No (hrs) (hrs) (hrs) 1 WTP tank (CIP Collection, balance, CSAS, Effluent, Biosludge & Chemical sludge) A Foundation 15 10 4 B WTP Tank Floor Plan 15 10 4 C WTP tank Roof Plan 15 10 4 D WTP Tank section & details 15 10 4 2 Blower & Control room A Foundation 12 8 3 B Slab on Ground Plan, Section & Details 12 8 3 C Concrete Roof Plan & Sections 12 8 3 D Beam schedule 12 8 3 3 Belt press, filtrate & sludge cake room A Foundation 12 8 3 B Slab on Ground Plan, Section & Details 12 8 3 C Roof Steelworks Plan & Elevations 12 8 3 D Roof Steelworks Section & Details 12 8 3 4 Chemical tank area A Chemical Tank area fondation 15 10 4 B Chemical Tanbk Area Slab Plan & Sections 15 10 4 C Chemical Tank Area Roof Steelwork Plan, Elevation & Details 12 8 3