LESS ENGINEERING IN RELATION WITH FACTORY CONTROL
Factory control Office Control
etc
2
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
3MU MEMO Tools
Air-less,
Look-less, conveyor- Stop-less,
walk-less, less, air cut- Adjust-less,
search-less, less, air ear pick-less,
building press-less, dust-less,
block-less, sump-less tool box-less
rough motion- etc
less Qualit
etc yDefective goods-
Material less, bungle-less,
& parts nonstandard-less,
clicking-less,
etc
3
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
EXAMPLES OF KEY
WORDS IN LESS Box-less, bar-less,
Safety
weight-less, spot-
ENGINEERING less, welding-less,
parts-less Roller accident-less, drop-
etc less, sandwich-less, body
cut-less, crash-less
etc
Method
Administration
Neck-less, over stock- Paper-less, post
less, hungry-less, setup- code-less, stamp-
less less, make- business-
less, telephone-less,
etc meeting-less
etc
4
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering ----Focused on Human
5
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering ----Focused on Human
6
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering 3 MU
Less Observed
Look- Less MURI MURA MUDA
Description of existing condition:
(Existing Condition) Date:
Time for the process to-1 = 22.3 seconds, while the
time for the 2nd = 57.8 seconds. Due to unbalanced
processing time, waiting time incurred every 5 units.
There is a waiting time of 2.8 seconds for the
process to-2. Would this be removed?
(After KAIZEN) Date:
14
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
EAR PICK-LESS ENGINEERING -1 EAR PICK-LESS ENGINEERING -2
15
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
CASE EXAMPLE KAIZEN WHICH FOCUSED
FACILITIES AND MACHINE (Explanation of Contents)
Less Engineering Explanation of Contents Expected Results
AIR-LESS *Do not transport in an empty state. *Rationalization of
*Do not let any area empty. distribution of parts
*Eliminate space that is not value *create excess space, and
added (Lori, shelf parts, containers, workplaces that enhance
conveyors, and the like as well as the value-added.
the layout and other unused 3
dimensions.
16
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
CASE EXAMPLE KAIZEN WHICH FOCUSED
FACILITIES AND MACHINE (Explanation of Contents)
AIR PRESS-LESS *Is the work of the press, too many *Reduced Cycle time
empty(air) press? *Energy usage saving
*Did cylinder or ram movement can *Saving in the number of
be reduced further? machines / facilities
17
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
CASE EXAMPLE KAIZEN WHICH FOCUSED
FACILITIES AND MACHINE (Explanation of Contents)
MACHINE STOP-LESS *Take action to stop the cause of *The number of units owned
(SHORT TIME MACHINE the Short time machine down. increased.
DOWN)
*To create awareness that Short *Total unit machine/ facility
machine down time is a big loss. reduced
*Productivity increases, the
downtime decreases, and the
percentage of work increase
*Prevention onset of NG product
18
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
CASE EXAMPLE KAIZEN WHICH FOCUSED
FACILITIES AND MACHINE (Explanation of Contents)
19
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering 3 MU
Less Observed
Air - Less MURI MURA MUDA
Description of existing condition:
Depending on the type of fuel tank, (XT, TDM) can not get into the
(Existing Condition) Date:
lorry 4 floors, but with lori 3 floors, a large distance between
shelves, so that the storage of the many empty spaces, in addition
to the amount that can be loaded into lorries only slightly . Here
are the current conditions
(1) Frequency of replenishment parts (lorries) many
(2) The number of lorries less (After KAIZEN) Date:
(3) Lori takes place
12.600 Yen/month 20
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering 3 MU
Less Observed
Air Less, Rough -motion less MURI MURA MUDA
Description of existing condition:
(Existing Condition) Date:
5.400 Yen/month 21
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
Less Engineering 3 MU
Less Observed
Air cut- Less MURI MURA MUDA
Description of existing condition:
(Existing Condition) Date: After checking the Air- cut (cutting blank) at the time of delivery of cutting
M / C, altitude determination of the location of the surface fast delivery
3mm from the surface.
Center drill, end mill and all also be 3mm or more from the surface. When
determining the location, after moving the XY axis, so move the 2 axis.
I want to try to reduce the Air- cut though slightly.
(After KAIZEN) Date:
24
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
2. less engineering that focuses on methods(explanation of contents)
Less Engineering Explanation of Contents Expected Results
NECK-LESS *Before process the material, should be *When the neck process
looking neck process (inhibitors) that cause (inhibitors) can be corrected
delay in a row, then all the
*Di among the amenities (jobs), facilities processes run smoothly
(jobs) which are the most time consuming? *The will be a reduction in
*In terms of quality, cost, and delivery time, is the cycle time
there a barrier? *The number of streams in
*If you find your neck process (inhibitors), find the process will be reduced
ways to eliminate them.
OVER STOCK-LESS *Understand lead times and stock levels using *Number of stock reduced
parts flow curve *Prevent excess stock
*Do a system that does not produce excess resulting from management
stuff in capturing the relationship between estimates
estimated and achievement *Maximize vitality
*When we create a system, that can make management
things desirable *Reduce lead time
*Are the stock be made just-in-time system? *Reduce raw material costs
*Stock is the source of all evils
25
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
2. less engineering that focuses on methods(explanation of contents)
Less Engineering Explanation of Contents Expected Results
SETUP-LESS *Production with many kinds of products of *Ensure the need for
small-scale production will result in small lot size preparation by using a
*Find and Know the situation by general set-up break-even graph
*Do walk-less, search-less, and bolt-less *Even though lot to be
effectively small, can run
*Changing the on-line setup to be off line setup production cost down.
*Seiri Seiton and roles are important *Cost down
ADJUST-LESS *Work adjustment takes time * It contributes to the
*Think of a method that does not require setup-less
adjustment
HUNGRY-LESS *Is the material had to wait until let machine *Percentage of machine
idle? working time increased
*Perform manual work after inserting the *Cycle time reduced
material into machine
*Is there muda contained in incorporating the
time between jobs to machines and the work
manually?
26
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
3. less engineering that focuses on the quality (explanation of contents)
27
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
3. less engineering that focuses on the quality (explanation of contents)
CLICKING NOISE-LESS *If during the removal of the product *Improve quality by
you hear a Klek-Klek means the former preventing the emergence
impact of a former impact on the
*Make efforts not to hear it again product surface
28
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
4. less engineering that focuses on the safety (content explanation )
BODY CUT-LESS *Is there any possibility of scratches with wood processing machine, press
machine, grinding machine, and others?
CRASH-LESS *Is there any possibility forklift collided with heavy equipment, machinery
transporter, cars, etc.
*Is there a way, or a ladder is damaged, or the lighting is poor, or where
the floor was slippery because of oil?
*Job well done by hanging using the correct ring, and with prudence
operators and providers of cue
29
This material prepared by HLMG Management Co Sdn. Bhd, QPP Department, for Graduate Development Programme (GDP) (Sep15)
4. less engineering that focuses on the safety (content explanation )
DROP-LESS *Is there a fear of falling from scaffold boards, stairs, bridges, and so
forth or fall into the pit, manhole etc.?
SPARK-LESS *Are there concerns that there are objects flying, falling, or rolled?
Does the way the accumulation and arrangement of bad stuff, whether
to leave tools or items to work on high?