MINUTES OF MEETING

As part of long term commitment and customer satisfaction, C&S team


visited RRVUNL, CTPP, Chhabra site and discussed following points:

1. M/s C&S Electric Ltd has supplied switchboard to RRVUNL, CTPP,


Chhabra, Rajasthan through M/s Punj Lloyd Ltd. in 2009-10 P.O no.
PFIN19/178076 dated 21.08.2007 for 2X250MW phase-I RRVUNL,
Chhabra Thermal Power Project. Plant commissioned in 2009-10 and is
under operation since September 2010.
2. M/s C&s Electric Ltd has supplied switchboard to RRVUNL,CTPP, Chhabra
Rajasthan through M/s Indure Ltd in 2012-14 through M/s ABB P.O no.
3191365509 dated 19.04.2011 for 2X250MW phase-II RRVUNL Chhabra
Thermal Power Project. Plant commissioned in 2014.

3. The fault rating of the switchboards is 50KA for 1sec. and maximum rating
of switchboard is 415V, 4000A.
4. The performance of switchboards along with all components supplied by
M/s C&S Electric Ltd. is found satisfactory up to till date.