Inspection findings
Item Description of check Remarks
Satisfactory Unsatisfactory
Ensure the fresh concrete is not poured from height more than 1.5m as
3
per project specification
In case of new concrete is placed over the old concrete ,ensure the old
5 concrete surface is clean, saturated and bonding agent is applied(if
applicable)
Ensure the concrete is placed in layer in accordance with project
6
specification
Check fresh concrete sampling and testing is carried out and field
10
concrete pouring record is updated
Remarks:
Reference:
Signature
Date
PROJECT: CPF PHASE 1 AT BADRA OIL
FIELDPermanent Camp Phase-II Project ITR No : C-021034 XA
INSPECTION & TEST RECORD-CIVIL
Proj.ITR No:
AREA CIVIL WORK COMPLETION
GB088GB150-2013IE02-
CERTIFICATCONCRETE POURING
0200-QA-IT-210104
INSPECTION CHECK SHEETE
Rev. : B0
(Space reserved for barcode) Project No: JI-2013IE02
Record No:
TAG RFI No:
SUB-SYSTEM No:
Description:
Drawing No: Rev:
Location:
Specification No: Rev:
Quality Control Procedure No: Rev:
Signature
Date