 2B 2A
A B A
0.7542
0.0611 xB xA
xB xA
3 Wh 2 b
max_center ( 1 ) ln 1 Stress at center of the plate
2 tp
2 r'o.
max_center 2.684 ksi max_center 18.509 MPa
max_center
UC1 UC1 0.072
allt
2 Wh
max_edge Stress at center of long edge
2
tp
max_edge 4.12 ksi max_edge 28.38 MPa
max_edge
UC2 UC2 0.11
allt
2
Wh b
ymax Maximum deflection
3
E tp
ymax 0.014 in ymax 0.365 mm
ymax
UC3 UC3 0.138
b
240
Subsea7 SFL MOUNTING Page 4 of 4
Structural Engineering Division Prepared By: JPY
North America Region PLATE DESIGN
Checked By:DDU
br
0.48
ar
xC 0.40
xD 0.50
C 1.73 D 1.146
C 0.167 D 0.081
br br
xC xC
ar ar
r C D C 1.2628 r C D C 0.098
xD xC xD xC
r Mh
0.0015
3
E tp
r Mh
b 22.502 ksi b 155.143 MPa Stress at center
2
ar tp
b
UC4 UC4 0.6
allt
r br Mh
a 10.801 ksi a 74.469 MPa Stress at outer edge
2 2
ar tp
a
UC5 UC5 0.288
allt
UC6 UC1 UC4 UC6 0.672 Stress at the center of the plate
UC7 UC2 UC5 0.398 UC7 0.398 Stress at the edge of the plate
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 25 mm
b1 = 166 mm t1 = 19 mm z1 = 213 mm
b2 = 166 mm t2 = 19 mm z2 = -10 mm
a1 = 244 mm
a2 = 244 mm
zn is given from the bottom of main plate to the middle of each bracket.
Weld size
Upper bracket : s1 13 mm
Lower bracket : s2 13 mm
p. 1
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Main padeye at top
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.28
Hertz pressure ratio = 0.88
shear stress ratio = 0.30
Tension stress ratio = 0.24
Tear stress ratio = 0.33
cheek weld stress ratio = 0.26
CONCLUSION
p. 2
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Main padeye at top
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 2642 mm
fp Bearing stress = 87.8 MPa OK
uc1 Bearing stress ratio = 0.28
Shear stress
Av Shear area = 6129 mm
fv Shear stress = 41.6 MPa OK
uc3 Shear stress ratio = 0.30
Tension stress
At Tension area = 6129 mm
ft Tension stress = 37.9 MPa OK
uc4 Tension stress ratio = 0.24
p. 3
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Main padeye at top
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -83.0 222.3 20.2 0.0 23.1 0.0 0.0 0.0 0.0 43.3 0.0 0.0 43.3 0.19
2 0.0 222.3 20.2 0.0 0.0 2.8 0.0 0.0 0.0 20.2 2.8 0.0 20.8 0.09
3 83.0 222.3 20.2 0.0 -23.1 0.0 0.0 0.0 0.0 -2.9 0.0 0.0 2.9 0.01
4 -83.0 -19.1 20.2 0.0 23.1 0.0 0.0 0.0 0.0 43.3 0.0 0.0 43.3 0.19
5 0.0 -19.1 20.2 0.0 0.0 2.8 0.0 0.0 0.0 20.2 2.8 0.0 20.8 0.09
6 83.0 -19.1 20.2 0.0 -23.1 0.0 0.0 0.0 0.0 -2.9 0.0 0.0 2.9 0.01
7 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
8 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
9 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
p. 4
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Main padeye at top
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket 13 mm F1 = 63.9 kN 15 MPa 0.11 tension = +
Lower bracket 13 mm F2 = 63.9 kN 15 MPa 0.11 compression = -
p. 5
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Buoyancy Yoke Hinge
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 25 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 130 mm
a2 = 130 mm
zn is given from the bottom of main plate to the middle of each bracket.
Weld size
Upper bracket : s1 13 mm
Lower bracket : s2 13 mm
p. 6
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Buoyancy Yoke Hinge
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.27
Hertz pressure ratio = 0.86
shear stress ratio = 0.44
Tension stress ratio = 0.35
Tear stress ratio = 0.23
cheek weld stress ratio = 0.00
CONCLUSION
p. 7
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Buoyancy Yoke Hinge
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1210 mm
fp Bearing stress = 82.7 MPa OK
uc1 Bearing stress ratio = 0.27
Shear stress
Av Shear area = 1815 mm
fv Shear stress = 60.6 MPa OK
uc3 Shear stress ratio = 0.44
Tension stress
At Tension area = 1815 mm
ft Tension stress = 55.1 MPa OK
uc4 Tension stress ratio = 0.35
p. 8
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Buoyancy Yoke Hinge
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -9.5 165.1 31.6 0.0 145.3 0.0 0.0 0.0 0.0 176.9 0.0 0.0 176.9 0.78
2 0.0 165.1 31.6 0.0 0.0 0.0 0.0 0.0 0.0 31.6 0.0 0.0 31.6 0.14
3 9.5 165.1 31.6 0.0 -145.3 0.0 0.0 0.0 0.0 -113.7 0.0 0.0 113.7 0.50
4 -9.5 0.0 31.6 0.0 145.3 0.0 0.0 0.0 0.0 176.9 0.0 0.0 176.9 0.78
5 0.0 0.0 31.6 0.0 0.0 0.0 0.0 0.0 0.0 31.6 0.0 0.0 31.6 0.14
6 9.5 0.0 31.6 0.0 -145.3 0.0 0.0 0.0 0.0 -113.7 0.0 0.0 113.7 0.50
7 -9.5 82.6 31.6 0.0 145.3 5.3 0.0 0.0 0.0 176.9 5.3 0.0 177.1 0.78
8 0.0 82.6 31.6 0.0 0.0 5.3 0.0 0.0 0.0 31.6 5.3 0.0 32.9 0.14
9 9.5 82.6 31.6 0.0 -145.3 5.3 0.0 0.0 0.0 -113.7 5.3 0.0 114.1 0.50
p. 9
TC1057 - Stone
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Buoyancy Yoke Hinge
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check RDH By AG the 2/19/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 10
- Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Bouy. Yoke Hinge on Frame
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/28/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 150 mm
a2 = 150 mm
zn is given from the bottom of main plate to the middle of each bracket.
Weld size
Upper bracket : s1 0 mm
Lower bracket : s2 0 mm
p. 11
- Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Bouy. Yoke Hinge on Frame
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/28/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.31
Hertz pressure ratio = 0.90
shear stress ratio = 0.29
Tension stress ratio = 0.24
Tear stress ratio = 0.19
cheek weld stress ratio = 0.00
CONCLUSION
p. 12
- Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Bouy. Yoke Hinge on Frame
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/28/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1626 mm
fp Bearing stress = 97.2 MPa OK
uc1 Bearing stress ratio = 0.31
Shear stress
Av Shear area = 4314 mm
fv Shear stress = 40.3 MPa OK
uc3 Shear stress ratio = 0.29
Tension stress
At Tension area = 4314 mm
ft Tension stress = 36.6 MPa OK
uc4 Tension stress ratio = 0.24
p. 13
- Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Bouy. Yoke Hinge on Frame
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/28/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -12.7 239.7 25.8 0.0 112.1 0.0 0.0 0.0 0.0 137.8 0.0 0.0 137.8 0.61
2 0.0 239.7 25.8 0.0 0.0 0.0 0.0 0.0 0.0 25.8 0.0 0.0 25.8 0.11
3 12.7 239.7 25.8 0.0 -112.1 0.0 0.0 0.0 0.0 -86.3 0.0 0.0 86.3 0.38
4 -12.7 0.0 25.8 0.0 112.1 0.0 0.0 0.0 0.0 137.8 0.0 0.0 137.8 0.61
5 0.0 0.0 25.8 0.0 0.0 0.0 0.0 0.0 0.0 25.8 0.0 0.0 25.8 0.11
6 12.7 0.0 25.8 0.0 -112.1 0.0 0.0 0.0 0.0 -86.3 0.0 0.0 86.3 0.38
7 -12.7 119.9 25.8 0.0 112.1 4.7 0.0 0.0 0.0 137.8 4.7 0.0 138.1 0.61
8 0.0 119.9 25.8 0.0 0.0 4.7 0.0 0.0 0.0 25.8 4.7 0.0 27.0 0.12
9 12.7 119.9 25.8 0.0 -112.1 4.7 0.0 0.0 0.0 -86.3 4.7 0.0 86.7 0.38
p. 14
- Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Bouy. Yoke Hinge on Frame
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/28/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 15
Subsea7 PIN CALCULATION Prepared By: EJO
Structural Engineering Division Checked By: JPY
North America Region STONE CARDONA
Ma
Do Di
t1 g1 t2 g2 t3
TABLE OF CONTENTS
1.0 REFERENCES
2.0 ASSUMPTIONS
p. 16 Page 1
Subsea7 PIN CALCULATION Prepared By: EJO
Structural Engineering Division Checked By: JPY
North America Region STONE CARDONA
1.0 REFERENCES
[Ref 1] STAAD Pro. Model: midwater.std
[Ref 2] Drawings
[Ref 3] AISC Steel Construction Manual
2.0 ASSUMPTION
The Pin is checked as per the Beam theory, following AISC.
The Pin is checked for the worst case scenario, when the hinges are centered.
3.0 HINGE CONNECTION [Ref 2]
Padeyes attached to Wing thickness t1 0.75in t1 19.05 mm
t3 0.75in t3 19.05 mm
g 1 0.25in g 1 6.35 mm
Connection geometry
g 2 0.25in g 2 6.35 mm
D i 0mm D i 0 in
35.5 157.912
Force (from STAAD) Ta kip Ta kN
13.7 60.941
1.5 6.672
Applied shear (from STAAD) Va kip Va kN
1.53 6.806
p. 17 Page 2
Subsea7 PIN CALCULATION Prepared By: EJO
Structural Engineering Division Checked By: JPY
North America Region STONE CARDONA
t1 t2
left side distance a g1 a 0.029 m a 1.125 in
2 2
t2 t3
right side distance b g2 b 0.029 m b 1.125 in
2 2
5.1 FORCES
P1 b 78.956 17.75
left reaction
R 1 R1 kN R1 kip
L 30.47 6.85
P1 a 78.956 17.75
right reaction R 2 R2 kN R2 kip
L 30.47 6.85
max shear
Vmax max R 1 R 2 Vmax 78.956 kN Vmax 17.75 kip
V1 2.42
angle to take into account for the shear atan deg
P1 6.372
p. 18 Page 3
Subsea7 PIN CALCULATION Prepared By: EJO
Structural Engineering Division Checked By: JPY
North America Region STONE CARDONA
2.256 1.664
right moment M2 R 2 b M2 kN m M2 kip ft
0.871 0.642
Do Di
4 4 5 4 4
Inertia of section I I 7.981 10 mm I 1.917 in
64
I
section modulus S 4 3 3
Do S 2.514 10 mm S 1.534 in
2
2 2
A Do Di 3 2 2
section area 4 A 3.167 10 mm A 4.909 in
Mmax
bending stress b b 89.753 MPa b 13.018 ksi
S
4 Vmax
shear stress 33.242 MPa 4.821 ksi
3 A
allowableshear 0.4 fy 137.895 MPa URshear 0.241
allowableshear
b
allowablebending 0.75 fy 258.553 MPa URbending 0.347
allowablebending
( for solid bar)
p. 19 Page 4
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Ta
Do
Di
t1 t2 g2 t3 t4
g1 g3
TABLE OF CONTENTS
1.0 REFERENCES
2.0 ASSUMPTIONS
p. 6 Page 1
Subsea7 PIN CALCULATION HINGED Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region CONNECTION
1.0 REFERENCES
[Ref 1] STAAD Pro. Model: yoke.std
[Ref 2] Drawings
[Ref 3] AISC Steel Construction Manual
2.0 ASSUMPTION
The Pin is checked as per the Beam theory, following AISC.
The Pin is checked for the worst case scenario. The padeyes attached to the Yoke are shifted to one end of the pin.
3.0 HINGE CONNECTION [Ref 2]
Padeyes attached to PLET thickness t2 1in t2 25.4 mm
t3 1in t3 25.4 mm
t4 1.25in t4 1.25 in
g 1 0.75in g 1 19.05 mm
Connection geometry
g 2 5.37in g 2 136.398 mm
g 3 0in g 3 0 in
D i 0mm D i 0 in
452 101.614
Force (from STAAD) Ta kN Ta kip
614 138.033
16 11.801
Applied moment (from STAAD) Ma kN m Ma kip ft
23.2 17.111
25 5.62
Applied shear (from STAAD) Va kN Va kip
63 14.163
p. 7 Page 2
Subsea7 PIN CALCULATION HINGED Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region CONNECTION
t1 t2
left side distance a g1 a 0.048 m a 1.875 in
2 2
t2 t3
middle distance b g2 b 0.162 m b 6.37 in
2 2
t3 t4
right side distance c g3 c 0.029 m c 1.125 in
2 2
p. 8 Page 3
Subsea7 PIN CALCULATION HINGED Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region CONNECTION
5.1 FORCES
P1 ( L a) P2 c 275.138 61.853
left reaction
R 1 R1 kN R1 kip
L 379.907 85.406
P2 ( L c) P1 a 176.862 39.76
right reaction R 2 R2 kN R2 kip
L 234.093 52.626
max shear
Vmax max R 1 R 2 Vmax 379.907 kN Vmax 85.406 kip
V1 5.192
angle to take into account for the shear atan deg
R1 9.416
Do Di
4 4 6 4 4
Inertia of section I I 3.066 10 mm I 7.366 in
64
I
section modulus S 4 3 3
Do S 6.898 10 mm S 4.209 in
2
Do Di
2 2
A 3 2 2
section area 4 A 6.207 10 mm A 9.621 in
Mmax
bending stress b b 262.305 MPa b 38.044 ksi
S
4 Vmax
shear stress 81.606 MPa 11.836 ksi
3 A
allowableshear 0.4 fy 206.843 MPa URshear 0.395
allowableshear
b
allowablebending 0.75 fy 387.83 MPa URbending 0.676
allowablebending
( for solid bar)
p. 9 Page 4
p. 10
p. 11
p. 12
p. 13
p. 14
p. 15
p. 16
p. 17
p. 18
p. 19
p. 20
p. 21
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
TABLE OF CONTENT
1.0 REFERENCES
2.0 INPUTS
3.0 CALCULATIONS
4.0 RESULTS
1.0 REFERENCES
AISC - Allowable Stress Design, 14th Edition
2.0 INPUTS
SMYS of Plate Fy 50 ksi
Length of plate L 57 in
Width of plate W 27 in
Plate thickness tp 1in
L 2 4in
Impact area
w2 4in
3.0 CALCULATIONS
Beam Check
Design Assumption
1. The beam is assumed to be simply supported at the ends.
2. All impact is assumed to be absorbed by local bending of the beam.
p. 1 Page 1
Subsea7 Cardona Page 2 of 2
Structural Engineering Division Prepared By:JPY
North America Region Checked By:DDU
Design Philosophy
Using the theory of plastic deformation to determine the maximum displacement of the beam,
the following equations are used:
Lb
Workdone by the displacement of the load Wd = Pu
2
Maximum Deflection Calculation
4 Mp
Max.plastic load Pu Pu 216.948 kN
Lb
Eimp
Max.plastic deformation b b 6.9 mm b 0.27 in
Pu
w1
W w2 w1 11.5 in
2
w3 w1 11.5 in
L 1
L L2 L 1 26.5 in
2
L3 L 1 673.1 mm
Aim w2 L2
Impact area
2
tp
Plastic moment per unit length Mpp Fy
4
p. 2 Page 2
Subsea7 Cardona Page 1 of 1
Structural Engineering Division Prepared By: JPY
North America Region Checked By:DDU
Eimp 1500J
Impact Energy
3
Plastic moment of inertia W4x13 Zb 6.28in
Lb
Workdone by the displacement of the load Wd = Pu
2
Maximum Deflection Calculation
4 Mp
Max.plastic load Pu Pu 166.775 kN
Lb Pu 37.493 kip
Eimp
Max.plastic deformation b b 9 mm b 0.35 in
Pu
p. 3 Page 1
Subsea7 Cardona Page 1 of 1
Structural Engineering Division Prepared By: JPY
North America Region Checked By:DDU
3
Plastic moment of inertia W8x28 Zb 24.3in
Maximum span L b 57 in
3.0 CALCULATIONS
Beam Check
Design Assumption
1. The beam is assumed to be simply supported at the ends.
2. All impact is assumed to be absorbed by local bending of the beam.
Design Philosophy
Using the theory of plastic deformation to determine the maximum displacement of the beam,
the following equations are used:
Lb
Workdone by the displacement of the load Wd = Pu
2
Maximum Deflection Calculation
4 Mp
Max.plastic load Pu Pu 379.269 kN
Lb
Eimp
Max.plastic deformation b b 4 mm b 0.16 in
Pu
p. 4 Page 1
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 251 mm t1 = 10 mm z1 = 208 mm
b2 = 178 mm t2 = 10 mm z2 = 59 mm
a1 = 93 mm
a2 = 53 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 62 kN
True in plane angle [0, 180] = 22.0 deg
True out of plane angle [0, 90] = 9.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 35 mm
Design load factor (including all factors)* DLF = 2.0
Design load (F x DLF) fdl = 124.40 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 8 mm
Lower bracket : s2 8 mm
p. 1
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 2 leg install
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/25/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.26
Hertz pressure ratio = 0.68
shear stress ratio = 0.42
Tension stress ratio = 0.34
Tear stress ratio = 0.20
cheek weld stress ratio = 0.38
CONCLUSION
p. 2
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 2 leg install
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/25/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1558 mm
fp Bearing stress = 79.8 MPa OK
uc1 Bearing stress ratio = 0.26
Shear stress
Av Shear area = 2378 mm
fv Shear stress = 57.5 MPa OK
uc3 Shear stress ratio = 0.42
Tension stress
At Tension area = 2378 mm
ft Tension stress = 52.3 MPa OK
uc4 Tension stress ratio = 0.34
p. 3
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 2 leg install
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/25/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -125.5 213.2 4.9 -17.8 21.0 0.0 0.0 14.6 0.0 22.7 0.0 0.0 22.7 0.10
2 0.0 213.2 4.9 -17.8 0.0 9.9 22.1 0.0 11.1 -12.9 21.0 22.1 54.3 0.24
3 125.5 213.2 4.9 -17.8 -21.0 0.0 0.0 -14.6 0.0 -48.5 0.0 0.0 48.5 0.21
4 -89.0 -10.0 4.9 25.6 22.1 0.0 0.0 -29.0 0.0 23.5 0.0 0.0 23.5 0.10
5 0.0 -10.0 4.9 25.6 0.0 7.6 22.1 0.0 -15.7 30.5 -8.1 22.1 50.9 0.22
6 89.0 -10.0 4.9 25.6 -22.1 0.0 0.0 29.0 0.0 37.4 0.0 0.0 37.4 0.16
7 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
8 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
9 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
p. 4
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 2 leg install
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/25/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket 8 mm F1 = -29.9 kN 28 MPa 0.21 tension = +
Lower bracket 8 mm F2 = 30.5 kN 51 MPa 0.37 compression = -
p. 5
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 4 point recovery eyes
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 251 mm t1 = 10 mm z1 = 208 mm
b2 = 178 mm t2 = 0 mm z2 = 59 mm
a1 = 93 mm
a2 = 53 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 41 kN
True in plane angle [0, 180] = 70.0 deg
True out of plane angle [0, 90] = 8.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 35 mm
Design load factor (including all factors)* DLF = 3.0
Design load (F x DLF) fdl = 122.10 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 8 mm
Lower bracket : s2 8 mm
p. 6
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 4 point recovery eyes
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.25
Hertz pressure ratio = 0.67
shear stress ratio = 0.41
Tension stress ratio = 0.33
Tear stress ratio = 0.20
cheek weld stress ratio = 0.37
CONCLUSION
p. 7
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 4 point recovery eyes
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1558 mm
fp Bearing stress = 78.4 MPa OK
uc1 Bearing stress ratio = 0.25
Shear stress
Av Shear area = 2378 mm
fv Shear stress = 56.5 MPa OK
uc3 Shear stress ratio = 0.41
Tension stress
At Tension area = 2378 mm
ft Tension stress = 51.3 MPa OK
uc4 Tension stress ratio = 0.33
p. 8
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 4 point recovery eyes
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -125.5 213.2 14.8 -7.9 46.2 0.0 0.0 -3.4 0.0 49.7 0.0 0.0 49.7 0.22
2 0.0 213.2 14.8 -7.9 0.0 13.8 8.0 0.0 -2.6 6.9 11.2 8.0 24.8 0.11
3 125.5 213.2 14.8 -7.9 -46.2 0.0 0.0 3.4 0.0 -35.9 0.0 0.0 35.9 0.16
4 -89.0 0.0 14.8 14.1 32.3 0.0 0.0 0.0 0.0 61.2 0.0 0.0 61.2 0.27
5 0.0 0.0 14.8 14.1 0.0 0.0 0.0 0.0 0.0 28.9 0.0 0.0 28.9 0.13
6 89.0 0.0 14.8 14.1 -32.3 0.0 0.0 0.0 0.0 -3.4 0.0 0.0 3.4 0.02
7 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
8 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
9 0.0 N/A N/A 0.0 0.0 N/A N/A 0.0 0.0 N/A N/A N/A N/A 0.00
p. 9
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat 4 point recovery eyes
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket 8 mm F1 = 18.6 kN 18 MPa 0.13 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 10
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat splash sacrificial
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 129 mm
a2 = 92 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 37 kN
True in plane angle [0, 180] = 32.0 deg
True out of plane angle [0, 90] = 0.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 35 mm
Design load factor (including all factors)* DLF = 2.0
Design load (F x DLF) fdl = 74.00 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 0 mm
Lower bracket : s2 0 mm
p. 11
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat splash sacrificial
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.15
Hertz pressure ratio = 0.52
shear stress ratio = 0.25
Tension stress ratio = 0.20
Tear stress ratio = 0.14
cheek weld stress ratio = 0.23
CONCLUSION
p. 12
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat splash sacrificial
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1558 mm
fp Bearing stress = 47.5 MPa OK
uc1 Bearing stress ratio = 0.15
Shear stress
Av Shear area = 2380 mm
fv Shear stress = 34.2 MPa OK
uc3 Shear stress ratio = 0.25
Tension stress
At Tension area = 2380 mm
ft Tension stress = 31.1 MPa OK
uc4 Tension stress ratio = 0.20
p. 13
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat splash sacrificial
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 4
Combined stresses
p. 14
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat splash sacrificial
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 15
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat lift sacrifical
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 10 mm
Fillet weld size between main plate and support = N/A 10 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 129 mm
a2 = 92 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 88 kN
True in plane angle [0, 180] = 0.0 deg
True out of plane angle [0, 90] = 0.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 35 mm
Design load factor (including all factors)* DLF = 2.0
Design load (F x DLF) fdl = 175.20 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 0 mm
Lower bracket : s2 0 mm
p. 16
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat lift sacrifical
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.36
Hertz pressure ratio = 0.79
shear stress ratio = 0.59
Tension stress ratio = 0.47
Tear stress ratio = 0.34
cheek weld stress ratio = 0.54
CONCLUSION
p. 17
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat lift sacrifical
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1558 mm
fp Bearing stress = 112.4 MPa OK
uc1 Bearing stress ratio = 0.36
Shear stress
Av Shear area = 2380 mm
fv Shear stress = 81.0 MPa OK
uc3 Shear stress ratio = 0.59
Tension stress
At Tension area = 2380 mm
ft Tension stress = 73.6 MPa OK
uc4 Tension stress ratio = 0.47
p. 18
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat lift sacrifical
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -12.7 269.9 0.0 -73.1 38.8 0.0 0.0 0.0 0.0 -34.3 0.0 0.0 34.3 0.15
2 0.0 269.9 0.0 -73.1 0.0 0.0 0.0 0.0 0.0 -73.1 0.0 0.0 73.1 0.32
3 12.7 269.9 0.0 -73.1 -38.8 0.0 0.0 0.0 0.0 -111.9 0.0 0.0 111.9 0.49
4 -12.7 0.0 0.0 73.1 38.8 0.0 0.0 0.0 0.0 111.9 0.0 0.0 111.9 0.49
5 0.0 0.0 0.0 73.1 0.0 0.0 0.0 0.0 0.0 73.1 0.0 0.0 73.1 0.32
6 12.7 0.0 0.0 73.1 -38.8 0.0 0.0 0.0 0.0 34.3 0.0 0.0 34.3 0.15
7 -12.7 135.0 0.0 0.0 38.8 1.9 38.3 0.0 0.0 38.8 1.9 38.3 77.0 0.34
8 0.0 135.0 0.0 0.0 0.0 1.9 38.3 0.0 0.0 0.0 1.9 38.3 66.5 0.29
9 12.7 135.0 0.0 0.0 -38.8 1.9 38.3 0.0 0.0 -38.8 1.9 38.3 77.0 0.34
p. 19
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Mudmat lift sacrifical
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 20
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Eye for shop handling
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 1
Weld type between brackets and support = 0 (0 means full penetration / 1 means fillet weld)
Weld type between main plate and support = 0 (0 means full penetration / 1 means fillet weld)
Fillet weld size between brackets and support = N/A 7.9 mm
Fillet weld size between main plate and support = N/A 7.9 mm
b1 = 0 mm t1 = 0 mm z1 = 0 mm
b2 = 0 mm t2 = 0 mm z2 = 0 mm
a1 = 30 mm
a2 = 30 mm
zn is given from the bottom of main plate to the middle of each bracket.
Static load F= 84 kN
True in plane angle [0, 180] = 45.0 deg
True out of plane angle [0, 90] = 0.0 deg
Percentage of uncertainties out of plane %= 5.0
Pin diameter Dp = 35.1 mm
Design load factor (including all factors)* DLF = 2.0
Design load (F x DLF) fdl = 168.00 kN
* Please refer to spreadsheet manual for the detail of load factors to take into account
Weld size
Upper bracket : s1 0 mm
Lower bracket : s2 0 mm
p. 21
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Eye for shop handling
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 2
EYE CHECK
Bearing stress ratio = 0.40
Hertz pressure ratio = 0.84
shear stress ratio = 0.68
Tension stress ratio = 0.55
Tear stress ratio = 0.44
cheek weld stress ratio = 0.57
CONCLUSION
p. 22
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Eye for shop handling
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 3
EYE CHECK
Bearing stress
Ap Bearing area = 1337 mm
fp Bearing stress = 125.6 MPa OK
uc1 Bearing stress ratio = 0.40
Shear stress
Av Shear area = 1969 mm
fv Shear stress = 93.8 MPa OK
uc3 Shear stress ratio = 0.68
Tension stress
At Tension area = 1969 mm
ft Tension stress = 85.3 MPa OK
uc4 Tension stress ratio = 0.55
p. 23
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Eye for shop handling
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 4
Combined stresses
Loc. y z fa fby fbz fvy fvz fto1 fto2 x y z vm vm
Point mm mm MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa MPa ratio
1 -9.5 203.0 30.7 -86.3 65.0 0.0 0.0 0.0 0.0 9.4 0.0 0.0 9.4 0.04
2 0.0 203.0 30.7 -86.3 0.0 0.0 0.0 0.0 0.0 -55.5 0.0 0.0 55.5 0.24
3 9.5 203.0 30.7 -86.3 -65.0 0.0 0.0 0.0 0.0 -120.5 0.0 0.0 120.5 0.53
4 -9.5 0.0 30.7 86.3 65.0 0.0 0.0 0.0 0.0 181.9 0.0 0.0 181.9 0.80
5 0.0 0.0 30.7 86.3 0.0 0.0 0.0 0.0 0.0 117.0 0.0 0.0 117.0 0.51
6 9.5 0.0 30.7 86.3 -65.0 0.0 0.0 0.0 0.0 52.0 0.0 0.0 52.0 0.23
7 -9.5 101.5 30.7 0.0 65.0 3.3 46.1 0.0 0.0 95.7 3.3 46.1 124.7 0.55
8 0.0 101.5 30.7 0.0 0.0 3.3 46.1 0.0 0.0 30.7 3.3 46.1 85.7 0.38
9 9.5 101.5 30.7 0.0 -65.0 3.3 46.1 0.0 0.0 -34.2 3.3 46.1 87.0 0.38
p. 24
TC1057 - Stone Energy
SUBSEA 7 Cardona
Subject:
PADEYE DESIGN Eye for shop handling
Spreadsheet Ref : GR-DCE-STR-004 - Rev 5 by JPY check By JPY the 7/29/2014 Rev : 0 Page : 5
WELDS CHECK
Weld stress for fillet welds between main plate and brackets
Weld Load transferred to main Stress within Weld stress
thickness plate weld ratio
Upper bracket N/A F1 = 0.0 kN N/A 0.00 tension = +
Lower bracket N/A F2 = 0.0 kN N/A 0.00 compression = -
p. 25
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
TABLE OF CONTENTS
1.0 REFERENCES
2.0 ASSUMPTIONS
4.0 CHECK
5.0 CONCLUSION
1.0 REFERENCES
API Bulletin 2V
TC1057-DR-XX-25015-00
2.0 ASSUMPTION
Panel represented by one long edge clamped, other long edge free, both short edges simply supported
p. 1 Page 1
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
0.3
width
b 14 in
thickness
t 0.75in
a
2.057
b
Using curve D: one long edge clamped, other long edge free, both short edges simply supported
k 1.3
p. 2 Page 2
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
2 2
servicibililty k E t
fxse
12 1
2
b fxse 101.16 ksi
1.67
FS
fxsp
fall.serv 28.722 ksi
FS
ansys 1
URserv 0.7 1.429
fall.serv URserv
ultimate Fy50
b
0.762
t E
2 1
fxu10 a Fy50 if 1
2
Fy50 otherwise
Fy50
fxu20 a if 1
Fy50 otherwise
fxu min fxu10 fxu20 8
fxu 3.45 10 Pa
fxu
fall.ult fall.ult 24.969 ksi
1.2
ansys
URult 0.805
fall.ult
p. 3 Page 3
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
width b 1 14 in
thickness
t1 0.5in
a1
2.057
b1
Using curve D: one long edge clamped, other long edge free, both short edges simply supported
k1 1.3
p. 4 Page 4
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
servicibililty 2 2
k1 E t1
fxse1
12 1
2
b1
fxse1 44.96 ksi
ultimate b1 Fy36
1 0.97
t1 E
2 1
fxu11 a Fy36 if 1 1
1 1
2
Fy36 otherwise
Fy36
fxu21 a if 1 1
1
Fy36 otherwise
fxu1 min fxu11 fxu21 8
fxu1 2.482 10 Pa
fxu1
fall.ult1 fall.ult1 17.964 ksi
1.2
ansys1
URult1 0.657
fall.ult1
p. 5 Page 5
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
b 2 14 in
width
thickness
t2 0.375 in
a2
4.114
b2
Using curve D: one long edge clamped, other long edge free, both short edges simply supported
k2 1.35
p. 6 Page 6
Subsea7 Stone Cardona Prepared By: JPY
Structural Engineering Division Checked By:DDU
North America Region PLEM Mudmat
servicibililty 2 2
k2 E t2
fxse2 fxse2 26.263 ksi
12 1
2 b2
2
Fy36 fxse2
otherwise fxsp2 26.263 ksi
Fp36 Fy36 Fp36 fxse2
2
fxsp2
fall.serv2 15.726 ksi
FS
ansys2
URserv2 0.816
fall.serv2
ultimate b2 Fy36
2 1.293
t2 E
2 1
fxu12 a Fy36 if 2 1
2 2
2
Fy36 otherwise
Fy36
fxu22 a if 2 1
2
Fy36 otherwise
fxu2 min fxu12 fxu22 8
fxu2 1.919 10 Pa
fxu22
fall.ult2 fall.ult2 13.89 ksi
1.2
ansys2
URult2 0.924
fall.ult2
5.0 CONCLUSION
p. 7 Page 7
API2V.xlsx sacrificiala1 8/20/2014
area316and480
0 5.8 8.5
0.2 6.6 2.1
1.4 1.3 3.1 fxa147 5.45 fxa258 7.15 fxa369 8.525
4.7 7.9 6.3 fxb147 6.95 fxb258 12.95 fxb369 21.475
0.3 4.5 0.2 txy147 1.275 txy258 3.075 txy369 2.9
2 1.9 1.8
12.4 18.6 30 12.4 20.1 30
0.3 0 1.6
0.3 7.2 4.9
p. 8
API2V.xlsx sacrificiala2 8/20/2014
Area385
p. 9
API2V.xlsx sacrificiala3 8/20/2014
area562
p. 10
API2V.xlsx recovery 8/20/2014
area636641 forrecoverycase
p. 11
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
P
L
E
M
B
W
i
t
h
o
u
t
A
/
R
y
o
k
e
,
w
i
t
h
o
u
t
B
u
o
y
a
n
c
y
y
o
k
e
,
w
i
t
h
c
a
p
s
1
4
.
0
0
T
e
1
.
0
7
x
1
4
.
0
0
=
1
4
.
9
8
T
e
3016.99 [118.78]
3319.06 [130.67]
724.82 [28.54]
1586.61 [62.47]
calculated: 733 mm
88.90 [3.50]
2587.57 [101.87]
calculated: 2566 mm
2447.58 [96.36]
4118.48 [162.15]
2 of 14
s
p
a
c
h
t
i
w
,
e
k
o
y
y
c e
T
n 2
B a 9
.
y 6
1
M o e =
u T
1
e
E b 8
.
T
1
L t
u
5
1 8
.
P o
5
1
x
h
t 7
i
w
0
.
1
,
e
k
o
y
calculated: 2825 mm
R
/
2850.95 [112.24]
A
h
t
i
W
calculated: 659 mm
650.06 [25.59]
3 of 14
s
p
a
c
h
t
i
w
,
e
k e
o T
y 9
2
B y
c
.
7
1
e
M n T =
E a 6 e
T
L y 1
. 6
P u 6
1 1
.
o 6
1
b x
h
t
7
0
.
i
w
1
,
R
/
A
calculated: 2862 mm
h
2882.62 [113.49]
t
i
W
calculated: 679 mm
670.34 [26.39]
2080.43 [81.91]
4 of 14
s
p
a
c
t
u
o
h
t
i
w
A ,
e
M k
E o e
L y T
2
P y 4
.
c e 5
d n T
1
=
n a 2 2
a y 4
. 4
.
B o 4
1 4
u 1
x
M b 7
E t
u
0
.
1
L o
P h
t
i
w
,
R
/
calculated: 2811 mm
A
2807.88 [110.55]
h
t
i
W
calculated: 513 mm
508.06 [20.00]
5 of 14
s
p
a
c
h
t
i
w
,
e
k
o
y
y
c
n e
T
a 4
y 4
A o .
5
u e
1
=
M B T
3 e
E t
u
4
.
T
3
L o
4
1 4
.
P h
4
1
t
i x
w 7
0
.
,
e
1
calculated: 2545 mm
k
o
2564.66 [100.97]
y
R
/
A
t
u
o
h
t
i
W
calculated: 811 mm
804.03 [31.65]
6 of 14
s
p
a
c
h
t
i
w
,
e
k
o
y
y
c e
T
n 9
A a 3
.
y 7
1
M o e =
u T e
E B 5
2
.
T
5
L t 6
1 2
P u .
6
o 1
x
h
t 7
i
w
0
.
1
,
e
k
o
y
R
/
A
calculated: 2800 mm
h
2823.39 [111.16]
t
i
W
calculated, dry: 730 mm
722.28 [28.44]
7 of 14
1859.70 [73.22]
s
p
a
c
h
t
i
w
,
e
k e
o T
y 6
7
A y .
7
c e
1
M n T =
E a 0 e
T
L y 6
. 0
P u 6
1 6
.
o 6
1
b x
h
t
7
0
.
i
w
1
,
R
/
A
calculated: 2836 mm
h
2854.77 [112.39]
t
i
W
calculated: 748 mm
740.52 [29.15]
8 of 14
19.31 [.76]
e
1034.32 [40.72]
k g
k
o 9
y 5
3
y
c g
k
=
g
n 5
3
k
5
a 3 3
y 3
o x
u 7
0
.
B 1
3822.93 [150.51]
2073.31 [81.63]
9 of 14
g
k
e 9
3
k e 9
o
2235.20 [88.00]
T 1
y g
k
=
3
R 3
1
1
8
/
A
8
1
1
x
7
0
.
1
10 of 14
322.17 [12.68]
e
T
9
T 3
.
4
A e
1
M T
5
=
e
D 4
.
T
5
U 3
1 4
.
3
M 1
x
7
0
.
1
11 of 14
verticalcogrefpipeaxis longCOGreffrontofstructure(NOTpup)
dry wet dry wet cog cog*mass cog*mass cog cog*mass cog*mass
source
Item qty [kg] [kg] [kg] [kg] [mm] [kg*mm] [kg*mm] [mm] [kg*mm] [kg*mm]
ea ea dry submerged dry submerged
pipeinsulation 1 212 31 212 31 500 106000 15500.0 2340 496080.0 72540.0 estmated,centerofprodhub
valveinsulation 3 52 8 156 24 500 78000 12000.0 2340 365040.0 56160.0 calculated
entrappedwater 1 71 0 71 0 1000 71000 0.0 2340 166140.0 0.0 calculated
CVChub 1 505 439.35 505 439.35 1934 976670 849702.9 1570 792850.0 689779.5 sk08091351rev01
CVChub 1 505 439.35 505 439.35 1386 699930 608939.1 4086 2063430.0 1795184.1 sk08091351rev01
1"10KROVcheminjection 2 208 180.96 416 361.92 500 208000 180960.0 2560 1064960.0 926515.2 PacsonGA13272
51/8API10KManualgatevalve 1 729 634.23 729 634.23 843 614547 534655.9 1570 1144530.0 995741.1 FMCDU100039348
51/8API10Khydraulicgatevalve 1 1384 1204.08 1384 1204.08 618 855312 744121.4 800 1107200.0 963264.0 FMCDU100039350
51/8API10Khydraulicgatevalve 1 1384 1204.08 1384 1204.08 618 855312 744121.4 2340 3238560.0 2817547.2 FMCDU100039350
anchorflange 1 83 72.21 83 72.21 0 0 0.0 152 12616.0 10975.9 calculated
straightpiping 1 95 82.65 95 82.65 500 47500 41325.0 2340 222300.0 193401.0 calculated
6x3tee 1 24.1 20.967 24.1 20.967 0 0 0.0 1284 30944.4 26921.6 Inventor
6x3tee 1 25.1 21.837 25.1 21.837 0 0 0.0 1874 47037.4 40922.5 Inventor
6x3tee 1 26.1 22.707 26.1 22.707 0 0 0.0 2160 56376.0 49047.1 Inventor
6x6tee 1 29 25.23 29 25.23 0 0 0.0 1874 54346.0 47281.0 Inventor
3x2reducer 3 1.7 1.479 5.1 4.437 0 0 0.0 2340 11934.0 10382.6 Inventor
PTsensor21/1610kBX 1 15.2 13.224 15.2 13.224 0 0 0.0 1570 23864.0 20761.7 Inventor
PTflange21/1610kBX 1 15.2 13.224 15.2 13.224 0 0 0.0 1570 23864.0 20761.7 Inventor
2inpipe 1 12.5 10.875 12.5 10.875 0 0 0.0 2340 29250.0 25447.5 Inventor
5Dbend 1 84 73.08 84 73.08 279 23436 20389.3 4115 345660.0 300724.2 calculated
cheminjflange 2 10.5 9.135 21 18.27 0 0 0.0 2536 53256.0 46332.7 frominventormodel
MinifixedJplate 1 48 42 48 42 1136 54528 47712.0 393 18864.0 16506.0 Oceaneering0429212
HFLfemaleend 1 54 47 54 47 1136 61344 53392.0 830 44820.0 39010.0 Unitech550Dwg.32069
tubing 1 10 8.7 10 8.7 1000 10000 8700.0 2340 23400.0 20358.0 est
frame 1 6400 5568 6400 5568 395 2528000 2199360.0 2405 15392000.0 13391040.0 Inventor
CP 7 42.2 28.3 295.4 198.1 373 110184.2 73891.3 3012 889744.8 596677.2 Inventor
WithoutA/Ryoke,
withoutBuoyancyyoke,
withcaps dry wet
piggingpressurecap 1 694 603.8 694 603.8 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 1134 986.6 1134 986.6 2742 3109428 2705202 1570 1780380 1548931 Cameronsk0204280201rev02
Totals 14433 12060.9 11700031 9908004 32335131 26931858
submergedfactor 0.84
verticalcogposition,mmabovepipe 811 821.5 cogaxialfromPUP 2545 2538
all,weightswith7%contingency 15443 12905.1
WithA/Ryoke,without
buoyancyyoke,with
caps note:yokelayingflat
piggingpressurecap 1 694 604 694 604 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 1134 987 1134 987 2742 3109428 2705202 1570 1780380 1548931 Cameronsk0204280201rev02
A/Ryoke 1 1813 1577 1813 1577 88 159544 138803 4520 8194760 7129441 Inventor
submergedfactor 0.84
totalswithyoke 16246 13638 11859575 10046807 40529891 34061299
verticalcogposition,mmabovepipe 730 737
all,weightswith7%contingency 17383 14593 cogaxialfromPUP 2800 2802
weightsrev9dynbuoyancy.xlsx WeightandCOGPLEMAZ:\Structural\1.JobFiles\Cardona(StoneEnergy)\_PLEMDesign\ExcelandMathcad\weights\weightsrev9dynbuoyancy.xlsx
12 of 14
WithA/R,withbouyancy
yoke,withcaps note:yokelayingflat
piggingpressurecap 1 694 604 694 604 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 1134 987 1134 987 2742 3109428 2705202 1570 1780380 1548931 Cameronsk0204280201rev02
A/Ryoke 1 1813 1577 1813 1577 88 159544 138803 4554 8256402 7183070 Inventor
Buoyancyyoke 1 351 305 351 305 1586 556686 484317 4051 1421901 1237054
submergedfactor 0.84
totalswithyoke 16597 13944 12416261 10531124 42013434 35351981
verticalcogposition,mmabovepipe 748 755
all,weightswith7%contingency 17758 14920 cogaxialfromPUP 2836 2840
WithA/R,without
buoyancyyoke,without
caps
A/Ryoke 1 1813 1577.31 1813 1577 88 159544 138803 4554 8256402 7183070 Inventor
0.84
totals 14418 12048 7459307 6218574 35975469 30098952
verticalcogposition,mmabovepipe 517 516
all,weightswith7%contingency 15427 12891 cogaxialfromPUP 2800 2803
TotalPHSweight
all,weightswith7%contingency 17758
weightsrev9dynbuoyancy.xlsx WeightandCOGPLEMAZ:\Structural\1.JobFiles\Cardona(StoneEnergy)\_PLEMDesign\ExcelandMathcad\weights\weightsrev9dynbuoyancy.xlsx
13 of 14
verticalcogrefpipeaxis longCOGreffrontofstructure(NOTpup)
dry wet dry wet cog cog*mass cog*mass cog cog*mass cog*mass
source
Item qty [kg] [kg] [kg] [kg] [mm] [kg*mm] [kg*mm] [mm] [kg*mm] [kg*mm]
ea ea dry submerged dry submerged
pipeinsulation 1 212 31 212 31 500 106000 15500.0 2340 496080.0 72540.0 estmated,centerofprodhub
valveinsulation 3 52 8 156 24 500 78000 12000.0 2340 365040.0 56160.0 calculated
entrappedwater 1 71 0 71 0 1000 71000 0.0 2340 166140.0 0.0 calculated
CVChub 1 505 439.35 505 439.35 1934 976670 849702.9 1570 792850.0 689779.5 sk08091351rev01
CVChub 1 505 439.35 505 439.35 1386 699930 608939.1 4086 2063430.0 1795184.1 sk08091351rev01
1"10KROVcheminjection 2 208 180.96 416 361.92 500 208000 180960.0 2560 1064960.0 926515.2 PacsonGA13272
51/8API10KManualgatevalve 1 729 634.23 729 634.23 843 614547 534655.9 1570 1144530.0 995741.1 FMCDU100039348
51/8API10Khydraulicgatevalve 1 1384 1204.08 1384 1204.08 618 855312 744121.4 800 1107200.0 963264.0 FMCDU100039350
51/8API10Khydraulicgatevalve 1 1384 1204.08 1384 1204.08 618 855312 744121.4 2340 3238560.0 2817547.2 FMCDU100039350
anchorflange 1 83 72.21 83 72.21 0 0 0.0 152 12616.0 10975.9 calculated
straightpiping 1 95 82.65 95 82.65 500 47500 41325.0 2340 222300.0 193401.0 calculated
6x3tee 1 24.1 20.967 24.1 20.967 0 0 0.0 1284 30944.4 26921.6 Inventor
6x3tee 1 25.1 21.837 25.1 21.837 0 0 0.0 1874 47037.4 40922.5 Inventor
6x3tee 1 26.1 22.707 26.1 22.707 0 0 0.0 2160 56376.0 49047.1 Inventor
6x6tee 1 29 25.23 29 25.23 0 0 0.0 1874 54346.0 47281.0 Inventor
3x2reducer 3 1.7 1.479 5.1 4.437 0 0 0.0 2340 11934.0 10382.6 Inventor
PTsensor21/1610kBX 1 15.2 13.224 15.2 13.224 0 0 0.0 1570 23864.0 20761.7 Inventor
PTflange21/1610kBX 1 15.2 13.224 15.2 13.224 0 0 0.0 1570 23864.0 20761.7 Inventor
2inpipe 1 12.5 10.875 12.5 10.875 0 0 0.0 2340 29250.0 25447.5 Inventor
5Dbend 1 84 73.08 84 73.08 279 23436 20389.3 4115 345660.0 300724.2 calculated
cheminjflange 2 10.5 9.135 21 18.27 0 0 0.0 2536 53256.0 46332.7 frominventormodel
MinifixedJplate 1 48 42 48 42 1136 54528 47712.0 393 18864.0 16506.0 Oceaneering0429212
HFLfemaleend 1 54 47 54 47 1136 61344 53392.0 830 44820.0 39010.0 Unitech550Dwg.32069
tubing 1 10 8.7 10 8.7 1000 10000 8700.0 2340 23400.0 20358.0 est
frame 1 6400 5568 6400 5568 395 2528000 2199360.0 2405 15392000.0 13391040.0 Inventor
CP 7 42.2 28.3 295.4 198.1 373 110184.2 73891.3 3012 889744.8 596677.2 Inventor
WithoutA/Ryoke,
withoutBuoyancyyoke,
withcaps dry wet
piggingpressurecap 1 694 603.8 694 603.8 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 694 603.8 694 603.8 2407 1670458 1453298 1570 1089580 947935 Cameronsk0204280201rev02
Totals 13993 11678.1 10261061 8656100 31644331 26330862
submergedfactor 0.83
verticalcogposition,mmabovepipe 733 741.2 cogaxialfromPUP 2566 2560
all,weightswith7%contingency 14972 12495.5
WithA/Ryoke,without
buoyancyyoke,with
caps note:yokelayingflat
piggingpressurecap 1 694 604 694 604 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 694 604 694 604 2407 1670458 1453298 1570 1089580 947935 Cameronsk0204280201rev02
A/Ryoke 1 1813 1577 1813 1577 88 159544 138803 4520 8194760 7129441 Inventor
submergedfactor 0.84
totalswithyoke 15806 13255 10420605 8794903 39839091 33460303
verticalcogposition,mmabovepipe 659 663
all,weightswith7%contingency 16912 14183 cogaxialfromPUP 2825 2829
weightsrev9dynbuoyancy.xlsx WeightandCOGPLEMB
Z:\Structural\1.JobFiles\Cardona(StoneEnergy)\_PLEMDesign\ExcelandMathcad\weights\weightsrev9dynbuoyancy.xlsx
14 of 14
WithA/R,withbouyancy
yoke,withcaps note:yokelayingflat
piggingpressurecap 1 694 604 694 604 1860 1290840 1123031 4086 2835684 2467045 Cameronsk12697910rev09
prodpressurecap(longterm=1134kg) 1 694 604 694 604 2407 1670458 1453298 1570 1089580 947935 Cameronsk0204280201rev02
A/Ryoke 1 1813 1577 1813 1577 88 159544 138803 4554 8256402 7183070 Inventor
Buoyancyyoke 1 351 305 351 305 1586 556686 484317 4051 1421901 1237054
submergedfactor 0.84
totalswithyoke 16157 13561 10977291 9279220 41322634 34750985
verticalcogposition,mmabovepipe 679 684
all,weightswith7%contingency 17288 14510 cogaxialfromPUP 2862 2867
WithA/R,without
buoyancyyoke,without
caps
A/Ryoke 1 1813 1577 1813 1577 88 159544 138803 4554 8256402 7183070 Inventor
0.84
totals 14418 12048 7459307 6218574 35975469 30098952
verticalcogposition,mmabovepipe 517 516
all,weightswith7%contingency 15427 12891 cogaxialfromPUP 2800 2803
TotalPHSweight
all,weightswith7%contingency 17288
weightsrev9dynbuoyancy.xlsx WeightandCOGPLEMB
Z:\Structural\1.JobFiles\Cardona(StoneEnergy)\_PLEMDesign\ExcelandMathcad\weights\weightsrev9dynbuoyancy.xlsx
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
1 inch = 25.4 mm
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS -6.678 -29.296 6.385 15.951 41.545 32.050 33.280 41.545 50.174
ULS -6.678 -38.084 6.385 15.951 41.545 41.665 33.280 41.545 59.789
Hub 2
Local Axis Global Axis Hub Coordinates
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS 12.760 -25.810 -8.488 -56.908 -56.878 -72.716 140.408 -88.969 100.660
ULS 12.760 -33.553 -8.488 -56.908 -56.878 -94.531 159.882 -88.969 122.475
x y
1 of 18
Outputs - SLS - Global Axis Reference Outputs - SLS - Geo Axis Reference
Load Factor Lf = 1.0 Lf = 1.0
Outputs - ULS - Global Axis Reference Outputs - ULS - Geo Axis Reference
Load Factor Lf = 1.3 Lf = 1.3
2 of 18
Stone Energy - Cardona Project
1 inch = 25.4 mm
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS 7.873 -26.353 6.385 15.951 41.545 -26.012 33.280 41.545 -47.379
ULS 7.873 -34.259 6.385 15.951 41.545 -33.816 33.280 41.545 -55.183
Hub 2
Local Axis Global Axis Hub Coordinates
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS -13.021 -27.168 -8.488 -56.908 -56.878 87.473 143.824 -24.130 -115.989
ULS -13.021 -35.318 -8.488 -56.908 -56.878 113.715 164.322 -24.130 -142.231
x y
3 of 18
Outputs - SLS - Global Axis Reference Outputs - SLS - Geo Axis Reference
Load Factor Lf = 1.0 Lf = 1.0
Outputs - ULS - Global Axis Reference Outputs - ULS - Geo Axis Reference
Load Factor Lf = 1.3 Lf = 1.3
4 of 18
Stone Energy - Cardona Project
1 inch = 25.4 mm
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS -0.775 -61.681 0.739 6.535 2.109 41.171 8.541 2.109 43.274
ULS -0.775 -80.185 0.739 6.535 2.109 53.522 8.541 2.109 55.626
Hub 2
Local Axis Global Axis Hub Coordinates
y y m m m
FX FY FZ MX MY MZ
kN kN kN kN.m kN.m kN.m
SLS -3.042 -21.264 -1.367 -14.898 -7.141 -59.230 71.370 0.510 52.568
ULS -3.042 -27.643 -1.367 -14.898 -7.141 -76.999 87.413 0.510 70.337
x y
5 of 18
Outputs - SLS - Global Axis Reference Outputs - SLS - Geo Axis Reference
Load Factor Lf = 1.0 Lf = 1.0
Outputs - ULS - Global Axis Reference Outputs - ULS - Geo Axis Reference
Load Factor Lf = 1.3 Lf = 1.3
6 of 18
Plem Loads-Case 1
SLS
Fx 22.85 kN M x 150.834 kN m
Fy 19.438kN M y 120.784 kN m
Fz 324.276 kN M z 47.424 kN m
ULS
Fxu 22.856kN M xu 182.264 kN m
Fyu 19.438kN M yu 124.387 kN m
Fzu 421.559 kN M zu 47.424 kN m
Fz1 127.53kN
Mudmat load
7 of 18
Eccentricity
x1 1.2m x2 3.1m x3 3.1m x4 1.2m z 0.33m
SLS Loads
Position 1
M x1 M x Fy z Fz Fz1 y1 19.526 m kN
M y1 M y Fx z Fz Fz1 x1 349.339 m kN
M z1 M z Fx y1 Fy x1 40.093 m kN
Position 2
M x2 M x Fy z Fz Fz1 y2 19.526 m kN
M y2 M y Fx z Fz Fz1 x2 496.669 m kN
M z2 M z Fx y2 Fy x2 123.677 m kN
8 of 18
Position 3
M x3 M x Fy z Fz Fz1 y3 294.971 m kN
M y3 M y Fx z Fz Fz1 x3 496.669 m kN
M z3 M z Fx y3 Fy x3 91.687 m kN
Position 4
M x4 M x Fy z Fz Fz1 y4 294.971 m kN
M y4 M y Fx z Fz Fz1 x4 349.339 m kN
M z4 M z Fx y4 Fy x4 8.103 m kN
ULS Loads
Position 1
M x1u M xu Fyu z Fzu Fz1 y1 17.142 m kN
M y1u M yu Fxu z Fzu Fz1 x1 469.679 m kN
Position 2
M x2u M xu Fyu z Fzu Fz1 y2 17.142 m kN
M y2u M yu Fxu z Fzu Fz1 x2 794.645 m kN
Position 3
M x3u M xu Fyu z Fzu Fz1 y3 394.499 m kN
M y3u M yu Fxu z Fzu Fz1 x3 794.645 m kN
9 of 18
Position 4
M x4u M xu Fyu z Fzu Fz1 y4 394.499 m kN
M y4u M yu Fxu z Fzu Fz1 x4 469.679 m kN
10 of 18
Plem Loads- Case 2
Outputs - SLS - Geo Axis Reference
Lf = 1.0
SLS
Fx 22.539kN M x 163.368 kN m
Fy 20.894kN M y 124.2 kN m
Fz 322.691 kN M z 17.415 kN m
ULS
Fxu 22.359kN M xu 197.414 kN m
Fyu 20.894kN M yu 128.827 kN m
Fzu 419.499 kN M zu 17.415 kN m
Fz1 127.53kN
Mudmat load
11 of 18
Eccentricity
x1 1.2m x2 3.1m x3 3.1m x4 1.2m z 0.33m
SLS Loads
Position 1
M x1 M x Fy z Fz Fz1 y1 306.876 m kN
M y1 M y Fx z Fz Fz1 x1 350.955 m kN
M z1 M z Fx y1 Fy x1 23.435 m kN
Position 2
M x2 M x Fy z Fz Fz1 y2 306.876 m kN
M y2 M y Fx z Fz Fz1 x2 488.237 m kN
M z2 M z Fx y2 Fy x2 66.409 m kN
12 of 18
Position 3
M x3 M x Fy z Fz Fz1 y3 33.65 m kN
M y3 M y Fx z Fz Fz1 x3 488.237 m kN
M z3 M z Fx y3 Fy x3 97.964 m kN
Position 4
M x4 M x Fy z Fz Fz1 y4 33.65 m kN
M y4 M y Fx z Fz Fz1 x4 350.955 m kN
M z4 M z Fx y4 Fy x4 8.12 m kN
ULS Loads
Position 1
M x1u M xu Fyu z Fzu Fz1 y1 408.687 m kN
M y1u M yu Fxu z Fzu Fz1 x1 471.811 m kN
Position 2
M x2u M xu Fyu z Fzu Fz1 y2 408.687 m kN
M y2u M yu Fxu z Fzu Fz1 x2 783.655 m kN
Position 3
M x3u M xu Fyu z Fzu Fz1 y3 0.069 m kN
M y3u M yu Fxu z Fzu Fz1 x3 783.655 m kN
13 of 18
Position 4
M x4u M xu Fyu z Fzu Fz1 y4 0.069 m kN
M y4u M yu Fxu z Fzu Fz1 x4 471.811 m kN
14 of 18
Plem Loads- Case 3 Installation
Outputs - SLS - Geo Axis Reference
Lf = 1.0
SLS
Fx 41.191kN M x 95.842 kN m
Fy 2.267kN M y 27.007 kN m
Fz 352.116 kN M z 2.619 kN m
ULS
Fxu 41.191kN M xu 125.963 kN m
Fyu 2.267kN M yu 27.179 kN m
Fzu 457.75kN M zu 2.619 kN m
Fz1 127.53kN
Mudmat load
15 of 18
Eccentricity
x1 1.2m x2 1.2m x3 1.2m x4 1.2m z 0.33m
SLS Loads
Position 1
M x1 M x Fy z Fz Fz1 y1 62.116 m kN
M y1 M y Fx z Fz Fz1 x1 282.917 m kN
M z1 M z Fx y1 Fy x1 28.935 m kN
Position 2
M x2 M x Fy z Fz Fz1 y2 62.116 m kN
M y2 M y Fx z Fz Fz1 x2 256.089 m kN
M z2 M z Fx y2 Fy x2 23.494 m kN
16 of 18
Position 3
M x3 M x Fy z Fz Fz1 y3 252.304 m kN
M y3 M y Fx z Fz Fz1 x3 256.089 m kN
M z3 M z Fx y3 Fy x3 34.173 m kN
Position 4
M x4 M x Fy z Fz Fz1 y4 252.304 m kN
M y4 M y Fx z Fz Fz1 x4 282.917 m kN
M z4 M z Fx y4 Fy x4 28.732 m kN
ULS Loads
Position 1
M x1u M xu Fyu z Fzu Fz1 y1 105.939 m kN
M y1u M yu Fxu z Fzu Fz1 x1 409.85 m kN
Position 2
M x2u M xu Fyu z Fzu Fz1 y2 105.939 m kN
M y2u M yu Fxu z Fzu Fz1 x2 382.678 m kN
Position 3
M x3u M xu Fyu z Fzu Fz1 y3 356.369 m kN
M y3u M yu Fxu z Fzu Fz1 x3 382.678 m kN
17 of 18
Position 4
M x4u M xu Fyu z Fzu Fz1 y4 356.369 m kN
M y4u M yu Fxu z Fzu Fz1 x4 409.85 m kN
18 of 18
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
Frame-coated area
Member Surface
- m2
Yoke (inventor) 18.200
Frame (inventor) 116.000
CVC hub support structure 2 plcs 12.680
uncoated area -13.600
buoyancy yoke 6.700
2
Total 139.980 m
Total with Contingency CONTINGENCY = 1.15 160.977 m2
2
Total 13.600 m
Total with Contingency CONTINGENCY = 1.15 15.640 m2
Piping System-insulated
Member Type Length Quantity OD Perimeter Total Length Surface
- - in m in mm mm m m2
2" Branch Pipe Pipe 69.884 1.775 1 2.375 60 190 1.775 0.336
Manual Gate Valve Body Valve 29.000 0.737 1 19.500 495 1556 0.737 1.532
6" pup on anchor flange Pipe 6.000 0.152 1 6.625 168 529 0.152 0.081
8" Anchor Flange Pipe 23.975 0.609 1 8.625 219 688 0.609 0.419
Hydraulic Gate Valve Body Valve 29.000 0.737 2 19.500 495 1556 1.473 2.678
6" Branch Tee Fitting 11.240 0.285 4 6.625 168 529 1.142 0.604
6" 5D Bend including tangents Pipe 67.124 1.705 1 6.625 168 529 1.705 0.901
6" Vertical Branch Pipe 11.800 0.300 1 6.625 168 529 0.300 0.158
6" Valve Pup-Piece Pipe 4.215 0.107 6 6.625 168 529 0.642 0.340
6" Hub 1 Pup-Piece Pipe 32.000 0.813 1 6.625 168 529 0.813 0.430
6" Hub 2 Pup-Piece Pipe 20.000 0.508 1 6.625 168 529 0.508 0.269
2 in elbows Pipe 2 0.050
2
Total 7.797 m
2
Total with Contingency CONTINGENCY = 1.15 8.966 m
p. 1
Piping System-uninsulated
Member Type Length Quantity OD Perimeter Total Length Surface
- - in m in mm mm m m2
Hydraulic Flying Lead J-Plate Fitting 15.000 0.381 1 11.000 279 878 0.381 0.334
MeOH Connector Fitting 0.574 1 220 691 0.574 0.397
Hydraulic Flying Lead Cobrahead Fitting 59.400 1.509 1 13.000 330 1037 1.509 1.565
Manual Gate Valve bucket support Valve sum from hand calc 2.000
Hydraulic Gate Valve actuator Valve 43.000 1.092 2 19.500 495 1556 2.184 3.784
Chemical Injection Valve Valve 62.807 1.595 2 9.843 250 785 3.191 2.604
2
Total 10.685 m
2
Total with Contingency CONTINGENCY = 1.15 12.288 m
Well Jumper
Member Type Length Quantity OD Perimeter Total Length Surface
- - in m in mm mm m m2
Piping Pipe 908.000 23.063 1 6.625 168 529 23.063 12.192
Connector Equipment 24.000 0.610 2 30.000 762 2394 1.219 2.919
Connector Pup-piece Equipment 33.000 0.838 2 6.625 168 529 1.676 0.886
2
Total 15.997 m
2
Total with Contingency CONTINGENCY = 1.15 18.397 m
Pigging Jumper
Member Type Length Quantity OD Perimeter Total Length Surface
- - in m in mm mm m m2
Piping Pipe 600.000 15.240 1 6.625 168 529 15.240 8.057
Connector Equipment 24.000 0.610 2 30.000 762 2394 1.219 2.919
Connector Pup-piece Equipment 33.000 0.838 2 6.625 168 529 1.676 0.886
2
Total 11.862 m
2
Total with Contingency CONTINGENCY = 1.15 13.641 m
p. 2
Mudmat
Member Surface
- m2
Immersed Coated Zone
mud dam 20.6000
top of plate 77.9000
2
Total 98.500 m
Total with Contingency CONTINGENCY = 1.15 113.275 m2
Buried Uncoated Zone
Mudmat-stiffeners 119.0000
bottom of top plate 77.9000
2
Total 196.900 m
Total with Contingency CONTINGENCY = 1.15 226.435 m2
Overall Results
Total without Contingency 467.461 m2
2
Total with Contingency CONTINGENCY = 1.15 509.653 m
Piping Module
Immersed zone (painted) with Contingency 182.231 m2
Immersed zone (painted + thermal insulation) with Contingency 8.966 m2
Uncoated immersed with contingency 15.640 m2
Mudmat
Immersed zone (painted) with Contingency 113.275 m2
Jumper
Well with Contingency 18.397 m2
Pigging with Contingency 13.641 m2
p. 3
Stone Energy Cardona Subsea Tieback
Subsea 7 19.09.2014
Contract J6549-SECA-PE-A-001
TC1057-ENG-10004
Production PLEM Structural Design Report Attachment 1
Rev 0
p. 1
p. 2
Subsea7
April-14
Project Title: Subsea7 Data Sheet No. Calculation Reference:
Stone Energy Cardona Field Development
Subject: Revision No:
Load On Structures from Flying Lead - 4 Ways
p. 3
20 ft(Approx)
6.1m
6 ft(Approx)
1.8m
p. 4