Beruflich Dokumente
Kultur Dokumente
MACHINE
S.NO COMPONENT NAME SHIFT
LEVER 7 I
1 100TON
LEVER 7 II
CAM THRUST CAP I
2 125 TON
CAP CAM BEARING SMALL II
CAP CAM BEARING FRONT I
3 150 TON
CAP CAM BEARING FRONT II
BOTTOM END PLUG(P40489A) I
4 250 TON
BOTTOM END PLUG(P40489A) II
12 EC/RC/01
VIBRO
S.NO COMPONENT NAME DEPARTMENT
1 CF 5R MOVED TO INSPECTIO
SEU1/2B MOVED TO INSPECTIO
2 BEARING HOLDER MOVED TO INSPECTIO
3 OB PUSH MOVED TO INSPECTIO
4 TOP END PLUG MOVED TO INSPECTIO
5 538 COVER MOVED TO INSPECTIO
6 544 COVER MOVED TO INSPECTIO
7 484 PUMP BODY MOVED TO INSPECTIO
8 CAM THRUST CAB MOVED TO INSPECTIO
9 PISTON MOVED TO MACHININ
10 OIL FILTTER MOVED TO MACHININ
11 CHECK VALVE MOVED TO MACHININ
12 UBBER HOUSING MOVED TO MACHININ
13
14
1ST SHIFT PRODUCTION SUPERVISOR 2nd SHIFT PRODUCTION SU
PRODUCTION
TARGET/ TARGET/ PER SHIFT CUMULAT
OPERATOR & HELPER NAME
HOUR SHIFT ACTUAL/SHO IVE SHOT
TS
CHITAMANI/JITENDHAR 140 1400 1230
4830
BHIMA/RK PANDA 140 1400 1250
VINAI KUMAR 140 1400 600
9110
ARUL DASS 140 1400 1050
MOHAMMED 100 1000 800
4156
PAVAN KUMAR 100 1000 1200
SIVAKUMAR/VIJAY DEEPAK 100 1000 810
2420
MIRAKUMAR /RANJITH 100 1000 610
PDC TOTAL MAN POWER / OT 12
NG PRODUCTION DETAILS
PER HOUR PER SHIFT PRODUCTION PER
CUMULATIVE
OPRATOR & HELPER NAME TARGET/ TARGET/NO SHIFT
QTY
NOS S ACTUAL/NOS
0 0 0
0
0 0 0
BOLA 200 2000 1474
7290
200 2000 0
200 2000
3492
3492
PADMANAV PATNAYAK 200 2000
RAJ KUMAR 300 3000 2800
15352
BAGAVAN 300 3000
JITHENDER 250 2500 1424
9294
SEBASTIN 250 2500
0 0 0
0
SHIBA 300 3000
PANKAJ 300 3000 977
PABANA 300 3000
0
PANKAT 300 3000
AJARUL 130/81
ROHITH 0
AJARUL 2200 /393
GITHENDHAR 305/210/54/355/612/296
ISLAM 604/2283
ROHITH
ISLAM 105/252
ROHITH
ISLAM 0
GITHENDHAR 2705
MAN
POWE OVER TIME REMARKS
R
2 0 METAL CHARGE
2 0 METAL CHARGE
1 0 COOLING TOWER PROBLEM/POWER FAILURE
1 4 DIE CHANGE
1 0 METAL CHARGE
1 0
2 4 METAL CHARGE
2 4 METAL CHARGE/DIE CHANGE
12 12
DATE - 04.07.2016
MANPO OVER TIME
WER
0 0
0 0
1 0
0 0 COMPONENT CATCHUP CAVITY1
0 0
1 0
1 0
1 0
1 0 5S WORK
1 4
0 0
1 0
1 0 125T HELPER
1 0
0 0
1 0
0 0
0 0
0 0
0 0 LEVER PACKING,5S WORK
10 4
DATE - 04.07.2016
4 0
TOTAL MANPOWER
POSITION PRESENT ALLOTED
INCHARGE 1 1
SUPERVISOR 6 8
OPERATOR & HELPER 25 35
TOTAL MANPOWER 32 46
PRODUCTION INCHARGE MOHANASUNDARAM