Quality Inspection Plan for Doc Number: QA&QC/FRM-21

Testing of the Seller Interconnection Facilities (EPA Requirements) Rev. 0

Issuance Date: 16 December 2015


50 MW GUL AHMED WIND ENERGY PROJECT - JHIMPIR Note: This document number, Date and Rev no. is only for DEL internal
reference.
Project Title : 50 MW GUL AHMED WIND ENERGY PROJECT Project No. 8213 QIP Number. 8213-S-000-1664-009 Rev. A Dated: 16-12-2015
Inspection Parties Involved:
H - Mandatory Hold Point = Contractor shall submit inspection notice in advance. The works may only proceed after the Inspection party gave his approval to proceed.
W - Witness = Contractor shall submit inspection notice to witness. If Inspection party does not witness, vendor will proceed his activity without written permission from Inspection party. 1- DEL : EPC Contractor
M - Monitor = Inspection party shall be at site and work shall be conducted under his/her presence. If Inspection party is not present then Contractor can proceed without written permission. 2- Gul Ahmed / OE : Client
R - Document Review = All documents/records to be reviewed by the Inspection party. 3- The ENGINEER / POWER PURCHASER: For EPA Testing
A - Approval = All documents/records related to inspection and test, must be in written form by the Inspection party.

H W W

H M W

H M W

H M W

H W W

H W W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W

H M W
Quality Inspection Plan for Doc Number: QA&QC/FRM-21

Testing of the Seller Interconnection Facilities (EPA Requirements) Rev. 0

Issuance Date: 16 December 2015


50 MW GUL AHMED WIND ENERGY PROJECT - JHIMPIR Note: This document number, Date and Rev no. is only for DEL internal
reference.
Project Title : 50 MW GUL AHMED WIND ENERGY PROJECT Project No. 8213 QIP Number. 8213-S-000-1664-009 Rev. A Dated: 16-12-2015
Inspection Parties Involved:
H - Mandatory Hold Point = Contractor shall submit inspection notice in advance. The works may only proceed after the Inspection party gave his approval to proceed.
W - Witness = Contractor shall submit inspection notice to witness. If Inspection party does not witness, vendor will proceed his activity without written permission from Inspection party. 1- DEL : EPC Contractor
M - Monitor = Inspection party shall be at site and work shall be conducted under his/her presence. If Inspection party is not present then Contractor can proceed without written permission. 2- Gul Ahmed / OE : Client
R - Document Review = All documents/records to be reviewed by the Inspection party. 3- The ENGINEER / POWER PURCHASER: For EPA Testing
A - Approval = All documents/records related to inspection and test, must be in written form by the Inspection party.

H W W