ESTIMATION OF PILE SET CRITERIA BASED ON HILEY'S FORMULA ‘Date th Apel 2017 Project: PROPOSED 26 UNITS SINGLE STOREY SEMI DETACHED HOUSES ON LOT 6372, BLOCK 14, SALAK LAND DISTRICT, JALAN SULTAN TENGAH, FOR KUCHING FAMILY PARK (PHASE 7 STAGE 3) Contractor: Meng Hua Construction Sdn Bhd Cs) ‘Summary of Working Pile Data Pie Type Reinforced Concrete Square Pile Size 175 mm Unit Weight 73.5 Kgl Estimated Penetration 30 m Working Loed 300 KN By Set Calculation Puk = etxWeH = x Wen! x Wp 8+ (CIHC2+G3 2 W+ We s = SfxWH x Wx(n'xwp) - (C1+C2+C3) /2 Putt W x Wp Where Put = Ultimate load capacity P sate x FOS 600 KN P safe safe working load 300 KN FOS factor of safety = 2 ef hammer efficiency 075 w weight of ram 15.00 KN wp Weight of pile Mp x Lp 22.05 KN Mp weight of pile per m 0.735 KN/m bp lenath of pile 30.00 m A coefficient of restitution 04 H drop of hammer 12m s pile penetration for last low or “set” (m) ct temporary compression allowance for pile head or cap (m) 2 temporary compression allowance for elastic deformation of pile (m) 3 temporary compression allowance for quake of ground (m) c1+cz+c3 taken as 0.018 m efx WxH O75 x 1500 x 12 © = 0.0228 Put 00 W+(nxwWp) = 16.00 + 0.16 x 2205 = 0.600 W+ We 7500 + 2008 (1+ c2+03)/2 = 0.018 , 2 = 0.008 ‘Therefore s 00225 x 0800 - 0009 = 0.00225 m 23mm Set per 10 Blows 230 mm

Das könnte Ihnen auch gefallen