PROJECT: CPF PHASE 1 AT BADRA OIL

FIELDPermanent Camp Phase-II Project ITR No : C-0211004 AA


INSPECTION & TEST RECORD-CIVIL
Proj.ITR No:
CONCRETE FOUNDATION COMPLETION
AREA CIVIL WORK COMPLETION
GB088GB150-2013IE02-
CERTIFICATINSPECTION CHECK SHEETE
0200-QA-IT-001104
Rev. : B0
(Space reserved for barcode) Project No: JI-2013IE02
Record No:
TAG RFI No:
SUB-SYSTEM No:
Description:
Drawing No: Rev:
Location:
Specification No: Rev:
Quality Control Procedure No: Rev:

Item Description of check Remarks

Confirm the plan and finished elevation of the foundation is as per IFC drawing (verify
1
concrete survey report)

2 Confirm the shim plates are fixed and survey report for top of shim plates is verified

Confirm that position of Anchor Bolts in plan and elevation is as per IFC drawing (verify
3
concrete survey report)

4 Confirm that the anchor bolt and threads are in satisfactory condition

5 Confirm that squabbling/roughening has been carried out for grouting work

6 Confirm that the Anchor Bolt pockets to receive grout are cleaned

7 Confirm that post-pour Survey Report of the foundation is accepted.

Confirm that surrounding area has been back filled and compacted to correct elevation
8
(verify compaction test reports)
Confirm that all Quality Records for foundation casting have been completed and
9
accepted by all parties and accepted
Confirm that all construction debris have been removed and the area around the
10
foundation is tidy.

11 Confirm that polyethylene sheet layer has laid above subgrade

Confirm that cover space is available as per specification


12

Remarks:

Record Acceptance Sub Contractor QCI Contractor QCM Employer


Name

Signature

Date
PROJECT: CPF PHASE 1 AT BADRA OIL
FIELDPermanent Camp Phase-II Project ITR No : C-0211004 AA
INSPECTION & TEST RECORD-CIVIL
Proj.ITR No:
CONCRETE FOUNDATION COMPLETION
AREA CIVIL WORK COMPLETION
GB088GB150-2013IE02-
CERTIFICATINSPECTION CHECK SHEETE
0200-QA-IT-001104
Rev. : B0
(Space reserved for barcode) Project No: JI-2013IE02
Record No:
TAG RFI No:
SUB-SYSTEM No:
Description:
Drawing No: Rev:
Location:
Specification No: Rev:
Quality Control Procedure No: Rev:
Reference:

Record Acceptance Sub Contractor QCI Contractor QCM Employer


Name

Signature

Date