Sie sind auf Seite 1von 1247

SAP ECC 6 - Implementation in 2009 & Support Responsibilities

Preparation of business blue prints of Materials Management.


discussion with biz users on various biz processes and making biz blue prints as per templates
MM, Purchasing, Inventory management

Configuration of MM organization elements -Plants, Purchase Organizations, Purchasing groups, Storage Locations.
Org levels
Client : its a commercial org unit in r3 system having its own data, master recods and set of tables, high level element of all org
digits alphanum
company code : It is a smallest org unit with an indepent accounting dept within external ac/c, having p&l & balance sheet, 4 dig
Path: SPRO>IMG>Enterprise Structure>Definition>Financial Accounting>Define Company & Edit, Copy, Delete, Check Compan
Table:T001 & Program:SAPLECOP)
Assign co code to company
Assign co code to credit control area
Assign co code to financial management area
Assign profit centre to co code
Assign co code to controlling area
Plant : its an org logistic unit that structures the enterprise from the perspective of production, producurement, material planning
warehouse, maintenance plant, 4 digit alphanu
Path: SPRO>IMG>Enterprise Structure>Definition>Logistics General>Define, Copy, Delete, Check Plant (T-code:EC02 & Table
Plant code 'EM36, Name, address, language, country, factory calendar
Assign plant to co code
Assign biz area to plant/valuation area and division
SL : its an org unit differentiate material stocks within plant, IM on qty based and pi is carried out at sl level
Path: SPRO>IMG>Enterprise Structure>Definition>MM> Maintain Storage Location (T-code:OX09 & Table:T001L & Program:S
OX09 - Storage location creation under Plant, sloc 'N01R', description, address, etc
OMIR - MRP indicator set up
Allow Freezing of Book Inventory Balance in Storage Location - SPRO> IMG> MM> IM & PI> PI> Allow Freezing of Book Inv B
PO : its an org that negotiates conditiions of purchase with vendors for 1 oor more plant
Path: SPRO>IMG>Enterprise Structure>Definition>MM> Maintain Purchasing Organisation (T-code:SPRO & Table:T024E & P

Assign purchase organisation to plant


Assign standard purchase organisation to plant
purch grp: key for buyer or group of buyers responsible for certain specific purchasing activities (eg. Mech/ Elect, etc.)
Path: SPRO>IMG>Enterprise Structure>Definition>MM> Maintain Purchasing Organisation (T-code:OME4,OMGF & Program:S

Configuration of Masters, which includes Material Master, Vendor Master, Source List and Purchasing Info Record.
Configuration and creation of new Material types, assigned number ranges, field selection groups and field status of material ma
Configuration and creation of new vendor account groups, screen layout and assigned number ranges.
Creation of new PO and PR document types, assigned number ranges and field status to Purchase Requisitions and Purchase

Master Data
Vendor master, material master
1 Vendor master
vendor master - vendor group, vendorl no. range, assignemtn no. to group, external, internal , ext or int
Vendor a/c group
Path: SPRO>IMG>Financial Accounting >Accounts Receivable & Accounts Payable >Vendor Accounts >Master data >Pre
Vendor Master Records >Define Account Groups with Screen Layout (Vendors) > (T-code:SPRO & Program:SAPL0F04)
KRED is the SAP standard Vendor group name. Field types are General data, C.Code data, Purchasing data
Vendor No. range
Path: SPRO>IMG>FA>A/Cs Receivable and >Vendor A/Cs>Master data> Preparations for...>Create Number Ranges fo
code:XKN1 & Program:SAPMSNUM)
Path: SPRO>IMG>FA>A/Cs Receivable and>Vendor A/Cs>Master data> Preparations for...>Assign Number Ranges to
(T-code:SPRO & Program:SAPL0F07)
Vendor Creation
Path: SAP Menu >Logistics >MM> Purchasing >Master Data (T-code:XK01,MK01,FK01 & Table:LFA1,LFB1,LFB5, LFM1
Program:SAPMF02K)
Define terms of payment
Path: SPRO>IMG>MM> Purchasing> Material Master> Define terms of payment
payment term code 'z30' ; description; own explanation ; account type 'vendor & customer' ; default for baseline date 'posti
of days
Check inco terms
Path: SPRO>IMG>MM> Purchasing> Material Master> Check inco terms
inco terms 'exw' ; description ; location mandatory 'X'
2 Material Master
master master - mat type, mtrl no. range, assignemtn no. to type, external, internal , ext or int
Material No. length
Path: SPRO>IMG>Logistics-General>Material Master>Basic Settings >Define output format for material nos. (T-code:OMS
Material Type
Path: SPRO>IMG>Logistics-General>Material Master>Basic Settings>Material Types>Define attributes of mat types (T-co
Table:T134,T179 & Program:SAPLMGCT134)
mat typ 'roh', description, field ref 'roh', sref mat typ 'roh', item category 'norm' with qty structure, external purchase order '2
'0', views, price control 'v', acc cat ref '0001', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen mat
mat typ 'fert', description, field ref 'fert', sref mat typ 'roh', item category 'norm' with qty structure, external purchase order '1
'2', views, price control 's', acc cat ref '0009', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen mat
mat typ 'halb', description, field ref 'halb', sref mat typ 'roh', item category 'norm' with qty structure, external purchase order
'2', views, price control 's', acc cat ref '0008', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen mat
mat typ 'zrwk', description, field ref 'zrwk', sref mat typ 'roh', item category 'zrwk' with qty structure, external purchase order
order '2', views, price control 's', acc cat ref '0010', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen
mat typ 'dien', description, field ref 'dien', sref mat typ 'roh', item category 'dien' with qty structure, external purchase order '
'0', views, price control 's', acc cat ref '0006', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen mat
mat typ 'hawa', description, field ref 'hawa', sref mat typ 'roh', item category 'norm' with qty structure, external purchase ord
order '0', views, price control 'v', acc cat ref '0005', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen
print price
mat typ 'hibe', description, field ref 'roh', sref mat typ 'roh', item category 'norm' with qty structure (nr), external purchase or
order '0', views, price control 's', acc cat ref '0002', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen
mat typ 'verp', description, field ref 'verp', sref mat typ 'roh', item category 'verp' with qty structure (nr), external purchase or
order '1', views, price control 's', acc cat ref '0004', qty update 'in all val areas' , val update 'in all val areas', mat type id 'gen
Material no. range and assignment
Path: SPRO>IMG>Logistics-General>Material Master>Basic Settings> Material Types>Define Number Ranges for Each M
code:MMNR & Program:SAPMSNUM)
select group, insert group under group tab, assign group to mat types
Create material group
Path: SPRO>IMG>Logistics-General>Material Group>Create Material Group (T-code:WG21 & Table:T023 & Program:SA
Shipping instructions
Path: SPRO>IMG>Material Management>Purchasing>Material Master>Define Shipping Instructions (T-code:SPRO & Pro
Purchasing value key
Path: SPRO>IMG>Material Management>Purchasing>Material Master>Define Purchasing Value Keys (T-code:SPRO & P
Field selection group and field status
OMSR ; Path: SPRO>IMG>Logistics General>Material Master>Field Selection>Maintain Field selection data screens
Path: SPRO>IMG>Logistics General>Material Master>Field Selection>Assign Fields to Field selection groups
Path: SPRO>IMG>Logistics General>Material Master>Field Selection>Define industry sector

Procurement of Stock Material


RFQ/Quotation, PIR, PO, GR to QI, IV
1 RFQ/Quotation
Define doc type (RFQ 'AN') & Define No. Range & assign no. range
Path: SPRO>IMG>MM> Purchasing>RFQ>RFQ/Quotation>Define Document Types (T-code:OMEA & Program:SAPL0ME
Path: SPRO>IMG>MM> Purchasing>RFQ>RFQ/Quotation>Define Number Ranges (T-code:OMH6 & Program:SAPMSNU
Screen selections
Path: SPRO>IMG>MM> Purchasing>RFQ>RFQ/Quotation>Define Screen Layout at Document Level (T-code:OME8 & Pr
Create RFQ
Path: SAP Menu >Logistics >MM> Purchasing > RFQ/Quotation (T-code:ME41 & Program:SAPMM06E)
Maintain Quotation & Comparision
Path: SAP Menu >Logistics >MM> Purchasing > RFQ/Quotation (T-code:ME47 & ME49 (quote comparision) & Program:
2 Purchase Info Record
Define no. ranges
Path: SPRO>IMG>MM> Purchasing>Purchasing info record >Define no. ranges (T-code:OMEO & Program:SAPMSNUM)
PIR no. will be same though PIR is created for all 4 categories for a material and a vendor
Define screen layout
Path: SPRO>IMG>MM> Purchasing>Purchasing info record >Define no. ranges (T-code:SPRO & Program:SAPL0ME5)
PIR Creation
Path: SAP Menu >Logistics >MM> Purchasing > Master Data (T-code:ME11 & Table:EINA,EINE & Program:SAPMM06I)
3 Source List
Path: SPRO>IMG>MM> Purchasing>Source List>Define Source List Requirement at Plant Level (T-code:SPRO & Progra
plant 'em36' ; name ; source list 'X' ; - Specifies that the source list must have been maintained in the case of external pro
plant. If the indicator has been set for a plant, a source must be entered in the source list before a purchase order that is t
can be created for this plant.
Source List creation
Path: SAP Menu >Logistics >MM> Purchasing > Master Data > Source list(T-code:ME01 & Table:EORD & Program:SAP
4 Quota Arrangement
Define Quota arrangement usage
Path: SPRO>IMG>MM> Purchasing>Source List>Define Quota arrangement usage (T-code:SPRO & Program:SAPL0ME
QA usage '3' ; The entry controls how the total order quantity is calculated in the quota arrangement, and thus which sourc
for the material at a particular point in time. You can enter a quota arrangement for the following field combinations:
purchase orders : The quantity of the material already ordered is included in the quota arrangement.
purchase requisitions : The total quantity requested in purchase requisitions for this material is included in the quota arrang
scheduling agreement : The total quantity scheduled in delivery schedules for this material is included in the quota arrange
planned orders : The total quantity planned in plnd ord for this material is included in the QA.
materials planning (MRP) : The quota arrangement mechanism is also used in materials planning; that is, the planned orde
requisitions created by materials planning are included in the quota arrangement.
production orders : The total quantity of all production orders for this material is included in the quota arrangement.
Define no. ranges
Path: SPRO>IMG>MM> Purchasing>Source List>Define no. ranges (T-code:OMEP & Program:SAPMSNUM)
Quota Arrangement creation
Path: SAP Menu >Logistics >MM> Purchasing > Master Data >Quota Arrangement (T-code:MEQ1 & Program:SAPDM06
5 Purchase Requisition
Define document types and no. range assignment
Path: SPRO>IMG>MM> Purchasing>Purchase Requisition>Define Document types (T-code:SPRO & Program:SAPL0ME
Path: SPRO>IMG>MM> Purchasing>Purchase Requisition>Define No ranges (T-code:OMH7 & Program:SAPLSNR0)
PR creation (Manual)
Path: SAP Menu >Logistics >MM> Purchasing > Purchase Requisition (T-code:ME51N & Table:EBAN,EBKN,EBKE & Pro
6 Purchase Order
Document Type and no. range assignment
Path: SPRO>IMG>MM> Purchasing>PO> Define Document Types (T-code:SPRO) & Program:SAPL0ME8)

Allowed item categories 'Standard ; B-Limit ; K-Consignment ; L-Subcontracting ; S-Third party ; T-Text ; D-Service'
No. range
Path: SPRO>IMG>MM> Purchasing>PO> Define Document Types (T-code:OMH6 & Program:SAPMSNUM)
Screen selection
Path: SPRO>IMG>MM> Purchasing>PO> Define Screen Layout at Document Level (T-code:SPRO & Program:SAPL0ME
Texts for purchase orders - Define Text Types for Header Texts & Item texts
Path: SPRO>IMG>MM> Purchasing>PO> Texts for PO> Define Text Types for Header Texts
Path: SPRO>IMG>MM> Purchasing>PO> Texts for PO> Define Text Types for Item Texts
Texts for purchase orders - Define copying rules
Path: SPRO>IMG>MM> Purchasing>PO> Texts for PO> Define Copying Rules for Item Texts

Set Tolerance Limits for Price Variance


Path: SPRO>IMG>MM> Purchasing>PO> Set Tolerance Limits for Price Variance (T-code:SPRO & Program:SAPL0MRP
Set up stock transport order
Path: SPRO>IMG>MM> Purchasing>PO> Set up Stock transport order (T-code:SPRO & Program:SAPL0ME6)
Set up subcontracting order
Path: SPRO>IMG>MM> Purchasing>PO> Set up Subcontracting order (T-code:SPRO & Program:SAPL0ME6)
Define reasons for ordering
Path: SPRO>IMG>MM> Purchasing>PO> Define reasons for ordering (T-code:SPRO & Program:SAPL0MEB)
Purchase order creation
Path: SAP Menu >Logistics >MM> Purchasing >Purchase Order (T-code:ME21N & Table:EKKO,EKPO,EKET,EKBE & P
Set up authorisation checks for gl accounts
Path: SPRO>IMG>MM> Purchasing>PO> Set up authorisation check for G/L Accounts (T-code:SPRO & Program:SAPL0M
Returns to Vendor
Path: SPRO>IMG>MM> Purchasing>PO> Returns to Vendor (T-code:SPRO & Program:SAPL0WCW)
Rounding Profile
Path: SPRO>IMG>MM> Purchasing>PO> Order optimising> Maintain Rounding Profile

7 Contract
Document Type (MK-Qty contract & WK-Val contract) and no. range assignment
Path: SPRO>IMG>MM> Purchasing>PO> Contract> Define doc type & no. range
Contract creation
Path: SAP Menu >Logistics >MM> Purchasing >
8 Scheduling agreement
Document Type (LP, LPA, LU) and no. range assignment
Path: SPRO>IMG>MM> Purchasing>PO> Scheduling agreement> Define doc type & no. range

Special procurement- Consignment & Subcontracting


Standard functionalities already defined in SAP. To be used during procurement process

SAP Consignment is process wherein you buy the goods from vendor, but dont valuate that stock. Only when goods are withdra
you liable to your vendor for your payments. Best example would be big TV shop which buys the goods from its vendors for adve
purposes and only when they sold, vendor charges him.
Consignment process in SAP MM is handled through item category in purchasing documentand it has certain prerequisites/step
to work.
1) There must be price maintained in inforecord for consignment (info type 2 in EINE table) for certain material, vendor, purch
Prices need to be maintained in inforecord which will be used when settling liabilities with vendor.(ME11)
2) Create the Purchase Order with item category K in ME21N to order the goods from vendor for consignment.
3) On requested delivery date in Purchase Order, do MB01 -101 that is Goods Receipt for above goods on consignment. Aga
you are still not liable to pay your vendor. These goods will not be valuated, accounting document will not be posted unless
consignment for your own use.
4) You withdraw the goods for your own purpose. Like in our example of TV shop, customer buys the TV. So that means shop
goods from his consignment stock and now vendor will be his liability.
Goods can be withdrawn in MB1A- 261 and MB1B-411 movement types with special stock indicator K used for consignme
This will be valuated and will post accounting document. Now consignment stock is actually valuated
5) Invoice in MIRO is not done in case of consignment process. The liabilities are settled in MRKO for certain period say mon
Vendor will be paid at price that is maintained in inforecord. As and when required, prices set with vendors must be adjuste
(ME12). Scales per validity period can be maintained if they vary over period in ME12.
6) If goods are not withdrawn, you can do 102 or 122 movement types in MB01 with special stock indicator K for consignmen
Here vendor is not your liability.
7) Inforecord needs to be maintained for normal as well as standard purchasing organization. Plant dealing in consignment p
Purchase Order) must be assigned to standard purchasing origination in configuration.
8) Stock in consignment is seen separately in stock overview MMBE for certain material and plant.

Customizing Pricing Procedure- Creation of Condition tables, Condition types, Tax codes, Access sequence, Schema groups, a
domestic and import purchasing.
Conditions
1 Define condition control at plant level
Path: SPRO>IMG>MM> Purchasing >Conditions >Define condition control at plant level (T-code:SPRO & Program:SAPL0
2 Define Access sequence
Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define Access sequence (T-code:
Program:SAPL080M)

3 Define Condition type


Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define Condition type (T-code:SP
PB00- aumating price pick up ; PBXX-manual price entry ;
Both the Condition Types PB00 & PBXX are Condition Types related to Gross Price.Both the Condition types will ahve the
different counter.
PBXX is a manual Condition Type and will not have any Access Sequence assigned to it. It can be entered only manually i
document.
PB00 is an Automatic Condition type and an Access Sequence will be assigned to it. whenever a Condition record founds,
the Purchasing document with the price from the Condition Record.If there is no Valid Condition record founds, then PB00
instead PBXX can be entered manualy.
4 Define Exclusion indicators
Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define Exclusion indicators (T-cod
Program:SAPL080Z)
A-Delivery costs, F-customs duties, N-tax code, O-event, U-metal price, V-sales price & X-gross price
5 Define Calculation schema
Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define Calculation schema (T-cod
Program:SAPL080M)
ZDOMPR domestic & ZIMPPR imports

6 Define schema groups


Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define schema groups (T-code:SP
Schema Groups: Vendor
IM - VENDOR SCHEMA DOMESTIC & ZI - VENDOR SCHEMA IMPORTS
Schema Groups for Purchasing Organizations
Schema group for Porg 'EM36' - Pur Org EM36
Assignment of Schema Group to Purchasing Organization
Purch org 'EM36' - Schema group for Porg 'EM36'
7 Define schema determination
Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define schema determination (T-c
Program:SAPL0ME3)
Determine Calculation Schema for Standard Purchase Orders
Determine Schema for Stock Transport Orders - have a look and set up if required
Determine Calculation Schema for Determination of Market Price - have a look and set up if required
8 Define Transaction/Event keys
Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Define Transaction/Event keys (T-
Program:SAPL080C)
Trans./Event Key
EIN - Purchasing account ; FR1 - Freight clearing ; FR2 - Freight provisions ; FR3 - Customs clearing ; FR4 - Consignme

Usage of Transaction/Event Key in Purchase Account Management

9 Maintain condition table


Path: SPRO>IMG>MM> Purchasing >Conditions >Define Price determination process >Maintain condition table (T-code:M
Create condition table - have a look and set up if required
Change Condition Table - have a look and change if required
Display Condition Table - have a look and change if required

- Account assignment
Maintain account assignment categories
Path: SPRO>IMG>MM> Purchasing >Conditions >Account assignment >Maintain account assignment categories (T-code
Program:SAPL0MEQ)
Define Combination of Item Categories/Account Assignment Categories
Path: SPRO>IMG>MM> Purchasing >Conditions >Account assignment> Define Combination of Item Categories/Account A

- Split valuation
1 Activate Split valuation
Path: SPRO>IMG>MM> Valuation and Account Assignment> Split Valuation>Activate Split Valuation (T-code:SPRO & Pro
2 Configure split valuation
Path: SPRO>IMG>MM> Valuation and Account Assignment>Split Valuation>Configure Split Valuation (T-code:OMWC & P
(mat type, valuation class, gl account)

Configuration of release procedure for PO.


Classification
Document Release (Approval) Procedure
Release (Approval) proceedure
1 Edit Characterstic
Path: SPRO>IMG>MM> Purchasing >Purchase Order >Release proceedure for PO> Edit characteristic (T-code:CT04 & P
POREL_NETVAL ; POREL_ORDTYPE ; POREL_PPV ; POREL_ZZSUBMI
Characterstic 'POREL_NETVAL' ; Basic data - desc 'Total net order value' ; status 'released' ; data type 'CURR' ; no. of c
'2' ; curr 'inr' ; val assignment 'multiple values 'X' & interval was allowed 'X'' ; Addnl data- table name 'CEKKO' ; field name
val assignment - not ready for input 'X' ; user entry handling 'X'
Characterstic 'POREL_ORDTYPE' ; Basic data - desc 'Order Type (Purchasing)' ; status 'released' ; data type 'CHAR' ; n
assignment 'multiple values 'X' ; Addnl data- table name 'CEKKO' ; field name 'BSTART' ; proceedure for val assignment
user entry handling 'X'
Characterstic 'POREL_PPV' ; Basic data - desc 'Premium Price Variance' ; status 'released' ; data type 'CURR' ; no. of ch
; curr 'inr' ; val assignment 'multiple values 'X' & interval was allowed 'X'' ; Addnl data- table name 'CEKKO' ; field name 'ZP
assignment - not ready for input 'X' ; user entry handling 'X'
2 Edit Class
Path: SPRO>IMG>MM> Purchasing >Purchase Order >Release proceedure for PO> Edit class (T-code:CL02 & Program:
PORELEASE ;
Class 'PORELEASE' ; Class type '032' ; Basic data - desc 'PO release precedure' ; status 'released' ; valid from ' ' valid
rel' ; character ' POREL_NETVAL ; POREL_ORDTYPE ; POREL_PPV ; POREL_ZZSUBMI' ;
3 Define release proceedure for purchase orders
Path: SPRO>IMG>MM> Purchasing >Purchase Order >Release proceedure for purchase orders >Define release proceed
code:OMGS & Program:SAPL0MEF)
Release groups

Release codes

Release indicator

Release strategies
Tables:T16FS,T16FD,T16FT,T16FK,T16FV,T16FC,

Inventory management- assigned number ranges for various doc types, configured field statuses, extended creation automatic s
movement types
Inventory Management/Physical Inventory
- Inventory Management: Overview
- Goods Receipts
1 Plant parameters
Path: SPRO>IMG>Material Management>Inventory Management and Physical Inventory>Plant Parameters (T-code:S
Program:SAPL0MB8)
2 Define no. assignment for goods recipt
Path: SPRO>IMG>Material Management>Inv management & PI >Number assignment > Define no. ranges for goods
code:OMC1 & Program:SAPMOMB0)
Define no. range assignment for material and physical inventory docs
Path: SPRO>IMG>Material Management>Inv management & PI >Number assignment > Define no. ranges for materia
docs (T-code:OMBT & Program:SAPLSNR0)
Path: SPRO>IMG>Material Management>Inv management & PI >Number assignment > Define no. ranges for materia
docs (T-code:OMBT & Program:SAPLSNR0)
Define no. range assignment for accounting docs
Path: SPRO>IMG>Material Management>Inv management & PI >Number assignment > Define no. range assignment
code:OMBA & Program:SAPMOMB0)
3 Set tolerance limits
Path: SPRO>IMG>Material Management>Inventory Management and Physical Inventory> >Goods Receipt>Set Toler
& Program:SAPL0MRP)
4 Inventory Sampling
Path: SPRO>IMG>Material Management>Inventory Management and Physical Inventory>Physical Inventory>Invento
Inventory Sampling Profiles (T-code:OMCK & Program:SAPL0MI0)
- Reservations and Goods Issues
Reservations>Default Values
Path: SPRO>IMG>Material Management>Inventory Management and Physical Inventory >Reservation>Define Defau
Program:SAPL0MBF)
- Stock Transfers and Transfer Postings
1 Movement type
Path: SPRO>IMG>Material Management>Inv management & PI >Movement type(T-code:OMJJ & Table:T156, T156T
- STO
1 Suppling plant must have the stock
2 While creating vendor, Extras>purchasing data>Enter plant 'XXX'
3 Define Shipping Data for Plants
Path: SPRO>IMG>MM>PUR>PO>Set up STO>Define Shipping Data for Plants (T-code:SPRO & Program:SAPL0ME
4 Create Checking Rule
Path: SPRO>IMG>MM>PUR>PO>Set up STO>Create Checking Rule (T-code:SPRO & Program:SAPL0PP1)
5 Define Checking Rule
Path: SPRO>IMG>MM>PUR>PO>Set up STO>Define Checking Rule (T-code:SPRO & Program:SAPL0PP1)
6 Assign Delivery Type and Checking Rule
Path: SPRO>IMG>MM>PUR>PO>Set up STO>Assign Delivery Type and Checking Rule (T-code:SPRO & Program:S
7 Assign Document Type, One-Step Procedure, Underdelivery Tolerance
Path: SPRO>IMG>MM>PUR>PO>Set up STO>Assign Document Type, One-Step Procedure, Underdelivery Toleranc
Program:SAPL0PP1)
- Consignment
- Subcontracting
Set up subcontract order
Path: SPRO>IMG>Material Management>Purchasing >Purchase order >Set up subcontract order (T-code:SPRO & P
PIR with subcon category(ME11), PO (ME21N), Goods movement to subcon location with mov typ 541(MB1B), Goods
to the stock with mov typ 101 and components backflush with mov typ 543
- Physical Inventory Management
Path: SPRO>IMG>MM>IM & PI>Define No. assignment for A/c doc > FI Doc types & FI No. ranges

- Cycle Counting
(GR, GI, Movement type, consignment, subcon, PI, CC)

Other Inventory management processes (Consignment, Subcon, PI & CC)


Configuration of automatic account determination process, valuation class, account category references and split valuation.

Valuation & Account Determination


- Introduction to Material Valuation
- Valuation and Account Assignment
1 Define price control for material types
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Define price control for material types (T-co
Program:SAPL0MBW)
Price control 'V' - Mat typ 'ROH' ; Price control 'S' - Mat typ 'FERT & HALB ;
2 Define valuation control
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
valuation control (T-code:OMWM & Program:SAPMOMBD)
Valuation grouping code should be 'active'
3 Group together valuation areas
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
together valuation areas (T-code:OMWD & Program:SAPM0MBW)
Valuation area 'EM36' - Co code 'EM36' - Company name - Chart of accounts 'COA' - Val grouping code '0001'
4 Define valuation class
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
valuation class (T-code:OMWD, DMSK, OMSK & Program:SAPM0MBW)
A/c category reference
Create A/c category reference '0001' - Reference for raw materials ;
Valuatin class
Valuation class '1310 & 1320' - A/c category reference '0001' - Reference for raw materials ;
Material type/account category reference
Mat type 'ROH & FERT' - A/c category reference '0001' - Reference for raw materials ;
5 Define account grouping for movement types
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account grouping for movement types (T-code:OMWN & Program:SAPL0MB4)

6 Activate purchase account in company code


Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
purchase account in company code (T-code:SPRO & Program:SAPM0MBW)

7 Calculation of value for purchase account


Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
>Calculation of value for purchase account (T-code:SPRO & Program:SAPL0MB6)

8 Calculation of value for purchase account - have a look


Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
>Calculation of value for purchase account (T-code:SPRO & Program:SAPL0MB6)
9 Separating account document for purchase account postings - have a look
Activate separate account document in valuation area
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account management >Separating account document for purchase account postings >Activate separate account documen
code:SPRO & Program:SAPL0MB6)
Create new doc type for separate document
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account management >Separating account document for purchase account postings >Create new doc type for separate do
Program:SAPL0F62)
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account management >Separating account document for purchase account postings >Configure no. range for document ty
Program:SAPLSNR0)
Inventory management ; configure document type for separate F
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account management >Separating account document for purchase account postings >Inventory management ; configure d
F (T-code:SPRO & Program:SAPL0MB6)
Invoice verification ; configure document type for separate F
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
account management >Separating account document for purchase account postings >Invoice verification ; configure docu
(T-code:SPRO & Program:SAPL0MRP)
5 Configure automatic postings
Path: SPRO>IMG>Material Management>Valuation and Account Assignment> Account determination >Account determina
>Configure automatic postings (T-code:OMWB & Program:SAPMO20M)
Account assignment

BSX-Inventory posting, WRX-GR/IR clearing account,


Simulation - Have a look
Choose

Account assignment

GL Accounts

Involved in interfacing and integrating of MM with FI and SD and PP modules.


Movement Types: MM-SD-FI : 601/602, 651/652 ; MM-PP-FI : 261/262 ; MM-FI : 561/562, 101/102
Valuation Class
Transaction/Event key: (BSX inventory account)
Material Type:

PP-MM Generating Purchase Requistion


MM Making Inquiries
Raising Purchase Order
Release of Purchase Order
MM-FI Goods received from Vendor Raw material account - dr
GR/IR clearing ac
Invoice Verification and quality Assurance GR/IR clearing ac
TO Vendor
MM-FI-PPGoods issue for consumption Rawmaterial Consumption Dr
TO Rawmaterial Inventory Account
MM-FI-PPProduction Receipt Finished Goods Inventory Account
to Change in Stock
MM-SD-FIFinished goods delivered to Customer Change in stock ac
to Finished goods inventory
SD-FI Raising invoice on customer Customer ac -
to Sales
Receipt of payment from customers

MM-FI Chart of accounts of the company code


Valuation grouping code for the valuation area
Transaction/event key (internal processing key)
Account grouping (for offsetting entries, consignment liabilities, and price differences)
Valuation class of material or (in case of split valuation) the valuation type
Account Category Reference
Movement Types
Account Groupings for Movement Types
Different G/L Accounts Assigned to Different Transaction Keys & Account Grouping

Tax code set up and GL mapping


FTXP & OB40

Data collection and migration using LSMW.


User acceptance test, functional design docs for Z report and other enhancements.
Designing functional specifications for various enhancements and Z reports.
Preparation of Config document, end user manuals and end user training.
Generation of various reports using SQVI
User admin and authorization (role/profile) set up

ASAP methodolozy
- Projection preparations : Provides initial planning and preparation for R/3 project
- Business Blue Print : Detailed documentation of business process requirement
- Realisation (Designing) : To configure and implement all business processes
- Final preparation (Testing) : To complete testing ,end-user training,cut-over activities
- Go Live and Support : Transition from project orientation to live environment
urchasing groups, Storage Locations.

s and set of tables, high level element of all org units represented with 3

external ac/c, having p&l & balance sheet, 4 digit alphanu


e Company & Edit, Copy, Delete, Check Company Code (T-code:EC01 &

of production, producurement, material planning. It can be a branc, hq,

opy, Delete, Check Plant (T-code:EC02 & Table:T001W & Program:SAPLECOP)

d pi is carried out at sl level


tion (T-code:OX09 & Table:T001L & Program:SAPL0ORG)

MM> IM & PI> PI> Allow Freezing of Book Inv Balance in SLoc

Organisation (T-code:SPRO & Table:T024E & Program:SAPL0ORG)

hasing activities (eg. Mech/ Elect, etc.)


Organisation (T-code:OME4,OMGF & Program:SAPL0ME6)

ce List and Purchasing Info Record.


d selection groups and field status of material master fields.
signed number ranges.
status to Purchase Requisitions and Purchase Orders

, external, internal , ext or int

s Payable >Vendor Accounts >Master data >Preparation for Creating


dors) > (T-code:SPRO & Program:SAPL0F04)
data, C.Code data, Purchasing data

a> Preparations for...>Create Number Ranges for Vendor Accounts (T-

> Preparations for...>Assign Number Ranges to Vendor Account Groups


01,MK01,FK01 & Table:LFA1,LFB1,LFB5, LFM1,LFM2,LFBK &

dor & customer' ; default for baseline date 'posting date or no default' ; no.

fine output format for material nos. (T-code:OMSL & Programm:SAPL0MM1)

terial Types>Define attributes of mat types (T-code:SPRO &

rm' with qty structure, external purchase order '2', internal purchase order
al update 'in all val areas', mat type id 'gen mat typ'
rm' with qty structure, external purchase order '1', internal purchase order
al update 'in all val areas', mat type id 'gen mat typ'
norm' with qty structure, external purchase order '2', internal purchase order
al update 'in all val areas', mat type id 'gen mat typ'
zrwk' with qty structure, external purchase order '2', internal purchase
as' , val update 'in all val areas', mat type id 'gen mat typ'
dien' with qty structure, external purchase order '2', internal purchase order
al update 'in all val areas', mat type id 'gen mat typ'
y 'norm' with qty structure, external purchase order '2', internal purchase
as' , val update 'in all val areas', mat type id 'gen mat typ', display materail,

orm' with qty structure (nr), external purchase order '2', internal purchase
as' , val update 'in all val areas', mat type id 'gen mat typ'
verp' with qty structure (nr), external purchase order '2', internal purchase
as' , val update 'in all val areas', mat type id 'gen mat typ'

aterial Types>Define Number Ranges for Each Material Type (T-

up (T-code:WG21 & Table:T023 & Program:SAPMWWG2)

efine Shipping Instructions (T-code:SPRO & Program:SAPL0MEK)

efine Purchasing Value Keys (T-code:SPRO & Program:SAPL0ME6)

ction>Maintain Field selection data screens


sign Fields to Field selection groups

ment Types (T-code:OMEA & Program:SAPL0ME8)


er Ranges (T-code:OMH6 & Program:SAPMSNUM)

n Layout at Document Level (T-code:OME8 & Program:SAPL0ME5)


ME41 & Program:SAPMM06E)

ME47 & ME49 (quote comparision) & Program:SAPMM06E)

anges (T-code:OMEO & Program:SAPMSNUM)

anges (T-code:SPRO & Program:SAPL0ME5)

11 & Table:EINA,EINE & Program:SAPMM06I)

uirement at Plant Level (T-code:SPRO & Program:SAPL0MEK)


ave been maintained in the case of external procurement for a certain
n the source list before a purchase order that is to be issued to this source

st(T-code:ME01 & Table:EORD & Program:SAPLMEOR)

ent usage (T-code:SPRO & Program:SAPL0ME6)


in the quota arrangement, and thus which source of supply is determined
ment for the following field combinations:
n the quota arrangement.
ns for this material is included in the quota arrangement.
for this material is included in the quota arrangement.
ncluded in the QA.
ed in materials planning; that is, the planned orders and purchase
ement.
ial is included in the quota arrangement.

de:OMEP & Program:SAPMSNUM)

angement (T-code:MEQ1 & Program:SAPDM06Q)

ment types (T-code:SPRO & Program:SAPL0ME8)


ges (T-code:OMH7 & Program:SAPLSNR0)

-code:ME51N & Table:EBAN,EBKN,EBKE & Program:SAPLMEGUI)

e:SPRO) & Program:SAPL0ME8)

acting ; S-Third party ; T-Text ; D-Service'


e:OMH6 & Program:SAPMSNUM)

ment Level (T-code:SPRO & Program:SAPL0ME5)

Variance (T-code:SPRO & Program:SAPL0MRP)

-code:SPRO & Program:SAPL0ME6)

-code:SPRO & Program:SAPL0ME6)

code:SPRO & Program:SAPL0MEB)

ME21N & Table:EKKO,EKPO,EKET,EKBE & Program:SAPLMEGUI)

G/L Accounts (T-code:SPRO & Program:SAPL0ME4)

RO & Program:SAPL0WCW)

valuate that stock. Only when goods are withdrawn from your stores, are
p which buys the goods from its vendors for advertising and display
ng documentand it has certain prerequisites/steps for consignment process

in EINE table) for certain material, vendor, purchasing org and plant.
g liabilities with vendor.(ME11)
ods from vendor for consignment.
s Receipt for above goods on consignment. Again one important point is,
d, accounting document will not be posted unless stock is withdrawn from

hop, customer buys the TV. So that means shop keeper withdraws the

ith special stock indicator K used for consignment


t stock is actually valuated
s are settled in MRKO for certain period say month, quarter etc.
equired, prices set with vendors must be adjusted in inforecord as well.
od in ME12.
01 with special stock indicator K for consignment to return goods to vendor.

ng organization. Plant dealing in consignment process (to be put in


onfiguration.
ain material and plant.

ax codes, Access sequence, Schema groups, and Calculation schema for

l at plant level (T-code:SPRO & Program:SAPL0MEK)

tion process >Define Access sequence (T-code:SPRO &

tion process >Define Condition type (T-code:SPRO &

oss Price.Both the Condition types will ahve the same Step number with a

assigned to it. It can be entered only manually in the Purchasing

igned to it. whenever a Condition record founds, then it will be updated in


is no Valid Condition record founds, then PB00 will not be included

tion process >Define Exclusion indicators (T-code:SPRO &


-sales price & X-gross price

tion process >Define Calculation schema (T-code:SPRO &

tion process >Define schema groups (T-code:SPRO &

tion process >Define schema determination (T-code:SPRO &


look and set up if required

tion process >Define Transaction/Event keys (T-code:SPRO &

ns ; FR3 - Customs clearing ; FR4 - Consignment payables etc.

tion process >Maintain condition table (T-code:M/03 &

Maintain account assignment categories (T-code:SPRO &

Define Combination of Item Categories/Account Assignment Categories

on>Activate Split Valuation (T-code:SPRO & Program:SAPL0ME6)

on>Configure Split Valuation (T-code:OMWC & Program:SAPMO10M)

ure for PO> Edit characteristic (T-code:CT04 & Program:SAPLCTMV)

; status 'released' ; data type 'CURR' ; no. of char '15' ; decimal places
; Addnl data- table name 'CEKKO' ; field name 'GNETW' ; proceedure for

asing)' ; status 'released' ; data type 'CHAR' ; no. of char '4' ; val
ame 'BSTART' ; proceedure for val assignment - not ready for input 'X' ;

; status 'released' ; data type 'CURR' ; no. of char '15' ; decimal places '2'
Addnl data- table name 'CEKKO' ; field name 'ZPPV' ; proceedure for val

ure for PO> Edit class (T-code:CL02 & Program:SAPLCLMO)


cedure' ; status 'released' ; valid from ' ' valid to ' ' ; keywords - 'po &
POREL_ZZSUBMI' ;

ure for purchase orders >Define release proceedure for purchase orders (T-

red field statuses, extended creation automatic storage location to various

Physical Inventory>Plant Parameters (T-code:SPRO &

mber assignment > Define no. ranges for goods receipt/issue slips (T-

mber assignment > Define no. ranges for material & physical inventory
mber assignment > Define no. ranges for material & physical inventory

mber assignment > Define no. range assignment for accounting docs (T-

Physical Inventory> >Goods Receipt>Set Tolerance Limits (T-code:OMC0

Physical Inventory>Physical Inventory>Inventory Sampling>Create

Physical Inventory >Reservation>Define Default Values (T-code:OMBN &

vement type(T-code:OMJJ & Table:T156, T156T & Program:SAPL0MB2)

for Plants (T-code:SPRO & Program:SAPL0ME6)

e (T-code:SPRO & Program:SAPL0PP1)

e (T-code:SPRO & Program:SAPL0PP1)

and Checking Rule (T-code:SPRO & Program:SAPL0PP1)

pe, One-Step Procedure, Underdelivery Tolerance (T-code:SPRO &

er >Set up subcontract order (T-code:SPRO & Program:SAPL0ME6)


subcon location with mov typ 541(MB1B), Goods receipt (MIGO), FG adds
543

oc types & FI No. ranges

ount category references and split valuation.

ent> Define price control for material types (T-code:SPRO &

ent> Account determination >Account determination w/o wizard >Define


ent> Account determination >Account determination w/o wizard >Group

unts 'COA' - Val grouping code '0001'

ent> Account determination >Account determination w/o wizard >Define

ent> Account determination >Account determination w/o wizard >Define


MB4)

ent> Account determination >Account determination w/o wizard >Activate


W)

ent> Account determination >Account determination w/o wizard


PL0MB6)

ent> Account determination >Account determination w/o wizard


PL0MB6)

ent> Account determination >Account determination w/o wizard >Purchase


nt postings >Activate separate account document in valuation area (T-

ent> Account determination >Account determination w/o wizard >Purchase


nt postings >Create new doc type for separate document (T-code:OBF4 &

ent> Account determination >Account determination w/o wizard >Purchase


nt postings >Configure no. range for document type (T-code:FBN1 &

ent> Account determination >Account determination w/o wizard >Purchase


nt postings >Inventory management ; configure document type for separate

ent> Account determination >Account determination w/o wizard >Purchase


nt postings >Invoice verification ; configure document type for separate F

ent> Account determination >Account determination w/o wizard


170 170000
rial Inventory Account
CIN

IMG SETTINGS :

(1) FINANCIAL ACCOUNTING:


Path: SPRO> F.Accounting > FI Global Settings > Tax on Sales & Purchase >
- Basic Settings : Please have a look on following nodes ( Please do not change any settings here as these are genera
- Check Calculation Procedure.
Have a close look in Define procedures. On TAXINJ Control data, which is the pivotal point for all Indian Tax Calc
Access sequence
JST1 & JTAX

Define Condition Types


Define Procedures ZTAXIN
- Assign Country to Calculation Procedure Please cross-check that the TAXINJ is assigned to India

- Specify Structure of Tax Juridiction Code (Have a look)


- Define Tax Jurdictions : If you want to add any separate Tax Juridiction code, create it in TAXINJ.

- At node India >


Activate Country version for fiscal years Check the account interface components are in valid fiscal year period

Settings are done at Logistics General

(2) LOGISTICS - GENERAL


Path: SPRO> Log.General > Tax on Goods Movements > India >
1 Basic Settings :
- Maintain Excise Registrations :
Create Excise Registration details here. (eg. X) Please indicate the duty applicability (aed, sed, cess), Options a
excise line items in excise invoice

- Maintain Company Code settings : Create the settings relevant for your company code.
Cenvat doc type 'SA', xchange rate type for CVD 'M', CVD account ' '
- Plant settings: Create your Plant Setting with excise registration (X) you have created, If your Plant is operating a
give the tick.
Plant - exc registration - multiple goods receipt

- Maintain Excise Groups : Create your own excise group for your Plant with the excise registration (X) already cre
a thorough look on the requirement and set accordingly like creation of EI, settings at MIGO, Automatic posting e
(exc group, exc reg '1', no. of grs '2')

- Maintain Series Groups : (Relevant for Outbound deliveries, but applicable in MM for Subcontracting) : Create S
excise registration (X) created already

- Maintain Excise Duty Indicators : All possible Indicators are to be maintained like 100% Duty, 50%, etc
- Maintain Postal address : Excise related address Management (Not maintained)

- Determination of Excise Duty :


- Define Tax Calculation Procedure : Please see that TAXINJ is assigned to India

- Maintain Excise Defaults : Check the defaults created in the system.

Tax procedure
CVD condition
Ex. type
tax code
A/PTax juris.code
Account payable
Account
BED
payable
condition
Account
SED payable
type
condition
Account
AED receivable
type
conditionBED
type c
TAXINJ JCV1 A0 9900 JMO1 JSO1 JAO1 JEX2
ZTAXIN JCV1 A0 JMX1 JSX1 JAX1 JEXP

BED Perc AED Perc SED Perc Cess Perc NCCD Condition
NCCDtype
Condition
AP
NCCDtype
PercECS
AR Condition type AP
JMOD JAED JSED JCED
JMOP JAOP JSOP JEX1

ADC condition
Account
type A/P
payable
Account
AT1receivable
condition
AT1 Perc AT1
type
Account
condition
payable
type
Account
AT2
receivable
condition
AT2 Perc AT2
type
Account
condition
payable
type AT3 cond

JADC JHX1 JESC JSEP

- Condition based Excise Determination :


- Define Tax Code for Purchasing Document - It is basically creation of Tax Code FTXP Create as many
the combination of A/P BED, AED & SED as 100% (It means that we are declaring that the material is 100%
respective Tax % for CST/ LST for your working scenarios. This Tax code we will be attaching in PO for po
Taxes.
FTXP

- Assign Tax Code to Company code


EM36 - A0 & C0

- Classify Condition types : No input here.


ZTAXIN - JMOP etc
2 Master Data
- Maintain Chapter Ids : Maintain the Chapter ID with Excise UOM

- Assign Users to M master screen sequence for ED Not used


Chaitanya, Hemkumar, Msrinivas, Rajesh

- Define Form Types - No Input

3 Account Determination
- Define G/L Account for Taxes It is OB 40 We are not using this because the accounts are assigned during the
code in FTXP

- Maintain Excise Account per excise transactions No data entry


57FC, 57NR
- Specify G/L account per Excise transaction All 256 accounts are to be entered by FI.

4 Business Transactions
- Incoming Excise Invoices
1) Select fields - no input
2) Define processing modes per transaction Check the transaction role and activate accordingly. For Transa
activate all.

3) Define Reference document per transaction No Input here


4) Maintain Rejection Codes Maintain some rejection codes, which is used while reversing the transactions

5) Specify Movement types involve Excise Invoices Enter the movement types and select the Registers for e

- Outgoing Invoices - (Its mainly for SD)


1) Assign Billing Type to Delivery Types

2) Maintain default Excise Groups and Series Groups


- Subcontracting
1) Subcontracting Attributes Enter all relevant subcontracting attributes here. Please check the Challan type
Subcontracting period (Presently it is 180 days), Number of Excise Invoice line items and Number range

2) Maintain movement type groups Please check/ enter for the combination of Movement type group and Mo
involved in Subcontracting

- Exports under Excise Regulations - SD Functionality


1) Exports
2) Deemed Exports
3) Printouts of ARE docs
4) Transaction config
5) Exports

- Utilization
1) Utilization Determination It is basically fixing the % of CENVAT accounts are to be debited by the fortnigh
CENVAT Report. Please note that the total of distribution should be 100.

2) Maintain minimum balances for excise accounts It is not applicable now.

- Excise Registers
1) Specify SAP Script Forms You can specify the Form Layout/ Forms here with the help of ABAP/ Basis.

5 Tools
- Long Texts Management of Texts on Excise transactions/ screens

- Number Ranges - All relevant number ranges for each Excise group is assigned here.

- Message Control All messages related to CIN are configured here.

(3) MM
1 Making Transfer posting for subcontracting - IMG setting
MM > Inventory Management & Physical Inventory > Goods Issue & Transfer Posting > Define Screen Lay out
In Change view field selection overview, Select Movement type 541 nad mark the Purchase Order field as an option

CREATION OF MATERIAL AND VENDOR MASTER RECORDS


Create the Material which are liable for Excise Duty in normal MM01 transaction
Create Vendors in XK01 and dont forget to enter the CIN Details of the Vendor by clicking on the icon CIN Details on the
entering the CST & LST Numbers, Excise Registration details and Pan Number. But dont forget to enter Excise Indicator
click on CENVAT Scheme participant on Excise duty Tab.

MAINTAINING OF MASTER DATA


Transaction Code J1ID

Basically Excise Mater Data for a Material, Plant & Vendor/ Customer
1 MASTER DATA
1 Chapter ID Just check the Chapter ID created in IMG setting under Master Data is appearing here or not.
2 Material and Chapter ID combination - Make the entry for Material and Chapter ID for your Plant. If you are using
Subcontracting, give the tick in Subcontracting box. Dont forget to give X mark if the material is declared to Exc
column. Please select the proper material type.
3 Material assessable Value You can fix up the Net Dealer Value and assessable Value of the Material at a partic
4 CENVAT Determination Here you are declaring the input and Output material for a particular Plant. Tick on def

2 EXCISE STATUS
1 Vendor Excise Details Enter your Vendor details created in XK01. Please dont forget to put the Excise Indicato
tick.
2 Customer Excise Details - SD Functionality
3 SSI Rate If the Vendor is SSI, enter the SSI status, Excise duty and SSI rating.
4 Excise Indicator for Plant Enter the Excise detail of your Plant with Excise Indicator and Number range group.
5 Excise Indicator for Plant & Vendor Enter the combination
6 Excise Indicator for Plant and Customer SD functionality

3 EXCISE RATES
1 Excise Tax Rate Specify the excise rates for BED, AED & SED along with Chapter ID and Excise Indicator.
2 Cess Rate Enter the Cess rate, if existing.
3 Exceptional Material Excise Rate If the material is having any exceptional rates, enter here. Please note that th
picked up on priority, even if you are maintaining another rate in Excise Tax rate.
4 Sales Tax set off percentages Can enter the data, if applicable.
5 Quantity based AED & SED If the quantity base AED & SED is applicable for a material at a Plant in Chapter ID

BUSINESS SCENARIOS
1 INTERNAL PROCUREMENT OF RAW MATERIAL
Its a normal Procurement cycle but with Excise transactions:
Pre-requisite
Customization and creation of Vendor, Material and Maintaining Excise Master Records in J1ID.

Step 1. Creation of Purchase Order


Its a normal ME21N activity, but make sure that you have selected GR based Invoice Verification and a proper Tax C
FTXP with BED, AED, SED, CST, etc) in Invoice tab of Item detail. Check and Save the PO and note the PO Number
Step 2 Capturing Excise Invoice
Transaction code is J1IEX. Select the tab of Capture excise invoice. Enter the Po number. Enter your Excise Invoic
in respective tabs and check the BED, AED & SED values and rates in Item Detail, Item and Header data. Check and
Note the Internal Excise Invoice Number. Note the Excise Invoice number system-generated messages.

Step 3 Goods Receipt


Do the normal MIGO transaction for that Purchase Order. On allocating the Storage Location and Flagging the Item O
coming in Header and Item. On Excise tab in Header select Only capture excise Invoice tab and drill down on Excise
and select the Excise Invoice number created in step 2. Enter the date, check and save the document. Note the mate
Number.

Step 4 Posting Excise Invoice


It is the same transaction J1IEX Select the tab POST tab and enter the internal excise number. No data entry is
the document. Click on Simulate CENVAT icon and see the posting. If satisfactory, click on Post CENVAT to saving
Accounting document Number and serial Number. Excise Invoice is posted now. Register RG23A Part I & II are upda

Step 5 Vendor Invoice Verification


Its a normal MIRO transaction. Enter the tax amount separately. Simulate and then Post the Invoice. Check the posti
& SED, CENVAT clearing account and GR/IR clearing account.

Step 6 Data and Reporting


1 For Checking CENVAT Register Transaction code J2I9
2 For Printing Excise Registers Transaction Code J2I6 (Any Excise Register can be printed)

2 PROCUREMENT OF CAPITAL GOODS


The procedure is same, but use an asset material in Purchase Order. The difference is the duties are posted in RG23
note that the credits will be 50% for the current year and the balance is credited in CENVAT on Hold account.

3 PROCUREMENT - IMPORTS
Pre-Requisite
1 Create a Vendor as Customs Normal schema group
2 Create a (Import) Vendor with a separate Vendor Schema(Y) in customizing
3 Attach the Pur Orgn and Vendor Schema(Y) and assign the IMPORT Pricing procedure in Customizing

Step 1 Creation of Purchase Order


Select the Vendor (Import) for the PO. Enter the data. In Invoice tab, Dont select GR based Invoice verification and s
V0. In Conditions tab, In condition JCV1 (In CVD) enter the percentage of CVD to be remitted to Customs. Select
details and attach the Vendor as Customs. Check and save.

Step 2 Invoice verification for the CVD


Practically when material is arrived at Customs, they will issue Bill of Lading. This BOL invoice value in MIRO. Select
Planned Delivery cost tab. In header enter the CVD amount and in details tab, check the Invoicing party as Vendor
Check and Save the document. See that the amount is posted in CVD/ customs clearing account

Step 3 Capturing of excise Invoice for Bill of Entry


Its an ordinary J1IEX transaction. But while entering the PO system will ask for a commercial invoice number, enter th
number which is created during step2. Enter the PO number and capture excise Invoice. Please see that the CVD is
BED. Note the Excise Invoice number.

Step 4 Posting of Goods Receipt


MIGO transaction w.r.to PO. Enter the Excise Invoice and commercial invoice number . Check and save the docume
Step 5 Posting of Excise Invoice
Ordinary J1IEX transaction. Check the data and save the document. Note the Serial number and Accounting docume

Step 6 - Invoice Verification


Standard MIRO transaction for Vendor Invoice.
Check the Reports.

4 SUBCONTRACTING WITH ED
Step 1 Create a Subcontracting Order
It is an ordinary ME21N functionality for creating SC Order. See that Components are attached in CS01 or in PO Mat
Also see that the material is declared as a subcontracting material in Master Data (Material and Chapter ID combinat
Select Tax code as V0 and select GR based IV.
In Item conditions, In condition type JEXC IN Manual excise %- Enter the excise percentage and Save the order.

Step 2 Transfer posting of components


It is also an ordinary MB1B transaction. You can refer the PO and post.

Step 3 Creation of Excise Invoice


Go to CIN easy access select Sales/ Outbound movements > Excise Invoice > For other movements > Excise Invoic
movements ( Transaction code J1IS)
Select the Reference Document type as MATD and enter other data. Also see that It is refereeing the transfer postin
number. Save the excise Invoice. Note the Excise Invoice number and FI document number created by system.
You can take the print of this Invoice by transaction code J1IV

Step 4 Capture of Excise Invoice


On receipt of material from the Vendor, Capture the Invoice using Transaction code J1IEX. Enter the required data
document. Note the document number.

Step 5 Goods Receipt


Its the same procedure what we have done in normal domestic procurement. Enter the required data and Save the d
document number.

Step 6 Posting the excise invoice


Normal J1IEX function same as that of domestic procurement. Post the Invoice.

Step 7 Vendor Invoice verification


Ordinary MIRO function. Post the Invoice and check all repots.

5 SUBCONTRACTING WITHOUT ED
Step 1 Create a Subcontracting Order
It is an ordinary ME21N functionality for creating SC Order. See that Components are attached in CS01 or in PO Mat
Also see that the material is declared as a subcontracting material in Master Data (Material and Chapter ID combinat
Select Tax code as V0 and select GR based IV.

Step 2 Transfer posting of components


It is also an ordinary MB1B transaction. You can refer the PO and post.

Step 3 Creation of Subcontracting Challan -


In CIN role go to creation of subcontracting challan (Transaction Code J1IF01). The screen will display the material
number created in transfer posting. Input other required detail, if nay and save the document. Material will go to subco
Now the processing is completed and he is supplying the finished product
Step 4 Goods Receipt
Its the same procedure what we have done in normal domestic procurement. But after entering the details, excise ta
header and item details. In header tab select the option of Refer Subcontracting challan. Go to the details icon and e
subcontracting challan number created in step 3. Save the GR and note the document number.

Step 5 Reconciling the Subcontracting challan Quantity


Transaction code is J1IFQ. Screen will display the material document of Goods receipt. Click on reconcile icon, a n
appears. Enter the assigned quantity at item detail and save the document.

Step 6 Completing the Subcontracting Challan


Transaction code J1IF13. Screen will show the detail of challan with a status In process, check the data and save
System will give a message that the challan is completed

6 STOCK TRANSPORT ORDER


Pre-Requisites :
1 Creation of Customer Master data Create both the Plants are Customers in XD01
2 Creation of Vendor Mater data Create both the Plants are Vendors. For each Vendor select the other Plant as t
(already created in Serial No.1).
3 IMG Settings : In MM > Purchasing > Purchasing Order > Set up Stock Transport Order > Define Shipping data

Select each Plant and enter Customer number of the other plant created in Step1 along with the data of Sales Org, e
4 Excise Master Data - In J1ID, see that the material data is entered for both the Plants.

Process Flow
Step 1 - Creation of Stock Transport Order.
In ME21N, mention the Issuing Plant. Please check the item tab Invoice and see the Tax juridiction code as IN00. Ch

Step 2 Transfer Posting


Do the transfer posting in MB1B with proper Plant selection and movement type 351. Refer the PO and adopt the det
Material document number.

Step 3 Creation of Excise Invoice


Create Excise Invoice for other movements in J1IS. Select the document type as MATD. See that the system is autom
the Invoice. Note the Excise Invoice Number and FI document number created by the system.

Step 4 Posting of Excise Invoice


The Transaction code is J1IV. Save the document and take the print.

Now the Material is reached at 2nd Plant. The activities at that Plants are :

Step 5 Capturing of Excise Invoice


Its an ordinary J1IEX transaction. Capture the Invoice against the stock Transport Order. See that Plant 2 is automati
Enter the required detail and save the document and note the internal number.

Step 6 Goods Receipt


It is also an ordinary MIGO transaction. Enter the excise invoice details, save the document and note the material do

Step 7 Posting the Excise Invoice


J1IED transaction. Select the tab as posting against Vendor Excise Invoice. Input the required detail. Click on SIMUL
see the postings. If it is OK, Post the Invoice. Note the serial number and Accounting document number.
Excise registers

RG1
RG23A
RG23C
RG23D
RT-12 (ER1)
ngs here as these are general FI Settings)

l point for all Indian Tax Calculations


signed to India
it in TAXINJ.

are in valid fiscal year period

y (aed, sed, cess), Options and number of


d, If your Plant is operating as a Depot, Please

e registration (X) already created. Please have


t MIGO, Automatic posting etc for your Plant

r Subcontracting) : Create Series group for the

0% Duty, 50%, etc


Account receivable
AccountSED
receivable
Account
condition
AED
receivable
type
condition
CESStypecondition type
JEXS JEXA JCES
JEXS JEAP JEXP

ECS Condition
ECStype
percentage
ARECS condition type A/P - Imports

JECS JEC1 JECV

Account receivable
AT3 PercAT3 condition type

e FTXP Create as many Tax codes with


ring that the material is 100% excisable) and
will be attaching in PO for populating EDs &
nts are assigned during the creation of Tax
vate accordingly. For Transaction code J1IEX,

e reversing the transactions

and select the Registers for each combination


ease check the Challan type (57FC),
items and Number range

Movement type group and Movement types

to be debited by the fortnightly Utilization of


the help of ABAP/ Basis.

Define Screen Lay out


ase Order field as an optional entry

the icon CIN Details on the Header. You are


get to enter Excise Indicator of the Vendor and

appearing here or not.


or your Plant. If you are using this Material for
e material is declared to Excise at appropriate

lue of the Material at a particular Plant


particular Plant. Tick on default Modvat Indicator

get to put the Excise Indicator and CENVAT determination

and Number range group.

ID and Excise Indicator.

ter here. Please note that this rate will be

erial at a Plant in Chapter ID can enter here.

rification and a proper Tax Code (Created in


PO and note the PO Number
ber. Enter your Excise Invoice Number ad date
and Header data. Check and Save the Data.
ated messages.

ation and Flagging the Item OK, Excise Tab is


ab and drill down on Excise Invoice Number
he document. Note the material document

se number. No data entry is required. Check


on Post CENVAT to saving. Note the
r RG23A Part I & II are updated

the Invoice. Check the postings of BED, AED

he duties are posted in RG23C Part I&II. Also


AT on Hold account.

ure in Customizing

ed Invoice verification and select a Tax Code


remitted to Customs. Select the condition go to

voice value in MIRO. Select the PO and select


Invoicing party as Vendor Customs.

rcial invoice number, enter the document


Please see that the CVD is treated as ordinary

Check and save the document.


ber and Accounting document number.

ached in CS01 or in PO Materials data itself.


al and Chapter ID combination)

entage and Save the order.

movements > Excise Invoice for other

refereeing the transfer posting document


ber created by system.

EX. Enter the required data and Save the

equired data and Save the document. Note the

ached in CS01 or in PO Materials data itself.


al and Chapter ID combination)

een will display the material document


ent. Material will go to subcontractor along
ntering the details, excise tab will appear in
. Go to the details icon and enter the
umber.

Click on reconcile icon, a new screen

s, check the data and save the document.

or select the other Plant as the Customer

rder > Define Shipping data for Plants.

with the data of Sales Org, etc.

juridiction code as IN00. Check and Save the PO.

er the PO and adopt the details. Note the

See that the system is automatically creating


stem.

See that Plant 2 is automatically appeared.

ent and note the material document number.

uired detail. Click on SIMULATE CENVAT and


ument number.
Materials
MARA Material Master: General data
MAKT Material Master: Description
MARM Material Master: Unit of Measure
MAPE Material master: Export control file
MARC Material master: Plant data
MARD Material master: Storage location
MAST Material link to BOM
MBEW Material valuation
MLGN Material Master: WM Inventory
MLGT Material Master: WM Inventory type
MDIP Material: MRP profiles (field contents)
MKOP Consignment price segment (old versions of SAP)
EBEW Valuation of sales order stock
QBEW Valuation of project stock
MVER Material Master: Consumption <Plant>
DVER Material Master: Consumption <MRP Area>
MVKE Material Master: Sales <Sales Org, Distr Ch>
MLAN Material Master: Tax indicator
MARC Material Master: Plant data
MAPR Material Master: Forecast
MARD Material Master: Storage Location
MCH1 Material Master: X Plant Batches
MCHA Material Master: Batches
MCHB Material Master: Batch Stock
MDMA MRP Area data
DBVM MRP Planning File Entry: MRP Area
MOFF Outstanding Material Master Records (Maintenance status)

MARCH Material Master C Segment: History


MARDH Material Master Storage Location Segment: History
MBEWH Material Valuation: History
MCHBH Batch Stocks: History
MKOLH Special Stocks from Vendor: History
MSCAH Sales Order Stock at Vendor: History
MSKAH Sales Order Stock: History
MSKUH Special Stocks at Customer: History
MSLBH Special Stocks at Vendor: History
MSPRH Project Stock: History
MSSAH Total Sales Order Stocks: History
MSSQH Total Project Stocks: History

Vendors

LFA1 Vendor Master: General data


LFB1 Vendor Master: Company data
LFM1 Vendor Master: Purchasing Data (Purchasing organization)
LFM2 Vendor Master: Purchasing Data (Plant, Vendor sub-range)

Purchasing ing
EBAN Purchase requisition: items
EBKN Purchase Requisition: account assignment
STXH SAPScript Text Header
STXL SAPScript Text Lines

EKKO Purchasing document header


EKPO Purchasing Document: Item
EKET Purchasing Document: Delivery Schedules
MDBS Material View of Order Item/Schedule Line (good to find open PO's)
EKKN Account assignment in purchasing document
EORD Purchasing Source List
EIPA Order price history record
EKAB Release documentation
EKBE Purchasing document history
EKBZ Purchasing document history: delivery costs
EKPB "Material to be provided" item in purchasing document
ESKL Account assignment specification for service line
ESKN Account assignment in service package
ESLH Service package header data
ESLL Lines in service package
ESSR Service entry sheet header data
ESUC External services management: Unplanned limits for contract item
ESUH External services management: unplanned service limits header data
ESUP External services management: unplanned limits for service packages
ESUS External services management: Unplanned limits for service types

EINA Purchase Info Record: General


EINE Purchasing info record: purchasing organization data
KONP Condition Item
KONH Condition Header

Inventory Management ry Management

ISEG Physical inventory document items

MKPF Material document: Header


MSEG Material document: item

RKPF Reservation: Header


RESB Reservation: Item

Invoice Verification Verification

BSIM Secondary index: documents for material


MYMFT FIFO results table
MYML LIFO material layer
MYMLM LIFO material layer (monthly)
MYMP LIFO period stocks, single material
MYMP1 Receipt data LIFO/FIFO valuation
MYPL LIFO pool layer
MYPLM LIFO pool layer (monthly)
RBCO Document item, incoming invoice account assignment
RBDIFFKO Invoice Verification: conditions
RBDIFFME Invoice Verification: quantity differences
RBDRSEG Invoice Verification Batch: Invoice document items
RBKP Document header: incoming invoice
RBKPB Invoice document header (batch invoice verification)
RBTX Taxes:incoming invoice
RBVD Invoice document: summarization data
RBVDMAT Invoice Verification: summarization data, Material
RBWT Withholding tax:incoming invoice
RKWA Consignment withdrawals
RSEG Document item, incoming invoice

Customising and other master data


sing and other master data

MDLV MRP Areas


MDLG MRP Areas - Storage Locations
MDLW MRP Areas - Plants
MDLL MRP Areas - Subcontractor
T023 Material Groups
T024 Purchasing groups
T030 Standard Accounts Table (Automatic Account Determination)
T156 Movement Type
T156T Movement Type: Text

AUSP Release Procedure: Strategy values (cl20n, cl24n)


AGR_USERS RS - Assignment of roles to users
CDHDR & CDPOS CDPOS - Change history of master data and documents
EDID4 EDI information
TSTC SAP Transaction Codes, lock/unlock: sm01, created: se93
TSTCT Transaction codes TEXT

NAST Message status

1 Customising
1.1 General settings
1.1.1 Countries
T005 Countries Countries
1.1.2 Currency
TCURC Currency Currency codes
TCURR Currency Wisselkoersen
TCURT Currency Currency name
TCURX Currency Decimal places for currencies.
1.1.3 Unit of measure
T006 UoM Units of measure
1.1.4 Calendar functions
T247 Calendar Month names
TFACD Calendar Factory calendar definition
T015M Calendar Month names
TTZZ Calendar Time zones
TTZD Calendar Summer time rules
TTZDF Calendar Summer time rules (fixed annual dates)
TTZDV Calendar Summer time rules (variable dates)
TTZDT Calendar Summer time rules texts
TTZ5 Calendar Assign Time Tones to Countries
TTZ5S Calendar Assign time zones to regions

1.2 Enterprise structure


1.2.1 Definition
T880 FI Company
T001 FI Company code
TKA01 CO Controlling area
T001W CO Plant / sales organisation
T499S CO Locations
TSPA CO Division
TVKO SD Sales organisation / company code
TVTW SD Distribution channel
TVBUR SD Sales office
TVKBT SD Sales office text
TVKGR SD Sales group
TVGRT SD Sales group text
T171T SD Sales district text
T001L MM Storage locations
T024E MM Purchasing organization
T3001 MM Warehouse number
TVST MM Shipping point
TVLA MM Loading point
TTDS MM Transportation

1.2.1 Assignment
TKA02 CO Assign company code to controlling area
T001K CO Assign plant (valuation area) to company code

TVKO SD Sales organisation / company code


TVKOV SD Distribution channel / sales organisation
TVKOS SD Division to sales organization
TVTA SD Sales aria
TVKBZ SD Sales office to sales area
TVBVK SD Sales group to sales office
TVKWZ SD Plants to sales organization
T024E MM Purchasing organization / company code
T024W MM Plant to Purchase organization
T001K MM Link plant ( = valuation area) / company code
TVSWZ MM Shipping point to plant
T320 MM Assignment MM Storage Location to WM Warehouse

1.3 Financial accounting


1.3.1 Company code
T004 Chart of accounts
T077S Account group (g/l accounts)
T009 Fiscal year variants
T880 Global company data
T014 Credit control area
1.3.2 Fi document
T010O Posting period variant
T010P Posting Period Variant Names
T001B Permitted Posting Periods
T003 Document types
T012 House banks

1.4 Not categorized


T007a Tax keys
T134 Material types
T179 Materials: Product Hierarchies
T179T Materials: Product hierarchies: Texts
TJ02T Status text
TINC Customer incoterms
TVFK Billing doc types
T390 PM: Shop papers for print control

2 Basic data / administration


2.1 Workbench related tables
2.1.1 Data dictionary tables
DD02L Tables in SAP
DD02T Tables description
DD03L Field names in SAP
DD03T Field description in SAP
2.1.2 Workbench
TADIR Directory of R/3 Repository Objects
TRDIR System table TRDIR
TFDIR Function Module
TLIBG Person responsible for function class
TLIBT Function Group Short Texts
TFTIT Function Module Short Text
TSTC Transaction codes in SAP
TSTCT Transaction codes texts
T100 Message text (vb e000)
VARID Variant data
D020T Screen texts
TDEVC Development class
TDEVCT Texts for development classes

2.2 Administration
2.2.1 User administration
USR01 User master
USR02 Logon data
USR03 User address data
USR04 User master authorizations
USR11 User Master Texts for Profiles (USR10)
UST12 User master: Authorizations
USR12 User master authorization values
USR13 Short Texts for Authorizations
USR40 Prohibited passwords
TOBJ Objects
TOBC Authorization Object Classes
TPRPROF Profile Name for Activity Group
DEVACCESS Table for development user

2.2.2 Batch input queue


APQD DATA DEFINITION Queue
APQI Queue info definition

2.2.3 Job processing

TBTCO Job status overview table


TBTCP Batch job step overview
2.2.4 Spool
TSP02 Spool: Print requests
2.2.5 Runtime errors
SNAP Runtime errors
2.2.6 Message control
TNAPR Processing programs for output
NAST Message status
NACH Printer determination
2.2.7 EDI
EDIDC Control record
EDIDD Data record
EDID2 Data record 3.0 Version
EDIDS EDI status record
EDPAR Convert External < > Internal Partner Number
EDPVW EDI partner types
EDPI1 EDI partner profile inbound
EDPO1/2/3 EDI partner profile outbound
2.2.8 Change documents
CDHDR Change document header
CDPOS Change document positioned
JCDS Change Documents for System/User Statuses (Table JEST)
2.2.9 Reporting tree table
SERPTREE Reporting: tree structure
2.2.10 LIS structure/control tables
TMC4 Global Control Elements: LIS Info Structure

3 MASTER DATA:
3.1 Material master:
MARA Material master
MAKT Material text
MARC Material per plant / stock
MVKE Material master, sales data
MARD Storage location / stock
MSKA Sales order stock
MSPR Project stock
MARM Units of measure
MEAN International article number
PGMI Planning material
PROP Forecast parameters
MAPR Link MARC <=> PROP
MBEW Material valuation
MVER Material consumption
MLGN Material / Warehouse number
MLGT Material / Storage type
MPRP Forecast profiles
MDTB MRP table
MDKP Header data for MRP document
MLAN Tax data material master
MARV Material Control Record
MTQSS Material master view: QM

3.1.1 Basic data text (sap script)


STXB SAP script: Texts in non-SAP script format
STXH STXD SAP script text file header
STXL STXD SAP script text file lines
3.1.2 Batches
MCHA Batches
MCH1 Batches
MCHB Stock: batches

3.2 Customer master data


KNA1 Customer master
KNB1 Customer / company
KNVV Customer sales data
KNBK Bank details
KNVH Customer hierarchy
KNVP Customer partners
KNVS Shipment data for customer
KNVK Contact persons
KNVI Customer master tax indicator

3.3 Vendor
LFA1 Vendor master
LFB1 Vendor per company code
LFB5 Vendor dunning data
LFM1 Purchasing organization data
LFM2 Purchasing data
LFBK Bank details

3.4 Customer material info record


KNMT Customer material info record

3.5 Bank data


BNKA Master bank data

4 Characteristics:
4.1 Characteristics:
CABN Characteristics ( o.a. batch/vendor)
CABNT Characteristics description
CAWN Characteristics ( o.a. material)
CAWNT Characteristics description
AUSP Characteristic Values
4.2 Class types and objects :
TCLAO Several class types for object
TCLA Class types ( vb. lfa1 => v10 en 010)
TCLAT Class type text
TCLT Classifiable objects
TCLC Classification status
4.3 Links:
INOB Link between Internal Number and Object
KLAH Class header data
KSSK Allocation Table: Object (vb.matnr) to Class
KSML Characteristics for a class (internal number)

5 FI/CO :
5.1 FI :
5.1.1 Master data
SKA1 Accounts
BNKA Bank master record
5.1.2 Accounting documents // indices
BKPF Accounting documents
BSEG item level
BSID Accounting: Secondary index for customers
BSIK Accounting: Secondary index for vendors
BSIM Secondary Index, Documents for Material
BSIP Index for vendor validation of double documents
BSIS Accounting: Secondary index for G/L accounts
BSAD Accounting: Index for customers (cleared items)
BSAK Accounting: Index for vendors (cleared items)
BSAS Accounting: Index for G/L accounts (cleared items)
5.1.3 Payment run
REGUH Settlement data from payment program
REGUP Processed items from payment program
5.2 CO
TKA01 Controlling areas
TKA02 Controlling area assignment
KEKO Product-costing header
KEPH Cost components for cost of goods manuf.
KALO Costing objects
KANZ Sales order items - costing objects
5.2.1 Cost center master data
CSKS Cost Center Master Data
CSKT Cost center texts
CRCO Assignment of Work Center to Cost Center
5.2.2 Cost center accounting
COSP CO Object: Cost Totals for External Postings
COEP CO Object: Line Items (by Period)
. COBK CO Object: Document header
COST CO Object: Price Totals

6 Sales and Distribution (SD) :


VBFA Document flow (alg.)
VTFA Flow shipping documents
6.1 Sales order :
VBAK Header data
VBAP Item data
VBPA Partners in sales order
VBKD Sales district data
VBEP Data related to line items, delivery lines
6.2 Billing document :
VBRK header data
VBRP Item data
6.3 Shipping :
VTTK Shipment header
VTTP Shipment item
VTTS Stage in transport
VTSP Stage in transport per shipment item
VTPA Shipment partners
VEKP Handling Unit - Header Table
VEPO Packing: Handling Unit Item (Contents)
6.4 Delivery :
LIKP Delivery header
LIPS Delivery item
6.5 Pricing :
KONH Conditions header
KONP Conditions items
KONV Procedure ( billing doc or sales order)
KOND
6.6 contracts :
VEDA Contract data

7 Material Management (MM) :


7.1 Material document
MKPF material document
MSEG material document (item level)
7.2 Purchasing
EKKO Purchase document
EKPO Purchase document (item level)
EKPV Shipping-Specific Data on Stock Tfr. for Purch. Doc. Item
EKET Delivery schedule
VETVG Delivery Due Index for Stock Transfer
EKES Order Acceptance/Fulfillment Confirmations
EKKN Account assignment in purchasing
EKAN Vendor address purchasing
EKPA Partner functions(Partner Roles in Purchasing)
EIPO Item export / import data
EINA Purchase info record (main data)
EINE Purchase info record (organisational data)
EORD Source list
EBAN Purchase requisition
EBKN Purchase Requisition Account Assignment
EKBE History per Purchasing Document
EKEH Scheduling Agreement Release Documentation
8 Warehouse Management (WM) :
8.1 Transfer requirement
LTBK Transfer requirement - header
LTBP Transfer requirement - item
8.2 Transfer order
LTAK Transfer order - header
LTAP Transfer order - item
8.3 Master data - stock positions
LQUA Quants
8.4 Inventory documents in WM
LINK Inventory document header
LINP Inventory document item
LINV Inventory data per quant

9 Quality Management (QM) :


9.1 Inspection lot / info record
QALS Inspection lot record
QAMB Link inspection lot - material document
QAVE Inspection usage decision
QDPS Inspection stages
QMAT Inspection type - material parameters
QINF Inspection info record (vendor - material)
QDQL Quality level
QDPS Inspection stages
9.2 Quality notification
TQ80 Notification types
QMEL Quality notification
QMFE Quality notification items
QMUR Quality notification causes
QMSM Quality notification tasks
QMMA Quality notification activities
QMIH Quality message - maintenance data excerpt
9.3 Certificate profile
QCVMT Certificate profile characteristic level: texts
QCVM Certificate profile characteristic level
QCVK Certificate profile header

10 Production Planning (PP)


10.1 Work center
CRHH Work center hierarchy
CRHS Hierarchy structure
CRHD Work center header
CRTX Text for the Work Center or Production Resource/Tool
CRCO Assignment of Work Center to Cost Center
KAKO Capacity Header Segment
CRCA Work Center Capacity Allocation
TC24 Person responsible for the workcenter
10.2 Routings/operations
MAPL Allocation of task lists to materials
PLAS Task list - selection of operations/activities
PLFH Task list - production resources/tools
PLFL Task list - sequences
PLKO Task list - header
PLKZ Task list: main header
PLPH Phases / suboperations
PLPO Task list operation / activity
PLPR Log collector for tasklists
PLMZ Allocation of BOM - items to operations
10.3 Bill of material
STKO BOM - header
STPO BOM - item
STAS BOMs - Item Selection
STPN BOMs - follow-up control
STPU BOM - sub-item
STZU Permanent BOM data
PLMZ Allocation of BOM - items to operations
MAST Material to BOM link
KDST Sales order to BOM link
10.4 Production orders
AUFK Production order headers
AFIH Maintenance order header
AUFM Goods movement for prod. order
AFKO Order header data PP orders
AFPO Order item
RESB Order componenten
AFVC Order operations
AFVV Quantities/dates/values in the operation
AFVU User fields of the operation
AFFL Work order sequence
AFFH PRT assignment data for the work order(routing)
JSTO Status profile
JEST Object status
AFRU Order completion confirmations
PRTs voor production orders
AFFH PRT assignment data for the work order
CRVD_A Link of PRT to Document
DRAW Document Info Record
TDWA Document Types
TDWD Data Carrier/Network Nodes
TDWE Data Carrier Type
10.5 Planned orders
PLAF Planned orders
10.6 KANBAN
PKPS Kanban identification, control cycle
PKHD Kanban control cycle (header data)
PKER Error log for Kanban containers
10.7 Reservations
RESB Material reservations
RKPF header
10.8 Capacity planning
KBKO Header record for capacity requirements
KBED Capacity requirements records
KBEZ Add. data for table KBED (for indiv. capacities/splits)
10.9 Planned independent requirements
PBIM Independent requirements for material
PBED Independent requirement data
PBHI Independent requirement history
PBIV Independent requirement index
PBIC Independent requirement index for customer req.

11 Project system (PS)


11.1 Basic data
PRHI Work Breakdown Structure, Edges (Hierarchy Pointer)
PROJ Project definition
PRPS WBS (Work Breakdown Structure) Element Master Data
RPSCO Project info database: Costs, revenues, finances
MSPR Project stock
11.2 Equipment
EQUI Equipment master data
EQKT Equipment short text
EQUZ Equipment time segment

12 Plant maintenance (PM)


IHPA Plant Maintenance: Partners
OBJK Plant Maintenance Object List
ILOA PM Object Location and Account Assignment
AFIH Maintenance order header
12.1 Human resources
12.2 Settings
T582A Infotypes: Customer-Specific Settings
12.3 Master data
T527X Organizational Units
T528T Position Texts
T554T Attendance and Absence Texts
T501 Employee group
T503 Employee group, subgroup
T503K Employee subgroup
T510N Pay Scales for Annual Salaries (NA)
T549A Payroll Accounting Areas
T750X Vacancy
12.4 Infotypes
PA0001 Org. Assignment
PA0002 Personal Data
PA0006 Addresses
PA0007 Planned Working Time
PA0016 Contract elements
PA0008 Basic pay
PA0105 Communications
PA1007 Vacancies
PA1035 Training
PA2001 Absences

Other important table


JEST System Status with object number
TJ02 System status description.
MRP Related
MDKP Header Data for MRP Document
MDTB MRP Table
MDVL Planning file entry for long term planning
MDVM Enry in MRP file
PBVPV Material Index for consumption of planning
REUL Material stock transfer reservation index
SAFK Run schedule master data
SQ01 Abap query
EDMSG ALE message type table

Release Strategies
T16FS Release Strategies
T16FD Description of Release Codes
T16FT Descriptions of Release Strategies
T16FK Release Statuses
T16FV Release Prerequisites
T16FC Release Codes
SE01 / SE09/ SE10 Transport organizer
E070 Change & Transport System: Header of Requests/Tasks ( Total moved transport requests)
s header data
vice packages
ed transport requests)
Q

Q
A

A
A

A
Q

A
A
A
A
Q

A
A

Q
A

A
A

A
A

Q
A

A
Q

Q
A
Q

Q
A

A
A

A
A
Q

A
Q

A
A

A
A

Q
A

A
Q

Q
A

A
A

A
Q

Q
A

A
Q

A
Q

Q
A

A
A

A
A

A
Q

A
A

Q
A

Q
A

Q
A

A
A

A
Q

A
Q

A
A

A
Q

Q
A

A
A

Q
A

Q
A

Transaction variants simplify transaction flow by:

1. Inserting default values in fields


2. Changing the ready for input status of fields
3. Hiding various screen elements and menu functions, or even
entire
screens
4. Adjusting table control settings

When you create a transaction variant, you run through the transaction
in a
special mode. In this mode, you decide which elements you no longer
need in
your transaction and which values should be inserted where. If you
choose to
hide an entire screen, the system will no longer display that screen in
the
transaction and will proceed on to the next screen in the series. You
can
also adjust table control settings and determine the width of columns
and
the order in which you want them displayed. In tab strips, you can
suppress
tabs that you no longer need by setting them to invisible.

You may also create as many variants for a transaction as you desire.
One of
these variants can be defined as a standard variant. This variant is
then
valid across all clients. You may also assign different variants to
specific
users.

This is done using *Variant Transactions *Variant transactions are then


places in those users' user menus instead of the standard transaction.

Thanks..

Regards,
Chandhru.R

On 9/9/07, murali reddy <murali_sapmm@yahoo.co.in> wrote:


>
> Hi,
> If any one knows the proceedure for setting screen variants and
> transaction variants, please mail me.
> Now i need to change 'invoice party field' in MIRO to display mode.
>
>
> Thanks in advnace,
> Murali.
>
> opmazhata <opmazhata@yahoo.co.uk <opmazhata%40yahoo.co.uk>> wrote:
hie
> gurus
>
> Can someone explain to me i detail how i can use transaction and
> screen variants to restrict display of cetrain fields to users.
>
> thank you guys

Q
A

A
Q

A
A

Q
A

Q
A

Q
A

A
Q

A
A
A

Q
A

A
Q

Q
A

Q
A

A
Q

Q
A

A
Q

Q
A

Q
A

A
A

Q
A

A
Q

Q
A

Q
A

A
Q

Q
A

A
Q

A
A

A
A

Q
A

A
Q

A
A

A
A
A

A
Q

A
A

A
Q

A
Q

A
A

Q
A

A
Q

A
Q

Q
A

Q
A
Q

A
Q
A

Q
A

A
A

Q
Q
A

Q
A
Q

Q
A

A
Q

Q
A
Q

A
Q

i am facing following problem.

Please give me reply as matter is most urgent.

Parag
+++++++++++
Dear All,
In PO, when we tick the GR BASED IV then in purchase order history we
can see the GR/IR ASSGT in Change View.
Where is the setting to see the GR/IR ASSGT without enabling the mark in
GR BASED IV.(is it possible?)
Where are the settings in spro for maintaining the Drop down for Change
view in purchase order history?

Pls. comment.
Regards,
Sachin Kokare
++++++++++++++++++

Dear All,
Can anybody tell me the logic behind the t.code MC46 for slow moving
items.
Various loopholes I found while analyzing the output of MC46.

A. At present MC46 gives that report but following is not


considering by system:

1.It ignore 281 movement, means any item is moved through 281, it only
consider 261 movement.
2.It ignore 201 movement.
3.It ignore 601 movement
4.it ignore 641 movement
5.It ignore 351 movement

B.MC46 report considers following movement which it should not be

1.311 movement , location to location transfer ( Means if any item is


Slow moving but it is moved during 365 days from one location to other,
system do not pick up as Non moving.

2.if any material do not have opening stock and there is purchase within
365 days and not issue through 261 takes place, mc46 shows as Non moving
which is incorrect.

Pls. comment on this.


Regards,
Sachin Kokare
++++++++++++++
Hi
Did you get any solution on this.

I am also stuck up with the same scenario

On 1/22/07, susheeliitr <susheeliitr@ yahoo.com> wrote:


>
> Hi gurus
> there is one scenario.
> our client takes mat from trader not from main vendor .
> trader takes mat from main vendor and sends us.
> suppose main vendor sells trader in 100Rs and 16% BED so he pays vendor
> 116Rs.
> trader sells client in suppose in 150 rs and 4 % sales tax so client
> pays him 156 rs. all these r fine.
> when we go for migo, base value for BED should be 100 rs not 156 i.e
> only 16 rs should go in cenvat account. if i do it manually then who
> 156 will go in GR/IR account. i want 140 should come from GR/IR account
> and rest 16 should come from cenvat account to pay 156 to vendor.
> i did setting vendor master date cin tab page and define trader but not
> working.
> plz tell me. it is very urgen.
> bye
+++++++++++==
Hi Sam

Did you get the solution,can you let me know it as well

On 7/11/07, Guru Ji <sapji.guru@gmail. com> wrote:


>
> Scenario is as follows:
>
> (Rate unknown) Manufacture( nirma)
>
> Rate Known Dealer(jain acid
> PO
>
> (Rate, Amount Qty is mentioned and remarks provided for provision Excise
> Duty
>
> Continue
>
> GRN
>
> continue
>
> Invoice
>
> (Tax Invoice + Duplicate for Transporter Copy)
>
> Dealer Manufacture
>
> For provision of Excise Duty
>
> For Payment
>
> 1)PO to dealer
>
> 2)GRN dealer
>
> 3)tax invoice from dealer is the total bill only, it does not contain
> duty.
>
> 4) but modvat benefit is taken on manufacturer' s duplicate copy.
>
> Plz tell how to map this scenario in SAP
> It's very urgent
>
> Thanks
>
> Sam
>
++++++++++++++++
want your advice on following issue.

I have typical scenario of dealer who passes on cenvat which he has received
from main manufacturer.

say 100 is the base price of the material and he is going to pass us the
excise of say Rs 10.I need to pay Vendor only Rs 100 but still need to get
cenvat of Rs 10.
I used condition jexc of manual excise but the problem in that case is gr
is prepared at goods receipt at Rs 100.But since we are availing the cenvat
of Rs 10 the GR/IR should be at Rs 90 only.

Can you let me know how do you solve the issue?

Regards
+++++++++++
hi Nilesh,
you can release the pr at item level also. pl follow the doccument
Setting up simple Release Procedure for Purchase Requisitions

Release Procedures (approval) can be used for Purchase Requisitions


(PR), Purchase Orders (PO), RFQ's, Outline Agreements and Service
Entry Sheets. The principle is exactly the same for all. If you can
master one, you will know them all.

Lets set up release procedures for PR for the following example:

Our company have got 2 plants: Plant 3100 (London) and plant 3600 (New
York).
For New York (plant 3100), if PR item value is between 0 - 1000
dollars, then PR needs to be released by one person (person B)
For New York (plant 3100), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
B, then person C)
For London (plant 3600), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
A, then person C).

Key terminology:
Release Codes - The different levels that the approval will go through.
Release Groups - Grouping of strategies.
Release Strategy - Unique, set of condition, sequence and levels of
releases. Every line in diagram is a Strategy (so we have 3).
Release Indicator / Status - The status of PR as it moves through
the strategy. Example 'Block' (can't create PO yet) or 'Final Release'
(can create PO from PR)
Here is a summary of the steps to follow to set up our example:
Create Characteristics & link to comm. structure (CEBAN for PR)
Create Class & link to characteristic
Create Release Groups & link to class
Create Release Codes
Release Indicator
Set up strategies
- Strategies & Codes
- Pre requirements
- Status
- Assign values for strategies
Set overall / item for doc type (PR only)
Create and allocate authorization profiles
------------ --- DETAILS OF SETTING IT UP ------------ ---

Create Characteristics & link to communication structure (CEBAN for PR)

Here we define which fields are used to determine the strategy that
will kick in. In our case we used 'Plant' and 'Item value'. Not all
fields in the PR can be used. For a full list of fields that can be
used to determine the release strategy, see tcode se12 table CEBAN.

So the two fields that will be used is:

Field CEBAN-WERKS for Plant


Field CEBAN-GSWRT for Item Value

We need to create a characteristic for every field. Tcode CT04


Any characteristic name can be used. Keep something descriptive to
avoid confusion.

For Item Value -- lets create characteristic Z_GSWRT

First go to Additional Data tab and enter the table/field (and Enter)

Enter currency to be used in the Basic data tab.


Also select multiple values and Intervals allowed
The Intervals allowed will allow us to assign a range of values,
example: If PR value is 0 - 1000 USD .....

Save the characteristic

For Plant -- characteristic Z_WERKS


Again, the table/field name in Additional Data to enter table/field

Again set multiple values and save the characteristic


The multiple values is to assign more than one plant to strategy,
example: If PR for plant 3100 and plant 3600 is ...

Create Class & link to characteristic

Create a class (simply to group the characteristics) . Again any name


can be used. Tcode CL01 -- Create Class. The Class Type must be 032.

Configure Release Procedures

Above actions was all master data. We now need to do some


configuration. Menu: IMG > Materials Management > Purchasing >
Purchase Requisition > Release Procedure > Procedure with
classification > Set up procedure -- (tcode OMGQ in older SAP versions)

Create Release Groups & link to class

We have two groups to create AA and AB. We need to indicate the class
we are working with, in out case Z_PR.

Create Release Codes

Create all the release code / group combinations. This is all the dots
in diagram above. So we have 4.

Later on, authorization profiles will be linked to these code / group


combinations.

Release Indicator

First we create the different statuses that the PR can be in


throughout it lifecycle. Later on (below), we will be linking using
these statuses. Here are the standard SAP indicators; we probably
wouldn't need to add any.

We will be using two of these -- X (Block) and 2 (Released)

Under the Details section, you can indicate which documents can be
created from this PR. For Indicator 2, one can create PO's and RFQ's.

With Field Selection you can define which fields can be changed. This
is the same indicator that gets used with document type configuration
to make some fields read only, mandatory, hidden.

Set up strategies - Strategy & Codes

Every line in our diagram above is a strategy. So We have three


Lets call them:
Group AA / Strategy S1 -- Code L1 (for plant 0001)
Group AA / Strategy S2 -- Code L1 & L2 (for plant 0001)
Group AA / Strategy S2 -- Code L1 & L2 (for plant 0002)

Here are the settings for AA / S2

Set up strategies - Prerequisites

Fir every strategy, we need to define a release prerequisites. This


indicates if one code needs to take place before the other. In this
case, level 2 (L2) can only take place if level 1 (L1) has been released.

Set up strategies - Status

this is also done for every strategy. The screen is dependant on what
groups were linked to the strategy as well as prerequisites that was
set up. In this example:

- if nobody releases it then PR is block.


- if L1 release the PR, the PR is still blocked
- if L1 and L2 release the PR, the PR can be converted to RFQ/PO

Out of interest, the reason why there is not a L2 only option is


because of the setting in the prerequisites.

Set up strategies - Values for strategies

The values linked to strategies are master data (not configuration)


and can be set in two places. Either within the configuration itself
-- selecting the classification button

Or, in classification, example CL24N

Both methods work, the advantage of CL24N is that all the strategies
can be viewed easier.

Set overall / item for doc type (PR only)

For Purchase Requisitions, there is an option to release either on


item level or on document level. For PO / RFQ / Contracts, one can
only release on header level. Back to the PR, it is highly recommended
to use item release. This can be done in two places.

Firstly where the groups were created

On the document type configuration for PR


Config menu: Materials Management > Purchasing > PR > Define document
types

Create and allocate authorization profiles

In our example we will have three people releasing, so three profiles


will need to be created. Authorization profiles can be created using
tcode PFCG.

Usages of PFCG are not being discussed here, but see below for
relevant screen where the profile was created.

------------ --- USING RELEASE PROCEDURES ------------ ---

Create a Purchase Requisition

Lets create a PR, and see if the release procedure kicks in. In our
case we will create it for plant 3600 and any value. So we will expect
Strategy AB / S2 to kick in.

Create PR -- me51n

If no 'Release strategy' tab, then it didn't work. In this case all is


fine. The user can see the Release Group (AB), Strategy (S2) and
release indicator (X).

(SAVE)

Release a Purchase Requisition

Releasing can be done per PR or collective. Lets' use the collective


release. SAP Menu: Logistics > Material Management > Purchasing >
Purchasing Requisition > Release > Collective Release -- ME55

Select all the items to be released and then hit Save. You will see
the status of the item change to the next Release Indicator.

This is the absolute basics of setting up Release Procedures for


Purchase Requisitions. For more posts on Release Procedures, see index
of posts.

SAP version used for this post: SAP ECC (ERP Central Component) 5.0

You can discuss this article here.

Last edited by SAPman : 3 Weeks Ago at 01:24 PM.

-- In sapmaterialsmanagem ent@yahoogroups. com, "nazim husain"


<nazsan_2002@ ...> wrote:
>
> u have to configure item wise relase for pr
>
>
> >From: Nilesh Deshmukh <nilesh_sap_ mm@...>
> >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> >To: SAP MM <sapmaterialsmanagem ent@yahoogroups. com>
> >Subject: [sap mm] PR Release
> >Date: Fri, 17 Aug 2007 06:28:49 +0100 (BST)
>>
> >Dear All,
>>
> > I have created a PR for 10 materials out of which I want to
release 5
> >materials only.
>>
> > Is there any provision in SAP wherein I can release individual
materials
> >only instead of whole PR.
>>
> > Regards,
>>
> > Nil
>>
++++++++++++++
you have to do the customization for release of PR at item level. Then you
will be able to release the PR item wise.

Thanks

On 17/08/07, Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in> wrote:


>
> Dear All,
>
> I have created a PR for 10 materials out of which I want to release 5
> materials only.
>
> Is there any provision in SAP wherein I can release individual materials
> only instead of whole PR.
>
> Regards,
>
> Nil
++++++++++

u can use ctrl y and than ctrl x


and than copy from excel Ctrl C and than paste in mass ctrl v

>From: sabri fidan <sabri_fidan@ yahoo.com>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] mass maintance interface
>Date: Fri, 17 Aug 2007 01:46:20 -0700 (PDT)
>
>Dear All,
>In mass maintance interface is there a button like "upload from clipboard"
>or any way to paste more then 17 items. I cant do it with " carry out mass
>change button" because all items have different values.
>Regards,
>
>sabri
>
+++++++++++++

Instead of doing transfer posting to put material from unrestricted to QI


stock, please use the functionality to manually create inspection lot, that
is a better and more systematic way of doing this.

regards

On 8/16/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:


>
> hi
> Can anybody tell me which movement type we should use to transfer
> material from unrestricted stock to Quality inspection stock
>
> Thanks
>
> prashan
++++++++++++++++
Dear All,

Regards,
sabri
+++++++++++

Specify conditions in purchasing in Material master & info record.

Nonkonzo Pato <npato@scaw.co. za>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
17/08/2007 12:20 PM
Please respond to
sapmaterialsmanagem ent@yahoogroups. com

To
sapmaterialsmanagem ent@yahoogroups. com
cc

Subject
[sap mm] Tax code - urgent

Hi guys,

Can anybody tell me how to make tax code to appear automatically when
creating a PO on a certain order type

Thanks in advance

NP
++++++++++++++
Try ME54N

Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
17/08/2007 10:58 AM
Please respond to
sapmaterialsmanagem ent@yahoogroups. com

To
SAP MM <sapmaterialsmanagem ent@yahoogroups. com>
cc

Subject
[sap mm] PR Release

Dear All,

I have created a PR for 10 materials out of which I want to release 5


materials only.

Is there any provision in SAP wherein I can release individual materials


only instead of whole PR.

Regards,

Nil
+++++++++++++
Hi,
Firstly you have to create 4 material types for each one..and each material
type will allow to configure

Quantity updates/No Quantity updates


Value Updates/No value updates

Over there u can configure as per your requirement. Let me know how it works?

Cheers!
--
With Cheers From:
M.K Thamarai Kannan
+++++++++++++++
Hi Vijay,
Best way to handle this is maintain two material code
as you have stock of unpacked material and packed
goods also.
tracability is easier when you have two seperate
material codes

Thanks

Samraj

--- vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


> Hemanth / Samraj,
>
> Yes, you both are right but in this scenario, the
> packaging is done by third party hence to track the
> cost at the vendor and third party (contract
> packager) the client needs to maintain two prices.
> The material goes directly from vendor to contract
> packager and then comes to entry point of the
> client. the client does want to maintain two
> material codes for change in only one field.
> How do you think this can be handled?
>
> Thanks & Regards
> Vijay
>
>
>
> ----- Original Message ----
> From: hemanth kumar reddy
> <hemanthkumar96@ yahoo.co. in>
> To: sapmaterialsmanagem ent@yahoogroups. com
> Sent: Wednesday, 15 August, 2007 11:25:47 PM
> Subject: Re: [sap mm] two prices for one material--
> Urgent
>
> Hi
>
> Why it is required?.If requires u have to create 2
> materials one as Semifinished Material(Before
> packing) and another one as finished product.
>
> Hope it makes sence.
>
> Thanks
>
>
> vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
> Hi
>
> How can we show two prices for the same material?
>
> Two prices in the sense material price before and
> after packaging.
>
> Thanks & Regards
> Vijay
+++++++++++++

Dear All,

I have created a PR for 10 materials out of which I want to release 5 materials only.

Regards,

Nil
+++++++++++
Hello gurus,
plzz help in CIN configuration. I have idea of J1IT and J1ID but what
do do further i am not getting. someone plzz gt me full step
thanks in advance
sameer
+++++++++
there can be a practice maintained to check ME5A every morning for open
requisitions

>From: mohammed quraishi <ms_quraishi@ yahoo.co. in>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] Purchase request
>Date: Thu, 16 Aug 2007 16:55:11 +0100 (BST)
>
>Hi friends,
>
>I have an important question,
>
>The purchase request created by PP For raw mateials &
>SD for finished goods to MM for purchase,
>My question is:
>How and where does this gets reflected in MM, how will
>the MM come to know that a Purchase request has been
>raised by PP or SD.
>Kindly look into this iam very confused.
>
>Thanx

+++++++++++++
Hi Dost,
For that purchase request have you tried Trans code md04.
if no then try that eventhough you r not satisfied I will suggest u more further.

Bye

mohammed quraishi <ms_quraishi@ yahoo.co. in> wrote:


Hi friends,

I have an important question,

The purchase request created by PP For raw mateials &


SD for finished goods to MM for purchase,
My question is:
How and where does this gets reflected in MM, how will
the MM come to know that a Purchase request has been
raised by PP or SD.
Kindly look into this iam very confused.

Thanx
++++++++++
hi

using this may be ur problem resolved.


let me know how u solved this?

Thanks
Bye
vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
Hemanth / Samraj,

How do you think this can be handled?

Thanks & Regards


Vijay

----- Original Message ----


From: hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, 15 August, 2007 11:25:47 PM
Subject: Re: [sap mm] two prices for one material-- Urgent

Hi

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
++++++++++
hi

Prashant

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi All,

What happens when GR is made against a subcontracting PO.?


I mean is the total value of the material changes?

Any inputs will be appreciated.

Thanks & Regards


Vijay
+++++++++++++++
Hi Guys

Purchase Order is that delivery is not being


processed (status is A) but customer is saying, that
is delivery is processed.

What should I do? can any one help me ASAP

Thanks

Sabbir
+++++++++++
Hello all,

I want to know if it is possible to automatically receive in


returnable packaging with a packaging instruction? We use inbound
deliveries for incoming raw material and we use rf scanners to receive
the material in. i want to setup a packaging instruction for each
incoming material so that when we receive in the components, the
corresponding returnable packaging is also received into inventory
based on the packaging instruction. Is this possible?

thanks in advance for any help,


gabe
+++++++++++
Hi friends,

I have an important question,

The purchase request created by PP For raw mateials &


SD for finished goods to MM for purchase,
My question is:
How and where does this gets reflected in MM, how will
the MM come to know that a Purchase request has been
raised by PP or SD.
Kindly look into this iam very confused.

Thanx

++++++++++

Hi...SAP MM Gurus,

Plz can anybody explain the functionality of MEI7...T.code. .

Thanks in advance...

Best regards..
avinash.
+++++++++++++
LAURO LAGMAN <mochee07@yahoo. com> wrote:
Hi Sha,
try checking your settings in t-code S_ALR_87000332 for the Automatic
delivery control indicator

Cheers,

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 6:15:38 AM
Subject: [sap mm] P.O Order from shah

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please.

Thanks

Shah
+++++++++++++++++++

Prashant Hazariwala <hazariwalapu@ yahoo.com> wrote:


MMBE IS FOR STOCK OVERVIEW

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Try using the TCODE mmbe
On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:
>
> hi,
> I have a problem in posting GR in the current period and it is giving
> me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> company code 1000 ' then i have tried to close all these period using
> Tcode MMPV but i couldn't close these posting period and i am getting
> message 'the specified year 2005 is not the calender year'.
> Again i can do posting in 2005/08 period but can not do posting in the
> current date.
>
> Can anybody help me on this?
>
> Prashant
>
>
>

[Non-text portions of this message have been removed]

------------ --------- --------- ---

[Non-text portions of this message have been removed]

venkat
9.1929E+11
++++++++++++++

You will try J1ID and go to Customer Excise details, maintain and save,

Regards

Diwakar

_____

From: sapmaterialsmanagem ent@yahoogroups. com


[mailto:sapmaterialsmanagem ent@yahoogroups. com] On Behalf Of
sapmmsenthil
Sent: Thursday, August 16, 2007 2:08 PM
To: sapmaterialsmanagem ent@yahoogroups. com
Subject: [sap mm] CIN Customizing

Hai MM Experts.....

Can any one Guid me the CIN Version Customization With T-


Code's.

Regards
SAPMMSENTHIL

++++++++++++++++

Hi All,

What happens when GR is made against a subcontracting PO.?


I mean is the total value of the material changes?

Any inputs will be appreciated.

Thanks & Regards


Vijay

++++++++++++++++

Hemanth / Samraj,

How do you think this can be handled?

Thanks & Regards


Vijay
----- Original Message ----
From: hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, 15 August, 2007 11:25:47 PM
Subject: Re: [sap mm] two prices for one material-- Urgent

Hi

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
+++++++++++++
U can use Split Valuation also.

Valuation Category : Packaging

Valuation Types : Pre Packaging and Post Packaging

On Thu, 16 Aug 2007 hemanth kumar reddy wrote :


>Hi
>

>
> Hope it makes sence.
>
> Thanks
>
>
>vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
> Hi
>
>How can we show two prices for the same material?
>
>Two prices in the sense material price before and after packaging.
>
>Thanks & Regards
>Vijay
+++++++++++++++
Dear Kumar,

Thanks & Regards


Pavan Kumar

----- Original Message ----


From: kumar manian <maniram_chn@ yahoo.co. in>
To: mm group <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Monday, 13 August, 2007 10:25:06 AM
Subject: [sap mm] Cancellation Service Entry Sheet document

Hi,

Thanks in Advance
Ram
++++++++++++++

Carefully check the log issued after every period close.

regards

epm
On Thu, 16 Aug 2007 Prashant Hazariwala wrote :
>MMBE IS FOR STOCK OVERVIEW
>
>
>ANAND CHANDOOR <mpower303@gmail. com> wrote:
> Try using the TCODE mmbe
>
>On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:
>>
> > hi,
> > I have a problem in posting GR in the current period and it is giving
> > me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> > company code 1000 ' then i have tried to close all these period using
> > Tcode MMPV but i couldn't close these posting period and i am getting
> > message 'the specified year 2005 is not the calender year'.
> > Again i can do posting in 2005/08 period but can not do posting in the
> > current date.
>>
> > Can anybody help me on this?
>>
> > Prashant

+++++++++++++++

Hai MM Experts.....

Can any one Guid me the CIN Version Customization With T-


Code's.

Regards
SAPMMSENTHIL

+++++++++++++

Hi All,

Can we use the MRP to create reservations? If any one knows pls let me know
in details.
Thanks.
vineet
+++++++++++

Please see in the delivery vl03n see the movt type is 601 or not

>From: "garasai sap" <garasaister@ gmail.com>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: Re: [sap mm] mm query
>Date: Thu, 16 Aug 2007 10:03:31 +0530
>
>my dear Nazeem
>My problem is : after delivery stock should be reduced, but it is not
>happening.To avoid this what settings should be done.
>Thanks&regards
>
>
>On 8/15/07, nazim husain <nazsan_2002@ hotmail.com> wrote:
>>
> > after delivery the stock should be reduced
> > check report vl06 for the total PGI
>>
>>
> > >From: "garasai sap" <garasaister@ gmail.com>
> > >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> > >To: sapmaterialsmanagem ent@yahoogroups. com
> > >Subject: [sap mm] mm query
> > >Date: Tue, 14 Aug 2007 20:16:58 +0530
>>>
> > >Hi
> > >How to clean up Finished goods stock
> > >After delivery and billing,finished good stock should clean up.But for
>my
> > >client stock is still available and not matching with physical
> > >stock.Pleasehelp me and what settings should be done to avoid this.
> > >Regards,
> > >venkat
> > >MM consultant.
++++++++++
You can display your PO in Me23n,from there go to Environment and then
hearder changes or iterm changes

> Go to me23n and make the necessary changes u need.


>
> On 8/15/07, H K <heartykid2000@ yahoo.com> wrote:
>>
>> HI All,
>> Can anyone tell me if theres any report for changes made in purchase
>> order. say in Header or item data level.
>> Thanks in Advance
>>
>> Regards

+++++++++++++

hi,
the mov type is 322

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
++++++++++
hello experts,

Happy independence day to all of you.

I m having a problem in vendor evaluation. During automatic amd semi-


automatic methods how the system generates scores. i.e. whats the use
of variance and how system computes scores from variance.

Do help me?
++++++++++++++++
Hi,
Pl go M type 322 it will transfer stocks from Unrestricted to Quality Inspection.

With Thanks & Regards


Mohanrao Nagavarapu

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
+++++++++++++

me23n,environment - header changes


it will be there for sure

>From: "Ellis, Cindy - ERP" <cindy.ellis@ cityofhouston. net>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] Purchase Requisition Header Note
>Date: Wed, 15 Aug 2007 08:47:59 -0500
>
>Is there a way to track changes made to a purchase requisition header note?
>I do not see an option for header changes in the environment.
>
>Cindy E. Ellis, CPPO, CPPB
>City of Houston - SAP ERP Support Team
>Materials Management
>voice 713-221-0682
>fax 713-221-0698
>email cindy.ellis@ cityofhouston. net
+++++++++++++
322

>From: "hazariwalapu" <hazariwalapu@yahoo.com>


>Reply-To: sapmaterialsmanagement@yahoogroups.com
>To: sapmaterialsmanagement@yahoogroups.com
>Subject: [sap mm] movement type for - unrestricted to QI stock
>Date: Thu, 16 Aug 2007 04:12:44 -0000
>
>hi
>Can anybody tell me which movement type we should use to transfer
>material from unrestricted stock to Quality inspection stock
>
>Thanks
>
>prashant
+++++++++++++
Hi Prasant,
The movement type from unrestricted stock to quality inspection is 322

by
Ramu

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
+++++++++++

MMBE IS FOR STOCK OVERVIEW

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Try using the TCODE mmbe

On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:


>
> hi,
> I have a problem in posting GR in the current period and it is giving
> me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> company code 1000 ' then i have tried to close all these period using
> Tcode MMPV but i couldn't close these posting period and i am getting
> message 'the specified year 2005 is not the calender year'.
> Again i can do posting in 2005/08 period but can not do posting in the
> current date.
>
> Can anybody help me on this?
>
> Prashant

+++++++++++

my dear Nazeem
My problem is : after delivery stock should be reduced, but it is not
happening.To avoid this what settings should be done.
Thanks&regards

On 8/15/07, nazim husain <nazsan_2002@ hotmail.com> wrote:


>
> after delivery the stock should be reduced
> check report vl06 for the total PGI
>
>
> >From: "garasai sap" <garasaister@ gmail.com>
> >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> >To: sapmaterialsmanagem ent@yahoogroups. com
> >Subject: [sap mm] mm query
> >Date: Tue, 14 Aug 2007 20:16:58 +0530
>>
> >Hi
> >How to clean up Finished goods stock
> >After delivery and billing,finished good stock should clean up.But for my
> >client stock is still available and not matching with physical
> >stock.Pleasehelp me and what settings should be done to avoid this.
> >Regards,
> >venkat
> >MM consultant.

++++++++++++++++++

hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant

+++++++++++++++

Hi Sukla,
The following dictation may help u, let me know ur query and status pls

MM Pricing
Procedure

How
pricing defined?

Note : = down arrow

Vendor

assigned to

Schema
group

assigned to

Pricing
procedure

has

Condition
Types

Note:
when we make PO, if vendor is selected pricing
procedure will be calculated accordingly
SPRO>

Material
Management

Purchasing

Conditions

Define
price determination process

Define
condition type

After create condition type

SPRO>

Material
Management

Purchasing

Conditions

Define
calculation schema

Define
condition type

Condition
Types are 3 types

1. Condition class

2. Calculation Type

3. Group condition change which can be made (header/item of PO)

What is Info Record?

Link
between material and vendor

Under Procedure

If you mark statistic for a condition type under


a pricing procedure and use this condition type in a PO then POs
net price wont be changed after discount

Regards,
Zusen

----- Original Message ----


From: vijay shukla <vijay_sap2005@ yahoo.com>
To: sap <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Tuesday, August 14, 2007 11:44:48 AM
Subject: [sap mm] pricing procedure

Hi MM gurus
1 basic price

2 discount on basic

3 gross ( 1-2)

4 packaging and forwarding charges on 3

5 excise duty on (3+4)

6.education cess on 5

7 discount

8subtotal of (1 to 7)

9 cst on 8

10 freight.

11 insurance

please suggest the pricing procedure for the the

Thanks in advance

vijay

++++++++++++
Go to me23n and make the necessary changes u need.

On 8/15/07, H K <heartykid2000@ yahoo.com> wrote:


>
> HI All,
> Can anyone tell me if theres any report for changes made in purchase
> order. say in Header or item data level.
> Thanks in Advance
>
> Regards
+++++++++++++++

Can the same principle be applied for paying to two different party
against 1 info record.

Example :-

Fully finished price -1000

Forging price - 800

M/cing price - 200

Regards,
Shetty Vijay
2601

____________ _________ _________ __

From: sapmaterialsmanagem ent@yahoogroups. com


[mailto:sapmaterialsmanagem ent@yahoogroups. com] On Behalf Of ANAND
CHANDOOR
Sent: Thursday, August 16, 2007 8:52 AM
To: sapmaterialsmanagem ent@yahoogroups. com
Subject: Re: [sap mm] pricing procedure

The query that u have posted is regarding Pricing Schema.


Go to MM- conditions-pricing schemes
In that u need to first create condition types.
U have to make entry step by step.
The query that u have posted will be found in condition types.
After creating condition types u need to link it to ur pricing schema.

On 8/14/07, vijay shukla <vijay_sap2005@ yahoo.com


<mailto:vijay_ sap2005%40yahoo. com> > wrote:
>
> Hi MM gurus
>
> Can anyone explain how to create pricing procedure if following
conditions
> are made .
>
> 1 basic price
> 2 discount on basic
> 3 gross ( 1-2)
> 4 packaging and forwarding charges on 3
> 5 excise duty on (3+4)
> 6.education cess on 5
> 7 discount
> 8subtotal of (1 to 7)
> 9 cst on 8
> 10 freight.
> 11 insurance
>
> please suggest the pricing procedure for the the
>
> Thanks in advance
>
> vijay
++++++++
Hi

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
++++++++++=
The query that u have posted is regarding Pricing Schema.
Go to MM- conditions-pricing schemes
In that u need to first create condition types.
U have to make entry step by step.
The query that u have posted will be found in condition types.
After creating condition types u need to link it to ur pricing schema.

On 8/14/07, vijay shukla <vijay_sap2005@ yahoo.com> wrote:


>
> Hi MM gurus
>
> Can anyone explain how to create pricing procedure if following conditions
> are made .
>
> 1 basic price
> 2 discount on basic
> 3 gross ( 1-2)
> 4 packaging and forwarding charges on 3
> 5 excise duty on (3+4)
> 6.education cess on 5
> 7 discount
> 8subtotal of (1 to 7)
> 9 cst on 8
> 10 freight.
> 11 insurance
>
> please suggest the pricing procedure for the the
>
> Thanks in advance
>
> vijay
>
>
+++++++++++++

Hi,

Two prices for same material can be done by split


valuation or by maintaining info records ( Vendor/
Material/ Plant Combinations ), but your example says
with and with out packing, if that is the case better
you maintain two different codes.

Sam
--- vijay anand <vakul_harsha@ yahoo.co. uk> wrote:

> Hi
>
> How can we show two prices for the same material?
>
> Two prices in the sense material price before and
> after packaging.
>
> Thanks & Regards
> Vijay
+++++++++

Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay

+++++++++++==

Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay

++++++++++++++
v received ur queries 3 times.... pls send it once......

dcms78 <dcms78@yahoo. com> wrote: Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type 261??
based on the Goods issue posted or shud there be something done to get
it delivered to production site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++

Is there a way to track changes made to a purchase requisition header note?


I do not see an option for header changes in the environment.

Cindy E. Ellis, CPPO, CPPB


City of Houston - SAP ERP Support Team
Materials Management
voice 713-221-0682
fax 713-221-0698
email cindy.ellis@ cityofhouston. net

++++++++++++++++==

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to


Production site based on Production order...we do an
Goods Issue...and we creat an goods issue and post
it..
goods issue created for moving goods from storage for
type 261...it isself an goods movement as the BAPI
call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued
in GI- type 261??
based on the Goods issue posted or shud there be
something done to get it delivered to production
site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++++++

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type
261??
based on the Goods issue posted or shud there be something done to
get it delivered to production site??
Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type 261??
based on the Goods issue posted or shud there be something done to get
it delivered to production site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh

++++++++++++++++

hi,
any body can explain about foriegn trade imports control and tc

++++++++++=

Hi sappers
Is it possible to calculate the total value for the Following in
calculation schema?
1. base price -
2. Add 1% pkg - on 1
3. add customs 12.5%- Upon (1+2)
4. add cvd-16%on(1+ 2+3)
5.ed cess-3%on (4)

Till this i did simple "from" & "to" and calculated

6. cess on duty- 3%- on (3+4+5) - this works on line no. 3,4 & 5 i am unable
to enter in FROM-TO format.
7. Spl duty (add 1to 6)*4%- this also i ma unable to enter in the FROM-TO
format
Total value- (add 1 to 7).

Attachment can be viewed.

Thanks

Any ideas
Samuel

+++++++++++

Hi, friends,
What is use of this movemeht type where we used this movement type.
I have cheake but it will post cost centre.But this movement type for
GI for sales . But there I don't find any sales order, Why

+++++++++++

HI All,

Thanks in Advance

Regards
++++++++++++

Hi,
Lau
----- Original Message ----
From: indika alwis <i_alwis@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 2:05:55 PM
Subject: [sap mm] credit limit check at delevary ststus

Dear all

can any body expleane . the procedure

1. Do it need any special ABAP development, If so roughly what are the steps

very eargent .

please reply

Indika
++++++++++

Hi Sha,
try checking your settings in t-code S_ALR_87000332 for the Automatic
delivery control indicator

Cheers,

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 6:15:38 AM
Subject: [sap mm] P.O Order from shah

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please.

Thanks

Shah
++++++++++
Hi Shah,

Thanks,
Zusen

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 5:10:14 AM
Subject: [sap mm] Purchase Order

Hi Guys

Can anyone tell me how can i find delivery complete

indicator in a Purchase order? Please let me know

ASAP.

Thanks

Shah
++++++++++
after delivery the stock should be reduced
check report vl06 for the total PGI

>From: "garasai sap" <garasaister@gmail.com>


>Reply-To: sapmaterialsmanagement@yahoogroups.com
>To: sapmaterialsmanagement@yahoogroups.com
>Subject: [sap mm] mm query
>Date: Tue, 14 Aug 2007 20:16:58 +0530
>
>Hi
>How to clean up Finished goods stock
>After delivery and billing,finished good stock should clean up.But for
my
>client stock is still available and not matching with physical
>stock.Pleasehelp me and what settings should be done to avoid this.
>Regards,
>venkat
>MM consultant.
>
>
+++++++++++++++

Under the delivery table in the item level in your purchase order

>
> Hi Guys
>
> Can anyone tell me how can i find delivery complete
> indicator in a Purchase order? Please let me know
> ASAP.
>
> Thanks
>
> Shah
>
+++++++++++
Hi Sabbir;

you can check the "delivery Complete"indicator by going to DELIVERY Tab


of PO...
to check : go to ME23N>Delivery, you can see there a Delivery complete box

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 7:10:14 AM
Subject: [sap mm] Purchase Order

Hi Guys

Can anyone tell me how can i find delivery complete


indicator in a Purchase order? Please let me know
ASAP.

Thanks

Shah
+++++++++++
Dear all

can any body expleane . the procedure

1. Do it need any special ABAP development, If so roughly what are the steps

very eargent .

please reply

Indika
+++++++++++
hello experts,

Happy independence day to all of you.

I m having a problem in vendor evaluation. During automatic amd semi-


automatic methods how the system generates scores. i.e. whats the use
of variance and how system computes scores from variance.

Do help me?

+++++++++++++

Hi Guys

Can anyone tell me how can i find delivery complete


indicator in a Purchase order? Please let me know
ASAP.

Thanks

Shah

++++++++++++++

Hi sreekanth
I got my problem solved. I checked in OMSY and OB52. It
is now working well. Thank u
Regards
Murthy

On 8/13/07, srknt03 <srknt03@yahoo. co.in> wrote:


>
> Hi Murthy!
>
> Have you checked the periods in OB52? Plz check up and change
> accordingly if reqd.
>
> Regards,
>
> Sreekanth
try omsy,ob52,,this can help u out.

Defined for 8/14/2007" error while posting Good Receipt in MIGO using a
PO No.
thanks
msk>

> "SATYANARAYANA
> MURTHY" <murtymagapu@ ...> wrote:
>>
> > Hello MM gurus
> > when i am doing MIGO i am getting error msg
> that
> > Posting Period 08 2007 not open. I have done all settings in MMPV.
> It is
> > showing current period 08 2007 and closing period 07 2007. How to
> do
> > settings for this? Please help me to sort out this issue.
>>
> > Thanks and regards
> > Murthy
+++++++++++

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please. I need it As Soon As Possible. Please

Thanks

Shah
++++++++++
Hi
Can anybody help me in differentiating between the following details given
below and what settings should be done and what exactly happens if I select
any one of these.

No stock no value(NSNV)
No stock with value update
Stock update with no value update
Stock update value update
+++++++++++++++++++++++

Hi
How to clean up Finished goods stock
After delivery and billing,finished good stock should clean up.But for my
client stock is still available and not matching with physical
stock.Pleasehelp me and what settings should be done to avoid this.
Regards,
venkat
MM consultant.

+++++++++++++++

"apparaoasv@gmail. com"

+++++++++++++

does anyone know why i am getting "K4 Fiscal Year variant, No period is
Defined for 8/14/2007" error while posting Good Receipt in MIGO using a
PO No.
thanks
msk

+++++++++++++

Hi MM gurus
1 basic price
2 discount on basic
3 gross ( 1-2)
4 packaging and forwarding charges on 3
5 excise duty on (3+4)
6.education cess on 5
7 discount
8subtotal of (1 to 7)
9 cst on 8
10 freight.
11 insurance

please suggest the pricing procedure for the the

Thanks in advance

vijay
++++++++++++++

Hi Sandeep

Tcode SQVI does not exist, use T code SQ01 for Query

Rgds
Naveen Goveas

On 8/13/07, Sandeep Acharya <sandeep_sapient@ yahoo.co. in> wrote:


>
>
>
>
> Dear Guru's,
>
> Can anyone help me... in understanding the steps for creating Sap Query
> using T.code SQVI
>
> Thanks in advance
>
> Regards
> Sandeep Acharya

+++++++++++++++++

Hi Sandeep,

The following instruction with exmaple may help u

Query Creation

1. SQ02 > Define Infoset

2. SQ03 > Give all authorization

3. SQ01 > Building the query and run it

SQ02

Name infoset (e.g.;


MM_INFO_TEST1)

Create

Name and Table Name

Authorization group = ZMM


Insert table

MARC

Back and Generate

Role / User group Assignment

ZMM

Save
Back & generate

SQ03

User group Assignment

Change ZMM

SQ01

Edit > Other user group

Name query (MM_query_test_ 1)

Infoset Query [ select info


set you have made]

Now select Parameter list


and selection criteria

Save and name your query


which you have made

Back and execute query

Regards,
Zusen

----- Original Message ----


From: Sandeep Acharya <sandeep_sapient@ yahoo.co. in>
To: sap mm <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Monday, August 13, 2007 2:39:00 PM
Subject: [sap mm] steps for creating Sap Query using T.code SQVI

Dear Guru's,

Thanks in advance
Regards

Sandeep Acharya

++++++++++++++++

--
Zusen

----- Original Message ----


From: mm consultant <mmconsultant_ k@yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Monday, August 13, 2007 2:46:30 PM
Subject: [sap mm] services

hi all,

thanks in advance

------------ --------- --------- ---

++++++++++

Hi MM Gurus,
Can anyone please give me to get a solution in details.
A Vendor will supply 5000 raw material with the following conditions:

Gross price of the material is $20/PC. A promotional discount 10%


applies to the total value of the material. Freight charge is $500
(absolute value).
Starting from the scratch please guide me how I can create the
following for the above mentioned problem. I am expecting a solution
like release procedure created by Chapman.

1. Condition type (with condition record)


2. Access sequence
3.Condition table
4. Calculation Schema.

After that I know how it could be assigned to vendor and create a PO


accordingly.
Please help me.Please! Please!

Thank you,
sachin

++++++++++

hi nilesh

AUM is the price diff ac for STO that u 've to maintain in obyc

for tr event key AUM maintain the G/L account ( get assist from ur FI consult)
this will solve ur probs
reg
prasanna
Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in> wrote: Dear SAP Gurus,

I am facing one problem in STO.


I have created one STO for a semi finished good material.

In Receiving Plant:-

Valuation class e,g 1000


Price control : S
In Supplying plant:-

Valuation calss e.g. 1000


Price control: V

Accunt determination for entry ABCD AUM not possible.Message No: M8147"

Regards,

Nil
+++++++++++

Hi,

This is the differece between this two.

ritu khanikar <ritu_khanikar@ yahoo.com> wrote:


Hi all,

regards

ritu
++++++++

Thanks for enlightment,

Sorry I miunderstood "reversal" is for "Return to


supplier"

Sam

--- hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>


wrote:

> Hi Sam,
>
> Pl.don't mislead the members, when u flag the
> Returns indicator in PO,MVT 161 will be triggered
> automatically, not 122.
>
> Normally MVT 122 will be used to send back the
> quality rejected materials to vendor against the
> material document.
>
> Thanks
>
> P Samraj <samrajpp@yahoo. com> wrote:
> Hi all,
>
> 102 is the reversal mvt. type of 101. Every mvt.
> type
> has its reversal counterpart. The are many reasons
> to
> make a reversal of any mvt. type (mostly human
> mistakes).
> 122 is used when you make a returns purchase order
> to
> a vendor. This is a purchase order with the
> "returns"
> flag marked. By the way, 122 has it reversal mvt.
> type
> in 123.
> It's true that in both cases material is being
> removed
> from the stock but for diferent reasons and in
> diferent bussiness processes.
>
> Hope I have clarified,
>
> Sam
>
> --- charles pary <charlessusai@ yahoo.co. in> wrote:
>
> > both cancellation and Reversal are same....
>>
> > Cheers
> > Charles
>>
> > "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> > Cancellation is used when the goods
> > receipt was done in error. The
> > entire qty of the original goods receipt is
> > reversed. Reversal is used
> > when you received goods and are returning it to
> the
> > vendor. You may
> > reverse the original goods receipt in its entirety
> > or a partial.
> > --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>>
> > > Hi Ritu
>>>
> > > The effects are same
>>>
> > > Rgds
> > > Naveen Goveas
>>>
>>>
> > > On 8/4/07, ritu khanikar
> <ritu_khanikar@ yahoo.com>
> > wrote:
>>>>
> > > > Hi all,
>>>>
> > > > While doing migo, we can use cancellation and
> as
> > well as reversal,
> > > what is
> > > > the diference between the two?
> > > > regards
>>>>
> > > > ritu
>>>>
+++++++++++++++

Dear All,

Can u please provide details of a report that gives the original


document numbers against the Material Document Numbers appearing in the
MB51..

For Eg. an Delivery Number 100 would raise a Material Document Number
501 (when PGI done) in the Item Ledger/CARDEX. An Invoice with number
601 will be generated later.

Is there any report available that links 100, 501 and 601??

Thanks in Advance.

Regards,

Rakesh K R

+++++++++++++++

Hi gurus,
plzz explain me the process of making PR mandatory.
how does we do this
thanks in advance
sameer
++++++++++
Hi..
I think answers r
for ..
Q.1) Ans:B
Q.2) ANS:C
Q.3) ANS:E
regards,
nag.

On 8/12/07, bayard0707 <bayard0707@yahoo. com> wrote:


>
> Hi All,
> Please help me with the following certifications questions. I am
> preparing for the exam.
>
> 1)You want to activate version management for contracts. Which
> combination of fields do you need (true/false) ?
> a)Document category + Document type + Company code
> b)Document category + Document type + Purchasing organization
> c)Document category + Purchasing organization + Purchasing group
> d)Document type + Purchasing organization + Plant
>
> 2) A confirmation control key requiring an order acknowledgment from
> the vendor has been entered in a purchase order. The data in the
> acknowledgment differs from that in the PO: Instead of the whole PO
> quantity on the desired date, the vendor confirms delivery of half of
> the total quantity on each of the two dates one week apart from each
> other. How do you enter this acknowledgment (one correct answer)?
> a) You enter two items with the confirmed quantities and date on
> the "Confirmations" tab page in the item details
> b) You set the partial delivery indicator on the "Delivery " tab page
> in the item details. As a result, an additional entry screen appears,
> on which you can enter the confirmed quantities and dates
> c) You enter two delivery schedule lines with the confirmed
> quantities and delivery dates on the "Delivery Schedule" tab page in
> the item details
> d) You change the delivery date of the existing PO item and reduce
> the PO quantity by half. For the remaining quantity, you enter a new
> PO item in which you specify the other delivery date
>
> About Solution Manager:
> 3) Which of the following are Solution Manager Usage Scenarios?
> (True/False)
> a) Manage Change Requests
> b) Monitor SAP Support Desk
> c) Upgrade SAP Solutions
> d) Link to SAP Education
> e) Implement SAP Solutions
>
> Thank you for your help.
>
>
>
+++++++++++++
Dear Dinesh,

Thanks a million!

Regards,
NI.
--- In sapmaterialsmanagem ent@yahoogroups. com, dinesh.singhal@ ...
wrote:
>
> Choose scope of list C then you will get information in a single
line.
>
> Thanks & Regards,
>
> Dinesh Singhal,
> SAP Functional Consultant
> Mob # +91-9324168248
>
>
>
>
>
>
>
> "Novel Ilyas" <novel.ilyas@ ...>
> Sent by: sapmaterialsmanagem ent@yahoogroups. com
> 08/13/2007 10:08 AM
> Please respond to sapmaterialsmanagem ent
>
> To: sapmaterialsmanagem ent@yahoogroups. com
> cc: (bcc: Dinesh Singhal/RCVL/ RelianceADA)
> Subject: [sap mm] List of PR
> Importance: Normal Sender's OU: Reliance
>
>
> Dear Gurus,
>
> Need your info on how we can have list of PR in single row manner,
> since ME5A list it in 3 rows each record.
> Appreciate your prompt reply.
>
> Regards,
> NI.
+++++++++++

not possible.

+++++++++++++

Hi Murthy!

Have you checked the periods in OB52? Plz check up and change
accordingly if reqd.

Regards,

Sreekanth

--- In sapmaterialsmanagem ent@yahoogroups. com, "SATYANARAYANA


MURTHY" <murtymagapu@ ...> wrote:
>
Q
Q
A

IMG-->MM-->PURCHASI NG-->P.O- ->DF9 SCREENLAYOUT AT DOCUMENT

IT MANDATORY .., SAVE IT..this is only option

otherwise ABAPER can make that field mandatory through coding


but in my client's location they are unble to make few fieldds mandatiry..

BRegards
adarsh

+++++++++++
Dear Friends;
i have been assigned to object of domestic project. I have the
functional specification, but the problem is that i am not getting
what they exactly want
In that functional specification ( FS ) they have mentioned about
input requirement and processing requirement in this way

Input Reqiurement :

Printing of Goods Issue will be triggered after creation of Goods


Issue against Process Order
i.e at the time of MB1A transaction is saved. (Movement type will be
261 and 262)

Processing Requirement :
For the Process Order: Check the Process Order Number

Header Data:

1. Plant : Check the Process Order Number : Table Name is AUFK


2. Plant Description: Table Name is T001W.
3. Material Description : Check the Process Order Number : Table
Name is AUFK
4. Material Code: Check the Process Order Number: Table Name is AFKO.
5. Batch Number: Check the Process Order Number: Table Name is AFPO.
6. Batch Size: Check the Process Order Number: Table Name is AFKO.

Component Data:

1. Item No: Check the Process Order Number: Table Name is AUFM.
2. Material Code: Check the Process Order Number: Table Name is AUFM.
3. Material Description: Check the Material Code from the Process
Order. Table Name is MAKTX.
4. Committed Quantity: Check the Process Order Number and
Reservation Number: Table Name is RESB. (if there is no committed
quantity, committed quantity column should be Zero for the
particular Material)
5. Withdrawn Quantity: Check the Process Order Number: Table Name is
AUFM. (take the movement types 261 and 262 only)
6. Batch Number: Check the Process Order Number: Table Name is AUFM.

What i supposed to do to complete this object?? WHat will be my


selection criteria ?? AS they have mentioned in FS check process
order number, what does it mean??
Please help me out its urgent.

Regards;
Parag Gavkar.

++++++++++++++

go to ml81n,put the service entry number,it must be on the change


mode.Revoke the acceptence and then save.
Do the same step again after saving,then this time you candelete it.
> Hi,
>
> What is the procedure to cancel the service entry sheet document posted
> through ML81N.
>
> Thanks in Advance
> Ram
++++++++++

Hi,

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Customization is done by superuser.It means the changes that r required can
be made by the user.Configuration is done by end user.

Release procedure is the authority required to release a PO.eg. Senior


manager,MD,CEO

On 8/10/07, nayna dixit <nayna_dixit@ yahoo.com> wrote:


>
> HI SAP--MM ----FRIENDS
> > can anyone explain me in tetails
> > the defferance between configuration and custmization ?
> > and what is meant by release procedure / and how to activate it ?
> > pl reply me in details with example
> > coz i total new to this field
> > so dont be angry on me
>>
> thanks in advance
> nayna dixit
++++++++++

Dear SAP Gurus,

I am facing one problem in STO.


I have created one STO for a semi finished good material.

In Receiving Plant:-

Valuation class e,g 1000


Price control : S

In Supplying plant:-

Valuation calss e.g. 1000


Price control: V

Accunt determination for entry ABCD AUM not possible.Message No: M8147"

Regards,

Nil
+++++++++

the code provided by u i.e bmbc does not exist.


plzz check it out
> u can try it in BMBC. it is batch information cockpit
>
> reg
> prasanna
>
> anil mahajan <anilmahajan_ 11@...>
wrote: Dear MM Gurus and friends,
>
> i'm a PP Consultant
>
> my user wants a report that gives the W.I.P stock details with
batch and date of manufat. of batch.
>
> i have tried MC46 and MC50 but it shows products only as our
requiremet is product code with batches.
>
> is there any table or T code that gives such details.
>
> kindly revert
>
> Thanks & Regards,
>
> Anil
>
++++++++++++++

Choose scope of list C then you will get information in a single line.

Thanks & Regards,

Dinesh Singhal,
SAP Functional Consultant
Mob # +91-9324168248

"Novel Ilyas" <novel.ilyas@ gmail.com>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
8/13/2007 10:08
Please respond to sapmaterialsmanagem ent

To: sapmaterialsmanagem ent@yahoogroups. com


cc: (bcc: Dinesh Singhal/RCVL/ RelianceADA)
Subject: [sap mm] List of PR
Importance: Normal Sender's OU: Reliance
Dear Gurus,

Need your info on how we can have list of PR in single row manner,
since ME5A list it in 3 rows each record.
Appreciate your prompt reply.

Regards,
NI.

++++++++++
Dear Gurus,

Need your info on how we can have list of PR in single row manner,
since ME5A list it in 3 rows each record.
Appreciate your prompt reply.

Regards,
NI.
+++++++++

Dear Hari,

pls give me further detail steps because I am not familiar with


financial operation.

thanks and regards


david

In sapmaterialsmanagem ent@yahoogroups. com, "Hari Appani"


<hari.appani@ ...> wrote:
>
> Please find some information on subsequent credit and subsequent
debit for
> these scenarios.
>-
> Hari
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David
+++++++++
Pls explain it in more details in a operation level. For
example,where and how can I add the extra amount? Can I use negative
value?

Thanks.

--- In sapmaterialsmanagem ent@yahoogroups. com, "ANAND CHANDOOR"


<mpower303@. ..> wrote:
>
> Price ina PO cannot be changed.But if there is an excess amount
That u need
> to add, then it should be balanced by using the G/L account.
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David

++++++++++++++

Pls explain it in more details in a operation level. For


example,where and how can I add the extra amount? Can I use negative
value?
Thanks.

--- In sapmaterialsmanagem ent@yahoogroups. com, "ANAND CHANDOOR"


<mpower303@. ..> wrote:
>
> Price ina PO cannot be changed.But if there is an excess amount
That u need
> to add, then it should be balanced by using the G/L account.
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David
+++++++++++

Is this answer relevant to the question???

azam hussain <azam_s007@yahoo. com> wrote:


me49,me50

----- Original Message ----


From: Pushpakumara Ajith <mihin2008@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Friday, August 10, 2007 3:08:13 PM
Subject: [sap mm] Slow / Fast moving Items

Dear All,

Ajith
+++++++++++++

Hi Sam,

Thanks

P Samraj <samrajpp@yahoo. com> wrote:


Hi all,

102 is the reversal mvt. type of 101. Every mvt. type


has its reversal counterpart. The are many reasons to
make a reversal of any mvt. type (mostly human
mistakes).
122 is used when you make a returns purchase order to
a vendor. This is a purchase order with the "returns"
flag marked. By the way, 122 has it reversal mvt. type
in 123.
It's true that in both cases material is being removed
from the stock but for diferent reasons and in
diferent bussiness processes.

Hope I have clarified,

Sam

--- charles pary <charlessusai@ yahoo.co. in> wrote:

> both cancellation and Reversal are same....


>
> Cheers
> Charles
>
> "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> Cancellation is used when the goods
> receipt was done in error. The
> entire qty of the original goods receipt is
> reversed. Reversal is used
> when you received goods and are returning it to the
> vendor. You may
> reverse the original goods receipt in its entirety
> or a partial.
> --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>
> > Hi Ritu
>>
> > The effects are same
>>
> > Rgds
> > Naveen Goveas
>>
>>
> > On 8/4/07, ritu khanikar <ritu_khanikar@ yahoo.com>
> wrote:
>>>
> > > Hi all,
>>>
> > > While doing migo, we can use cancellation and as
> well as reversal,
> > what is
> > > the diference between the two?
> > > regards
>>>
> > > ritu
>>>
>>>
>
____________ _________ _________ _________ _________ _________ _
> > > Yahoo! oneSearch: Finally, mobile search
> > > that gives answers, not web links.
>>>
>
http://mobile. yahoo.com/ mobileweb/ onesearch? refer=1ONXIC
>>>
> > > [Non-text portions of this message have been
> removed]
>>>
>>>
>>>
>>
>>
>>
> > --
> > Naveen Goveas
> > SAP MM Consultant

++++++++++++++

Hello MM gurus
when i am doing MIGO i am getting error msg that
Posting Period 08 2007 not open. I have done all settings in MMPV. It is
showing current period 08 2007 and closing period 07 2007. How to do
settings for this? Please help me to sort out this issue.

Thanks and regards


Murthy

++++++++++++++=

Hi All,
Please help me with the following certifications questions. I am
preparing for the exam.

1)You want to activate version management for contracts. Which


combination of fields do you need (true/false) ?
a)Document category + Document type + Company code
b)Document category + Document type + Purchasing organization
c)Document category + Purchasing organization + Purchasing group
d)Document type + Purchasing organization + Plant

2) A confirmation control key requiring an order acknowledgment from


the vendor has been entered in a purchase order. The data in the
acknowledgment differs from that in the PO: Instead of the whole PO
quantity on the desired date, the vendor confirms delivery of half of
the total quantity on each of the two dates one week apart from each
other. How do you enter this acknowledgment (one correct answer)?
a) You enter two items with the confirmed quantities and date on
the "Confirmations" tab page in the item details
b) You set the partial delivery indicator on the "Delivery " tab page
in the item details. As a result, an additional entry screen appears,
on which you can enter the confirmed quantities and dates
c) You enter two delivery schedule lines with the confirmed
quantities and delivery dates on the "Delivery Schedule" tab page in
the item details
d) You change the delivery date of the existing PO item and reduce
the PO quantity by half. For the remaining quantity, you enter a new
PO item in which you specify the other delivery date

About Solution Manager:


3) Which of the following are Solution Manager Usage Scenarios?
(True/False)
a) Manage Change Requests
b) Monitor SAP Support Desk
c) Upgrade SAP Solutions
d) Link to SAP Education
e) Implement SAP Solutions

Thank you for your help.

+++++++++++
[Non-text portions of this message have been removed]

++++++++++++++==

Hi,

Cancellation has some additional features :

1. U can cancel wrt original doc no. which can fetch data automatically.

2. U can have original doc no as refence .

P Samraj <samrajpp@yahoo. com> wrote:


Hi all,

102 is the reversal mvt. type of 101. Every mvt. type


has its reversal counterpart. The are many reasons to
make a reversal of any mvt. type (mostly human
mistakes).
122 is used when you make a returns purchase order to
a vendor. This is a purchase order with the "returns"
flag marked. By the way, 122 has it reversal mvt. type
in 123.
It's true that in both cases material is being removed
from the stock but for diferent reasons and in
diferent bussiness processes.

Hope I have clarified,

Sam

--- charles pary <charlessusai@ yahoo.co. in> wrote:

> both cancellation and Reversal are same....


>
> Cheers
> Charles
>
> "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> Cancellation is used when the goods
> receipt was done in error. The
> entire qty of the original goods receipt is
> reversed. Reversal is used
> when you received goods and are returning it to the
> vendor. You may
> reverse the original goods receipt in its entirety
> or a partial.
> --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>
> > Hi Ritu
>>
> > The effects are same
>>
> > Rgds
> > Naveen Goveas
>>
>>
> > On 8/4/07, ritu khanikar <ritu_khanikar@ yahoo.com>
> wrote:
>>>
> > > Hi all,
>>>
> > > While doing migo, we can use cancellation and as
> well as reversal,
> > what is
> > > the diference between the two?
> > > regards
>>>
> > > ritu
>>>
>>>
Hve u given any delivery date for that PO or not.Plz check

Q
A

Q
A

A
Q

Q
A

Q
A
Q

A
Q

A
A
A

Q
A

Q
A
Q
A
A

Q
A

Q
A
A
A
A
A

A
A

A
A
A

A
a

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A

A
A

A
A
Q
A

Q
A

A
A

Q
A

Q
A

Q
A
Q
A

A
A
A

Q
A
A

A
A

A
A

A
A

A
A
A

A
A
A
A

A
Q

A
A
A

Q
A

A
A
A

Q
A

A
Q
A

A
A

Q
A

Q
A

A
A

A
A

A
A
A
A
Q

A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A
A

Q
A

Q
A

Q
A

Q
A

A
A
A

A
Q

A
Q
Q

Q
A
Q
A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
Q

Q
A

Q
A

Q
A

Q
A

Q
A
Q

A
A

Q
A

Q
A
Q

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
A

A
Q

Q
A

Q
A

A
Q
A

Q
A
A
A
A

Q
A

Q
A

Q
A

Q
A

A
A

A
Q
A

Q
A

Q
A
A

A
A

Q
A
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q
A

A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A
A
A

Q
A

Q
A

Q
A

A
Q

Q
A

Q
A

Q
A

Q
A

A
A

Q
A

A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q

A
A
A

Q
A

A
Q
A

A
A
A
A
A
A

A
A
A

try the below procedure,,, this may work for u,,,

steps to follow:
1. Batch - FIFO
a) Create a Characteristic using t_code CT04 for LOBM-VFDAT
b) assign it to a class 023_005 using t_code CL02

create sort sequence = 023_005S, assign characteristics LOBM-VFDAT

ME01 - Movement type/Plant/Mat No.


Class = 023_005
sort Sequence = 023_005S
No. of Splits = 3,

assign search procedure ME0001 to movement type 201, active check batch
f) Create a condition record t_code MBC1,
Strategy Type - ME01
movement type / Plant
select the line and click on selection criteria
characateristic value = 01.11.2007-31. 12.2007
select the line and click on sort
sort rule - 023_005S ,,, assign and save

now to check in master data:


1. Create material master with batch management active in purchasing view
2. Cretae Batch Master using t_code MSC1n

try this out,,, and let me know the result.


Can anybody help me out for solving this issue
and also one more thing i want to clarify
Q
A

Q
Q

Q
Q
Q

Q
A
Q

Q
A

A
A

A
Q
A

Q
A

Q
A
A

A
A
A

Q
A

Q
A

Q
A

A
Q

Q
Q
A
A

Q
A

A
Q

A
A

Q
A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
A

Q
A
Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A
A

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A

A
Q

A
A

Q
A

Q
A

Q
A

Q
A

A
A
Q

Q
A

Q
A

Q
A

A
A
Q

Q
A

Q
A

Q
A
A

A
Q

A
A
A
A

Q
A
A

A
A

Q
A

Q
A

A
A

Q
A

Q
Q

A
A

Q
A

Q
A

A
A
A

Q
A

A
A

Q
A

Q
A
A

Q
A

A
A

A
A

A
A

A
A

Q
A

A
Q

A
A

Q
A

Q
A
A

Q
A

Q
A
A
A

A
A

Q
A

A
Q

Q
A

Q
A
Q

A
Q

Q
A
Q

A
A

Q
A

A
Q

A
Q

Q
A
A

A
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A
A

A
A
A

Q
A

Q
A

A
Q

Q
A

A
Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

A
Q

A
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

Q
A
A
A
Q

A
A
Q
A

Q
A
A

Q
A

A
Q

Q
A
Q

Q
A

A
A
A

Q
A

Q
A

Q
A

A
A

Q
A

A
Q

Q
A

Q
A

A
Q

Q
A
A

A
A

A
Q
A

Q
A

Q
A
A

A
A
A

Q
A

A
A

Q
A

Q
A

Q
A

A
A

Q
A

Q
A
A
Q

A
A

A
A
A

Q
A

A
A

A
A

A
A

Q
A

A
Q
A

Q
A
A
A

A
A

A
A
A

A
A

Q
A

Q
A

Q
A
A
A

Q
A

Q
A
Q
A

Q
A
A
A

Q
A

Q
A

Q
A
Q
A
A

A
A

A
A

Q
A

Q
A

A
Q
A

A
A

Q
A

Q
A

Q
A

A
A

A
A

A
A

A
A

Q
A
A

Q
A

Q
A

A
A

A
A
A
A
A

Q
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
A
A

Q
A

A
A

Q
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A
A
A

Q
A

A
A
Q

A
A

Q
A

Q
A

A
A

Q
A

A
A

Q
A
A
Q
A

A
A

A
A

A
Q

A
A

Q
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

Q
A

A
A

Q
A
A
A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

A
Q

Q
A

A
Q
A

Q
A

Q
A

Q
A
Q

A
A

Q
A

Q
A
Q

A
A

Q
A

Q
A
A

Q
A

Q
A

A
A

Q
A

A
Q
A
A

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q

Q
A
Q

A
A

Q
A
Q
A
A

Q
A

Q
A
Q

A
A

Q
A

Q
A

Q
A

A
A

A
A
A
A
A
A
A
Q

A
A

Q
A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
A
A

Q
A

A
Q
A

Q
A

A
A

Q
A
A

Q
A

Q
A

A
Q

Q
A

Q
A
Q

A
A
A

A
A
Q

A
Q

A
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A
Q

Q
A

A
A

Q
A

Q
A
A
A

A
Q

A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q

A
Q
A
A
A
A

Q
A

Q
A

A
Q

Q
A

Q
A
A
Q
A

Q
A

Q
A
A
A
Q

A
Q
A

Q
A
A

Q
A

Q
A

A
A

Q
A

A
Q

Q
A

A
A

Q
A
A

A
A

A
A

Q
A
Q

Q
A

A
A
A

A
A

Q
A
A
A

Q
A

Q
A

Q
A

Q
A

A
A
A
Q
A

Q
A
A
A
A
A
A

Q
A
Q

A
A

Q
A

A
A

Q
A
Q

Q
A

Q
A

Q
A
A

A
A
A
A

Q
A

Q
A

Q
A

A
Q

A
A

Q
A

A
A

Q
A

Q
A

A
Q
A

A
A
A
A
A

A
A
A

A
A

Q
A
Q

A
A

Q
A

Q
A
Q
A

Q
A

Q
A

A
A
Q

Q
A

A
A

A
A
A

A
A
A
Q
A
A

Q
A

Q
A
A

A
A
A
A

A
A
A
Q

A
A
A

A
A
A

A
Q
A

Q
A

Q
A

A
A

Q
A
A
A

Q
A

Q
A

Q
A
A

Q
A

A
A
A

Q
A

Q
A

Q
A
A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A
Q
A

A
A

Q
A

A
Q

Q
A

Q
A

Q
A
A

Q
Q
A
Q
A

Q
A

A
A
A

A
A
A

Q
A
A
Q
A
A

A
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A
A

Q
A

Q
A

A
Q

A
A
A

A
A

Q
A
A
A
Q

A
A

A
A

A
Q

A
A

A
A

Q
A

A
A
A
Q

Q
A

A
A
A

Q
A

Q
A

Q
A

Q
A

A
A

Q
A
A
A
A
Q

A
A
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A
A
Q
A

Q
A

A
A

A
A

Q
A

Q
A
A

A
A

Q
A

Q
A

Q
A
Q

Q
A

A
A

Q
A

A
Q
A

A
A

Q
A

A
Q
A
A

A
Q

Q
A

A
A

A
Q

Q
A
A

Q
A
A

Q
A
A
A
Q

A
A

Q
A

Q
A
A

A
A
Q

A
A
Q

Q
A

Q
A

A
A

A
A

A
A
A

A
A

Q
A

A
Q
A

A
A

Q
A

A
A

A
A
A

A
Q
A

Q
A

A
A
A
A
A

A
A

Q
A

Q
A

Q
A

A
A

Q
A

A
A

Q
A

A
A

Q
A

A
A
A
A

A
Q
A

Q
A

A
Q

A
Q

A
A

A
A

Q
A
A

Q
A

A
A
A

A
A

Q
A
Q

Q
A
Q
A

Q
A

A
Q

Q
A
A

Q
A

Q
Q
A

Q
A

A
Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A
A
A
A

Q
A

A
A

Q
A
Q

Q
A

A
A

Q
A

A
A
A

Q
A
Q

A
A
A

A
A
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A
A

A
A

A
A
A

Q
A
Q
A

Q
A

Q
A

Q
A

A
A

A
Q
A

Q
A
Q
A
A

Q
A
A
Q

Q
A

A
Q

A
A

Q
A

Q
A

A
A
A

Q
A

Q
A
Q

A
Q

Q
A
Q

A
Q
A

Q
A

A
Q

A
A

A
A

A
A

A
Q

Q
A
A
A
A
A

A
Q

A
A

Q
A
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A
A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q

Q
A

Q
A
A

Q
A
A

Q
A

Q
A

A
A

A
Q
A

A
A
Q

Q
A
A
Q
A

A
A
A
A
Q

A
A

A
Q
A
Q

Q
A

A
A

Q
A
A

A
A

A
Q

A
A

Q
A

Q
A

Q
A

A
A
A
A

A
A

Q
A

A
A

Q
A
A

A
A

Q
A

A
Q
A

Q
A

Q
A
Q
A

Q
A

A
A

A
A

Q
A
A
A
A
A

Q
A

Q
A
A

A
A

A
A

A
A

A
Q
A

A
Q
A

A
A
A

A
A
A

A
Q
A

Q
A

Q
A
A
A

Q
A

A
A
A
A
A

Q
A

Q
A

Q
A

A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
Q

A
A
A

Q
A

A
A

Q
A

Q
A

Q
A

A
A

Q
A
A

A
A
A

A
A
A

Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

Q
A
A
A

Q
A

A
Q
A

Q
A

A
Q
A

A
A
A

Q
A

Q
A

A
A
A

A
Q
A

A
A

Q
A
Q

Q
A

Q
A

A
A

Q
A
Q

A
A
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

A
A
A

A
A
A

Q
A

Q
A

A
A
A

Q
A

A
A
Q
A

A
A
A
A

Q
A

A
A

Q
A
Q
A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

A
Q

Q
A

Q
A

A
A
A
A
Q

A
A

Q
A

Q
A

Q
A

Q
A
Q

A
A

A
A

Q
A

Q
A

Q
A

Q
A
A
Q

A
A

Q
A
Q
A

A
A

Q
A
A

Q
A
A

Q
Q
A

A
A

A
Q
A

A
A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A

Q
A
A

Q
A

A
A

Q
Q

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A

Q
A

A
Q

Q
A

Q
A

A
A

Q
A
A

A
A
A
A

A
A
A

Q
A
A

Q
A

Q
A

Q
A

Q
A

Q
Q

Q
A

Q
A
Q
A

Q
A

Q
A

Q
A
Q

A
A

Q
A
A
A
Q
A

Q
A
A
A

Q
A

Q
A

Q
A
A

A
Q

Q
A
A

Q
A
A
A
A
Q
A

Q
A

Q
A

Q
A

A
A

Q
A
A

A
A
Q

A
Q

A
Q

Q
A
A
A
Q

A
Q

Q
A
A

A
A

A
A

A
A
A

A
Q

A
Q
A
A

A
A

A
A

Q
A

Q
A

A
A

A
A
A

A
A

A
A

Q
A

Q
A

Q
A

A
A

A
A
Q
A

Q
A

Q
A

Q
A
A

Q
A

A
A

A
A
A

Q
A

A
Q

Q
A
A

Q
A

A
Q

Q
A
A

Q
A
Q

Q
A

Q
A
A

Q
A
Q

A
A

A
A

Q
A

Q
Q
A

Q
A

A
Q

Q
A

Q
A

A
A

Q
A
A

A
A
Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A
A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A

A
Q

Q
A

Q
A

Q
A
A

A
A
A
A

A
A

Q
A

Q
A

Q
A

Q
A
A

A
A

A
A
A

Q
A

A
A
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A

A
Q

A
A

A
A

A
A

A
A

Q
A

Q
A

A
A

A
A

Q
A
A

Q
A

A
A
A

Q
A

Q
A

Q
A
Q
A

A
A
A

A
A
Q
A

Q
A
A
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A
A

A
A

Q
A
A

Q
A

Q
A
Q
A

Q
A

A
A

Q
A

Q
A

Q
A
Q
A

Q
A
A

Q
A
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

A
Q

A
A
A

A
Q
A

A
A

Q
A

A
A
Q

A
A

Q
A

Q
A

A
Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
Q

Q
A
A

Q
A
A

Q
A
A
A

A
A
A

Q
A

Q
A
A

A
A

Q
A

Q
A
A

Q
A

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q

A
A
A
A

Q
A

Q
A
Q
A

A
A

Q
A
A
Q

A
Q

Q
A

A
Q

A
A

A
A
A

Q
A
A
A

Q
A

Q
A

Q
A

Q
A

A
Q

Q
A
A

A
A
A

Q
A

A
A

A
Q

Q
A

Q
A

Q
A

Q
A

A
A
A

Q
A

Q
A
Q
A

A
A
A

A
A

A
Q

Q
A

Q
A

Q
A
Q
A
A
Q

A
A
A

Q
A

Q
A
Q

Q
A

Q
A

A
Q
A

A
A
A
Q
A
Q
A

Q
A

Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

A
A
Q
A

Q
A

Q
A

Q
A
Q
A

Q
A

Q
A
A

Q
A

Q
A

A
A
Q

Q
A

Q
A

A
Q

A
A
A

A
Q
A

Q
A
Q

A
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A
A

A
Q

Q
A

A
Q
A

Q
A

A
A
A

A
A

Q
A

A
A

A
Q

A
A

A
A
A

Q
A

A
A

A
A
A

A
A
A

Q
A

Q
A

Q
A
A
A
A

Q
A
A

A
A

A
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A
Q

A
A
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A
A
Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
Q
A

Q
A
Q
A
A

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
A
Q

Q
A
Q

A
Q

A
A
Q

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
Q

Q
A

Q
A

Q
A

Q
A
Q

A
Q
A
Q
A

A
Q

Q
A

A
A

A
A

A
Q
A

Q
A

A
A
Q
A
A

A
A

Q
A
A

A
Q

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

A
A

A
A
A

A
A
Q
A

A
A
Q
A
A

A
A

Q
A

A
Q
A

A
A

Q
A

Q
A
Q

A
A
A

Q
A

A
A

Q
A

Q
A
Q
A

Q
A

A
Q

A
A

Q
A

Q
A

Q
A
Q

Q
A

Q
A

Q
A

Q
A
Q

Q
A
A

Q
A

Q
A
Q
A
A

Q
A
A

A
Q

Q
A

Q
A
Q

A
Q

Q
A

Q
A

Q
A
A

Q
A
A
Q
A

Q
A

Q
A

Q
A

Q
A
A

Q
A

Q
A

Q
A

Q
A
Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A

Q
A
When I'm transferring Quantity within material to material using movement type
309.(T code MB1B). I'm getting the message "Account determination for entry
ABCD AUM not possible" This is affecting only my finished material ....other
Material type it is working.
goto T-Code:OBYC- >AUM->check u r valuation class entry exist or not, if not exist
goto new entry& add it.

pl.tell me ,How do you know that a purchase requisition is created manually or thru
MRP?
In the Item details of the P.Req, there is a tab 'Contact Person' and once you open
the tab you would find the 'Creation Indicator'.If the P.Req has beem created
manually, it would show Real time manual...in case of MRP..it would show MRP.
you can track it through md04 if it is generated through mrp it will show there
you can find through the tracking number, for MRP PRs no tracking will be there
and for manual PRs tracking number will be there, This is the way to find it.If you
got any additional data pl. forward it to me

I want a monthly report in which MIRO and MIGO Documents no.s come. I want to
track MIRO document no.s with the MIGO Document NO.s for a month. The main
purpose is to know out of how many GRNs (migo) done by store,miro have been
done by finance department. Can anybody have an idea of the report in which
Document no.of Both MIGO(GRN)and Miro Document comes.
If you want migo done for the month you can track it trough mb51 there u will find
the po no against which the gr has done, then u can track the miro done for that gr
no in me23 where u enter the po no and go the po history it will show u the miro
against gr .

I am looking for some help in the SAP automatic document adjustment. We want
to update the open Purchase order price with the new price updated in the Info
Record. Can any one let me know what are the configuration to be done and how it
work in SAP.
I have a contract with target value of $1,146,818.31. Contract header statistics
indicate releases totaling $1,132,458.42 have been issued. Additional releases
cannot be issued for greater than $14,359.89. However, when I pull a purchase
order report (ME80FN) releases issued against this contract total $1,149.675.89.
None of the release issued are on hold, have been deleted, are for return or free
items.
you can create a doc type or copy the UB doc type in S_ALR_87002197 and assign
a Number range in OMH6 then to SPRO>Matl Mgmt>Purchasing> Purchase
Order>Setup Stock Transport Order
A. Define Shipping Data (Plants)
B. Define Checking Rule (SD Delivery)
C. Assign Delivery type (NL) and Checking Rule (Sd delivery) and Doc type (UB)
D. Assign Doc type and step procedure > Document category (Purchase Order)
Thanks a lot for trying to explain me the procedure /configuration steps for Stoxk
transport Order. i apreciate the effort of all u guys. But, I am still facing some
problem , as have only my organisation structure without any sd component , like
sales organisation, etc etc. Only I have the MM components, as being a MM guy, I
dont know what r all the sd components required to execute STO and the steps to
configure
Did sd components.
you check the item category for material for third party it should be BANS
instead
2. of NORM.
In sales order item category should be TAS instead of TAN which generates
automatic
3. Generate PR.
PO wrt PR.
4. When PO created check the delivery schedule.
5. Do MIGO with movement type 101 whereby it generates accounting document.
6. MIRO with reference to MIGO
7. Generate a Sales invoice.
Do post me was this helpful or you found any other source to solve the problem.

My query is regarding Physical inventory, can we specify different reasons for the
uncounted quantity in physical count. Ex: book inventory qty = 100, qty counted =
90, uncounted =10, for the uncounted qty 5 i want to give the reason as Poor
quality & for another 5 qty i want to give the reason as damaged. how can i
achieve
yes, you this
can do like this.
You open the T code Mb1a and use movement type 551 to post material. Select
reason and fill the quantity and execute

I need to make a vendor as preferred over other vendors in a source list. How to
achieve
While that ?
maintaining source list, you need to click on fix vendor column to give
preference to respective vendor.
U HAVE TO CLICK ON FIX VENDOR AND SAVE IT (SOURCE LIST)

My users wants to track every goods receipt against a single P.O. For example.
The user will create a P.O( account assignment) for an item of Qty 2000. There will
be multiple goods receipts aginst that P.O and item. Now for every receipt there
should be a some trackig number. Is there any solution.
to track all gr from a po you can go to mb51 give the po no and the movment type
101 u will get all the gr done against that po
Please see the PO history tab for each line item of PO . This gives the comple
history of GIRs and IRs with all the information
ME2N, ME2M with GR /IR
A simple query can bring in the information your are asking for... you can get the
information from PO history table EKBE, if not try to join table MSEG & RSEG.

Delivery of not possiblble with MRP status PD.If I removed it delivery can
possible.What could be the reason?
can you tell me in detail. from which destination you are delivering what thing. As
MRP status is used to calculate requrement of material by running MRP.

In Purchasing View ,in General Data you have to maintain Plant specific material
status field active i. e - E2. Try this & let me know is it working or not.
pl maintain purchasing view in that perticular material For that particular material, in
that particular plant, Purchasing view to be maintained in material master.

Exploring a way to do it using condition records. That way one can avoid vendors in
the records. However...in this method there is no straightforward way to add Tax
Code to the condition records. So stuck again.

can i know what is the main purpose of creating the Inforecord without vendor
you can not create info record without vendor because info recor is master data for
some material with some vendor.

We need to enter material to ower stocks(inventories) but the purchase ordere has
been created with account assigment F directly to Production Order. It happens
because the consumption to order mov type 201 must be used to appear opened
into CKM3. If material doesn't thru by inventory , material ledger could not see it
opened as we need. We found an user exit into CO15 and CO11N to create this
stocks when Production Orders is confirmed and with this , we continue with
purchase order to Prod.Order and costs appear correctly in the CKM3. Does
anyone has faced the same scenario ?
We can create info-record without material master record,but wut is the use of
doing so. can anyone explain me this.
You can create it for Material groups, the use for this is that if you have a same
pricing structure for a particular group of materials, say for all Raw material like
Wheat [for making finished good flour] all wheat is at 10 USD per Tonne. then all
varieties of wheat are created under material group wheat and the info record is
maintained at group level so whenever wheat is procured it is at 10 USD.
Well it involves the following situation: We do not know what the vendor is going to
bring to us, since the commodities being procured are natural produce such as
fruits and vegetables etc. of varying grades, each grade is a material code. Hence
created a new goods movement to do GR and auto create PO. This makes it
necessary to have info records.

Now, since there are 5000+ materials 9000+ vendors and multiple plants...with
material prices changing every monday morning 7 AM, you can see what an
excercise it will be to create and update info records each weekend, sunday night
after the gates close on 0100 hrs on monday. The update run takes more than 11
hours. If we can eliminate the LIFNR requirement from info records...we will have to
do only 5000 x 15 info records, instead of 5000 x 15 x 9000 records.
On 8/28/07, Alan <alan_ed@yahoo. com> wrote:

I Want to create Info Record for a Material - Plant - Purchasing Org. i.e. without
taking vendor into consideration. How can it be achieved ??
This doesn't make sense. the info record is where you store information on the
combination of a vendor and material. No vendor = no sensible data. have you
thought about what you want to do? What information do you want to store?

I have a contract with target value of $1,146,818.31. Contract header statistics


indicate releases totaling $1,132,458.42 have been issued. Additional releases
cannot be issued for greater than $14,359.89. However, when I pull a purchase
order report (ME80FN) releases issued against this contract total $1,149.675.89.
None of the release issued are on hold, have been deleted, are for return or free
items.
Go to SPRO->MM->Purchasin g->Environment Data->Define attributes for system
Messages, in that you have to maintain (00-06-042) Version 00-Application Area 06-
No. 042 as Error / Warning

Can any one tell me what is Z table .for what it is used in detail.
Creating CUSTOM TABLES....i. e. user defined table...Any object created by user
should start with 'Z'.. Some rare case 'Y' According to business requirement we will
be creating it For SAP standard objects you need access key to change. For
example we need 3 fields from MARA table and 2 fields from MARC tabe - in this
case creating Z table is the best practice The second option is we can create
internal table...That program will be created at the time of execution and it will be
automatically discarded when closing.....
C201 is the Master Recipe creation transaction( Process Industries). The
environement allows to create Task List as well as BOM in the same transaction.
the t code for create the BOM is CS01 not C201.

How to make sub-group of material group in SAP.


there is no way to make sub groups to the material groups, But you can create the
material groups
I too faced this problem in my earlier project, you have to create subgroup as
Material
You can group.
try for this ... For example
Material Group : Description
1000 : Bearing ( Material Group)
1000.01 : Rolles Beraing ............ ......... .....Sub- group 1
1000.02 : Double Roller bearings ------------ ----Sub-Group 2
1000.03 : Taper roller bearings ------------ ------Sub- Gropu 3

Check the material master for valuation calss (Receiving Material). Ensure that for
Chart of Account "ABCD" and Transaction key "AUM: Loss/Gain from Stock
Transfer" proper G/L account has been assigned.

I have a problem when I tried to create Material Master Data. The system gave me
an error message saying that "The company code doesn't exist or has not been
fully maintained" The solution that the system provided is to configure the company
code for materials management and can be done in Customizing for the Material
Master in the activity Maintain company codes for materials management. I
couldn't find this activity in IMG. Does anyone know the path to "Maintain company
codes for materials management" activity? Any idea of what should be the cause of
this problem? I double checked the creation and maintenance of all org. objects
and the assignment between them and I think everything has been defined
properly.
AttachingCould
Materialanyone
Type please help
to Plant. me
IMG out?
- Logistics General - Material Master - Basic
Settings - Material Types - Define Attributes of Material Types. Select the Material
Type to be attached to the plant and then click the Quantity/Value updating folder in
the left side of the screen. On the next screen tick the Quantity updating and Value
updating columns. Attaching period to company code IMG - Logistics General -
Material Master - Basic Settings - Maintain Company Codes for Materials
Management. To extent any material code the period should be open. In the fist
instance we have to open the period through IMG setting After that from T-CODE
MMPV we can open and close the period. After maintaining both of the above try
and can
you check by creating
check new material code.
it in SPRO>Enterprise Structure>Assignmen t
I am doing STO between plant 1000 and 1100. My material no 1415 is created in
plant 1000 and also maintained(extended ) in plant 1100. While doing STO I got
message "Not possible to determine shipping data for material 1415". How I will
maintain shipping data in material 1415 in which view and what else configuration I
need to do? Please guide me step by step.

I have a problem in assigning class in hieararchy level (T-Code CLW1). It doesn't


allow me to add more then 100 records, is there is any config or settings I have to
do for this.

I'm facing problems regards Purchase Order printout. I have copied message type
NB to ZIMP to create messages to PO type ZIMP too. When configure on tcode
MN04 , and creates PO , the message isn't generated. Does anyone have some
tips or documentation about this customizing ?

When I am trying to create a shopping cart system is showing the error "ambiguous
workflow". We are having a stand alone system in SRM5.0. The configs that have
been done are as follows: 1)Root organization , the purchase organization and
purchase groups have been created and assigned to the root organization. 2)One
manager and a employee have been assigned to the root organization. 3)For the
task specific workflow configuration ,under assign agents the manager has been
assigned to TS 10407964. 4)The standard SAP workflow are all active and have
the same currency as the shopping cart . Can anyone tell me the steps for checking
the uniqueness of the workflow? Further, do we require specifying anywhere that
the manager is the approver of the employee or the system is supposed to find that
automatically from the organization plan? I am basically a MM guy new to SRM, so
any input in this regard will be very useful.

can anyone explain the customization of CIN. I read many documents but in every
document its only the theory about CIN but no customization process.
I'm gtting the following error message when trying to receive goods
>against PO. I closed all the periods using "omsy" and "mmpv" and for
>my company code the period in "omsy" view shows yr-2007 Pe-08 Fyr-
>2007 mp-07 Fyr 2006 LM 12. The message is as follows-
>
>"Period 008/2007 is not open for account type S and G/L 400000
>Message no. F5286
>
>Diagnosis
>Period 008 of fiscal year 2007 does not exist in table T001B either
>in period 1 or in period 2 of a table entry with record type "0", the
>selected company code, the account type S and the G/L account 400000.
>The period is therefore not open.
>
>System Response
>Processing cannot be continued.
>
>Procedure
>Check table T001B for record type "0", the selected company code,
>account type S and G/L account 400000. If required, make sure that an
>entry is made in the table or an interval is changed."

For valuated materials "material valution" is managned in logistic (Material Master)


as well as in Finacial accounting. Hence the posting period (based on the posting
date) should opened in both (MM and FI).
>
> Use the following transaction an check the period status
>
> MMPV - Close Period
> MMRV - Allow Posting to Previous Period
> OB52 - for FI period closing /opeining
>
> Hope this will help you to resolve your issue.

One more transaction for help in this regard is OPK1/OPK2.


For every valuated movement,there will be 2 documents.

1.Material document - which you make available by MMPV.


2.Accounting document - Which you make available by OB52.

In your case OB52 is not maintained.So use OB52 and maintain period for account
type S and G/L 400000.If you put * in the G/L column,then all accounts of Type S
will be considered for accounting document posting.

i am a sap consultant , i faced the issue last week..


>
> check in t/c o m s y
>
> also check in t/c o m b three
>
> then maintain the material by extending the material in that plant
>,
> storage location..
>
> then GR will be possible , otherwise GR is not possible

Does anyone know how to block a material from order entry but not
> from
> delivery? The situation is that we want to block a material from
> being
> entered on a sales order but at the same time allow deliveries of
> sales
> orders created before we decided to block the material from being
> entered on
> an order.

I don't know if sales work like MM, but in t-code MM02,Change Material,
under the Purchasing tab, there is a field under General Data called
Plant-sp.matl status. From the drop down box you can choose "B1 Do not
buy or make". This setting prevents the user from ordering the material
but allows you to receive and pay for that material on previous POs.
Maybe there is a similar field in the Material master for SD.
John, to block sales order entry, you can do that in the MM02, Sales Org
Data 1, field X-DIST CHAIN STATUS. Select OB and field VALID FROM, you can
key in today's date. Hope this helps.
Thanks Jennifer will have a look at this approach.

I am an experienced vb/vba programmer, but a neubie to SAP. We have been live


for only 7 weeks now.
The question I have seems to have been answered at this link: http://www.sap-
img.com/mm025. htm
Unfortunately, when it comes to SAP, I'm on the leash, not holding it - our parent
company makes all the decisions about how SAP is to be run
here. They have made no response what-so-ever with respect to the "OMW0"
transaction data given at the link.

My issue is this:
Some of our customers do not have warehousing capabilities. So, they will
purchase an entire lot of material we have produced, but only have a
certain portion of it shipped to them. The remainder remains in our warehouse,
where it is now considered non-valuated, as it belongs to the customer. The
problem is how to show this material has no value in SAP while separating it from
other valuated lots of the same material.

Currently, we have to make an entirely new material number for the non-valuated
material. We ship the entire lot in SAP, then receive back w/o PO the remainder
under the new material number. Although workable in SAP, this solution causes a
number of other problems, for instance with
labelling. Furthermore, the customer purchased x kg of material 14098005, of
which their records show we are still holding y kg for them. Unfortunately, our
system does not concur with theirs, as our system shows that we have y kg of
How many stock transfer process are avaikable in SAP?
Like 1)Two step stock transfer (MM/SD) .
2)Two steap stock transfer ( MM only) Move type 303& 305.
3 One step stock transfer Move type 301.

is there any other stock transfer is availbel ? if yes then let us


know in details ( movment types ).
Also following stock transfer can be done.
(1) One Step Transfer posting by Mvt. 311
(2) Plant to Plant Transfer by Goods Issue against P.O. (Stock Transport Order-
using item category `U' in P.O. ) by Mvt. 351

While doing MIGO, I am receiving the following error. My question is


how you can make the combination of plant and material type other
than selecting the material type @ mm01 and also how I update table
T134M-

"Combination of plant YY00 and material type Raw material does not
exist
Message no. M3375

Diagnosis
You have entered a combination of material type and valuation area
for the plant that is not defined in the system.

System Response
An entry made up of this combination is normally created
automatically for all valuation areas in table T134M if you execute
the function Edit material type in Customizing for the corresponding
material type and then save your data.

The absence of an entry can be due to you setting up and assigning an


additional plant to a company code. Although the system then
determines the respective company code automatically, it does not
create an entry in table T134M for the existing material types in
this case.
Please go to SPRO and check for your material type whether the Quanity and valua
updation is define for your plant.

Logistics - General --- Material Master ---Basic Settings ---Material Types ----Define
Attributes of Material Types
I have requirement that there should be tolerance limit for the
invoice amount at header level.(Please do noy suggest tolerance keys
for price variance) What i need is system should not allow me to post
the invoice containing multiple line items which exceeds by 5000
amount than expected amount as per GR.
Any advice?

>I'm gtting the following error message when trying to receive goods
>against PO. I closed all the periods using "omsy" and "mmpv" and for
>my company code the period in "omsy" view shows yr-2007 Pe-08 Fyr-
>2007 mp-07 Fyr 2006 LM 12. The message is as follows-
>
>"Period 008/2007 is not open for account type S and G/L 400000
>Message no. F5286
>
>Diagnosis
>Period 008 of fiscal year 2007 does not exist in table T001B either
>in period 1 or in period 2 of a table entry with record type "0", the
>selected company code, the account type S and the G/L account 400000.
>The period is therefore not open.
>
>System Response
>Processing cannot be continued.
>
>Procedure
>Check table T001B for record type "0", the selected company code,
>account type S and G/L account 400000. If required, make sure that an
>entry is made in the table or an interval is changed."
> For valuated materials "material valution" is managned in logistic (Material
Master) as well as in Finacial accounting. Hence the posting period (based on the
posting date) should opened in both (MM and FI).
>
> Use the following transaction an check the period status
>
> MMPV - Close Period
> MMRV - Allow Posting to Previous Period
> OB52 - for FI period closing /opeining
>
> Hope this will help you to resolve your issue.

One more transaction for help in this regard is OPK1/OPK2.


For every valuated movement,there will be 2 documents.

1.Material document - which you make available by MMPV.


2.Accounting document - Which you make available by OB52.

In your case OB52 is not maintained.So use OB52 and maintain period for account
type S and G/L 400000.If you put * in the G/L column,then all accounts of Type S
will be considered for accounting document posting.

> When I was doing MIGO, the following error was showing-
>
> Plant and Material Type (Raw material) are not associated. Where do I
> associate material type and plant in SAP.

check that material is created or not in that plant in MM01 &


refer this path also spro->logistics- general-> material master->basic
settings->material types->define attributes of material types-> select u r
material type & click on qty/value update, u r plant entry is there or not
check it.
A couple of questions..
1) Can we make a subcontracting PO... which is also third party in
nature? what i mean to say, the subcontracting vendor should assemple the
BOM components, and then send the finished good not to us, but to
another customer. Are there any special settings required for this?

2) can we make a service PO, where the service vendor performs some
service on the equipment at his site, and transfers it to another vendor
for further operations?
like in service PO, we add devivery address etc.

>We are faced with a lot of PR's that are not complying with the
>minimum requirements for the scope of work. This poses a problem as
>one gets stuck with a lot of PR that are not actionable and even
>though one lets the originator know that there is a problem they still
>ignore one's complaints for weeks.
>
>Is there functionality on SAP that could be built in to reject such
>requisitions that are not complying with the minimum requirements
>outright?
>
>Indicators - these unactionable requisitions form part of the month
>end conversion stats.

Please make those fiels in PR mandatory so that the users will have to fill it or else
he may not be able to save the PR.cHECK IN SPRO SCREEN LAYOUT for PR.

> Purchase requsition does not have relise stragegie.


> info, how can i create one and why it is not there,
> please help me
go though this document. It will help to you

Setting up simple Release Procedure for Purchase Requisitions

Release Procedures (approval) can be used for Purchase Requisitions


(PR), Purchase Orders (PO), RFQ's, Outline Agreements and Service
Entry Sheets. The principle is exactly the same for all. If you can
master one, you will know them all.

Lets set up release procedures for PR for the following example:

Our company have got 2 plants: Plant 3100 (London) and plant 3600 (New
York).
For New York (plant 3100), if PR item value is between 0 - 1000
dollars, then PR needs to be released by one person (person B)
For New York (plant 3100), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
B, then person C)
For London (plant 3600), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
A, then person C).

Key terminology:
As per your Suggestion i have set up release procedure .But after creating PR,
when i go to Collective release i.e ME55, no PR is seen in that table.

pl suggest which area i should check again.

> Here i have a question about alternative BOM. I have created two BOMs
> for one material now when i am creating a PO for subcontracting and i
> am exploding BOM it is picking up 1st BOM. I want to know how to pick
> up 2nd BOM while creating PO?

for BOM some Production version concept is there, it is maintained in ME11 &
MEQ1.
but i don't know much more about this issue.
what i have understood the difference b/w
SAP 4.7 & SAP ECC 6.0 is ..

ECC 6.0 does contain all applications like

SOLUTION MANAGER , which if activated


alows B/W to work through it..

likewise other modules like APO etc..

also possible in SAP ECC 6.0

Which are otherwise not possible in SAP 4.7

iff user / consultant wants to work on B/W

HE /she should install 4.7 & b/w in diff.servers. .

> > What is the procedure to cancel the service entry sheet document posted
> > through ML81N.

go to ml81n,put the
> service entry number,it must be on the change
> mode.Revoke the acceptence and then save.
> Do the same step again after saving,then this time you candelete it.

> I am able cancel the Service entry sheet document now.


firat you want to cancell the payement to vendor and also invoice. and then
goto ml81n. goto change mode, then enter po number and service entry sheet
no. then click revoke option. then no further service can be allowed. this
indicated by red indcator in the screen.
> I am trying to post goods issue in VL02N. The warehouse is setup
under WMS.
> All movements have been completed or have a `C' status (overall
pick status,
> overall WM status and pick confirmation) . The only one that has
an `A'
> status or `Not yet processed' is the Total Goods Movement.
>
> When I try to click on `Post Goods Issue', there is an error
message: "No
> Items Were Transferred. " or message M7300. What could be the
reason behind
> this error message? Is it in the config?

> Did u check the delivery dates, one of the reason can be
delivery date status. Is the picking status "C" do check the
warehouse number in the picking status confirm is the same when you
do PGI.
>
> Revert back for further developement.

I've already checked the picking status and warehouse number. They
are both correct. I've also tried checking the delivery date and it
is also correct.

What could be the cause of the problem?

> 1.how to attach doc like(excel sheet,drawings) to


> Purchase order (PO)?
>
> 2.what is the difference between SAP4.6 & 4.7E ?
>
> 3.how can we know that Purchase requisitions are
> created.
Your basis team has to activate Object services for create transactions.
then you can go to "Create Object Services" button to add your attachements,
it can be any file from your PC.

> while making the GR for a third party PO with


> reference to PR/With out reference to PR iam facing a
> problem
>
> error is : Purchase order document 450000001 contains
> no items.
>
> i have checked vendor master, materia master,
> inforecord, sourcelist. iam not able to find the
> solution for this problem.
> can anyone help me in this regard.

> Do u have any release procedures,did u release the order.


Purchase order document 450000001 is not Release, first you release the
PO and then do MIGO.

> You can do GR for 3-rd party PO with standard


> customizing. What is your scenario exacly? You use
> 3-rd party PO for issuing directly goods to customer
> from Vendor. It means that when you create 3-rd
> party Sales Order, system generates 3-rd party PR
> authomatically. After customer received the goods
> and signed vendor delivery order, vendor will make a
> vendor invoice to us. It doesn't need doing GR from
> Vendor. Based on the vendor invoice, MM will do
> vendor invoicing (LIV) refer to 3-rd party PO.
> Also it doesn't need doing GI to customer. Based
> on the vendor invoice, SD will do customer billing
> refer to 3-rd party SO.
> If you still need GR/GI through 3-rd party PO,
> you can copy the account assignment from standard,
> and re-customizing.
> u 've to do the statitical GR in MB01.
>
> hope this 'll help u

Check the following things

1. GR indicatior has been mainatined for the PO line item


2. if PO is subjected to release stratgey .. then whtether it has been released
3. if you are working in ECC5.0 /6.0 then the plant metioned in the selection screen
should be same as in the PO

Hope this will solve your problem

is there any diference between thirparty item category tas and indvidual purchase
order item category tab from mmpoint of view if it is there what is the benifts of tab
over tas and tas over tab, this i need because i have configure this one.

> I have created a Scheduling agreement (LPA), but it is not asking for
> release? what could be the reasons??
> amit bhattacharjee
>
> Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in <nilesh_sap_ mm%40yahoo.
co.in>>
> wrote:
> Dear All,
>
> I want to round off amount after being calculated from various duties and
> taxes.
>
> Where is the option in SPRO wherein I can maintain settings for decimal
> places.
Sceduling agreement LPA is with release documentation, here you need to
maintain delivery schedules depending on your requirement ( FRC or JIT)
after you create a scheduling agreement.
> > >Can anybody tell me how to get the consolidated requirement stock i.e.
> > >reserved stock which appears when we see the stock in MMBE for any
> > >material.
>>>
> > >This reserved stock or requirement qty given net requirement qty as on
> > >date considering prod orders, sales orders.
>>>
> > >I am able to find field name ie. BDMNG & structure name -
>RMMMBESTN_DATEN
> > >which appears if see the technical information of that field.
> > >But not able to get the table name which will give the consolidated
> > >requirement for a single item in single line.
>>>
> > >Request you to help . It's urgent pl.

> >see MB52


> >Thanks for tip but it doesn't appear in MB52. I have tried changing
>layout
> >also.

>can u try list of reservation and than do a subtotal on material wise.


>MB24
>let me know if ti works

>That reservation quantity is what we have raised manually.


>Not calculated by system considering Sales order & production orders etc.

whether created manually or automatically u can see them in mb24


just have a try

> The business scenario is that all PO must be released before sending to
> vendor except a purchase group's PO. Meaning, the POs created by this
> Purchase Group do not need release.
>
> Does anyone tell me the steps of this configuration? It's urgent!
Just u did not add that purchase group to that characeristic value in
(T-Code:CT04) .

Please help me very urgent . what are different


between importpurchase order and domestic purchase order.

instead of BED it will be CVD


pricing pro. will be different
for the customs amount we havw to assign third vendour

> > >Can anybody tell me how to get the consolidated requirement stock i.e.
> > >reserved stock which appears when we see the stock in MMBE for any
> > >material.
>>>
> > >This reserved stock or requirement qty given net requirement qty as on
> > >date considering prod orders, sales orders.
>>>
> > >I am able to find field name ie. BDMNG & structure name -
>RMMMBESTN_DATEN
> > >which appears if see the technical information of that field.
> > >But not able to get the table name which will give the consolidated
> > >requirement for a single item in single line.
>>>
> > >Request you to help . It's urgent pl.

Purchase requsition does not have relise stragegie.

info, how can i create one and why it is not there,

please help me
Basic work for development of Rel. str for PR or PO

Define
characteristics CT04

Define
class and Assign characteristic to class CL02

Define
release codes SPRO

Define
release strategy SPRO

hope this wood halp u.

Purchase requsition does not have relise stragegie. info, how can i create one and
why it is not there,
go though this document. It will help to you

Setting up simple Release Procedure for Purchase Requisitions

Release Procedures (approval) can be used for Purchase Requisitions


(PR), Purchase Orders (PO), RFQ's, Outline Agreements and Service
Entry Sheets. The principle is exactly the same for all. If you can
master one, you will know them all.

Lets set up release procedures for PR for the following example:

Our company have got 2 plants: Plant 3100 (London) and plant 3600 (New
York).
For New York (plant 3100), if PR item value is between 0 - 1000
dollars, then PR needs to be released by one person (person B)
For New York (plant 3100), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
B, then person C)
For London (plant 3600), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
A, then person C).

Key terminology:
I have followed your instructions, but when i create release groups & try to save it
shows message as"PLEASE CHECK RELEASE CLASSES". Please help.

Also if i try to go ahead by copying the earlier made release groups then also i am
not able to see any PR in collective release..Please hel
delete existing entry,save it & goto new entries
Thankyou very much .Now i am able to release the PR through Collective release.

> Any one can give the details about e-Procurement please????.. .....
> What is e-Procurement and where the configuration will be done????
> Its very urgent.,.... ..

e=procurement is done on the web you procure materials through web you will
need sap SRM (SUPPLIER RELATIONSHIP MANAGEMENT)for this.
This is asked me in the Interview Yesterday

In pricing Procedure

In Caliculation Schema we r maintaining different condition types


at condition No 5 i have given Subtotal the value coming is rs.50

in total caluculation schema the price is coming Rs.500.

Now when i do MIRO What is the price is come

Options 1)Rs.500 2)Rs.50 3)Rs.550

Plz give the answer

I have given this answer

If statastical indicator we give to particular condition type no 5


it will not appear in Miro The price will come Rs.500

If we dont give Statastical indicator particular condition type no 5


the price of subtotal Rs.50 add to the final price Rs.500. the total
price will at this situation is Rs.550

can u guys explain the configuration steps of output determination (message) with
an example? i am confused with the the use of the condition technique.
will appreciate any help in this regard.
I guess you are asking for the output determination for PO.....the condition
technique is just a way to access the right document (NEU) for the right purch Org
and the right vendor....you can add more fields to the table if required.... you do that
in transaction MN04...explain where you are confused ..pls be a bit more specific....

How we can configur priceing procedure for header and items section in
PO priceing condition type configuration .

what are the conditions that you would like to configure... .like standard price,
transportation cost etc...SAP comes with most of them so you usually do not need
to create them but if you can explain your requirement a bit further, i'll try to help.
In Sub contract PO the lead time was fixed to 45 days in Info Record, but when the
weekly Open PO runs the lead time was changed to 2 days or sometimes it takes
the same day of the PO document date. Can any body help where to fix the lead
time so that it should take 45 days from the date of creation of PO always.

I want to delete 1 material.

but i want that system will propose alternate/new material if any user want to use
old material.

I am not using SD module.

We have 14 similar Company Codes spread across Europe with in a single


client instance, currently in 4.6B but migrating to mySAP ECC 6.

Each Vendor has an info record per Company Code, is it possible to


have inforecords over more than one company code? So the buyer from
Company Code A can view the Info Records for the Vendor 1 in all the
Company Codes Vendor 1 exists in?

Info records are mainatined with the follwoing key combimation

Vendor /Material/ Purchase Orgnisation


Vendor /Material/ Purchase Orgnisation/ Plant
There is no direct relacance of company code in info records. Company code is
detremined ( by the system) while doing logistic transactions based on the
orgnisation structure defined.

Hope this will give some insight to your problem. Rest the displaying the documents
(info-records) of all enterprise can be controlled via authorisation.
Yes.you can try the following:

1.Create a central purchase organisation which will do purchase for all company
codes.Assign this purchase organisation to all plants under the company codes.

2.Create vendor and Info records for above purchase organisation.

3.Now you should be able to view the info record at purchase organisation by all
the plants.

4.Try and give feed back.

Also tell the difference between 4.7 and ECC 6.0

> some of the processed material supplied by the


> subcontractor
> is rejected by our quality department. we donot
> want to send the
> material back to the vendor , but we want to
> reprocess the same at our
> end.pls help

> While taking the usage decision post the stock to


> blocked stock and not in return delivery.
>
> From blocked stock you can rework the material and
> then move it to unrestricted use.

Thankyou verymuch for your reply.


my client wants to scrap the material and reprocess
i.e(melting) in their plant. at the same time they
want the payment to vendor to be blocked by SAP System
automatically( with out manual intervention) .
could you please give me a step by step procedure
for this scenario.
I want to change material MAP .
Pls let me know the difference between transaction MR21 and MR22 .

Material Revaluations Price Changes (manual)


Logistics -> Materials Management -> Valuation -> Valuation -> Price
Determination -> Change price - MR21
Material Revaluations Debit/Credit Material
Logistics -> Materials Management -> Valuation -> Valuation -> Price
Determination -> Debit/cred. material - MR22

In MR21--> U have to enter the new price and it will hit direct change the moving
average price or standard price with refer to the material master settings.

E.g. Material No: ZZZZZZZ


Material Price: 20.00
If u use MR21 u can change the price directly in to 23 or 25 whatever u need.

In MR22--> U have to enter the amount needs to be adjusted and it will hit the
moving average price or the standard price with refer to the quantity u are having in
stock

E.g Material No: ZZZZZZ


Material Price: 0.17
Quantity: 191 Nos
Total Value : 31.57 ( 31.57/191=>0. 17)

If you enter debit or credit to this material


Assume if you want to add 100.00 to this material.

After the change ==>


Material No: ZZZZZZ
Material Price: 0.69
> Pl tell me the main use for creating the different material type.
> I mean why we create more material types.
As other people has pointed, there is several reasons why standard
material types might not meet your buisiness needs. If you need to use
a different internal/external number assignment, you might also need
to add a new material type to make it possible.

Please tell me,


Is there any provision to create 2 Bill of Materials (BOM)
for a 1 material.

For first Project Of A.C. I had creted BOM, now for Second project of AC
little change in the configuration. So i have to create another BOM without
changing the firstBOM.
Material Code for first & second AC project is same.

Please suggest me how to create Two different BOMs(Projectwise) for the same
material.

when u try to create another bom under same material name the system will
automatically ask whether to create alternative bom. give no 2 for alternative bom
and do the needful.while attaching so to bom u need to give proper altenative bom
nos
ye u can do it with Alternative BOM.

Try this and let me know it works or not

> How can we show two prices for the same material?
>
> Two prices in the sense material price before and after packaging.

> Why it is required?.If requires u have to create 2 materials one as


> Semifinished Material(Before packing) and another one as finished product.
>
> Hope it makes sence.
> Yes, you both are right but in this scenario, the packaging is done by
> third party hence to track the cost at the vendor and third party (contract
> packager) the client needs to maintain two prices.
> The material goes directly from vendor to contract packager and then comes
> to entry point of the client. the client does want to maintain two material
> codes for change in only one field.
> How do you think this can be handled?

> U can do Split valuation according to valuation category quality and keep
> valuation type 1) semifinished and 2)finished in one material master.
>
> Now when receive goods receive it in semifinished goods and then send it
> to subcontractor in the system and the receive it in finished goods.
>
> using this may be ur problem resolved.
>
> let me know how u solved this?

Still say that it is easier in long run to have two material codes, keeps
things much simpler plus much better form reporting view point. Remember
that the material will be in one plant only both semifinished and finished
val types with same code. Just imagine what your MMBE would look like. Or
MB5B?

> > Can anybody tell me which movement type we should use to transfer
> > material from unrestricted stock to Quality inspection stock

> Instead of doing transfer posting to put material from unrestricted to QI


> stock, please use the functionality to manually create inspection lot,
> that
> is a better and more systematic way of doing this.

> Thanks for ur reply


>
> but how to do this?
> Use movement 322. It will show as q1 to unrestricted, but just do it and
> you will see end result is unrestricted to q1. It is little strange but 322
> works for q1 to unrestricted.
>
> Give it a try.

Use TCODE QS01 it will let you create manual inspection lots. This will let
you transfer material from unrestricted to QI. After that when you wish to
get it to unrestricted, record the results for the inspection. using QE01 or
QE51N. Then do Usage decision to post the stock back to unrestricted.

> Hope someone can help with this issue.


>
> We currently have an invoice for purchase order "X", created in 2002,
> for company code 1234. When checking the FI documents for the MM document
> we
> have two FI documents. FI document 1 displays all the information relevant
> to purchase order "X" and FI document 2 points to purchase order "Y",
> which
> has no relation to the vendor in PO "X". FI document 2 appears in the
> vendor
> line item report for the vendor shown in PO "Y", FI document 1 does not
> appear in the vendor line item report for the vendor displayed in PO "X".
> All the purchase orders and FI documents are for 2002 and company code
> 1234.
> All documents, as you may have guessed, have been paid, with a clearing
> document.
>
> I have two questions. The first is how could this have happened and the
> second is how can this be corrected, without having to open up an FI
> period
> for 2002?
Ask your basis guys, this is possible if the client has been redone from
scratch by copying from another client, the issue that arrises here is that
the number ranges do not copy over properly. So, a new PO might be created
and its GR will have accounting document generated for it, but an earlier
accounting document will have reference to the same GR number... hence you
will see the same GR having two accounting documents.

This is one possible scenario. I hope it is not your production server.

Can somebody please let me know how a purchase order type is linked to
item and header pricing schema/procedure

doc type is noway connected to pricing procedure/cal schema.


unless and otherwise if u customize (create) condn table and linked to
access seq.

Thanks Prasanna, but my question would be then how does a the conditions
autopopulate into a purchasing req or order (or may be it doesnt). of you
could shed some light on it

Depending on vendor Schema gp in vendor Master , the pricing conditions


populated in Order .

Extracts from the SAP Document.. TCode: SHD0

Transaction variants simplify transaction flow by:

1. Inserting default values in fields


2. Changing the ready for input status of fields
3. Hiding various screen elements and menu functions, or even
entire
screens
4. Adjusting table control settings

When you create a transaction variant, you run through the transaction
in a
special mode. In this mode, you decide which elements you no longer
need in
your transaction and which values should be inserted where. If you
choose to
hide an entire screen, the system will no longer display that screen in
the
transaction and will proceed on to the next screen in the series. You
can
also adjust table control settings and determine the width of columns
and
the order in which you want them displayed. In tab strips, you can
suppress
tabs that you no longer need by setting them to invisible.

You may also create as many variants for a transaction as you desire.
One of
these variants can be defined as a standard variant. This variant is
then
valid across all clients. You may also assign different variants to
specific
users.

This is done using *Variant Transactions *Variant transactions are then


places in those users' user menus instead of the standard transaction.

Thanks..

Regards,
Chandhru.R

On 9/9/07, murali reddy <murali_sapmm@yahoo.co.in> wrote:


>
> Hi,
> If any one knows the proceedure for setting screen variants and
> transaction variants, please mail me.
> Now i need to change 'invoice party field' in MIRO to display mode.
>
>
> Thanks in advnace,
> Murali.
>
> opmazhata <opmazhata@yahoo.co.uk <opmazhata%40yahoo.co.uk>> wrote:
hie
> gurus
>
> Can someone explain to me i detail how i can use transaction and
> screen variants to restrict display of cetrain fields to users.
>
> thank you guys

> Can someone explain to me i detail how i can use transaction and
> screen variants to restrict display of cetrain fields to users.

> If any one knows the proceedure for setting screen variants and
> transaction variants, please mail me.
> Now i need to change 'invoice party field' in MIRO to display mode.

I have a question related to purchase order and asset accounting. The


issue is of putting the goods receipt to the settle an asset.The problem is
that when you enter the purchase order for say $1000, and then when you
enter the goods receipt, the goods receipt is posted to zero rather than
$1000.

Please help.
Extracts from the SAP Document.. TCode: SHD0

Transaction variants simplify transaction flow by:

1. Inserting default values in fields


2. Changing the ready for input status of fields
3. Hiding various screen elements and menu functions, or even
entire
screens
4. Adjusting table control settings

When you create a transaction variant, you run through the transaction
in a
special mode. In this mode, you decide which elements you no longer
need in
your transaction and which values should be inserted where. If you
choose to
hide an entire screen, the system will no longer display that screen in
the
transaction and will proceed on to the next screen in the series. You
can
also adjust table control settings and determine the width of columns
and
> There is requirement of our system auditor.In MIRO transaction they want "
> Invoicing party " in "details tab" to be supressesed .No body from accounts
> dept.while making invoice verification can enter another vendor in that
> field as this vendor comes frrom PO by default.
> I checked in Customisation also but unable to found this field for making
> the same to be grey means supress.
> Please help and guide me how to make this field supressed.

In spro-mm-Invocie Verification- Incoming Invoice-Aggregation -MAintain


Variants for Aggregation list.

Here u have to create r u can create as per ur client requirementl like


suppress,mandatory etc..
I hope this will sort out ur Problem.
Can you explain in details.
I am not able to do.
Please explain in step by step for customization for MIRO transaction any field to
be suppress, mandatory,optional, display if any.
It is urgent,

I have got the same requirement.


Please let me know how can I put invoing party in display mode.

I HAVE SMALL PROBLEM,PL CLARIFY. WE ARE RELEASING NUMBER OF


ORDERS FOR SPARES TO VENDORS IN VARIOUS PLACES,IN TURN
VENDOR WILL SUPPLY THROUGH STANDARD TRANSPORTS VIZ.,
KTC/ARC/KRS ETC. FOR THEM WE HAVE TO PAY AND THE SAME HAS TO
BE ADDED IN MATERIAL COST. FOR THIS I THINK INBOUND DELIERY IS A
LENGHTY AND CUMBERSOME PRCEDURE. CAN U SUGGEST ANY BEST
ALTERNATIVE?
ADD the Condition for Freght in PO itself and assign GL Code accordingly
Just remove the statistical indicator for this condition type in that pricing
procedure.Then it'll be added to the material cost.
sorry for long silence and the reason is due to some other project at office.
condition ishall i maintain as FRC2 or FRb2 as the case may be. but how i can
assign g/l a/c 'eiter it is carriage inward a/c or respective material g/l a/c pl
eloborate
MAybe you could add the delivery/freight cost with the material cost with out using
the conditions. Or you could also use the conditions header of PO and set the
freight cost. The system will distributed the cost per line item and you couls also
see in item details of PO.
Can anybody tell me about STO scenario with IMG settings
How the scenario flows. step by step
If some body help me regarding this it will very helpful for me
see for sto we can go through the mm route or sd route.
for mm route we have to create a sto and then issue the goods from the issuing
plant( it will be atransfer posting), use mvt- 351, adopt the details of the sto in the
transfer posting doc- a/c doc is created in this step.then final GR for the sto in
MIGO.HERE NO A/C DOCS ARE CREATED.it will be only a material document.

for ceating sto we can use doc type as UB or NB(with item category U).

IF U WANT THE I CAN ALSO TELL THE DETAILS OF THE SD ROUTE WITH
ALL THE REQUIRED IMG SETTINGS.

i have some issues .pl help me.

1.i want to create ONE RFQ FOR MULTIPLE PR OF SAME MATERIAL GROUP
TO SAME VENDOR?

2.IN ME5A, I WANT TO ELIMINATE THE PR FOR WHICH RFQ CREATED? OR


ANY T CODE FOR PR LIST FOR PENDING PR FPR WHICH RFQ/PO TO BE
CREATED.?

3.PO WHEN IN HOLD MODE, I WANT TO PRINT? IS IT POSSIBLE.THIS IS TO


AVOID THE MISTAKES DONE BY USER MODE AFTER PRINT AND BEFORE
RELEASE TO VENDOR,IF WE COME TO NOTICE AND WHILE
CORRECTING PO DOC.(.) CHANGED AS PO SUPPLEMENT.THE SAME THING
WE WANT IN CONTRACT ,RFE,SCH.AGREEMENT WHERE WE DONT HAVE
"HOLD" FACILTY?

4.SHORTEST PROCEDURE OF MAINTAING OF MRP IN MM01

> I want a monthly report in which MIRO and MIGO Documents no.s come.
> I want to track MIRO document no.s with the MIGO Document NO.s for
a month.
> The main purpose is to know out of how many GRNs (migo) done by
store,miro have been done by finance department.
> Can anybody have an idea of the report in which Document no.of Both
MIGO(GRN)and Miro Document comes.
> If you want migo done for the month you can track it trough mb51
there u will find the po no
> against which the gr has done, then u can track the miro done for
that gr no in me23 where u enter the po no and go the po history it
will show u the miro against gr .

> I want a one report in which it shows clearly date migo doc
no.and miro no.
> for example i will give selection like posting date-01/07/2007 to
31/07/2007 and plant
> and it will show me report date migo doc no. miro doc no.
> in this way i can track whether for particular GRN(MIGO doc no.)
MIRO DOC NO. is created or not for particular month(for example July).

Try to use MR51. This will accounting details with material document
details.

Consider pulling po report via ME80FN then switch to the PO History view.
But in this report you can view PO no.,Qty,Material Doc no.,but as per my request ,i
also need Doc no.generated at the time of MIRO.

Please check per return mail.

A simple query can bring in the information your are asking for... you can get the
information from PO history table
EKBE, if not try to join table MSEG & RSEG.

how can get the total stock of GR blocked stock


( include all part no )
which transition can i use.
please its urgently for me.

MB52

What is SAP customer number ? Where I can find this?


SAP Customer number is nothing but the customer created for that plant, Easy way
to fine customer number are go to transaction ME21n, Under Item category select
customer data and there u do have customer filed click F4, it will list you all the
customers.
I don't think your answer is correct. If you are not confident ,pl mention that also.
some time back,someone has given like this SAP Customer Number is a unique
number representing the particular customer in SAP. You can find Customer
Number (KUNNR) in the Table KNA1. Any comments from experts welcome.
I have planned to sit for SAP Examination and SAP institute requested me to
specify the SAP Customer Number. Hence, the need arised. If we go to SAP
screen, in the top line menu bar (5th icon) you could see - SYSTEM - Going inside -
12th field is Status. Inside we can see the implementation no. Please correct me,
whether implementation no refers to SAP Customer no? If not, how to access the
Customer number
SAP customer No ?Immediateis uniquereply will be
number appreciated.
which represnts customer .XD03 is
display customer transcation .in the customer field you can use fnctionkey F4
where you can different selection to find customer nimber maintained.go to SE11
and give the table name KNA1 where the feild KUNNR gives you the customer....
......... ......... ......... ......... ......... ...
Hi Gurus, may i know if i can setup batch per material group? i know
that batch can be setup at client, plant or at material level, but can
i have different batch no. or serial number per material grp?

May I know if we can setup different batch number range per material grp? What I
know is that, batch mgmt can be setup at client or plant or at material level.

What if we use serial number?

How to use "me 97" to delete PR from sap system completely?


pls send me any doc otherwise any Mass Deletion of Purchase Requisations
We will have an Z table to be used as parameter to input an WHT code at MIRO
automaticaly.
Some vendors and services must be taxed by certain codes. So we need change
the currently code at MIRO WHT screen to new one.

Could I do this thru user exit at MIRO without end user put their hands ? could I
change bases too ?

I found user exit 'EXIT_SAPLMR1M_ 004' but I'm sure if is possible do it !

> > I am getting following detlails about Error while doing IV.Pleasesuggest
> > me where i have to make change.
>>
> > Tax Code V0 country In does not exit in procedure XYZ
>>
> > Diagnosis
>>
> > You entered a tax code which is not defined for the country of the
> > company code to be posted to in the tax calculation procedure.
>>
> > Procedure
>>
> > Check and, if necessary, correct the entry.
>>
> > Procedure for System Administration
>>
> > If it is not an input error, check and possibly change the system
> > settings.
>>
> > To do this, choose Maintain entries (F5).
>>
> > Check whether the company code is assigned to the correct country and
> > whether the correct tax calculation procedure has been entered for the
>> company
goto T-COde: code country.
*FTXP* & maintain it.
> Thanks for your reply.but tax code V0 is already maintain in FTXP for
> country IN.any other possiable reason for this error.
Maintain Condition Records for the tax code and Condition type. Using
Condition information Criterias.
By Transaction code - FV11

> Kindly help me out from the problem which I am facing right now. Our co is
> going to be sold to a new company mid of the month. For a prticular co code
> , say on 15th all the activities will be closed down on behalf of the old co
> and new activity will be started from 16th on behalf of new company.
>
> Now my question is how to manage this senario with the particular MM
> period (06/2007)?
> Is there is any option to manage the senario?
> Kindly treat this very urgent.

use MMIV to initilized period and MMPV to close period.


for april 2007 use 01 2007, for may use 02 2007. But use for a full month
and u may use transactions from 16th of same month.

what is the* Message Class for Invoice verification? *

Just wanna discuss one scenario:


When we compare quotations in ME49, it gives rank list. So Procurement
dept usually going to place order (PO)
against the rank 1 vendor(who has quoted less price) .
So How the person raising PO(person who has not done price comparison)
will come to that PO should be raised against rank 1 vendor.
Because while raising PO, one will not come to that for that respective
material so and so vendor is lested as rank 1 or quoted less price?
My querry as end user persepective that, System should give error if we
raise PO against rank 2 or rank 3 vendor who has been sent
rejection letter already..... .
I am getting following detlails about Error while doing IV.Please suggest me where i
have to make change.

Tax Code V0 country In does not exit in procedure XYZ

Diagnosis

You entered a tax code which is not defined for the country of the
company code to be posted to in the tax calculation procedure.

Procedure

Check and, if necessary, correct the entry.

Procedure for System Administration

If it is not an input error, check and possibly change the system settings.

To do this, choose Maintain entries (F5).

Check whether the company code is assigned to the correct country and
whether the correct tax calculation procedure has been entered for the
company code country.

i have a question,
in PO by default Delivery address is coming from Plant Address, but i want
to maintain different Delivery Address (other than Plant Address),
where i will maintain this.
i will not enter in (PO->item details->delivery address tab), by default
system will pick automatically.
any body suggest me...
In ME22N, and tried to change the address in po-item details-delivery address,
there is one icon for address details. Just click on it and change the desirable
address.
I think it should work. Also check wth the address mentioned at header level.
At header level: your company's address will appear and at item level your vendors
address will appear. you can make changes in vendors address as per the
requirement.

In SPRO check with po header text in OMF6. where purchase order text is
The requirement is that the pricing procedure has 20+ condition types which show
up in the PO. However when the PO is printed, we want only some of these
condition types along with their description and values to be shown along with the
total value of the order. How can this be done?
Go into pricing procedure which your are using in P.O. then uncheck the print
option of all the condtions which you don't want to show in P.O. Print.

> For Import purchases, we are following the below scenatio.


>
> PR
> PO
> Custom Duty MIRO
> Clearing & Forwarding MIRO
> MIGO
> Part 2 Posting
> Vendor MIRO
>
> But In case of MIGO, Additional duty amount is also adding to material
> value, which has to debit Additional duty account during Part 2 posting.
>
> Material value will be wrong if additional duty adds during MIGO.
>
> Can anyone tell me how to change this. I dont want to add this during
> MIGO. It has to debit during Part 2 time like CVD 16% and ECess and
> SECESS.
>
> Allother excise duties are going proper GL A/c other than Additonal duty.
>
> Kindly give the path where to change this. I tried in OBYC. I have not got
> the answer.
> Kindly check the Calculation procedure using T-Code OBQ3 and check the
> account key specified.For that account key ensure automatic posting is
> configured in T-code OB40.also check the posting keys and GL code.
> Last and foremost Ensure correct calculation for the respective tax code
> using T-Code FTXP

Kindly check the Calculation procedure using T-Code OBQ3 and check the account
key specified.For that account key ensure automatic posting is configured in T-code
OB40.also check the posting keys and GL code.
Last and foremost Ensure correct calculation for the respective tax code using T-
Code FTXP
I tried in this tocdes also. all are correct. in OB40, it is showing cenvat
clearing GL A/c. No.

But In case of Import, we are using V0 tax code in purchase order.

can you please check and tell me.

> Can anyone tell me how to get a list of PO item and its condition
> types? I want to know how to set up the connection between which
table ?

Goto TRANSACTION CODE - ME2N


Scope of List type - BEST

You can use standard T,Code ME2M in layout u can select Purchase Order
Condition.
Or else use ME80FN got to last option in report and selecr PO History.

You can create a simple ABAP report by selecting the following tables EKKO - For
Header details of a P.O,
EKPO - For Item details of the P.O,
KONV - For condition types involved in the same P.O.
Kindly provide these functional specification for the ABAP report.
Futher, You can be specific on condition types by Hardcoding the condition type in
KONV-KSCHL field and checking the values from field KONV-KWERT.
we we do stock transfer within two plant of our company ith goods
movement 303 nd 305 it generates document no but when we want to see
that against which ferecence document no we did stock transfer
movement tye 305 it does not show the ref. doc. no in MB51 Where as
when we want to see the ref document no in case of goods received
against purchase order in our plant hrough movement type 103 n 105 it
shows the document no in same MB51.

this is urgent reqirement of my client plz reply me within time and


help me out for this i wanna thank u all Guru's thax in advance.

Our one of the Customer need to Archive Material & Financial Documents
since 5 years. and also need to view the archive document. Please
send me if any document to pavankulkarni03@ gmail.com. or please let
me knwo the archival Procedure ( Archiving and View ) in SAP

Is there a Transaction Code to mass delete old purchase requisations?


ME97 to archive requisitions.

In my company code FG Inventory for one Profit Centre, is showing -ve value of
Rs.82,000/- whereas if I check the Plant records, nothing is in Minus. One Plant =
One Profit Centre funda in my company code

How can it be?

Further Plantwise inventory is not at all tallying with Profit Centre.


In fact I checked the Profit Centre code for all materials in the Plant. It is 100%
Correct.

Pls tell me what could be the reason and how to resolve the issue
The requirement is that the pricing procedure has 20+ condition types which show
up in the PO. However when the PO is printed, we want only some of these
condition types along with their description and values to be shown along with the
total value of the order. How can this be done?

> I am getting following error while assigning Release Group to Release


> Class.
> Please check release classes (see long text).
> & while Click on Long Text the message is :
> Please check release classes (see long text)
> Message no. ME492
> Diagnosis
> Here you can assign release groups to release classes. Only one release
> class should be used within the release groups for overall release and
> the release groups without overall release in each case. However, in
> this instance several release classes have been used.
>
> Procedure
> Assign the release groups that were created for overall release to one
> release class only. Assign the release groups that were not created for
> overall release to a different release class.
> Example:
> Example:
> Rel. group Rel. obj. Overall rel. Class Descripti
> 01 1 _ FRG_EBAN Group 01
> 02 1 _ FRG_EBAN Group 02
> S1 1 X FRG_GF_EBAN Group S1
> S2 1 X FRG_GF_EBAN Group S2
>
delete that existing entry,save it & click on new entry.

I'm trying to set up the release strategy for PR's but somehow there
seems to be an error saying "final status of strategy not released".
When I try to simulate the release it says to check the release
statuses. I redefined everything including the release classes and the
characteristics but still it remains unsolved. Can someone help me out
You have to change the status in the release strategies become "release"
with CL24N (assign object to class) please make sure that status is
"release" on this assigmnet.

Please delete the exsisting class names which are available in the assingnement
area and then assign your group to your class. Ensure that only your group and
class should be in that screen, then save it.

Could any body tell me how I can set FIFO valuation and what are the configuration
settings?
Actually my client have a business policy to implement FIFO valuation

I have 2 questions, why do we need to Configure New document types for


Purchase Order's, Purchase Requisitions, RFQ's and Contracts.

First Questions.

In which scenarios, a consultant need to create the above new purchasing


documents,

Second Question.

In which scenario, a consultant need to create a customed movement types in


inventory management.

Please can any one tell a simple scenarion, in case of manufacturing industry.

I really appreciate ur answers.


Document types for PR , PO ... need to be created according to company
requirement. let say for a Telco a PO doc. type can be Import type or Admin type or
Standard Type , you have to create doc type acc. to ur client requirement for
different purchasing doc.

Now vis-a-vis movement type--- it is also acc. to company requirement. If ur client


needs subcontracting process which does not match standard SAP u may need to
create new one. lets say if u want to GI multiple material to subcontracting vendor
and GR one bundle product which contain muliple(3/4) items u may need to create
new movement type and others related configuration.

i am new to this field


pl can anybody explain me
transfer posting (migo) and sto ( po) means what ?
and when we can use it
pl explain in details

Kindly call me back so that i will send some good materilas on this.

9880892104

if u have good material with u please post on this blog, so that everyone can
read,kindly share your knowlege with all bcoz this is a group mail
IN TRANS. POST. ( MIGO ) WE CAN TRANSFER MATI.FROM STORE
LOCATION TO ANOTHER STORE LOCATION, VENDER.
transfer posting in migo that is individualy movement for plant to plant without
reference.sto that is also transfer posting from plant to plant via m.t 641Quoting

> I need an urgent help. How to change the screen layout of MIGO under
> the tab Account assignment. Thanks in advane

> Kindly be more specific on requirements of changes in account assignment


> on MIGO transaction
> Thabks for your prompt reply. The details scenerios are given below
>
> P.O will be created with internal order no. for say qty 1000 Kgs
> While receiving the material ( MIGO), we would like to have the facility
> to change the order no in MIGO which is under account assigbment tab.,
> Currently the order field is now uneditable.

Try this, browse through SPRO and under purchasing get account assignment
category and set account assignment changable at goods receipt option.

What is the neccessity of changing P.O no (Assuming Purchase Order and not
Production order) at the GR level.You will lose the tracability in such cases.Any
ways you can use t-code OMBW and activate the field status for ORDER (CO/PP
order) in Materials management tab .

> I'm new in SAP and start developping some reporting for my client, I
> would like to know if there is a table where we can find the link
> between SAP Material number and customer material number.

I used T VD51 to create this link between Sap material number and
customer material number.

Can anyone tell me the settings to restrict the goods issue, If goods issue qty is
greater than reservation qty( If we are using GI Againest Reservation ).

WHAT IS THE DIFFERENCE B/W POST GOODS ISSUE (PGI) AND THROUGH
DELIVERY.

> Is it possible to make one GR document of multiple PO's of same vendor.


> If
> yes, please tell me how.

> It is possible when you enter one p.o. after switch enter and enter
> another po then shown you both po item.
> I tried out the scenario and the system does not allow doing GR for 2
> vendors in the same material document. Even if you try entering the second
> PO against a different vendor from the first line system will throw an error
> as pasted below. Please refer the screen shot.

GR is a document acknowledging the receipt of one or more material from one


vendor.
The vendor send Delivery Challan or Invoice along with the material. This
document is between your
company and your vendor . Another vendor cannot be invovled in the same
Document. Legally not possible

u have to set the error message 107 to warning in SPRO. so It allows you to post.
Beware If the receiver is receiving the same material from two vendors he must be
sure of what he does.

Regarding movement type 262. We had an incident last week in which a


greater amount than that issued via movement type 261, was returned via
movement type 262. Again this week there was another mistake made
involving units of measure. The end result is that again more was returned
than was issued. It was indicated to me that Standard SAP does not
restrict quantity on movement type 262 based on 261 movement type. Is
there any way that it can be? It seems odd that SAP would allow the
creation of phantom stock without so much as a warning, whereas in other
areas it is very restrictive in what you can or cannot do. It makes
logical sense that you cannot return more than you allocated. Is there
another way or a different transaction that can be used that will ensure
this logic? I agree that we need to be careful in how we do things, but
the value of a computerized system is to control scenarios such as this.
It should at least show a warning that what you are about to do doesn't
make sense.

Please tell me what is batch input recording and what is standard batch
direct input? What is the difference between them?
Legacy Data Transfer Using Batch Input Procedure (Program RAALTD01)

When you use the batch input procedure, the system creates a batch input session
containing the legacy data, and automatically processes this session

Batch input is a method to upload mass data in batch (nightly jobs etc). Direct input
method can also be scheduled for nightly jobs(nightly means every night
regular), but they are different in uploading the data into the system

Function Modules, update stmts are used in direct input method

Batch input programs can use call transaction


Batch input method is better for handling more data load.

I need an urgent help. How to get new frieght TAB in the screen layout of MIGO
under
item level. Thanks in advane

As per your instruction ,i have made setting of release strategy for PR.But when i
have made a PR ,and gone for collective release-ME55, no PR was seen on
screen.Please suggest where i have gone wrong.
follow the points to find out the mistake if any in your procedure
1.Are you selected the correct table and fields
2.Are properly linked the class(032)
3.Given correct release indicator
4.Are you given the correct inter well in the classification in each release strategy
I think mostly you did the mistake in 4th step, so follow it. and find out me is it
working or not.
What is the trigger for your PR release? Remember, you have to assign the class,
characteristics and values via transaction "CL24N"
One of my friend have an issue pl. try to find out the solution.
Hai guys,anyone can explain me

material price differances.


client is having two products.
product 1 and product 2 differance is 1000 dollers.
ex- product 1 is 7000 dollers and prod 2 is 8000 dollars.
he purchased prod-1 after using some time he returned and taken the
second product. -cost diff. is 1000

requirement is: Instead of creating the credit memo -( taking back the
old amount and paying the new price for the new product ), they want
to adjustment between the product prices.
simply he want to pay the 1000 dollers( excessprice for the new
product-8000) to the vendor. What are the configuration settings..

I am new in this area. I had read that the field ref. for external
pur. doc. is 'F', so where is the particular set.
plz help me out.

you can maintain the field referance for external procurement F in material master
i.e. transaction code mm01, in MRP2 view for procurement.

F=external procurement
E=inhouse procurement

go to MB5T (stock in transit plant to palnt)Quoting abhijit dhage


&lt;abhijitdhage@yahoo.co.in&gt;:dear all,tell me how to genrate or see
sale in transit stock report

But I need Stock provided to vendor in a perticular time for example in the month of
August whais the value of the toal stock provided to a subcontracting vendor
ME2O
can any body tell me which report will give me the Total Stock provided to a
perticular sub-contractor in a perticular specified period
me2o & mb5b if u wanna see the subcontracting stock for a particular date. Me2o
do you know if there is any possibility to specify the posting for the transaction
ME2O? If not, could you please let me know how the posting period is
determined?
try mb5l & MBLB
we 1st do MIGO remove from storage--- others then we create document
and this is transfered to our another plant then we do MIGO -- place
in storage-- material doc.then we create this document against 1st
document.
this is 305 against 303 when we want to see against which document
no we did 305 tht is placed in storage in MB51 T-CODE reference doc.
no is not displayed in our case against which we did 305 movement
type. where i have to customize or we are doing mistake that this
ref. doc. no does not displayed in MB51where as we get the ref. doc.
no. in case of 103 n 105 movement type.

While Creating PR / PO system showing -

Items not committed to Company code 10/1000

Pl give suggestion to create PR / PO

> pl tell me the differance between


> std and mav price
> and when we have to use it and how
> if we select std price for any type of material
> and then while po it takes from material master automatically ?
> or we have to maintain ?
std=standard price.
map=moving average price
in the system of std the value of the material will not change with
the corresponde to the invoice price, in this case if the price oof
the material A is Rs20 in the material master we maintained with std
mode, after that the price of the material is increased to Rs22, the
vendor send the invoice for the amount of Rs22, O.K. in this case the
stock value of the material will not change but the amount should be
paid to the vendor and some of the account should be updated to the
difference amount. In this case the difference amount will be posted
to the price differences account.
so
the value of the material which is sent by vendor is Rs20 each unit.

In the system of MAP the value of the materal will change with the
reference to the vendor invoice price. In this case take same above
example.
The exes ting stock of the material is 100 units.
we ordered for the material 200units
the vendor sent the material and sent for the amount of 200*22=4400.
actually according to old rate it should be 4000 only
we posted the invoice for the material,
in this case there is no price difference account, only gl a/c which
is
Stdassigned to the
price is the movement
fixed typeas
price where i.e.Map
stock a/c
is variable.
We can use Std price for material type :Finished,semi finished and Mav price
used for material type:Rawmaterial

But I need Stock provided to vendor in a perticular time for example in the month of
August whais the value of the toal stock provided to a subcontracting vendor

> Insted of extending the one material to 1500 plant, i did it


> for 1550 so how can i revoke the wrongly extended material from Plant
> 1500. Please Suggest me.......... .

One's extending the material in one plant you can not revoke that extension.
But if you does not want this extension no more then you can set the
deletion flag for this material,plant and storage location.
I wanted to create stroage location; also i want to maintain description and address
of storage loc in two different
Language (Eg German and English)

Can anyone help me out on how to track the pending invoices to be booked in
MIRO , after 103 movement(GR) and 105 movement(release blocked stock) have
been made?Is there any specific T.Code??
Please try Transaction MB5S. You will get what you want.
If I need to view pending invoice for PO that NON GR-based whereby the GR is not
need to be done for example service, where should I go?
That you can do by running transaction ME2S.
Also try FLB1N
MC$G - Purchasing values Material & MC$I - Purchasing Quantities Material

Is the User Exit Will be Applicable for the Excise Related Transactions in STO
Process. Suggest Me Guys.....

I want to make default baseline date by the system in T-code Miro ( In Payment
Tab).it calculate base line date automatic.what is the procedure & i want to free for
payment option as default in place of block to payment in T-code Miro.

CAN ANYONE HELP ME OUT BY LETTING ME KNOW THE DIFFERENCE


BETWEEN
MATERIAL REQUIREMENT PLANNING(MRP) AND STOCK REQUIREMENT
PLANNING(SRP) ?
> > I have a problem when I try to create Good receipt in MIGO. The
system
> > give me an error message saying that
>>
> > "Maintain tolerance limits for tolerance key VP (CoCode...)"
>>
> > I go to transaction OMC0 to add new entry for tolerance key VP in
my
> > company code however I am not sure what should be the tolerance
limit so
> > I use "do not check" for both lower limit and upper limit.
>>
> > When I try MIGO again, I am still get the same error
>>
> > Does anyone know what should be the cause of this problem?

> try t code omr6 and set tolerance limit for VP


I have already had an entry for my company code in the table of
transaction OMR6 and it was set to "Do not Check" the tolerance limits

Then I tried to executed MIGO again and for unknown reason it works.

STO involves physical movement of goods , updates stocks has financial


implications. .

TRANSFER POSTING is only logical moment , no physical movement of goods ,


so no financial implicatins
This is nothing but..

LOGISTICS covers almost all modules of SAP..like production planning ,


material management , sales distribution,
finance and accounting , human resources etc....

whereas SUPPLY CHAIN MANAGEMENT follows a cycle like right from


procuring the raw material to finished good

it shall incorporate mainly three four modules like Production planning . ,


material management , sales and distribution etc..

it has huge requirement when compare to individual modules of SAP..

Thank you for your help. But still I am facing problem. Yes I am
sending raw material. I maintained sales view in my material master
1421 and I am sending material from plant 1000 to plant 1100. Both the
plants are under same company code 1000. I maintained the Sales-org.
1000, distribution Channel.10. I am confused for which plant I have to
maintain shipping data(supplying or receiving plant). How I will fill
up the field Customer no. Plant in the screen for shipping data for
plant config.(screen shot attached). What config I have to do in the
material master? Please explain me in details with screen shot. Here I
am not doning STOCK TRANSFER ORDER with SD and billing. Then who is the
customer? In my conception Plant 1100 is the customer. Please explain
me in details. I know u guys r very knowledgeable. Please help.
Thank you in advance for your help. I will be eagerly waiting for your

Maintain sales organisation( shipping data) view to the supplying plant (ensure the
plant code of supplying plant is entered in delivering plant field in sales org. view.)
of material master and purchasing view to the recieving plant of the material
master.Create the customer code for recieving plantand vendor code to the
supplying plant.Ensure maintanance of material master data in both the
organisations at plant level. These data will enhance a smooth flow to the STO.
MB1A Goods Issue. I would like to restrict Goods Issue to only
reference Purchase order or Reservation how do i do it.

use FSRK (field ref selection key) in back end to control the fieds
you can use issue the mati with referance of reservation no
in migo you creat reservation with the help of production order
creat a prod order in transition co01 and creat reservation in trnisition zppres1
and issue mati. MIGO TRANSFER POSTING RESERVATION NO

> Anybody can tell me where i can find informations (maybe period by
> period)> about Moving Average Price changes for an article?
> I know that i could re-calculate the Moving Average Price after each
> stock movement but it's a bit tricky!
> The fact is that the Mov. Average Price for an article is incredibly
> high, but as the article documents are regularly archived, i've got
> no view of what can have happened to explain that.
> We have not Material Ledger implemented

MR21 T.CODE CHANGE YOUR Moving Average Price changes

can any one explain me


the differance between
logistic / supply chain / procurment / materials management
i am very new to this field

one of our clint as a requerment of release procedure for delivery schdule created
manualy kindly give your comment .

plz tell me how to insert a field in mb51.

example : i have to insert material group field in mb51.how it is


inserted.
Try following steps.
Configuration Menu>MM>Inventory Mgt.>Reporting> Define field selection for
material document list.

Here you can activate the field what you want from available field.

While doing MIGO against PO for Non-codified materials ( No material


code and account assignment - F in P.O ), Excise Tab pop up is coming,
even though there is no excise related master data maintained in J1ID.
It should not come in MIGO.

I am using ECC 6.0.

Can any one suggest the solution.

After making PO for free of charge , in GR (MIGO) mvt is 101 but not 511 .
how activate the mvt for free goods ?

In Puchase order at Item details, in invoice column if you remove the tick from
"Invoice receipt". Then goods will be delivered at free of cost. Also see the avilable
help for this indicator.
> I want to make Businness Area filed in Details tab of MIRO Screen
as
> Mandatory.
>
> Can you please tel me the path and how to make mandatory.

MIRO screen Workout for many Mov.Type So based on what


mov.Type you are in need to do ?

Who can tell me the the deference between the condition types, YA00 and
RA00, in details? with an example?
Pl tell me the main use for creating the different material type.
I mean why we create more material types.

It depends on your Industry Rqmt. why you create many material types
such as the maintenance of required views/fields in customizing,
Abap programming rqmts, etc.

As other people has pointed, there is several reasons why standard


material types might not meet your buisiness needs. If you need to use
a different internal/external number assignment, you might also need
to add a new material type to make it possible.

we create many material type as each material type has different charatcterstics ,
each material type have different sreen .
such as finished with have only sales data and no purchasing data .
similarly each material type will have different valuation class to valuate material

It's related with your business process, we can make I different approach
for instance between the our stock materials type with the stock
consignments materials.

How many stock transfer process are avaikable in SAP?


Like 1)Two step stock transfer (MM/SD) .
2)Two steap stock transfer ( MM only) Move type 303& 305.
3 One step stock transfer Move type 301.

is there any other stock transfer is availbel ? if yes then let us


know in details ( movment types ).
Stock transfers

Without STO
One step stock transfer Move type 301.
Two step stock transfer ( MM only) Move type 303& 305.

using STO with out delivery:


doc.type: UB
GI:351, GR:101

STO with delivery:


GI:641, GR:101
delivery type:NL

STO with delivery and billing:


GI:643, GR:101
delivery type:NLCC ,billing type:IV

Can anybody tell me what does it mean by Release Strategy?


Release strategy is "a condition" to release something it can be PR
(Purchase Requisition or Purchase Order), the condition can be amounts,
items code, etc
For my client, Make to order is the general process

ther is an order from the customer for finished goods material say, Zink
tank with some specifications and size, it is ok PR will be automatically
rised by MRP.
He is regular customer.So,
If the same customer required the same finished goods material with
different specifications and size but same process and working
principle.Here our client needs the same material code
repeatedly.Becausee very time when we get the order, creation of new
material code is
difficult task and there should be the existing material code for MRP. Here
how the system will pick the same material code with different
specifications and size.

Is it possible to attend this scenario, is there way to follow.

try configurable BOM for your process.


Can you explain the required steps for configurable BOM

Is there a way I can impose security on a material type for a group of


users via Tcode: MM01 and MM02.
I'm trying to restrict access to material master records for certain
material types to a particular group of users.

If you have created roles for the users, then the role with the material master
authorization should have a line that says material types. This is where you indicate
whether they should have authorization or not.

> I am a student currently taking a course in SAP MM and most of it


self
> learning. I have come across a problem where when i create a PO
for a
> particular item i get the error message "material not maintained by
> purchasing" I have gone into the material master for the item but i
> cannot figure out which field is causing this error message.
> For that particular material, in that particular plant, Purchasing
view to be maintained in material master.
> Do this and try again.
> Plz Let me know the status.

Thanks Mahesh, it worked. Can you please give me an example of an NLAG


material. I would like to create one in Material Master as a practice exercise.

we r facing a problem in service entry sheet preparation in that,if we a


have a service PO for two or three line items and if we create entry sheet
it is taking only one line item and giving the error message. please suggest
on this issue.its urgent.

msg no SE364.

SES can only be created for 1 po line item.


As per SAP standard scope of supply /design, it is possible to book a service entry
sheet for single PO line item. There are 2 ways to resolve your issue. 1 --- you
create a single PO line item with all datails as "Service Line items" 2 --- Make
use of "Model Service Specifications" functionality
Could you please explain me,how to create Model service specifications and use?
Can u eloborate the error message.
If in case, you have more than one item, you need to check the appropriate line
item in the list menu just below the P.O. No. (Right hand side - Document overview)
Choose the appropriate line no. and enter the service quantity. Each line item has
separate service entry in a SErvice Entry Sheet.

During implementation we did not use solution manager.How we can track which
data we have maintained / implemented in reference IMG.

do for t.code QS11, it will help u


How many stock transfer process are avaikable in SAP?
Like 1)Two step stock transfer (MM/SD) .
2)Two steap stock transfer ( MM only) Move type 303& 305.
3 One step stock transfer Move type 301.

is there any other stock transfer is availbel ? if yes then let us


know in details ( movment types ).

> plzz help in CIN configuration. I have idea of J1IT and J1ID but what
> do do further i am not getting. someone plzz gt me full step

> Can anybody tell me which movement type we should use to transfer
> material from unrestricted stock to Quality inspection stock

Instead of doing transfer posting to put material from unrestricted to QI


stock, please use the functionality to manually create inspection lot, that
is a better and more systematic way of doing this.

but how to do this?


Use movement 322. It will show as q1 to unrestricted, but just do it and you will see
end result is unrestricted to q1. It is little strange but 322 works for q1 to
unrestricted.
I want to round off amount after being calculated from various duties and taxes.

Where is the option in SPRO wherein I can maintain settings for decimal places.

Never , Never touch SPRO settings for decimal places( for any currency ) once it is
set during Implementation. It will change the entire accounting records of that
currency and your financial data goes for toss. Beware ...! don't even try this aspect
in the quality /development server as these settings are cross client and will impact
all ( ncluding the production client )

however , you may try the help of ABAP to write a special report where in the
decimal places are rounded off for the duties and other parameters. This ( change
of decimal places )can be done at report level and should not be tried for
transaction ( all though it is possible )
I have created a Scheduling agreement (LPA), but it is not asking for release? what
could be the reasons??

I want to know the answers for these questions?

1. What is the difference between customization


request and work bench request?
2. For release procedure , after trasportation of
request , what are not transported in to production
server?
3. Can we make External number arrangement type in
Alpha numerical for vendor master record? if so, How?

Here i have a question about alternative BOM. I have created two BOMs
for one material now when i am creating a PO for subcontracting and i
am exploding BOM it is picking up 1st BOM. I want to know how to pick
up 2nd BOM while creating PO?

> Can anybody tell me which movement type we should use to transfer
> material from unrestricted stock to Quality inspection stock

Instead of doing transfer posting to put material from unrestricted to QI


stock, please use the functionality to manually create inspection lot, that
is a better and more systematic way of doing this.

but how to do this?


> > I have a problem in posting GR in the current period and it is giving
> > me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> > company code 1000 ' then i have tried to close all these period using
> > Tcode MMPV but i couldn't close these posting period and i am getting
> > message 'the specified year 2005 is not the calender year'.
> > Again i can do posting in 2005/08 period but can not do posting in the
> > current date.

> 1.check fiscal year variant at company code level whether it is K4 or V3,
> and also check at maintain co.code for Material management.
>
> 2. again check usingT.code MMPV , until which date postings were closed,if
> it is showing current 2005/08, previous 2005/07 then we have to close all
> posting periods till 2007/08 in case of k4 fiscal year variant. 2007/05 in
> case of v3 fiscal year variant by using T.code MMRV

Try using MMPV


In that u need to close time period every month from 2005 to 2007
If there are 24 months
u need to change 24 times

> Firstly you have to create 4 material types for each one..and each
> material
> type will allow to configure
>
> Quantity updates/No Quantity updates
> Value Updates/No value updates
>
> Over there u can configure as per your requirement. Let me know how it
> works?

I can understand but let me know what are the effects of GR and IR after
considering these.Can you explain me in detail.
Re-updating info structure s031, s032

I have changed the movement type 311 for Statistically relev. 3


(Standard analyses only (update)) to blank for no updating.

With this changes I now want to re-update the info structure s031 &
s032 for all material document posted till date with change effect of
movement type 311 changes. ( i.e. I dont want the statistically update of
311 movement. How can this possible ? pl guide me.

i am facing following problem.

I had prepare PO of excisable material for which specific rate for BED is maintained
in j1id. Also in tax code, jm01 is 100 %. In PO, condition type jm01 shows right
amount.
While capturing excise invoice j1iex with ref. to PO, specific rate of BED is right in
duty rate tab but in duty value tab, total duty of BED gets double which should not
happen.
Please give me reply as matter is most urgent.

Parag
+++++++++++
Dear All,
In PO, when we tick the GR BASED IV then in purchase order history we
can see the GR/IR ASSGT in Change View.
Where is the setting to see the GR/IR ASSGT without enabling the mark in
GR BASED IV.(is it possible?)
Where are the settings in spro for maintaining the Drop down for Change
view in purchase order history?

Pls. comment.
Regards,
Sachin Kokare
++++++++++++++++++

Dear All,
Can anybody tell me the logic behind the t.code MC46 for slow moving
items.
Various loopholes I found while analyzing the output of MC46.

A. At present MC46 gives that report but following is not


considering by system:

1.It ignore 281 movement, means any item is moved through 281, it only
consider 261 movement.
2.It ignore 201 movement.
3.It ignore 601 movement
4.it ignore 641 movement
5.It ignore 351 movement

B.MC46 report considers following movement which it should not be

1.311 movement , location to location transfer ( Means if any item is


Slow moving but it is moved during 365 days from one location to other,
system do not pick up as Non moving.

2.if any material do not have opening stock and there is purchase within
365 days and not issue through 261 takes place, mc46 shows as Non moving
which is incorrect.

Pls. comment on this.


Regards,
Sachin Kokare
++++++++++++++
Hi
Did you get any solution on this.

I am also stuck up with the same scenario

On 1/22/07, susheeliitr <susheeliitr@ yahoo.com> wrote:


>
> Hi gurus
> there is one scenario.
> our client takes mat from trader not from main vendor .
> trader takes mat from main vendor and sends us.
> suppose main vendor sells trader in 100Rs and 16% BED so he pays vendor
> 116Rs.
> trader sells client in suppose in 150 rs and 4 % sales tax so client
> pays him 156 rs. all these r fine.
> when we go for migo, base value for BED should be 100 rs not 156 i.e
> only 16 rs should go in cenvat account. if i do it manually then who
> 156 will go in GR/IR account. i want 140 should come from GR/IR account
> and rest 16 should come from cenvat account to pay 156 to vendor.
> i did setting vendor master date cin tab page and define trader but not
> working.
> plz tell me. it is very urgen.
> bye
+++++++++++==
Hi Sam

Did you get the solution,can you let me know it as well

On 7/11/07, Guru Ji <sapji.guru@gmail. com> wrote:


>
> Scenario is as follows:
>
> (Rate unknown) Manufacture( nirma)
>
> Rate Known Dealer(jain acid
> PO
>
> (Rate, Amount Qty is mentioned and remarks provided for provision Excise
> Duty
>
> Continue
>
> GRN
>
> continue
>
> Invoice
>
> (Tax Invoice + Duplicate for Transporter Copy)
>
> Dealer Manufacture
>
> For provision of Excise Duty
>
> For Payment
>
> 1)PO to dealer
>
> 2)GRN dealer
>
> 3)tax invoice from dealer is the total bill only, it does not contain
> duty.
>
> 4) but modvat benefit is taken on manufacturer' s duplicate copy.
>
> Plz tell how to map this scenario in SAP
> It's very urgent
>
> Thanks
>
> Sam
>
++++++++++++++++
want your advice on following issue.

I have typical scenario of dealer who passes on cenvat which he has received
from main manufacturer.

say 100 is the base price of the material and he is going to pass us the
excise of say Rs 10.I need to pay Vendor only Rs 100 but still need to get
cenvat of Rs 10.
I used condition jexc of manual excise but the problem in that case is gr
is prepared at goods receipt at Rs 100.But since we are availing the cenvat
of Rs 10 the GR/IR should be at Rs 90 only.

Can you let me know how do you solve the issue?

Regards
+++++++++++
hi Nilesh,
you can release the pr at item level also. pl follow the doccument
Setting up simple Release Procedure for Purchase Requisitions

Release Procedures (approval) can be used for Purchase Requisitions


(PR), Purchase Orders (PO), RFQ's, Outline Agreements and Service
Entry Sheets. The principle is exactly the same for all. If you can
master one, you will know them all.

Lets set up release procedures for PR for the following example:

Our company have got 2 plants: Plant 3100 (London) and plant 3600 (New
York).
For New York (plant 3100), if PR item value is between 0 - 1000
dollars, then PR needs to be released by one person (person B)
For New York (plant 3100), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
B, then person C)
For London (plant 3600), if PR item value is bigger than 1000
dollars, then PR needs to be released by two people (first by person
A, then person C).

Key terminology:
Release Codes - The different levels that the approval will go through.
Release Groups - Grouping of strategies.
Release Strategy - Unique, set of condition, sequence and levels of
releases. Every line in diagram is a Strategy (so we have 3).
Release Indicator / Status - The status of PR as it moves through
the strategy. Example 'Block' (can't create PO yet) or 'Final Release'
(can create PO from PR)
Here is a summary of the steps to follow to set up our example:
Create Characteristics & link to comm. structure (CEBAN for PR)
Create Class & link to characteristic
Create Release Groups & link to class
Create Release Codes
Release Indicator
Set up strategies
- Strategies & Codes
- Pre requirements
- Status
- Assign values for strategies
Set overall / item for doc type (PR only)
Create and allocate authorization profiles
------------ --- DETAILS OF SETTING IT UP ------------ ---

Create Characteristics & link to communication structure (CEBAN for PR)

Here we define which fields are used to determine the strategy that
will kick in. In our case we used 'Plant' and 'Item value'. Not all
fields in the PR can be used. For a full list of fields that can be
used to determine the release strategy, see tcode se12 table CEBAN.

So the two fields that will be used is:

Field CEBAN-WERKS for Plant


Field CEBAN-GSWRT for Item Value

We need to create a characteristic for every field. Tcode CT04


Any characteristic name can be used. Keep something descriptive to
avoid confusion.

For Item Value -- lets create characteristic Z_GSWRT

First go to Additional Data tab and enter the table/field (and Enter)

Enter currency to be used in the Basic data tab.


Also select multiple values and Intervals allowed
The Intervals allowed will allow us to assign a range of values,
example: If PR value is 0 - 1000 USD .....

Save the characteristic

For Plant -- characteristic Z_WERKS


Again, the table/field name in Additional Data to enter table/field

Again set multiple values and save the characteristic


The multiple values is to assign more than one plant to strategy,
example: If PR for plant 3100 and plant 3600 is ...

Create Class & link to characteristic

Create a class (simply to group the characteristics) . Again any name


can be used. Tcode CL01 -- Create Class. The Class Type must be 032.

Configure Release Procedures

Above actions was all master data. We now need to do some


configuration. Menu: IMG > Materials Management > Purchasing >
Purchase Requisition > Release Procedure > Procedure with
classification > Set up procedure -- (tcode OMGQ in older SAP versions)

Create Release Groups & link to class

We have two groups to create AA and AB. We need to indicate the class
we are working with, in out case Z_PR.

Create Release Codes

Create all the release code / group combinations. This is all the dots
in diagram above. So we have 4.

Later on, authorization profiles will be linked to these code / group


combinations.

Release Indicator

First we create the different statuses that the PR can be in


throughout it lifecycle. Later on (below), we will be linking using
these statuses. Here are the standard SAP indicators; we probably
wouldn't need to add any.

We will be using two of these -- X (Block) and 2 (Released)

Under the Details section, you can indicate which documents can be
created from this PR. For Indicator 2, one can create PO's and RFQ's.

With Field Selection you can define which fields can be changed. This
is the same indicator that gets used with document type configuration
to make some fields read only, mandatory, hidden.

Set up strategies - Strategy & Codes

Every line in our diagram above is a strategy. So We have three


Lets call them:
Group AA / Strategy S1 -- Code L1 (for plant 0001)
Group AA / Strategy S2 -- Code L1 & L2 (for plant 0001)
Group AA / Strategy S2 -- Code L1 & L2 (for plant 0002)

Here are the settings for AA / S2

Set up strategies - Prerequisites

Fir every strategy, we need to define a release prerequisites. This


indicates if one code needs to take place before the other. In this
case, level 2 (L2) can only take place if level 1 (L1) has been released.

Set up strategies - Status

this is also done for every strategy. The screen is dependant on what
groups were linked to the strategy as well as prerequisites that was
set up. In this example:

- if nobody releases it then PR is block.


- if L1 release the PR, the PR is still blocked
- if L1 and L2 release the PR, the PR can be converted to RFQ/PO

Out of interest, the reason why there is not a L2 only option is


because of the setting in the prerequisites.

Set up strategies - Values for strategies

The values linked to strategies are master data (not configuration)


and can be set in two places. Either within the configuration itself
-- selecting the classification button

Or, in classification, example CL24N

Both methods work, the advantage of CL24N is that all the strategies
can be viewed easier.

Set overall / item for doc type (PR only)

For Purchase Requisitions, there is an option to release either on


item level or on document level. For PO / RFQ / Contracts, one can
only release on header level. Back to the PR, it is highly recommended
to use item release. This can be done in two places.

Firstly where the groups were created

On the document type configuration for PR


Config menu: Materials Management > Purchasing > PR > Define document
types

Create and allocate authorization profiles

In our example we will have three people releasing, so three profiles


will need to be created. Authorization profiles can be created using
tcode PFCG.

Usages of PFCG are not being discussed here, but see below for
relevant screen where the profile was created.

------------ --- USING RELEASE PROCEDURES ------------ ---

Create a Purchase Requisition

Lets create a PR, and see if the release procedure kicks in. In our
case we will create it for plant 3600 and any value. So we will expect
Strategy AB / S2 to kick in.

Create PR -- me51n

If no 'Release strategy' tab, then it didn't work. In this case all is


fine. The user can see the Release Group (AB), Strategy (S2) and
release indicator (X).

(SAVE)

Release a Purchase Requisition

Releasing can be done per PR or collective. Lets' use the collective


release. SAP Menu: Logistics > Material Management > Purchasing >
Purchasing Requisition > Release > Collective Release -- ME55

Select all the items to be released and then hit Save. You will see
the status of the item change to the next Release Indicator.

This is the absolute basics of setting up Release Procedures for


Purchase Requisitions. For more posts on Release Procedures, see index
of posts.

SAP version used for this post: SAP ECC (ERP Central Component) 5.0

You can discuss this article here.

Last edited by SAPman : 3 Weeks Ago at 01:24 PM.

-- In sapmaterialsmanagem ent@yahoogroups. com, "nazim husain"


<nazsan_2002@ ...> wrote:
>
> u have to configure item wise relase for pr
>
>
> >From: Nilesh Deshmukh <nilesh_sap_ mm@...>
> >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> >To: SAP MM <sapmaterialsmanagem ent@yahoogroups. com>
> >Subject: [sap mm] PR Release
> >Date: Fri, 17 Aug 2007 06:28:49 +0100 (BST)
>>
> >Dear All,
>>
> > I have created a PR for 10 materials out of which I want to
release 5
> >materials only.
>>
> > Is there any provision in SAP wherein I can release individual
materials
> >only instead of whole PR.
>>
> > Regards,
>>
> > Nil
>>
++++++++++++++
you have to do the customization for release of PR at item level. Then you
will be able to release the PR item wise.

Thanks

On 17/08/07, Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in> wrote:


>
> Dear All,
>
> I have created a PR for 10 materials out of which I want to release 5
> materials only.
>
> Is there any provision in SAP wherein I can release individual materials
> only instead of whole PR.
>
> Regards,
>
> Nil
++++++++++

u can use ctrl y and than ctrl x


and than copy from excel Ctrl C and than paste in mass ctrl v

>From: sabri fidan <sabri_fidan@ yahoo.com>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] mass maintance interface
>Date: Fri, 17 Aug 2007 01:46:20 -0700 (PDT)
>
>Dear All,
>In mass maintance interface is there a button like "upload from clipboard"
>or any way to paste more then 17 items. I cant do it with " carry out mass
>change button" because all items have different values.
>Regards,
>
>sabri
>
+++++++++++++

Instead of doing transfer posting to put material from unrestricted to QI


stock, please use the functionality to manually create inspection lot, that
is a better and more systematic way of doing this.

regards

On 8/16/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:


>
> hi
> Can anybody tell me which movement type we should use to transfer
> material from unrestricted stock to Quality inspection stock
>
> Thanks
>
> prashan
++++++++++++++++
Dear All,
In mass maintance interface is there a button like "upload from clipboard" or any
way to paste more then 17 items. I cant do it with " carry out mass change button"
because all items have different values.
Regards,
sabri
+++++++++++

Specify conditions in purchasing in Material master & info record.

Nonkonzo Pato <npato@scaw.co. za>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
17/08/2007 12:20 PM
Please respond to
sapmaterialsmanagem ent@yahoogroups. com

To
sapmaterialsmanagem ent@yahoogroups. com
cc

Subject
[sap mm] Tax code - urgent

Hi guys,

Can anybody tell me how to make tax code to appear automatically when
creating a PO on a certain order type

Thanks in advance

NP
++++++++++++++
Try ME54N

Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
17/08/2007 10:58 AM
Please respond to
sapmaterialsmanagem ent@yahoogroups. com

To
SAP MM <sapmaterialsmanagem ent@yahoogroups. com>
cc

Subject
[sap mm] PR Release

Dear All,

I have created a PR for 10 materials out of which I want to release 5


materials only.

Is there any provision in SAP wherein I can release individual materials


only instead of whole PR.

Regards,

Nil
+++++++++++++
Hi,
Firstly you have to create 4 material types for each one..and each material
type will allow to configure

Quantity updates/No Quantity updates


Value Updates/No value updates

Over there u can configure as per your requirement. Let me know how it works?

Cheers!
--
With Cheers From:
M.K Thamarai Kannan
+++++++++++++++
Hi Vijay,
Best way to handle this is maintain two material code
as you have stock of unpacked material and packed
goods also.
tracability is easier when you have two seperate
material codes

Thanks

Samraj

--- vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


> Hemanth / Samraj,
>
> Yes, you both are right but in this scenario, the
> packaging is done by third party hence to track the
> cost at the vendor and third party (contract
> packager) the client needs to maintain two prices.
> The material goes directly from vendor to contract
> packager and then comes to entry point of the
> client. the client does want to maintain two
> material codes for change in only one field.
> How do you think this can be handled?
>
> Thanks & Regards
> Vijay
>
>
>
> ----- Original Message ----
> From: hemanth kumar reddy
> <hemanthkumar96@ yahoo.co. in>
> To: sapmaterialsmanagem ent@yahoogroups. com
> Sent: Wednesday, 15 August, 2007 11:25:47 PM
> Subject: Re: [sap mm] two prices for one material--
> Urgent
>
> Hi
>
> Why it is required?.If requires u have to create 2
> materials one as Semifinished Material(Before
> packing) and another one as finished product.
>
> Hope it makes sence.
>
> Thanks
>
>
> vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
> Hi
>
> How can we show two prices for the same material?
>
> Two prices in the sense material price before and
> after packaging.
>
> Thanks & Regards
> Vijay
+++++++++++++

Dear All,

I have created a PR for 10 materials out of which I want to release 5 materials only.

Is there any provision in SAP wherein I can release individual materials only
instead of whole PR.

Regards,

Nil
+++++++++++
Hello gurus,
plzz help in CIN configuration. I have idea of J1IT and J1ID but what
do do further i am not getting. someone plzz gt me full step
thanks in advance
sameer
+++++++++
there can be a practice maintained to check ME5A every morning for open
requisitions

>From: mohammed quraishi <ms_quraishi@ yahoo.co. in>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] Purchase request
>Date: Thu, 16 Aug 2007 16:55:11 +0100 (BST)
>
>Hi friends,
>
>I have an important question,
>
>The purchase request created by PP For raw mateials &
>SD for finished goods to MM for purchase,
>My question is:
>How and where does this gets reflected in MM, how will
>the MM come to know that a Purchase request has been
>raised by PP or SD.
>Kindly look into this iam very confused.
>
>Thanx

+++++++++++++
Hi Dost,
For that purchase request have you tried Trans code md04.
if no then try that eventhough you r not satisfied I will suggest u more further.

Bye

mohammed quraishi <ms_quraishi@ yahoo.co. in> wrote:


Hi friends,

I have an important question,

The purchase request created by PP For raw mateials &


SD for finished goods to MM for purchase,
My question is:
How and where does this gets reflected in MM, how will
the MM come to know that a Purchase request has been
raised by PP or SD.
Kindly look into this iam very confused.

Thanx
++++++++++
hi

U can do Split valuation according to valuation category quality and keep valuation
type 1) semifinished and 2)finished in one material master.

Now when receive goods receive it in semifinished goods and then send it to
subcontractor in the system and the receive it in finished goods.

using this may be ur problem resolved.


let me know how u solved this?

Thanks
Bye
vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
Hemanth / Samraj,

Yes, you both are right but in this scenario, the packaging is done by third party
hence to track the cost at the vendor and third party (contract packager) the client
needs
The to maintain
material goes two prices.
directly from vendor to contract packager and then comes to
entry point of the client. the client does want to maintain two material codes for
change
How do in only
you onethis
think field.
can be handled?

Thanks & Regards


Vijay

----- Original Message ----


From: hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, 15 August, 2007 11:25:47 PM
Subject: Re: [sap mm] two prices for one material-- Urgent

Hi

Why it is required?.If requires u have to create 2 materials one as Semifinished


Material(Before packing) and another one as finished product.

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
++++++++++
hi

ya, it shpuld reflect 1.25 in material master of material B bechause system updates
stock account for semifinished product = OP(order price) +VP (valuation price raw
material material A in ur case)

Prashant

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi All,

What happens when GR is made against a subcontracting PO.?


I mean is the total value of the material changes?
for example if a material A is sent for subcontracting for painting and returns as
material
the valueB.of material A is $1.00 and after painting the value is added by $ 0.25 and
total value of material B is $1.25. Now if I make GR against sub-contracting PO will
the material master get updated to $1.25.

Any inputs will be appreciated.

Thanks & Regards


Vijay
+++++++++++++++
Hi Guys

Purchase Order is that delivery is not being


processed (status is A) but customer is saying, that
is delivery is processed.

What should I do? can any one help me ASAP

Thanks

Sabbir
+++++++++++
Hello all,

I want to know if it is possible to automatically receive in


returnable packaging with a packaging instruction? We use inbound
deliveries for incoming raw material and we use rf scanners to receive
the material in. i want to setup a packaging instruction for each
incoming material so that when we receive in the components, the
corresponding returnable packaging is also received into inventory
based on the packaging instruction. Is this possible?

thanks in advance for any help,


gabe
+++++++++++
Hi friends,

I have an important question,

The purchase request created by PP For raw mateials &


SD for finished goods to MM for purchase,
My question is:
How and where does this gets reflected in MM, how will
the MM come to know that a Purchase request has been
raised by PP or SD.
Kindly look into this iam very confused.

Thanx

++++++++++

Hi...SAP MM Gurus,

Plz can anybody explain the functionality of MEI7...T.code. .

Thanks in advance...

Best regards..
avinash.
+++++++++++++

go to SPRO---MM--- -Purchasing- ----PO--- -- screen layout for PO then select


Me21 and excute,find the field delivery completed indicator, i think it was hide so
set this one either optional or required or display wht ever u want
LAURO LAGMAN <mochee07@yahoo. com> wrote:
Hi Sha,
try checking your settings in t-code S_ALR_87000332 for the Automatic
delivery control indicator

Cheers,

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 6:15:38 AM
Subject: [sap mm] P.O Order from shah

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please.

Thanks

Shah
+++++++++++++++++++
1.check fiscal year variant at company code level whether it is K4 or V3, and also
check at maintain co.code for Material management.

2. again check usingT.code MMPV , until which date postings were closed,if it is
showing current 2005/08, previous 2005/07 then we have to close all posting
periods till 2007/08 in case of k4 fiscal year variant. 2007/05 in case of v3 fiscal
year variant by using T.code MMRV

Prashant Hazariwala <hazariwalapu@ yahoo.com> wrote:


MMBE IS FOR STOCK OVERVIEW

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Try using the TCODE mmbe
On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:
>
> hi,
> I have a problem in posting GR in the current period and it is giving
> me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> company code 1000 ' then i have tried to close all these period using
> Tcode MMPV but i couldn't close these posting period and i am getting
> message 'the specified year 2005 is not the calender year'.
> Again i can do posting in 2005/08 period but can not do posting in the
> current date.
>
> Can anybody help me on this?
>
> Prashant
>
>
>

[Non-text portions of this message have been removed]

------------ --------- --------- ---


Choose the right car based on your needs. Check out Yahoo! Autos new Car
Finder tool.
[Non-text portions of this message have been removed]

venkat
9.1929E+11
++++++++++++++

You will try J1ID and go to Customer Excise details, maintain and save,

Regards

Diwakar

_____

From: sapmaterialsmanagem ent@yahoogroups. com


[mailto:sapmaterialsmanagem ent@yahoogroups. com] On Behalf Of
sapmmsenthil
Sent: Thursday, August 16, 2007 2:08 PM
To: sapmaterialsmanagem ent@yahoogroups. com
Subject: [sap mm] CIN Customizing

Hai MM Experts.....

Can any one Guid me the CIN Version Customization With T-


Code's.

Regards
SAPMMSENTHIL

++++++++++++++++

Hi All,

What happens when GR is made against a subcontracting PO.?


I mean is the total value of the material changes?
for example if a material A is sent for subcontracting for painting and returns as
material
the valueB.of material A is $1.00 and after painting the value is added by $ 0.25 and
total value of material B is $1.25. Now if I make GR against sub-contracting PO will
the material master get updated to $1.25.

Any inputs will be appreciated.

Thanks & Regards


Vijay

++++++++++++++++

Hemanth / Samraj,

Yes, you both are right but in this scenario, the packaging is done by third party
hence to track the cost at the vendor and third party (contract packager) the client
needs
The to maintain
material goes two prices.
directly from vendor to contract packager and then comes to
entry point of the client. the client does want to maintain two material codes for
change
How do in only
you onethis
think field.
can be handled?

Thanks & Regards


Vijay
----- Original Message ----
From: hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, 15 August, 2007 11:25:47 PM
Subject: Re: [sap mm] two prices for one material-- Urgent

Hi

Why it is required?.If requires u have to create 2 materials one as Semifinished


Material(Before packing) and another one as finished product.

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
+++++++++++++
U can use Split Valuation also.

Valuation Category : Packaging

Valuation Types : Pre Packaging and Post Packaging

On Thu, 16 Aug 2007 hemanth kumar reddy wrote :


>Hi
>
> Why it is required?.If requires u have to create 2 materials one as Semifinished
Material(Before packing) and another one as finished product.
>
> Hope it makes sence.
>
> Thanks
>
>
>vijay anand <vakul_harsha@ yahoo.co. uk> wrote:
> Hi
>
>How can we show two prices for the same material?
>
>Two prices in the sense material price before and after packaging.
>
>Thanks & Regards
>Vijay
+++++++++++++++
Dear Kumar,
Just Go into T-code Ml81n again & open your entry sheet,select change mode,you
will get a new option Revoke,just click on that,your entry sheet automatically
reveresed by system.
Thanks & Regards
Pavan Kumar

----- Original Message ----


From: kumar manian <maniram_chn@ yahoo.co. in>
To: mm group <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Monday, 13 August, 2007 10:25:06 AM
Subject: [sap mm] Cancellation Service Entry Sheet document

Hi,

What is the procedure to cancel the service entry sheet document posted through
ML81N.
Thanks in Advance
Ram
++++++++++++++
Use MMPV to close periods 2005/9 to 2007/8 one after the other. i.e you have to
use MMPV 24 times.Then you can do posting in 2007/08.

Carefully check the log issued after every period close.

regards

epm
On Thu, 16 Aug 2007 Prashant Hazariwala wrote :
>MMBE IS FOR STOCK OVERVIEW
>
>
>ANAND CHANDOOR <mpower303@gmail. com> wrote:
> Try using the TCODE mmbe
>
>On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:
>>
> > hi,
> > I have a problem in posting GR in the current period and it is giving
> > me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> > company code 1000 ' then i have tried to close all these period using
> > Tcode MMPV but i couldn't close these posting period and i am getting
> > message 'the specified year 2005 is not the calender year'.
> > Again i can do posting in 2005/08 period but can not do posting in the
> > current date.
>>
> > Can anybody help me on this?
>>
> > Prashant

+++++++++++++++

Hai MM Experts.....

Can any one Guid me the CIN Version Customization With T-


Code's.

Regards
SAPMMSENTHIL

+++++++++++++

Hi All,

Can we use the MRP to create reservations? If any one knows pls let me know
in details.
Thanks.
vineet
+++++++++++

Please see in the delivery vl03n see the movt type is 601 or not

>From: "garasai sap" <garasaister@ gmail.com>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: Re: [sap mm] mm query
>Date: Thu, 16 Aug 2007 10:03:31 +0530
>
>my dear Nazeem
>My problem is : after delivery stock should be reduced, but it is not
>happening.To avoid this what settings should be done.
>Thanks&regards
>
>
>On 8/15/07, nazim husain <nazsan_2002@ hotmail.com> wrote:
>>
> > after delivery the stock should be reduced
> > check report vl06 for the total PGI
>>
>>
> > >From: "garasai sap" <garasaister@ gmail.com>
> > >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> > >To: sapmaterialsmanagem ent@yahoogroups. com
> > >Subject: [sap mm] mm query
> > >Date: Tue, 14 Aug 2007 20:16:58 +0530
>>>
> > >Hi
> > >How to clean up Finished goods stock
> > >After delivery and billing,finished good stock should clean up.But for
>my
> > >client stock is still available and not matching with physical
> > >stock.Pleasehelp me and what settings should be done to avoid this.
> > >Regards,
> > >venkat
> > >MM consultant.
++++++++++
You can display your PO in Me23n,from there go to Environment and then
hearder changes or iterm changes

> Go to me23n and make the necessary changes u need.


>
> On 8/15/07, H K <heartykid2000@ yahoo.com> wrote:
>>
>> HI All,
>> Can anyone tell me if theres any report for changes made in purchase
>> order. say in Header or item data level.
>> Thanks in Advance
>>
>> Regards

+++++++++++++

hi,
the mov type is 322

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
++++++++++
hello experts,

Happy independence day to all of you.

I m having a problem in vendor evaluation. During automatic amd semi-


automatic methods how the system generates scores. i.e. whats the use
of variance and how system computes scores from variance.

Do help me?
++++++++++++++++
Hi,
Pl go M type 322 it will transfer stocks from Unrestricted to Quality Inspection.

With Thanks & Regards


Mohanrao Nagavarapu

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
+++++++++++++

me23n,environment - header changes


it will be there for sure

>From: "Ellis, Cindy - ERP" <cindy.ellis@ cityofhouston. net>


>Reply-To: sapmaterialsmanagem ent@yahoogroups. com
>To: sapmaterialsmanagem ent@yahoogroups. com
>Subject: [sap mm] Purchase Requisition Header Note
>Date: Wed, 15 Aug 2007 08:47:59 -0500
>
>Is there a way to track changes made to a purchase requisition header note?
>I do not see an option for header changes in the environment.
>
>Cindy E. Ellis, CPPO, CPPB
>City of Houston - SAP ERP Support Team
>Materials Management
>voice 713-221-0682
>fax 713-221-0698
>email cindy.ellis@ cityofhouston. net
+++++++++++++
322

>From: "hazariwalapu" <hazariwalapu@yahoo.com>


>Reply-To: sapmaterialsmanagement@yahoogroups.com
>To: sapmaterialsmanagement@yahoogroups.com
>Subject: [sap mm] movement type for - unrestricted to QI stock
>Date: Thu, 16 Aug 2007 04:12:44 -0000
>
>hi
>Can anybody tell me which movement type we should use to transfer
>material from unrestricted stock to Quality inspection stock
>
>Thanks
>
>prashant
+++++++++++++
Hi Prasant,
The movement type from unrestricted stock to quality inspection is 322

by
Ramu

hazariwalapu <hazariwalapu@ yahoo.com> wrote:


hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant
+++++++++++

MMBE IS FOR STOCK OVERVIEW

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Try using the TCODE mmbe

On 8/10/07, hazariwalapu <hazariwalapu@ yahoo.com> wrote:


>
> hi,
> I have a problem in posting GR in the current period and it is giving
> me a message ' Posting only possible in periods 2005/08 and 2005/07 in
> company code 1000 ' then i have tried to close all these period using
> Tcode MMPV but i couldn't close these posting period and i am getting
> message 'the specified year 2005 is not the calender year'.
> Again i can do posting in 2005/08 period but can not do posting in the
> current date.
>
> Can anybody help me on this?
>
> Prashant

+++++++++++

my dear Nazeem
My problem is : after delivery stock should be reduced, but it is not
happening.To avoid this what settings should be done.
Thanks&regards

On 8/15/07, nazim husain <nazsan_2002@ hotmail.com> wrote:


>
> after delivery the stock should be reduced
> check report vl06 for the total PGI
>
>
> >From: "garasai sap" <garasaister@ gmail.com>
> >Reply-To: sapmaterialsmanagem ent@yahoogroups. com
> >To: sapmaterialsmanagem ent@yahoogroups. com
> >Subject: [sap mm] mm query
> >Date: Tue, 14 Aug 2007 20:16:58 +0530
>>
> >Hi
> >How to clean up Finished goods stock
> >After delivery and billing,finished good stock should clean up.But for my
> >client stock is still available and not matching with physical
> >stock.Pleasehelp me and what settings should be done to avoid this.
> >Regards,
> >venkat
> >MM consultant.

++++++++++++++++++

hi
Can anybody tell me which movement type we should use to transfer
material from unrestricted stock to Quality inspection stock

Thanks

prashant

+++++++++++++++

Hi Sukla,
The following dictation may help u, let me know ur query and status pls

MM Pricing
Procedure

How
pricing defined?

Note : = down arrow

Vendor

assigned to

Schema
group

assigned to

Pricing
procedure

has

Condition
Types

Note:
when we make PO, if vendor is selected pricing
procedure will be calculated accordingly
SPRO>

Material
Management

Purchasing

Conditions

Define
price determination process

Define
condition type

After create condition type

SPRO>

Material
Management

Purchasing

Conditions

Define
calculation schema

Define
condition type

Condition
Types are 3 types

1. Condition class

2. Calculation Type

3. Group condition change which can be made (header/item of PO)

What is Info Record?

Link
between material and vendor

Under Procedure

If you mark statistic for a condition type under


a pricing procedure and use this condition type in a PO then POs
net price wont be changed after discount

Regards,
Zusen

----- Original Message ----


From: vijay shukla <vijay_sap2005@ yahoo.com>
To: sap <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Tuesday, August 14, 2007 11:44:48 AM
Subject: [sap mm] pricing procedure

Hi MM gurus

Can anyone explain how to create pricing procedure if following conditions are
made .
1 basic price

2 discount on basic

3 gross ( 1-2)

4 packaging and forwarding charges on 3

5 excise duty on (3+4)

6.education cess on 5

7 discount

8subtotal of (1 to 7)

9 cst on 8

10 freight.

11 insurance

please suggest the pricing procedure for the the

Thanks in advance

vijay

++++++++++++
Go to me23n and make the necessary changes u need.

On 8/15/07, H K <heartykid2000@ yahoo.com> wrote:


>
> HI All,
> Can anyone tell me if theres any report for changes made in purchase
> order. say in Header or item data level.
> Thanks in Advance
>
> Regards
+++++++++++++++

Can the same principle be applied for paying to two different party
against 1 info record.

Example :-

Fully finished price -1000

Forging price - 800

M/cing price - 200

Regards,
Shetty Vijay
2601

____________ _________ _________ __

From: sapmaterialsmanagem ent@yahoogroups. com


[mailto:sapmaterialsmanagem ent@yahoogroups. com] On Behalf Of ANAND
CHANDOOR
Sent: Thursday, August 16, 2007 8:52 AM
To: sapmaterialsmanagem ent@yahoogroups. com
Subject: Re: [sap mm] pricing procedure

The query that u have posted is regarding Pricing Schema.


Go to MM- conditions-pricing schemes
In that u need to first create condition types.
U have to make entry step by step.
The query that u have posted will be found in condition types.
After creating condition types u need to link it to ur pricing schema.

On 8/14/07, vijay shukla <vijay_sap2005@ yahoo.com


<mailto:vijay_ sap2005%40yahoo. com> > wrote:
>
> Hi MM gurus
>
> Can anyone explain how to create pricing procedure if following
conditions
> are made .
>
> 1 basic price
> 2 discount on basic
> 3 gross ( 1-2)
> 4 packaging and forwarding charges on 3
> 5 excise duty on (3+4)
> 6.education cess on 5
> 7 discount
> 8subtotal of (1 to 7)
> 9 cst on 8
> 10 freight.
> 11 insurance
>
> please suggest the pricing procedure for the the
>
> Thanks in advance
>
> vijay
++++++++
Hi

Why it is required?.If requires u have to create 2 materials one as Semifinished


Material(Before packing) and another one as finished product.

Hope it makes sence.

Thanks

vijay anand <vakul_harsha@ yahoo.co. uk> wrote:


Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay
++++++++++=
The query that u have posted is regarding Pricing Schema.
Go to MM- conditions-pricing schemes
In that u need to first create condition types.
U have to make entry step by step.
The query that u have posted will be found in condition types.
After creating condition types u need to link it to ur pricing schema.

On 8/14/07, vijay shukla <vijay_sap2005@ yahoo.com> wrote:


>
> Hi MM gurus
>
> Can anyone explain how to create pricing procedure if following conditions
> are made .
>
> 1 basic price
> 2 discount on basic
> 3 gross ( 1-2)
> 4 packaging and forwarding charges on 3
> 5 excise duty on (3+4)
> 6.education cess on 5
> 7 discount
> 8subtotal of (1 to 7)
> 9 cst on 8
> 10 freight.
> 11 insurance
>
> please suggest the pricing procedure for the the
>
> Thanks in advance
>
> vijay
>
>
+++++++++++++

Hi,

Two prices for same material can be done by split


valuation or by maintaining info records ( Vendor/
Material/ Plant Combinations ), but your example says
with and with out packing, if that is the case better
you maintain two different codes.

Sam
--- vijay anand <vakul_harsha@ yahoo.co. uk> wrote:

> Hi
>
> How can we show two prices for the same material?
>
> Two prices in the sense material price before and
> after packaging.
>
> Thanks & Regards
> Vijay
+++++++++

Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay

+++++++++++==

Hi

How can we show two prices for the same material?

Two prices in the sense material price before and after packaging.

Thanks & Regards


Vijay

++++++++++++++
v received ur queries 3 times.... pls send it once......

dcms78 <dcms78@yahoo. com> wrote: Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type 261??
based on the Goods issue posted or shud there be something done to get
it delivered to production site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++

Is there a way to track changes made to a purchase requisition header note?


I do not see an option for header changes in the environment.

Cindy E. Ellis, CPPO, CPPB


City of Houston - SAP ERP Support Team
Materials Management
voice 713-221-0682
fax 713-221-0698
email cindy.ellis@ cityofhouston. net

++++++++++++++++==

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to


Production site based on Production order...we do an
Goods Issue...and we creat an goods issue and post
it..
goods issue created for moving goods from storage for
type 261...it isself an goods movement as the BAPI
call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued
in GI- type 261??
based on the Goods issue posted or shud there be
something done to get it delivered to production
site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++++++

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type
261??
based on the Goods issue posted or shud there be something done to
get it delivered to production site??
Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh
++++++++++++++

Hi....

Am very new to SAP..


jus Learning...
I have an Question.

When one says Goods movement from Storage to Production site based on
Production order...we do an Goods Issue...and we creat an goods issue
and post it..
goods issue created for moving goods from storage for type 261...it
isself an goods movement as the BAPI call BAPI_goods_mvt ????or???
how to confirm that the goods are delivered? as issued in GI- type 261??
based on the Goods issue posted or shud there be something done to get
it delivered to production site??

Plz do reply.
Would be very helpful!!

Thanks in advance.

Diana Balasingh

++++++++++++++++

hi,
any body can explain about foriegn trade imports control and tc

++++++++++=

Hi sappers
Is it possible to calculate the total value for the Following in
calculation schema?
1. base price -
2. Add 1% pkg - on 1
3. add customs 12.5%- Upon (1+2)
4. add cvd-16%on(1+ 2+3)
5.ed cess-3%on (4)

Till this i did simple "from" & "to" and calculated

6. cess on duty- 3%- on (3+4+5) - this works on line no. 3,4 & 5 i am unable
to enter in FROM-TO format.
7. Spl duty (add 1to 6)*4%- this also i ma unable to enter in the FROM-TO
format
Total value- (add 1 to 7).

Attachment can be viewed.

Thanks

Any ideas
Samuel

+++++++++++

Hi, friends,
What is use of this movemeht type where we used this movement type.
I have cheake but it will post cost centre.But this movement type for
GI for sales . But there I don't find any sales order, Why

+++++++++++

HI All,
Can anyone tell me if theres any report for changes made in purchase order. say in
Header or item data level.
Thanks in Advance

Regards
++++++++++++

Hi,
Try set your your Sales Doc type set to "Delivery BLock" in OVAK under Check
Credit column
Lau
----- Original Message ----
From: indika alwis <i_alwis@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 2:05:55 PM
Subject: [sap mm] credit limit check at delevary ststus

Dear all

I have a problem , customer need to check the credit limit at the delivery creation
stage .This is special case . Normally credit limit is check at the stage of sales order
creation. But this is customer requirement.

can any body expleane . the procedure

1. Do it need any special ABAP development, If so roughly what are the steps
2.Is it possible to do by configuration changes, if so what are the con fig steps in
sequential order

very eargent .

please reply

Indika
++++++++++

Hi Sha,
try checking your settings in t-code S_ALR_87000332 for the Automatic
delivery control indicator

Cheers,

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 6:15:38 AM
Subject: [sap mm] P.O Order from shah

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please.

Thanks

Shah
++++++++++
Hi Shah,

Go to "delivary" tab in PO item view and in right side u will find "Delivery
Completed" check box
Thanks,
Zusen

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 5:10:14 AM
Subject: [sap mm] Purchase Order

Hi Guys

Can anyone tell me how can i find delivery complete

indicator in a Purchase order? Please let me know

ASAP.

Thanks

Shah
++++++++++
after delivery the stock should be reduced
check report vl06 for the total PGI

>From: "garasai sap" <garasaister@gmail.com>


>Reply-To: sapmaterialsmanagement@yahoogroups.com
>To: sapmaterialsmanagement@yahoogroups.com
>Subject: [sap mm] mm query
>Date: Tue, 14 Aug 2007 20:16:58 +0530
>
>Hi
>How to clean up Finished goods stock
>After delivery and billing,finished good stock should clean up.But for
my
>client stock is still available and not matching with physical
>stock.Pleasehelp me and what settings should be done to avoid this.
>Regards,
>venkat
>MM consultant.
>
>
+++++++++++++++

Under the delivery table in the item level in your purchase order

>
> Hi Guys
>
> Can anyone tell me how can i find delivery complete
> indicator in a Purchase order? Please let me know
> ASAP.
>
> Thanks
>
> Shah
>
+++++++++++
Hi Sabbir;

you can check the "delivery Complete"indicator by going to DELIVERY Tab


of PO...
to check : go to ME23N>Delivery, you can see there a Delivery complete box

Lau

----- Original Message ----


From: sabbir zahir <sabbirzu@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Wednesday, August 15, 2007 7:10:14 AM
Subject: [sap mm] Purchase Order

Hi Guys

Can anyone tell me how can i find delivery complete


indicator in a Purchase order? Please let me know
ASAP.

Thanks

Shah
+++++++++++
Dear all

I have a problem , customer need to check the credit limit at the delivery creation
stage .This is special case . Normally credit limit is check at the stage of sales order
creation. But this is customer requirement.

can any body expleane . the procedure

1. Do it need any special ABAP development, If so roughly what are the steps
2.Is it possible to do by configuration changes, if so what are the con fig steps in
sequential order

very eargent .

please reply

Indika
+++++++++++
hello experts,

Happy independence day to all of you.

I m having a problem in vendor evaluation. During automatic amd semi-


automatic methods how the system generates scores. i.e. whats the use
of variance and how system computes scores from variance.

Do help me?

+++++++++++++

Hi Guys

Can anyone tell me how can i find delivery complete


indicator in a Purchase order? Please let me know
ASAP.

Thanks

Shah

++++++++++++++

Hi sreekanth
I got my problem solved. I checked in OMSY and OB52. It
is now working well. Thank u
Regards
Murthy

On 8/13/07, srknt03 <srknt03@yahoo. co.in> wrote:


>
> Hi Murthy!
>
> Have you checked the periods in OB52? Plz check up and change
> accordingly if reqd.
>
> Regards,
>
> Sreekanth
try omsy,ob52,,this can help u out.

MSK <mb_krm@yahoo. ca> wrote: does anyone know why i am getting "K4 Fiscal
Year variant, No period is
Defined for 8/14/2007" error while posting Good Receipt in MIGO using a
PO No.
thanks
msk>

> --- In sapmaterialsmanagem ent@yahoogroups. com<sapmaterialsmanage


ment%40yahoogrou ps.com>,
> "SATYANARAYANA
> MURTHY" <murtymagapu@ ...> wrote:
>>
> > Hello MM gurus
> > when i am doing MIGO i am getting error msg
> that
> > Posting Period 08 2007 not open. I have done all settings in MMPV.
> It is
> > showing current period 08 2007 and closing period 07 2007. How to
> do
> > settings for this? Please help me to sort out this issue.
>>
> > Thanks and regards
> > Murthy
+++++++++++

Hi Gurus

I am missing delivering complete late indication on


Purchase order. Can any one help me for this issue
please. I need it As Soon As Possible. Please

Thanks

Shah
++++++++++
Hi
Can anybody help me in differentiating between the following details given
below and what settings should be done and what exactly happens if I select
any one of these.

No stock no value(NSNV)
No stock with value update
Stock update with no value update
Stock update value update
+++++++++++++++++++++++

Hi
How to clean up Finished goods stock
After delivery and billing,finished good stock should clean up.But for my
client stock is still available and not matching with physical
stock.Pleasehelp me and what settings should be done to avoid this.
Regards,
venkat
MM consultant.

+++++++++++++++

Can any body give me the step-by-step procedure for running MD01 /MD04 for
MRP run and MPS run.

Please note that i had switched to below gmail address which has been reqularly
using.
"apparaoasv@gmail. com"

+++++++++++++

does anyone know why i am getting "K4 Fiscal Year variant, No period is
Defined for 8/14/2007" error while posting Good Receipt in MIGO using a
PO No.
thanks
msk

+++++++++++++

Hi MM gurus
Can anyone explain how to create pricing procedure if following conditions are
made .
1 basic price
2 discount on basic
3 gross ( 1-2)
4 packaging and forwarding charges on 3
5 excise duty on (3+4)
6.education cess on 5
7 discount
8subtotal of (1 to 7)
9 cst on 8
10 freight.
11 insurance

please suggest the pricing procedure for the the

Thanks in advance

vijay
++++++++++++++

Hi Sandeep

Tcode SQVI does not exist, use T code SQ01 for Query

Rgds
Naveen Goveas

On 8/13/07, Sandeep Acharya <sandeep_sapient@ yahoo.co. in> wrote:


>
>
>
>
> Dear Guru's,
>
> Can anyone help me... in understanding the steps for creating Sap Query
> using T.code SQVI
>
> Thanks in advance
>
> Regards
> Sandeep Acharya

+++++++++++++++++

Hi Sandeep,

The following instruction with exmaple may help u

Query Creation

1. SQ02 > Define Infoset

2. SQ03 > Give all authorization

3. SQ01 > Building the query and run it

SQ02

Name infoset (e.g.;


MM_INFO_TEST1)

Create

Name and Table Name

Authorization group = ZMM


Insert table

MARC

Back and Generate

Role / User group Assignment

ZMM

Save
Back & generate

SQ03

User group Assignment

Change ZMM

SQ01

Edit > Other user group

Name query (MM_query_test_ 1)

Infoset Query [ select info


set you have made]

Now select Parameter list


and selection criteria

Save and name your query


which you have made

Back and execute query

Regards,
Zusen

----- Original Message ----


From: Sandeep Acharya <sandeep_sapient@ yahoo.co. in>
To: sap mm <sapmaterialsmanagem ent@yahoogroups. com>
Sent: Monday, August 13, 2007 2:39:00 PM
Subject: [sap mm] steps for creating Sap Query using T.code SQVI

Dear Guru's,

Can anyone help me... in understanding the steps for creating Sap Query using
T.code SQVI
Thanks in advance
Regards

Sandeep Acharya

++++++++++++++++

Service entry sheet filling up (t-code ML81N) will be against a PO. so make a PO
with materials which u gonna send of servicing, and receive ur services using
ML81N with materials, quentity and values as many time u want against a PO

--
Zusen

----- Original Message ----


From: mm consultant <mmconsultant_ k@yahoo.co. in>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Monday, August 13, 2007 2:46:30 PM
Subject: [sap mm] services

hi all,

can anyone explain about services processing as we are sending materials for
servicing .and how to make service entry sheet and record it.

thanks in advance

------------ --------- --------- ---

Once upon a time there was 1 GB storage in your inbox. Click here for happy
ending.
++++++++++

Hi MM Gurus,
Can anyone please give me to get a solution in details.
A Vendor will supply 5000 raw material with the following conditions:

Gross price of the material is $20/PC. A promotional discount 10%


applies to the total value of the material. Freight charge is $500
(absolute value).
Starting from the scratch please guide me how I can create the
following for the above mentioned problem. I am expecting a solution
like release procedure created by Chapman.

1. Condition type (with condition record)


2. Access sequence
3.Condition table
4. Calculation Schema.

After that I know how it could be assigned to vendor and create a PO


accordingly.
Please help me.Please! Please!

Thank you,
sachin

++++++++++

hi nilesh

AUM is the price diff ac for STO that u 've to maintain in obyc

for tr event key AUM maintain the G/L account ( get assist from ur FI consult)
this will solve ur probs
reg
prasanna
Nilesh Deshmukh <nilesh_sap_mm@ yahoo.co. in> wrote: Dear SAP Gurus,

I am facing one problem in STO.


I have created one STO for a semi finished good material.
While extending Semi finished materials from one plant to other in the same
conpmany code,we maintain price control as V but when we actually produce the
same mateial we change price control to S.

In Receiving Plant:-

Valuation class e,g 1000


Price control : S
In Supplying plant:-

Valuation calss e.g. 1000


Price control: V

While issueing material from supplying plant against created STO,I am receving
error asdetermination
Accunt " for entry ABCD AUM not possible.Message No: M8147"

Could you please let me know the possible wrong entries happened in
configuaration settings so that I can resolve the issue.

Regards,

Nil
+++++++++++

Hi,

While doing cancellation there will not be a possibility to change the quantity in the
document. Means if u receive 10 qty in that document u have to do cancellation for
all the ten qty's. There is no option to change the quantity's (You have to cancell the
entire document)
In the second case if you try to do reversal and select Return Delivery and then
select the movement type as 102, in this document u can change the quantity.

This is the differece between this two.

ritu khanikar <ritu_khanikar@ yahoo.com> wrote:


Hi all,

While doing migo, we can use cancellation and as well as reversal, what is the
diference between the two?
regards

ritu
++++++++

Thanks for enlightment,

Sorry I miunderstood "reversal" is for "Return to


supplier"

Sam

--- hemanth kumar reddy <hemanthkumar96@ yahoo.co. in>


wrote:

> Hi Sam,
>
> Pl.don't mislead the members, when u flag the
> Returns indicator in PO,MVT 161 will be triggered
> automatically, not 122.
>
> Normally MVT 122 will be used to send back the
> quality rejected materials to vendor against the
> material document.
>
> Thanks
>
> P Samraj <samrajpp@yahoo. com> wrote:
> Hi all,
>
> 102 is the reversal mvt. type of 101. Every mvt.
> type
> has its reversal counterpart. The are many reasons
> to
> make a reversal of any mvt. type (mostly human
> mistakes).
> 122 is used when you make a returns purchase order
> to
> a vendor. This is a purchase order with the
> "returns"
> flag marked. By the way, 122 has it reversal mvt.
> type
> in 123.
> It's true that in both cases material is being
> removed
> from the stock but for diferent reasons and in
> diferent bussiness processes.
>
> Hope I have clarified,
>
> Sam
>
> --- charles pary <charlessusai@ yahoo.co. in> wrote:
>
> > both cancellation and Reversal are same....
>>
> > Cheers
> > Charles
>>
> > "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> > Cancellation is used when the goods
> > receipt was done in error. The
> > entire qty of the original goods receipt is
> > reversed. Reversal is used
> > when you received goods and are returning it to
> the
> > vendor. You may
> > reverse the original goods receipt in its entirety
> > or a partial.
> > --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>>
> > > Hi Ritu
>>>
> > > The effects are same
>>>
> > > Rgds
> > > Naveen Goveas
>>>
>>>
> > > On 8/4/07, ritu khanikar
> <ritu_khanikar@ yahoo.com>
> > wrote:
>>>>
> > > > Hi all,
>>>>
> > > > While doing migo, we can use cancellation and
> as
> > well as reversal,
> > > what is
> > > > the diference between the two?
> > > > regards
>>>>
> > > > ritu
>>>>
+++++++++++++++

Dear All,

Can u please provide details of a report that gives the original


document numbers against the Material Document Numbers appearing in the
MB51..

For Eg. an Delivery Number 100 would raise a Material Document Number
501 (when PGI done) in the Item Ledger/CARDEX. An Invoice with number
601 will be generated later.

Is there any report available that links 100, 501 and 601??

Thanks in Advance.

Regards,

Rakesh K R

+++++++++++++++

Hi gurus,
plzz explain me the process of making PR mandatory.
how does we do this
thanks in advance
sameer
++++++++++
Hi..
I think answers r
for ..
Q.1) Ans:B
Q.2) ANS:C
Q.3) ANS:E
regards,
nag.

On 8/12/07, bayard0707 <bayard0707@yahoo. com> wrote:


>
> Hi All,
> Please help me with the following certifications questions. I am
> preparing for the exam.
>
> 1)You want to activate version management for contracts. Which
> combination of fields do you need (true/false) ?
> a)Document category + Document type + Company code
> b)Document category + Document type + Purchasing organization
> c)Document category + Purchasing organization + Purchasing group
> d)Document type + Purchasing organization + Plant
>
> 2) A confirmation control key requiring an order acknowledgment from
> the vendor has been entered in a purchase order. The data in the
> acknowledgment differs from that in the PO: Instead of the whole PO
> quantity on the desired date, the vendor confirms delivery of half of
> the total quantity on each of the two dates one week apart from each
> other. How do you enter this acknowledgment (one correct answer)?
> a) You enter two items with the confirmed quantities and date on
> the "Confirmations" tab page in the item details
> b) You set the partial delivery indicator on the "Delivery " tab page
> in the item details. As a result, an additional entry screen appears,
> on which you can enter the confirmed quantities and dates
> c) You enter two delivery schedule lines with the confirmed
> quantities and delivery dates on the "Delivery Schedule" tab page in
> the item details
> d) You change the delivery date of the existing PO item and reduce
> the PO quantity by half. For the remaining quantity, you enter a new
> PO item in which you specify the other delivery date
>
> About Solution Manager:
> 3) Which of the following are Solution Manager Usage Scenarios?
> (True/False)
> a) Manage Change Requests
> b) Monitor SAP Support Desk
> c) Upgrade SAP Solutions
> d) Link to SAP Education
> e) Implement SAP Solutions
>
> Thank you for your help.
>
>
>
+++++++++++++
Dear Dinesh,

Thanks a million!

Regards,
NI.
--- In sapmaterialsmanagem ent@yahoogroups. com, dinesh.singhal@ ...
wrote:
>
> Choose scope of list C then you will get information in a single
line.
>
> Thanks & Regards,
>
> Dinesh Singhal,
> SAP Functional Consultant
> Mob # +91-9324168248
>
>
>
>
>
>
>
> "Novel Ilyas" <novel.ilyas@ ...>
> Sent by: sapmaterialsmanagem ent@yahoogroups. com
> 08/13/2007 10:08 AM
> Please respond to sapmaterialsmanagem ent
>
> To: sapmaterialsmanagem ent@yahoogroups. com
> cc: (bcc: Dinesh Singhal/RCVL/ RelianceADA)
> Subject: [sap mm] List of PR
> Importance: Normal Sender's OU: Reliance
>
>
> Dear Gurus,
>
> Need your info on how we can have list of PR in single row manner,
> since ME5A list it in 3 rows each record.
> Appreciate your prompt reply.
>
> Regards,
> NI.
+++++++++++

can anyone explain about services processing as we are sending materials for
servicing .and how to make service entry sheet and record it.
Is possible to make Service Entry Sheet for multiple line items for PO. For
example:I have one service PO. in that PO Five line items and each line item has
its sarvice items.
Line item 10 text........ ......... ......... ......... .... & it has twoservice items like 10 & 20.
Same line items 20,30,40,50 has its own service items. So is it possible to make
one Service Entry Sheet for all Line items & their service items. If it is possible then
reply
not me how it may possible urgentlu.
possible.

+++++++++++++

Hi Murthy!

Have you checked the periods in OB52? Plz check up and change
accordingly if reqd.

Regards,

Sreekanth

--- In sapmaterialsmanagem ent@yahoogroups. com, "SATYANARAYANA


MURTHY" <murtymagapu@ ...> wrote:
>
> Hello MM gurus
> when i am doing MIGO i am getting error msg
that
> Posting Period 08 2007 not open. I have done all settings in MMPV.
It is
> showing current period 08 2007 and closing period 07 2007. How to
do
> settings for this? Please help me to sort out this issue.
>
> Thanks and regards
> Murthy
++++++++++

go to ,

IMG-->MM-->PURCHASI NG-->P.O- ->DF9 SCREENLAYOUT AT DOCUMENT


LEVEL-->SELECT ME TWENTY ONE N-->DETAILS- ->SELECT PAYMENT
TERMS
IT ..MAKE .., SAVE IT..this is only option
MANDATORY

otherwise ABAPER can make that field mandatory through coding


but in my client's location they are unble to make few fieldds mandatiry..

BRegards
adarsh

+++++++++++
Dear Friends;
i have been assigned to object of domestic project. I have the
functional specification, but the problem is that i am not getting
what they exactly want
In that functional specification ( FS ) they have mentioned about
input requirement and processing requirement in this way

Input Reqiurement :

Printing of Goods Issue will be triggered after creation of Goods


Issue against Process Order
i.e at the time of MB1A transaction is saved. (Movement type will be
261 and 262)

Processing Requirement :
For the Process Order: Check the Process Order Number

Header Data:

1. Plant : Check the Process Order Number : Table Name is AUFK


2. Plant Description: Table Name is T001W.
3. Material Description : Check the Process Order Number : Table
Name is AUFK
4. Material Code: Check the Process Order Number: Table Name is AFKO.
5. Batch Number: Check the Process Order Number: Table Name is AFPO.
6. Batch Size: Check the Process Order Number: Table Name is AFKO.

Component Data:

1. Item No: Check the Process Order Number: Table Name is AUFM.
2. Material Code: Check the Process Order Number: Table Name is AUFM.
3. Material Description: Check the Material Code from the Process
Order. Table Name is MAKTX.
4. Committed Quantity: Check the Process Order Number and
Reservation Number: Table Name is RESB. (if there is no committed
quantity, committed quantity column should be Zero for the
particular Material)
5. Withdrawn Quantity: Check the Process Order Number: Table Name is
AUFM. (take the movement types 261 and 262 only)
6. Batch Number: Check the Process Order Number: Table Name is AUFM.

What i supposed to do to complete this object?? WHat will be my


selection criteria ?? AS they have mentioned in FS check process
order number, what does it mean??
Please help me out its urgent.

Regards;
Parag Gavkar.

++++++++++++++

go to ml81n,put the service entry number,it must be on the change


mode.Revoke the acceptence and then save.
Do the same step again after saving,then this time you candelete it.
> Hi,
>
> What is the procedure to cancel the service entry sheet document posted
> through ML81N.
>
> Thanks in Advance
> Ram
++++++++++

Hi,
Configuration means by without changing the sap existing process or front screens
,only we do settings as per our or client requirements i.e. not changing sap
programmes or t.codes(standards) we are fulfilling our requirements

Customization means we are creating or changing Sap existing process or front


screens i.e changing or creating sap programmes or t.codes as per our or client
requirement

ANAND CHANDOOR <mpower303@gmail. com> wrote:


Customization is done by superuser.It means the changes that r required can
be made by the user.Configuration is done by end user.

Release procedure is the authority required to release a PO.eg. Senior


manager,MD,CEO
what u need to do is Go to Materaials management -Release strategies, there u
need to work on it.

On 8/10/07, nayna dixit <nayna_dixit@ yahoo.com> wrote:


>
> HI SAP--MM ----FRIENDS
> > can anyone explain me in tetails
> > the defferance between configuration and custmization ?
> > and what is meant by release procedure / and how to activate it ?
> > pl reply me in details with example
> > coz i total new to this field
> > so dont be angry on me
>>
> thanks in advance
> nayna dixit
++++++++++

Dear SAP Gurus,

I am facing one problem in STO.


I have created one STO for a semi finished good material.
While extending Semi finished materials from one plant to other in the same
conpmany code,we maintain price control as V but when we actually produce the
same mateial we change price control to S.

In Receiving Plant:-

Valuation class e,g 1000


Price control : S

In Supplying plant:-

Valuation calss e.g. 1000


Price control: V

While issueing material from supplying plant against created STO,I am receving
error asdetermination
Accunt " for entry ABCD AUM not possible.Message No: M8147"

Could you please let me know the possible wrong entries happened in
configuaration settings so that I can resolve the issue.

Regards,

Nil
+++++++++

the code provided by u i.e bmbc does not exist.


plzz check it out
> u can try it in BMBC. it is batch information cockpit
>
> reg
> prasanna
>
> anil mahajan <anilmahajan_ 11@...>
wrote: Dear MM Gurus and friends,
>
> i'm a PP Consultant
>
> my user wants a report that gives the W.I.P stock details with
batch and date of manufat. of batch.
>
> i have tried MC46 and MC50 but it shows products only as our
requiremet is product code with batches.
>
> is there any table or T code that gives such details.
>
> kindly revert
>
> Thanks & Regards,
>
> Anil
>
++++++++++++++

Choose scope of list C then you will get information in a single line.

Thanks & Regards,

Dinesh Singhal,
SAP Functional Consultant
Mob # +91-9324168248

"Novel Ilyas" <novel.ilyas@ gmail.com>


Sent by: sapmaterialsmanagem ent@yahoogroups. com
8/13/2007 10:08
Please respond to sapmaterialsmanagem ent

To: sapmaterialsmanagem ent@yahoogroups. com


cc: (bcc: Dinesh Singhal/RCVL/ RelianceADA)
Subject: [sap mm] List of PR
Importance: Normal Sender's OU: Reliance
Dear Gurus,

Need your info on how we can have list of PR in single row manner,
since ME5A list it in 3 rows each record.
Appreciate your prompt reply.

Regards,
NI.

++++++++++
Dear Gurus,

Need your info on how we can have list of PR in single row manner,
since ME5A list it in 3 rows each record.
Appreciate your prompt reply.

Regards,
NI.
+++++++++

Dear Hari,

pls give me further detail steps because I am not familiar with


financial operation.

thanks and regards


david

In sapmaterialsmanagem ent@yahoogroups. com, "Hari Appani"


<hari.appani@ ...> wrote:
>
> Please find some information on subsequent credit and subsequent
debit for
> these scenarios.
>-
> Hari
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David
+++++++++
Pls explain it in more details in a operation level. For
example,where and how can I add the extra amount? Can I use negative
value?

Thanks.

--- In sapmaterialsmanagem ent@yahoogroups. com, "ANAND CHANDOOR"


<mpower303@. ..> wrote:
>
> Price ina PO cannot be changed.But if there is an excess amount
That u need
> to add, then it should be balanced by using the G/L account.
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David

++++++++++++++

Pls explain it in more details in a operation level. For


example,where and how can I add the extra amount? Can I use negative
value?
Thanks.

--- In sapmaterialsmanagem ent@yahoogroups. com, "ANAND CHANDOOR"


<mpower303@. ..> wrote:
>
> Price ina PO cannot be changed.But if there is an excess amount
That u need
> to add, then it should be balanced by using the G/L account.
>
> On 8/9/07, superoasiscn <superoasiscn@ ...> wrote:
>>
> > Hi,
>>
> > After receiving invoice in SAP, we found that the price in PO
needs to
> > be changed. How can I do in this scenairo?
>>
> > With regards,
>>
> > David
+++++++++++

Is this answer relevant to the question???

azam hussain <azam_s007@yahoo. com> wrote:


me49,me50

----- Original Message ----


From: Pushpakumara Ajith <mihin2008@yahoo. com>
To: sapmaterialsmanagem ent@yahoogroups. com
Sent: Friday, August 10, 2007 3:08:13 PM
Subject: [sap mm] Slow / Fast moving Items

Dear All,

Please let me know a TCODE to view Slow moving & Fast Moving Items in Material
Management module. Thanks.

Ajith
+++++++++++++

Hi Sam,

Pl.don't mislead the members, when u flag the Returns indicator in PO,MVT 161
will be triggered automatically, not 122.

Normally MVT 122 will be used to send back the quality rejected materials to
vendor against the material document.

Thanks

P Samraj <samrajpp@yahoo. com> wrote:


Hi all,

102 is the reversal mvt. type of 101. Every mvt. type


has its reversal counterpart. The are many reasons to
make a reversal of any mvt. type (mostly human
mistakes).
122 is used when you make a returns purchase order to
a vendor. This is a purchase order with the "returns"
flag marked. By the way, 122 has it reversal mvt. type
in 123.
It's true that in both cases material is being removed
from the stock but for diferent reasons and in
diferent bussiness processes.

Hope I have clarified,

Sam

--- charles pary <charlessusai@ yahoo.co. in> wrote:

> both cancellation and Reversal are same....


>
> Cheers
> Charles
>
> "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> Cancellation is used when the goods
> receipt was done in error. The
> entire qty of the original goods receipt is
> reversed. Reversal is used
> when you received goods and are returning it to the
> vendor. You may
> reverse the original goods receipt in its entirety
> or a partial.
> --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>
> > Hi Ritu
>>
> > The effects are same
>>
> > Rgds
> > Naveen Goveas
>>
>>
> > On 8/4/07, ritu khanikar <ritu_khanikar@ yahoo.com>
> wrote:
>>>
> > > Hi all,
>>>
> > > While doing migo, we can use cancellation and as
> well as reversal,
> > what is
> > > the diference between the two?
> > > regards
>>>
> > > ritu
>>>
>>>
>
____________ _________ _________ _________ _________ _________ _
> > > Yahoo! oneSearch: Finally, mobile search
> > > that gives answers, not web links.
>>>
>
http://mobile. yahoo.com/ mobileweb/ onesearch? refer=1ONXIC
>>>
> > > [Non-text portions of this message have been
> removed]
>>>
>>>
>>>
>>
>>
>>
> > --
> > Naveen Goveas
> > SAP MM Consultant

++++++++++++++

Hello MM gurus
when i am doing MIGO i am getting error msg that
Posting Period 08 2007 not open. I have done all settings in MMPV. It is
showing current period 08 2007 and closing period 07 2007. How to do
settings for this? Please help me to sort out this issue.

Thanks and regards


Murthy

++++++++++++++=

Hi All,
Please help me with the following certifications questions. I am
preparing for the exam.

1)You want to activate version management for contracts. Which


combination of fields do you need (true/false) ?
a)Document category + Document type + Company code
b)Document category + Document type + Purchasing organization
c)Document category + Purchasing organization + Purchasing group
d)Document type + Purchasing organization + Plant

2) A confirmation control key requiring an order acknowledgment from


the vendor has been entered in a purchase order. The data in the
acknowledgment differs from that in the PO: Instead of the whole PO
quantity on the desired date, the vendor confirms delivery of half of
the total quantity on each of the two dates one week apart from each
other. How do you enter this acknowledgment (one correct answer)?
a) You enter two items with the confirmed quantities and date on
the "Confirmations" tab page in the item details
b) You set the partial delivery indicator on the "Delivery " tab page
in the item details. As a result, an additional entry screen appears,
on which you can enter the confirmed quantities and dates
c) You enter two delivery schedule lines with the confirmed
quantities and delivery dates on the "Delivery Schedule" tab page in
the item details
d) You change the delivery date of the existing PO item and reduce
the PO quantity by half. For the remaining quantity, you enter a new
PO item in which you specify the other delivery date

About Solution Manager:


3) Which of the following are Solution Manager Usage Scenarios?
(True/False)
a) Manage Change Requests
b) Monitor SAP Support Desk
c) Upgrade SAP Solutions
d) Link to SAP Education
e) Implement SAP Solutions

Thank you for your help.

+++++++++++
Dear friends&nbsp; i wnat to put more clarification on configuration and
customizing with example.configurati on is the data which is already there in SAP .
such as Po document type . It contains colums like no. range ( int and ext), field
selction, Allowed item catogories&nbsp; e.g., NB but if client wants a diff no range
and wants a perticular field to be mandatory . Then at that time you make a new
doc type . It is customizing . Both data is made by consultants .Vijay
9822207362On Sun, 12 Aug 2007 02:17:27 +0530 sapmaterialsmanagem
ent@yahoogroups. com wrote Customization is done by superuser.It means the
changes that r required can be made by the user.Configuration is done by end
user. Release procedure is the authority required to release a PO.eg. Senior
manager,MD,CEO what u need to do is Go to Materaials management -Release
strategies, there u need to work on it. On 8/10/07, nayna dixit wrote: &gt; &gt; HI
SAP--MM ----FRIENDS &gt; &gt; can anyone explain me in tetails &gt; &gt; the
defferance between configuration and custmization ? &gt; &gt; and what is meant
by release procedure / and how to activate it ? &gt; &gt; pl reply me in details with
example &gt; &gt; coz i total new to this field &gt; &gt; so dont be angry on me &gt;
&gt; &gt; thanks in advance &gt; nayna dixit &gt; &gt; ------------ --------- --------- ---
&gt; Moody friends. Drama queens. Your life? Nope! - their life, your story. &gt; Play
Sims Stories at Yahoo! Games. &gt; &gt; [Non-text portions of this message have
[Non-text portions of this message have been removed]

++++++++++++++==

Hi,

Cancellation has some additional features :

1. U can cancel wrt original doc no. which can fetch data automatically.

2. U can have original doc no as refence .

P Samraj <samrajpp@yahoo. com> wrote:


Hi all,

102 is the reversal mvt. type of 101. Every mvt. type


has its reversal counterpart. The are many reasons to
make a reversal of any mvt. type (mostly human
mistakes).
122 is used when you make a returns purchase order to
a vendor. This is a purchase order with the "returns"
flag marked. By the way, 122 has it reversal mvt. type
in 123.
It's true that in both cases material is being removed
from the stock but for diferent reasons and in
diferent bussiness processes.

Hope I have clarified,

Sam

--- charles pary <charlessusai@ yahoo.co. in> wrote:

> both cancellation and Reversal are same....


>
> Cheers
> Charles
>
> "Damita B.Casey" <damitacasey@ yahoo.com> wrote:
> Cancellation is used when the goods
> receipt was done in error. The
> entire qty of the original goods receipt is
> reversed. Reversal is used
> when you received goods and are returning it to the
> vendor. You may
> reverse the original goods receipt in its entirety
> or a partial.
> --- Naveen Goveas <naveen.goveas@ gmail.com> wrote:
>
> > Hi Ritu
>>
> > The effects are same
>>
> > Rgds
> > Naveen Goveas
>>
>>
> > On 8/4/07, ritu khanikar <ritu_khanikar@ yahoo.com>
> wrote:
>>>
> > > Hi all,
>>>
> > > While doing migo, we can use cancellation and as
> well as reversal,
> > what is
> > > the diference between the two?
> > > regards
>>>
> > > ritu
>>>
>>>

Can anyone please give me to get a solution in details. A Vendor will supply 5000
raw material with the following conditions: Gross price of the material is $20/PC. A
promotional discount 10% applies to the total value of the material. Freight charge
is $500 (absolute value).
Starting from the scratch please guide me how I can create the following for the
above mentioned problem. I am expecting a solution like release procedure
created by Chapman.
1. Condition type (with condition record)
2. Access sequence
3.Condition table
4. Calculation Schema.

I have changed the price for all materials, But now I want to see old and current
price and generated document no. So can any body tell me in which table or T-
Code
Go to IT-code
can getme1p.
the same?
you will get the all purchase history from this t-code. oher wise
just make a simple query with table EKBE.MKPF.
hi whenever u change the price then revaluation of the material will be done in this
case u can get the details from the Ac doc generated.

i have a question. if suppose we have relased the po, than is it possible to reverse
the PO. if so wut is the process.
u can go to me28 or me29n and cancel the release by clicking on the release flag
again
Hello can anyone explain to me how to change a supplier from fax releases to
receiving ASN from the supplier?

I created purchase order i got one error msg . That msg was no commitement itme
00010 1000.
Hve u given any delivery date for that PO or not.Plz check

I'm hoping you can assist with understanding this parameter, Planned Delivery
Time. It appears in three places: The Material Master, the Schedule Agreement
and the MRP Areas. It seem to do three different things...and I'm not sure I
understand any of it ;-) I also understand there is a transaction, which we do not
use, called WPDTC where one can calculate the Planned Delivery Time. I'd like to
know if there is an optimum way to set the PDT so that we improve delivery of
purchased materials. I'd also like to know where the proper place is to set and
maintain this parameter, since it's in three places (and stored therefore in three
different tables).
I would also like to know how the Planned Delivery Time impacts the error
messages that show up on the lights (MD06) and on the individual part (MD05 or
MD04). For example, will I get an exception message 07? Or will I get advice to

While Creating PR / PO system showing - Items not committed to Company code


10/1000 Pl give suggestion to create PR / PO
Pl held any body in this problem.

After receiving invoice in SAP, we found that the price in PO needs to be changed.
How can I do in this scenairo?
Please find some information on subsequent credit and subsequent debit for these
scenarios.
In addition to seubsequent Debit /Credit, following is one of the best solution
provided by SAP that is "MRNB - Revaluation " to handle the business events
which you are looking for. This is from SAP help"
You use revaluation function within Logistics Invoice Verification to determine the
difference values on the basis of price changes that are retroactively valid and to
create settlement documents for them. You can also revaluate purchasing
document items for which you have entered invoices or credit memos in different
currencies."
Do remember ... You can change the Price of PO even after Invoice Booking
(ME22ina
Price or PO
ME22n)
cannot be changed.But if there is an excess amount That u need to
add, then it should be balanced by using the G/L account.
I have read your web-page on Safety Stock Calculation (http://www.sap-
img.com/material s/safety- stock-calculatio n-in-sap. htm), which was very useful,
however there is one point I need clarification on please - SAP R = Relationship
between forecast accuracy and service level
(Service Factor) Q. How do you calculate R?

i'm a PP Consultant my user wants a report that gives the W.I.P stock details with
batch and date of manufat. of batch. i have tried MC46 and MC50 but it shows
products only as our requiremet is product code with batches. is there any table or
T can
u codetrythat
it ingives
BMBC.such details.
it is batch information cockpit

can anyone explain me in tetails the defferance between configuration and


custmization ? and what is meant by release procedure / and how to activate it ? pl
reply me in details with example coz i total new to this field so dont be angry on me
Customization is done by superuser.It means the changes that r required can be
made by the user.Configuration is done by end user.
Release procedure is the authority required to release a PO.eg. Senior
manager,MD,CEO what u need to do is Go to Materaials management -Release
strategies, there
Configuration u need
means by to work on
without it.
changing the sap existing process or front screens
,only we do settings as per our or client requirements i.e. not changing sap
programmes or t.codes(standards) we are fulfilling our requirements.
Customization means we are creating or changing Sap existing process or front
screens i.e changing or creating sap programmes or t.codes as per our or client
requirement
what u need to do is Go to Materaials management -Release strategies, there u
need to work on it.

Anyone could explain the account postings during the GR for subcontract. what r all
the accounts get debited and credited,
Please look the below link. http://help. sap.com/saphelp_ 47x200/helpdata/
en/4d/2b90bd43ad 11d189410000e829 fbbd/frameset. Htm
Purchase order 50 pieces of material ASSEM-1 were ordered. The subcontract
price is $10/piece (total value = $500). The following components were provided
to the subcontractor: 15 kg of the component COMP-1 5 pcs of the component
COMP-2
Goods receipt: The subcontractor delivers 50 pieces of material ASSEM-1. At
goods receipt, a consumption posting for the components provided to the
subcontractor is automatically made. It is valuated at the price from the material
master record, for example: 15 kg of the component COMP-1 at $20/kg = $300 5
pcs of the component COMP-2 at $30/pc = $150
The goods receipt is valuated with $950. This is calculated as follows: The
subcontract price (50 pcs * $10/pc = $500) and Value of the components ($300 +
$150).
Invoice receipt
The vendor (subcontractor) sends you an invoice for the subcontract work.
However, the price is $10.50/pc. Therefore the invoice is 50 pieces ASSEM-1 *
$10.50/pc = $525. Posting Schema for Moving Average Price Control In this
Postings At goods receipt At invoice receipt Vendor account 525 - GR/IR
clearing account 500 - 500 + External service account 500 + 25 + Stock
i have been assigned to object of domestic project. I have the functional
specification, but the problem is that i am not getting what they exactly want In that
functional specification ( FS ) they have mentioned about input requirement and
processing requirement in this way
Input Reqiurement : Printing of Goods Issue will be triggered after creation of
Goods Issue against Process Order i.e at the time of MB1A transaction is saved.
(Movement type will be 261 and 262)
Processing Requirement : For the Process Order: Check the Process Order
Number
Header Data:
1. Plant : Check the Process Order Number : Table Name is AUFK
2. Plant Description: Table Name is T001W.
3. Material Description : Check the Process Order Number : Table Name is AUFK
4. Material Code: Check the Process Order Number: Table Name is AFKO.
5. Batch Number: Check the Process Order Number: Table Name is AFPO.
6. Batch Size: Check the Process Order Number: Table Name is AFKO.
Component Data:
1. Item No: Check the Process Order Number: Table Name is AUFM.
2. Material Code: Check the Process Order Number: Table Name is AUFM.
3. Material Description: Check the Material Code from the Process Order. Table
Name is MAKTX.
4. Committed Quantity: Check the Process Order Number and Reservation
Number: Table Name is RESB. (if there is no committed quantity, committed
quantity column should be Zero for the particular Material)

put cursor on that field,which u want to suppress go for f1 , select technical info..
navigate u'll get field name...some alphabets..4 digits like.. then go SPRO->LG-->
M.MASTER-->FIELD SEECTIONS--> MAINTAIN FIELD SELECTIONS FOR DATA
SCREENS.. PUT CURSOR ON POSITION, GIVE FIELD NAME.. MAKE IT
SUPPRESSED , SAVE IN T.REQUEST & GT IT TRANSPORT TO QA..TESTING. .
1. I want to make the Payment Terms Field in MIRO as display , but going through
thecnical information, I have found the field name as ZTERM, and as suggested by
you, I tried to search in "Maintain Field Selection in Data screen" by putting the the
filed name ZTERM in Position ( reference field Selection) , but the field name is not
available. Could you suggest me further.
Please let me know a TCODE to view Slow moving & Fast Moving Items in Material
Management module. Thanks.
ME49 is for Quatation Comparision & ME50 Tcode Does not excist.
T. Code ME5A
MC46 - Slow-Moving Items MC50 - Dead Stock
U can find in LIS
Can you please tell what LIS is?
logistics information system
Hello Zuohong, the meaning of LIS is Logistic Information System. The MC.9,
MC.A, etc. transactions reads from them to show the results. Some of the LIS
tables are S031, S032, S033, etc.

any body tell me the t-code for view the open purchase requestion.
Go to ME5A , uncheck the closed requistions check box , hope this wud help.
i wanna ask u what is the Specific Relevance of Specifying Purchasing Group in
Making Purchase Order. What are the effects if by mistake i specify wrong
Purchasing Group While Making PO.

I have a problem in posting GR in the current period and it is giving me a message '
Posting only possible in periods 2005/08 and 2005/07 in company code 1000 ' then
i have tried to close all these period using Tcode MMPV but i couldn't close these
posting period and i am getting message 'the specified year 2005 is not the
calender year'. Again i can do posting in 2005/08 period but can not do posting in
the do
plz current
checkdate.
configuration settings (i.e.SPRO) for maintaining the material
management for company code....just check the What is your current financial
year..and
The period....tyr
message this
"specified message 2005 is not calendar year" is just a
warning(yellow signal) ,you can press enter and can go ahead. Make sure you
close
try all period from 2005/7 to 2007/7.
ob52
Go to SPRO.In Material Master -Maintaning the Material Management for Company
Code.In that Enter your Current year as 2007 & period as 08.
I have solution, plz try and let me know if this works Firstly goto plant assignment
and delete the
assignment with co code. using Tcode /NOMSY, find ur plant and then enter the
current fiscal year and period, save. after this reassign ur plant to ur cocode and
put cursor on that field,which u want to suppress go for f1 , select technical info..
navigate u'll get field name...some alphabets.. 4 digits like.. then go SPRO->LG-->
M.MASTER-->FIELD SEECTIONS--> MAINTAIN FIELD SELECTIONS FOR DATA
SCREENS.. PUT CURSOR ON POSITION, GIVE FIELD NAME.. MAKE IT
SUPPRESSED , SAVE IN T.REQUEST & GT IT TRANSPORT TO QA..TESTING. .
Thank you very much for your prompt reply. I tried nut encountered the following.
1. I want to make the Payment Terms Field in MIRO as display , but going through
thecnical information, I have found the field name as ZTERM, and as suggested by
you, I tried to search in "Maintain Field Selection in Data screen" by putting the the
filed name ZTERM in Position ( reference field Selection) , but the field name is not
available. Could you suggest me further.
Can any one tell the configuration sttgs for mm-sd integration method.

We are in the process of elimination of vendor aid. In vendor aid, major contributor
is the raw material & hence m/cing vendor cannot afford block such huge working
capital. Can we have a program is SAP wherein below logic is applied. Basic raw
material supplier will deliver r/m to achining vendor directly on assurance from
M&M for timely payment. Machining vendor will deliver the fully finished part to
M&M after processing. On receipt of f/f part, SAP will divide the invoice value is
such a way that r/m contribution is paid to r/m supplier & m/cing vendor gets his
contribution.
Timely paymentRejection due to
from whom r/m should
machining also have
supplier the same
or M&M? If thetreatment
timely payment is
from M & M. This can be done under sub-contracting. T code: CS01 for BOM, if
multiple materials.
1. We have to place an order on raw material supplier, ME21N
2.Raw material vendor supply the material to the sub-contractor( machining
vendor).
3. we have to do Goods receipt for the material received by the sub-contractor
based on the acknowledgment received from the sub-contractor. GR "MIGO"
movement type not sure
4. We issue the raw material to the sub-contractor "MB1C" movement type not
sure.
We have this procedure in place for sub-contracting, we want to get away from sub-
contacting w/o having any impact on landed & hence provision in SAP should be
available by which sub-contractor will buy r/m & sell it to us & during payment sub-
contractor should get his part & r/m supplier should get his parts from us instead
from sub-contractor.
I have a problem in posting GR in the current period and it is giving me a message '
Posting only possible in periods 2005/08 and 2005/07 in company code 1000 ' then
i have tried to close all these period using Tcode MMPV but i couldn't close these
posting period and i am getting message 'the specified year 2005 is not the
calender year'. Again i can do posting in 2005/08 period but can not do posting in
the
MMBE current date.STOCK OVERVIEW
IS FOR
First u check ur controlling area settings in SPRO - enterprise structure-controlli ng.
There, see whether u have defined fiscal year varient V3 or K4? If it is V3, then the
yaer starts from April to March. In this case, August will become 5th month in 2007
year.
Now check your company code status, in T.code: OMSY. It should be 5th month,
2007 ( In case of V3) or 8th month 2007 (In case of K4). If it is not there, then
change this in MMPV, accordingly.
Also, in T.code:OB52, for all 1000 related varients, open the periods upto 12th
month, 2007. ( This is FI related). If required, maintain the factory calendar that is
assigned to plant, even for previous 2 years. Now you do GR through MIGO. I
CAN ANY ANY ONE EXPLAIN ME HOW TO MAINTAIN IN FV11 FOR THE
CONDITIONS HAVING " INCLUSIVE OF EXCISE DUTY" IN E1 TRANSACTION
maintian the taxes in fv11 by already defined taxes in taxinn procedure at
document dates.
Could you please guide me on How to configure the `Electronic Transmission' of
RFQs and Quotations from and to Vendors / Suppliers. (EDI)

I had two doubts , 1. How to set vendor evaluation in IMG for perticular plant.
2.How to set release stategy for Rs.50000plus minus 2000 for perticular release
group . If say PO value is Rs.52000 But release stategy for X
was set for Rs.50000 ,In this case it should not go to Y for next release group it
should has to go for X only . How we can set that

I need your urgent help. Our Finance Users want to make grey some of the fields in
MIRO screen Layout. I am not getting in SPRO for the above option. Could you pls,
helpnot
I'm mesure,
out but did you check OMSR transaction ??

When I am releasing a PO in t.code ME29N, I am getting the error 'Negative


delivery costs not allowed'. First of all, why did the system apportion a negative
delivery cost to one line item in my PO? Second, how do I correct this error and
continue to proceed normally? Note my PO has several line items. And the
delivery cost has been entered as a global amount. It is the system which does the
apportionment.
We are in the process of elimination of vendor aid. In vendor aid, major contributor
is the raw material & hence m/cing vendor cannot afford block such huge working
capital. Can we have a program is SAP wherein below logic is applied. Basic raw
material supplier will deliver r/m to machining vendor directly on assurance from
M&M for timely payment. Machining vendor will deliver the fully finished part to
M&M after processing. On receipt of f/f part, SAP will divide the invoice value is
such a way that r/m contribution is paid to r/m supplier & m/cing vendor gets his
contribution. Rejection due to r/m should also have the same treatment

pl any body can explain 1.How to create Non valuated material PO 2.What is
back gground process and its transaction code 3.Difference between LIV and
valuation invoice verification 4.How to assign a purchase organization( standard)
to SPRO-
4. plant ENTERPRISE STRUCTURE-ASSIGNMEN T-MAT. MANAGEMENT-
ASSIGN STANDARD ORG. TO PLANT
use material type UNBW,, nd create a po, then accounting document is created
while GR ,but only in gr/ir , consumption account is triggred.
1. If I understand you well, you want to create PO for material with price 0.
First solution - create the new material type, non-valuated. Best way would be to
create it with ROH reference and without accounting view.
Second - if you want to create the PO for any "standard" material but with price 0,
just check the box "Free" on item leven in PO. Don't forget to check the "GR non-
valuated" in Po!
I need your urgent help . My users( finance) wants to make the Payment Terms
field , non editable' in P.O ( Under Header Tab Deliver/Invoice) . The Payment
terms which is coming from Vendor Master should be retained in the P.O. The
person who is creating the P.O should not be allowed to change the Payment
terms. I do not find any configuration to make this field in P.O for display only. On
the
Make other
the hand, is there
field non any (display)
editable solution via release
in SPRO strategy?
- PO - define screen layout at
document
For this youlevel.
have to set the screen layout for PO in customization. Go to: SPRO-
MM-Purchasing- Purchase order-Define Screen Layout at document level, here
select ME21N go to details. Double click on Terms of delievery and payment. Here
check the boxes in to Display mode.
How do we handle Service material Type? if we are not handling services in Ext
services management. What will be the cycle of procurement?

What is material type HERS? Can a material under this material type hold stock
quantity?
Thsi typr indiacte that it is manufactured part. It can hold stock.
I would like to clarify that manufactured part can hold stock. For example, I have a
ROH material X0001 and a (HERS) manufactured part M0001 referenced to
X0001. When G/R against the PO on M0001, will stock update under M0001?
HERS is Mfg. Part Number Which give us the information about manufacturer of a
products / Material. This may use different manufacturer part numbers to identify
the material.The approved manufacturer parts list contains assignments of
manufacturer parts to a firms own materials taking the manufacturer, plant, a
validity period, the revision level, and blocking reasons into account. In this
situation, Your Client Each material is assigned with a Mfg. Part / Material Code
which is Equalparts
Manufacturer to your inventory.
(HERS) Manufacturer parts are materials that can be supplied
by different manufacturers and/or vendors who use different manufacturer part
numbers to identify the materials.
My understandng on manufacturer parts ( HERS ) is Original Equipment
Manufacture ( OEM ) materials can be purchased from the equipment
manufacturare or from the dealers, We can have stock as we keep stock of spare
parts,
Where can I check the value updation and quantity updation? Can u provide me
tcode?

Purchase order item with limits has actual value field equal to the overall limit &
expected value fields. However, the po history reflects service
entry/goods receipts total to less than the actual value field. This difference is still
reflected in the AC commitment documents (FM & CO). Additional service entry
cannot be created as no overall limit for unplanned services exist. Where can I find
the details that make up the actual value field?
If you have actual value under the limits is more than GR/Service entry sheet
values, please execute the program RMBESTK3 by giving input as PO Number
and try. You can try the test run first and check and do the final one.
How do we handle Service material Type? if we are not handling services in Ext
services management. What will be the cycle of procurement?
Program RMBESTK3 is only for blanket PO For normal one use program
RMBESTK2
My question is for SAP-MM. I am doing Purchase Requisition. I have multiple
vendors assigned for one line item. I want to assign only one vendor who is L1 i.e.
best to fulfil my requirement. How can I evaluate all vendors suggested by system
and choose the best one vendor to place PO on him ?
maintain quotations for all the supplier,then compare the quotation price from these
which supplier supply the goods with best price, quality, on required date then raise
PO against particular quotation maintain source list for particular item then fix one
of the supplier as a fixed vendor
mintain inforecord particular material/plant/ supplier, then fix the supplier as a
regular
Maintainvendor
them in quotation can set the least pick up

Why do material cost in ZMIRO and the cost in MM02 differ? Shouldn't these cost
be the same? I have been given the task of determine the cost of freight in transit;
howover, when I started to investigate the cost I found that the cost were different.
Please help.
Material cost maintained in the master data is the cost price or u can say estimated
cost for that particular material during procurement or call of new quotations the
material cost varies or depending upon the vendor's quote which shoots the price
during the purchase order either frm info record or from the last purchase price.

i have a problem i m unable to understand pricing procedure for po. i have taken
condition type gross price discount freight packaging and forwarding excise but in
net price calculation it is taking only grosss- discount and invoice is also made for
the add
To same amount
freight . in your net price,go to MM-PURCHASING- CONDITIONS-
charge
DEFINE PRICE DETERMINATION PROCESS-DEFINE CONDITION TYPE -
Define condition type-and select ur freight condition type-deactivate ACCRUALS
key in control data2 (freight condtion screen) & save.Create PO again.

Problem: Souce list not included despie source list requirement Sol: to verify PIR,
SL along with valid dates and delivery dates

I m having a problem related to pricing procedure. Plz tell me the use nd imp. of
access sequence while creating condition type. how actually the systems searches
record with access sequence. why access sequence is entered during creation of
gross price nd not during discount ,frieght ,packing etc.
Access Sequence is a search strategy and it searches for a valid condition record
of a condition type, in a condition table. If you go to Access sequence and see, you
will find the table no.s lie 17, 63 etc. Again in each table, you will find some fields
like material no, vendor, plant etc.When you maintain condition records ( values),
those will be stored in that tables. Access sequence will search for the records as
per the sequence of tables, defined.
For example, for condition type PB00, if Access sequence is 0002, then it will
search for the value of PB00 in those tables, while you are creating a P.O. If any
value is found, then system will automatically copy that value in P.O. If no value is
found in tables, then you will have to enter the price manually.
For other condition types like freight / discount, Access sequence is not defined
means, that condition type is dependent on some other condition types. i.e,
discount
Why ( RA01)
condition willpboo
type be calculated
is used in on Gross price(PB00), then there won't be any
contract

when iam doing the Miro transaction below two error message is coming -
Balance not ZERO, 2,028000.00 Debit,Credit : Zero -Only inputtax is allowed for
account 191100 8475, V1 is not allowed. can any one help to correct the above
bugs.
Enter the amount in the coloumn the error gets nullified with 0
You need to select the correct tax code in the Invoice verification. As per the error
V1 tax code is not applicable.
Enter 2028000.00 in amount field of miro screen.& also enter correct Input
Tax(Purching tax).you are entering wrong tax(output Tax.).

How to get the report of date wise stock at vendor.thru MBLB I can only get the
stock as on date. If I want to check the stock of vendor on some
previous date wht would be the T.Code. Pls help me
Mb5b is report which will tell you stock lying for material on posting date........ ....
what you mean stock a vendor ... is this a special stock ...........please explain
clearly
thru MB5b we can only get the special stock but not the name of vendor. pls help
Ineed the detail of special stock vendor wise.
can u try MBLB
in MBLB date selection is not there. It shows as on date stock.

when i am creating a PR i am getting error no 629 i.e Item & payment budget for
year & exceeded. till last day everything was ok, but now its not taking the
commitmnet item and fund center. help me out

Does anyone know how to change the byer's address in the PO sheet that printed
by ME9F?
Change the address of the purchase group.
I think it is not possible once PO is printed. due to change of Pur. Grp Address
Change i think i WILL NOT Effect..
I checked it is possible.
is the requirement to change only the address for this particular PO are for all po?
go to delivery address in po and change it the system will prompt if the change is to
effect otheryou
I suppose places.
can use the Address field in Item Detail->Delivery Address tab of the
Purchase Order. Goto Change Purchase order and do the changes, then print the
PO using
ME9F must ME9F.
link to a program in which the delivery address is embed. How can I
find the code of the program?
there will be a Name of the Form ( SAP SCRIPT ) Assigned in SPRO . Go the Form
through se71 and change the Address required .

Solution : CANCELLATION REVERSAL


Canellation means total purchase item or a part of it can be cancelled when we feel
it is not required and material has not yet been received by the company
Reversal means Purchase Return when the material has reached your company
and you want to return it back due to some reason then u can go for reversal

Can any one explain me what is the Diff Between TAXINN & TAXINJ, Where it Hits
In MM. is the condition based tax procedure .
TAXINN TAXINJ is the formula based tax
procedure
TAXINJ .
is formula based TAX Calculation Procedure for INDIA and is the most
predominantly used Procedure in India, WHILE TAXINN is condition based TAX
Calculation procedure, except for a handful of companies, others haven't opted for
TAXINN.
TAXINN
Let me addminimises the use
to the below of ABAPOnly
statement. routines
a few companies are using TAXINN right
now. However with the advent of New Dimension products of SAP which use IPC,
Billing and Tax Engines, it is advisable to start any impementation with TAXINN
only, for future integaration. All companies which have used TAXINJ and are opting
for CRM/SRM are swithching over to TAXINN, which in itself is a huge effort
involved.
Hi Joshi,
Here are some differences in TAXINN AND TAXINJ tax conditions.
TAXINN:
When you enter a purchasing document, for example, a purchase order, the R/3
System automatically calculates the applicable excise duties using the condition
technique.
Logistics - General, by choosing Taxes on Goods Movements > India > Basic
Settings > Excise Duties Using Condition Technique and ... > Account
Determination.
Features
The standard system comes with two tax calculation procedures. TAXINN is only
supports condition-based excise determination, whereas

TAXINJ:
supports condition-based excise determination and formula-based excise
determination.
Customer Master Data,Vendor Master Data,Material Master Data,Plant Master data
and Excise tax rate have to be maintained.
Formula-Based Excise Determination:
When you execute a business transaction involving materials that are subject to
excise duty, the system automatically calculates the duty for you.
Prerequisites
In order for the system to be able to determine which rate of excise duty to apply,
you must have maintained all the data on the
TAXINJ:
1. It is Formula Based Tax procedure.
2. It was most commonly used upto intial phase of R/3 4.7, but the latter
implementations were with TAXINN.
3. Tax Code plays a vital role, as the Tax Rate are maintained in Tax Code.
4. It is complex compared to TAXINN

TAXINN:
1. It is Condition Based Tax procedure.
2. Tax Code is required to be maintained in Condition Record, & if Tax Code is not
found in Condition Record, Sales Cycle will go upto billing, but not release to
accounting. Hence even a single Tax code may suffice trhe requirement for
different Tax rate.
If SAP is implemented for any company in INDIA and the company is in
EXCISABLE range then
in SAP ,CIN is implemented ( Country India Version) then
you have to implement the SAP by either of the one type of CIN
1. TAX INN - Condition based CIN implementation
2.TAX INJ -Formula Based CIN implementation
1. If you are using TAXINN then system will pick rate from condition record
maintained using tcode FV11.
2. If you are using TAXINJ then rates are to be entered while creating tax code in
FTXP & J1ID.
TAXINN is condition Based While TAXINJ is formula based pricing procedure.
Now these days, in ECC 6.0, SAP using TAXINN
The basic difference between both the procedure is TAXINN is a condition based
for each condition type we have to maintained a condition records and TAXINJ is a
formula based for which me maintained a tax code in FTXP and the same will be
assigned to the condition type UTXJ with accesses sequence Country/Region of
Delivery Plant/Region of Customer/ Tax Classification of Customer / Tax
Classification of Material/ Tax Code when we create a condition record for SD
related.
In SPRO ---> Logistic General --> tax on goods movements ---> inida --> basic
settigs --> determine of Excise duty -->
maintaiin Excise Defaults
here for TAXINJJ, you have to maintain all fields you are using but for TAXINN you
have
TAXINJ:to maintain only one "JCV1" in CVD condition conditions.
1. It is Formula Based Tax procedure.
2. It was most commonly used upto intial phase of R/3 4.7, but the latter
implementations were with TAXINN.
3. Tax Code plays a vital role, as the Tax Rate are maintained in Tax Code.
4. It is complex compared to TAXINN

TAXINN:
1. It is Condition Based Tax procedure.
2. Tax Code is required to be maintained in Condition Record, & if Tax Code is not
found in Condition Record, Sales Cycle will go upto billing, but not release to
accounting. Hence even a single Tax code may suffice trhe requirement for
different Tax rate.
In TAXINJ:
The value of a particular condition is calculated from a set of predefined values ie
while defining an TAX code in a TAXINJ the structure is as follows
1 BASB - 100
2.JVRD - 12.5% of BASB
3. JIPC - 4% of BASB
4. JIPL - 2% of JIPC.

All these calculations are structured in the tax code Z1 say for example, when the
user wants to have such a calcuation in his PO he need to use the tax code Z1
instead if he want to have JIPL as 8% instead of 2% then in such a case he needs
to create a new tax code as Z2 with JIPL = 8% ( formula of calculation is getting
changed)
So the tax code plays a vital role in the determination of the tax condition value in
the case of TAXINJ.
Where as in TAXINN:
The condion records are mainted instead of hard coded percentage value in the tax
code.
Say for example JIPL for vendor V1 can be maintained as 2% with FV11
transaction similarly the
TAXINJ -- Condition same
as well ascan be maintained
Formula Based as 8% with a combination of
TAXINN -- Formula Based.
For TAXINJ, you need to Maintain Jurisdiction code. and the Condition
values will be taken from FTXP Transaction
where as for TAXINN, you will get the values from Condition Records from FV11
Transaction
Firs of all both are Tax Procedure. Tax procedure is attached to Country Key. In
case of India , country key is IN.
Taxinj
is formula based tax procedure
TAXINJ requires you to maintain additional data in the Excise Rate Maintenance
transaction, J1ID.
Taxinn
is condition based tax procedure
TAXINN finds all of the condition records that you have created for that combination
of vendor and material. This method requires condition records to be maintained for
combination of vendor and materials.
SAP recommends new customers to go for Taxinn
TAXINN is condition-based excise determination procedure
This method requires you to create condition records for each combination of
vendor or customer and material (and possibly other conditions).
When you create a purchasing document, the system calls the tax procedure
assigned to India. The tax procedure finds all of the condition records that you have
created for that combination of vendor and material.
When you create a sales document, the excise duties and sales taxes are
determined by the pricing procedure (not the tax procedure).

TAXINJ is formula-based excise determination procedure


This method was used in the Country Version India Add-On and requires you to
maintain additional data in the Excise Rate Maintenance transaction, J1ID.

When you create a purchasing document, the system calls the tax procedure
assigned to India. Each of the excise duties in the tax procedure has its own
condition types, and each condition type is assigned to a formula. This formula
instructs the system to calculate the excise duty using the data that you have
maintained in the Excise Rate Maintenance transaction.

When you create a sales document, the system determines the excise duties and
sales taxes using the pricing procedure (not the tax procedure).

TAXINN is to be preferred for CIN usage.


Basically Cin is divided in to two types:
1. TAXINJ - Is a Routine Based that is used in the condition types. it will work on
the logic what ever is there in the Routine.
2. TAXINN: - Is a condition Record based. Means we have to create condition
records for each and every condition type that you are going to use in the Pricing
Procedure.
Since Version 4.7 this TAXINN came into picture and start using this.
And one of the important points is since 4.6 c CIN comes a separate package. But
after introduction of 4.7 Version, CIN is coming the SAP Package itself and even in
the Customer Master Record also we will find the CIN Icon.

Basically 4 types of Pricing Procedures are used in CIN and are as follows:
1.JDEPOT - Depot Sales
2.JEXPOR - Export Sales
3.JFACT - Factory Sales
4.JSTKTR - Stock Transfer

Country Version India comes with four pricing procedures as follows:


JINFAC (Sales from manufacturing plants)
JINEXP (Export sales)
JINDEP (Sales from depots)
SAP
JINSTK (Stock transfers)
recommends to use TAXINN for all the new implementation. The TAXINN is
the condition based, you can simply create the conditions records for all the Excise
and Sales tax but the TAXINJ will have the formual assigned for each condition
which derives the rate from the J1Id transaction with the help of taxcodes.

The reason for moving from TAXINJ to TAXINN is that all the formual written in the
R/3 should be written in the CRM Pricing also which is a Java code. If you have any
plan to implemet the CRM in near future it is strongly recommended to use
TAXINN.

We use vendor batch numbers to manage our material, the problem is that our
vendors have no system in generating their batch numbers(not in
numerical order). Is there a wsy to enter the vendor batch for tracking purposes, but
allow SAP to generate a batch to manage FIFO. Thanks in advance for your
assistance,
Why do material cost in ZMIRO and the cost in MM02 differ? Shouldn't these cost
be the same? I have been given the task of determine the cost of freight in transit;
howover, when I started to investigate the cost I found that the cost were different.
Please
Materialhelp.
cost maintained in the master data is the cost price or u can say estimated
cost for that particular material during procurement or call of new quotations the
material cost varies or depending upon the vendor's quote which shoots the price
during the purchase order either frm info record or from the last purchase price.

Is there a standard report that shows the changes that has been done during the
Invoice verification (MIRO) - Header and item level or atleast at header level. Like
Invoicing party, price, date, payment terms etc.

Can we increase inventory valuation without updation of stock thereis one way by
transaction MR21 we can increase it, is there any anthoer method ?
Yes. But only in case of FG. Since this is valuated at Std Cost, transfer the
material from one code to another. Then the material is valued at the receipt
material cost but the variation will hit the P&L account
I Think Question is not clear to u . I will try littel more to explain my question . Can
we increase total valuation of inventory without increasing / deacresing stock
available level ?. your suggested solution is that to transfer stock from one code to
onthor this will increase / deacreas the stock.this is possible by transaction MR21
by whcih youe can directly increase / decrease MAP/ STD price so that inventory
valuation get update accordingly & there is no impact on stock of this transaction .
is you
If there anyincrease
want anothor way ?
or decrease the stock item for a perticular qty we can create a
batch with the help of split vauation we can revaluate for the specific quantity batch.
My understanding is if we decrease or increase the value by MR21 the valuation
would be applicable for the entire qty in stock, in the WIP stage material also.

I have some materials which is supplied by two vendors, i want to maintain Gross
wt and Net wt for materials in the material master, but the thing is weight of the
materials differ vendor to vendor, plz tell me how to maintain two gross weight and
Net weight for a single material in one material master
case 1- The stock keeping unit is same for both materials. The gross/net weight
maintained in the material master is the wt of material of Base unit of measure ( for
ex if the UOM is 'kg' and the gross wt is 5 then it means each unit is 5 kg) so
maintain a common UOM where wt of the
material is same.
case 2- The stock keeping unit is different for both the materials. Go for different
material codes
For this scenario you can split the material by split valuation.

Can any one please suggest how is the cancellation of GR handled in case of
vendor evaluation. I processed GR thru MIGO for a PO through Movement type
101 and the correct score was calculated for criteria "On time Delivery
Performance" . Then i cancelled my GR through MIGO with mvt. type 102 , but it
didnt reflect in the score of criteria "On time delivery performance" . What should i
do.

While doing migo, we can use cancellation and as well as reversal, what is the
diference between the two?
The effects are same
Migo Cancellation is through movment 102 ( cancel GIR for wrong entry or any
other mistake ) & MIGO reversal is through movement 122 ( sending back to
vendor
Both )
Cancellation and Reversal are same....
Movement Type 102 in MIGO will reverse the Goods Receipt for PO and the same
will happen for Cancellation also......
Movement type 122, is for Return delivery to Vendor and this wont come under
Reversal or Cancellation concept...
Cancellation is used when the goods receipt was done in error. The entire qty of the
original goods receipt is reversed. Reversal is used when you received goods and
are returning it to the vendor. You may reverse the original goods receipt in its
entirety or a partial.
I have some materials which is supplied by two vendors, i want to maintain Gross
wt and Net wt for materials in the material master, but the thing is weight of the
materials differ vendor to vendor, plz tell me how to maintain two gross weight and
Net weight for a single material in one material master

does anyone know if you can create contracts for internal procurement. I need to
create contracts for our inter-company purchases.

*Kindly provide Transaction code to check the list of pending purchase orders.*
ME2L, ME2N, ME2M, ME2O,
use ME2N , scope of list ALV & change layout as per requirement.
Can use transaction code ME2L for pending PO vendor wiseAnd transaction code
ME2M for pending PO material wise
You have other TCodes like ME2C -by material group and ME2W by supplying
plant
we can use t-codes:- ME2M, ME2L. in that give BEST OR ALV, to list all pending
po.
you can also use ME80FN

SAP--MM TEACHIES CAN ANYONE TELL ME THE DIFFERANCE


BETWEEN SERVICE MASTER RECORD AND SERVCE ENTRY SHEET ?
IF POSSIBLE PL DESCRIBE ME THE WHOLE SERVICE PROCURMENT CYCLE
I WLL BE VERY MUCH THANKFUL TO ALL OF U
Sevice master record is the master data like materail master wheras service entry
sheet is like goods receipt of services.
I am sorry to saay that before posting any problem to this forum,u should work
atleast something then only members can help u.The problem which u have posted
is very basic and silly.So pl.try to work some thing...this is my sincere request.
Also please try not to type everything in capitals. It seems like shouting.
Sevice master record is the master data like materail master wheras service entry
sheet is like goods receipt of services.
We maintain service master by T-code ac01.& for service entry sheet first make
P.O. by me21n in which maintain K & D in Account & Item category.then make the
service entry sheet by T-Code ML81N. then pass the service entry sheet by ml85.
The expalnation given by Pavan may help u to some extend,but u have to explore
many things which will be possible when u do some thing on that..don't feel bad
about my words..this is for ur betterment only..

What is FFF Class and where it can be used for? I have a internal part X in bom
with three manufacturer part M1, M2 and M3. Two of them, M1 & M2 can be used
in product. What is the best practice so I will not do wrong GI to production?

1.Could any one tell me whats the exact difference between workbench request
and customizing request? 2.What is meant by Version managment?Where it is
used?
workbench request indicates ..tasks / objects done by technical guys.. customising
request is for ...tasks done by technical people..

Can we increase inventory valuation without updation of stock thereis one way by
transaction MR21 we can increase it, is there any anthoer method ?any anthoer
method
Yes. But?only in case of FG. Since this is valuated at Std Cost, transfer the material
from one code to another. Then the material is valued at the receipt material cost
but the variation will hit the P&L account
I Think Question is not clear to u . I will try littel more to explain my question .
Can we increase total valuation of inventory without increasing / deacresing stock
available level ?. your suggested solution is that to transfer stock from one code to
onthor this will increase / deacreas the stock. this is possible by transaction MR21
by whcih youe can directly increase / decrease MAP/ STD price so that inventory
valuation get update accordingly & there is no impact on stock of this transaction .
is there any anothor way ?
For cancellation of GR There is transaction MIGO movment type 102 and another
Transaction MBST Lets us know when should we use MBST& MIGO with 102
mov.?
If You use GR mvt 101 then you got Material Document Number. You can use Mat
doc Number for cancel MBST and MIGO (mvt 102).
Please understand the reason behind every transaction code. MIGO is for GIR (
Good In Register ) for Procurement related transaction. ( though common
movement is 101 ). MBST is cancellation of Material documentation. In SAP a
material document gets generated whenever there is a movement of material or
value addition of material. Some of the Movements are automatic ( non-optional )
and some are decided by the user ( optional )
MBST can only cancel a material document where the movement type is Optional (
Inventory management transactions like MB1B, MB1A etc ) where by you can
reverse the transactions by canceling the respective
material document . This is an alternate route to reversal of such documents
through their original TR ( like MB1B, MB1A etc )
( Please note, in SAP, there is no real cancellation , only reversal of any entry is
possible ). MBST CAN NOT cancel/reverse material documents generated through
automatic postings ( Like closure of Production order, Phy inv adjustment etc )
Such cancellations has to be done through respective Reversals only ( ex:
MIGO cancellation etc )
101 movement is defined for debit Stores ( entry to stores ) either by Purchase
order or by Production order. 102 is the reversal of the same. ( explanation given
by " ugenx " is absolute rubbish. Please don't mislead .) .Accodrdingly go through
Kindly suggest where do I mention Shelf life of a material.
Material master - Plant Storage Data 1

When i am doing LIV for Exciable material,Excise is also calucating on Frieght(Like


BED,Edu Cess & SHE on Frieght). But in Migo there is no Entry. What will be the
reason,can anyone please send me the changes i have to do.
U hv to maintain condition records JMX2, JEX3, JHX2 AS 100% , then the values
wont be captured in MIRO
COULD ANY ONE EXPLAIN THE APPLICATION OF T CODE MRDC AND MRRL.
ALSO TO EDIT THE MIGO IN WHICH EXCISE INVOICE DATE WRONGLY
ENTERED.

I HAVE ONE PROBLEM IN CLASSIFYING PR FOR LOCAL PURCHASE AND


SENT FOR RFQ .AS THESE ARE HANDLED BY DIFFERENT PERSONS,SOME
TIMES IT IS GETTING DUPLICATED,COULD ANYONE PLASE GUIDE ME TO
DIFFERENTITE THE SAME WHILE CREATION OF PR ITSELF?
I suggest you create two different PR document types for ur scenario. And then
navigate to SPRO > Materials Management > RFQ/Quotation > Define Document
Types. here under the 'Link purchase requisition - document type' folder, define the
PR document types for which can be adopted in an RFQ, which in your case is the
'PR for RFQ'. By defining this this the user will not be able to create an RFQ that is
being adopted from the local PR. However, i also sense that there is something
wrong abt the whole process as it seems a bit dodgy. Let me knw the whole
scenario so that i can help you out better.
which is your parent material and child material in BOM. parent material is the one
which is assy & child material is which fits into assy. Parent material for a subassy
is considered as child assy for FG of higher level. You can check the level of
material in BOM. Depending on the level code of item they are in BOM.. parent
material is mentioned in po.. n the material u r mentioning in bom r child matrials

What is the difference between LSMW & CATT? At which situation we can use this
tools?
LSMW is Legacy System Migration Workbench. It is used to upload the data from
legacy system to SAP system before golive. CATT is Computer AidedTest Tool,
used for testing data in SAP system.

hi frnds can any one hlep me to know the table names for PR RFQ PO MIGO
MIRO and BOM ; PR - EBAN / EBKN ; PO - EKET / EKBE / EKKN / EKPO ;
BOM - MAST ; MIGO / MIRO - Which fields you want ?

How can I block Miro of invoice if materials are> unapproved or rejected?


Dear prasanth,i have a modified problem of what sumedadescribed. if the goods
received and accepted and got regected in production centre and want to hold the
MIRO,is there any way.?pl guide me.
you can put manual block.
Use 103 movement at the time of MIGO .It will not allow MIRO untill 105 is not
done.
try doing MIRO wrt PO
The ideal solution for you would be to enter a return delivery for the goods that
have been rejected at the time of production. However, if you still want to hold the
MIRO. Move the stock into quality inspection and consume it physically, once
consumed move the approved pieces into unrestricted (in SAP) and post the
consumption. Reject the rest of the goods from quality inspection. Since invoicing
and payment cannot be done for goods in quality inspection.
While posting doc during MIGO I got error message "Posting period not open".
Then I tried closing the previuos period using MMPV I got the message "Incorrect
Period in control record of Comp Code XX. No Conversion the current period
(mm/yy) of the control record is XX". I also tried fixing this using OB52, but
surprisingly I couldnt see 2007, pls see attached file. Can anybody suggest some
solution? I will really appreciate your response in this regard.

I am facing probelm in issuing material against reservation and message coming is


as: CO-document number assignment not possible for business transaction COIN
in CO area .what is mean by Transaction COIN in controlling area ,pls reply
Check out the Number ranges in customizing. create a new group. and insert COIN
into that group

I am facing probelm while MIRO transanction ,the message is as : Tax code VN


country IN does not exist in procedure TAXIN. even though i have maintain tax
code.

I am Facing a Problem Regarding BOM Updation. Whenever After Making BOM


through CS61 , i go for BOM Updation Through CS62 an update termination Error
is Getting Generated and BOM is not getting Updated. I am Facing This Problem
Regulary and Unable to Trace The Error.

What is difference between "terms of payment" and "payment terms"?


In what context you are asking. If you are asking aout PO then Payment term is
used to calculate due date in MIRO where as "terms of Payment" is a text field
which can be used for long description if you v.
They mean the same thing but they are specified at different level, ie. Company
Code and/or Purchasing Org Level.

Could anyone please help me how can i Transfer a material from its present
material type to another material type. Is there any t-code for that?
To transfer a material from its present material type to another material type the T-
code we have to use is MMAM
There are restriction on this kind of transfer !!! Have a look on Sap help
You can change a material type to another material type using T-Code MMAM.
Prerequisite is the material should not be in any Bill of Material, no Purchase Order
should exist, no reservation exist and no valuated stock exist.
Go to MB1B select movement type 309 and do it. If the material are relevant with
batches you have to create a new batch

I want to take only list of pending GR/IR i.e 105 list. Kindly advice from with t-code
or from which report I can take the same.
MB5S, MB51
have already used MB5S but limitation of this option is that we could not find one
summary list of all parties with number of 105 which is going to be passed in SAP.
If we find this type of report than we can easily control pending bills for passing in
accounts on weekly basis in spite of party basis.
what do you mean 105?
105 is movement type from which we make entry for stock through migo. Now I
want to take a list of pending stock entries (105) for passing in account of party
ledger.
i want to transfer stock from unrestricted use to quality inspection. wut movement
type i shold use, or tell me how to do this.
Hi, use Mvt type 322....
322 is reversal , but i want to send it to quality inspection from unrestricted use
Satish is right, it has to be Movt type 322 only. Do not worry about Movt type 321,
evenif u have nopt carried out 321, Movt type 322 works independently if u want to
move
Is QM from Unres to ?Quality
implemented

Can any one guide me how to find the total amount for a Particular Purchase
requesition. Is there any Report for this?
You can try ME5A but you will have to select your desired output fields (It does
have the Total Value Field).

this a pblm facing in my company, there are 2 document types zdnb and zcnb zdnb
is used as purchase req(prs1),zcnb is used as purchase req(prs2) i need zdnb to
ask account assignment as mandatory field where as in zcnb i need not how can
configure this

Is it possible to reverse the UD given in QA32 & goods & accounting movement of
the same. mvt due to UD is 122. Pl help. Its very urgent.
Can any one explain the following in length ACCOUNT MODIFIERS,VARIANCES ,
TRANSACTION EVENT KEY. Explanation with an example would help me a lot.

please tell me Invoice Amount and Purchase Order No display T-code I mean
Invoice amount means Purchase order -> Purchase Order History -> Invoice
Receipt amount and purchase order no.
Try ME80FN and change view to PO History

Can any body tell me what material group reports can we get?
i couldn't get you what you meant to ask????

please tell me Invoice Amount and Purchase Order No display T-code. I mean
Invoice amount means Purchase order -> Purchase Order History ->Invoice
Receipt amount and purchase order no.

I have problem on MiGO, message account determination for entry INT KBS 0001
3000 not possible. I have used OBYC but the Kbs is grey and could not make any
entries. What else can i do.
you tell ye self as SAP papa & u dont know the simple solution for the ans go to
OBYC & assing the GL account

Can anyone tell me,what is meant by 'back flushing'?


The non-manual posting of an issue of components some time after their physical
withdrawal for an order. The goods issue posting for backflushed components is
performed automatically at the time of order completion confirmation.

Kindly help us on how to edit the last serial number. Our user accidentally create a
wrong serial number that is why everytime they will create a new serial number, a
wrong last num serial number has been displayed and generated. Attached is the
screen shot of the last num serial number. Thanks!
have a look with SNRO and the appropriated object

Can you help me out to find out the Total Amount for Purchase requisition having
multiple line items? (Total value of a Purchase requisition)
For the document type of PR,check the overall release requirement in SPRO.You
could get the header value of PR.
IN IMPORTRED PO, MIGO EXCISE TAB IS NOT COMING. HOWEVER CVD ,SPL
DUYTY ARE MAINTAINED IN DELIVERY COSTS AS PER MY CONSULTANT
INSTRUCTIONS. PL GUIDE ME FOR EXCISE POSTING.
For Import p.o,following components will come:
1.Basic price (CIF,C&F etc) - However this will be arrived including cost,insurance,
freight,landing cost etc.
2.Basic customs duty on item 1(percentage will vary based on product customs
classifcation)
3.CVD - 16% on item (1+2)
4.Excise cess - (2+1)% on item 3
5.Custom cess - (2+1)% on item(2+3+4)
6.Special duty - 4% on item (1+2+3+4+5)
Ensure above all components are figured in your import calculation schema.
KINDLY GUIDE ME HOW TO RETRIVE HOLD MIRO DOCUMENT FOR WHICH I
HAVE NOT KNOWN THE THE DOCUMENT NO? SECONDLY, IN ONE
SOEDIFIC CASE WHILE I AM POSTING MIRO I HAVE A MESSAGE "ACCOUNT
45600000 REQUIRES ASSIGNMENT CO OBEJECT" 45600000 IS OTHER
GAINS ACCOUNT. COULD ANY ONE GUIDE ME TO SORT OUT ABOVE
PROBLEM
For second problem you just go into preporties of your G/L aaccount,assigan a cost
center to this G/L.

I was reading some documents regarding RFID used in SAP. The idea is cool but I
can't really imagine a scene like this - a truck is edging away into the gateway of a
warehouse. When it reaches the scope of RFID reader, material administrators
suddenly see 10,000 goods receiving's in SAP because there're 10,000 SKUs with
1 RFID tag sticked on each SKU, which possibly leads to a system crash... Further,
how it's going to deal with special cases like purchasing kanban (you can't just
make goods receiving with MIGO because then kanban cards status won't change
to FULL), go without saying purchasing documents out of a normal PO (such as
delivery schedule). Is that the way RFID works in SAP?

anil, this is problem of AAD, use T.Code OBYC, select KBS ie Account assigned
purchase order, n give the credit n debit , like 91 81, n save than u try the save
service entry, group
add valuation
I'm trying to find out where the Purchase Requisition header text (Header notes)
configured. I searched in SPRO could not find . I could see Purchase Reqsuisition
item text. I have created 3rd party sales order and I want to pass sales order
header text to Purchase requision or purchase order header text. I could not find
where the configuration for header text.... I'm able to configure Item text.. Please
help me where could I configure the header text. to get the 3rd party sales order
header text to Pruchase req and purchase order...?...

I'm looking for how to configure from 3rd party sales order header text to purchase
requsiton / Purchase order header text? or MM user-exit... ?

Please could you help me that SAP MM config flowchart.or config start point to end
point.

Can anyone explain with examples?? 1.) acceess sequences 2.) condition
records 3.)condition types 4.)condition tables
Access Sequence: A combination of accesses to condition records. The access
sequence defines the order in which the system searches for condition records.
Condition Record: A data record that stores a condition or condition supplements.
Conditions include Prices,Discounts and surcharges,Taxes, Output.
Condition Type: A characteristic of a condition. For example, in pricing, different
condition types are used to distinguish between a discount that refers to a net price
and a discount that refers to a gross price. .
Condition Table: A table that defines the structure of condition record keys. The
key consists of a variable part that represents one or more fields, and a fixed part
that is identical for all condition records.

In the Vendor Master Record the Conciliation Account field is grayed out I can't
input any data in this field. I tried to fix it by Tcode: omsg and make the field as
required field but still it is grayed out. Please some one help me to fix this problem
immediately.

Is there a way to know all the SAP table names and the kind of data it hold ...
You can also try T-Code: MM00
Description: Values for TINC &amp; TINCT tables are not consistent. The following
codes are included in the TINCT table but missing in the TINC table: CFR
CIP CPT DDU DEQ DES FH UN Please note that the Vendor
Autoload tool is mapped to the TINCT table whereas the vendor master creation
transactions (XK01, XK02) are mapped to the TINC table. Vendor Autoload tool is a
tool to create vendors Autoload users are able to select any of the above values.
however, the request cannot be processed as these values are invalid in PCM.;

We received X material with qty 50 kg then dispatch to production at the end of


pack we calculate the total issued quantities we found 49.600 kg we want to
calculate excees and shortage .how this equation called reconcillatin or what .
you may say so

Even if you remove the reason for blocking the invoice, you have to release the
blocked invoice in separate steps, it does not get released automatically. Yes you
have to release it by Tcode: MRBR.

When ever u find an error in MIGO as such u have given, the reason will be
available in the top line itself. Pl check the document type of MIGO selected, the ref
doc, the number of ref doc and item no and finally the MvT used. the combination
should be correct. ur error message will not come.

we have automatic updation of info record for all purchase order type.we want to
block for one of the purchase order type. please explain the procedure .

I have maintained the quota arrangement and source list for the required material
and plant.But when PR is made iam not getting the source from quota arangemnt
or Source list but it is determining from info record. How to set it right? can anyone
tell step by step procedure?where iam doing mistake? Another issue is, i
maintained release procedure with out classification for PR based on value for
particualr material group and plant. But when i do PR for more than the value set
for same material and plant also PR is not going through relese procedure. How to
set it right? can anyone tell step by step procedure?where iam doing mistake?
what is the function of unit of accounts in warehouse it is related to Purchases all
special order items. Prepares requisitions and Reviews billing .

147 Account determination for entry INT KBS 0001 not possible, This error had
come at the time posting service entry sheet. So please solve this error as soon as
possible.

I have maintained Quaota arrangement & source list for a material and plant. But
when i do PR and i click source determination iam getting a source from Info record
but not from quota arrangemnt or source list. In source list and quota arrangement
different source is maintained. Can anyone tell me where iam doing mistake with
sequence of operations?
Another issue is i set release procedure without classification for PR which is based
on value and is saved and activated. But when I do PR with same material group
and plant also PR is not going through RP it is directly released. Can anyone tell
me where
only iam doing
valid sources aremistake with
selected sequence source
in automatic of operations?
selection. When you open the
screen, first tick source determination, then enter rest of the data. You also need
info records of vendors you mentioned in source list, quota arrangement.
1.Have you checked source list requirement and quota arrangement in Material
Master Purchasing view? 2.Value is item value or header value?RS set is at value
or header level?Both have to match.

Can anyone tell me,what is meant by 'back flushing'?

What is the difference between the Discounts what we give in Vendor Master
record and the Discount what we give in Pricing. 2. How does the system know
which to ADD and Which to Subtract in Pricing. 3. What are the Transaction
Keys Hot when
1.Discount givenwe
in Post MIGO?
info record/contract/ sch.agree will apply to purchases involving
the particular material.Whereas discount in vendor master applies to all purchases
involving that vendor. ex.turnover discount.i.e. Vendor master discount can be
applied over and above the material discount. 2.While defining condition type in
price determination process (SPRO) you will be mentioning positive or negative.
3.Not understand your query.
I have business requirement to develop release strategies on contracts and
purchase orders in such a way that if Purchase Orders are created from a contract
and the contract already has been released/approved via ME35K, there should not
be a need to release the purchase orders, if the pruchase orders (for the same PO
doc type) are not created for a contract, they are subject to release strategy... Is
there any standard solution that could be applied, or is there a user exit which I can
use in itthis
I think situation..
is better any different
to have help would be appreciated
document types for normal p.o and release p.o.
with which your requirement can be fullfilled.

Please help to solve this issue. PO qty = 100 ; GR 1 qty = 80 ; IR qty = 100
Once I post Invoice it goes into blocked, in my opinion when I post GR 2 for qty 20
the invoice should be released for payment automatically. But it is not. Is my
thinking wrong? Do I need to still run T.Code MRBR for releasing the blocked
invoice?
In your case,invoice is blocked for quantity variance.An invoice which is blocked for
any reason,need to be released manually.
u need to run the automatic release blocked invoices cycle, Once all the blocking
reason for an invoice are not valid, invoice releases automatically in run.

Can anyone tell me if there is a BADI or a Function Module to create an Inbound


Delivery?

Can we change the database any time i.e assume that we have initially started
implementation with oracle 10i and later after one year If we want to change the
data base from Oracle to xxxx . will SAP system supports that .If Yes what are the
possibility.
Yes you can change,

created two release streategys 01 01 and 02 02 and created Charecterstics Doc


Type(NB),Vendor( 000100015, 0001000279. .) and NetOrder Value(<250000USD,
>250000USD) and assigned these charecterstics to the Class.First release strategy
01 01 (NB,000100015, 0001000279 and<250000USD) and second Release
strategy(NB and >250000USD) and i dont want to restrict as per the Vendor for
second release strategy.My system is triggering only first release strategy and
second releasestrategy is not at all triggering since Vendor value going blank.How
can i make my second release strategy should work with out restricting the
Vendor?Can anybody help
iam doing implementation project to maufacturing company. the client want to
assign batch number for his raw material and the same number has to be carried
upto finish goods.After sales any queries with respect to product will be tracked
down wrt batch number.So for ease plz help me wrt my doubts. 1)At the time of GR
suppose PO is having X line of items can i assign different batch number for each
line of item ,if i prefer for external assignment of batch number. 2) Can i opt for
alpha numeric for batch number n what is the char length? 3)In material master in
Purchasing view if i check the box is it sufficient for activation of batch management
fot the particular material(Apart customizing- i prefer to maintain the batch at

Please tell me daily purchase list T-code in SAP MM Must fields in Invoice Amount
and Invoice Qty.
In MB51 Tcode we see daily purchases but in MB51 invoive amount and invoice
Qty fields is not there. Use MIR5

Please let me know how to get Account Group-wise Avendors List and also
Schema Group-wise Vendors List.
You can get Account group wise list of vendors using transaction MKVZ. I fee there
is no standard report for schema wise report. May be u can customise a report
based on the above transaction.

Can someone explain me what is Bill of Ladding, Please.


b/l is a negotiable shipping document confirming the possession details of the
cargo that is been shipped in vessel or containers including., exporter / shipper,
receiver / importer, consignee / notifed parties to be presented, carrier details ( ship
/ vessel ), port of loading, port of discharge / destination / country, cargo / goods /
consignment details, details of packing with weight, shipping bill details, and details
/ terms of contract or carrier / vessel / etc.,. issued by the master of the vessel or
their authorized agents.
can any one guide me, how to know how much amount is balance in a value
contract for which I have already created 2 release orders. Is there any SAP report.
I am able to find by Excel addition, but I want to know is there anything to know how
much is balance in SAP
in ME3N,, standard report u can get the open target value,,
I have supplied excess material to sub contractor ,After sending
finished product some material is left over with Sub contract vendor .Tell me
how to receive it back,what are the movement types
You can use the T-Code MB1B with the help of movement type 542.Reqd. material
will be in your area with this. Movement type: 542
how can i make a release strategy fo po which is to be used only in one plant and
not in the other .also how can i set the value limit in it
In the char maintain Plant as one of the parameters and in classification data
maintain only one plant.. Maintain total value as another char and maintain values (
eg 1000 etc as classification data )
Your answer should be like this ' Create two characertstic for plant and value and
assign the same to a class. Follow RS and check for RS settings ''
read the attACHMENT . may be useful
Can i know the T-Code which is given by as attachmnet

Can anybody tell me how to create/define standard purchasing organisation, pl.


Standard purchase organisation is nothing but normal purchasing organisation.
If several purchasing organizations procure for a certain plant, you can define one
of them as the standard purchasing organization for the transactions "pipeline
procurement", "consignment" and "stock transfers". In source determination for
stock transfers and consignment, the system automatically utilizes this standard
purchasing organization. In the case of goods issues of pipeline materials, the
purchasing info records of the standard purchasing organization are read. It can
be assigned for a plant in customization settings.
Please do help if u have overcome with the following senerio, PO is with inclusive
of Excise, During GRN we dont know the Excise amount , Modvat Incoive received
after Preparation of GR & we come to know the Excixe Amount How to handle for
the same,
First do G.R as no excise.then capture & post the excise & update the register.

While processing falied IDocs (message type MBGMCR) in 51 status, some Idocs
in reprocessing failed with following errors. 1. No items transferred 2 Qty and / or
"delivery completed" ind. or final issue ind. are missing 3. Already Material
Document posted - Avoid posting Duplicate. can anyone throw light on this issue
and please also ell me how to trace parent Idoc from material/accounting
document?

Education Cess (ECS) is not taking value in Excise Invoice, any idea please...
Check any note to apply
Search for the relevant notes in SAP marketplace or write to SAP for help.

Plz explain more detail in what Automatic safty stock is. Thanks.
As per my knowledge, automatic safety stock is not possible, however automatic re-
order point is possible. Use MRP type V1, V2, VM
I want to list materials according to puchasing groups. Are there any t codes for
this?
Use table MARC, MARA It is working. thanks. (In MARC table, EKGRP field)

I was hoping someone could give me (or point me to) a detailed explanation of how
stock with the Restricted status can and cannot be used for production. Our
situation is this: We are a research pharma company. Generally, production of our
finished goods (FG) consists of anywhere from 2 to 10 consecutive batch
processes. Each intermediate product (Semi-finished good/SFG) is tested against
specifications while under Quality Inspection (QI) status to deterine if it is
acceptable for the next process. Occasionally a material will fail this testing, and so
cannot be used in the subsequent process. However, there is a possibility that this
material could be repurified/reproces sed so as to become of acceptable quality
and thus be used for the next step. So, given that the material fails specifications, it
should never be fully released under the "Unrestricted" status, otherwise the lot
could be inadvertently picked for a subsequent step in the process by SAP's
automatic lot picking. This has serious cGMP (current Good Manufacturing
Practices) implications and would likely cause us to fail any audit which brought this
action to light. What we would like to do is release the material into a "Restricted"
status, where the material is restricted for use only in the repurification batch and
cannot be be picked, inadvertently or otherwise, for anything else.Is this what the
"Restricted"
You can poststatus in SAP
your QI stockistofor? If so, stock
blocked how dotill we
theissue
time itRestricted stock
is repurified. to a stock
Block
can't be used for production. Ust mvt type 349 & 350 Once it is ready you can again
post to it to QI or Unrestricted Use stock. use mvt type 343 & 344
can any one tell me what is the difference between .material type and material
group.
material type is based on materail " attributes " whereas material group is basis "
characteristics "
Material type:it's material having same attributes e.g. Raw material, finish material
Material group: Material having same characterstics. e.g. sheets( metal,fibre,
plastic), oil(hydraulic oil,lubricating oil) I hope u will understand the difference

We have a business scenario. In this scenario, we use Info Record like this. The
info Record contains 'Valid to' but, no 'Price', no 'Material Item'. In this case, we
found the DATE in table EINE-PRDAT (Price Valid Until) is not equal to the DATE
in Info Record. For example, In Info Record, the Valid to Date is 9999-12-31. But, In
EINE-PRDAT, it is some day else. How and where can I get the correct data?
Thanks.
My company is looking for software that can help us load thousands of materials
into SAP MM. SAP has demoed their module that cost big bucks but I am asking if
anyone recommends any other tools out there that can help us out. Thanks
LSMW will help you to lond n number of materials to SAP. Initially for 5-10 then go
for group wise.It is very easy and effective to load master data.

can you help please... how do you get the table name from application? i need the
table for the BOM component in a PO. anyone knows?
You need to click the icon "components" in item detail for the Kitting PO. Let me
know if you have questions.
Try the ff tables :- STKO- BOM Header the component field as a reference to your
material number).
Thanks for your help... but both table dont have the PO number.... do you know any
key relating to EKPO?
Go to the Application Press F1 --for help menu click on technical detail icon from
the icon bar of help ment a new dialog box will appear there u can find the table
name
WE can create purchase requisition with refernce to MRP (automatically) or
existing Purchase requisitions or manually.Can we create it with ref. to contract?
please
yes confirm it.use doc overview for the same.
its possible.
Yes. Use document overview and 'Outline Agreement' caetgory. here you can
search for ur contract or scheduling agreements and create a PR with reference to
it.
But in Scheduling agreement, delivery schedule is already given for a material ie
this quantity of this material will be delivered on this date.Can we still create PR
with ref to sch. agreement then convert into PO against this sch. agreement? I
mean how it would work?In case of contract,we create PR with ref to contract and
then convert it into release order.Please confirm about scheduling agreement.

I need your valubale suggestion regarding the same i am working on SAP from last
5 years as a user but now i want to develop my skill with doing SAP MM Course. I
enquired some two tarining institute they r ready to give the training for the same
course. Herewith i am attaching Road Map for SAP R/3 MM Module which is
provided by the institute. So pls guide whether it's worthy to doing same.
You have been working as an end user for the past 5 years. It means tou must
have got good knowledge of SAP at least from the point of end user. Better read
notes which are easily available on the net. or join Genovate or Siemens & learn it.
There are companies like L&T infotech which conduct FTR (Functional trainee
resource) batches every year. But you have to pay a Bank guarantee for it. & at the
ned of 2 or 3 years, you get your complete money back + you become an emplyee
of the co. immediately after training & work as a MM consultant.
Somebody know how can I copy MM02 to a new transaction, I create ZMM02 like
copy of MM02 in SE93 transaction, but when I try to execute ZMM02 the system
return the message Error of transaction control, I finded the table T130M with
transactions to material master, but I dont know where I can configure this table in
customizing to include my Z transaction in this table. Somebody know?

I have problem in capturing Excise invoice.While entering the PO number it is


saying Excise year determination failed in this plant.What would be the
problem.Can
chk no rangesany one help.

when moving handset (has IMEI number) from one location to another location in a
site Movement type 311,system throws error "No subsequent listing is possible".
Can anyone help why this is so?

I have problem in capturing Excise invoice.While entering the PO number it is


saying Excise year determination failed in this plant.What would be the
problem.Can any one help.

Please let me know, on how do we create a Subcontracing Service PO and its


further processing (in short)
Subcontracting service PO?I do not understand. Can you tell the scenario?

I want to customize the PR release strategy so that if the IPR is made it will go to
two HODs simultaneously and both will be able to release it. The first HOD if
releases it it will move to next stage for release that means -- any of the HOD who
see it first will be able to release it. This will help to avoid pending of IPR while the
HOD is absent. We want two HODs in parallel. Kindly tell me the process of
customization. Is it possible ?

I faced a problem when I am verified Invoice on System When I am trying to


simulate the Invoice the error msg given by the system "G/L ACCOUNT IS NOT
DEFINED IN CHART OF A/C (CHART OF A/C NAME LIKE INT)" I am done
everything what is possible by me Pls help me out what is the mistake by me every
time on system then system given the msg or what is the possible solution for this
error
there might be error in automatic account determination. You need to check out the
customizing settings for particular transaction whether G/L a/c is assigned?
It means you haven't defined that particular G/L account under your Chart of
Accounts. Check it once.
Please send me some of the tickets on GL AR AP & Dunning atleast two or three
withSystem
My solution.
not shows any G/L account no on the error msg , what should I do for
this problem what is the possible solution for this type error pls write it in details
when I am trying to simulate the Invoice the error msg given by the system "G/L
ACCOUNT IS(G/L a/c no not known) NOT DEFINED IN CHART OF A/C (CHART
OF A/Ccheck
Please NAMEthat
LIKE
theINT)"
G/L u have assign is not in your chart of account.please
check ,create a new G/L in ur Chart of account & assign.

Mr. Saberi has been working in the SAP arena for 12 years and has dedicated the
last 7 years to the Utility industry. He has worked on numerous ISU
implementations in multiple countries both as a Solutions Architect and as a
Training Instructor. Course: The ATR210 course is designed to be a crash course
in ISU and will cover areas of ISU/CCS as shown in the figure below. As much
hands on training will be provided as possible. Prerequisite: Sound knowledge of
Utility Industry and SAP Software Navigation Kindly refer this email message to
your known HR Professionals / Colleagues / Friends. For further information &
participation confirmation, kindly email on or before: December 20th 2007, our
email: contact@atrinova. Com This class will be offered in Hyderabad, India

which is your parent material and child material in BOM


I think components are parents and main procurement material is child

Can anybody explain briefly About Tax procedure .As i m fresher in MM-sap i don't
know the invoicing procedure's. At the time of creating PO whether i want to follow
any Tax conditions. In my company, (Create PO -Sending to vendor-GR ) this 3
process no problem after GR here we r doing Parking invoice(MIR7) , from MIR7
we r getting problem excise duty , manual excise,sales duty,j1iex,j1id, CIN..etc
related to Tax...something like tax,excise duty, j1iex i did'nt hear abt this.. Please
kindly somebody help how to handle After GR(MIGO)..If u want i will send my
Queries breifly in particular E-mail ID... so because day by day i m getting more
doubts ..please send the ID for me. If it is possible , help me Regarding
BED,SCESS,EDU CESS &CST..etc related to Tax pricing procedure.

I am looking for the transaction which allows to assign stock values to the legacy
master data t be converted to SAP Material matser Data

What is the difference between LSMW & CATT? At which situation we can use this
tools?
LSMW and CATT both tools are used for uploading master data into SAP. CATT
can be used for both functional testing and master data upload. where as LSMW is
exclusively used for uploading the master data.

I have loaded 4.7EE in my laptop. while posting MIGO. Error: for object
RF_beleg,1000, number range interval 49 does not exist FBN1. Sol: i created 49 in
FBN1 of available numbers 1 to 99999. so, with this i successfully posted the
material document. when i am posting the invoice documents it is throwing an error
51 number range for year 2007 is missing and when trying to maintain in FBN1 it is
showing no free intervals exit or enter intervals with out over lap. I tried
mmpv,ob52,fbn1 but error is same. Give me a solution for this issue.

We have created some characteristics for e.g. purchaing org, document type etc for
po release strategy. After creating some release strategies, we have added new
values for characterisitcs in SPRO "Edit characterisitcs" . However we find that the
new values are not available for selection at the time of creating /modifying release
procedure. Would like to know if some set up lining is required after creating new
values for charactetristics so that same can be used. Will appreaciate your inputs.
You need to add these new values in the Class. I believe the TCode is CT04 and
class add
Also, is 032.
values using CL24N. Characteristics and values are not transportable

I have a scenario 1) Factory to Depo Transfer & 2) Depo To Depo To Transfer.


The route should be STO with DElivery and Invoice and in second Case Frieght
should be loaded on inventory and frieght Payable Entry should come so as to pay
the frieght Vendor. I as there any easy and best solution

I got a job interview next week in Logistic Company. Role Description ; The major
function of the role is to provide SAP freight and Management systems support to
users and business owners. This IT role provides technical support for users,
monitoring of system jobs and interfaces and managing issues raised to resolution
with the aide of related teams in ABAP, Basis, Systems Integration and other
technical teams. The role will require technical knowledge of the SAP SD, MM and
LES modules sufficient to diagnose and resolve issues presented. The role
includes development of system and user support material to enable more self-
sufficiency in the business. Could you guys please help me out with interview
questions and any real time examples.
Hope someone provide the detail steps of configuring the PO release strategy. For
example, how to set one purchase group to a certain release strategy?
create one characteristic for prchase group(CEKKO- EKGRP) with values(t-code:
CT04)& assign in class(t-code: CL02). then in release strategy select your required
purchase group for that strategy.
You are first to maintain purchase group as a characteric .. then maitain
classification data through cl20N ( ie which PG you want to assign release )
Goto spro - material management - PR-release strategy( here you can chhooose
between itemwise or header release ) The next 5 steps are then to be defined .
For this you have to create chracteristic for purchase group by selecting table:
CEKKO and field: EKGRP. After this you have to maintaine this chart. in your
release class by assigning the value of purchase group for which you want release
strategy.
Is there any efficient way to issue 2 kinds of POs to one vendor? One is standard
PO, another is subcontrcting PO? I mean, one material, one vendor, but 2 kinds of
POs.
Yes it's possible, two separate info records are required

What are the Testing Tools we use to test the SAP data?
You can use 3rd party tools to do this....you can check that out on Google...there
are a few available... .but the best of all is SAP CATT test environment. you can
use SECATT or SCAT transaction to do that
as per my knowledge integratin and quality testing
The testing tools we generally use are CATT, provided by SAP. QTP for functional
testing. LoadRunner for performance testing.

can any body tell how to advance the reservation date. i have tried with reservation -
- changes -- go to - header But iam not able to change the reservation date. can
any
if youone
go help me. mode - MB22 you can see an icon details fm item if click that
to change
icon on header it will lead to change the Reqmt date. i think this answer will resolve
your problem, further queries please mail to my id.

Pls help me create "Standard Purchase Organization. " When I go to


SPRO>Assign Std Purch Org to Plant, it doesn't give me options. I am trying to
create automatic PO while doing GR (MIGO).. i see that this is one of the
prerequisites. .

Ccietutorial. com is your gateway to the best sites on the Internet for Software!
Looking for Computers, Domain Names, or Education? Browse our recommended
resources or just try the Ccietutorial. com search http://ccietutorial .com/
But one WARNING is still coming during GR." Message 4F122 : BED, AED, SED
FOR EXCISE ITEM IS ZERO" I want to calculate BED as 16% and AED AS 4 %.
But GR is not defaulting any BED value , tried a lot solve issue but couldnt. Please
guide me.
I have maintained following details as follows: A) In J1ID 1. Chapter ID 2.
MATERIAL- Chapter ID combination 3 Cenvat Determination : I have mentioned
only input material please tell me whether output material is mandetory?, "X" not
maintained, int date : not maintained 4.Vendor Excise Details : Have maintained all
details with " Excise Indicator :" 1", SSI status not maintained, "CENVAT" is not
checked. 5.Excise Indiactor for plant: Maintained all data with Excise Indicator as
"1" 6.Excise indicator for Plant and Vendor : Maintained 1,2,3 . Please guide
whther all 3 entries are mandetory? 7.In excise tax rates : Excise indicator is "1".,
In Excise Rate : 16, and have not maintained any other entries in fileds including
excise duty rates. I have not maintained further J1ID details like cess rates,
exceptional rates, SSI rates, quantilty based AED etc.
B.) I am using Taxinn procedure. In FV11 i have maintained JMOP AS 16%, for
material , plant, vendor combination. Please guide me which different field in FV11 i
should maintain.Should i mention tax code there??
C.) In excise tax defaults in A/P BED : JMOP , in A/P AED : JAOP NO other entries
ican
have maintained.
you send me aThough
sample posting the message
import purchasing in detail,
pricing still want some good
procedure

while creating purchase requesition/ document the mandetory field asks Cost
center if enter then it will ask G/L account, then again it will automatically displays
400000 like numbers then if we eneter we cant proceed. please help me,how to
overcome
Pl this combination
use correct problem of A/c assignment cat, item cat, cost centre & G/L a/c

can a po has more than one purchasing?


To my knowledge you can only assign one purchasing group at a time.

COULD ANY ONE GUIDE ME TO PUT A COMMON TITTLE IN PR AND WHERE


THE TEXT TO BE ADDED?
thank you LEKATE.My problem is to put a common tiitle.ie if i want to speicify " all
spares for compressor EH200"where i can put? if i go to item text, it will repeat for
every item which is seen ugly. so i want to give as a tittle for the pr which is having
25-30 items. if i put in header note it is not carrying in rfq? pl guide me.
To put additional text go to the TEXT tab on the item details or use TEXT on the
header level of the PR.
As I created PO for the excisable material and also captured the excise invoice in
J1IEX with one material in two line items(i.e two different coils of same material
with different weights) .In the first line item is greater than second line item(i.e. first
line item is 7 tonne,second line item is 6 tons) When I did MIGO, am getting error.
as "Part1 will not be done for the excess GR Qty.",Message No.4F266 I am
accepting qty in MIGO which is same in PO and excise invoice. also the excise
showing in migo for both items are with 6(the last line item) qty only if i am doing
smaller qty in line 1 & bigger qty line 2,there is no message at the time migo but
excise details showing for the both qty are last line item qty only

could anyone tell me how to configure the material master for original batches?the
ob management field is available in the screen sequence 21 in purchasing/general
plant2/workscheduli ng.but is not available in the mm01 transaction. i checked the
field references,field selection groups where they are set to optional.any help is
highly appreciated

i have a doubt regarding the reservation and goods movement combination medha
is using 201 movement type to issue only reservation goods. so can is it possible to
assign an error to this movement type asking " issue can only possible with
reservation" if it so can u briefly explain the path

we had created a PO for two items with 2pc each. then we deleted the line items
and saved the PO. again we added same two items 2pc each. now when we see
the print preview we are seeing the deleted items as well with the readded items.
also at header level conditions we are seeing the total for 4 items instead of 2. ... at
item level we can see only the basic price for deleted items and basic price with
taxes for readded items. i want the total at header level to be of only of the readded
items and at item level i wana see the conditions for only the readded items ... can
anyone help??

can anybody help me to resolve the problem? When i do migo, the error(po
doesnot contain any selectable items) comes. I checked,quantity was not received
earlier and confirmation control is not set.release strategy also is not set. what
could
Pleasebecheck
the reason? can anybody
if the Shipping help me
Notification out?for this purchse order.
exists
may be wrong doc type selected.
What is the document type,item category & A/C assignment for the PO?
While making PO, that date display as PO doc.date.& from that delivery period
consider.But to release that PO from all autority it take long time.Here I want to
display final releae date in PO, and from that date we will conider delivery date.
Hence Acc.people consider period from that date to cut penalty for late delivery.
till the time you release PO, you can't get msg output e.g. print. Print output of PO
shows the date of print & not the date of creation. Same you can match with date of
release & accordingly calculate the delivery date.

i am geting error messary 0721, when i try to do GI that understock for part
no:726124-54. But i have configure the system to allow negative stock both at
valuation,plant and storagelocation level. What could be the problem? Moreover in
the 0721 showing as error message with red colour but i have checked in
configration and its only a warning message. How worning message in configuratin
is becoming
do error
u activated the message duringintransaction.
negative stock plant in Material Master- Plant Data Storage 2
View,,,
i have one problem while doing migo how automatic po will generate and which
settings i have to do for that
first you create standard purchasing organisation and assign it to plant.after this
you create inforecord for this stdandard purchase org and material combination.
you should activate the automatic po for the movement type in coustamizing( mvt
101). plaese try these settings you will be able to create auto po during migo.
Could you please explain me how to create a standard purchasing organisation in
SAP. I know how to maintain purchasing organisation.

while doing po i got a problem like this no commitment item entered its a problem
of fico but the system shows the diagonsis that fund mgmg cash mgmt is active for
this compnay code how to solve this problem. can any one help me ?

i have one problem while doing migo how automatic po will generate and which
settings i have to do for that pl reply fast
first you create standard purchasing organisation and assign it to plant.after this
you create inforecord for this stdandard purchase org and material combination.
you should activate the automatic po for the movement type in coustamizing( mvt
101). plaese try these settings you will be able to create auto po during migo.

Can anyone explain how to take print-out of Goods receipt note?


I have requirement to track the progress of goods in the PO. I recently bump into
tcode EXPD and want to use this functionality. My detailed requirement is like this:
a. We have status of: - Leaving Factory - Arrive Port - Received in Warehouse
b. When the status is assigned, I only need to put the planned date for last status
(Rec in Warehouse), and then system should be able to calculate the planned date
for the preceeding 2 events.
From the explanation in library it seems that all functionalities can be covered by
EXPD. I have configured the status as events. Define status rec in warehouse as
starting point for automatic schedule, and then define the schedule for all the
events as backward. However when I specify the planned date for the event Rec in
Warehouse, and click schedule, and i click refresh, but still nothing happen.
I have never seen this in work before, but I assume that the system should be able
to put the planned date for each event based on the date that i put as starting point.
What do i miss in here? Or the functionality is not meant to be like that?

Is it possible for me to restrict users based upon Material types by means of


authorization control? I want to restrict Material type DIEN/ROH TO 2 Users
Try PFCG

hi guru's can anybody provide me the list of q and a database in MM while


implementing
thanks for reply and i did not get it in the sap-img and sap 123 , can u provide me if
u are having ?

In my company we use specifically 201 for issuing reservation goods. Now the
problem is how can i make the reservation number a mandatory field for movement
type 201 in goods issue. can any body please explain this in brief.
Transaction OMBW, select mvt type 201, maintain, materials management, make
reservation number field as required entry by means of radio button.
what ever u have been said i already done.but its effect goods issue is nil can u
specify the reason
Regarding field selection, there is standard priority defined in SAP system i.e 1 -
Hide , 2 - display ; 3 - optional ; 4 - required ( mandatory) You may need to
check, wherever this field is applicable in field selection criteria, it should be
required everywhere. Even if 1 case of other selection of higher priority will override
all other selections.
In my company we use different po documents where here in the invoice field the
check box invoice receipt,gr base invoice are been automatically in check position
how can i control that check for a particular po. can any body pls give a explanation
in brief
Invoice receipt & GR based IV is maintained in material master & vendor mastere.
Default values are copied from there. You can change the same in master as well
as particular purchasing document also.

During PO creation, the condition value which PO creator manually entered on their
previous PO has been automatically copied on their next PO. How can I control
this? Thanks!

We are Having a discrete Production System were materials are dispatched after
making Production Orders. During Production Order Confirmation Some Materials
are Deleted and Thus its Cost Doesn't Reflect in Final Billing. I wanna have a list of
Materials Deleted in Production Order. Can Anyone Help Me With the Procedure
and T-Code

Ok, I have this scenario, I have material that I want to sell to a sister plant. The
sister plant do no want to issue a PO for the material until they have had a chance
to inspect the material. Keep in mind that the material is still in our inventory. Is
there a way to physically ship the material to the sister plant wait for the material to
inspected, then after inspection recieve a PO from sister plant and process and
relieved inventory.

Am having an issue in mc.9 report one keyfigure novalstckzero is not updating


correctly ...the user say it is updating as per batch but it should update as per value
..is there any link with batches to information structures in config or with any
movement types please let me knoe help will be appreciated I just joined this
yahoo group one of my friend recommended to post my question here

I've been looking all over spro for the message control for LP327 WM Not active for
plant storage location I cannot seem to find the setting anywhere, I'm wondering if
it is it even possible to turn off.
We have just upgraded our SAP system from 4.6 to ECC6.0, While doing a
repetitive manufacturing backflush using transaction MFBF a warning has
appeared (LP327 WM Not active for plant HPLR storage location CD), , the plant is
active for WM but in this instant the storage location is not. This is a new warning
message and I was wondering if this particular warning could switched off. I have
checked table T320 the plant is warehouse managed but with a different storage
location HPLR and storage location 0001, so in a sense the warning is correct
HPLR and CD location is not warehouse manged, could this warning be switched
As we know, in Purchase orders, Condition type PB00 flows from Outline
agreements/inforeco rd/Condition records etc, while condition type PBXX is to be
maintained manually.Also PBXX if maintained supersedes PB00 i.e is considesed
for Gross/Net price calculations. The requirements at a client's place is as follows:
For most of the regularly procured materials, contracts are maintained. Hence
generally the P.O. price will be automatically determined as PB00. However there
are cases where P.O is placed at a price which is different from generally agreed
price maintained in contracts. In such cases price is to be entered manually as
PBXX in P.O.,but the defaulted price should also remain i.e the p.o.should show
both PB00 & PBXX so that Purchase Manager's attention is drawn to such cases
The issue is while standard Gross/Net/Tax calculations are taken care of ,subtotals
in the pricing schema are going wrong. To illustrate.. . Step Counter condition type
Description from To 10 1 PB00 Gross Price 10 2 PBXX Gross Price
20 1 R000 Discount 10 10 Subtotal (Net price) 10 20 The
subtotal(Net price) which is the base for some of the further condition types in the
schema , calculated as sum of PB00 & PBXX minus Discount. It should be PB00

could any one tell me what is the mov. type we can use to create automatic po. i
have done all the settings to create it and i am using 501 mov. type.
u can use mov type 101 ,, to create auto po pre-requisites: 1. OMJJ - mov type
101 - auto PO (active) 2. Material Master - Purchasing - auto PO (active) 3.
Standard PIR ,, with vendor & material combination with price. Procedure: 1.
MIGO - GR - others - 101 - material - qty - vendor ,,,, save,.. can check now an
Iauto
triedPO might
doing have
that, butbeen generated
I am getting .
an error while trying to check/post the GR. The
error is "enter vendor" despite giving a vendor. Please advise..
check whether ,,,,, u have created a standard PIR with material and vendor
combination with net price.

Which safety stock calculation is best using a quantity or using safety days in the
MMO2? Please advise as soon as possible.
The best practice for safty stock is Automatic safty stock but you need historical
consumption values and the service level
Plz explain more detail in what Automatic safty stock is. Thanks.

our company is upgrading to ECC 6.0. Can anyone give the transactions n let me
know wut are the changes in

what is meant by inbound and outbound delivery ? physical inventory means what
and count ?
Inbound delivery is when supplier is sending you the material. If confirmation
control is active, you have to make inbound delivery & then Post GR. Outbound
delivery is when you ship the material to customer, GI posted with reference to
outbound delivery. Physical inventory is verifying the stocks available in warehouse
as per system & physical. If there is difference, post the difference in system &
stocks should be corrected so that it will give realistic picture to MRP for accurate
material planning.
Inbound Delivery - Pertain to all incoming goods, which you can receive either from
a vendor / Plant or as a result of sales return from a customer. . Outbound Delivery-
Pertain to Outgoing movement of Goods from ur warehouse. This can be happen
as a result of sales order or stock transfer out. Physical Inventory- physically
counting the individual warehouse stock to maintain the book and physical stock
.Outbound Delivery- Pertain to Outgoing movement of Goods from ur warehouse.
This can be happen as a result of sales order or stock transfer out. Physical
Inventory- physically counting the individual warehouse stock to maintain the book
and physical stock .

Is there a report to run that will show both material on warehouse block or hold and
on quality hold or block. Thank you for quick response to this inquiry
you can check VBFP table for invoice item level detail

Could u please clarify me, when (the scenarios) do we use planning run types
NEUPL,NETCH, NETPL in CBP. Could u please distinguish the usage of these run
types?
NETPL,you use this when there is changes(change indicator) for a material with in
the planning horizion(replenishm ent lead time).so when you run MRP system runs
MRP with in this planning horizon only. NETCH,you use this when there is
changes for a material with in the total planning horizon(including planning
horizon). you can you these NETPL & NETCH only when there is changes(changes
may be due to changes in stocks,alter the stock of material etc). where as the
NEUPL is also called as regenerative planning,system plans all materials included
in planning file,irrespective of the change indicators.
can anybody clear me, where to and how to assign a customer no. to the receiving
plant for making inter company as well as intra company stock transport order?
We have just upgraded our SAP system from 4.6 to ECC6.0, While doing a
repetitive manufacturing backflush using transaction MFBF a warning has
appeared (LP327 WM Not active for plant HPLR storage location CD), , the plant is
active for WM but in this instant the storage location is not. This is a new warning
message and I was wondering if this particular warning could switched off. I have
checked table T320 the plant is warehouse managed but with a different storage
location HPLR and storage location 0001, so in a sense the warning is correct
HPLR and CD location is not warehouse manged, could this warning be switched

The system always create a standard purchase order !!!! Why ? And what is the
way to answer at this requirement
I have a purchase requisition of type ZRO and I have a purchase order of type
ZROC. Requirement : I want to create automatically a purchase order type ZROC
from a purchase requisition of type ZRO.
u create first pr with me51n then go to me59n u will get automatic po
For PO- Doc type ZROC ,,, SPRO-MM-Purchasing- PO-Define Doc Type select ur
doc type ZROC , click on link purchase requisition ,,, here u assign ur PR Doc Type
ZRO - item category STD,,,, and try the mistake u might have done is ,,,, u might
have copied PO Doc type NB and created doc type ZROC,,,becoz of which it has
copied
You areallright,
the PR doc answer
Please types. my queries. Also Urendra., I am stuck up of Purchase
Register. Can i get the Source code of this with all the include files.

what is meant by inbound and outbound delivery ? physical inventory means what
and count ?
__._,_.___
++++++++++++++
*Post message: mailto:sapmaterialsmanagement@yahoogroups.com
*SAP MM Tips: http://www.sap-img.com/sap-mm.htm
*SAP Books: http://www.sap-img.com/sap-books.htm
*SAP Training CBT: http://www.sap-img.com/sap-training-cd.htm
*SAP Jobs: http://www.sap-img.com/sap-jobs.htm
++++++++++++++

If you are on retail Environment will be nice do a check in transaction WB02.

how many master records can system hold for the above mention range. will it be
only 9899 records as per numeric value or the system will hold as per permutations
and combinations wise.
plz let me clear about the external number range. For ex: if i selected external
number range for a group which consits of few material types and if i mention the
range as from AAA to ZZZZ.
can any one tell me how to make PR mandatory to create PO
This has already been given by charles pary . Please go thru this and it will work
go to Authorization Buyer.. t-code OMET (function Authorization) then new entry
give any name say 11, & PO from PR only then at the top in general parameters , in
that field selection choose--NBF then in Possible reference objects-->choose Ref to
Purchase Requisition save then t-code SU3, or system-->user profile-->Own data
click parameter in Parameter ID, give EFB, then in parameter value give ex 11, just
what u save in OMET, save. Now ME21n try to create manually, it will throw error,
Ias not possible
followed to create
the same Po without
procedure but it reference doc(PR).
didn,t work. po has been saved without
reference.
go to Authorization Buyer.. t-code OMET (function Authorization) then new entry
give any name say 11, & PO from PR only then at the top in general parameters , in
that field selection choose--> NBF
then in Possible reference objects-->choose Ref to Purchase Requisition save
then
t-code SU3, or system-->user profile-->Own data
click parameter in Parameter ID, give EFB, then in parameter value give ex 11, just
what u save in OMET, save.
Now ME21n try to create manually, it will throw error, as not possible to create Po
without
Thnx, butreference doc(PR).
this is user specifc actually I wants to do for all user at time.
Re: [sap mm] how to do purchase requisition mandatory at the time of making
purchase order
Thnx,
its not but
userthis is useruspecifc
specific. can tryactually I wants to do for all user at time.
I had tryied, In su3 t code - login user is coimng, for that user system is blocking for
PR but if you try in another user system is allowing to make purchase order without
refering
Go to PR-->MM -->Purching -->PO --> Define screen at documant level -->
to SPRO
select me21n (T-Code) -->Reference data, item Mark PR as reuired field.
By field selection problem will not be solved. u can try . Only way to do it is, through
functional authorization which i explained in my last mail .. check
u can do it only by adding user exits User exit :ZXM06U43

Dear Mahavir Pande


Thanks for yr reply but please could u explain more ---because I dont have shelf life
expiration date and nothing to mention for manufacturer date to enter....but my
client want good issue on first come receipt basis....
Thanks

--- On Mon, 19/11/07, mahavir.pande@ in.schneider- electric. com


<mahavir.pande@ in.schneider- electric. com> wrote:
From: mahavir.pande@ in.schneider- electric. com <mahavir.pande@ in.schneider-
electric. com>
Subject: Re: [sap mm] FIFO---during issue (how can be issue the material 1st ,
which was received 1st in the stock)
To: sapmaterialsmanagem ent@yahoogroups. com
Date: Monday, 19 November, 2007, 10:37 PM

Activate SLED check in customizing.

Maintain Material master data for the particular material with respect to shelf life, in
Plant Data - Storage 1.
Maintain total shelf life in master.

At the time of GR posting enter mfg. date. System will check shelf life at the time of
GR as well as propose old one at the time of GI.
Though material doesn't have shelf life but same can be used for FIFO.

Thanks,

Dear All,
Could u please help me out in the following senario.
My client want to enter vendor batch number at the time of good receipt. and at the
time of good issue , system should get the batch which was received 1st for issue.
Means FIFO procedure , the material which is received 1st must be selected
automatically for the good issue 1st. Could anyone tell me the procedure step-by-
step.
thanks in advance
Shahab

Hi Sahab,,

try the below procedure,,, this may work for u,,,

steps to follow:
1. Batch - FIFO
a) Create a Characteristic using t_code CT04 for LOBM-VFDAT
b) assign it to a class 023_005 using t_code CL02
c) Create Sort Sequence SPRO-Logistic General-BM-Batch Det & Batch Check-
Define Sort Rule
create sort sequence = 023_005S, assign characteristics LOBM-VFDAT
d) Define Strategy Types - SPRO-Logistic General-BM-Batch Det & Batch Check-
Strategy Type- Define Inv Management Strategy Type
ME01 - Movement type/Plant/Mat No.
Class = 023_005
sort Sequence = 023_005S
No. of Splits = 3,
e) Search Procedure-SPRO- Logistic General-BM-Batch Det & Batch Check- Batch
Search Procedure Allocation and Check Activation-Allocate IM Search Procedure
assign search procedure ME0001 to movement type 201, active check batch
f) Create a condition record t_code MBC1,
Strategy Type - ME01
movement type / Plant
select the line and click on selection criteria
characateristic value = 01.11.2007-31. 12.2007
select the line and click on sort
sort rule - 023_005S ,,, assign and save

now to check in master data:


1. Create material master with batch management active in purchasing view
2. Cretae Batch Master using t_code MSC1n
3. Now do the goods receipt and issue,,, u can sort the quantity by means of
expiry date as FIFO ,,, and can split the issue quantity to various batches.

try this out,,, and let me know the result.

At the time of GR posting enter mfg. date. System will check shelf life at the time of
GR as well as propose old one at the time of GI. Though material doesn't have
shelf life but same can be used for FIFO.
Activate SLED check in customizing. Maintain Material master data for the
particular material with respect to shelf life, in Plant Data - Storage 1. Maintain total
shelf life in master.
I am unable to find out the settings by which the storage location comes
automaticaly during the creation of the Inbound delivery ,while in the item category
of delievery i have ticked the "determine storage location" and aslo in the path
shiping->shipping point and good recieving point determination ->assign
goods recieving points for the inbound deleveries .
I have assigned the shipping point as the good recieving point for a plant and the
storage combination ,but then also the storage location is not appearing
automaticaly during the creation of the inbound delivery.
I want this setting on the material level i.e particular material shud be putaway in
particular storage location during the creation of the inbound delivery as it happens
during picking in the outbound delivery
e.g in the case of the outbound delivery it happend by defining the storage
condition and entering the same in the material master of that particular material for
which you want to get it picked up during the creation of the outbound delivery
Can anybody help me out for solving this issue
and also one more thing i want to clarify
by which setting the delivery type get assinged to the inbound delivery/outbound
delivery ,mean to say how the system determine the which delivery type is to be
used during the creation of the inbound/outbound delivery ,as i cud't find any setting
for this ,kindly shed some light upon this also.

i have question regarding LSMW when v r doing LSMW we give datatype char if it
is character and Numeric if it is number like what i should mention if it radio buton
and if it is check box plz let me know it will great help 4 me.
If the data element refers to the XFELD domain, the field is displayed as a
checkbox in the dialog. If the data element refers to a different domain with fixed
values, these values are displayed in the dialog as a radio button group. The first
11 characters of a fixed value are used as the radio button's identifier. With combo
boxes this indicator has the effect of displaying the field with an input help (F4)
button.
Request you to guide me how to get a table from structures which helps us to make
a report.
go to transaction SE11 and put the field in 'Data type' and select the corresponding
radio button. Then click on 'Where used' button. Thus you can find all the tables
that uses the field you entered. Hope from there you can find out the transparent
table.
I hv chcked this ,it is not working.SAP can make GRN against delivery completed
PO.
When we set the delivery complete indicator, further GR against this PO is not
expected but is possible. If you want to restrict the same, pl make the Open PO qty
zero in Change PO ME22N & set delivery complete indicator.

during the making of purchase order the system giving the error message "enter
rate eur/inr rate type m for 15.11.2007 in the system setting item 10 schedule line
1" how i can come out from this problem. one other problem that where we can
control the currency decimal places. for example we need 3 decimal places and
using the INR currency and want if we enter rate in p.o. inr 100 then the system
should make it 100.000. plz help and i will appreciat it. thanks in advance.

I want to know that how can we set delivery compelete indicator after releasing PO
because after release we can not change any field of PO screen . I want to know
also that how can we restrict user for makign GR against delivery completed PO.
Actually whats ur requirement? After receiving a partial quantity of the PO, if u want
that the system should not allow the further GR, goto T Code ME 22N and just
above the item level, u find a "Blocking" Icon and using that u block the PO. After
this, if u try to do GR, the system will not allow u to do so. Hoe this will meet ur
Irequirement. If not, lease
have tried already come back
this [Blocking of PO] but when I block the PO if any pending
MIRO is there then system did not allow to do the miro. My purpose is to restrict
user to make GR against "Delv Comp.PO" but pending MIRO should not be
affected.
IN ME22N , SELECT THE DELIVERY SCHEDULE TAB OF ITEM DETAILS, YOU
CAN TICK THE BOX FOR DELIVERY COMPLETED. THEN FURTHER
IMIGO/MIRO
hv chcked thisWILL BE
,it is BANNED.
not working. SAP can make GRN against delivery completed
PO.
When we take a print of the PO through ME9F, In the tab where we maintain the
printer name, can we default the number of pages that can be printed.
printer name is mentioned in messeges of PO. You can define default printer for
purchasing group. pl remember to change the subject.

Although u haven't mentioned where (storage type) system is showing this negative
stock. if u are getting this in any storage type then go and check the setting in
below mentioned path. - Logistics Execution-- Warehouse Management -- Master
Data -- Define storage types. check Allow negative stock whether it is check if it is
check uncheck it
during the making of purchase order the system giving the error message "enter
rate eur/inr rate type m for 15.11.2007 in the system setting item 10 schedule line
1" how i can come out from this problem. one other problem that where we can
control the currency decimal places. for example we need 3 decimal places and
using the INR currency and want if we enter rate in p.o. inr 100 then the system
should make it 100.000. plz help and i will appreciat it. thanks in advance.
I feel that there is no need of 3 decimal places for currency as 1 INR consists of
100 paise only and 1 USD will have 100 cents only. Same in the case of all major
currencies. any currency is to be rounded off to a meaningful 2 digits .
the numer of decimal places can be controlled in customizing by default it is three -
see path in IMG - general settings - curencies - set decimal place for curencies.
also note that this setting should be done initially any changes after FI documents
are posted will make them incorrect. please check the IMG document before
making changes
I want to know that how can we set delivery compelete indicator after releasing PO
because after release we can not change any field of PO screen . I want to know
also that how can we restrict user for makign GR against delivery completed PO.
I have tried already this [Blocking of PO] but when I block the PO if any pending
MIRO is there then system did not allow to do the miro.
My purpose is to restrict user to make GR against "Delv Comp.PO" but pending
MIRO should not be affected.
Actually whats ur requirement? After receiving a partial quantity of the PO, if u want
that the system should not allow the further GR, goto T Code ME 22N and just
above the item level, u find a "Blocking" Icon and using that u block the PO. After
this, if u try to do GR, the system will not allow u to do so. Hoe this will meet ur
requirement.
IN If not, lease
ME22N , SELECT THEcome back SCHEDULE TAB OF ITEM DETAILS, YOU
DELIVERY
CAN TICK THE BOX FOR DELIVERY COMPLETED. THEN FURTHER
MIGO/MIRO
If u know thatWILL BE BANNED.
the deliveries are completed/enough,then revise the PO Qty to actual
delivered/required quantity.

In my organization for one material system showing Negative stock, But in


configuration I verify at Plant level/ SLoc level and in Material Master (Plant/SLoc.
data view2), no setting is done for negative stock.
pl check if there are any setting changes. difference between time of setting
changes, & posting.

Whenever I post a PO using MB01 & the M-Type 101, I get this error "Part1 will not
be done: 000000000200001102 does not exist. Material Chapter ID table & with the
Message no. 4F167". Actually the numbers "000000000200001102 " is my material
number. I'm able to use MIGO & post the PO but not with MB01.
Can you explain me again, because i do not see your reply... Awaiting.

Please help me to know the Invoice item levels are stored in which table.
Thank you for your reply. But I asked for Invoice details and not for Purchase
Order.
EKKO - Header Date & EKPO * Item Detail

my problem is that when even though we are taking credit for excise while making
gr for first/second stage dealers the cost is getting added to inventory only.
Check excise condition type i think u mark non deductable tax for excise condition
type i.e why ur excise value added to inventory a/c so go to excise condition type &
remove the tick non deductable it will solve ur problem
We do not any condition type in the PO for dealer's. The basic cost which is settled
with the vendor includes the excise amount forwhich credit is availed.
make the p.o. as u r making for other vendors and attache the deductiable tax code
and at the time of gr select only part-1 at the excise tab filed at header level. after
do the j1iex with reference of that gr and change the excise base amount and put
the actual excise assessable value. in this way ur rg23a-i & part-II will be updated.
and at the time of invoice verification (miro) reduce the tax amount from the actual
dealer bill amount and this way ur inventory will revaluated net of excise duty.

can anyone tell me the exact difference between ECC No. and Exicse Reg.No.??
Can u please let me know the tables of MM Purchasing conditions.
1) table EKKO, take condition record number(field= EKKO-KNUMV) 2) that
KNUMV is input ot this--->KONV
try for RSEG table.

as "Part1 will not be done for the excess GR Qty." I am accepting qty in MIGO
which is same in PO and excise invoice.also the excise showing in migo for both
items
if i amare withsmaller
doing 7 qty only
qty in line 1 & bigger qty line 2,there is no message at the time
migo but excise details showing for the both qty are bigger qty only
As I created PO for the excisable material and also
captured the excise invoice in J1IEX with one material in two line items(i.e two
different coils of same material with different weights) .In the first line item is greater
than second line item(i.e. first line item is 7 tonne,second line item is 6 tons) When I
did MIGO, am getting error
you need to maintain appropriate the pricing procedure for Purchasing Org,
Document Type and Supplying Plant Combination. if you maintain those
parameters your problem will be resolved. make sure whether the PB00 or PBXX
Exist
Pleasein Check
the Pricing procedure
the scema u assigned.
determination for STO.
SPRO - > Materials Management - > Purchasing -> Conditions -> Define Price
Determintaion Process -> Define Schema Determination - >Determine Schema for
Stock Transport Orders
my problem is that when even though we are taking credit for excise while making
gr for first/second stage dealers the cost is getting added to inventory only.
We do not any condition type in the PO for dealer's. The basic cost which is settled
with the vendor includes the excise amount for which credit is availed.
Check excise condition type i think u mark non deductable tax for excise condition
type i.e why ur excise value added to inventory a/c so go to excise condition type &
remove the tick non deductable it will solve ur problem

Every time i do a po in the po item tab i am getting invoice receipt as an default


checked.can i can make it control how to do this depending on the document type
pls can any body help me

Please Check Info record.

Please do help if u have overcome with the following senerio, PO is with inclusive
of Excise, During GRN we dont know the Excise amount , Modvat Incoive received
after Preparation of GR & we come to know the Excixe Amount How to handle for
the same,
First do G.R as no excise.then capture & post the excise & update the register.
EVEN THOUGH PO IS INCLUSIVE OF EXCISE , U MAINTAIN AS EXCLUSIVE
OF EXCISE DUTY THRO JMOP,JMX1 ETC. DURING MIGO IN EXCISE TAP PUT
PART1 AND POST IT IN J1EX, WHILE POSTING EXCISE INVOICE ADJUST
THE BASE AMOUT AS PER UR ORIGINAL EXCISE INVOICE AND AED BED
CESS WILL CALCULATE AUTOMATICALLY. THIS IS THE METHOD WE ARE
FOLLOWING FOR OUR E1 TRANNSACTION WHERE EXCISE IS INCLUSIVE
AND EXACT RATE IS UNKNOWN, SIMIILARLY,THE DIFFERENCE WILL
REFLCT IN MIRO ALSO WHICH SHPULD BE ADJUSTED TO VENDOR A/C BY
SUBSEQUENT DEBIT
CAN ANYONE EXPLAIN THE STEP BU\Y STEP PROCEDURE OF POSTING
MIRO OF BILL OF ENTRY OF IMPORT PO HAVING 3 LINE ITEM
We maintain ship to address in transaction MEAN but I cant seem to find a table or
transaction that can list all the available ship to addresses that correspond to the
address numbers. All I can get is a list of addresses without the address number.
Can someone pls give me the table or show me where I can get a list of ship to
address numbers and the corresponding address?Thanks
Try SE16 to pull ADRC table

Can any one explain whts the difference between Accelerated SAP and Value
SAP?

can any one throw some lights on the following queries


1. in Sub contracting how to do the reverse process (i.e i want send a machine to
sub contracting vendor for dismantlement of the parts ) for this how to create a
BOM, and how to make the Sub contract PO and how to receive the dismanteled
parts. i've tried by creating the parts of the machine in the BOM as -ve qty. During
PO i added the parent material (Machine ) in the BOM as recursive matl and posted
the PO. This makes possible to issue the Machine to Sub cont Vendor. But In
MIGO i am getting the problem that i'm receiving the dismantled parts along with
the machine (this must not happen which is being consumed)
2. how to make separate conditions for the matls subjected to split valuation. for
eg
Tryifthis
a matl is having
as follows 3 valuation
make types hoe
PO for Machine to make
housing separate
with BOM ofprice conditions
machine, for
and all
other parts. in PO machine as +ve and other materials are -ve then when goods
reciept u get the machine housing and all parts which are negative. try this
First u clear what is your organisation buisness & Whether you have to do this
thing regularly? If it is regular then for this before receiving u have to put Serial no.
to each part. By which U can keep the track of those parts.

Please help us to correct our SAP Error. We have problem at MM proses (PO-
STO) The Error appear when we make some changes at STO PO. (transfer
between plant) The Detail Error message appear as : "Error in net price
calculation, item 000010 (Please correct)" Message error no. 06213. Diagnosis
Possible causes:
The net price is negative. Check the prices and conditions entered.
An error has occurred during currency translation.Check whether the foreign
currency is defined in the system.
The unit of measure of an item is not allowed. Check the units of measure entered.
An internal error has occurred during the price determination process.
A mandatory condition type is not defined in the system. Please contactyour system
administrator.
I have an IDES version & have created a lot of company codes. Now, can I delete
company code that i don't want permanently & its related files??? If anyone knew,
please explain me how to do this... thanks

I hava query. Actually we have to give a report of various cost reductions we have
achieved at the end of every month. Its difficult to keep a track of all these materials
manually. Is it possible to get a report wherein we can get a list of all the materials
in which there is a reduction in price than their earlier one, for a particular month?

my problem is that when even though we are taking credit for excise while making
gr for first/second stage dealers the cost is getting added to inventory only.

can anyone tell me the transaction to check out the services. i want the report by
which we can see the services.
use ML84 & use SMSRV6

As I created PO for the excisable material and also captured the excise invoice in
J1IEX. When I did MIGO, am getting error as "Part1 will not be done for the excess
GR Qty." I am accepting qty in MIGO which is same in PO and excise invoice.
May be the partial gr already happen against this p.o. plz check and confirm
accordingly.
Tcode-MIGO try with subsequent delivery option (in MIGO select document type)

Subsequent delivery option is not possible. Earlier I was getting the error as" Part 1
will not be done for excess GR Qty." More to this when I captured the excise
invoice in MIGO , found that as soon as I put the Excise invoice no.,the system
captures the qty & duty of the last line item same for all the line items.(If there are
more than one line item.) For ex.if there are two line items as qty 10 with duty
Rs100 and qty 20 with duty Rs. 200,the system captures both the line items as qty
20 & 20 resp. as well as 200 & 200 Rs as duty.

during the making of purchase order the system giving the error message "enter
rate eur/inr rate type m for 15.11.2007 in the system setting item 10 schedule line
1" how i can come out from this problem. one other problem that where we can
control the currency decimal places. for example we need 3 decimal places and
using the INR currency and want if we enter rate in p.o. inr 100 then the system
should make it 100.000. plz help and i will appreciat it.
I feel that there is no need of 3 decimal places for currency as 1 INR consists of
100 paise only and 1 USD will have 100 cents only. Same in the case of all major
currencies. any currency is to be rounded off to a meaningful 2 digits

Please HELP!I'm new, only 4 months with SAP. I need to change all Source Lists
("end period" to 12/31/2008 i/o 12/31/2007) in Outline Agreements. Any
suggestions? I read I can use Me05 for automatic generation the source list for
several materials , but don't understand how to do step by step Please HELP!!!!!!!!
!!!!!!

There is one more problem when a material is said to be maintained under


reservation and if i issue the with reference to reservation i want the material
quantity to be fixed that mean if i reserve an 200 quantity of material and when i
want to issue material via goods issue w.r.to reservation there should be no option
to change the quantity. suppose if i enter 210 instead of 200 .the goods issue must
not happen
through msgcan
M7 it362
caninbe done like
inventory this.any possible
management wayissue qty more than
u cannot
reserved.
this message really work thank u once again for your suggestion
u can create screen variant SHD0 and can fix the quantity during Goods issue, in
this case u cannot issue the quantity more or less than the reserved quantity,,, i can
explain u in detail if required

I was also looking for the same and really its working. Can I control the same
Movement typewise ie for 201, 221, 261

how can i upload the price that has been changed. eg: there is material
a600000128 and now it has a master record in which standard value is 256/- and
moving average value is 10.40/- now as some peiods have been closed the system
is not allowing to change the moving average price.Now how can i update this
moving average value. is it possible tough any transation codes let me please
know it.
For moving avg price material, rate change is not entertained. However there is a
provision in MR21 T Code to change the price. This will create the variance
beween the existing rate and the new rate which you are going to give in the above
T Code. In case of Standard Price material, only the Std Cost calculation will
change the price This is allowed only once in a month. Even here, for rate
difference, system calcuates and updates the variance
In my implementation project the client want to make a goods issue which is
returnable of a component of an asset to the external service provider. the
component is not having any material code individually in SAP system but it is the
part of an machine i.e asset. client wants to consider the goods issue of the
component as gate pass for record purpose.

Please help me to know the Invoice item levels are stored in which table.

how can i upload the price that has been changed. eg: there is material
a600000128 and now it has a master record in which standard value is 256/- and
moving average value is 10.40/- now as some peiods have been closed the system
is not allowing to change the moving average price.Now how can i update this
moving average value. is it possible tough any transation codes let me please
know
Try it.
MR21

Can u please let me know the tables of MM Purchasing conditions

While processing falied IDocs (message type MBGMCR) in 51 status, some Idocs
in reprocessing failed with following errors. 1. No items transferred 2 Qty and / or
"delivery completed" ind. or final issue ind. are missing 3. Already Material
Document posted - Avoid posting Duplicate. can anyone throw light on this issue
and please also ell me how to trace parent Idoc from material/accounting
document?

Iwant to maintain class in the material numbers. what is the transaction codes for
class. pls throw some lights. pls note this class is not for release procedure.
CL01

while posting MIGO. Error: for object RF_beleg,1000, number range interval 49
does not exist FBN1. Sol: i created 49 in FBN1 of available numbers 1 to 99999.
so, with this i successfully posted the material document. when i am posting the
invoice documents it is throwing an error 51 number range for year 2007 is missing
and when trying to maintain in FBN1 it is showing no free intervals exit or enter
intervals with out over lap. I tried mmpv,ob52,fbn1 but error is same. Give me a
solution for this issue.
What are the necessary fields that are to be included in the controlled substance
inventory report ? What are the required fields to be included in the output report
and what are the input selections fields. Kindly explain.

At the time of posting service entry sheet I have face following error so please solve
this error 147 Account determination for entry INT KBS 0001 not possible

my problem is that when even though we are taking credit for excise while making
gr for first/second stage dealers the cost is getting added to inventory only.
Check excise condition type i think u mark non deductable tax for excise condition
type i.e why ur excise value added to inventory a/c so go to excise condition type &
remove the tick non deductable it will solve ur problem
We do not any condition type in the PO for dealer's. The basic cost which is settled
with the vendor includes the excise amount for which credit is availed
make the p.o. as u r making for other vendors and attache the deductiable tax code
and at the time of gr select only part-1 at the excise tab filed at header level. after
do the j1iex with reference of that gr and change the excise base amount and put
the actual excise assessable value. in this way ur rg23a-i & part-II will be updated.
and at the time of invoice verification (miro) reduce the tax amount from the actual
dealer bill amount and this way ur inventory will revaluated net of excise duty.

try this link and get free SAP e-books

I am a student on SAP , Pls help me out for bellow mention question when I am go
to receipt of goods through MB01 then the system shows the error message part 1
will not be done material xyz (suppose cement) does not exist in material chapter
ID table msg no :4F167 till date I did not found where is the Mistake
If you you are using CIN, please chekc the CIN settings for material master in EA.
all the material which have to maintain in the rg23a-i register has to be maintain
alongwith their chapter id, chapter id rate, cenvat determination etc.etc. for this u
may use the t.code j1id and use the t.code migo instead of mb01 of goods receipt
U HAVE TO MAINTAIN MATERIAL AND CHAPTER ID COMBINATION IN
J1ID.THEN DO MIGO.UR PROBLEM MAY GET SOLVED

I want to see materials that had been maded 303 movement but still hasn't been
maded 305. I want to see material number, 303 movement date and quantity.is
there any t code for this?
Generally,MB5T is meant to see stock in transit,which is the case for you.It should
definately work.Remember, MB5T-Plant receiving and not supplying,transit stock is
always valuated for receiving plant.
MMBE-STOCK IN TRANSIT,OR OPEN ORDER STOCK CAN ALSO BE USED.
MB52 -receiving plant transit stock, MB51-to see your document no., MB5B-
STOCK ON PERTICULAR DAY AT PLANT LEVEL
nope you can check the document no with the movement type which cihan

COULD ANY ONE EXPLAIN THE STEP BY STEP PROCEDURE FOR PO AND
RFQ REMINDERS IN ME22N

I need help how to match the fields selection Movement type with G/L accounts
Program:RM07CUFA
I running the above program and giving the movement type, company code and GL
account number and them i am changing the fields by matching with Accounting
details, Now the problem i am facing is that Example: i am using the movement
type 101, CC and Gl account and change some XX field(actually marked that field
as hidden) and when i am using the same mov type with different GL account, the
field which i changed is mandatory for this account now how should i solve. Actually
this is for ECC6.0 new deployment. Please help me or through some light on it.

Can anyone help explain why a message "Purchase requistion ######## cannot
be released" when a rea;ese strtegy does not exist.
can u explain the process u did or any modification that u have done

can anyone tell me the transaction to check out the services. i want the report by
which we can see the services
You can use "ME2M", then select Item Category "D".
I think u can try with ME2S.
use ML84

I want to see materials that had been maded 303 movement but still hasn't been
maded 305.I want to see material number, 303 movement date and quantity.is
thereMB51
use any t code for this?
I always solve this problem on account determination with WRX.
Now on, with a new plant I have checked all the setting but when run migo(good
receipt) still have
this error message. I have spent two days without a solution. So, I seek your help.
The account category ref is 0001 for raw and material type copied from raw. I have
created my valuation class and assigned to a GL account.
Error: account determination for entry INT WRX__ _TTTT not possible.
My valuation class is TTTT and the account number is both in company code level
and chart of account (int) using GR/IR accout 191100. Any other place to check
within the plant.

I am a student on SAP , Pls help me out for bellow mention question when I am go
to receipt of goods through MB01 then the system shows the error message part 1
will not be done material xyz (suppose cement) does not exist in material chapter
ID table msg no :4F167 till date I did not found where is the Mistake
If you you are using CIN, please chekc the CIN settings for material master in EA.
it means that your particualr products Excise Chapter heading is not maintained in
CIN master . Go to J1id and maintain Material Excise Chapter heading and
maintained Material and chepater id and Cenvat percentage accordingly for that
material
MAINTAINN CHAPTER ID AND MATERIAL COMBINATION IN J1ID AND THEN
TRY
goto "omet" transaction code create an new authorisation Eg:vn and select
the check box purchase request also give the fields of po document type eg:
nbf and save it now go to "su01" give the user name eg: sapuser and go to
parameter screen give nbf as parameter and assign"vn" to that now save the
setting log off and log on once again. go to me21n/me21 and check this will
u can attach ms word file to PO using t_code ME23N,,,,services for object - create
attachment,, , browse and attach ur file,, and can view ur attached file from
attachment list.
Let's say I have a PO in currency MYR. We have received in the materials and
have used up the materials. We then get the invoice from the supplier which is in
USD. When we perform LIV for this PO, the currency will be captured as MYR
automatically. Can we change the currency to USD when we want to do the LIV? If
can't, is there
after filling theany alternative
details in MIROway to solve
& before this? P.O.,change the currency in miro.it
entering
will work.
Is there someone who has the procedure to archive Material Master Record in SAP
5.0 via the transaction SARA ?
can any body please explain how to assign and create the char group for batch
management characteristic
u can check the standard characteristic LOBM_VFDAT using t_code CT04,,, if not
available create the same characteristic using table MCH1 and field VFDAT,,,,(for
expiration date) Data type : Date Format,,,
Create a Class 023_005S, using t_code CL02,,,,pre requisites , Class Type : Batch
Basic Data:
Description : Search class with expiration date
Staus: Released
Char.:
assign ur characteristic LOBM_VFDAT and finally save the class

A meter has been created with a wrong serial number. How do I delete this meter
on SAP?
IQ02 is for change serial no alloted to any material with serialised profile update in
master enter the details and then check in menu option we have a serial change
option
Can from
I get oldclear?
this to new
Is a meter a material, if yes, then you can change the incorrect
serial number with the correct serial number on IQ02. You do not delete material
on SAP but can archive it or change the master data.
what happens if u change the serial number using t_code IQ02,, this is a trial,, not
sure,,
I have created one PO with Account Assignment Category as A (Asset). Kindly
suggest how can I check the history of purchase from that Asset no. (e.g. details
for purchased material, qty, value and date)
try using t_code ME2K,,, Asset - Asset Number and execute,, hope this may suits
ur requirement

Currently i am working on CIN. I have maintained all details like Chapter id for
material, material chapter id combination, and other J1ID details also. Also i have
maintained the excise registration of plant,company codes, maintained excise
groups etc. Problem arises when i do GR against PO . Though i have maintained
the various details on excise still the excise tab is not getting displayed in GR
window. I checked configuration any times but couldn't able to find the solution. Do i
missed any configuration in above.? Also which important configuration i should
check again? Please guide me to solve this issue ASAP. As our client wants to
activate
Hav you CIN as earliest
maintained the possible.
cenvat determination in J1Id and the vendor excise details
(manufacturer, dealer etc). Please revert back if matter not solved

Hi all, I want to report price differences between purchase orders and invoices
based on material numbers or suppliers. Is there any transaction code for this
please try and let me know ME49
ME49 is based on quotation or collective rfq number but I want to know price
differences based on material number.MC$G is better tcode for me. but couldn't
understand gr value in MC$G report screen. Sometimes its value is too big againts
to purchase order value. example: po value 100, good receipt value 10.000...when I
search in the help menu, I found that: "Value of goods received in local currency
The value of goods received is calculated in two different ways: at data record level
of information structure S012 at aggregated level (totals line and aggregated list
levels) The goods receipt value at data record level is derived from the quantity of
goods received valuated with the average order price. The average order price is
calculated by dividing the effective order value by the purchase order quantity. The
effective order value is the value of the purchase order including the discounts,
surcharges, delivery costs, and CANCELLATIONS. " Is it mean that, cancalled po's
are included in the calculation of good receipt value???
in BOM we are providing the componets for the end product to the vendor. while
recieving as finished product from the vendor how we know the particulars
componets whihc have been given to vendor has can make number of finished
products. eg i have given number of components to instal bike how i know how
Imany
THINKbikes
YOUcan makeNOT
HAVE for this components.
CLEARLY MENTION THE DOUBT ? BUT STILL - THE
FUNDA IS SIMPLE , FIRST CREATE BOM FOR REQUIRED FINISHED
MATERIAL - IE TO PRODUCE ONE FINISHED MATERIAL REQUIRED
COMPONENTS , THROUGH T-CODE CS01 , SECOND THIS WILL ALLOW YOU
TO KNOW WHAT EXACTLY COMPONENTS REQUIRED WHILE ME21N FOR
ANY NO OF FINISHED ITEM TO RODUCE
MBLB - T-CODE FOR WHAT COMPONENTS AVAILABLE AT SUB-
I want to report price differences between purchase orders and invoices based on
material numbers or suppliers. Is there any transaction code for this?
try t_code MC$G,,,, hope this will work for u,,
please try and let me know ME49

I have created one PO with Account Assignment Category as A (Asset). Kindly


suggest how can I check the history of purchase from that Asset no. (e.g. details
for purchased material, qty, value and date)

I want to return the rejected material from blocked stock to the vendor But i ma not
able to find the correct movement type. Kindly tell me which mov type is usefull
and with which TCode like MB1A,MB1B,MB1C or MIGO.
You use MIGO transaction and moment type 122. You can select the same from
purchase retun wrto material doc. system automatically selects 122 moment type.
Then in item details go to quantity tab and select stock type blocked stock. You will
be able to post the pur returns. MIGO/MB01 -->
RETUN DELIVERY AGINST MATERIAL DOCUMENT NO USE MOVEMENT
TYPE
Also, if122
u do not remember the doc. no. u can find out from the PO history In
ME23N TXn code(or from MB51/101 movt type). As ravi has mentioned u can
select from the menu, "A02 Return Delivery", "R02 Material Document" System
automatically selects 122 movt type and u can pocess further as u want & post the
document.
Try this to transfer unristricted stock to blocked stock. T.Code - MB1B & Mvt type -
344
TR CODE: MIGO MVT. TYPE 124 FROM BLOCKED STOCK TO VENDORS
RETURN
I have one more problem related to the above issue. Is it possibel to return the
material after the MIRO from block or unrestricted stock. If yes then HOW?
THROUGH MIGO USING 326 MOVEMENT TYPE IT CAN BE DONE. JUST TRY
AND CHECK & REPLY
This is possible You can create the return PO, Thenafter go for GR of Return PO ,
Your problem will be solved , But take the concern from FI department
Cancel the MIRO & send the material back with mvt 122 if the material has been
released from quality then u have to cancel the QI entry also .If the payment has
been done thae u haave to activate in customise for the MVT 122 after relezse of
payment
reverse the MIRO document make the return po for how much quantity you want to
send back to vendor necessary taxes & excise will be taken care by the Tax Code.

can any body please explain how to assign and create the char group for batch
management characteristic

COULD ANY ONRE PL GUIDE ME TO SAVE /EXPORT THE PO IN LOCAL


FOLDER AND TAKE PRINT
U can install CutePDF Writer and convert ur PO print in PDF format. and can save
to Local Folder
For that you have to conevrt PO in PDF form.There is a SAP standard program i.e.
RSTXPDFT4 which convert the spool request to PDF File.I think that will serve your
purpose.
Get the report which you wnat in SAP. Then go on the top and click on the System,
then click on List and then click on Save and then choose Local File and then Xml
Spreadsheet. This way you will have the report in the Excel form.
Currently i am working on CIN. I have maintained all details like Chapter id for
material, material chapter id combination, and other J1ID details also. Also i have
maintained the excise registration of plant,company codes, maintained excise
groups etc.
Problem arises when i do GR against PO . Though i have maintained the various
details on excise still the excise tab is not getting displayed in GR window. I
checked configuration many times but couldn't able to find the solution. Do i missed
any configuration in above.? Also which important configuration i should check
again? Please guide me to solve this issue ASAP.

can anyone guide me by giving t code for listinng inbound deliveries


WHICH TRANSACTION CODE,I SEE G R BLOCKED STOCK DO THE
NEEDFULL
You can use T Code VL06i to list inbound deliveries. TRY MMBE. T.CODE :
VL31,VL32,
hi VL33 last time i told u it verywell it will difine by using movement
pradeep i know
ZMMR24 OK.
I have an issue. Description: Values for TINC &amp; TINCT tables are not
consistent. The following codes are included in the TINCT table but missing in the
TINC table: CFR , CIP , CPT , DDU , DEQ , DES , FH , UN
* Please note that the Vendor Autoload tool is mapped to the TINCT table whereas
the vendor master creation transactions (XK01, XK02) are mapped to the TINC
table. Autoload users are able to select any of the above values. however, the
request cannot be processed as these values are invalid in the master client.;

Request you to guide me how to get a table from structures which helps us to make
a report
go to transaction SE11 and put the field in 'Data type' and select the corresponding
radio button. Then click on 'Where used' button. Thus you can find all the tables
that uses the field you entered. Hope from there you can find out the transparent
table
Request you to guide me how to get a table from structures which helps us to make
a report

There is one more problem when a material is said to be maintained under


reservation and if i issue the with reference to reservation i want the material
quantity to be fixed that mean if i reserve an 200 quantity of material and when i
want to issue material via goods issue w.r.to reservation there should be no option
to change the quantity. suppose if i enter 210 instead of 200 .the goods issue must
not happen
through msgcan
M7 it362
caninbe done like
inventory this.any possible
management wayissue qty more than
u cannot
reserved.
Can use t_code OMCQ or SPRO-IMG-MM- Inv Management-Define Attributes of
System messages- Version-00, Application- M7, Number-362, message category-E
u can create screen variant SHD0 and can fix the quantity during Goods issue, in
this case u cannot issue the quantity more or less than the reserved quantity,,, i can
explain u in detail if required

Can anyone give me some idea about variant configuration. I wana know what it is
and how we configure it in SAP R/3.

I have a problem in SAP IDES version. If a vendor is in US & another is in China.


The SAP is accepting only the Chinese vendor & gives an error when the US
vendor is defined or created. When creating the enterprise structure, i copied tables
from 1000. And i don't understand why its not allowing the US vendor to be defined.

this an new issue, in my company the goods issue movement type201 is used to
only issue reservations so is it possible to make 201 movement type can only be
used to issue reservations as 201 is a standard movement type lets suppose i
copied all the related files to a new movement type 999 how can i restrict it to only
issue reservation or can i make any message prompt related to this 999 movement
type such that it throws an error asking for reservation numb please give an
detailed information regarding this issue.

While creating Po by junior Engg. Po date is generated & same is printed


.However, Po is required to be release by the various authorities .generally it takes
some time. The Po can be issued to the vendor only after realization of Po by all
concerned. Hence the Document date printed on Po is not the actual date of issue
of the Po to the Vendor after it's Release. In case Penalty is levied for delay in
delivery ,the period is calculated from the document date of Po & not from date of
issue of the Po to the Vendor as it is not exhibited in system. So please guide
me,How to exhibit Actual release date in PO, so further deduction on delivery will
be consider
It may not befrom that date.
possible to change the date in the PO. The system takes the system
date at the time of creation of PO itself. Hence can't be changed. Please study
howmany days it is taking for each po to release from top authority. Average
number days can be added to the delivery period. Before doing this have a word
with
Aftervendor
knowingdoing so.
on average, how many days it takes to release a PO, before saving,
change the suggested date that is assign to the PO to current date + average days
to release.
ANY ONE PLEASE EXPLAIN ABOUT bom EXPLODING
Partner roles and partner functions are one and same. The following are some
partner functions. Ordering ; adress ; Goods supplier ; Invoicing Party ;
Different payee Partner roles are determined by the accounting group selected in
Vendor master records.
U can configure partner roles by the following T codes in customising: -
OMZ1: Define partner roles in purchasing
OMZ2: Key re-assignment of Partner roles
OMZ3: Permissible partner for each accounting group
OMZ4: Partner schema for Vendor Master
OMZ5: Assign partner schema to vendor Accounting groups
OMZ6: Partner scheme for purchasing documents
Please try and confirm results.

can any one guide me how to do the plant to plant consignment stock tranfer and
wat will be the movt type. and help me to do with single step procedure and two
step procedure.
T.Code MB1B mvt 301 (ONE STEP) & T.Code MB1B mvt 303( to issue) and then
at recieving plant MB1B mvt 305(to recieve)
You could look at this website which has the MIGO transaction with screen shots
for the Transfer Posting Plant to Plant. Step by Step. I have used it as user training
material for last project. It is simple and easy to use.

Please assist me in setting the field short text optional entry. It is currently greyed
out. On SPRO it is set as optional entry but doesnt allow any entries. Would you
know
I'm notwhere elsepltocheck
sure but check?
field selection key NBB-Purchase requisition, Field
settings - short text - required entry
NBB also has the same settings. The short text is set as optional entry>but the field
is greyed out
This will not work.. There are 6 FRSKs in the system for resultant field setting. You
have to go throgh the SPRO documentation before selecting them
Pl make it as required entry not optional
The are no changes even when the field is set as required entry. Can >this has
something to do with the system?
No idea. However I had checked with same settings, it is working fine with me.
Yes got it. Pl check field selection key AKTH, there in short text must be in display
mode, make it optional, save the settings
Thanks for all your help. The field selection shown below didn't work for me. I found
the solution on field selection NBB-Purchase requisition.
I think you had not read my mail i had clearly written. "please check all the entries
in the list apart from " me51 52 53 me 21 22 sometimes any one if is made dispaly
it hampers
try all thepath
this settings, settings
is SPRO->MM->purchasing->purchase requisition->define
screen layout at document level->select ME51N click on details->basic data->short
text change the status to optional

Can you assist in solving this query? When printing a Purchase order after making
changes, it only prints the changes effected, and not the whole documen
Is there a way that I can do a mass change on the material document that has
serial numbers.. I have +- 8000 serial numbers to be changed.
The serial number once created can not be changed . Only way you first return
tghem to vendor or issue to scrape account and agains made the incoming entry
with the correct serial number
COULD ANY ONE EXPLAIN THE STEP BY STEP PROCEDURE FOR PO
REMINDERS IN ME22N

Change in Material type


If u want to change the material type of a material, one of the condition has to be
fulfilled.
(a) Both material types must be assigned to same account category reference
(b) There must be no stock, open PO and Reservations.
Further use T code MMAM.
In ASAP Methodology Which type of data is upload at the time of Final preparation
stage In my view Master datas any thing else(It is called Cutover Period)
Generally following data should be uploaded - (1) Material Master, (2) Vendor
Master, (3) Service Master, (4) Open Purchase Order , (5) Open Purchase Request
, (6) Open Reservation, (7) Historical Data, (8) Tax Master, (9) Any other
documental transaction which is used in your organisation like Gate pass, Scrap
related documents etc , (10) All open transaction during cut over period which will
upload
There willafter
beGo
twoLive
types of data always. 1. Master data & 2. Cut Over data i.e Open
data for uploading.
Need to set authorisation for ME35K i.e. Contract for nearly 5 Release codes. I
have 2 document types in Contract. How to proceed. My basis guy is not able to
create this.
The back ground, let me tell. For PO & PR i.e ME29N & ME54N the release
strategy strategy is working fine with all the release codes. I have almost 10 users.
For the above two Txn codes my basis guy has assigned ME22N/ME53N also
ME35K & ME52N/ME53N also ME35K for the PO & PR release TXn to work. I do
not understand why ME35K is also needed to be assigned to the object for PO &
PR release to work.
What
in extra I should
authorisation doperform
matrix so that these
ME35K should workobject
activities: for the users assigned(Release
: M_EINK_FRG for
code and Group) assign ur release codes and release group belongs to
contract,,,
Let's say I have a PO in currency MYR. We have received in the materials and
have used up the materials. We then get the invoice from the supplier which is in
USD. When we perform LIV for this PO, the currency will be captured as MYR
automatically. Can we change the currency to USD when we want to do the LIV? If
can't, is there any alternative way to solve this?

If a user account have not developer key, can the user create and record a CATT
TEST? Where to control the record right
To create and use CATT TEST the Client should be active for CATT and secondly
the user should have authorisation for transaction SCAT then only one can create
& record CATT TEST and no developer key is required.
Thanks for your details. I am using ECC 6.0 and the Extended CATT works for me.

Does anyone know how to make the PARTNER FUNCTION field in PO creation a
required field?
Sorry, I don't Know. Can I know, what is Partner Function
Thanks for your reply. The Partner function is in the PO Header.

can we make goods movement restrictions to a particular storage, location if so


can i have an detail explanation Eg: consider a plant has 2 storage locations 0001
0002, i want all gr with 101 movement type to be allowed in 0001 where as this
allowance to be restricted to 0002, and 501 can be allowed to 0002 while must
restricted to 0001. how can i do that please give me an detailed explanation with
related
throughtransaction codes
Authorization control u can do this,, MM- Inventory Management, Object -
M_MSEG_LGO, Goods Movement - storage location - movment type , 0002 - 501
, 0001 - 101, try this,,, can fulfil ur requirement,
Thank u sir it really worked thanks for ur suggestion. before the authorisation i think
i must activate the authorisation for storage location in mm>logistic invoice
verification> authorisation managent.
KINDLY CHECK FOR MATERIAL MANAGEMANT - INVENT MANAGEMANT -
GOODS ISSUE / TRANSFER POSTING

We have a requirement to change the material type configuration from valuated to


non valuated. I performed this change in sandbox and the system allows me to
change the configuration. There are some impacts of doing that like we need to kill
all the open PO's an create new ones and also the value of stock will never get
clears out etc... So my question is whether is this a good practice to change the
material
try type configuration
with tcode or not.material type No need to get into configuration
MMAM to change
changes
We have change the material type but not from valuated to non valuated,but it was
some different configured material types ,but we have changed at a very initial
stages when there were no stocks for the materials ,there were some pr or po whici
we deleted than changed the material type and than again created the new pr and
po
As I created PO for the excisable material and also captured the excise invoice in
J1IEX. When I did MIGO, am getting error as "Part1 will not be done for the excess
GR Qty." I am accepting qty in MIGO which is same in PO and excise invoice.
Tcode-MIGO try with subsequent delivery option (in MIGO select document type)

How do you change the delivery address on the PO ? I have tried doing this on the
PO delivery address tab but it only works for that PO . The documents created after
that doesnt adopt the new address. Where else can I change it permanently
For permanent change in delivery address, Change the address of concern plant in
SPRO.
Go to SPRO setting change the address in the plant

Is there a way to enable users to change unit of measure on a material when doing
GR, GI and placing an order? Scenario: Buying goods in a box, and issuing in
packets or each Where can I make these changes?
The only change that will affect your UOM is when you place an order.(GR/GI will
consider what has been captured when an order is placed)
Bear in mind that the UOM is dependent on the type of Order that you are placing.
Internal Order will always check for Base Unit of Measure, whereas, External Order
will do the conversion if you use Preq. If you place External Order directly on
ME21N, the system will automatically pull through your Order Unit. Hope this will
make sense. ( All this changes can be done on MM01/MM02)
You can maintain the conversion in Material Master (MM01/MM02) in the additional
data(Unit of measure)

WHILE CREATING SERVICE ORDERS, TO CHANGE THE G/L A/C NO W/O


DELETING THE SERVICE LIMIT, COULD ANY ONE PL GUIDE ME?

is it possible to see the last usage date of a materials with movement type.
Use T.Code MB5B

While creating Po by junior Engg. Po date is generated & same is printed


.However, Po is required to be release by the various authorities .generally it takes
some time. The Po can be issued to the vendor only after realization of Po by all
concerned. Hence the Document date printed on Po is not the actual date of issue
of the Po to the Vendor after it's Release. In case Penalty is levied for delay in
delivery , the period is calculated from the document date of Po & not from date of
issue of the Po to the Vendor as it is not exhibited in system. So please guide
me,How to exhibit Actual release date in PO, so further deduction on delivery will
be consider from that date.

i m creating a reservation of 50 units in one storage location in a plant.total no of


units are 60 in that s.loc. now when i n creating a stock transfer without refering to
the resevation i m able to make a transfer of all the 60 items. what happend to the
resevation stock.i can see the items have been reserved in MMBE.
The reservation created in SAP are only a soft reservations and will not restrict you
to transfer the materials. U can block the materials so that u dont transfer them.
which type of movement type can be used for blocking the material?
it seems that you,after creating reservation you did not tick the movement allowed
indicator.if you dont tick this indicator,even if you create reservation system will not
consider this reservation for goods movement.please try this.
Can you restrict reservation based on MRP type Only unrestricted stock quantity is
allowed
MRP takes input for generating PR for a material from following source
(1) ROL & ROQ (LOT Size) and present unrestricted stock level
(2) Created reservation for same material
As you want to allowed reservation only for unrestricted stock quantity then MRP
will take input from only first source.
In my situation, I have configured vendor evaluation however it compute score only
for a vendor that is evaluated for the first time. After the first evaluation, no matter
how many procurement transaction have been created for the same vendor. The
system always display the same score as the first time. From my understanding the
system will compute the score automatically everytime after the procurement is
closed and will display the average score when the user run vendor evaluation
(ME61). Does anyone know what should be the cause? Thank you for every help
and
In suggestion,
me61 transaction, after entering pur orgn and vendor to be evaluated, follow the
path Edit--> Auto new evaluation to evaluate the vendor.
Thank you Girish. Your suggestion is exactly what I did and what I mean by"the
system doesn't generate score for latter evaluation". The score is always the same
no matter how many time I procure material and evaluate this vendor. The only
reason I can think of is because the configuration for vendor evaluation for example
the point score is changed after the first evaluation. I'm not sure is this reason
cause the problem. What am I thinking is the system doesn't generate new score if
there is a change to the evaluation parameter since the first evaluation to ensure
the consistence of the evaluation score.Any idea?
What is the use of J1I6 T.code how we can use that Please explain me

i m creating a reservation of 50 units in one storage location in a plant.total no of


units are 60 in that s.loc. now when i n creating a stock transfer without refering to
the resevation i m able to make a transfer of all the 60 items. what happend to the
resevation stock.i can see the items have been reserved in MMBE.
The reservation created in SAP are only a soft reservations and will not restrict you
to transfer the materials.
U can block the materials so that u dont transfer them
which type of movement type can be used for blocking the material?
344
Please try this for freezing the material. SPRO->MM->Inventory management and
Physcial Inventory-Allow freezing. I guess this will fulfil ur req.
Pl. let me know the feedback.

I am doing inbound delivery. what field in the material I have to maintain so that I
can create inbound delivery with this material and what else customization I have to
do for that. Please hellp. How can I configured\ my printer so that I can print
necessary transaction results locally.(not print screen)
sir my attitude is to settle all the disturbances of freight in po
itself.i new about the provision in miro for unplanned cost.but my
thinking is why this freight is acting in different way?cant we
alter within po every time as the lot is said to be arrived.
-- In sapmaterialsmanagem ent@yahoogroups. com, "BHAVIN TRIVEDI"
<bhavin.1927@ ...> wrote:
>
> you can mannual add the amount of the freigh during MIRO if u have
made
> provision & the value at freight coloum seams tobe ZERO. Please
try &
> confirm
>
> bhavin
>
> On 11/12/07, y2me210 <y2me210@... > wrote:
>>
> > thanks for ur advice.
> > one thing here is the freight is calculated on weight basis in
the
> > company and made as fixed amount.its an header value,and not an
item
> > value.as in purchase order several line items are present we
cant give

As I created PO for the excisable material and also captured the excise invoice in
J1IEX. When I did MIGO, am getting error as "Part1 will not be done for the excess
GR Qty." I am accepting qty in MIGO which is same in PO and excise invoice.
Please check is partial delivery already received
As per your suggestion,I checked partial delivery which recd earlier. It couldnt solve
the problem. As I created a PO with qty. 33.380 Mt. and splitted this qty. in one
excise invoice with two line items such as 16.740 Mt & 16.640 Mt. In MIGO,the
system accepts only 16.640 mt and not more than this.(ie if I put the two line items
as 16.640 & 16.640 respectively, the system accepts these quantities.) That means
the system accepts only the smaller qty.(As I checked whatever the qty in PO ie for
eg. 100mt.Split up as 16.740&16.640, it gives the warning message.)
i m creating a reservation of 50 units in one storage location in a plant.total no of
units are 60 in that s.loc. now when i n creating a stock transfer without refering to
the resevation i m able to make a transfer of all the 60 items. what happend to the
resevation stock.i can see the items have been reserved in MMBE.
The reservation created in SAP are only a soft reservations and will not restrict you
to transfer the materials. U can block the materials so that u dont transfer them.
which type of movement type can be used for blocking the material?
it seems that you,after creating reservation you did not tick the movement allowed
indicator.if you dont tick this indicator,even if you create reservation system will not
consider this reservation for goods movement.please try this.

Some of my friend said .. that I must create co-product setting .. for example : A
finish good ; B raw material ; C Scarp material ; So when I do back flush ..
material C will increase stock and material B will be consumed Is it correct
Dear Budhi,
Add the conversion at material master between sheet and KG.
Dear All
Can somebody help me I have issue in my company.
I will explain a lill bit about my company bussines process.
My company use discrete manufac for automotive and will produce assembly sheet
(for body part)
Finish good UOM for sheet was PC and for the scrap my employee maintain
manually and the UOM was Kg.
Can someone help me .. how to maintain this in SAP and give the process in
system plizzzz ^_^

As I created PO for the excisable material and also captured the excise invoice in
J1IEX. When I did MIGO, am getting error as "Part1 will not be done for the excess
GR Qty." I am accepting qty in MIGO which is same in PO and excise invoice.
May be the partial gr already happen against this p.o. plz check and confirm
accordingly.
one thing here is the freight is calculated on weight basis in the company and made
as fixed amount.its an header value,and not an item value.as in purchase order
several line items are present we cant give each and every item dividing the freight
to
youeach
can item.
mannual add the amount of the freigh during MIRO if u have made
provision & the value at freight coloum seams tobe ZERO. Please try & confirm
Could you please let me know how can i make field Gross Price of an service enrty.
Now quantity field is modifyable but gross price can not be modify as it is not
modifyable.
during service entry it will picked up form the PO only. Or in the conf u might have
done as a display field. ML81N

Can someone please tell me how can I receive the delivery Manualy for a STO? I
did MB1B for transfer posting with mvt. 351and the PO History tab is there now, but
I want the Delivery Completed box checked under Delivery Tab. I have to use mvt
101 for the GR. Correct me if I am wrong in that.....
U have to do MIGO Goods reciept -Purchase order - than the PO number AND
CAN COMPLETE THE GR

is it possible to see the last usage date of a materials with movement type
date is possible but not mvt as per my knowledge
Use MB51 and than put the material and movement type if u want than u can see
that movement was done on which date .
Use MB5B

Material A has a BOM. In the BOM, there is a material B. A is produced by a


subcontractor. For each A, one B is needed. There is a PO for 1000 PC of A.
When GR for the PO, and GR QTY is 30, for example, 1000 PC of B is deducted,
instead of 30 PC of B. That's strange. I don't know why.
pls check UOM
let me try to explain to you in this way, I call A as parent material and I call B as
child material When you do MB1B and ME21N, A & B will be linked automatically
through BOM, it this clear, When you want do MIGO for 30 pcs only, you have to
enter qty 30 with reference to A and also with reference to B, Hope your problem
will
Checkget the
sloved.
base quantity for the BOM and in the PO made check the req. being
picked for making 1000 pcs in the components tab.
Ur issue will get resolved.
The quantity available with the subcontractor end will be 30 only,so it is taking 30
only
What is RTA?

Can anybody tell me how & where to configure the system to check the PO
Quantity to not exceed the PR Quantity when creating PO with Reference to PR, i
dont want the field PR to be mandatory when creating PO, & i knwo an error
message when exceeding the PR Quantity but i want it through user exist as it is
applied for specific users.
We are a part of large Denmark based group .We urgently require following sap
consultants having experience of one full life cycle implementation at least for our
sap implementation.
FICO Functional
SD Consultants
MM Consultants
Sap ABAP Consultants
PS Consultants
Please send urgently your Resume at ruppal.mba.aicwa@ gmail.com

WHILE CREATING PO W.R.T.OTHER PO BY COPYING, AFTER SAVING THE


DOCUMENT ,WE ARE UNABLE TO IDENTIFY FROM WHICH PO IT WAS
COPIED? COULD U PLEASE GUIDE ME IN THIS REGARD?
it will copied from the po which you have taken , or if u not choosen any po it will
take from the last po.

is it possible to see the last usage date of a materials with movement type

WHILE CREATING PO W.R.T.OTHER PO BY COPYING, AFTER SAVING THE


DOCUMENT ,WE ARE UNABLE TO IDENTIFY FROM WHICH PO IT WAS
COPIED? COULD U PLEASE GUIDE ME IN THIS REGARD?

Today we use Rounding value to show forecast in correct reelsizes and also to
place orders correct according to reelsize, Rounding value is updated as reelsize
per material but if we have two different reelsizes from a split between two suppliers
we use minimum multiple i.e. one supplier have 2000/reel and one have 3000/reel
we put in 6000 in rounding value. Is this correct way to do in SAP or is there other
solutions that we can use to get Quota split correct? Is there another solution in
SAP that can handle reelsize/material so we will place orders correct to package
size and also show correct package multiple in forecast? Or a solution if we can
just have one of these demands fullfilled(Correct package when placing orders but
forecast show per one or the opposite way)?

Is there a way to enable users to change unit of measure on a material when doing
GR, GI and placing an order? Scenario: Buying goods in a box, and issuing in
packets or each Where can I make these changes?
The only change that will affect your UOM is when you place an order.(GR/GI will
consider what has been captured when an order is placed)
Bear in mind that the UOM is dependent on the type of Order that you are placing.
Internal Order will always check for Base Unit of Measure, whereas, External Order
will do the conversion if you use Preq. If you place External Order directly on
ME21N, the system will automatically pull through your Order Unit. Hope this will
make sense. ( All this changes can be done on MM01/MM02)
Purchasing View.
Plant Data View.
Put the conversion of box to packets in the material master; additional data->units
of measure
In my situation, I have configured vendor evaluation however it compute score only
for a vendor that is evaluated for the first time. After the first evaluation, no matter
how many procurement transaction have been created for the same vendor. The
system always display the same score as the first time. From my understanding the
system will compute the score automatically everytime after the procurement is
closed and will display the average score when the user run vendor evaluation
(ME61).Does anyone know what should be the cause? Thank you for every help
and suggestion,

The client need the report on the unreleased PO/SA and their approval level
(lowest level only). In the Structure RM06B, We have two fileds ANZEF : Final
Release ANZFR : Release to date The difference between the two fields will
give me the unreleased PO/SA. My question is 1) Does data comes from
Structure-Field combination, if not 2) What is the equivalent Table-Field
Icombination and how
hink your problem dobe
can I see
wellit.solved easily by ME2m(Scope of list ALV) by
filtering the release Indicator and u can see the corresponding Release Group and
release code. I hope this can solve your problem

Here is a problem i am facing in the company imports section when ever an PO is


raised to the material we generate freight in the condition tab. but on other hand we
receive material in lots(batches) Every one knows that freight is dependent on the
each lot of delivery. But when we come to invoice verification, freight in the first lot
is shown as cleared and for the next lot the freight that has to be added is
automatically shown to zero. why this is happening? can anyone please help me.If
so please send the solution to my mail id y2me210@yahoo. co.in. any other
clarification needed i will surely provide them to you.
I need your help urgently on the following scenerio We have two plant per say A &
B. A plant will produce a finsihed product X and its base unit measure is Pound and
Material type is FERT. This product will be used as raw material Y in the plant B.
The Raw material Y is having Base unit of measurment "KG" and Material type
"ROH" The plant B will receive the material from plant A using STock transport
Order. Problem Arises here How do we convert the material X to Y ( whose Base
unit is different from Y) Shall be very much grateful, if you could kindly give me
solution under such business scernerio

I want to change kurs when i do MIRO,..could u tell me how..?..or customized.. ?..

I have diffculty in making report for material that having two version. When i m
check my meterial tru md04, i always cannot see aterial e.g (label) version in store.
Is that any transaction make easy way to capture both version & at the same time
make one
Please try report
to use Trx: MM60 to get the report you want
MM60 Still show not separate qty with diffrent version. It only indicate the
descriptive information on material not the version & qty on storage.
Hi,
The theory how MM activity triggers A/c posting is:
Each movement type has quantity and value string, which decides what to update.
Also each movement type has transaction event key ( account modifier) which in
turn depending upon valuation grouping code and valuation class decides which
G/L account to post.
The flow is as follows.
Material type --> Account Category reference --> Valuation class -->Material.
Movement type -->Transaction event key-->Account modifier.
you have to do the configuration settings using Tr. code OBYC.
Try with Tr.code OMBW to check which G/L accounts are being hit on Plant,
Material and movement type.
Hope you got the solution.
Best wishes.
Ravi.

Rahul Shah <srahul38@yahoo. com> wrote:


Thank you Ravi for the previous answer....

I have one more favour to ask today...Could you please give me an answer for the
following question? it's very urgent.

We have movement type 343-Damage Remove


344-Damage Add

I would like to know how to create a new field reference by copying Field reference
ROH for material type.?

Kindly help me solve the following MRP queries.


1) We had taken MRP run on 4/11/07. But for one of the items we got Delivery
schedule for 1/11/07. What could be the reason for getting such backdated
scheduling line?
2) What is the effect of pending STOs (Stock Transfer Orders) on MRP run? i.e
whether we will get the procurement schedule more than or less than the actual
required?
3) What is the effect of pending SOs (Sales Orders) on MRP run? i.e whether we
will get the procurement schedule more than or less than the actual required?
4) After MRP run, for some items we get schedule lines more than the actual
required & for others we get it less than the actual required. What could be the
posssible reasons for these differences? Kindly extend your expertise for these
does anybody know a program to create transfer orders for pre allocated stock in
background

I want confirge a Subcontracting PO with delivery . and i have setup the Delivery
type "ZBL" for Subcontracting Order . but the new PO could not generated
shippoint when i create a new Subcontract PO.

When doing GR to subcontract PO, the system determines the components for
each order item and creates a goods issue item for each component. But, why the
system can't determines the correct quantity of the components for each order item
when doing partial GR to the subcontract PO? For example, BOM is B under A,
1:1. When GR to a PO for 100 of A, system does GR for 100 x A and GI for 100 x
B. But, when doing GR for only 30 x A, why does the system do GI for 100 x B,
instead of 30 x B? This is a strange and urgent issue. Does anyone throw some
light on it?

i m creating a reservation of 50 units in one storage location in a plant.total no of


units are 60 in that s.loc. now when i n creating a stock transfer without refering to
the resevation i m able to make a transfer of all the 60 items. what happend to the
resevation stock. i can see the items have been reserved in MMBE.
reservation is just for indicative purpose. It doesn't block the stock. You can transfer
material without reservation also. If you don't want any movement of material pl put
the same in blocked stock

When I receive goods into the system via MIGO. If I order 30 pieces of material but
the vendor only sent 20 pieces. I only received 20 pieces and want to do vendor
evaluation for this vendor so that this vendor will award low score because of
delivery quantity. Assume that I have done all configuration for vendor evaluation.
When I evaluate this vendor, the system can't generate score for quantity reliability
because this purchase order is not closed (10 more pieces still missing). How can I
received only 20 pieces and indicate that this purchase order is completed but the
vendor failed to deliver the order quantity. I heard about "Delivery completed
indicator".
once u closeDoes
theanybody
po, then know how to will
only system solve this problem?
calculate the score for qty reliability. .you
can close a po in change po( me22n) by choosing dely completed ind. or you can
choose in MIGO also( the one u did for 20 pcs)
Can I change the rule based on material type
Pl check whatever options available in same screen.

AT THE OUTSET, I WISH U ALL HAPPY DIWALI.COULD ANY HELP ME IN


DIFFERENTIATE THE MEANING OF FOLLOWING SELECTION PARAMETERS
WITH EXAMPLES,SINCE I AM GETTING SAME LIST FOR ALL.
1.OPEN TARGET QTY
2.OPEN INVOICES
3.OPEN ISSUE QTY
4.OPEN GOODS RECIPT
5.GOODS RECIPT EXISTS(WE102, WE110&WE106)
6.ROUGH GR
Go to ME2L or ME2M in selection parameters select RECHNUNG it shows list of
pending imvoices
I think to view the pending invoices in respect of the vendor we can try FBL1N
Transaction
I would like to know how to create a new field reference by copying Field reference
ROH for material type.?

I have two type of items. one which are covered in MRP and PI is raised through
MRP other which are not covered in MRP. PI are raised mannually. My company
want that the there should be no limit on reservation for MRP items . For Non MRP
items reservations should not be such that it exceeds the available quantity.
In customizing transaction OMB1 you can set up dynamic availability check for
reservations & define checking rule as per your requirement. Accordingly you can
setup warning or error msgs.
I could not create info record.It is asking to enter all fields.The field Valid to is made
mandatory but it is not activate to enter data.Please help me to sort this out.
From general data screen directly goto pur org 2( path : goto --> pur org 2) then to
conditions screen.....once u r done with this comeback to pur org 1 sceen for data
entry.....
i m trying to creat a third party order but it is asking me to enter the plant, even
though i m entering the delivery address. i think is must not be needed to enter the
plant as the matarial is to b send to the del add.
You have to enter plant , for which plant u r creating a purchase order.
We have some materials that were set up incorrectly for batch management. I need
some help understanding how to correct. For parts that were set to batch managed
and transactions have occurred, what has to be done to fix? For parts that were not
set to batch managed and transactions have occurred, what had to be done to fix? I
have removed all inventory and tried to set the batch management but it gives an
error still. of those batches....go to MB51 and try reversing the documents (if
For each
possible)... this might be a tough job though...... or else is finance agrees then
move those batches with a 711 movement to the variance account.....

can we creat po for 10 different items each having the same price without entering
the price for all items.
Create info record for the alll the item, while creating PO it will take price from the
info record
Could any one let me the Transaction code get the details of Transfer Order line
items confirmed with with Difference
can you pl elaborate the scenario & what is your exact requirement.

Is anyone aware of how to report on unplanned services for both purchase


requisitions and purchase orders? This option does not appear to be available with
any of the standard list displays or reports. Checking this forum before creating
adhoc query.

Does anyone know how to make the PARTNER FUNCTION field in PO creation a
required field?

One advise needed on the following scenario: Index pricing is available in Sales
pricing procedure. Does any body aware if the same functioanality is also available
in MM pricing procedure.Requirement is:
1) Inter Co sto is created
2) Goods issue posted
3) Billing is posted agaisnt delivery
4) GR posted against STO at price STO price
5) while invoicing at the month end, there is a price change (specific to oil & gas
industry scenario) How to adjust this price change as all the other documents like
GR/GI is already posted at the old price.
u can change the amount n adjust at the time of invoice verification n payment.
I think we cannot simply change the price at the time of invoice. It all depends on
PO terms and coditions. PO is a valid legal doc.I think you may have implement
price variation based on PO clauses.

i m trying to creat a third party order but it is asking me to enter the plant, even
though i m entering the delivery address. i think is must not be needed to enter the
plant as the matarial is to b send to the del add.

can we creat po for 10 different items each having the same price without entering
the price for all items.

I have problem in creating info record.The valid to field is deactivated and i cannot
enter in that field.Without that info record could'nt be created.Can any one can help
me
u ? do this in two ways, either u can go to screen layout n change the settings or
can
u can skip the page by clickin on text button at top aftr enterin text page u can click
nxt content button n u can enter the gross price, the net price will automatically
come so u donn hav to com bk n u can save thr. even if u give any significant no in
the valid to field it wll can b changed at altr stage.
I have maintained a quota arrangement for Procurement of some material from two
vendors with 50% split between the two.I have given that if the amount of req is
more than X than only split.but the planed order for the material is not getting split
50-50. Kindly tell what could be the reason. say X here is 780,000 and the total
quantity is getting split as 115,000000 and 89,000000 why is such a split and not
50-50 split
Splitting among different sources is carried out if a lot-sizing procedure for which
the splitting quota indicator has been set is assigned to the requested material in
the latter's master record. get back to me if i am correct

Is it possible to BLOCK only a SINGLE MATERIAL FROM PR creation? If so How


U can also make use of the Material Field(MM03) -X plant mat status. It will not
allow any PO to be created.
Try to mark indicator "flag for delition" for that material but before that see no stock
exit for the same material.

We are made PO By Using "K"Acc.Assign.Hence Stock not available at st.loc.(i.e.


direct Consumption to Cost center).and MIGO & MIRO of
that material has also done. If We want to bring that material at stock then what is
the procedure? Pleae suggest the solution ,this is an important isuue.
Take the material back into stock with mvt type 202, but also let me know why u
want the materia lback into stock what about the valuation part of the material.

Can anyone tell me how do the consumable items/non stockable items pick or are
assigned the G/L accnts I think the material type NLAG is not assigned any ACR in
our system.

I could not create info record.It is asking to enter all fields.The field Valid to is made
mandatory but it is not activate to enter data.Please help me to sort this out.
From general data screen directly goto pur org 2( path : goto --> pur org 2) then to
conditions screen.....once u r done with this comeback to pur org 1 sceen for data
entry.....
Kindly let me know what are the steps & goods movements for scrap disposal
You can use transaction MB1A & Movement type : 551

Can I use MRKO for backlog (Backdate) process?


MRKO is for pipeline & consignment liability settlement, liability may be backdated
or present
We are made PO By Using "K"Acc.Assign. Hence Stock not available at st.loc.(i.e.
direct Consumption to Cost center).and MIGO & MIRO of that material has also
done. If We want to bring that material at stock then what is the procedure? Pleae
suggest the solution ,this is an important isuue.

There is a Transaction of PR to PO (ME59n) but when ever i try to execute it thows


an error No Suitable requisition Found This is very important process to keep
endusers interested and quick
whil creating PR click on source determination, and than goto me59, and over there
click on ref. to pr. plzz check and let me know
for automatic creation of PO thro PR, Standard P Org should be needed Try this
and reply feedback
try to check that , may that PR's not assigned any source of supply, its better to
check open that po->item details->Source of supply
I have created a framework PO and have set a limit value for this particular PO
however it doesn't work. I'm not sure is it because the way I used this framework
PO is not correct or the way I create it is not correct. What I did is I adopt new PR to
this PO then I receipt the goods (MIGO), then create invoice (MIRO) until posting
payment. After finished one procurement then I adopt other PR into the same PO
and repeat the same procurement steps until the value of the goods that are
procured exceed the limit value in framework PO. However I can still add new PR
to this PO
Which even it type
document is over
r u the limit.
using Does
while anybody
creating theknow
PO. what I went wrong?
I'm not really sure what do you mean by document type, Could you give me some
example? I'm using Framework Order instead of Standard PO when I create this
PO and I set Item Category to "B" limit. Then I set a limit value for this framework
PO but the system still allow me to add purchase requisition to this PO even the
value exceed the limit.
When ever you run transaction "OMWB",you will find three buttons on the top.
"Account Assignment", "Simulation" and "G/L Account". Click on "Simulation",
here enter plant,material and movememnt type for which you want to see the g/l
account.And press "account assignment" button. It will show you the a/c which will
be hitted with the posting keys. This is done with the help of transaction code
"OBYC". This is account determination setting. This is also called as MM-FI
integration. Depending onyou plant, chart of account,transaction event key,
valuation class and movement type system will pick G/L account.

Could anyone pls. let me know which table capture the stock quantity of all types of
materials
mesg
Use table "MARD". (Plant and sloc combination) . Mbew( Material price

I have to comeup with the idea and program for Phy inv. We have Mainframe---
>Biztalk- --->SAP. My company wants to bypass Biztalk and wants the data directly
come from Mainframe into Sap.

Could you please give me detailed steps for 'Inter Company Stock Transfer
Order'including required prerequisites and Configurations settings?
By using Tcode ME21N u can create stock tran.Order. Refer the below screen print
But I need prerequisites and all configuration settings and the material movement
types.
Move the consigment stock to plant own stock. then create STO between the
plants. then convert the plant own stock to consigment stock. even I am not sure
about the third step. first two steps will do.

Krishna

On 11/5/07, ravi rk <svrk1234@yahoo. co.in > wrote:

Hi Alan,
If you know the correct answer plz give.
Not better to lower other consultants.
Sorry for taking interfering. Everybody may not be knowing A to Z.
Thanks,
Best wishes,
RK

Alan <alan_ed@yahoo. com> wrote:


Dear Suniths,

once again you have given an incoreect answer. Why do you think it is
not possible to do a transfer posting of consignment stocks between
plants.
thanks a lot...

--- In sapmaterialsmanagem ent@yahoogroups. com, mahavir.pande@ ...


wrote:
>
> I think simple solution is increase stock by mvt 561 & reduce in
other
> material by mvt 562.
> Is there any issue in this??
>
> Thanks,
>
>
>
>
>
> David Pedley <david.pedley@ ...>
> Sent by: sapmaterialsmanagem ent@yahoogroups. com
> 11/05/2007 06:46 AM
> Please respond to
> sapmaterialsmanagem ent@yahoogroups. com
>
>
> To

I need help. Some one by mistake changed the posting date to months 9/10 of
2007 .. it shud have been 7/8 of 2007 financial year is from april to march how to
undo this .... can anyone guide me

I could not create info record.It is asking to enter all fields.The field Valid to is made
mandatory but it is not activate to enter data.Please help me to sort this out.
Hi Jai

We do not use split quota. Instead, we use allocation quota whereby the system
picks up the vendor on turn by turn basis. Notwithstanding, I had experimented
even with split quota with the following steps

Lot size procedure is modified to enable quota splitting.


Minimum quantity for split is specified in the quota file

But, no luck. The system just created one schedule line for one of the two
component vendor.

By the way, I am also based at Noida. Could we meet at mutual convenience.

A K Jain
----- Original Message -----
From: "Jai Khurana, Noida" <jai.khurana@ hcl.in>
Date: Monday, November 5, 2007 11:37 am
Subject: RE: RE: {Disarmed} RE: [sap mm] Subcontracting MRP
AreawithQuotaArrang ementUsage
To: sapmaterialsmanagem ent@yahoogroups. com

> HI Jain,
>
can we have two pricing procedures with single vendor ; if yes then in which
situation and wat steps we have to configure for that. ; 2)can we trnsfer
consignment stock from one plant to another plant to the consignment stock of the
plant wat wiill be the movement type and wat configuration we have to do
hi u can't transfer consignment stock from one plant to another plant. U only can
tranfer from one storage location to another storage location with in a plant. that too
only possible to do single step stock transfer from one storage location to another
storage location. T.code MB1B single step procedure - mvt type 311K
once again you have given an incoreect answer. Why do you think it is not possible
to do a transfer posting of consignment stocks between plants. I can only guess
you're not an MM consultant as this is the second incorrect answer I've seen from
you in one update. Maybe you should attend some MM training
If you know the correct answer plz give. Not better to lower other consultants. Sorry
for taking interfering. Everybody may not be knowing A to Z.
You can create but one will be the suplementory condition which will be use in the
contract & quotation Ex. Contract with suplementary condition. Contract rel Order
with the condition which u have mention in the vendor master data.

I am importing some material in one depot and then transfering it to another now, I
want to transfer and i want the freight should get loaded into the material cost and
also I should get frieght payable entry so that FI can pay the bill
You make the MIGO with freight at one Depo where u do the import & after that u
create STO for the another plant where u want ti transfer with the freight data in
stock transfer PO.
after migo, any leftout delivery cost is not addable in po in ME22N.As we are GOVT
PSU a/c dept is not adjusting the same in MIRO and doing the payment.can any
one guide me for the above problem?
If it is not possible during MIRO then u have to cancel the MIGO amend the PO &
them do the MIGO i dont think any other solution for the same

We have an urgent need to use subcontracting MRP area with Quota Arrangement
usage so that components can be directly delivered to subcontractor from third
party vendor as per quota arrangement. Does SAP support the functionality in 4.6
C or any later version. If not, is there a work around available.
Yes...sap supports ur req...but u hv to approach MM Consultant
Can you explain in detail for this requiremnt. How to fulfill this type of requiements.
Waiting for expert's comment.
Their r lot of things to be maintained for it. Few of them , 1) Activate MRP area , 2)
DEfinesub con MRP Area for the plant , 3) Maint. The quota for vendor , 4) Maint
an inforrecord for sub con vendor , 5) While creating PO , make the delivery at SC
location and specifythe location for it.
All this has already been done but without any success. The issue is that we have
two vendors supplying same component to a given sub con vendors. Secheduling
agreements are in place with both the component vendor duly providing for direct
delivery to sub con vendor. Both the scheduling agreements are included in source
list and are MRP relevant (indicator 2 - this was possible by amending system
message 375 from error to warning). Both the comonent vendor are included in the
quota.
MM setting both for plant and sub con vendor MRP area are in order. Special
procurement key 20 is assigned in sub con vendor MRP area.
When we run MRP for sub con vendor area, system is creating a schudle line but
the agreement picked up is not of the vendor who ought to receive the schedule as
per quota. Further, the schedule line quantity is not updated in the quota. It appears
that quota record are just not considered by the system while running the MRP for
sub
Havecon vendor. splitting quota for lot size, as such standard SAP doesnt hv this
u activated
activated. Maintain the quota a fresh after doing the same and logging out.

I am facing the problem of, there are 35 items in one p.o but it shows only 20 items
in print preview and moreover the total eff.price are also not displayed in print
preview
Please check has remaining 15 ites are deleted fr the PO . or check with yr BASIS
team for the print paramater ,

Can anyone give me some idea about variant configuration. I wana know what it is
and how we configure it in SAP R/3.

Could you please give me detailed steps for 'Inter Company Stock Transfer
Order'including required prerequisites and Configurations settings?

I have a problem with getting the current stock qyt and value . i am taking table
S033, I am calculating current stock = received qty -issued qty : ( S033_MZUBB ) -
(S033_MAGBB) ; received total stock value value of issued stock)
(S033_WZUBB) (S033_WAGBB) but values are incorrect for certain materials.
am I selecting from wrong table?. what is the right table?
Current stock equal to OP stock + Recipt - Issue qty. Please search for the table &
let me know also.

can anyone guide me by giving t code for listinng inbound deliveries


MMBE & try vlo6i
I want to transfer a material to another. But uom's are different. source material is
kg, destination material is mt2.how can I do this? migo dont let me this
T. Code MB1B will allow you to transfer material to material. However the base has
to be the same. There is no two way about this. Work around solution: Create
destination material with same base unit and same moving average price (MAP),
then write off the balance from the source material and write on the balance to the
destination material
can u pl explain the write of and write on situation over here.
Material X has base unit "ea" - each, quantity 5, moving average price $11.00 ;
Material Y has base unit "bt" - bottle, quantity 2, moving average price $10.00 ; In
the above scenario, the system will not allow you to transfer the quantity of material
X to material Y because the base units are different.
Option 1. - Use t. code MR21 to change the MAP of material Y to $11.00 if
necessary. Create the physical inventory document MI01 or MI31 with only
material X and Y. Enter the count for X as zero and the count for Y as 5. View the
variance report with MI20 and post the physical inventory document (variance) with
MI07.
Option 2. - If it is ok to create a new code, then do so, material Z, with the base unit
as "ea" and the moving average price or standard price at $11.00.
Create physical inventory document using t. code MI31 or MI01 for material X,
material Y and material Z. Enter the count for material X has zero and the count for
material Y as zero and the count for material Z has 5 + 2. When you run the
variance report (MI20), you will see the amount of 5 being written off from material
Xthink
and simple
the amount of 2isbeing
solution written
increase off by
stock from
mvtmaterial Y. You in
561 & reduce willother
see material
7 being written
by
mvt 562. Is there any issue in this??

PL GUIDE ME HOW TO CORRECT THE MATERIAL TYPE IN INTIAL SCREEEN


IN MM02type can be changed by t code MMAM but there should be no open data
Material
for that material .for eg PR,Po,Reservations, Stocks Etc should nto be there

I want to know that how can we set delivery compelete indicator after releasing PO
because after release we can not change any field of PO screen . I want to know
also that how can we restrict user for makign GR against delivery completed PO
The delivery complete indicator can be set at the time of receival. In t. code
MIGO_GR, change the indicator "set automatic" to "set" when receiving if the
quantity received is less than the PO quantity. With MB01, you can set the delivery
indicator if the quantity received is less than the PO quantity or even if the item is
not delivered. I think your PO configuration is set so that no changes allowed to PO
after release. Therefore, the above is an option I know of and it works.
I have a problem with total invoice reduction as if we assign tolerance group to a
vendor in vendor master data total reduction is follow as per that tolerance group
but if we don't assign any tolerance group to vendor in vendormaster data it follows
tolerance range for the small difference for each company code. My question is
where do we set this tolerance range for each company code in spro?
SPRO->MM->Logistic Invoice Verification->Select co-code-absolute Set the
reduction limits
I am getting the following error everyday for diffrent articles., Defict of SL Blocked 1
EA:3765553 0250 1000 Article: 3765553 , Mvt :343 , S.Loc: 1000 , Plant :250 ,
Can someone please explain the cause of this error and solution ASAP.
Hi, Pl check whether storage location blocked or not with Tr.codeMM06
Use t. code MM06 to check if the storage location for the material is blocked.
Because you are trying to issue from storage location that is either blocked or does
not have enough stock
PL GUIDE ME HOW TO CORRECT THE MATERIAL TYPE IN INTIAL SCREEEN
IN MM02.
The precoditions to change a material type are: There are no stock, no open
purchase orders, no scheudleing agreements, no reservations, no open physical
inventory docs for processing.
i am facing some problems while doing pricing procedure
Please intimate ur exact problem
See go to your calculation schema there you make following changes in your
pricing procedure. See the GRN stage you are getting the error that seect
adherence to shipping instruction for this you go to have check this fied as i am not
sure whether comes on the Where tab or the PO tab of the .line item in the MIGO.
for pricing procedure in calculation schema u put tick mark for P(printing) for gross
price and for shipping instructions in where tab one column for shipping instructions
is there u can evalute that shipping instruction. u can contract me at any time

I want to transfer a material to another. But uom's are different. source material is
kg, destination material is mt2.how can I do this? migo dont let me this
Try with movement type 309

I want to know that how can we set delivery compelete indicator after releasing PO
because after release we can not change any field of PO screen . I want to know
also that how can we restrict user for makign GR against delivery completed PO
You can set the delivery completed indicator in ImConfiguration. SPRO->MM-
>Inventory Managment and Physical Inventory-> Goods Receipt-> Set Delivery
completed indicator.
after migo, any leftout delivery cost is not addable in po in ME22N.As we are GOVT
PSU a/c dept is not adjusting the same in MIRO and doing the payment.can any
one guide me for the above problem?

where do i find currency conversation table in SAP?


It is There in OC41. transaction
Sorry, OB52 is for FI period. OB08 is for currency. I think the table is "TCURR

We are in the process of SAP implementation, likely to GO-LIVE by Apr'08. We


have issue in handling receipt of raw material in DUAL UOM. We account any
material receipt in both NOS and MT and the weight relation varies every
consignment, hence we cannot adopt to fixed weight norm. Any way to address
this DUAL UOM with dynamically varying norm. Can anybody help.
check this link http://help. sap.com/saphelp_ erp2005/helpdata /en/ef/f53f710fa
549ab8ffeb00f5ce fda4a/content. htm
always try to maintain basic UOM as a stock keeping unit UOM and whenever you
want to make PO, that time u make use of ORDER UNIT concept
I think there are 2 methods for Dual UOM maintenance.
1. Same plant with SPLIT valuation.
2. SAme material With different plant. create new plant and extend the material
with different UOM
check this link http://help. sap.com/saphelp_ erp2005/helpdata /en/ef/f53f710fa
549ab8ffeb00f5ce fda4a/content. htm

Can anybody tell me how to create/define standard purchasing organisation, pl.


Standard purchase organisation is nothing but normal purchasing organisation. If
several purchasing organizations procure for a certain plant, you can define one of
them as the standard purchasing organization for the transactions "pipeline
procurement" , "consignment" and "stock transfers". In source determination for
stock transfers and consignment, the system automatically utilizes this standard
purchasing organization. In the case of goods issues of pipeline materials, the
purchasing info records of the standard purchasing organization are read. It can be
assigned
Thanks a for a plant
lot for in customization
the reply. Whatever usettings.
said is correct. Whatever you mentioned is
from SAP help document. But, when I am trying to assign the the standard
purhasing Organisation to Plant the available entries were empty. Without defining
a Std. Pur org. we cannot assign, right? So, could you please tell me how to define
a Std. Pur Org. out of create purchasing organisations.
follow the path, spro-->img-- >ent. structure--> defination- ->material management-
> maintain purchase organization
But how to define a Std purchasing organisation out of created purchasing
organisations
As I told earlier, std purchasing organisation is nothing but normal purchase
organisation.
One thing u need to do is to assign the normal purchase organisation to a plant as
standard
The processpurchase organisation.
is correct. I have created one plant and some pur. org. When I tried
to attach a puchase organisation in 'assign standard purchasing org to plant' no
values were found. Then how to assign?

is there any option to delete the storage location or to block. because i dont want to
use that storage location
You can LS06 T code to block / Unblock the Storage Bins
Try MM06 Transcation
it seems u r talking abt storage bin and azam i s talking abt SLOC

I recently posted a link from a website about the tutorial on doing transfer postings :
MIGO: 301 from plant to plant On the same website i found a good video about how
a proper implementation of SAP can work wonders for your company. I am posting
that link here: http://sapphire06. 50webs.com/ imagetips/ waytouse. html visit it if
you are interested

hi can any one guide me how to do the plant to plant consignment stock tranfer and
wat will be the movt type. and help me to do with single step procedure and two
step could
You procedure
look at this website which has the MIGO transaction with screen shots
for the Transfer Posting Plant to Plant. Step by Step. I
have used it as user training material for last project. It is simple and easy to use.
http://sapphire06. 50webs.com/ imagetips/ migo301.html
This is a good website but does it have more transactions other than MIGO 301.

COULD ANY ONE GUIDE ME TO POST THE MIRO OF BILL OF ENTRY OF


IMPORT ORDER OF MORE THAN 3 LINE ITEM THRO"STEP BY STEP
PROCEDURE
Do you need to do a LIV for the goods or for the import duty? In case it is import
duty component then you need to have the import duty as an expense condition in
the PO or STO [depending on your treatment of the issue]. Then simply go to the
MIRO screen and input the order number and select delivery/expense, hit enter and
you shall see the various line items where you can select the ones you wish to
process. Just like MIRO of expense conditions of a normal multi line item PO.
Correct solution, But can you please explain how the CHA expences of the
unplaned transportation expences can be booked during the LIV of Import Goods?
In case of standard MM treatment, if your costs are unplanned, meaning that there
is no corresponding expense condition record in the PO or
STO, then, there is no way you can do an IV for that cost in reference to the PO or
STO in question. You might have to do an FB60 transaction
in FI to book that expense.
You can try "Subsequent Debit" in MIRO.
Subsequent debit will not work as in case of unplanned cost item, that cost item will
not show up in MIRO against that PO. You can only take it
through FB60 to a non-inventorised GL
HOW TO CHANGE THE EXCHANGE RATE IN MIRO FOR IMPORT PO/B/E
think you can change exchange rate while doing MIRO itself

in vendor master what are the datas we are maintainig at plant> level...
vendor master is not maintained at plant level. It can be maintained only on Client,
company code and Purchasing org. level.
How can I view the Vendor data in SAP MM Module Kindly guide me.
try MKVZ, for vendor list,
we can also maintain Vendor master for plant level also if only the data retention
level is active we can maintain purchasing and partner functions for plant level and
VSR level
xko3 or mk03
See Vendor master has folowing data ; Data at client level ----may be company or
corporate ( group of company ) ; Data at company code ---- company code specific
data ; Data at purchsing org level--- related to the purchasing

PL GUIDE ME HOW TO CORRECT THE MATERIAL TYPE IN INTIAL SCREEEN


IN MM02.
Try the following transaction codes for solving all your queries regarding the posting
periods.
1. Use T Code SE38 for ABAP Editor and run program ZMMPER1A for all
company codes of ur organisation.
2. Use MMRV to see what is the existing period and allow posting to the previous
period.
3. Use MMPV for closing the the period every month.
4. Use MMPI if u are intialising ther posting for the first time and previosely there
was no transactions carried out.
5. OBBO for creation of posting period vaiants (by FI/CO)
6. OBBP for assigning CoCode to the posting period. (FI/CO)
7. OMSY to see all the posting period updation.
8. OB52 to to make all accounts cklarified A, D, K, M, S and +.
I want to transfer a material to another. But uom's are different. source material is
kg, destination material is mt2.how can I do this? migo dont let me this

I have a problem with total invoice reduction as if we assign tolerance group to a


vendor in vendor master data total reduction is follow as per that tolerance group
but if we don't assign any tolerance group to vendor in vendormaster data it follows
tolerance range for the small difference for each company code. My question is
where do we set this tolerance range for each company code in spro?

It is the same period initializing issue, can any body throw some light & clarify, how
to initialize MM period every month. I hope that Im not wrong, when I say I should
never use The TXn code MMPI. for this.I think this is stopped from rel 4.5 or so
OB52 I am sure is for FI period opening. Should i close the period with MMPV
every
we month
r using 6.1& here
do initializing
we use MMPV for month end closing nothing else required For
Fi they use OB52 may be ,that i m not sure
Follow the instruction in Note 487381 and then do MMPIthen u can open
previous
Period period
initialization is basically activated or ticked in two scenario, 1. When a new
system is installed and a new company code is created. 2. Correction purpose
Initializing directly assigns current period to all stocks,also initializing is not a period
closing activity. You are absolutely right OB52 is used for FI period opening. In
OB52 you can maintain the number of open periods for the settlement of
accounting documents. Hope this has enhanced your thought on initialization and
FI period closing.
We have an urgent need to use subcontracting MRP area with Quota Arrangement
usage so that components can be directly delivered to subcontractor from third
party vendor as per quota arrangement. Does SAP support the functionality in 4.6
C or any later version. If not, is there a work around available
Yessap supports ur reqbut u hv to approach MM Consultant

i have a doubt
first i want to explain u the scenario
when we want to consume some materials(tools or consumables) we issue it to the
cost center .movt type 201 .this wayt the stocks and the accounts both go fine .an
entry is created in the consumption gl account for that amount of material value.
but here is the problem
suppose in productioon the tools got broken or the consumable got spoilt which
cant be used again comes back to the stores ,so we make an reverse of issue to
cost center by movt type 202 .the stocks are updates in the inventory but the gl
account is also hit and it shows a negative consumption. but actually that material
was already consumed and got broken in the production .the stock is not a problem
but the account are getting effected badly .
is there any solution to take back the broken materials back to the stos without
creating any finance entry.
i will like to give an example
suppose isse material cons1122 ,quantity 1 pcs ,to cost center by movt type 201
the 1 pc will be deducted from the storage location and the gl account will be
having a value of say 100 rupees (means a 100 rupees is being consumed by the
cost center)
till here everything is fine
but suppose the cons1122 got broken in production and cant be used than it is sent
back to the stores .we do movt type 202 and take back in the stores .here a stock 1
is increased in the stores that is ok but also in the gl account one entry of -100 is
created that shows
i understand it is a reversed
ur scenario. consumption.
but pls note butany
if u consume actually the material
valuable material is
then it
will make definately a fi entry. in ur case u can issue these unusable material to
production overhead or scrap cost centre and this way the respective gl will be
updated. But plz note that it can not be possible that material wil scrap and no fi
entry wil passed. whereever u post/issue a valuable material the system wil must
make a gl entry also.
when we consume a material , a fi entry should no doubt be passed ,i have no
issue regarding that ,but the problem is ,when the consumed material get damaged
and is taken back by 202 ,an fi entry is again created nullifying the before
consumed entry but in actual we have consumed the material and the material
during consumption is broken or damaged which cooming back to stored is not of
any use again .(so the actual consumption entry in fi should not be nullified as the
material have been actually already used and consumed by the company,its
coming back dont give any proifit to the company but when i do 202 it shows and fi
entry
as perindicating a profit i.e.negative
my understanding you shouldofpost
the cost of mvt
scrap, consumption).
551 i hope u
Though I do not have complete idea how u are handling the material out of the
three scenarios I have mentioned in my previous reply, What i feel, scrapping by
means of 551 should solve your issue as amount equaling the material price will be
deducted from the inventory & consumption for the cost center issued will be
added. FI entries should be OK.
Look we generally use 202 for reversal for this purpose if we are maintaining
valuated material master for tooling. If you have UNBW i.e. non valuable material
then the problem does not arise, then we have some other issues other than FI to
handle
The toolsi.e are
howvaluated
to procure
andexhausted
have a veryquanity etc. Come
high values evenback
someif toold
you have any other
are more than
100's of dollars .That is why i m more concerned aboutt the valuation rather than
the stocks.If i take the material back by 202 and than scrap it by 551 will the same
consumption account will be effeced or have to see the account maintained for
scrapping and movt type 551 .Please reply with surity as it is a real time scenario
Do scrapping and issuing to cost center hold the same effect on gl account/
There is not much diference between Issuing to cost center for Consumtion/use of
tools & Issue to costcenter (551) for scrapping. Both the activities will hit the same
type of account i.e inventory & Consumption. The only difference could be Cost
center in both the cases. The same scenario is working fine for me and we have
10,000 Tools/Accs. out of which almost 70% are imported formUS/Europe & are
carry Good valution. We are Live only.
I guess you have to have a word with your FI & CO Guys as both the people are
involved & your Business process Owner(Client) so that there is a Rule/Displn. for
carrying out this activity. As more than a SCM guy they should be worried upon how
the accounts should be hit as per the business requirement.
i Ifthink
you ifare in agreement
i maintain the samewith gl
me, I will be
account forhappy to know
scrapping how
as in theuconsumption
have solved than
this
my net consumption will be perfect.as we are not using scrapping till now. I will talk
to the Fi person and the busines s persons
i created info record for an item in my system and while i entring that inforecord
number in my purchaseorder as a line item, it is not taking the complete details of
that inforecord ie. pur org, Vendor, item price, plant..can i get header data and
pricing data of that item using inforecord number in PO..pls reply..

while creating document type we assign item category to the document type. Can
any one explain how should we select item category while creating the doc type.
Do item category have any effect on the document type. Also what is the
significance of link PR .If i wanted to create document type ZCAP for PO what item
categories i should select or what item categories are preferred

Can any one answer whats is Stock Transfer Note?

1.HOW TO CANCEL THE FAULTED RFQ? 2.HOW TO CREATE PR WITH


RESPECT TO INTERNAL ORDER FOR BUDGETTEDMATERIALS?
Change RFQ - ME42 Create PR - ME51N
COULD U PLEASE DETAIL. Ie. IN ME42 WHAT ENTRIES TO BE MADE FOR
CANCELLATION SIMILARLY IN ME51N , WHERE INTERNAL ORDER
REFERENCE CAN BE MADE FOR TRACKING?
Use me51n & Put "F" In acc.ass. Enter the Internal order no & the other details of
PR. Save the PR

I would like to change the standard price in the material master for the finished
goods materials. The standard is set up in the material master one time when the
material is created and is never changed. I would like to change the process to
updating the standards for these materials on a quarterly basis and need to
understand the effects that this change will have in SAP. I know there is a
transacton MR21...wanted to understand the EFFECTS THAT THIS CHANGE
WILL HAVE IN SAP, besides the price changing??

Can you assist in solving this query?


> When printing a Purchase order after making changes, it only prints the
> changes effected, and not the whole document.
> How can I fix this?
Go to t-code ME22N,go to messages,then choose neu,print out put,enter,enter a
printer name after saving go to me9f excecute and go to
sp01. You can call me on 053 830 8861 if you are not clear,i'm also in DWAF
kimberley
When we create a debit / credit entry for vendor with reference to a P.O. due to
some price difference in P.O. & bill of vendor,the amount which pass thru debit /
credit entry will load on material price. if yes then please give me example & also
send me SAP can
Your problem screen shot.
be analysed in two ways.
1. If the material is valuated with moving average price (v ), the difference of price
what ever will go to stock account i.e., loaded on to the material, provided there is
sufficient stock coverage. EXAMPLE. you have recieved material of 100 kg, but at
the time of invoice verification you have only 80kg stock, so the price difference
amount for 80kg only will be loaded to the materil, and the remaining amount for
20kg price difference will be debited to the PRICE DIFFERENCE ACCOUNT.
2. If the material is valuated with Standard price then the difference amount will be
debited to PRICE DIFFERENCE ACCOUNT.

While releasing the IPR and after saving it, we are getting error like [Express
document "Update was terminated " received from author XYZ]. This makes PR
unreleased.What is the problem? Will you please guide me in resolving this
problem.
PR-I know.But what is IPR?
its same act we use it as IPR ( internal purchase requisition) . But over all it is
known
IT MAYas PR.TO NUMBER RANGES
DUE

Is there any report which shows the list of all purchase orders amended in a given
period (for a week or a month etc.)?
U can use t.code se11 and table ekko

I am Unable To put on sap123 If u have the answer please Reply (g.doc


attachment)

When we create a debit / credit entry for vendor with reference to a P.O. due to
some price difference in P.O. & bill of vendor,the amount which pass thru debit /
credit entry will load on material price. if yes then please give me example & also
send me SAP screen shot.

please explain..what is procedure for cancellation of a PO.. is there any transaction


for cancellation
Use me22n and delete all the line items

1.HOW TO CANCEL THE FAULTED RFQ?


2.HOW TO CREATE PR WITH RESPECT TO INTERNAL ORDER FOR
BUDGETTEDMATERIALS?
Change RFQ - ME42 Create PR - ME51N
COULD U PLEASE DETAIL. Ie. IN ME42 WHAT ENTRIES TO BE MADE FOR
CANCELLATION SIMILARLY IN ME51N , WHERE INTERNAL ORDER
REFERENCE CAN BE MADE FOR TRACKING?
When cancellign the RFQ,you go to ME42,enter the RFQ numbet and then press
enter,select all your iterms and press the dust bin sign,then SAVE
It is better u reject the quotation, which is not required

Vendor block
u can block the vendor T.code xk05.
y cant we try t_code OBR2 to delete the master data, in this case i hope we require
program,,, try this let me know

Is there any function module or program available for finding latest GR number for
a part number, vendor, and plant combination?
Pls try use "ME2M".
You can use MB51 T Code. Mvt Type 101 to find the list of GR for an article

While creating the Vendor master record i IDES i am getting an error . System
prompts for the Reconciliation account. Prior to creation of vendor master record i
already have done following configurations
1.I CREATE COPY OF CHART OF ACCOUNTS from INT1 to create my COA.( As
country is india any suggestion which reference COA i should select to copy from)
2. Assigned new COA to my company code.
3 I also maintained controlling area which is my company code.
When i click the Recon field in XK01 i found no possible entries.
Please guide me as without mentioning the Recon account i am not able to save
the vendor master record.
What else configuration i need to make, so that system can find the recon account
on its own.
check whether have u defined any account group 'LIAB' with account numbers from
and to,, in t_code OBD4. Now create a Reconcilation GL Account in t_code FS00,
there u use the account group 'LIAB',, now try to create vendor master ,,,, hope
this may work for u
I' d like to know what is the transaction that I can use to registe dates into the table
Home tax ( em portugues domicilio fiscal). Do
anyone know?
There are some concepts about the pricing in PO that I never got it clear. I really
appriciate it if someone can help me.
What is the base amount for calculate the tax via tax code?
In the invoice verification there often is a tax code in which a tax rate is decided.
But what is the base amount of the tax? How does the system get the base amount
from all kinds of conditions from purchase order? Does it related to the
configuration in the condition type, or in the calculation schema?
I looked into the tax code configuration to find the base amount condition type as
BASB without any access sequence. and for India there is a basetype 362 in the
pricing schema. I can not understand the code in routine 362, and for example
there even isn't a basetype in China. Then how does the system get the proper
amount for calculate the tax?
Please explain me how to define the tax code appeared in IV.
From where does the system takes base value to calculate the tax amount

i info record i could not able to work on conditions if i click on conditins no


response. y so can any one help on this
info record for STO why it is required
hey not only for sto for any i could not able to work on conditons.
check if the conditions screen is activated in config
Check out if there is default procedure is there & assigned to vendor in the system.
U have to check in Pricing procedure for this.

There are various vendors and tax codes in our system which are not in use.So we
want to delete those vendors and tax codes
Permanantly from the system.Please let me know the process of arciving this from
the system.

I need to know which transaction permit to see which transfers (313) are waiting for
receptions (315) and where I can find out a reception X (315) to which transfer
corresponds
Try to set the(313).
varrient in mb51 & see its happens or not or u have to double clik on
the material document it will give u the ref docu, in STD SAP it will not avilable what
u want.
How can I change the object text (description) in transaction code CL24N?

This is Maruthi,Can anybody explain me about QM and MM Integaration and


Integaration testing scenarios
can anybody help me how to proceed with tcode CJ20n,ie how use it and for what
purpose
its solvedCJ20N SAPLCNPB_M Project Builder

Can anybody guide me how to maintain decimals beyond upto 4 places for
example 1.0012 usd.
Never ever try to attempt to change the deciaml places once set during
implementation. It will screw up all the finalcial data of the company Beware.....! If
you want to consider more decimal places for ordering in PO, you can make it as a
quantit term ex : price of an item is 0.44536 per peice you have decimal place up to
2 in PO enter price as 445.36 for 1000 numbers. this will solve your problem.
Never attepmt to change decimal places even in Dev / Quality server as these
changes are cross client and will change all your data in the production server also.
See SAPfacing
am also works same
upto problem.
2 decimalif points
i enter price Rs.100 & qty is 200 then amount it
shows as 200.00 instead of 20000. pl avice
Please get Decimal Notaion changed in user master data
We can set no. of decimals as per our requirement, in user parameters, use SU3
Ifor
amthe same
really sorry .we can set currency to different decimal points . Each currency
has a different number of decimal places. If you are adding new currencies, which
do not have two decimal places, you have to enter these currencies in the menu
option 'Decimal places'. In the settings delivered with the system, the most
important currencies which do not have two decimal places are pre-set according to
the ISO
See SAPstandard.
works upto 2 decimal points
You can use a pricing unit of 1,000. In your example, price the item at 1,001.20 per
1,000
i have 2 val type of one material: 1. ind-spare, 2- ind-prj simultanously we use
different val class for diff val type when we want to procure material for project,
then we use ind-prj and when we want to use material for operation then we use
ind-spare. for project procurement we create pr in cj20n then do po and migo and
for operation we create pr in me51n and do po and migo. but problem is this for val
type ind-prj, price and qty in material masster is not updating but for operation it is
updating.
use OMS2sot code
i wanted
and to knowthe
select thematerial
problemtype
andfor
solution.
which qty and value updations
are not taking place. check whether the qty and value
updations are checked by valuation area. if not check both the buttons and save.
this will solve the problem
how to get the list of technical names of transactions in customizing like OMS2. In
SAP Easy Access Screen - there is option to show technical names. same way it is
not available in IMG in SPRO
Check the field "Proj stock valuation class" in Material Master Accounting 1
view.Have you put the valuation class there?.
is it posssible to put on hold the contract wnenever we have doubt while creating?
print preview of contract is possible
in info record i could not able to open the conditons can any one help on this
Go to ME13, Input Vendor & other details & open Info Record , Conditions button is
there, press the same or F8 will take u to conditions. In case of any error messege
you are getting, what is the msg?

i am transfering one mateiral to another material (quality to unrestricted use) in 321


movement type. but error is came i.e change the inspection stock of material in QM
only.
Please use t code qa32 it is quality module transaction beause quality has been
activated for this material do the result recording and than make the usage decision

We are made PO by using "K" in Acct.Ass.& we did MIGO Of the same due to this
we were not get material in stock ( i.e. Direct consumtion to the Cost center)But
now if we want to see detail stock of each item ,is that possible? If it is then How?
Please
If gudecharge
you direct me. the materials, then no stock account got updated. However, you
can use MB51 with movement type 101 which will show you all the receivals for
those direct charge items. Take this to be the stock.
hey u can see the stock overview T.code MMBE
Enlighten me. How can you see stock for items for which the PO have been made
with "K" so that the items are expensed when received. As far as I know there is no
inventory, so you cannot see stock

Use t code MB51 .U can also use MB1A than goto Environment on top and than
select document mvt .fill mvt type(313,315, 241)whose document u want to sea.fill
material and plant and store location .recive with mbsu(315) .
Hi guys, I need to know which transaction permit to see which transfers (313) are
waiting for receptions (315) and where I can find out a reception X (315) to which
transfer corresponds (313).
Supose that I did the mvt 313 doc. number 4900006255, material 900607 quantity
5000 UN. Then I did de mvt 315 doc number 4900006330, quantity 4000 UN.
Which TCode tells me the doc. number whose received the doc. number
4900006255, material 900607 quantity 4000 UN.
For example:
Mat. Document Material Quantity UM Reference
4900006255 900607 4000 UN 4900006330
Then which TCode tells me that the doc. number 4900006255, material 900607
they still lack 1000 UN to receive.
For example:
Mat. Document Material Transit UM
4900006255 900607 1000 UN
Try >MB51 - shows movement of material >MB5T - shows material still to be
received
Hi David, TCode MB51 don't show me the doc. referenced in mvt 313 and 315, like
this
Mat. Document Material Quantity UM Reference
4900006255 900607 4000 UN 4900006330
and MB5T only show me the purcharse order in transit, not de mvt 313 in transit
and its document
Ruben, try MB5B number.
apply t code MB1a and go to environment then to material movment fill the M code
,plant ,store location and movement type.

In ERP, does the system have the ability to determine the impact of safety stock on
carrying costs (or inventory costs)?

Kindlu guide me how to define the Business Organisation Structure in ECC 6.0.
From financial angle what is the maximum utilization of various terminology such as
Company, Company Code, Business area, Functional area, Consolidation
Business area, FM area, Segment and profit center . What is the relation in
between . Please depict a pictorial diagram for better understanding. This is very
urgent
I suggest that you attend a complete SAP-MM training or SAP-FI? I am not sure
which module you want to go in for from the information given below

I am facing one problem while creating stock transport order. The system gives me
error: S:ZCA:005. There is no any long text with this error
We are handling under Assets, so the above issue is handled under depreciation.
In your case you have created Master for the Tools. It is true that once u make
reversal for the broken or Consumed tools u will have Accounting entry.
What about Scrapping the Broken/Consumed tools after the reversal. Inventory
gets reduced & Consumption gets added to the amount of the material. We have
one client in us , who handles this types of materials under UNBW category.

We are made PO by using "K" in Acct.Ass.& we did MIGO Of the same due to this
we were not get material in stock ( i.e. Direct consumtion to the Cost center)But
now if we want to see detail stock of each item ,is that possible? If it is then How
no, now u can not see the stock position of said material. only way u have to check
the sotck physically as in the system it has been already consumed.

wat s the diff between pboo & pbxx in detail

what are all the configuration required for centralise purchase organisation in terms
of assignment ...... either assign to company code or plant or some other
For this you have to make use use of the reference purchasing organisation and
you have to assign the purchase organisation to this refernce purchase
organisation. Example : 0001 is refrence Purchase organisation ; 0002 Purchase
organisation 1 ; 0003 Purchase organisation 2 ; 0004 Purchase organisation3 ;
0002 ,0003 , 0004 are to be assigned in the step ; Assign purch. organization to
reference purch. ; organization in this way you can make use of the condition
maintained forthe
how to create thephysical
reference P org todoc
inventory other P organisations
auromatically after GR immediately
instead of creating manually in mi01?

I heard 'FireFighter' but I don't know the details about it. Does anyone tell me what
the function of it and how to perform it? Thanks.
In my company i have been activated material ledger & parallel currency. I want to
make sure is my setting is correct or not and i want give the example:
Material master data:
MAV material :
Company code currecny : 20000 IDR
Group currency : 2 USD

Purchase Order (foreign currency)


PO currency : 2 USD
Qty order : 10 PC

Result of FI document on GR transaction( Exchange rate : 9000):


Document Currency
Inventory 22,22 USD 200000 IDR
GR/IR 20 USD 180000 IDR
ML 2,22 USD 20000 IDR

Group Currency
Inventory 20 USD 200000 IDR
GR/IR 20 USD 180000 IDR
ML 20000 IDR

My assumption, calculate to get amount inventory in document currency & group


currency is different,

In import PO i want to see the LC no and expiry date, landed cost shipment
status active and then will get report on the LC no , LC expiry date , bank
gurantee etc.. how can I link these document with the PO

Can you give details on automatic account determination becuase in my


implementaiton this was done by fi guys but in interview they ask this questiopn
many times also the terms used in it and there links like valuation class ACR
posting
How do keys
the FIand glscan do on their own, either they know something of MM or they
guys
have taken the help of a MM guy, the reason is they do not have much to do in Acct
determination as they are required to provide G/L accts alone based upon process
requirements and the Books to be maintained by the client. Contact them as it is a
elaborate proces which covers all the valuaton classes & processes being used in
the organisation.
Our Pm was Fi guy so he said he doesn't want to take the risk and since i was not
so confident i could not oppose so that is why i want to knwo it learn it properly so
next time i want to do on my own

My client requirement is LIFO-FIFO during the Good issue .....they want to issue
material to the user dept whuch was received 1st, automatically how should i do
it

I want to change the valuation class of a material for a particular plant, but when I
tried to change I received a message, valuation class cannot be changed. There is
no stock for the material in the plant and also there is no movements of this
material in the current period or the previous period. There is no stock of this
material in other plants but, there are movements in other plant during the previous
period. Could you please advise why the system is not allowing to change the
valuation
Please class?.
see the total coverage stock of required material using T code MMBE. Any
open PR/PO or reservations might be there in yor plant.
Procedure to change val class: Change message status to warning. Transaction
OMT4. ; Messages 00 MM 326, 00 MM 327 ; Check if stock in transfer exists ;
Set Delivery completed indicator in PO items
Empty stock- mvt 561/562 ; Change val class ; Then return back all previous
steps.

in our company sap auto miro is configured . we are doing it successfully . but when
we do this in the miro generated reference number get overwritten by miro number
which is earlier the party bill no. so in sap is there any configuration where it can be
stopped
how did u do auto MIRO settimngs
we are doing auto miro with mrrl

i am facing the problem oin creating a material & stock transfer with mov.type 562
Hi can u clarify why are u using the Movt type 562, this is used for reversal of Initial
Uploading of material master. Are u under some kind of training wher-in it is
standard practise to boost the stock using 561.

i have a doubt regarding realeaseprocedure for P.R creation


What kind of doubt? The entire procedure or a part of 2 kind of rel. procedures
available for PR
find the best shops in every city. use tcode OLMRLIST
can i help for everbody i want sap mm T.code
I do not think anyone understands your request. Are you asking for all the Sap MM
transactions
Please use simple and understandable English for others to response your
queries.
as per my consltantant advise ,for the purchase of item in E1 transactions inwhich
ed is inclusive,we have been asked to maintained as exclusive in FV11.the
difference in assable value can be coorected in j1-ex.by doing this ed a/c is ok. but
in MIRO the difference in assable value is reflecting.how to resolve this. otherwise
anyother
While method
posting the is there
doc for ed
during GR,conditions?
I am getting error "Posting period __XX 2007 not
open ". I tried to check using T code MMPV also but still getting the error. Any
suggestion is really appreciated
I think you have to check your FI opening period thru T-Code OB52 and open for
the period closed. I assume your are working in IDES. If you are on Production
server, you have to ask your FI team to work on this issue as its not the
There are twoofplaces
responsibility the postingresource
MM Functionals period is controlled, which are as follows: FI
transaction OB52 MM MMPV

I want toknow if there is any process to delete vendors permanently from theclient,
like we do with materials.
use t--codexk06
Thanks for the reply, but my question is like we use mmdeto delete material
pemanently from client is there any transaction todelete vendors from the system
permanently. XK01 is for flaging thevendors for deletion but it will remain in the
system.
When i was creating Old P.O. with Old delivery date i.e.08.12.2003, system
generate message "Period not in Co.Calander" Message No.M087.
Why you wana create the PO with old delivery date, the system is delivering a
correct message. Create PO with correct future date, you will be fine

Is there any standard report in MM which shows me history of moving average


prices for a material. with reference to Purchase order (with or without)
Problem of Payment Terms comes at time of Invoice verification of particular
supplier, Payment term in P.O is A (30 days.) Payment term in Vendor master-
Purchasing and finance view is B ( 45 days.) but at time of MIGO system takes C
(60 days ) Supplier was having C ( 60 days) payment terms but none of active
P.O/Schedule agreement is with C payment Terms. For every other Supplier
System takes Payment
u can change the termsTerms as mention
of payment in P.O/Schedule
in MIRO. agreement
also u can change the Terms of
Payment in configuration section n thn assign it. but thr is some system setting
error in migo plz chk it.
what are all the configuration required for centralise purchase organisation in terms
of assignment ... either assign to company code or plant or some other
Can we change the valuation type of a material already define in split valuation
type. If yes how

The Stock/Requirements list is displaying the delivery schedule lines for the deleted
delivery schedule. There are 3 components m1,m2,m3 for a BOM Material M123. A
sub-contracting Scheduling Agreement is created for the M123 and Delivery
Schedule is maintained.Subseque ntly a couple of schedules are deleted. Now
when i run Stock/req list MD04 for m1/m2/m3,the delivery schedule lines are also
created for the delivery schedules already deleted. Appreciate if you can give any
solution/reason for this any program/report to be run to correct the md04 list.

For SAP MM T-codes Goto this link u will find all SAP transaction code .
http://www.easymark etplace.de/ transactions- m.php

i have some basic questions: 10.what is the expansion of MIGO & MIRO? 20.is it
possible to put hold on contract? 30.contract print preview other than mein me35k
is possible? 40.after supplementing the po we ar getting the changes only in the
print .if we want both the print ,then how? 50.for nlag material, while crating po it
is asking to assign a/c assignment category which is not possible by dirct
posting.how to resolve? i think this is some thing with material master.

I want automatic generation of PR for the shortage materials. example. Customer


Order X material of 100 Qty, we find shortage of materials 40 Qty via availability
check.
what
Pl. are the
check yousettings to be made
have configured forinMRP.
mm run
part.
inVendor list is and
your system alredy
gomaintained.
for MRP to have
auto PR generation through system T.code MD01/MD03

Is there any standard report in MM which shows me history of moving average


prices for a material. with reference to Purchase order (with or without)
Run Tcode: ME1P
Thanks for the reply. That does not solve my problem. I tried find out with the with
the reports list avaialble in MM, but I could not suceed. Any other Txn codes
anybody aware. May be I have to go for separate new report generation for this. I
was trying to avoid this ABAP report stuff, but seems it can not be avoidable.
Kindly try Trx code: CKMPCD
Problem of Payment Terms comes at time of Invoice verification of particular
supplier, Payment term in P.O is A (30 days.) Payment term in Vendor master-
Purchasing and finance view is B ( 45 days.) but at time of MIGO system takes C
(60 days ) Supplier was having C ( 60 days) payment terms but none of active
P.O/Schedule agreement is with C payment Terms. For every other Supplier
System takes Payment
u can change the termsTerms as mention
of payment in P.O/Schedule
in MIRO. agreement
also u can change the Terms of
Payment in configuration section n thn assign it. but thr is some system setting
error in migo plz chk it.
I have one problem in 4.7 IDES (tranning )as follow, In RFQ message coming as :
company code is not assign to country or calculation procedure . pls reply me
where is the probelm in custmization ? ur reply is valuable ,
See check for the compnay code whether the country key has been given or not
and if it is fine then check for the calculation ( tax procedure ) . But to me it looks
that at the time of RFQ it will not show this error .May be one more possiblity that
you are
This is aworking
common with tax jurdiction
problem in IDES.code
The reason, there is no Calculation procedure
existing & assigned to Country India.
The solution can be (particular to IDES only)
1. Financial Accounting-- ->Financial Accounting basic setings---->tax on
sales/puchases- -->check calculation procedure--->Define Procedures , here copy
one of the sales tax proceudres example TAXGB and name as TAXIN.
2. Assign Country to calculation procedure in the next step save it and ur problem
will be gone..
I would like to repeat this is for training purpose only, as in real case u have to have
actual Procedure Taxinj or Taxinn will assigned to co country India for Taxes
Hi,We have a material with serial number.some materials is used some areas in
the city before we started to use SAP.After SAP,we add these materials to the
system,and appears as mounted anywhere.Then the producer company produce
new materials by the same serial numbers with the last years.And then the new
materials can be added into warehouse ( i have no idea how the system accept this
operation ).now some materials appear mounted and stored at the same time.when
I try to mount the material in the warehouse the system is not allowed this
operation,cuz this material is already mounted in the area.I changed the serial
number of the mounted material to be able to use the stored one, but when i
changed mounted one also stored changed too.basically, i have two material with
same serial in reality but system have one material with two property.My last plan
is, I will move the
material as a scrap from the warehouse and then again enter the warehouse with
any
you movement.But
have had somethis is not
model acceptable
code and add for accountancy if there is any other
to enter
I have a problem in MRP.
I have two plants 1001 and 1002.A material x will be procured from plant 1002 to
1001.
I have put special procurement key ST(Stock transfer) in material X of plant 1001
(recieving Plant).
When I run MRP for 1001, a PR is created because of demand and for same
quantity PRRel should created in 1002.
But in my case, when I run MRP for 1001,a PR is created in 1001 for demand and
in 1002 (issuing plant),A PRRel and also a PR is generated for same quantity.PR in
1002 should create when I run MRP in 1002.But here If I run MRP in 1001, A
PRRel plus a PR is created in 1002.
Can somebody give a step by step instructions of resetting the PO number range,
am trying to change the From number and it is giving me "Only can be change at
initial closing
while entry" error
the existing no range, no should be set to initial, then close. create
new no range as per your requirements and assign
To do this go to OMH6 t.code and select the number range and make the
changes below : Say ur current number in system is : 45 4500000000
4599999999 4500000004 What you have to do 45 4500000004
4599999999 then you will able to do , but the missing number you have to
check with basis as i they cannot be tracked ...........
We having some material which after use( Ist GI) we rework on them and again
use( II nd GI).My question is how take this material in stock after Rework?

We are assign Moving Price to our material at the time of BAPI. I want to know
whether this price change (i.e. It's Equally divide on remaining Stock item) if We
Change IN PO. OR If this not happen what to do?

1. Can you configure MRP to include shelf life?


2. If you activate 'shelf life' in config. does it affect every material or can you limit it
to specific plants/storage locations?
3. If you have same material (same material number) in 1 warehouse purchased
seperately with different shelf lives, when you issue goods out how does SAP know
which of the materials you issued from ?
4. Do you have to insert shelf life into master record or can you work off something
else e.g. goods reciept date or manufactured date?
5. Can you configure SAP to account for item manufactured date as when shelf life
begings?
you have to activate shelf life for plant & mvt type. You can do MRP for shelf life
material through user exit,
shelf life will be activated for the material for which you hace mentioned in the
Material master Data for shelf life Exp Date When u post the goods issue & if u
have activaed for mvt type 201 the system will check min remaining shelf life during
goods issue & will issue the same also you go to mm03 / me23n & serch help
function for the SLED will get better idea regarding date of Prodn &
Do you have the user exit that does it

I have a scenario which I want to map into SAP. I am explaining the problem with
the help of a T-shirt selling. Let us assume I want to sell T-shirts. I have 100
individual T-shirts & 100 packs of T-shirts. Each pack contains 3 T-shirts. ie, totally
400 T-shirts.I will be selling the individual T-shirts at MRP 100 Rs/pc and a pack at
M.RP Rs 250/pc. At off-season I will be only Selling T-shirt packs at Rs 250/- and
during peak season I will be only selling individual pieces at 100 Rs/pc so as to
makesimple
very profit. ifHow
you can
haveI map
threethis scenario
types in all
of tshits SAP?the three should have diff material
code while in off season make a package of this three tshirs as new material code.
give pricing of 250 for this new code system will pick automatically from three diff
stock of material and issue as one pakage in sales
i can suggest a way but how far it'll works i don't know!!!
try to make base unit of measure as Sinle T shirt as EA/ PC (whatever)
and make ordering unit as Pack such that 1 pack = 3 PC
now make variable unit active in mm master pur view.
maintain the info record for both the unit with different price for different validity
periods.
See what i have understood from this is that you are base unit of meaure is EA .But
the you are selling in Pack also you you have too set conversion factortht 1 pack =
3 shirts . Now if the shirt is of smae material or colour you can treat them as
seperate material code .But if you wanna to use one material code you can take
help of help of variant confiuration where youwill define the different types of shirt
base on the charatcetric and you can maintain the conditions ( prices accordinly ).

Coming to your peaksituation prices you handle this thru the reabte or discount
............ .........

Please correct me if i have not understood correctly... ......


I hav one scenario ... assume we hav three subcontracting vendors and we r
deliverying the end products from the previous vendor to the next vendor witout
comin int our factoy premises. after completing all the process from all the 3
vendors we are receiving the material .my question is how to get the scrap from all
the 3 sc vendors separately
job work end piece return back to 542 movement T.code mb1b after made 551
scrap
I presume u are using 3rd party process, now are u using 3 separate orders for the
3 vendors? Do u havescrap item codes? How u are planning to handle, fixed or
variable scrap quantity, u have to finalise/clear all these before u handle Goods
receipt for Subcontractor material including scrap. As far as ur question goes it is
possible to receipt scraps separately from 3 vendors based upon how u have
treated the scenario.
i want to transfer from one plant to another plant in same company code thru sto
and thru sd route can i include frieght payable in the proforma invoice and also can
i load the frieght cost in the receiving location

i want to learn CIN & then configure. so i want CIN implementation document(for
MM),please send to me

Can someone please let me know what is the menu path for creating purchase
group and storage location ? Also where can I assign plant to multiple purchase
organization
hi man are u a mm guy or what look the following path - img - mm - purch - creat
pur group - go with trans -ome4 to creat pur group
To create P. Group go the Material management & to create St loc Enterprise
Structure - Material managemnt. No u can not assign plant to P. Organisation, but
u can assign P. Org to the different plant. Enterprise Structure - Assignment -
Material Managemrnt
Can we make the accounting entry while making the transfer posting thru
movement type 311. If yes how? pls. help
MVT type 311 is trf fr st loc to st loc in single step. No accountin doc will get
gererated in this case. If the material is of split valustion a/c doc will get generated.
I try this but no account doc is generated. Is any customization is required for this?.
No accounting document gets generated if u are transfer posting of stock inside
same valuation area. There is no need of it as material price remains same. Only
the SLocplant
TP with Virtual
willchanges
not generate anu acc doc

Can anybody tell me the path in IMG for defining accruals for Service purchase
order, the pricing procedure I am calling is based on service nos. entered in the
services tab of line item and not on the basis of item mentioned in item detail.

Could anybody tell me how can trasfer stock from unrestricetd use to blocked stock
U can use mvt 344 . Go to MB1B use Movement type 344,enter plant and SLOC
Through MIGO Mvt type 344 / 343 Fr unrestricted to block & from Block to
unrestrivted.
suppose i want to make po only with refrence to pr not my any other means that is
without rfq manually or with contract how will i customize . what is the difference
between mnt type 102,122 and 161
122 is line Rejection(material issue item rejection that line rej) , 102 is a reversal
of 101 goods receipt , 122 is a return delivery( return to vendor)
102 in MIGO will reverse the Goods Receipt for PO and the same Results as that
of the Cancellation of the Goods reiept . 122 is Return delivery to supplier or to
production .The effects of movement type 122 correspond to a cancellation of
movement type 101. 161 :Return for purchase order , Movement type 161 has the
same effects as movement type 122.In purchase order item is marked as a returns
item, the returns to vendor are posted using movement type 161 when the goods
receipt for purchase order is posted.
I am having one scenario in which you have to plan such a way that you should be
aware about Work in progress at supplier premises , about his stock position on
line with out including that dedicated unit in to your enterprises structure ie he
will be suppling component for your finished product, he is your vendor dedicated to
produce those components for you. pl help me out how you will create enterprises
structure for this

i need to send a matl to a vendor without acc impact. wht is the way
See your query is not clear to me.If you are sending material to the vendor as the
case may be the subcontract vendor then then in such case account posting takes
place the time when you are recieving the material .There will be not account
posting when you are issuing the material to sub contractor .there will account
posting at time when you will do the GR for the final product.
Now tell me is this ur case . If not then what is ur case ............ ......... ......... ......
if you dont mind can you please tell what is ur sceneario where you are sending
material to vendor
While creating PO .check the check box Free Item. When you will do GR, no
accounting documents will be generated

Can any body tell me the transaction code or menu path for new company code
initial period assignment
you can do this with t.code OMSY
I have deleted GMF release code and release strategy and changed the Head of
SCM limit 0 - 10000000 for PO acc. to user requirement. Previously for PO, Head
of SCM limit was 0 - 500000 and for GMF 500001 - 1000000(with double release
strategy). after deleting GMF release code and strategy, for 900000 PO, release
applies for Head of SCM which is ok. but it does not working in PRD. Please help
me out for this, what are the things i should consider to delete one from the release
strategy.
Please be careful while deleting release strategies. The problem is even-if u
remove the details remain inside. What u can do is, create new class & assign the
caharacteristics & values fresh, do not try to insert things in the old config. I had
faced similar problem & i could solve the issue by creating new release class and
multiple strategies for the same class. Try this if ur problem in similar in nature.

1. Can anyone tell me with some example, in which case we go for value contract
and in which case we go for Qty based contract,
2.While posting service entry sheet for services PO's what are all the documents
generated?
3.How to block the invoice posting,Some settings please?
4.Can anyone suggest any SAP MM books that covers the entire things starting
from basic ideas upto customisation

I have posted GR and Excise Invoice on incoming raw materials. After excise audit,
it was pointed out in some cases where CENVAT reversal need to be posted.
Since my GR is ok, i used J1IH Excise JV- other adjustment to reverse. I entered
the requried field like doc no/yr/excise grp/register type etc and then material wise
details in next screen. When i post, it gives err message "Debit/Credit indicator is
inconsistent". Can you please suggest in this regard.

Kindly let me know the step by step procedure to add new fields in first screen of
T.code :- Mb01.

when im posting an invoice in cin i get an error that tax code is invalid in tax
procedure taxinn. i've maintained all config settings like FTXP OBBG OBCL
FV11 BUT STILL ITS NOT UPDATING.ANY HELP IS HIGHLY APPRECIATED
I am trying to reverse the material document for non stock material,in which PO has
created using Acct assignment 'K'.I did GR and Invoice. Then i reversed the IR and
when i try to reverse the GR system throwing an error "Deficit of SL unrestricted in
Storage location. Since this is a non stock item how can we put this into stock.
you can return material from same cost centre through mvt type 202
you can return material from same cost centre through mvt type 202

next issues about the SAPwm functionalities:


- is the any trigger to warn you for a warehouseload (palletplaces occupied) of ig.
93%? if so, where?
- how do i arrange the double in orderpicking: a putaway followed by a orderpick,
followed by a putaway etc
- what is the specific ID (if any) for return items, and where to define?

I want see comparision statement in SaP.please tell me transaction code.


ME49

is there any one work in warehouse incoming materials of pharmaceutical company

I facing probelm in pricing procedure in IDEAS 4.7 i had defined pricing procedure
for my purchasing org and assigned to vendor but when i go to create PO then only
one condition type is coming and other are not appearing .Message is coming as:
enter all condition types. when i checked in dropdown button then no condition
found
Check whether your calculation schema/pricing procedure is defined for the
schema groups combination of your purchase organisation and the specific vendor
assign ur schema to the schema group pur org.then asign ur pur org to thr schema
group pur org.assign thr schema group to ur vendor in the vendor master.

1)In TCODE FTXP iam unable to maintain tax rate for condition type. 2)Is it
mandatory to maintain tax rates through transaction code fv11 for Plant/Vendor/
Material combination. 3)I have maintained tax code V0 as a default taxcode for
company code through tax procedure and the same tax procedure is maintained for
coumpany country at the time of MIRO the error iam getting is ZTXINN (tax
procedure defined and assigned to country and default tax code for the ccode is
maintained) is not assigned to country IN.
I always often confused about the TAXINN and TAXINJ.. TAXINN is new
conditions based tax calculation procedure. For this procedure we maintain
condition type thru the FV11 transaction code. I wanted to whether is it necessary
to maintain taxcode for TAXINN thru FTXP? When we create the PO with TAXINN,
is it necessary to mention taxcode in INVOICE tab of PO? If not how can i
check/see the various amounts of the taxes that system have calculated?
Also in import PO various condition values are calculated in foreign currency , how
to maintain them in INR ANY CUSTOMIZATION FOR THE SAME?

how to cancel the parked/delete liv? could u pl guide by step by step instruction
use T.CODE MR8M. In Cancellartion put the Document # which was generated
.and post for cancellation

how do we find the table of particular field,i have tried F1 key,,,but some time i get
tables, but most of the time, it displays structure. Is there any other way to find out.
if you see that tables a structure, switch to tab ENTRY/HELP Check and you can
see the related table
Use transaction code SE84 goto ABAP Dictionary<Fields<Table Fields<Enter
Field Name<Execute. This will display the names of Tables having this

While releasing the IPR and after saving it, we are getting error like, Express
document "Update was terminated " received from author XYZ]. This makes PR
unreleased. What is the problem? Will you please guide me in resolving this
problem.
PR-I know.But what is IPR
its same act we use it as IPR ( internal purchase requisition) . But over all it is
known as PR.
Kindly
Still notsolve
clearmy problem.
with your answer. Kindly elaborate your answer with procedure

Can anyone please mail me the config details of the IDEAS 4.7 server.
I had it initially. But when I changed my platform from Windows 2000 to Windows
XP. My SAPLogon pad became blank.

Kindly tell me what is meant by R to R Cycle in SAP. I heard that P to P Cycle


means Purchase to Pay, Same way what is the extension for R to R Cycle
are u usinf R to R concept? are u in product dev

pl help me in creation of import po.the problem is my overseas vendor currency is


euro. after cif indian port for my custom authorities (as a vendor) i have to
maintainJCDB, JCV1,JEDB, JECV,ZCE1, ZCH1,ZAD1 IN INR. PL GUIDE ME
HOW TO DO IT
In ME51N, AFTER FINAL RELEASE EFFECTED, WE WANT TO CHANGE THE
QTY?HOW TO DO IT?AFTER CANCELLING THE RELEASE MEANS HOW TO
CANCEL THE RELEASE? STEP BY STEP PROCEDURE PL

I have a problem in IDES 4.7 , when I am go to Issue a material from Plant then
System shows the message
CO DOC NO : ASSIGNMENT NOT POSSIBLE FOR BUISNESS TRANSACTION
COIN IN COMPANY CODE XXX
Pls Give me a solution which is help me out from this problem and what is the error
I made in my system , then system shows the message

We have a material with serial number.some materials is used some areas in the
city before we started to use SAP.After SAP,we add these materials to the
system,and appears as mounted anywhere.Then the producer company produce
new materials by the same serial numbers with the last years.And then the new
materials can be added into warehouse ( i have no idea how the system accept this
operation ).now some materials appear mounted and stored at the same time.when
I try to mount the material in the warehouse the system is not allowed this
operation,cuz this material is already mounted in the area.I changed the serial
number of the mounted material to be able to use the stored one, but when i
changed mounted one also stored changed too.
basically, i have two material with same serial in reality but system have one
material with two property. My last plan is, I will move the material as a scrap from
the warehouse and then again enter the warehouse with any movement.But this is
not acceptable for accountancy if there is any other way..

i need to send a matl to a vendor without acc impact


will the material will come back to you, are u selling the same as free of cost, If the
material is going to received back send the same with MVT 541 , if you selling the
material at free of cost to yr vendoe which is not going to back then create free
Sales Order & send to vendor as a sample
I have some problems when doing transfer posting plant to plant, my problem is
about the value of the material. Why do the values of the material follow the
material values in receiving plant. Is it possible if the value of the material follow
the material values in a Giver Plant? Because that's the need in our business
process. And how we can do this, through customizing SPRO or T-code? But i'm
sorry if this problem is not MM module only, but FICO also i think.

pl help me how to reverse the service accptenance by step by step procedure.


Display already created service entry sheet using T code ML81N. Click on the
"pencil" button to bring it into change mode. Click on the "revoke acceptance"
button to reverse the acceptance and then save it. Again bring service entry sheet
into change mode and then you will be able to see "delete" button which is a
dustbin
goto symbol.
ML81N select that Service Entry Sheet, click on change mode button & click
on Cancel Release(Ctrl+ F8) button

If we cancel the MIGO and part 1, then in J1I7 report this cancelled documents are
showing as pending if we select Part 1 posted and part 2 pending radio button. If
we select this button, it should show only pending documents.
But in our case, all cancelled MIGO documents are also showing as pending. This
will result wrong report.
And also in J1I7 report, ECS and SECess is not appearing. We need to appear
ECS and SECess also in J1I7 report.

We can find out the list of pending orders by using WE101 (Open Goods Receipts)
in the selection parameters. But can anyone pls tell me how to find the list of
pending schedule lines. i.e schedules have been put material is not yet recd
Try ME3M, Selection parameter WE101

SAP v 4.7, When I look at a PIR, on the condition screen, I can click on Extras -->
Status information. I see a status of "Condition is active". How is this status
maintained? Can I create and use additional status' here?

I know that T Code COR3 gives actuals and standard consumption for a given
Process Order. Simillar data for a given Subcontract PO, from which T Code I can
get?
Check the transaction code ME2O .this is for the subcontarcting
ME2O is only for issuing to the sybcontractor, what is needed is a report which
would tell the actual conversion ratios compared to the planned ratios from the
components in the PO
I am purchasing some raw materials from a vendor X and I want to send these raw
materials directly to Subcontractor S for processing into finished goods. For this I
have clicked option of 'SC vend" at Item level in deliver address tab.But in the print
out of PO,delivery address is of my plant only instead of subcontractor. What do I
do so that delivery address will be of subcontreactor.
Youhave to give the vendor code there and youhave to set the tick at vendor SC
HAVE U GIVEN THE SUBCONTRACTOR VENDOR CODE JUST BESIDE
WHERE U HAVE TICKED SC VEND?

I have mentioned subcontractor code too. In PO display I could see the delivery
address of subcontractor but in print preview its not appearing.System is taking
plant's address as delivery address.

During printing of PO from ME9F the unreleased po is not allowed however if we


print from ME22N and ME23N unreleased po can be printed. We want to restrit the
printing from ME22N and ME23N
You can make use of the GUI setting .Basis person can do this .He will make Print
option not availabe. Other alternative you make use of the authorization object for
this
Could anyone tell me how to close PR manually---- I dont want to delete or block
that PR---the senario is like list----
Purchasing has been done on PR based (cash purchase from my own pocket)----- -
NO PO generated -----------GR has been done with automatic PO------ PO will be
used for reference of LIV-------but i want to close PR-----so that noone can use that
PR again----or if u have some other suggestion
Open the particular PR which u want to close. Then go to quantities / dates at the
lower tab. Tick on the check box "Closed". save and come out
T.Code ME52n select PR document # , Go to item tab field below , select tab
=Quantities/ Dates and , make the check(Tick) in Closed box
SIMILARLY PO PENDING QTY MAY GET CLOSED?BECAUSE AFTER MIGO
CREATION, DEL IND COMPLETED IS GREYED OUT

We are developing ERS for the Invoice Verification but the same is not functioning,
Is there any Customize in the Assign ERS Invoice Number Rnnges To company
code is it necessary if yes what we have to do in the same, In T. CODE MRRL
Postable Key is coming not changeble , how to make the same as changable,
Also your vendors need to be created with the following settings. the fields in red
rectangles in the image are essential, the one in blue are required only if you are
going in for automatic po creation. (refer 'ven' jpeg attachment)

Can anyone tell me if we can create two type of materials.


1. Reservation is possible even if stock is zero
2. Resevation can be made for more than quantity available in stock
Item 1 is needed for MRP items
Item 2 is for rest of the items
For MRP item, reservation is possible with out considering stock For Non MRP
items, reservation is possible with respect to - Stock + qty. on PO + qty. on PR

I have created one PO against which I have done GR and IV.Also I have ticked
option "GR based IV".Still I can delete the material from PO after GR and IV being
done.System is not throwing any error message.I want to change this setting so
that system will not allow me to delete materials.

While making P.O for STO ,it is showing message as source list is maintained for
this material,but even after making source list ,it is showing me same message.
In this case you should remove the tick of the indicator from material master record
of your material in the "purchasing" tab page. Because of this indicator the system
is giving you this message. & you have to maintain source list before creating PO.
SINCE SOURCE LIST IS MAINTAINED CREATE STO WITH REFERENCE TO
CONTRACT USE TRANSACTION ME21
If you mean STO is stock transport order create a source list with plant from which
you are sourcing the material.
how and where do I organise a combined movement in orderpick: this is putting a
pallet away in stock, directly follwed by picking out a pallet needed for a TO, ect.

While doing MIGO of subcontracting PO system gives me an error Account


417001 requires an assignment to a CO object
Ask your FICO person.or otherwise assign CO object in T-code okb9 but before
assign please consultant your FI person
I have already solve the problem in T-code KA02 by assiging the cost centre to cost
element, 417001.
I need to give External Number range HU_VEKP,Its working but Not taking the
leading zeros(prefix zeros). Coz its vendor supplied HUs and the Number they are
using starts with 2digits-00 + 18 digits. Example Carton:00-123456789 123456789
Pallet:01-123456789 123456789 When I am using external Number Range its not
taking the Prefix zeros

Trying to create a metric report by using Header text Need to see if users are
updating customer daily when parts are not ship out from our vendor..Is there an
easier way of doing PO metrics on such

Is it possible to prevent people drawing on specific contracts? i cant see anything in


security where you can control who has access to draw (CRO) from a contract

have problem for transfer posting material to material with


movement type 309.
- Material receive can't follow the alternative unit of measure
for the case :
i have material number : A with base UoM - PC and alternative UoM - KG
B with base UoM - PC and alternative UoM - KG
when i doing transfer posting form A to B with alternative UoM ( KG ) ,
in material document for material A is not problem but in material B can be only
receive
in PC and
Please can automatic
activate not in KG alternative uom field in MM then u can try for STO. let
me inform if problem persist
U CANNOT CARRY OUT an article to article movement IN SAP STANDARD
WITH DIFFERENT UOM
In order to carry out a transfer posting from material to material both materials must
be managed in the same stockkeeping unit. Such a transfer posting is always
carried out in one step and without advance planning. The posting can only be
carried out from the unrestricted- use stock of the issuing material into the
unrestricted- use stock of the receiving material. If i am not wrong the Base unit of
measure
But whereiswe thecan
stock kepping
activate unit........unit of measure in MM. we can define in Mat
alternative
Master. but where to activiate

Can anybody tell me how to reverse the document ,if i posted a physical inventory
document wrongly.i know how to delete the physical inventory document but dont
know how to cancel the Posted documents in MI07
Deleting the physical inventory document doesn't help. You have to do the reversal
of what you did. In other words if you had quantity 10 in stock and wrote off 3 in
error,
then you will have 7 in stock. To bring your stock back to 10 you have to write on
How to limit customer consignment stock? (say we want to control that it should not
go above a specific level
Try to run the MRP for the Consignmet Stock so it will not raise the PR, Or user
should not raise the PR if the stock isavilable i dont think any other solution
You can limit in the Purchase info record Purchasing view Max quantity filed. This
trows a message numbered:06803. Change this warning message to error

Can it posiible to receive contract material without making release orders to it.(i.e-
PO)
it is not possibe. Wehaveto create Contract release order

In PURCHASE REQUISITION DOUCMENT TYPE CREATION, I WANT TO


KNOW THE USEABILITY OF SOME FIELD IN EASSY ACCESS.
IN PR 1.LINK PR TO PURCHASE DOCUMNET NO ACCOUNT
ASSIGNMETRADIO BUTTON (N) .WHAT IS THE USE
2.CONTRACT RELEASE ORDER/SA DELIVERY SCHEDULE (R/S).
WE HAVE 3 PURCHASE ORGANISATIONS, THE PO CREATED IN 3 PUR. ORG.
IS OF SAME DOCUMENT TYPE, THE DOCUMENT NUMBER (PO NUMBER
CHANGES AT THE END(LAST 3 DIGITS) .
P.ORG1 ---- PO NO-4500000451 ( BUT PO DOCUMENT TYPE
P.ORG2 ---- PO NO-4500002522 USED IS SAME IN ALL
P.ORG3 ---- PO NO-4500001633 PUR. ORG. )

CAN ANYBODY GIVE THE EXAMPLES FOR DIFFERENT MATERIAL TYPES


EXAMPLES SERVICES- DIEN , , OPERATING SUPPLIES- HIBE , , TRADING
GOODS- HAWA NON STOCK MATERIAL- NLAG NON VALUATED MATERIAL-
UNBW EMPITIES- LEER
PACKAGING-
PIPE LINE MATERIAL EXAMPLE IS -OIL,GAS,ELECTRICIT Y
LIKE THAT KIND OF EXAMPLES FOR OTHER TYPES OF MATERIAL TYPES.
WHERE AND ,WHAT SCENARIO THOSE ARE USED
SERVICES- DIEN
OPERATING SUPPLIES- HIBE
NON STOCK MATERIAL- NLAG
NON VALUATED MATERIAL-UNBW
EMPITIES- LEER
PACKAGING-

Kindly clarify with solution. My client wants immediate PR for the stock shortage
against orders, We are using availability check. Example: customer Orders X
materrial of Qty. 100 units. Availability of stock 60 Units. shortage of
material automatic P.R to be generated in the back ground.(the No. can be
visible va02 change view of sales order)based on the PR we create P.O. Kindly
explain
You complete
mentioned process
your of so
"client" IMG settingsthat
I assume howyouto map
are aIt.consultant? If so, I cannot
beleive that you are asking for the "complete process of IMG settings how to map
it". Even if you are not in a consultant role, who would you expect someone to just
hand you all the answers? The only way you will ever learn is if you do some work
on your for
Thanks ownYour email, There some meening in my question,If U know pls answar
the question what are the settings are needed im MM and to create PR for a
shortage quantity of sale order. I did the settings of availability check and TOR in
SD Part. send Ur mail Id I will get in touch with U for explanation what UR asked.By
oversite It has mentioned the complete IMG process,for that Iam sorry,I should not
take much time of Urs.SAP is wast in that my knowledge is verry little and
uncomparable. If U feel now UR confirt pls repply with the requirement
Purchase order is made for 5 items,but 3 items has been received .When I do
goods receipt for 3 items,system is not allowing to save.Display message "Select
all items
You need".Kindly
to make solve
surethis
that the Item Ok check box is ticked before you save your
document.
From the configuration side,change the message from an error message to a
warningensure
Please massagethat the DELIVERY indicator of PO Item data in Delivery Tab shud
be ticked. If not ticked, then tick it & after that try making GRn. You'll get it.....

I created a sales quotation and then created sales order for that quotation. then I
run MRP using MD03 for that material. when I checked the created planned order
in MD04, it shows the quotation number in sales order field in Assignment Tab in
planned order.. I want it to show the sales order number.. Is there any configuration
or indicator that I need to look at solve that problem?
It is right because sales order has been generated thru sales quotation. If you will
create direct sales order then sales order will come in this field
But how can Configure MRP to show the sales order number in planned order
I managed to solve the problem by removing the requirement type from quotation
item category. It's under sales -Basic Function - Requirement / ATP area. then
planned order take the sales order number

this is regarding batch managenment & shelf life. i have not tick the batch
management in the material master. i want only to shelf life of the material to be
apper. i have customised the shelf life tab in IMG , it also appers during the migo
also ( date of manufacture ) but after migo , in MB5B report expiry date is not
appearing. does this mean unless batch management tick expiry date will not
appear.or is there any other arrange ment i.e. for shelf life without
batchmanagement

i have a question that How to add reference document for transaction in MIGO in
SPRO? I have tried with spro- MM - INV. MANAGEMENT - ENJOY MIGO
SETTINGS - SETTING FOR TRANSACTION AND REFERENCE DOCUMENTS
here i can only display or change the reference that are already in system. Like as
per my system it is taking a reference of MATERIAL DOCUMENT for transaction
RELEASE A GR BLOCKED STOCK. i want to add one more reference for this
transaction. can any one pl. tell me how can i do this?

while raising GRN i am getting an error as WM movement type 101 not allowed for
warehouse number***
Movement types in WM are assigned to specific warehouses, You need to define
the Movement Type in warehouse configuration

What is the Trans code to find out the amount of purchase done in a particular
month for a particular Tracking no.
t,code is ME2B for the purchase order by requirement tracking order

could anyone explain how to force the invioce even though it's exceeding the over
tolerence limits.
See it doesnt make the sense to post the invoice which has crossed the toerance
limits.Even you want to post you can change the tolerance limits and then post the
invoice a
We have had a request to create a central warehouse for specific stock items for
various divisions The request is that specific quantities of items stocked (although
same material) be assigned to each division and no other division be allowed to
draw on them e.g. - if we stock material A in the warehouse, then 10,000 of matrial
A be allocated to division 1 and 5000 for division 2. Once division 1 has used up
their allocation they cannot take from division 2, ie. SAP will not allow them access.
I was thinking to separate divisions by storage location and/or separate material
masters for each one Any ideas on best way to handle this would be great
Also which is the best way to monitor 'shelf life' in SAP, is there something or some
way SAP can tell us that a material's due date is almost up, e.g. if we stock
medications with a 3 year life span. Can SAP include expired materials into MRP

hai sacchi
i am putting here whatever i know and hope may help you
Services: say u r running a hotel and hope some company places an order with u
for supplying food to their employees on some occasion in the process they incurr
expense for the food i.e. they have to pay ur bill right so the amt whatever u claim
for they will enter in their record as expense incurred due to the service- "providing
the food" this is one example and take another simple like a hardware person
comes and repairs(maintenance work so this becomes a service and u enter in ur
records for enabling u to pay that persons bill in future)
Trading goods:say i am running some business which has lot of activities like
providing services,manufactur ing some things,etc and among them one let us
consider that i purchase some goods frm one person and sell it to other person i.e.
as a mediator so that goods whatever i purchase and just sell them out becomes
an example for trading goods
Packaging:say a garment company in its process of running its business it procures
some thousands of materials some go for stiching,some for office work and some
************ ********* ********* ********* ********* ***
for packing the materials (dresses that are being manufactured or being sold)say
boxes or cartons etc and these will be considered/recorded as packaging material

I have made two release strategies as '01' and '02' with respect to two different
plants and there respective document type 1 doc type is assigned to release strat.
'01' and other doc type to '02' but both document types as picking '01' as default
release strategy. kindly tell me if there is any other setting releavent to releasing
and doc. type
In MC$G the report is based on Month wise details but the client wants date wise.
Since for this report standard Info Structure is S012 and we dont want to change
the standard one and created new info structure by coping standard S012 and
below are the steps I followed.
1. Created new Info Structure S554 by copying the standard one S012 after that
structure is saved and Generated. Tcode MC21
2. Updated the Structure since we required data to be displayed as Date wise so
updated the rules by using MC24 (Create Update Rules)
3. Copied the historic values(Month wise) to new structure(Date wise) from S012 by
using Tcode MCSZ and checked the values in data base and perfectly copied.
4. By using MC9C and entering Structure number the report will generate but the
values are displaying irregularly and some times it will not show the data. What will
be the problem? Did I miss any step in configuration step?

We are trying to create Purchase order. We have given output message as Fax.
While print previewing the Purchase order we are getting the following message:-
"Call of SHENBH with 9054793558 FAX Error occurred in R/3 in SAPconnect"
Here SHENBH is the user id and 9054793558 is the fax number maintained in the
vendor master record. Whenever we save and display the purchase order we are
not able to see any output message type in the PO. For Print output and external
send.
SAP uses fax number format which starts with country name e.g. India - IN. pl
check your fax number as per required format

In case of import P.O. scenario, while capturing customs duties in MIRO, the
sequence of condition types is not as defined in P.O. ( no
GR bassed IV, MIRO before MIGO).
For example, sequence defined in P.O : 1. Basic duty , 2. CVD , 3. Spl. Addl.
Cess , 4. E.Cess on CVD , 5. S&H E.Cess on CVD ,
6. Customs E.Cess etc...
While capturing the customs duties in MIRO, after entering the P.O. no, the system
should propose the same sequence of condition types
as defined above (i.e., P.O). But it is proposing in the following sequence.
1. S&H E.Cess on CVD , 2. Basic duty , 3. E.Cess on CVD , 4. CVD , 5.
Customs E.Cess , 6. Spl. Addl. Cess
The sequence of condtion types defined in pricing procedure is also same as
shown in P.O.

have error mesage on miro, invoice verification. Here is the message, no taxes on
sales/purchase are allowed for account 159999 2000 is not allowed. (attachment
'miroerror')
Go to fs00 select gl acct no. 159999 in c.code 2000 click on control tab & just tick
on posting without tax allowed it will solve ur problem
In the accout 159999, without tax allowed is ticked. Where else can i check

I am working on functional specification (interface) to upload physical inventory


count from access to SAP. Could any one give me a layout of how to go about this?
Should have to create a custom Tcode. Should i use MI04 or MI09? will this be a
batchcan
You runuse
program
of T-Code MI10 and if you need and if more materials are there then
you can do the LSMW of the above T-Code

In spro how to creat GL account and cost element,. I costcente then i get error
creat GL account and cost element . I am not found

We are ordering material from a vendor but they will supply material from different
plants. How can we create a vendor with different supplier points, so that vendor
address in the P O will be depending on the supplying plant
Use partner roles, define supplying plant under supplier partner role
You have to need create different supplying points A/c for same vendor

Plz tell me in T-code ME80FN how to find or add invoice document no's in view of
purchase order history display
AS PER MY EXPERIENCE YPU CAN SEE THE INVOICE NO IN
CONFERMATION TAB.
Can u pls tell me how to Configure the Release Procedure For PO

can anybody tell that how we cancel the credit memo document(MRHG)
use T-Code: MR8M

U r entering some unplanned services in the service entry sheet and hv not
maintained the same in limit tab of Po . Enter the same value in the expected value
also so that the same is reflected in the Po at header level.

I got a problem while posting Service entry sheet, please find the following: After
entering the respective details in the new sheet...Error message is automatically
displaying "No overall limit of Rs..... for unplanned services exists" in Maintain
service details. Please drop-in your valuable solution and the reason for this
message
try to maintain over all limit in u r PO->item details->limits tab.

Is there a way an authorization check stopping a 311 movement at specific storage


location level

What is the table that store the information of the PO release details such as
Release Date and Time, Released By EKKO and EKPO are the table to store PO
information, what about the PO release details
I guess it is CEKKO table, please correct me if i am wrong
but CEKKO is a structure not table.. and I can't through SE16. How to check
structure
go to se11 and chekc the same
PO Release Details is avaiable only in CDHDR and CDPOS tables. From the PO u
hv to take the release strategy and release group (EKKO-FRGGR and EKKO-
FRGSX ) go to Table T16FS ( in this table u can find the release sequence ) From
the PO Environment - Header changes u can find , when the release changes an
number is generatred, that too be made use in the table CDHDR....
The change header table CDHDR will store the purchasing document number in
the field OBJECTID. So I try to create an infoset (SQ02) to link the table EKKO and
CDHDR together by the PO number. EKKO-EBELN link to CDHDR-OBJECTID but
there is an error saying that it's a Illegal join condition. What should I do?

pl help me , by giving t code for finding the po puton hold

Pur Req (PR) Does not print to the P2L2 (short name) printer. Prints incorrect
output to LOCL printer. Do I have to do any customization. If not then what/where
do i need to specify a PR to print to a printer other than LOCL
See in SAP we do not have the message detremination for the PR.You have to go
to PR and there you have the print icon cick there .the Printer name is to defined in
the system if it is not defined .The request wi besent to spoo.Go to SP02 you will
there the spoo request and seect that and cick the print icon.You will able to take
print out,do u need to print a PR
But why

is there any day wise stock report in mm


MB5B

I have made 2 release strategy for RFQ. 1.Amount <10000 2.Amount<=20000


But whenever i make RFQ for more than Rs.10000 & go for release it opens only in
Amount<10000.
change the value of the second item & put it in interval format 10,000 - 20,000INR,
it will work fine
I have made the changes as per your suggestion ,but still my RFQ for more than
20000 shows in amount <10000. pl suggest where i have to make change
Hv u entered the value in the characteristics (CT04), unless u enter the interval
over their and then mention in the release strategy using CL24n, it will not work

We need to block the ' consumption from specific storage locations per user' for
the transaction code MFBF, in a repetitive manufacturing scenario. Kindly advise
on the 'Authorisation Object' & the modalities for the same,please
These are the following authorization i think you can try this as in my case we dont
have repetitative manufacturing .So i cannot test this in my system
Functions of.... Authorization object
Repetitive manufacturing C_SAFK Repet.manufacturing
Backflushing C_BFLS Backflushing
Resetting reporting
point quantities C_BFLS_R Resetting
Reposting reporting
point backflush. C_BFLS_N Repost
Restricted
backflush C_BFLS_L Restricted backflush
Hope this can hep you out.Do let me know

Can you help. There is a blocked invoice appearing on MRBR. This invoice was
previously released and paid, but it still appears on MRBR. It is also cleared in the
vendors account. Can please you assist me on resolving this issue?

(1) the List of Pending/Open Purchase Orders each item-wise/Vendor- wise


alongwith Expected Date of Delivery as mentioned in PO (2) the details of Shelf life
for List of selected material line items
Point No. 1
Purchasing List for Open Purchase Order, Goods Receipt, Invoices Open Purchase
Order = Open Goods Receipts ( Selection parameters WE101). This two
parameters determined what information is shown:
selection parameter , scope-of-list parameter , The configuation transaction code
is OMEM
You can define additonal selection parameter for your users as well as untick those
fields which you does not want it to be printed.
Your can have the Purchasing Documents by :-
ME2L - Vendor
ME2M - Material
ML93 - Service
ME2K - Account Assignment
ME2C - Material Group
ME2B - Requirement Tracking Number
ME2N - Purchase Order Number
ME2W - Supplying Plant
Point No. 2
You canuse
Please useTcode:
T.Code. ZMST and put your required data in required field.
ME80FN
I tried OMEM but it is not working."Transactio n OMEM does not exist

COULD ANYONE GUIDE ME TO GET THE COMPLETE LIST AND TOTAL QTY
OF RECIPTS,ISSUES FOR A SPECIFIED PERIOD AGAINST A MATERIAL
CODE
You can use T.Code MB5B or ZVS3. Both are for material ledger.
Use t/code MC.9 but youll have to change the layout to display what u want
you can use use t-code ZVS3
Try to use Transaction Code : MC$G
U can use MB5B - Stock on Posting Date
WE CAN GET ALL REPORT ABOUT MATERIALS RECEIT AND ISSUE WITH
THE HELP OF MOVEMENT MB51
mmbe is the transaction code
in MB5B or mc.9 month wise list coming but i want day wise tell me any solution.

After saving PO, if I have to change condition type (e.g. handlg. charge, service
charge etc.)then here that field remain grey. I tried to delete that, but not possible.
Then how to overcome this problem. Please guide me
Pls. open your PO thru T.code ME22N and put your amount in AMOUNT Column
and
If SAVE
migo is not done, u can change the condition type as follows; 1. select the
wrong condition 2.delete the row 3.enter the same conditionwith correct
price/reqd condition
How to view the enterprise structure (flow link) created in SPRO?
go to ec01 then click on structure and then on navigation u will find it
use t code ec 01 then go to structute then enter ur plant and co code then click on
navigation and see the enterprise structure

Can someone explain me STO step by step process with transaction codes in MM
and SD point of view. Also please send any document related to STOs
Step for STN Creation :
ME21N - Create Stock Transfer order (STO)
ME22N - Change STO
ME23N - Display STO
VL10B - Create Delivery
VL02N - Post goods issue & Batch / qty. picking
VF01 - Create Billing Documents ( STN )
VF02 - Display STN
VF03 - Printout for STN
Step for STN Cancellation :
VL09 - Reverse post goods issue
VL02N - Reverse delivery / pick qty.
ME22N Cancel / delete STO
Reports :
ZVE6 - GR updating
ZVSLDET Billing Documents details
ME21N - Create STO
ME22N- Change STO
ME23N- Display STO
MIGO - Goods issue for STO [MM route, no delivery created]
MIGO - Goods receipt against STO - in case of MM route simply do MIGO
against purchase order, in case of SD route where you have created a
delivery using VL10B, do GR against Outbound Delivery. If you do GR v/s
PO in SD route, then the SD document flow will not be updated.

i want to configure the PO STO to be created only with a reference to PR, i went
throught the Field selction key in PO Document type & in reference data item i
made the Purchase requisition as required field. but still can make the order without
ay PR.
Although i tried to make another field like infor record as mandatory & it works..... i
dont know if theres a system message that i should configure as an error but i
already tried some of them & still not working ...... any idea would be great
How we can WM and Barcode devices be integrated. Do we need any
developement in SAP

Assume that I've never done a vendor evaluation before and I have already created
(let say 10 procurement transactions) for one vendor. I want to evaluate vendor
based on "on-time delivery" and "quantity reliability" . Is it possible to run the
evaluation for all existing procurement transactions?
It seems to me that the vendor evaluation has to be executed every time after
there is new procurement. Is there another to configure the system to evaluate the
vendor and
update vendor score automatically after new procurement is created

have created new company code and new plants for an offshore manufaturing
plant. At MIGO, I get this message 'Please check table 169p. Entry 1200 does not
exist" 1200 is the new company code we created. I have checked configuration at
Goods receipt and all have been updated. Please advise what I might have missed
out in config or maybe this is an area that the FI/CO guy has to get involved?
Error 1. Company code not existing during goods receipt against a purchase
order.
Reasons. I. One of the reasons might be due to non-availability of Invoice
reduction default parameters for the Company code. This parameter can be set
inside Logistics Invoice Verification Configuration by copying the existing 0001
company code details or defining the company code parameters fresh.
II. Company code not assigned to Company In your case the first case is
applicabe as u might not have maintained the Invoicing config for the company
code. The table
Pls ignore 169pbelow.
message is for Invoicing related
Finally found only, at
solution u can check it in SE16.
service.sap.com. In case
anyone come across this problem, the solution is to update company code at
OMRG which is Change View "" Stochastic block:Value"":Overview. I added the
new company and was able to carry out MIGO successfully

How do I export my Material master data from a SAP V4.6c system. I understand
there is way to it via ALE. Is there any direct output like direct input using LSMW.

Let me know what configuration setting need to be done for Automatic Vendor
evaluation
I need help in identifying a field where-in I can fill-in the old PO No. while uploading
OPEN PO into the production client. Is it possible later to refer the old po number
to can
U get ause
report
field UNSEZ (our reference) available at header level of PO in
communication tab for entering old PO no
I would like to ask you a question. Please consider it urgent . We are closing down
and selling one of our production facilities. Once the sale completes, we want that
no postings can happens in that plant and we would like to officially lock that plant
in SAP (Read - Decommission that plant in our system). We do not want to severe
the Company Code - Plant link (due to Auditors) but want to handle it in some other
better way. Please advise with your experience as to how can we do that.
U can delete the assignment of plant to the company code, no posting will happen
there after
remove permissions from users for the company code and plant
We have used the Tracking No in the Purchase Order. You can get the report
based on the tracking No

view profit center in any MM reports (excluse mm01,mm02,mm03)

Can anybody explain What is the difference between General Item Category Group
and Item Category Group in MM01

If invoice is completed for a particular PO, Can we see through the tables whether
invoice is completed or not? if so what is that table, please help

HAVE GOT AUTHORISATION FOR AC02 T CODE WHEREAS I DONT HAVE


CHANGE ICON IN THE SCREEN. PL HELP ME TO GIVE PROPER
AUTHORISATATION
Contact your Basis person (Technical person) in your organization to get
authorization for changes

IAM NEW FOR SAP MM. WHEN IAM DOING INVIOCE VERIFICATION, IAM
GETTING PROBLEM WITH TAX CODE FOR LAST THREE DAYS. I HAVE NO
ANY IDEA FOR HOW TO PROCEDURE. PLS TELL AS CLEARLY AND HELP ME
OUT.

Is it possible to compare RFQ's with several line items? If possible please advise
on how to maintain the system for that
It is maintained by manually thru Tcode me47n and to see the comaprision all
RFQs thru Tcode me49n. How it config. first I will check after that mail to u.
wut means what
can u plzz explain wut is work order

We are currently being advised that SAP can only handle PR authorisation through
workflow at PR line item level rather than header level which we require.
Can anyone advise if this is correct or can SAP be configured to handle this?
PR can be released on header level.Only disadvantage is that addition of item can
be made(without knowledge of final authority ) without affecting final authorisation
It is possible to have the release at header level with the PR block for changes at
the first release

In my organization, it is the end user requirement that the PR should be mandetory


while creating PO Pl. help me Thanks & Regards Sandip Patil SAP MM
Consultant
there is one t code omet Try this & test it carefully
If you use OMET t-code it will be applicable to all document types.If you want to
make PR mandetory for particular document type,use userexit which works fine.We
have applied one user exit in our organisation for this requirement.

material ABC external i created as non stock and raise P.O against cost center but
after few days i reliaze that this material would be a stock material now i want to
keep same material no. for stock material.is it possible if possible how????
You can do the sme by the following ways:
- Cancel the PO, in case no GR happenned and change the material type. Tr. Code
MMAM (or)
- Check the quantity and value updation for this material type in your valuation area
(Plant) - Tr. Code OMS2
I HAVE A MATERIAL PROCURED FROM TWO VENDOR, ONE VENDOR IS
LOCAL AND THE OTHER ONE IS OUTSTATION VENDOR(IMPORT),
MATERIAL CODE FOR BOTH IS SAME AND IN THE MATERIAL MASTER LEAD
TIME AND PROCESSING TIME IS MAINTAINED AS PER LOCAL SUPPLIER.
BUT SOMETIMES MATERIAL IS PROCURED FROM BOTH
I HAVE PROBLEM IN MAINTAINING PROCESING AND LEAD TIME FOR BOTH
HOW TO MAINTAIN THE SAME THROUGH A MATERIAL CODE SO AS TO
FACILITATE FINANCIAL PART
In this case, one can extend the same material 1.1 to create similar purpose
material 1.2 for import procurement of material as per the requirement.
Path: SPRO --> IMG --> MMR (Initial screen after creation of the material 1).
try to use Split Valuation concept. valuation types are two: one for local
procurement & other for import procurement.
is there any tcode to see all plants puchase organisation and company code wise
list

how to see the profit center for a perticulat material.

Use the field changeability option in OMGQ>Release indicator>Details ,


Changes/Addition will not be possible

While creating a PO I am getting "Not Relevant Grant" error message. Can


anybody suggest some solution

Will anybody help to get following report.


1.Moving average price after each transaction like MIGO ,REturn etc.
2.itemwise unrestricted stock in various plant (different plant in different columns
and material in different rows)
3.Average consumption of items daywise and monthwise and file should be able to
print or convert in excel sheet.

I HAVE ONE PROBLEM. WE ARE BUYING COAL FROM SCCL FOR WHICH WE
ARE HAVING RELEASE ORDERS AGAINST A VALID CONTRACT. BUT
UNLOADING OF COAL CHARGES COMES RS28+12.36% SERVICE TAX.WHEN
I ADD THE COST IN MATERIAL ORDER AS A ITEM CONDITION,THEN
SERVICE TAX IS NOT POSSSIBLE.IF I MAKE A SERVICE ORDER I CANNOT
POST THE CHARGES DIRECTLY ON MATERIAL G/L A/C. PL HELP ME TO
RESOLVE THIS

While doing GR of a P.O ,It is taking Movement type 161 by default in item line. pls
suggest me from where it is piking this M.type & how to resolve it.
Go to Yuor Purchase order and check for the line item you have ticked the Returns
field.Please untick that field and then try to do the GR you will be able to do the
Goods reciept .You willnot face that error.Revert back to me
in PO line item u r checked line item as Returns Item
Its nothing my friend, you used the last GR with movement type 161 its defaulty
come, better u check any other movement type and post it ,next time that
movement type will come..
How to get combination of message output while saving PO in one shot ? What r
the settings involved?
Go to T.code Mn04 Select the message output ....and key combination and choose
the print medium go t to further data there you select key 3 send immediately and in
the communication give the printer name and save. After when you wiill create
PO the system will pick this condition record and will send this PO to spool

plz may i know how we can close the po.


You can close your PO by seeting the Delivery completed indicator in the PO
Please follow as below in Purchase order data tab of MIGO, "Del.completed" ind. 2
Set, Save the arrangement once u shift from auto indicator to set indicator
suppose the gr does not happens till particular date and i want that my should be
closed automatically how we will do this
You have to make a program that will run in background to close the PO
automatically . for this i think there BAPI function available .Ask ABAP person to
make program which will run after the number of the days you want to close the
PO
Can anyone guide me for the settings done for not allowing to issue goods more
than the qty entered in reservation. Means system should throw message while
issuing goods more than that of reservation qty

First of all, the intent of this message is not to offend or attack anyone, but I feel
there are some things that need to be said here. I am completely fed up with the
questions that say "give me step by step instructions" or "send details with screen
shots" etc. I think it is about time that those of you who expect others to just hand
you the answers go do some research on your own. You will never learn anything
by just having answers given to you. There is an almost limited supply of resources
available (SAP Note, Internet groups, etc.) and if you are not motivated to dig
around a little, then you have no business in this profession.
Also, there are numerous questions regarding what to say in a job interview. If you
are not qualified for a position then you shouldn't be interviewing and you certainly
do not deserve the job.
Many of us have devoted a great deal of time and effort to further our careers and
if you are not willing to do that, go find another line of work.
I am sure that I speak for many of us in that I am glad to help people out who have
tried hard but just can't figure something out, but I will not help anyone who is
simply lazy and doesn't want to make an honest effort.
I could not agree more. Over the last year or so, I have seen so many instances of
this, it is ridiculous. I too will help anyone who has made a solid effort and just
hasn't been able to find resolution, but I will not respond when it is apparent that
someone is just looking to take the easy way out.
You are absolutly right .i must say thanks to you as if they dont put their effort they
will never undertstand. this is place where we can share our problems which be are
facing
very true & I am in completely in line with you.
i appreciate ur comments and its true that untill unless everybody not put their own
efforts can not do anything in his life.

What is WBS Element in MM? please drop-in information


WBS is known as work breakdown structure and it is a part of the Project systems
in SAP .This is used when you are working with project and for making this
youhave to cretae PO with account assignment category P and at the line item you
will find tab account assingment there you have tto Give the WBS elemnt creteated
.You have first create project and after creating project you have to release the
project.For this you have to work in consultation withthe PS guy.
I have one clarification in Excise. If we post cenvat credit in J1IEX, ie for example.
If we post it as capital goods 50% Cenvat Hold account and 50% Cenvat BED
account. Then I want to reverse this using the J1IH. In J1IH if you select J1IH, it
has to split up and credit to cenvat hold account and cenvat BED account and debit
to cenvat clearing. But in our case, all the 100% is crediting to Cenvat BED account
and debiting to Cenvat Clearing account.

We are currently being advised that SAP can only handle PR authorisation through
workflow at PR line item level rather than header level which we require. Can
anyone advise if this is correct or can SAP be configured to handle this?

One is blocked.as checked in LS26. The stock Catagory indeicator is "S" As I


understand, the stocks in Quality Control is "Q", Stocks Returns is "R" & Blocked
stocks is "S".
How do I move these
To move/transfer block stocks
the goods to the unrestricted
from Bolcked stocks.. stock u sue
stock to Unresticted
movement type 104 in MB1C transaction
while doing MIGo transaction, please tell me what should be the corrective action
when the error message "control indicators for the controlling
area bpl4 does not exist or not maintained" appears. and also some times in migo
,the message comes as said below "purchase order 4500015397 has no items",
but i had created the purchase order with some materials clearly.
Did u maintain Quantity & Value updation indications for the materials? Check this
out
I have created my own doucument tpe and number ranges for PR .but when i go to
crete PR then system gives message as : Item category is not allowed to this
documet
While tpye Document types , in the same definition you have to allow your
defining
desired Item categories for the document type
Go to your document type, select it and then click on allowed item category on left
hand side. here you can define the item category for your new doc type.

We have defined our raw material warehouses(spread all over India) as storage
locations in SAP and assigned them to our manufacturing plant(which is a plant in
SAP) so that we can run MRP at the plant and we can take all stocks lying at
external locations for netting.However, since these stocks are at different physical
locations, we need to build in the lead times for them to travel to the mfg. plant from
storage location.Thus when calculating the need for material, I should subtract the
stock that is present at Chennai warehouse.However, since it takes two days to
move stock to mfg plant, it should also alert the user or cognise for the lead time
and not show the material as available for production.

i have copied from movt type 101, and have seen that i had copied allowed
transactions . but still its showing an error.
if u do not mind can you repeat the erreor

I wanna know how to release the materials in the quotation after the quotation got
expired
There is no standard practise to release the material from the expired quaotation,
but if you want to procure the material, then go to change mode of the Quaotation
and then procure the required.
I am talking about the sales quotation, not the purchase quotation

while creating a PO for services I am getting error message "Tax code ( VN ) in


procedure TAXUSA is invalid". I check ed the TaxCode but could find anything
causing
try error.
to check this it will help u. 1). T-Code: FTXP enter u r tax code & check it.
2).spro->financial accounting->financial a/c global settings->tax on sales/purchase-
>basic settings->check calculation procedure->click on define procedures->select
TAXUSA & click on control data & compare with (1).
Thanks for your reply. I did what you mentioned but 1 & 2 dont match. Then in the
Item Detail under Invioce I changed the Taxcode to someother value (VN was not
in the tax code selection). But still its not working. So if you have someother wayout
then
Tax VNlet me
will know.
come by defult, You have to create your own tax code country related &
to assign to PO or not assign any tax code in PO
Thanks for the reply. Now its working.

How we config release procedure for RFQ,PR, PO, Contract? Pls help step wise
and screen shots wise. How many stepes involved for config the release
procedure.
For the release procedurefor PO documents you have do following:

1first you create characteristics for a release procedure for purchase documents
(POs/RFQ/ Contracts )Create a characteristic for each field from communication
structure CEKKO that is to be a criterion for your release strategy. Enter the table
name and the field name on the tab page Additional data (for example, table
CEKKO for field GNETW for the net value .in similar you can create charaterstic
what you want........ ......... ....
2.create classes for a release procedure for purchase orders
a. Create a class with the class type 032. You have a free choice of names
for the new class (e.g. REL_RFQ for the release of RFQs).
b.Assign a name for the new class on the tab page Basic data.
c.. You can view an error message if different characteristics with identical
values have been assigned to a class. To be able to do so, select the Check with
error message indicator in the Same classification area.
d.Asign your characteristics to the class via the tab page Characteristics.
3.Define release procedure for the PO documents .Here you will definw the
releasse group/Release codes/release indicator/release strategy.

Create a release group for your release procedure and assign it to a class.then
release codes you need for your release strategy and assign the codes to your
release group then you have cre ate a release strategy for your release group and
assign your release codes Release prerequisites
release prerequisites, you specify the order in which the individual release points
while doing mb1c the message is account determination for entry GBB--------- -----
BSA 3000 NOT POSSIBLE
For this you have to make entry for threGBB by going thru OBYC transcation code
and select GBB it will ask you chaart of account give your chartof account and
make entry for valution modifer BSA for valution class 3000-- give the G/L account
there.
Can you be specific on which movement type you are using for T-code
MB1C.Kindly check the same with T-code OMWN in account grouping,if the
account modification BSA is maintained for the TE key GBB in the respective
movement type.If maintained enter T-Code OBYC i.e, Automatic posting check with
TE key GBB whether for Account modification BSA with the combination of
valuation class 3000 the GL account codes are maintained for debit and credit
posting
goto t-code: OBYC->double click on GBB->enter u r chart of accounts->check for
this entry 0001-BSA-3000- G/L account,if does not exist goto new entries.

can any body tell me what is TCode for standard REPORT WHERE I CAN SEE
Type the T-code SAP1 & u can see a list of all std. reports

In consignment settlement when we do the stock transfer (MB1B) from


consignment stock to company's own stock and settle the vendor's claim
with the transaction MRKO, the accounting documents are created Can anyone
please tell me which tables and the fields from these tables the
system is using to create these accounting documents.(please mention tables and
fields for the two transaction separately)
Is there any customization other than entering K (manually) in the item category
field in ME21N, so that we don't have to enter every time "K"
in the item category field manually to indicate that it is a consignment PO.
See Achra this is SAP standard process that you have to enter the item category K
for consignment .You can set the default value for item category or can make of the
parameter .But there will be problem when you will be crating the other PO ( normal
po).
I have created a new movement type copying from movt type 101.(using t code
OMJJ). but when i am doing GR through MIGO using that created movt type then
its giving error.
that choose
Check the allowed
the Allowed movt type.
transactions please
for the tellmovt
copied where i am
type, wrong.
if there are no
transactions , then enter Transactionsin new entries
WHILE DOING A GR WITH RESPECT TO A PURCHASE ORDER THE STOCK
ACCOUNT > GETS DEBITED AND THE GR/IR ACCOUNT GETS CREDITED. >
NOW MY QUESTION IS THE AMOUNT WHICH SHOWS IN THE STOCK
ACCOUNT > ASWELLAS THE GR/IR ACCOUNT IS WHICH AMOUNT TAKEN
FROM THE PRICING > CONDITION FROM THE PURCHASE ORDER?IS IT THE
NET VALUE OR THE MATERIAL > COST? > THE REASON BEHIND MY
QUESTION IS I HAVE DONE A PO WHERE I HAVE GIVEN > THE FOLLOWING
CONDITION:
> GROSS PRICE :1000
> TAX ON PO : 200
> ------------ --------- --------- --------- -------
> NET VALUE :1000
> ------------ --------- --------- --------- ------
> ABSOLUTE DISCOUNT: 10
> NON-DEDUCTABLE TAX:35
> ------------ --------- --------- --------- -----
> MATERIAL COST WITHOUT INVOICE : 1025.
>
> NOW WHEN I AM DOING THE GR OF THIS PO IT IS SHOWING THAT THE
STOCK > ACCOUNT AS WELLAS THE GR/IR DEBIT ACCOUNT IS 1035 i.e. IT
ISNOT > CONSIDERING
If the material in question is THE 10 maintained
being RUPEES DISCOUNT.
with StandardPrice, then the
Discount amount of Rs. 10/- will be posted to Discount Clearing Account Initially
and when the Invoice is posted, the same will be transferred to Gain on Price
Difference Account. If the Material is maintained with Moving Average Price, then it
will be
Just lettransferred
me know the to Stock Account
following at the time
information whichofyou
Invoice
fill upPosting.
in PO, so that I can
clear all of your doubt regarding account posting. PO Quantity ? Net Price ? Tax
Amount
the ? Discount
following are the?details asked by u:
> gross price rs.1000
> tax on po rs.200
> ------------ ------
> net value rs.1000
> nondeductable tax rs.35
> absolute discount rs.10
> ------------ ------
> material cost before in. rs.1025

> but when i am doing gr,the account posting is taking


> rs.1035 instead & of rs.1025
the discount price is enter in inforecord at condition tab interms of % or rs.
for Account document creation go to t-code--obyc double click on KON enter GL
acc num fill valuation |gen modifier|valuation class|debit| credit 0001 30000

How is a shelf-life item managed in SAP? What is the full cycle?

Please advise if there is a way to restrict the purchase order document type that
may be created in reference to a specific contract document type. We have
multiples of each, and need to establish restrictions. I see how to link document
types to requisitions, but not purchase orders or contracts.

In MM50 (extend material) after entering the material number and pressing
execute, the extend material overview screen is appearing. By default it shows the
columns (Status, Created on, Material, M Type, I, Plant etc.) but the client wants to
have the Status description column to appear against each Status since the status
code alone is confusing them. for example: A-Work Scheduling, B-Accounting, C-
Classification, D-MRP etc...). Please let me know if it possible and confirm the
steps to customize the 'Extend Material Overview' screen so that the description
column comes next to Status 'S' column.

Could you please explain me the steps to Configure, 'Print Output' for Contracts
(ME31K) via ME9K
To use me9k, 1. Click the message Icon in the Contract , 2. Enter -
Output type - NEU
Medium- Print output (enter others if others)
PartnerFn-Vn
language- En
3. Communication method
Logical destinatin- LP01 (Enter the printer name Configured for SAP print out)
GO-back
4. Further Data
Send with own application
Go-back (twice) & save the contract.
IF RELEASE IS THERE THEN RELEASE THE CONTRACT AND PROCEED
FOR ME9K OR PROCEED DIRECTLY FOR ME9K
I think now u should be able to enter the details in ME9K, try it if not then come
back , Unless the above is done, ME9K will not have any doc. to process.
In Sub-contracting PO --- the components are consumed during GR of finished
products from Subcontractor. During this process we have the option that we can
change the no. of components consumed (under/over consumption) for the finished
product. My question is that for under consumption we can change the no shown
during GR from subcontractor without any question, but how we can do it for over
consumption, where did the subcontractor found this excess material, as we didn't
send it to vendor yet. Please explain. Another question how we will manage the
scrap from the Subcontractor? We can mention it as negative quantity during
creation of PO but how? Say I have two components each 10 pieces, then how I
willrelation
In show the scrap
to the quantity
scrap in the
quantity youPO? Please
make explain
allowance for that in the Bill of Material
(BOM)
for prt material , i am getting an error message of " valuation record does not exist
" while making migo. do anybody is having the solution
what is material type you are using
production resourse & tool ,, valuation class - 3070

We want to use Asset Purchasing through P.O in our Organization. Can any one
tell me what is the procedure and what are the configuration settings?
IN PO CREATION SELECT ACCOUNT ASSIGNMENT CATEGORY AS "
A"..THEN ACCOUNT ASSIGNMENT ASSET TAB WILL APPEAR.U MAINATAIN
THE ASSET MASTER OF THE ORDERED ITEM(WHICH IS MAIINTAINED BY
FINANCE GUY THRO' TCODE AS01) AND SAVE IT
Can any one please tell me that do we need to maintain material master of all the
capital goods/Assets
without material master, how you can maintain
material/asset to be picked up for procurement? ??????

for all materials/assets we have to maintain master


and we have to consider the "AAC-Account Assignment
Category" for the procurement process.

this is my stand reg. this


Assets are to be created & maintained in Asset Master & can be procured without
material code
asset master?????? ? let me know somemore about this pls

is there any other tcode for getting the materials list with all details like legacy
code,plant,
You sloc....
may have get all Materials list in MARA Table in T.Code SE11 instead of
MM60
thanks for ur reply and tmrw i will check in my office and today i found one more
option through MM03 and I got legacy code, mat description, sap material(sap
code). There i was unable to get sloc and all.......anyhow, i will check ur answer.
IN MM03, ENTER THE MATERIAL NUMBER, SELECT THE ORGANISATIONAL
LEVEL,THERE U CAN FIND PLANT, STORAGE LOCATION AND VALUATION
ETC.
thanks for ur reply and there i m not having option to enter plant....... .. i want list out
all the materials which is coming under one plant......

when i do migo mov101 error:postinly only possible 2006/04 and 2005/04 so i


change on mmpv change the pstng prd. even samy come how to salve this
use T-Code OB52 and change the periods to current periods and ur problem will be
solved.
You have to close the period in the material master.Logistics --->MM -----> Material
Master ----> Other ----> Close Period. You have to enter the next period and fiscal
year
I have maintained a new taax procedure with new tax codes and maintained
condition records.When iam creating a material at the time of PO and checking
INVOICE TAB everything is OK.I have maintained FRB1 (FREIGHT FIXED
VALUE).Default tax code is V0 (ZERO INPUT TAX) and tax code for material is 12
(Taxes are calculating correctly in PO) But when i post invoice for this PO after GR.
Even iam selecting V0 as tax at header level even freight charges are also getting
taxed by the same tax code i.e tax code:12 to which i maintained for material. Even
if i tried to post planned delivery costs separetly also the same thing is happening.
Kindly
take Zero helpTax
meCode for Planned Delivery Costs ( ie., Frieght ) at item level and for
material take the tax code which is relevant

could you please provide me with the information necessary to find out the value of
the planned material requirements by month. I am not referring to a detailed list by
part number but a summary with the global value of the raw materials to be
withdrawn month by month according to MRP schedules

Pl. provide me the related information about "What is the difference between the
material type Non-valuated material and Free material which is maintained in
P.O.(that means some vendors give offer that if we purchase the 100 nos of
material they will give 5nos free in kind).

I am creating a Purchase Requisition for procurement of Asset by assigning "A" in


the account category. I have a issue, In the Valuation tab of the PR The indicator
for "GR Non-Val" is activating automatically. My end users does not want that to
happen. Where do I do the customising for that so that it should not come again
Pls go to transaction OME9 where you will be find the account assignment
categories, there you can change the GR non valuated

I want to add unit of measures how can i customise... .. please mention path
use t code: CUNI it is and img activity

can u all telll me how to get the list of invoice. plzz tell me the t.code for the same
T CODE MIR 5

Can any one tell me what r types of valuation. Is it allowed to have value in
negative ,in MAterial master accounting view total value

PL GUIDE ME TO GET THE LIST OF PR FOR THE FOLLOWING : 1.PR WHICH


ARE CONVERTED AS RFQ ,TO BE CONVERTED AS PO. 2.PR WHICH ARE
CONVERTED AS PO.
3. PR WHICH ARE HAVE NO ACTION TAKEN. PL SUGGEST THE T CODE AND
SELECTION PARAMETERS IN DETAIL
You can see the PR list thru T.Code - ME5A
Y_AC3_67000372 Try this T.Code for PR status
is it a customised Txn code? Can you guide with node names for this report

IN PO , OUR STAFFS ARE MAINTAINING TAX CONDITIONS AND PUT ON


HOLD AND THE DOCUMENTS ARE COMING TO ME FOR VERIDFICATION. I
AM ALSO VERIFIED THE SAME AND SAVED THE DOCUMENT. BUT AFTER
MIGO MY FINANCE GUY WANTS TO PAY THE TAX WHICH IS NOT
REFLECTED IN MIRO AND ALSO IN PO ALSO. HE COMPLAINTED. I VERIFIED
AND CONDITIONS ARE STILL EXISTS IN FV11. BUT NOT REFLECTING IN PO
MIRO. WHY? HOWEVER IN FV12 I HAVE RE ENTER THE SAME CODE , THEN
PO BECOMES ALRIGHT . BUT NIT IN MIRO OBVIOUSLY,AS MIGO ALREADY
DONE
Check your Vendor master data for TAX information. If the supplier is not registered
for the tax condition it wont pull through on MIRO.

Can you help me out to find out the Total Amount for Purchase requisition having
multiple line items? (Total value of a Purchase requisition)
i also having the same question as i am having the values for line by line item only
and while taking print only i am getting full PR values for multiple line items.
any idea wher we can find the total amount for PR. Currently I have used myABAP
guy to write a logic for this and using a report kind of thing to know the total amount.
Expect valuable comments & help in this regard
Use SUM keyword to calculate the total of any column in a report. Ex: where u r
writing the data in the report just let thecolumn which u r doing the calculation it
shud be placed in the end of the internal table that will be gud and handy..... SUM.
itab-netwr, itab-mwbsk.

I would like to seek advice on this issue. I need to do a stock transfer using 303 and
305. However, during reservation, the mvt type 303 is not allowed (is this true?). So
have to choose 301. Then when I do MIGO with reference to the reservation, the
movement type is defaulted to 301. How to go about this issue?
MVT type 303 and 305 are exclusively for Stock Transfer Posting in two steps.
You can make use of movment type 309 also in T-Cdoe MB1B, in 301 you can
transfrer the material from one plant two another, but in 309 you can tranfer from
plant to plant, also Sloc to Sloc

What is Backorder processing of sales orders? What are the steps and t-code
involved?

Please let me know max how many release code we can assign to release
strategy.
maximum 8

I have a doubt in MRP. I have checked in MD04 for two materials. I found out that
for one material the requirements were pushed from the order and for the other
material the requirements were displayed with respect to the delivery. What is the
control that triggers whether it should be triggered from order or delivery

Please assist me, I need a transaction to draw a report showing the top ten
suppliers in Rand value (ZAR) for professional service providers
Try transaction "ME81N
try using t-code MC$4 if this is fit with you rqmt. i'm not familiar with ZAR your
referring to.
I want daily summary of receipts,issues and closing stock details daily report
use MB5B for stocks on posting date to cross-check, use MB51 and change your
lay-out to gridlines

While creating vendor using T code XK01,I am gettign an error message as


"Screen layout for purchase organization XYZ is not defined'
Financial Accounting >Accounts Receivable and Accounts Payable >Vendor
Accounts>Master Records<Preparations for Creating Vendor Master
Records>Define Screen Layout per Company Code (Vendors) chek here you will
get
Please check the vendor a/c group which u assigned. Because the only one
perameter that controls screens of a vendor master is ven A/C group.

i created material in mm01. and also created PR & Po but. i cant do MIGO the
error display is Material X1, plant- x , storage location -X does not exist
can u give solution for that
you have not maintained the plant and storage data . Maintain that view view you
have use MM01 t.code you will able to do

i have a doubt regarding split valuation for a material .How it works & in what
scenarios? kindly let me answer as quickly as possible
The SAP R/3 System allows you to valuate stocks of a material either together or
separately, that is, according to different valuation criteria. Split valuation is
necessary if, for example:
1. Stock from in-house production has a different valuation price than externally
procured stock.
2. Stock obtained from one manufacturer is valuated at a different price than stock
obtained from another manufacturer.
3. Different batch stocks of a material have different valuation prices.
while creating po i got a problem that no commitment item 0001/1000 for this
company the system shows the diagnosis that for this company fund / cash or
project management is active so pl maintain the commitment item pl telll me where
i have to check this or how to deactivate it / reply soon
this is mainly work of fi/co guys.the commitment item is related to profit centre of
company, which is also linked to cash management. chk ur fico settings. it happens
that when u create a company/cost centre it is automatically linked. so chk ur
settings or try to give all 9 in commitment item if u r using 1000 ctry code.
If u input the cost centre, this error should not come

the utility of the purchase group is from the reporting point.Purchase group is a
buyer .group of buyer responsible for buying activites .Purcahse group is not
assigned to any of the organisation level
purchase group is a floating entity, it is not assigned at any org. levels(mat. type is
also floating entity).
i have a problem in creating my own P.R after realease the P.R in three lavels It
shows some error message & also flag is not comming on the top.can you help me
out the detail procedure from realease of P.R to my own P.O.

are u assign pur.group to pur. organization, if yes where


This is done within our security roles
NO, p.group is an independent org element.it is not assigned anywhere but only
defined.
daily wise receipts,issues, closing stock report.
MB51, MC.1, MC.9
Mc.1 and Mc.9 will give you stock status for the particular period not on particular
date and MB51 you will get the material document list .
I feel that is not fullfulling the requirement as asked byrajesh
use t.code MB5B that will give stock on posting date .that is the stock on particular
date opening stock /reciepts /closing date

Material Returns To Vendor. Assuming that I have some materials which have
been in the store for some periods of time. A few months later, some were found to
be faulty. So I need to return back the materials to your vendor but it does not
relate to any particular PO and vender is reddy for return. I am taking modvet & bill
passed return
Create by acct.
PO,dept.
tick the check box under return items column for the materials to
be returned.Then do goods receipt with reference to this PO using movement type
161
Create Return Purchase Order and fallow the all trasanction Code as it is .and you
will get the Create the Credit note. in case of Excise u need to generate the same
way using J1IEX. Since there is no any PO Reference, you need to fallow like this.
other wise directly using reference of material document can possible to return and
excise can be reversed using Transaction Code : J1IS

Can anyone help me to get all SAP (MM) ALL T-CODE with function.
try SM01
try MM00 for all tables
pls try tcode TSTC
T.Code is SE93 and put the MM* in transaction code and press f4 key.
I tried with T.Code is SE93 with MM* in transaction code and pressed f4 key But
some error message is appearing which is attached so pls do the favour
Use Transaction code : SE16
When my users create a reservation (MB21) for movement type 201, they want to
be able to enter the GL account optionally.
If they leave it blank the account assignment must be determined by the material's
valuation class.
Is there a way to do this in SAP?
I know that in OMJJ you can switch on/off the display of the GL Account, which
works fine.
My question is this: If I have the value in OMJJ set to ' ', which means account entry
is optional, how can I make it in MB01 to also be optional? In this scenario, if the
user does not
According enter the GL
to customized account,
settings he receives the error messageclass-G/L
in OBYC->GBB->VBR-valuation "Please enter
account assigned, system by default that G/L account will pick, if we want it can
change. if no settings&blank definitely system will rise account determination error.
if u want your customized error, i think contact with ABAPer
The default G/L account is set up correctly in OBYC->GBB->VBR with valid GL
accounts. I have found out in the mean time that there is an additional check in the
field exit of the GL account, specific to our company, which explains why I get the
error

I need to programmatically create a vendor on the master data. Looking for a BAPI,
I could only find BAPI_VENDOR_ CREATE, which is online. Do you know a
function module that I can use to automatically create a vendor?
ME2W T-CODE

pl guide me to find out the status of pr pending for conversion, which are converted
to req, to po. if ME5A means selection parameters pl

Why there is need to flag option of " GR BASED IV" in Purchase Order. How does
it affect while performing MIGO or MIRO.
GR based IV means that your invoice will be based on the goods receipt.
What will happen during MIRO if I dont click on "GR based IV" in PO. Will FI people
able to do invoice verification ?
Of course FI people able to do invoice verification n GR based IV. In GR Based IV
a seperate invoice item is created for each delivered partial delivery. You can
assign each invoice item to a uniquely good receipt item.
GR based IV is for Domestic Purchasing procedure. If you want to pay for vendor
after goods receipt then you have to check GR based IV.IV is not possible to
process before GR. But in Import procedure you have to make invoice for customs
duties before goods receipt,in that case you should not check this GR based IV in
PO.
u can select gr based IV in PO in the item-invoice tab,u can click on the box (check
in the attachment), by taking P.O.reference only we r doing GR & MIRO (refer 'r1'
attachment
1)I want report where i can see combination of G/L account Vs valuation class.
2)how to assign G/L to valuation class 3)is it possible to assign number of G/L
code to single valuation class
U can assign G/L accounts to Valuation Class in OBYC in concerned Transaction
key. U can't assign one valuation class to no. of G/L accounts, but u can assign
one G/l account to no.of Valuation Classes

Can a Service PR can be created with reference to Service Contract.


U can create Service PO w.r.t Service contract
Yes you can create a service PR with reference to a contract,it is very much
possible. In T-code Me51n you put "D" under Iterm catagory for services and you
put the contract nymber under outline agreement.when you press enter in the next
screen you will see the services mantained in the contract then choose from them.
Tellthe
On mebottom
if you don't
of thecome
pageok
you will a clikable button which is "SERVICE
SELETION" click it,on the next screen you will see the contract number that you've
put,make sure that the contract check button is checked then enter.on the next
screen you will be able to see you items from the contract. I did the same thing but
Ii is
didnot
thecoming
same thing but i is not coming

Can I check the info record is available for same vendor and same material with my
different plant. If yes how ? please help me in this case .
for info record mandatory fields are Material number(with/ with out material master)
& vendor number is Mandatory, but plant is optional. what is exact requirement?
explain
My casedetail
is this We have 2 different plant say PLANT-1 and PLANT-2, in PLANT-1
we have RATE-1for VEND-1 & MATERIAL-1 now i want a check at the time of
createion of info record for PLANT-2 with the same vendoer and material.
We can customise the me11 transaction so that plant is made mandatory try
ME11_PLANT
In our company has several plant. Each plant using same material for production.
Each plant raised P.R for same material and differ qty and same delivery date.
Purchase department convert P.R to P.O for single line item for total qty. My
question is how can we identify P.R convert to P.O or not. In purchase order one
line item we
For single can
line refer
item onlyfor
in PO one P.R material, we can use more line items for the
same
same material from DIFFERENT PR and this is possible.

Can any body please tell me if 2 Uoms of a single item can be displayed in the PO
?
at a time in one po, we can use one UOM only. Meanwhile we can maintain
ALTERNATE UOM in material master

Is there any way to delete all the PR which is Not Released


Pls. use T.Code ME5A and open your pending PR list and then use T.code ME52N
and put your PR and delele all PR one by one
Check for a BAPI....for PR deletion.... That might help.....

When making gr to po , during posting 101mov, the following message come 1-


price changing amounting to % in month 2- price changing amounting to 19000 %
in month 12/2007 3- posting can only be made to G/L a/c 300000 in curr.GBP
THESE MESSAGE ARE YELLOW MARKED MESSAGES. SO U CAN IGNORE IT.
ONLY POINT NO 3 ONLY U HAVE TO CHECK BEFORE POST IT.
ur problem is quite natural, u may have given the price standard or moving average
price in info record, which is low and in the tolerance limits u have given the
variance in some percentage. That is y it is showing % of price changing amount,
for the change the old to new price go MR21 transaction and give the new price.

Pl. provide me the related information about "What is the difference between the
material type Non-valuated material and Free material which is maintained in P.O
non valuated materia is non valuated at your plant end ow ever u need to pay to
vendor. in case of free material vendor is sending you as fre. u need not to pay to
vendor. hi otheres : if any deference more than this please let me know

Is there any way to delete all the PR which is Not Released


which pr you want to release either not yet released fully nor not yet started to
release
When ever at my work, such problem occur. We were deleting line item of the PR
which is not released or released but material not requires
Pls. use T.Code ME5A and open your pending PR list and then use T.code ME52N
and put your PR and delele all PR one by one

While posting GR for an asset, system not able to pick up offset account(GR/IR
account). Anyone got the idea where my configuration settings
are missing ?

Can any body please tell me if 2 Uoms of a single item can be displayed in the PO
?
A po has 50 items, all the 50 items have the same price, instead of entering the
price for each item 50 times is there any option in Sap where the common price can
be entered in one go. I have tried but i couldn't solve it, Give the solution for his
type
sinceofinscenario.
sap, release strategy is item oriented( plant, pgrp and value) , we have to
do in this scenario. in the meantime, we can do it in the EBAN table settings and it
will affect in normal scenario
my client is facing problem related to pr release.he is unable to do second level
release of one particular pr.other pr he is able to release. actually,the pr is having 3
level release,the first level release has been ok,but user in the second level release-
is not able to release the pr. in pr, it is showing small yellow traingle(symbol) 1)i
have checked the release strtegy, 2)basis consultant checked user profile and
access issues related to t-code me54n.we are using standard sap configuration
and custimazation only. 3)workflow consultant is telling that -no problem with
workflow. the pe is having account assignment category-"K" . is anything special
to be checked. please provide valuable olution for this issue.
your suggestion
whether pr release arestrategy
taken valuable.
is maintained properly??? pls check once again.
yes i have checked the release strategy and also the agent addition in
workflow.everything found to be ok.the user can(first level) already released the
pr.this
It seems is for thisisprallready
ur PR only. released. Pls check the value on which ur release
strategy is fixed.Please inform once ur problem is fixed.
on the screen where u see the ellow triangle,put /osu53 ad give that screen to ur
basis guy
i had this problem before but i dont remember the authorisation obect.u try this may
Ibe
amsolve
havingur problem
this problem with PRs and POs on more than one occasion. All
settings and configurations are ok. My simple solution is to cancel the release so
that it goes back to the first person, then hopefully to the second. This work most of
the time for me. When it does not work we cancel PR or PO and do new one.
The hierarchy mentioned in the PR strategy needs to be monitored.

in migo gr to po mov 101 unable to post ON DISPLAY LOGS FOLLOWING


DISPLAYED - PRICE CHANGING AMOUNTING TO % IN MONTH/ - PRICE
CHANGING AMOUNTING TO 1,9000% IN MONTH 12/2007 - POSTING ONLY
CAN ONLY BE MADE TO G/L A/C 300000 IN CURR. GBP
in gr where does the price will come and what is the price growth %
whether pr release strategy is maintained properly???
yes i have checked the release strategy and also the agent addition in
workflow.everything found to be ok.the user can(first level) already released the
pr.this is for this pr only.
I am having this problem with PRs and POs on more than one occasion. All
settings and configurations are ok. My simple solution is to cancel the release so
that it goes back to the first person, then hopefully to the second. This work most of
the time for me. When it does not work we cancel PR or PO and do new one.

Pls let me know how to create condition type so as to input on the po for a asset
so that invoice for it gets blocked /will not be posted
Use Invoice Tolarance limit procedure
I would also requset you to give me the detailed process of configuring that .
Because this is just to have control on unapproved vendor invoice payments or to
configure for mile stone based invoices, And this is specially for equipment
purchases
I would like to add few things regarding Asset procurement.
1. There is no need to maintain material master, instead Asset master is to created
where-in asset no & the corresponding G/L no is attached to the asset no. for
Posting during fututre procure ment. This is basically FI/CO acitvity.
2. There will be internal order which is basically budgetary provision for
procurement of assets. SCM gut needs to maintain Asset number & Order number
against which asset is procured in the Account assignment category tab of PR/PO.
3. of-course it goes without saying that one has to maintain "A" in the account
assignment category column
4. There will be no accounting document generated during GRN if the indicator for
GR-Non valuated check box is not removed.
One has to coordinate with the CO guys for Budgetary alocation/provision
/availability details before going ahead with asset procurement.
1) Assets are to be maintained by finance asset master. The data is shared among
a) PP - for Production Planning in Mfg. schduling if the assets are machines
b) PM - for maintenance of machines etc.,
c) Finance - maintenace of both machinery and non-machinery aseets like
buldings, lands etc. in asset master,
Tax - Excise Duty / customs duty are returned if u r producing goods using
assets / machines ( in some % of assets)
d) Controlling - budget allocation via projects, forecast requiremnt, new ventures
etc., Creation & Maintenance of GL accounts for Asset Procuring, asset
mainteance, assets servicing etc.,
e) MM we
I think - forcan
procuring
create athe assets,Account
separate for negotiating service
Asignment contractsfor
Categories forAsset
maintenance
Procurement. However, we need to mention all posting entries, GL accounts etc

can anybody send me a sample of domestic and importe Po Pricing with TAXINN
condition
Why can not we change the vendor for a created PO "Not released yet"

by MIGO during receive mov101 error : posting only possible GBP 30000 only
then i put mov 103 blkd stock so now how to bring to unres.st. where have to
change a/c

can any one tell on how to return goods purchased, and to create a DR memo for
the returns.. ie(cancelation of MIRO/MIGO/ returns movement type etc......)
regarding material return pls go ahead with return po with mvt type 161.
When u do Returns , there is two methods.
1. With Material document . called as with reference to PO
2. Wthout material document which called as Return Purchase Order.
the first situation will come in industry that if u have any reference document, like
GR number or PO number, u can able to do the purchases using that ref.
document. other wise the second one will be prefered . for suppose some material
procured long back and do not have any ref. documents and the same material
going to send back to vendor. in this situation, the second method will be prefered.
in first method 122 movement will be get hit
in second method 161 will get hit
You can create credit memo with respect to delivery note

Could you please explain process flow for VMI in SAP ? What is the logic behind
VMI and how to map it in SAP ?
Vendor Managed Inventory

i want to use 313 E for storage location two step transfer of salesorder stock but i m
not able to do > it gives erro that 313 E does not exist> do i hvae to make some
setting in omjj?> can anyone guide>
use T-code 301
301 is plant to plant one step transfer ,i want to transfer sloc to sloc and that also
two steps
I think u want to transfer plant(A) to plant(B) and also storage location of Plant A(1)
to storage location of Plant B(1). Am I right?
use 303 & 305
303 and 305 for plant to plant i want sloc which is 313 and 315 but i cant use for
sales order stock that is 313 e and 315 e.
no i want to use two steps transfer from plant (a) sloc (a )to plant( a) sloc (b)
>first i will use 313 to transfer from plant (a) sloc (a),and than again recieve the
material at plant (a) sloc(b) by movt type 315
>this i am able to do for normal stock but i want to do the same for sales order
stock ( special stock E)
>that is i want to use 313 E and 315 E.
>hope somebody can help

first u need to check in OMJJ whether for 313 and 315 t.code special stock
indicator E is available or not
have to do any settings ?

what is quota arrangement ?


Quota is done when u have more than one vendor.T-CODE= MEQ1
quota arrangement means u can alot a quota while venodr selection

We are start our system from April'07. we are procuring some material from last
budget(Manual) and the same materail we used till end of Jully.We have not Stock
updated of this material in system at april'07. Now we have to show consumption of
this material, for that we have to Updating that Stock. But now problem is that if we
do that our this year budget will consume.So please guide me in this case.
whether stock is updated in initial stage(before go-live) by 561 MVT into sap from
your legacy or not???
You have to update the materials thro MB1C movement type 561 (receipt per initial
entry of stock balances in to un resticted use). Enter if you have any batch nos for
the above materials. Automatically the stocks were updated in your system and
ready for issue.
Kindly help me by answering my queries mentioned below:
(1) What Report can we get wrt to Purchase orders by using Purchasing Value
Keys & How?
(2)
plz How to how
tell me get the details
to see of Shelf
all PR life forMuch
and HOW List ofPO
selected material
is raised linethat
againest items.
PR
You can use T.code - ME5A
T.code for purchasing value - ME84/ZRF2/ MC$4 and T.Code for selflife - ZMST

Does anyone know of a report in SAP that can show the Posting Date and the
Delivery Date for Stock Transport Orders? It would allow reporting of transit times
for hauliers.
You can use T.code ZVSLDET if you are updating this data AND for intransit
T.code is MB5T
Can somebody explain me how to get EXCISE TAB during MIGO when I am
working on CIN?
If Material maintained in J1id (Excise Master) and Vendor maintained in Excise
Master (J1id) then only Excise Tab appear in MIGO.
Go to Exise master data using t-code J1ID. Maintain record for material in
transaction Cenvat determination & Vendor Details in the relevant transactions. U
will getdone
I have excise tab in
these MIGO but still tab not available.
settings
When u diclare a material as Exciable in Excise Master , system automatically Pop
up the Excise Tab. First you Declare material as Excisable in Transaction Code :
J1ID.
i wanted to know the basic difference between Requirement, Condition formula for
alternative calculation type and alternative formula for condition base value.

Kindly throw some light on how to use alternate BoM's at PO level


If you are creating Subcontracting Purchase Order / Scheduling Agreemnt the
following process 1) Create Alternate BOM (Version 2) (T Code CS01)
2) Crete Production Version in MRP4 go to Production version and maitain the the
same 3) Then Create Info record. In info record Version tab must maintain 0002
(BOM Alternate Version) (T.Code MM02) 4) After maintaing Info Record u can
create Subcontracting Scheduling Agreemnt ALternate BOM automatically pick
from info record in PO (T Code ME21N / ME31L)
plz tell me regardind movement type to see how much PR is raised and againt that
how much PO is made
U have to create Version for the BOM & then

We buy boxes from a vendor. When we receive stock, chances are the quantity
from the vendor will be different. That is, if we order 500 boxes, we might receive
485 boxes or 512 boxes. Hence we have set tolerance levels of quantities to -10%
and 10% in MM02 Purchasing tab. So we can MIGO quantities
that fall within the tolerance and the PO will be closed. Problem is the system
doesnt do this? Can any advice
The system doens not know about the tolerence % of particular material. I am
pharmaceutical field. We use Raw materials and Packing materials. In RM we are
not facing any problem because the order qty and the received qty is mostly same.
In packing materials we are not expected the currect order qty will be supplied by
the vendor. Because he have some minimum order level for the particular material.
In our case we have order 1000 nos of packing slips the vendor supply only 5000
nos. Hence in the PO itself we mentioned/put the allowed tolerence % the system
automaticlly allow to post the GRN.
Anyhow
here youithave
is depending upontolerance
to use "order the nature of material/minimum
limit" order
both overtolerance and qty fiexed by us.
undertolerance
in order qty and can solve this issue.
I had configared new plant with all configarion, but during posting showing define
internal number . Please send solution by mail on rbalegar@gmail. Com

I am facing the problem in the pricing Procedure as while I am creating PO , all the
values are picking up as per pricing procedure , but at the time of Goods Receipt
the values are not picking up , i.e. when i am giving discount after net value it is not
picking up
My Client requirement
Basic Material Cost 100 100
BED(Non Deductable) 16% 16
CESS(Non Deductable) 2% 0.32
Hi Cess(Non deductable) 1% 0.16
SubTotal 1 116.48
Less Discount on Sub Total 6 6
SubTotal 2 110.48
Add Vat/Cat on Sub total2 4% 4.4192

Add Entry Tax 10


Add Octroi/or 20
Add Entry Tax 10
150.48
I created the Pricising Procedure (Attached in attachment), in MIGO the discount
Please give
First of all anillegal
it is idea to
to solve the problem
give discount after charging EXCISE so please check
wether the discount after excise or before excise
U can make use of Manual excise JEXC for excise purpose. ie: enter excise BED
amount in JEXC. Create another condition type for discount with negative value
entry. Assign the same in the pricing after manual excise and give subtotal as 4.
Create tax code with BED-0%,BED Setoff-100%, ECS-2%, setoff-100%, SECS-1%,
Setoff-100% & Vat-4% Now ur problem will be solved for both vat & excise.
First of all you have to set tolerance limits in Purchase Order in IMG-Materials
Management-Purchasi ng-Purchase Order-Set Tolerance Limits for Price Variance:
In this screen select ur Com.Code, give the Tolerance Key and put the tolerance
limits as lower limit, upper limit. When you creating P.O give the tolerance limits in
Delivery tab. If you set these configuration setting then only you can solve your
problem.
We need to be able to change the GL account on the detail tab in MIRO, but it is
shown disabled. Someone knows how to enable it in customizing ?
Go to matertial Mgt in SPRO - Logistic invocie Verification - Incoming Invoice -
Activate Direct Posting to G/l A/c, then the popup will come for the G/l A/c.

We are facing here problem of Advance payment.My case is that we did 100%
adavnce payment to vendor for a material (by Tr.Co F-47), Hencefore our budget
head deduct Material cost.But when we done MIGO for this material again the
same cost has deduct from our Budget head. So Two time our budget head
consumed for a single puchasing of Materil. I know this problem relate with FI-Co
IModule , butdoing
think, after anybody knows
invoice solution &ofvendor
verification this please forward.
settlement, this problem will be
solved. Pls try and reply

I have changed tax code at miro , (GRN ,excise posting already done with previous
tax code ). With same tax rates of previous tax code but only desciption of CST
chaged Tax amounts are calculating wrong . We are working on 4.7 .All master
data is correct . In the same invoice this is happening with only one material. For
remaining materials with same tax code calculations are correct Pls any one has
faced this previously pls forward solution as this is critical

Hi all, I want to list materials that have VB mrp type. are there any t codes for this?
may be it is possible through tables go to material master and see the field name
for material type try through se11 transaction code
USE table MARC to get the list
Go se16, table marc enter VB and exceute, Use MARC table, field DISMM
What is VB Mrp type ?
VB MRP Type is Material Planning on Manual re Order Point . U will maintain an re
order point along with this mrp type .if your stock goes below the re order point than
during the MRp run a automatic planning of this material will be done and a
planned order or purchase requisition will be created in the system.
eg stock = 100 grams, reoder point = 50 grams, MRP Run
No PR or planned Order
stock = 25 grams, reorder point = 50 grams, MRP Run
PR or planned Order will be created for 50-25 = 25 grams I hope is clear
u r correct except the planner order qty calculation. system will consider already
existing PO, GRN to be made, material under inspection ....
Thanks for the addition i forgot to add

We need to be able to change the GL account on the detail tab in MIRO, but it is
shown disabled. Someone knows how to enable it in customizing ?
System proposes the Recon.Account number in that G/L field which is maintained
in the vendor master record

In our company has several plant. Each plant using same material for production.
Each plant raised P.R for same material and differ qty and same delivery date.
Purchase department convert P.R to P.O for single line item for total qty. My
question is how can we identify P.R convert to P.O or not. In purchase order one
line single
For item we can
line refer
item onlyfor
in PO one P.R.material, we can use more line items for the
same
same material from DIFFERENT PR and this is possible.
If you see the P.O print same material no. and differ qty display in more than one
line. May be vendor feel something wrong in this P.O.
in a single line item in one PO, you can use more number of PRs for the same
material. keep it in mind FOR SAME MATERIAL ONLY IN SAME PLANT this is
possible
WHEN PR CREATED FOR DIFFERENT PLANT DEFINETLY PR NO ALSO GET
DIFFERED.SO WHILE CREATING PO CREATE PO W.R.T. PR WITH
RESPECTIVE PLANT. Eg:
ITEM QTY PLANT PR
XXX 10 001 101
XXX 20 002 102
XXX 30 003 103
AND SO ON. WHILE PEINTING ALSO NO CONFUSION, AS AFTER EVERY
LINE ITEM PLANT DELIVERY ADDRESS WILL BE PRINTED HOPE THIS WILL
SOLVE
Why notUR PROBLEM
u suggest to the user department to create PR based on Plant
Specification. .?? ask them when they create PR the Plant is mondatory. So when
ur Converting the PR in to PO system automatically determine the Plant and create
the PO ....Hope this would be better . and all other answers also pretty much
correct
Please tell me T-code for month wise purchases qty and purchases value
T Code : MC$4 & MC$0

Can anyone pls provide the T-Code to get report relating with PR , PO , GRN , and
Service Entry in one Report only.
Try MB51 with varrient selection or ME2n with ALV grid,
Please try ME80FN
pls try ZMRET (Z REPORT) I DONT KNOW AVAILBALE FOR YOUR PLANT

I need to get the Issue Report of all Project materials except three materials how i
can get this Pls do the needful at the earliest as i have to submit the report .
use mb51/ksb1

Sometimes we can find in MD04 there is PR number followed by a *. This means


this PR's date is firmed. Who can tell me this indicator is in which table and which
field? This is urgent. Pls help

I want to know how we should customize the setting for PO so that if the PO is
released no field like PO qty, Net price etc. can be changed.Same i want to know
for PR also. After release no field should be changed. Can you guide through step
by step procedure.

is it possible to translate the entries of the purchasing groups in order to have a


different visualisation by two divisions located in two different countries?
If possible, how?

We are creating Excise Invoice through J1IS for return delivery. Excise invoice is
generating but the status field in the Table J_1IEXCHDR is showing as P ( ie.,
Pending to adjust excise amount). But by default it is adjusting automatically. If
you open J2IUN, balance amount is showing the deducted amount, but in the
pending invoice display for adjustment. I need to make the status field and
Censtart field as C ( ie., Completed) while posting excise invoice with Tcode J1IS.
If you tick "GR Based IV" in Purchase Order we can do MIRO only if GR is
happened. The functionality is working fine such as we process invoice only after
GR and we can not do a GR reversal once it is paid etc.
However, our client has the requirement to do MIRO before GR, therefore we
unticked "GR Based IV". It is working fine, we can process the invoice without the
GR but the big problem is that we can do a GR Reversal once it is paid.
The question is, Is this the standard SAP behaviour?. If yes, what is the alternate
configuration so that the AP clerk can process the invoice without GR?. We are
aware that the Invoice will be blocked in this case until the GR happens.
SPRO->MM->Inventory mgmt&phy. invtry->Goods receipt->GR based IV,reversal
of GR despite Invoice->102 mvt-check it.

I am getting the following error everday for several diffrent PO. Can someone
please explain the detailed reasn for this errors.
Message: MARC-VMTRA exceeded by 1 EA , Material :4839866 , Plant: 0245
, S.Loc: 1000 , Mvt. Type: 101 , Mvt. Disc.:PO/STO Receipt , P.O no.:
4700056811

How to change material type or in which situation we can change material type.
Use the t.code MMAM to change the material type, but you have to consider the
follow issues:
-No valuated stock should exist for the material
-No open PO's should exist.
The razons to change it could be:
-Wrong material type at creating.
-When for example, you have a material as NON-STOCKABLE type (NLAG) coz is
for ocassionaly use and purchasing, but now you have buy it frequently and
Is there any report which will show the balance GR/IR quantity & Amount for a
particular Period against PO/Contract?
Try running FBL3N for open items and enter the G/L accounts (GRIR Accounts).
When selecting the columns, make sure you have Year/Month, Assignment and
Amounts columns. You can then do subtotals by either Assignment or
Year/Month.
You can also try transaction MR11.

I was doing GR against a Purchase Order wherein I got error message as, "could
not determine receipients for message type ACPJMM" Could anyone explain me
what this error is and what is the remedy for this error. I am in deep need to take
GR so please let me know on urgent basis.
we are working with account assigned Purchase order ( P) projects where the
system is picking the G/L account thru valution class from the OBYC and we are
giving the WBS element.In my PO we have different conditions for base price ,
frieght and others. my goods reciept is nonvaluated and when i doing the invoice
my conditons are appearing as seperate line items but the account is same as what
is in PO. My requirement is that i wanna to post Material cost and fright to sepearte
G/L acount . To me it seems that it should to that G/L account. I wanna to post
material cost and freight cost to sepearte .......... Please suggest me how i should
move
you soset
can thataccount
my requirement can be
key & acruals meet. procedure. spro->MM->purchasing-
in pricing
>conditions->price determination process->define calculation schema->select u r
prcing schema&click on control data->enter in account key & accrauls for u r
required
That is okconditions like freight,
.These setting etc..i made the condition frieght as delivery with
are there
accural and assigned the account key and accural in my pricing procedure .........
but that is not picking the account at the time of invoice posting.

Could you pls give me details about Fabric Constructions: e.g. 130x72 / 30+30 x
16+16 I need to explanation about this.

Can anyone know how can i use first in first out (FIFO)during good issue (i.e) i
wanna good issue to consumption ----1st those goods are received ist need to go
1st to consumption.
Maintaine the Accounting2 view in material master for FIFO
Can you explain in details where this is updated in accounting view 2 of material
master. Waiting for your reply.
First go to the material master and select the FIFO indicator in Accounting 2. Then
go to, MRF4 and maintaine your material
can use a FIFO if the batch mgmt is active, set the batch search strategy and the
sort seq. for issue mvt type, it will work.
Thanks a lot for clearing my doubts. Can you explain in details MRF4 transaction.
What happen if you maintain material in this transaction. Waiting for your reply.

Let us suppose there is a material M1 .... and we recieve 100pc of M1 from vendor
V1, 200pc from vendor V2, 300pc from vendor V3 and we do the GR for all I want
to know if there is any Tcode which shows me M1 recvd from each
vendor...seperately I dnt want to see the combined qty (600)
MB51
Use T C - ME2C And put PLANT----- Purch org------- Material
code(Item code)------- Execute (F8).
Best way is to use T C - ME2M. Put - material, plant, Purc Org.
Use Tcode MB51,you can shows to enter of goods of M1 with the 3 purchase
orders of V1, V2, and V3.

Please tell How to Implement KANBAN bin system in SAP without going for
warehouse management module
it is a SAP standard function. First, you need to make decision that which field
where you want to implememnt Kanban, production or procurement? 2nd, which
kind of kanban do you want, ... Pls tell me in details.
Thanks for reply, We have to implement in Production and Procurement Both. We
dont have storage capacity of more than 3 days inventory. so we have to
build up pull type of management. we tried using zreports but could not linkup the
standard purchase order to them. Please help.

Is it possible to set up a storage location for specific plant for quarantine materials?
We would then be able to place stock that is not in use or is damaged in a location
(where we can still see it on the system and it is still in our inventory), but so it will
not confuse or interfere with the MRP system for the production and purchasing
personnel. I'll appreciate any comment or idea that you can give me.

In SAP system, at PO Creation, the exchange rate type M will be picked up You
can set your exchange rate by overwriting the default. On the top you can set the
"fix Exchange rate" flag to ensure that the same rate is picked up at GR & IR
Now friends is there any config step where i can change my Exchange rate type M
and set any other e.g. BSR to be used for creation of PO
Dear Execute Tcode OB08 or else put directly search in img and in finacial
accounting you will find what you needed.

i am not getting the right effect of quota arrangement i have defined quota
arragnement usses 4 and source list indicator in material master purchasing view.
then i have maintained info record after that i have also maintained source list
finally i have maintained quota arrangement through meq1 t-code now when i am
creating purchase requisition it suggest source one by one to each source list not
according to quota rating calculation. i am not getting that where i did mistake if
anybody
i m new to can help
sap, me
can thn me
u tell plz the
do itprocess
its urgent.thanx
of qouta in advance. and what is use of
arrangement
that.
To set up a quota arrangement for the procurement of a material, proceed as
follows: Master data -> Quota arrangement -> Maintain, enter the material and
plant number, press ENTER to display the overview screen for the quota
arrangement periods, Enter a validity period for quota arrangement, Enter date until
which the quota arrangement is valid. The start date is calculated by the system.
Press ENTER . Select the quota arrangement and choose Goto -> Item overview to
display the item overview screen of the quota arrangement. Enter a quota
arrangement item for each source of supply you want to include in the quota
arrangement. You must enter the following data. - Procurement type - Special
procurement type, Enter k in the S column, for example, if a consignment
arrangement for the material exists with the vendor.
> > > - Vendor number
> > > - Procurement plant (supplying plant):
> > > - Quota column, enter the quota assigned to each item. Press ENTER .
> > > The percentage distribution of the quotas is calculated and displayed
automatically by the system.
> > > Save the quota arrangement. The system assigns a number to the quota
arrangement item automatically , if u want to setup quota arrangement for a
particular material,that material should not have fixed vendor (from source list) as
well as regular vendor(info record) keep in mind

> > > mahavir.pande@ wrote:


> > > Suppose for 1 item 2 supplier are there, then u can
> > define % ge of supply
To set up a quota arrangement for the procurement of a material, proceed as
follows:
Master data -> Quota arrangement -> Maintain, enter the material and plant
number, press ENTER to display the overview screen for the quota arrangement
periods, Enter a validity period for quota arrangement, Enter date until which the
quota arrangement is valid. The start date is calculated by the system. Press
ENTER .
Select the quota arrangement and choose Goto -> Item overview to display the
item overview screen of the quota arrangement. Enter a quota arrangement item
for each source of supply you want to include in the quota arrangement.
You must enter the following data.
- Procurement type
- Special procurement type, Enter k in the S column, for example, if a consignment
arrangement for the material exists with the vendor.
- Vendor number
- Procurement plant (supplying plant):
- Quota column, enter the quota assigned to each item.
Press ENTER .
The percentage distribution of the quotas is calculated and displayed automatically
by the system.
Save the quota arrangement. The system assigns a number to the quota
arrangement item automatically ,

if u want
thanx to now
a lot setup quota
i am arrangement
getting for a particular
the right effect material,that material
of quota arrangement should
but i wanna know
about few things in quota arrangement 1.how we use quota base quantity coloum
in case of new vendor inclusion. 2. how we can use spliting coloum whts are the
effect which
Check we can
for validity get through
period it
u have defined . u have done the steps right. it should pick
vendor according to min quota rating
have maintained quota arrangement & source list but at the time of MRP run qty is
not getting divided as per quota arrangement. I am trying to generate scheduling
lines but only one scheduling line is getting generated. Also when I try to manually
generate scheduling line for other scheduling agreement then system give s
warning - Quota arrangement specifies vendor 900198.
Check the lot size configuration.
i m new to sap, can u tell me the process of qouta arrangement and what is use of
that.
Suppose for 1 item 2 supplier are there, then u can define % ge of supply among
them. e.g. 60 & 40
can any body tell me the complete procedure from the material master record to
creation of purchase requisition to get the right effect of quota arrangement its
urgent plz reply me mm guru's.
Use Tcode MEQ1

I have on doubt - (Eg) If i transfer 100 stocks of m/t from one plant to another plant
but in my receiving plant they got only 80 stocks and remaining 20 is scrap, done
by two step procedure.what my question is - for 100 stocks transfer posting value
be raised by issuing plant, but who will raise for scrap stocks....
First u hv to do receipts of 100 pcs at the receiving plant, then do the scrap booking
of thetosame
How book scrap?
Use mvt type 551, Xn MB1A, u hv to enter the CC, responsible for absorbing the
cost.
Obviusly the receiving plant will decide what is good material and what is bad.
Secondly as told above scrapping can be done from any stock after receiving the
full quantity into stock by means of movements type 551 to 556. There has to be a
cost center reference as material is going to be consumed against scrapping.
Please check the movement types from 551 to556

can any one tell me the t.code to check the reports for GRN
ME80FN
u can check the GR numbers by MB51 T.Code,in that u can see GRN by
material,vendor ,doc.dates etc
what is that Tx code ZMMIV ? Is it a custom developed Report?
MB5S & ZMMIV

How the end-user will know a specific material is created for which Sales Area?
MVKE gives the sales org and not sales area, it is maintained at customer level
using XD01 and not at material level. U can hv different sales area based on
different sales org. for a particular material. If u want to check the sales org., while
viewing Mat master using MM02, click on sales view and then take a drop down of
sales org, system will show the list of sals org for which the material is extended.
U can check the Purchase Requisition created by whom ,this may be useful for u
(refer attachment 'PR'
hi try se16 -table MVKE ...if it does not solve ..please revert back..

What purpose have material group on basic data 1 trough supply chain (especialy
in production process)
I wish to know what might be the reason ,after creating a mtl 100 in material master
with all the accounting view maintained the system is giving error
asking to provide the account assignment category while creating the p.o please
reply at the earliest.

Kindly let me know can we create Service PR from Service Contract & then Create
Service PO with reference to Service PR
Use ME51N, use document overview, my contracts, select your contract. U can
create Service PR. In same way, service PO can be created
I did the same things what you have mentioned,Contract No is appearing but while
adopting it is not copying in the PR, also it is not showing any error

I have an materil produced from Production in the stage state , whic is yet again
used as raw material in second material with other ROH materials. MY doubt is I
need to move this goods made in 1st stage in CONTAINERS to Storage Location.
Where will I specify that its go to be containers in to which it should be packed??? It
needs to be also Identified saying its pertaining to this order number , how can I do
it??
Pl state your doubt clearly. Not able to understand the scenario

I am able to generate automatic schedule lines at the time of MRP run(MD03) but it
is not getting splitted as per quota arrangement( 60:40) i.e. I am getting only one
schedule line instead of two. I have maintained quota arrangement & source list for
this process.

Lets say tht there is material M1 ... Using MMSC we enter SL for it ....
0001,0002,0003. I want M1 to be stored only at 0001 and want to delete 0002 &
0003 permanently for M1 .... How to do that?? .. Any Tcode ??
SLoc once extended cannot be moved away from MMSC, however u can delete the
sloc for a material using MM06. Then the system will not allow u to do
receipts/issues from that sloc. U may hv to convert the messg no. M7127 for issues
to
If 1aMaterial
error one code have many storage Location then you want use only 1 storage
loc. You can delete flag that storage use t-code MM06. Pls consider if you have
stock.
Can any one explain the procedure to create automatic PO from GRN?
You have to first ativate yr plant & MVT 101 to create automatic creation of PO.
You must have Tick in the Material Master in Automatic Creation PO Buttom Same
in the Vendor Master also You must have Valid Info record for the same
tried this, but when i am creating the grn than an error is coming, i.e business area
not defined, but could not find where to solve this problem from. can u help me.
Check in Spro, setting ES Assignment LG Assign BA to plant. Enter the
business area for the plant for which u r auto. Creating PO , it will work
To use Tcode ME59N

pls let me know when i try to create a material say some 'XXX' 'in MM01,under
Industry sector-Mechanical Engineering Material Type-Raw Material
after entering the above details and press ENTER key,the screen changes and in
Material type field Finished product is displayed and a warning message also pops
up telling that: material type Finished Product copied from Master Record and the
Message no is M3310. why is it so (Instead of Raw material it shows as Finished
product)how to overcome this problem what are the things i need to change or any
customization
This means that prblm pls let me
the material know solution
number you entered, already exists
Check the initial screan on mm01(creation of mmr), in that in reference material
field, there may be some material name or number is reflecting. IIt is causing the
problem. you do one thing remove the name or number of the reference material
and try
Migo ... Mvt 602 ... generally reversal is done by next even mvt type

kindly tell me what is meant by VALUATION CLASS and how it differs from g/l a/c
and cost centre. what is the application of the same in sap?
Valuation Class means a key to Assignment of a material to a group of G/L
accounts,by this u can attach material to G/L accounts ,there are many valuation
classes like as follows 1.Raw Material - 3000,3001,3002 , 2.Semi-Finished
7900,7910 , 3.Finish : 7920 , 4.spares : 3040 , This valuation class are used
for automatic account determination
Pls explain how to create the import pricing procedure in detailed steps.
See the attachment and maintain the orange coloured conditions in PO conditions
(refer attachment PO taxes and Z reports)
pls explain how to link this procedure to po.

I am setting up release strategy on Purchase Orders. Wanted to know the steps so


that I can can set up the PO so that the release strategy tab appears/displays on
the Purchase Order.

Can any one tell me what is MM closing and what is FI closing? How can I know if
period is closed
In order to see the currently open MM period go to the TCODE : MMRV . There
select the company code you wish to check for.
The others have answered about the difference between MM and FI period closing.
Remember if FI period is closed but MM period is open you still cannot post
material movements which have an accounting implication.
MM closing means that you can not post materials document. In MM area you have
two open periods current and previous.
if you do not set other in MMRV - here you can check which are the open MM
periods for company code. If you check Allow posting to previous period - it will
forbid MM posting in pr period.
FI open period allow to post FI documents. As I know you can allow postings for
some accounts - for example forbid material accounts for previous period in order
to prevent MM posting until you finish all FI documents.
to close MM period pls use the MMPV transaction

what is the pocess of creating the stock transfer order? what is the essential inputs
of stock trans. order.
this is only within the comp.code(W/ o SD) 351+101 MvT. with SD 641+101 (refer
attachment 'sto')

Does anybody know a different way of how to look at the changes for a >specific
field within the material master? Currently while in the >material master, I go to
display changes. But this gives me all the >changes made to every field in the
material master and I would like to >know of a way to only display the changes to a
specific field. (ie. MRP >controller number field or safety stock field)
Please try using Tables : CDHDR and CDPOS thur SE16 Transaction .Most of the
field changes get recorded there.If you wish to see only changes to a particular field
say "MRP" , then you need to give MRP field name in the selection screen and then
you see only the changes done to that field.

can any one explain me what is STO AND TRANSFER POSTING pl explian in
details with tr code and mvt type
Let us say that you are moving goods from one end of the city to another or from
one ware house to another and in so doing you are incurring a
cost, let us say freight. Then you are going to have to do a stock transfer of the said
goods from one plant to another or from one storage location to another. for this
you need to create a stock transfer order using the TCODE : ME21N and then
depending on whether you need a challan or not you can either issue using MIGO
or create a delivery VL10B.
In case you are moving goods from one shelf in a warehouse to another, without
incurring a specific cost which can be uniquely attributed to the movement, let us
say your employees moved the goods for you [employee wages are for a period of
time not for specific jobs], then you have done a trasfer posting using MIGO. The
actual
first goods
you have movement to bevia
to create STO used depends
t-code on then
ME21N, your go
configuration and create
to VL10B, and the move
delivery
can anyone explain about different types o reports in SAPMM& how they execute?

Check doc of ecc 6 attachment

can somebody explain what is the best way to configure Debit Note and Credit
Note for Cross Company STO (which involves Delivery & Invoice)?
Also, what is the best way to setup Returns for STO? Has anybody setup Returns
for STO which has a single step stock transfer from Supplying Plant? From SAP
Notes, I see that it is not possible to update Returns process in the document flow
for single step stock transfers.

What is the basic difference between User exits,Enhancement & Modification? Pls
explain with suitable example

can any body help me ? from which t-code i can get inventry wip (work in process)
T Code KKAO gives Wip Report

Is the moving average price the same as price from ppc2 calculation???
how to find the list of ppc2 calculation for all materials fron stock?

I have passed a sale transacation with mvt 601 Can any one explain how to reverel
of the same
602
You can reverse the same with the following movement type 451 and 453 from the
respective customer.
How can I make the PO to release again after I change the PO say from 2000
meters to 1000 meters or $2 to $1? Currently, the our PO is subject to releasing
only when there is an increase in PO qty or the unit price or both. However, during
decrease for both no releasing. Please provide inputs and advise.

FPLA and FPLT are the tables to store the purchase order invoicing plan data.
There is a field in FPLA which store the Purchase Order Number. But I cannot find
the field that store the Purchase Order Line Item Number. How to link the invoicing
plan with the line item in Purchase Order?
try EKPO

Unable to cancel GRN error message "You cannot cancel GR, since inspection
lot is already partly posted" After GRN material received in quality Further
transferred to Unrestricted Now again transferred to quality. Still it is not allowing
GRNucancellation.
First Kindly
have to cancel the suggest
Mat document which is generated by UD then only u can
reverse the GRN
you can't reverse movements done by UD
complete the cycle, post all stock from Quality to Unrestricted & reject from
warehouse using mvt type 161 or 122. Post excise entries & again post new GR if
required.
pl tell me what is the benifit of sap implementation ? what chaneges and progress
of company after sap implementation
Benefits of SAP implementation :
Benefits to the suppliers :
1) SAP increases their market share and , increased business by virtue of AMCs
2) Implementer gets business and people working at client side will build their
resume
3) Hardware manufacturer gets their share of business without any effort

Clients :
1) Efficient , user specific, customized legacy system dies. Along with all the trained
people to manage it will also loose their importance and gets demotivated.
2) Increased cost of IT by virtue of Initial expenditure on SAP licenses/ Hardware/
Net working & implementation. recurring costs /year goes up by virtue of AMC for
SAP licenses and support
3) Entire Company performance goes down. Each person puts the blame on SAP
for not working properly,
4) Trained manpower in SAP leaves the company in search of better ( ? )
opportunities leaving the systems department in disarray . This puts more
dependence on support from AMC ( which is a mirage and clients pay heavy price )
5) One year post go live, with great difficulty , companies finalise accounts and
have nightmarish times explaining the auditors.
6) Educated end users will find out lots of open ends in various clearing accounts.
Due to pressure from Sr.Management, they try to pass manual entries and end up
in differential account balances. ( simple inventory statement form MC.1 does not
tally with sum
Any body haveofthe
corresponding GL accounts
orginal performance )
data before implementation and after
implementation
You can't compare performance before and after implementation SAP. As
explained by NO NAME ....it entirely depends on business nature ..and in
numerous cases SAP implementations proved to be a disaster for company. It is
not that SAP is the only best solution available in market ....but it is one of the best
solution ....and in market depending on business requirement many other
application like people soft , Baan , I2 , Red prairie , JD Edward etc is available.
And it's the job of Solution Strategist to propose best fit solution for a particular
Can anybody tell what is Reconciliation account how do we define in practical

Can you tell me how the system is calculating Cummulative schedule Quantity
which comes in delivery schedule for particular delivery date in scheduling
agreement.I need to develop a report which calculates this.Please reply asap.

Difference between S & V ?


I want to take a print out for Gr difference Quantity recieved. Let me detail first
Suppose vendor has mentioned in Delivery challan 100 Nos: but the reciever has
recieved 95 Nos: Only. so my client to want to intimate the vendor reflecting the
following fields PO Quantity: Delivery Challan Quantity: Recieved Quantity:
In customizing i able to find out the condition type MLMD which suits for my
requirement but iam unable to aset conditions for this condition type.So kindly pass
ur valuable suggestions in this regard. this is must required bz my client recieves
vendor invoice along with material so he want to intimate his vendors about
SHORT/EXCESS
My goods
suggestion is ask reciept.
ABAPer to create a report with the fields what you want on
print out and when ever the client wants to send to vendor,he can execute and and
take print and he can send that.if you need more details let me knw.
While Posting GRN u put Delivery note qty as mention in Challan & in the ?Rec qty
u put whatever u rec it will come as a shortage
doing grn, while posting into usage decision itself we should post this difference in
grn by using the field shortage

Can i use document type used for credit memo for invoice reduction or i heave to
create new document type for invoice reduction and assign number range.
u can use Doc Type KG which is Vendor Creit Memo and no need to create new
doc type and new no range.

I have two qurries , 1)How many total views and fields are presnt in material
master 2)What is the use of costing 1 and costing 2 views in Material Master
3)What is use of MRP3 /MRP4 views for MM module
1. 27 Views , 2.mrp 3 - Release strategy , availablity check, forecast ,
requirements ; mrp 4 - rem profile, bom explosion
How can we use MRP- 3 & 4 views for below descriped function
can u explain me this MRP3/4 views are related production planinng and who is
going to fill up data in it in actual MM master cretaion
I try to sharing with you about material master, The material master is the sum total
of all information about all materials which a company purchases, produces, stores
and sells. For the company, the material master is the central source for material-
specific data. The material master is used by all components of the SAP logistics
system.
We can see all of information and There are 24 views in material master. In MRP
1,2,3 and 4 are related with MRP or Purchase Requisition and
Production Order. In MRP 2 there're :
1.Backflush, used for indicator whether materials BOM consumed automatically at
Production Order or not. If not so you don't mark it.
2. Prod. Sloc : Warehouse or storage your material in production process (staging
area)
3. Scheduling >>> How long you can produce the product if In House production,
and plan delivery time in day, etc
4. Net requirement calculation >>> Safety stock, Minimal stock level in FG
I think in MRP 2 a lot of used for Production order.
And then In MRP 3 there're:
1. Forecast requirement or periode indicator for using forecast
(monthly, weekly or daily)
2. Strategy Group >> Show you how to make product whether make to
stock, planning with assembly, planning w/o assembly, make to order,
or how you clasify your strategy for produce your product.
>>> Consumption mode : indicator mode to consumption material at BOM
whether Backward, Forward or combined about your prod. order.
Can anyone suggest me to upload in purchase order / scheduling agreemnt in item
detail tab convert X (Quality inspection) to Unrestricted use for more than 100
items at a time (Mass Changes)

When SD-Post Goods Issue, system will generate a Material Document no. Could
we configure system to populate "Customer PO" field (in Sales
Order), to display at Material Document Header Text. Is there any configuration or
user exits to update the Material Document Header Text?

Can anyone suggest me stape by stapes transaction code of the purchasing of


oxygen cylinder (including return of empty cylinder).
Is it possible to create Source List and Info Record automatically ? where is the
custmization setting .
check the IMG. SPRO
Info record will be created automatically once you create a first PO for a material
with vendor. For Source list creation, If i am correct it cannot be created
automattically. Some one can clarify on this
I HATE SAP. TO KNOW IAM CERTIFIED SAP COSULTANT, WHO HAS FUCKED
OFF THIS THING, BECAUSE FUCKING COMPANIES LIKE M/s DEXLER
INFORMATION > SOLUTIONS R IN THIS BUSINESS, AND THEY MAKE >
PROFESSIONALS LIKE US WHO DESERVE ABOUT + 5000 EUROS(I.E WHAT I
GOT AFTER QUTTING SAP) IN OUR DOMAIN GET OUT OF TRACK. SO
PLEASE JOIN I HATE INDEED I HATE VERY, VERY ....... MUCH DEXLER
INFORMATION
Mr. ChandrashekarSOLUTION,
Patil who DOMLUR
asked you, join
BANGALORE
to SAP? Please do not make this type
of bad comments ina public group.
Mr. Subbarao, iam extremely sorry to hurt your feelings. I am 100% sure that you
are not a certified consultant. Because only than you can understand my feelings. I
know and it is almost evident, please donot understand me wrong, that most of the
candidates, and mostly people belonging to AP are the one big culprits who has
spoiled the noble SAP. Because they don;t even know ABC of SAP and get some
fake SAP experience and pretend asif they know every thing. It is because of such
kind of people, noble persons who really excel in this field are diminished. And
reallyteri
Atta u find
chupnobasa.
bodyyour
putting every thing
comments are forward for SAP.
very,very... ......bad about Andhra peole. I
studied in Maharastra, worked in Maharastra I know very well about people
who is tht stupid fellow scolding bad comments on andhra people. abbe salle chup
ke bytere.. i know about u all guys from maharastara u r more than cheap of us.

can u explain me scenario, Consignment Subcontracting Third Party Quota


Arrangement
The below are special stock types in material management.
consignment: in this vendors material is stored/kept at your place. so its valuated at
storage location level. with item category K. the owner is still the vendor. vendor
liability arises only if the stock sell it off. eg big bazaar.
subcontracting: here you provide the material to vendor to create the finished good
for yourself.
the material provided is stored in po as material to be provided. BOM components
can be part of that.
item category is L.
here the materail is valuated at plant level as the material is lyingwith vendor and
you are the owner of the same. Here vendor use the bom component or semi
finished good or raw marerial provided by you and prepare the finished good and
Third Party order is that you order a material to a vendor and the material is
delivered to a third party and not to you.That is you are not the reciever of the
material instead you ask the vendor to deliver to some third pary.The item category
used is S.

Regarding the Quota arangement: For example if you procure a material from two
vendors A and B.You can allocate percentage of material to be deliverd by each
one of them.i.e if you require 100nos of the material you can allocate 60nos to A
In which schenario we can use both std and moving avg price for material
you can use both if the material is in transit and change the valuation type. which is
called split valuated. in mm01 there is field for split valuated material too
You can use in stock transfer. In one plant you can use Std. Price and in the other
plant you can use Moving Avg. Price. But we have to consider the movement types
and
If relatedisdocuments
material procured externally than use moving avg. price. If material is internal
process material (like steam, semifinish material etc.) than use standard price.
You can use in stock transfer. In one plant you can use Std. Price and in the other
plant you can use Moving Avg. Price. But we have to consider the movement types
and
u canrelated documents
use only one at a time
The same material u r producing Inhouse & purchasing from Outside & then selling.

when i post against po error: posting can only be made to G/L acct. 300000 in curr.
gbp please explain

Can please guide me ,whether it is possible to assign a single user to more than
one people for releasing.i. e.one- many relation.Example is a single person
reporting to two bosses.Once he prepare the PO and release the same PO needs
to be released by any of the bosses as per requirement.
you can manage by creating 2 different purch gps

Can anybody explain me the difference between condition types and when to use :
Freight % ; Freight Value ; Freight /quantity

how many std types are present for RFQ?


Following is the requirement what can i do to solve this.
The PO has been approved all the way through all 5 levels. The original cost of the
PO is $100,000. Now , The PO price in the Net Price field was then lowered to
$60,000.After the price was lowered, it canceled all of the approvals and
retriggered the approval process. If the Net Price is raised, then the approval
process should be retriggered, and it is; however, it should not be retriggered if the
Net Price is lowered.
The same thing happens when the quantity is changed to lower the price. The
original PO has been approved all the way through for 100,000 pcs at $1 for a total
of $100,000. When the quantity is changed to a lower number to bring the price
down to another approval level, the approval process is started all over again

My client has a special requirement. The base unit of measurement for all the
materials are in 'lbs', we have our ordering units in 'TONS'. As the inventory unit of
measure is 'lbs', all our inventory report (except MMBE and MRP report) shows the
values in 'lbs' We require our inventory report to show up in 'TONS'. Is there a
config setting that can be done to get the report in different unit of measure?
Change Base Unit of Measure One raw material we assigned base unit of
measure as OZ, later add alternate unit of measure as ML.
Now I wanted to change the base unit to ML and alternaet to OZ. For that I deleted
component from the BOM. Related PO's, Prd ord and demand are closed.
Deleted the alternate unit from purchasing and plant/stock (Area were we assign
the alternate unit), then try to change it giving message as Unit of measure ML
used as alternate unit. (In additinal data screen still the alternate unit and
conversion available)
You can do the following procedure (after deleting the material in all concerened
documents ie inventory, open demands, prs):
1. Delete the uom from Unit of issue field (General Plant Data / Storage 1) in MM if
you have mentioned it there.
2. Go to additional data , use delete line tab and delete the conversion factor by
keeping the cursor on that line.
3. Come to main data, now change the base unit of measure to the required one.
4. Then give the alternative unit of measure, system will ask for conversion factor.
5. Then save
could someone tell me the transaction code where i can extend a material to the
particular warehouse?.. like in MMSC we can do for storage location
You can extend the material in MM50
Wouldn't MM01 work as well?
I'm trying to create a PO for returns to a vendor which in fact is a plant in the same
company code. I'm getting this error message " No
delivery type for returns processing assigned to item 00010". I assigned the
delivery type LR for both plant in IMG. please give me a solution ASAP

can anyone tell me what is bill of lading?how can an invoice be posted referring an
bill of lading?delivery note??.
bill of lading is nothing but shipping document in the case of import purchases.if the
migos generated w.r.t B/L then MIRO can be posted w.r.t. B/L

I have a scenario were I am importing a material and forwarding it to the


manufacturing unit, There the material is inwarded but there are some expenses
like shipping company bills,freight bills and warehouse bills are reaching after
MIGO so I am unable to book those expenses in PO itself and those remain
unbooked So friends please help me to attach un plan expenses with reference to
PO
u directly
can create separate service order and maitain the gla/c and cost center for the
specific imported material, then expenses will automatically booked in the
respective material a/c
i have forgotten to flag the gr based iv in po ,resulting i could not get migo wise miro
for payment.and in cumulative as on date. since migo has already generated i
could not flag the same thro, ME22N. pls help me to resplve this. as per the co
policy
The miro
best adj.isistonot
way acceptable
cancel the Invoice documents (mir8 i suppose) and cancel the
GR documents (MBST) and redo the same using GR based invoice verification
option. This method can be adopted if the number of POs to be corrected are few in
number. Also after cancelling the Invoice documents do not forget to clear the
Accounting entries on the FI side in the respectice GL Accounts. This should solve
your problem.
thx for ur immediate response. my problem is against particualr release po (against
contract), around 40-50 migo already generated.can u suggest alternate ease
method.
While opening the period in MMPI TCode , I got the error message as "Follow the
instruction in note 487381 before initialization
U hv to set todays date in the parameter id of ur user profile then then u can re-
open previous period.
What is parameter ID? is it in 'SU01' T.Code? In Parameters tab of 'SU01' i ve not
find any date? for whihc parameter id i can set todays date? please give steps.
Before you start period closing with initialization, you must be aware of the
consequences of period closing with initialization. This note describes the possible
data inconsistencies that might occur if you carry out the initialization in a
productive system.The resulting inconsistencies are not to be traced back to a
system error but they are a result of the period closing program with initialization.

Hence, these inconsistencies can only be corrected within the remote consulting
purchased separately since normally you no longer need to start the period closing
program with initialization in a release > Rel. 4. 5.

If you use release <4.5 refer to the note to find the solution.

I got problem during goods receipt Posting. as error message is "Period 010/2007
is not open for account type S and G/L 399999"
In transaction OB52 you should enter for company code and acc type S /G/L acc/
period 10. As I know S is need for GR/IR account. Ask the FI people for more
details.
Here is my scenario
User creates a Vendor Return PO for goods that are going to be analyzed at the
supplier for errors. They were received back from a customer with errors.
Goods are issued to the Vendor.
Vendor decides the goods are broken at the customers fault so we will not Debit
the supplier for the cost.
The quantity is so small that we will not receive the goods back from the Supplier.
Question is how to close out the PO since we dont receive the goods and dont
debit the supplier? One option is a virtual receipt, but this is cumbersome and adds
no value. Are there any settings we can make so we can close it out without invoice
or receipt

what is the procedure to release a contract


Plz use T- Code .... ME35K FOR RELEASE OF CONTRACT
using ME35K also i am not able to release the contract
I think u must receive any massage when u try ot release contrac. plz explain or
send same screen to us
Check ur release code first, is it the right one and proper authorization is being
given, else let us know the error being displayed at the status line
Please check in the configuration if you are authorised to release the contract. If
your name or user ID is not in release codes, you are not allowed to do it.
ME35K for contract, & ME35L for Scheduling agreement.
Here is the scenario, we re trying to implement release procedures on Contracts,
we already have release procedures set up on POs. We use the same PO doc type
for contracts. What we want to do is if the Purchase Order is created against a
contract which has been released/approved via release procedure on the contract.
An automated routine will release the PO in teh background. If this could be done
without
Since u aalready
user exit, alsostrategy
hv rel. please let
setme
for know.
Contract, why is their a need for auto release
of PO, u can remove the config at PO level and go ahead with one level release at
Contract level. Auto release of PO doesnt hv any meaning.

can any body help me from which table i can get openning stock. example-
suppose today is 05/10/2007, but i want to get oppening stock on dated
01/04/2007, please let me know the table name.
U can check the stock in MB5B Xn, it shows stock by calculating from MSEG table
only. There is no specific table for it.
hello jai thanks for your feedback. in mb5t i have seen the table name as
mard_labst. but i am unable to find it in data browser,
try in MB5B

can any one explain the config. for automatic creation of PO with GRN. Suppose
we raise a GRN with movt type 501 than is it possible to genertae PO for the same
GRN.
Pre requisites:
1).in Material master record->purchasing view->select auto PO indicator
2).in Vendor master record->purchasind data->select automatic PO
3).SPRO->MM- >Inv. mgmt&phy.inv- >Goods receipt->Create PO automatically-
>Mvt.> type 501 select it.
you have just shown how little you know about MM.
What the original poster seems to be asking about is the automativc generation of
a purchase order at goods receipt time. If this is the case, what you have answered
about the automatic creation of purchase orders from assigned purchase
requisitions does not apply in the slightest.
As to whether or not a purchase order can be created automatically when doing a
goods receipt with movement type 501, again firstly this is not possible. Secondly, it
doesn't make sens. 501 is used to record a goods receipt for a purchase order not
created in the SAP system. Therefore, why try and create one. If you want to create
a purchase order for a movement type 101, then this must bbe allowed in
customising for movement type 101, a standard purchasing organisation must be
assigned to the plant in which the goods receipt takes place, the material must
have value updating
its working, andi see
but how do an info
the record
createdmust have
PO for thebeen
samecreated for the
When u post the GR, don't come out of MIGO transaction, display material
document just created. Go to purchase order tab, u can see the PO no. generated.
Double click on same will take u to po
goto any T-Codes like ME2M, ME2L.... enter material or vendor or
posting/document date like that u can search it.
i got ur point,
i tried wut u said,
but how to see for the PO that has been created automatically while
using 101 mvt type and raising grn

1.Can u pl. tell me wht is conventional IV? and wht is the diff between convention
invoice varification and Logistic invoice varification?
2. what is controlling area and how can we assign in organization structure? and
wht is its use ?
3. wht is business area and how can we assign in organization structure? and wht
is its use ?
4. when we save Market price from maintaining quotation where it is saved? and
how we can use that?
5.Where material type display in Tcode - Display Material master?
6. in customizing, SPRO-mm-purchasing- conditions- define condition control at
plant level. and as per book it has some connection with
info update indicator in PO. can u tell me wht is the use of this and effet of this?
7. where can we find in customizing to define how the system handles conditions
from the last PO like conditions from the last po are always copied
Conventional Versus Logistic Invoice Verification
Can any one let me know the basic difference between Logistics invoice verification
and normal / conventional invoice verification?
MRHR for other goods receipts.
Logistics Invoice Verification [MIRO] was developed to take into account
requirements that were technically not possible in the conventional Invoice
Verification component, such as distributing MM and FI to separate systems.
All the functions in conventional Invoice Verification are available in Logistics
Invoice Verification. If required, you can use conventional Invoice Verification and
Logistics Invoice Verification alongside each other.
The following functions in conventional Invoice Verification are not possible in
Logistics Invoice Verification:
1. Verification of invoices with no reference in the system to a purchase order or a
goods receipt.
2. Posting directly to a G/L account, asset or material
3. Changing the account assignment in the purchase order
4. Simulation of documents
Some new functions are only possible in Logistics Invoice Verification :
1. Unlimited multiple selection
2. Manual invoice reduction
3. Automatic invoice reduction
4. Invoice verification in the background
5. Verification of invoices with installment conditions.
6. Posting across company codes.
I would like to block the PO creation with reference to Contract,if the quantity
mentioned in the contract is completed
If PO created with respect to Contract and the quantity exceeded it gives a warning
message saying that the target quantity exceeded by that much quantity If this
message is changed into error message going into message determination topic in
configurations
If this then
qty is completed can benodone.
any release order create by any user. Qty is over then
contract is over.

any t code is available for finding list of material with opening balance,recipt
,issue.closing balance for a specified period
MB5T
MB5L

want to take the list of materials which are all not having any purchase related
documents (i.e., not yet used for procurement and stock qty is zero rightnow) in
plantisXXXX
wat the purpose or scnerio?
we want to delete all duplicates in the particular plant and we want to enrich
material master with details. This is the scenario.
u can do this thro mb51 and take the report only those material which have
procured from outside (raw mat., packing mat., consumable, spares etc.) and
download this report to excel and u can see and takeout such material those have
no material docs and afterthen can findout the duplicate one and can
remove/delete
I don't think it isorgoing
alter to
accordingly.
work. As you will get the record in MB51 only after the
goods receipt has been posted. From MB51 you will not able to make out if any PR
or PO has been posted for the particular material code for which no goods receipt
has been posted. We have developed our own Z code for this purposes which will
search in all purchase related tables EBAN, EKPO etc and give the report

Can anyone suggest which field should I use in Material Master to maintain PACK
SIZE OF FG? Is it Base unit of measurement?
e.g. Material - SUGAR , Pack size - 1KG , Qty - 1
maintain it as alternative unit of measure in Additonal view
you have to maintain basic UOM in the issuing unit. e.g., if you are purchasing
sugar in KG maintaining basic uom KG and issuing in GRAM then you can post it
during GI? always try to keep basic UOM in material master and prefer alternate
UOM for ordering unit as "ORDER UNIT".

Are there any way for issuing 701 and 702 movements from migo without Physical
Inventory document?
No.. It is not possible... Ofcourse this is the business requirement. and also system
automatically pick the 701 & 702 Movments based on Physical Inventory only
(1) I am a officer in stores & puchase Department in a textile industry namely
Rajasthan Textile Mills, Bhawanimandi. (Rajasthan)
In our unit SAP ERP system has implematted so I request you to please give me all
the transaction code for Stores & Purchase department which is used or linked by
stores & purchase.
(2) We have done migo for any excise material but the time of migo, excise do not
mention in purchase order and also excise bill not received at the time of migo.so I
did not take only part I in excise tabe at the time of migo, after migo we received
excise invoice and after receiveing of excise invoice we have to capture this excise
invoice against material document.IN the item detail we will see quantity tab the qty
of material not entered in credit available, in this condition if we captured this excise
invoice then excise invoice do not post.
3. we have done migo for excise material. and found material doc. number, excise
invoice has been posted. after some time few qty recd in material doc number.and
done subsequent delivery by me. In case what is the process for excise duty.
4. Finally please send a complete circle fo SAP for Stores Department.

i got one problem while doing migo the system show s the error message that
account determination entry INT--------- BSX------ ---3000 not possible
how to solve this problem i used omwb but cant get the solution any one can help
me regarding this ?
This message indicates that the valuation class set up on your material master
does not agree with the movement type you are trying to post. In most cases, the
valuation class on the master needs to be changed.
Config BSx in transaction code OBYC
assign the plant to valuation grouping code and then check OBYC
this error clearaly says for chart of a/c INT & valuation class was not maintained for
BSX Tr event key. go to OBYC thr u select BSX double click on that one & then for
G/L a/c 30000 u create new valuation class or change the VC in Material master
which is existing in the system...
can any one explain how can track the goods in transit using in bound delivery? or
any alternative method is there?
try for MB5T

I CREATED A PURCHASE ORDER WITH 5 LINE ITEMS,BUT WHEN I DO


GOODS RECEIPT ONLY 4 ITEMS ARE APPEARING.HOW TO SOLVE THIS,AND
WHAT MIGHT BE THE REASON.
Pls check the Delivery in th P.O , tick in the delivery completed.
Are these line items inventory items. Are they direct charge items. If so, then maybe
one of the account assignment indicators does not require GR. Therefore, you
would be missing a line item when you do the GR.
try to check in PO->item details->delivery->Goods Receipt indicator selected/not for
all 5 line items.

have forgotten to mainatain vendors for supplu as "GR BASED INV". IS THERE
ANY CODE IS AVL FOR MASS MAINTENANCE TO ALL VENDORS
U can do mass maint. Using Xn MASS, use table LFM1 and field WEBRE. Also
make it as a default entry in screen layout, so that whenever u create a vendor, u
make this entry as mandatory

*Account 510010 requires an assignment to a CO object*- 510010 is a cost


element. The above is the error i am getting during MIGO for a subcontracted
material receipt. I would like to clarify few things here. The G/L ccount mentioned
here is the GBB account and I am doing a normal
subcontract procurement , i.eI am paying for the process charges only for the
material. I have completed the Goods issue of components and trying to get back
the ordered material from the subcontractor. 1. My query is why do system asks for
a Cost center assignment here as I am not doing any procurement against cost
center. (Evenif I ma going via MRP run and then procurement it is forcing me to
enter Costcenter and G/L account during routing maintenence) whether it is
mandatory sap requirement if so how do I over come it? is it that i have to assign a
cost
True,center and guy
an FI/CO proceed.
has toI do
m not
this.convinced
But what about thetoend
I wanted result.
know is why is so and the
consequences if I assign a Cost center to the G/L account it is asking.
For production of any material for sale, there is a concept of Product Costing in CO.
This requires that all costs incurred in production are to be captured.
In this case the cost incurred is captured as a costing element i.e.the GL a/c
maintained needs to be assigned to a CO Object (which captures the cost)
I hope this answers your query
Thanks, if we see it from production perspective i am able to get the answer.
Needed an cost center as the consumption accounts are P/L accounts. tested it
aftre assigning a Cost center to the cost element and working fine.

Could anyone please tell me how can i change a PR's doc type. User has create a
PR of type ZE(emergency) now he wants to convert it as NB(standard). Please help
me out if it possible to convert a created PR document type
goto SPRO->MM->Purchasing->PR->Define Document types->select that doc type
ZE & click copy as NB.
Actually document type of created PR needs to change
I don't know if it will help you - but I have done some day exactely the same
mistake.
To repair it I have entered into the same document in ME52n and just changed the
document type in the header (if you have different types of PR, the user can choose
it). Then save - and the document number should stay the same and the items ,
too.
I don't know
Problem if ythis
is that, hereuser
we is to maintaining
are create different typesnumber
different of PR - range
because if he is to do
of document
number for different document type and for that system does not allow to change
document type.
Please tell me, what is MAPPING

I want to check whether "delivery note" has been eneterd before making a goods
receipt. how can I do this setting in customizing?
goto T-code: SPRO->MM->Inventory mgmt&phy.inv->settings for enjoy
transactions->filed selection for MIGO->select Delivery note status is required
thanks but I mean that I want to check whether the same delivery note has been
entered before the last 101 movement. for example: at 03.10.2007 I made 101 with
delivery note 54444 when I want to make 101 at 04.10.2007 with the same delivery
note, I want to system warn me. how can I do?
according to my knowledge with Standard SAP delivery note number in MIGO is
not any control field,

can u explained asset Purchase Schenario in MM ? Material master is required for


asset PO material?what about stock of asset Purchases. In project scenario all PO
are asset pos only?

Please help how to guide for archived document , like material document or
accounting document

what is Bill of Register?

If any body having FM notes or any data,please forward me


I m getting error at the time of hitting service sheet entry by t. code ML81n & my
error is '' 147 Account determination for entry ZZ WRX 0001 not possible'' & ZZ is
my Chart of account so pls help me its very urgent
what is 0001? generally WRX contains only GR/IR clearing G/L account only, goto
OBYC->WRX->ZZ verify it, it may help.
I already assing GR/IR account in wrx by using t.code obyc & 0001 is my valuation
grouping code after doing all these then also i m getting same error

How to send PO by email in bulk. e.g. All POs raised today to different vendors to
be mailed in single shot to all respective vendors, without going into individual PO.

Can you please give me the solution to solve this problem. I am not working on
IDES environment. So what can be done to resolve this issue. Please guide me.

quickly... in cross company stock transport order, do we have to have a particular


material type , or all the types are valid for this transport? bcos, we do not see
shipping tab in PO even after maintaining the shipping data in the IMG

Pl. tell me workflow in release strategy of po/pr. regards


ME29N for release PO
Release Procedure follows following steps
1. Relase Group
2. Release Codes
3. Release Indicator
4. Release Strategy
5. Work flow

I have to work in a industry where SAP has been upgraded from 4.6c to ECC 6.0. I
have to do the MM documentation part. Can anyone please tell in details how I can
do that.

please tell me about detailed Pricing procedure & Release Procedure.


Pricing Procedure in SAP works on the concept of Condition technique. Each Pur
Org is attached to a Pur Org Schema. Each Pur Schema has a pricing procedure
attached to it. For this, condition types are defined for each pricing procedure in
SPRO. These condition types are then attached to Access Sequence. The access
sequence in turn has a list of condition tables. These tables contain condition
records. Each condition record fetches the applicable price. You can go to SPRO
and checkprocedure,
in pricing for yourselfthis
howareit the
works to understand
steps it better.
to follow navpath for define price
determination process
spro->sapcous& imple guide-->materidals management-- > purchasing->
conditions- ->define price determination process-->define acess sequence
select for gross price-0002
2nd step--define condition type
3rd step--define calucaltion schema
4th step-define schema group
I am getting one error message during PO creation I can not able to save PO.Error
is '' PO approver is mandatory" . I cheched me29n for PO release but i m not able
to see any release strategy set for this PO but a warning message is coming that
this PO can not be released. Please help me to solve this problem.
If your are working on IDES environment with Multiples users accessing the same
database/ release strategy configuration, you will get this error generated.

Could you please help me to list out some of the frequently asked questions related
to Implementation module? I have been in our company project in end to end
implementation as part time member. In particular, interviewer' s focus their
attention (ie., Business Blueprint (or) project realisation, etc.,) to which areas. If it is
Business Blue Print area,what the likely question's to posted by the interviewer ?

I want to block 413 movement type for some users. How can I do this?
use T.code SU01>> enter required user >> choose appropriate role >> under
Object (MM_B) Materials Management: Inventory Management/Phys. Inventory>>
uncheck the mvt type 413
I am getting one error during the creation of PO error - Customization for company
g105j_iindcus missing in table. error documentation says- check global setting
please help me for solving this problem

how we can maintain the same material ( two materials) under same material types
but in two different plants in value basis and quantity basis??
Same material can be maintained in different plants with different value and
quantity pertaining the valuation area is defined at plant level
thanks a lot and where we have to set these??????
It would be in Material master
Using T- code OMS2 you can maintain Differentiation for quantity/value updation.
Also you need to maintain the material master at both the plant levels.
In OMS2 - material type creation, we are able to maintain either qty or value
updation only.if i am maintaining any one of these qty/value updation, then how i
can get in different plant in different way???
Split valuation is entirely a different concept.To be precise split valuation is used for
valuating a material within a plant in two different types.
You can maintain in Tcode: OMS2, go to your material type, click on quantity/value
update. Here you can maintain your material type for different plant as per your
requirement.
Can anyone tell me detailly what is the Blueprint, how to createit and what is the
purpose of doing it? Are there any links where I can find some examples of it? It is
rather urgent, thank you kindly in advance for help,
goto www.sdn.sap. com, & search it

I have created my own characteristics & classes for the realease procedure.can
you help me out to solve the problem relatring with/without classification. Hope to
get your
use with response soon
classification only

Can any one suggest me how to rounding of the Tax amount (During PO / MIRO). It
include Excise / VAT / CST.
I hope Rounding isn ot possible in Indian Excise
In taxinn or taxinj procedure for the particular condition type in altconditionytpe
colimn put 17 as requirement key.
Also in general settings in spro there setting i can remember the exact path where
you have to mention 100 as rounding units for country IN.the table is t100r i
suppose.do this and your tax will round off.

While doing Goods Receipt, If i check in T.C.MMBE found that at a time material
updated in both Un Restricted Stock, Quality insection stock, What could be the
Ireason.
think it very
is noturgent
possible to show in both. Please check your GRN in MIGO Display
and also check material ledger with t.code ZVS3 or MB5B it will show the actual
status
see to migo
that you. no in the migo desplay and check in the "where"tab in the detail level
and check that in which sloc it has been received.
By accident I changed standard prices in the system - stock value is wrong and
stock movements are wrongly booked. IT says the only way are the new
calculations of standard price (which takes time). Is there any other way??? Can we
make manual postings on stock accounts?
Of course it can be done . use invoice verification MIRO and use the G/L posting
tab for naming the material/s and G/L account/s for this purpose.
Sorry but this is rubbish. Firstly, there's no mention that the material is even
purchased and that therefore there will be an invoice. Secondly, posting to a
material via MIRO does nbot change the material's standard price. Why not use the
revaluation transaction to get bthe correct value for the material?

This is madhu . i am in usa (Houston). I have try for job in SAP MM & WM .
please any body help him for me.
You have to assign pricing schma to Account group & the group to Vendor as as
sson as you create a Purchase Order thg Vendor & Account group assign to
particular vendor it picks while creating Purchase order. means while creating po ---
u have to enter vendor and thr that vendor it will pickup pricing schema

i have a question for you pls help me out with the suitable answer with full details
containing as to how it can be solved and its like this .....while creating a material
master record in client 800 for some material belonging to ROH - raw material type
the default raw material type itself was got deleted unknowingly and so now how
can i retrieve it back or how can i have it back into my material type list pls
explain/tell
you me how
go to oms2 tomaterial
your do it in detail.
type available or not. somebody have delete your
material type. you create new one then proceed.

I need ur valuable attention at this point and it seems like this while creating
purchasing inforecord i come across a field like predicted delivery days .....,in the
second screen i suppose,which even made optional (its status)also it doesnt allow
me to go ahead without filling anything or even when i fill some arbitrary value also
why does it happen like this in such situations what shld i do
this is simple man, create info record that time you go to click the texts you enter
name info, then you go to conditions next you go to second screen you are not
getting problem. you observe validity period. after also you are getting pb mail me.

Could someone help me...I want to put UPC code in the Basic Data Tab in the
material master but my 10 digit code is not being accepted. Do I have to make a
change in configuration?
You will have to check two things...... .First Create a 10 digit number range using
transaction W4EN (Navigation: SPRO>Logistics General>Material Master>Settings
for key fields>International Article Numbers>Define Number ranges for
EAN/UPCs).
Second, assign the number range to the UPC category in Define Attributes of
EAN/UPCs. Since you are manually assigning the UPC code put the number range
in Ext. number range field. Also the EAN length field should have 10.
If there is already a 10 digit number range assign that to UPC category (you can
Please tell me about different types of movement types( with description) used in
MM module.

My issue is such that when my users enter a return PO (through return indicator in
the PO), PB01 base price shows a negative value and the ZTAX condition suggest
a positive value summing up an incorrect total. How can I rectify this?
Pls check the assignment in the pricing procedure
STILL IT'S NOT WORKING,EVEN AFTER I CHANGE CONDITION DETAILS TO
PLUS/MINUS STILL THE SAME PROBLEM. IS THERE ANY OTHER PLACE I
CAN
MAINTAIN
pl check theTHESE
pricing DETAILS? ALSO
procedure and WHERE
correct IN ASSGHNMENT
it u will get +ve reply I CAN CHECK

Please tell me about Gap Analysis, CIN & workflow in mm module

Please advise where the following two settings may be changed for defaults on
account assignment tab of requisitions & purchase orders when multiple
account assignment is selected: Distribution Indicator & Partial Invoice Indicator.
Currently distribution indicator defaults to Distribute Proportionately, need default to
be Distribute to Following Row

Can any one guide me, why there are no accounting document generated During
GR for an ASSET which is procured using PO with Acct assignment as "A". I am
able to see all the vendor posting in simulation with Txn MIRO but not during GRN.
The scenario is if an Invoice is sent late by a vendor, how do the liability to vendor
is tracked in the system for the Asset aftre GRN has been processed.
Information is I am using as internal order with G/L accout assigned at Order level
to create a PR and then PO.
How we can deselect storage location if selected wrongly by mm01 transaction or
automatically
don't know the way how to remove it however it's possible to restrict use of the SL
for the plant. Use SPRO->MM->Inventory Management and Physical Inventory-
>Authorization Management->Authorization Check for Storage Locations. Check
the indicator to prevent use of the SL. You can use the help how it's working

Pls explain about the sap landscape


its like a server system SAP is divided into three differant landscape i.e.
develoment, quality assurance and production
DEV-- would have multiple client
QAS--may again have multiple clients
PROD-- may have something 200-production
a request will flow like development --quality--- production not backward
SAP Landscape is nothing but the servers used viz.
development
testing
production
sandbox

What is meant by Client Dependent data and Client Independent data in SAP
MM???????
for example.. Client inpependent: if u change any configurations in one client, it will
also effects on other clients also client dependent: if u change any configurations in
one client, it does not effects on other clients.

pls explain about CIN.


Country India Version, it is basically used in indian Excise & Tax procedure

Can anyone kindly explain me how the Purchase Order picks up the pricing
schema?
You assign pricing schma to Account group & the group to Vendor as as sson as
you create a Purchase Order thg Vendor & Account group assign to particular
vendor it picks while creating Purchase order.
1. in Mendor Maser is assigned a Schema group for Vendor
2. in Purchase organisation is assigned a Schema group for Purchase
oraganization
these (1+2)=pricing
the pricing schema
schema wil is assigned.
triggred through the vendor master of vendor which you are
maintaining in the P.O. for that you have to assine the vendor to the any one
schema group, which is assined to schema group purchasing organisation. schema
group purchasing organisation is assigned to prucahsing organisation of plant. i
think you got idea with this
How can GI for Multi cost center

For the PO with document type Legacy PO, the changes/creation of line item text is
not reflecting in print preview. For all other document types its coming fine, i mean
iam able to create new text as well as the text from material master is reflecting in
print preview. kindly advice. Is it a SMARTFORM issue?

could you please let me know your feedback on the fllowing questions?
1. How the transaction STAD is populated?
2. Suppose that we have one SAP system and two clients (one used for
development and another one for production),
what is the customizing to do in order to define a trasport route from
development to production via transaction STMS?
3. Do you know if there is some transaction to change massively user's password?
4. Is there any standard procedure to provide access to external business partners
for a limited time?
5. Could you please let me know where I can find standard SAP profile per each
departments (i.e. Purchasing, sales, etc..)?

How can I access to a specific partition in a shelf in MM.......eg. ..my client has a 5
shelves or rack(A,B,C,D, E) in a storage location and each rack or shelve has more
than 50 small partition(1. .......50) .......and they wanna get acess on each small
partition directly through the MM module .....is it possible if how????????? ???
MM does not go any lower than the storage location
U hv to go for WM Module impl. Then only requirement will be fulfilled.
With out WM module you can do the following: While issuing you should go to
defaulted value and choose FIFO, LIFO, Shelf life Exp.asc or Shelf life Exp.desc .
No if you're using just MM this is not possible. MM does not go any lower than the
storage location
One of my friends is facing the following problem.Kindly help.
I have set reorder point planning in Mrp type in MM and NO forcast Indicator in
Automatic reorder point in customization( OMDQ). Also I have put reorder point and
safety stock only then Requirement is given to PIR, then MRP is run, then in stock
requirement list system minus safety stock quantity form available quantity, but
their no automatic purchase requisition is generated. Also I have set purchase
requisition generate in MRP type in customzation. In Mrp run(MD02) I have set
purchase requisition generated in openning period, but system has not generated
purchase requisition ? What setting is required to generate purachase requisition in
stock requirment list?

Can anyone tell me,How we can handle the rejection of that material which we
have already taken in our account as an asset with the movement type 101.We
want to send this material to supplier as a rejection.Pls. send a reply soon
change movt type 122 in the migo for the combn of GR N PO, u can reject the total
quantity or u can change it in item detail of migo.

After creating the material in the material master with some desription say mobile
and also the info record for the,while entering the same in the me21n,
with plant it is asking for account assignement category.pls help it urgent.
First, please check if the material master has been created properly with all existing
views and obligatory fields. Then please check what material type this is and if the
Accounting view exist for this type. Also check valuation classes for it in SPRO. If
this material is to be non-valuated one and no Accounting view nor valuation class
exist, account assignment category during creating PO is mandatory.
Anna is correct. if u have created a master record for a material with out accounting
view then While creating ME21n it will ask you a accoult assignment category i. e
procurement against cost center it is as simple as that.
please chk if u hav chkd in your material type in oms2 the subgroups i.e, quantity n
value against ur plant
if account assignment has been asked while creating the PO then during the
defining of material type check in the control data whether quantity and value are
updated in your plant
WHILE POSTING INVOICE THROUGH T/CODE MIRO WITH RESPECT TO A
PURCHASE ORDER I AM GETTING A ERROR WHICH AS FOLLOWS:
MOVING AVERAGE PRICE OF MATERIAL XXXXXXXX IS NEGATIVE. I HAVE
CHECKED THE MATERIAL STOCK VALUE WHICH IS PERFECT.
THE REFERENCE PURCHASE ORDER DO CONTAINS 10 LINE ITEMS AND
THE MATERIAL FOR WHICH THIS ERROR IS COMING HAS COME FROM A
PRODUCTION ORDER.
I hope u are not changing the price manually in PO level. Generally The PR--->PO
conversion takes the price from info-record of the material.
How is that u are referring a material used in production as bought out, doe it have
both procurement type? what is ur cycle or business flow?
Moving average price is negative, why you are checking stocks. It has nothing to do
with the stock. If it is production order, check the setting in G/L of raw materials
correctly incorporated. if the raw material is not taken in to account, the cost of raw
material is not considered, but production it shows. Hence the moving average
price shows negative.
I'm running Global MRP. The output for certain materials must be a Transfer
Purchase requisition. . The problem here is that the purchase requisition is being
generated with Purchase oganization XXXX but it must be assigned with purchase
organization YYYY. So my question here is what can I do for having the correct
purchse organization in the purchase requisition? . As an addittional Info I already
create a Source list but I still have the incorrect purchas organization
There are few things, What is the that Global MRP u are running? Is MD01 is the
TXn u r running? Second, what is the Pur orgn u are using in Source List? Third,
Did you assign any agreement/s to vendor/s in source list? Please clarify in detail.
Please check whether the purchase organisation YYYY in the source list and try
u can use quota arrangement / fix vendor indicator in source list for optimal remedy.

We have maintained the Subtransaction type IP in the Excise Transaction type.


For Example In CAPE & GRPO we have maintained.Now Both plain CAPE &
GRPO and CAPE IP & GRPO IP is there. I need clarification, in which scenario
plain GRPO will take and in which scenario GRPO IP will take. In some case palin
GRPO is taking and in some cases GRPO IP is taking. I am not able to trace out.
In which base this IP is taking.
Sub transaction type IP will appear in case u r doing GR for imported item, system
will determine the G/L a/c automatically for it and for domestic receipts, it will be
blank.
Thanks for your reply. In case of import purchases, the system will take
Subtransaction type IP, that is correct. my question is how the system will
determine weather IP should take or blank should take. Where exactly the system
will take IP, is it depends on Pricing procedure. If so where in pricing procedure.
I heared that there is a CVD indicator. If it is ticked, then the sytem will pick the
GRPO IP. If it is not ticked the system will pick plain GRPO. But I am not finding
the CVD indicator tick. Can anyone help me in this regard.

I was wondering if there is a way to see the changes only for a certain field in the
material master. When trying to find a certain change right now, I'm clicking and
drilling into each and every change to find a specific field change while in the
material master. But is there a different way to find the changes to a specific field
within the material master?

Could you please tell me what else I have to do for updation of info record
automatically. The check box of info update in Purc. Order is OK. I have done the
GR as well. But new price is not showing in info record.
The info update indicator in the P.O. ONLY updates the last purchase order in the
info record. It NEVER updates the conditions.
Please enter into me22n go to the conditions in items details and select the
condition line which is to be updated ,press update button and edit the price as
required
I have done all.. info record is still not updated with new price. Please let me know
about info update
it will not update the price in PO , just it will update the last PO number.
Then wot the use of info update indicator in po....
if i am not wrong u can update info record from PO but before that u have to define
conditions from last PO in customizing: it has a option like
Are always copied
are not copied when the price is entered manually
are never copied
i think in ur sys it has selected 3rd option. but i don't know where can we find this in
SPRo
case1:If you create Info Record and enter the price manualyy in that and after that
u cretaed PO and selected Info Update then Info Record will update with
new prices.Otherwise it will not.
Case2:Without info record if u create Po and selected Info Update then it will create
Info Record but will not update the price
could you please let me know your feedback about the following issue in VL31N:
Enter a material or an item category Message no. VL383
If i am rght u r creating an Inbound delivery wrt a Purchase Order, frst check if that
Purchase Order still contain Items, i mean if it is not Ordered in Full.
otherwise try to make a manual entry of the line item / Material
of course the PO is open

Kindly define me the steps of pricing procedure. What is the use of Access
Sequence, Condition types, Calculation Schema, Schema Group and Condition
Table. I want to use the pricing procedure with Standard po. How can I do.

My company wants to use SAP consignment programs, but understand that the AP
payment must go to the same vendor number as the order from/issue vendor. In
the past, we order from vendor number 123, but we pay vendor number 456 (as per
the vendor's request). Is there a way to use partner functionality or home office
functionality with the two vendor numbers to accommodate both?

if i have 5 plants at different locations. and i have a server located at different place.
then how is the connectivity between the plants is done and will the tcodes used will
be the same. please tell be different types of connecting techniques.

Is there a way of tracking the time from requisition creation up until payment of
vendors? We want to be able to see the time a process was undertaken.

I have created my realease stratergy with and with out classification. also i am
using t.c omgs.what happens is i have created two realease groups. the 1st one is
showing some errors showing an message showing the realease group is not
properly defined or sometimes it pops it is not in my classification system.can you
solve the problem
try to check it out ,only one release group it allowed for with classification

created a realse procedure for a contract. The releasee strategy is working for PO
but not for the contracts. Can anybody has a solution?
could you please tell me the steps with detail for creating release procedure coz i
hve created release procedure for PR ,but still it is not showing in my system.
Follow the navigation Spro---Mat Mangmt---Purchasing ----PO--- -Rel Prod of PO----
Def Rel Proc for PO--- ; Then Release grp, Release code, Release Indicator,
Release strategy
Attached screen shots of "CT04", "CL02" and "CL24N" in an excel file or word
document. Send to david.pedley@ superclubs. com I will offer what help I can.
(refer attachments 'class1, karaktrestic1, strategy1)
I advise that cleare all of your procedure and make it again.
1. create charactheristic via ceban table for purchase req.(add. data tab page) for
example, table CEBAN, field ERNAM...
2. create class with class type 032
3.create release group for purchase req.
4.create release codes for your strategy
5.create indicators for your purchase req.
6.and define your strategy
try to check Charactaristic values like Document Category in Class(t-code: CL02) .
Document Catogory: F-for PO,K-for contract
Could you tell me what is mean be landscape in SAP
I have done by SAP MM certification, in one of interview, the interviewer asked me
about landscape.
nothing but the servers ur using that is devlopment,quality, production etc. Kindly
refer the below link u get a clear pitcure of SAP Landspace.
http://sap-img. com/general/ what-is-sap- -landscape. htm
Landscape is like a server system or like a layout of the servers or some may even
call it the architecture of the servers viz. SAP is divided into three different lanscape
DEV, QAS and PROD.
- DEV would have multiple clients for ex: 190- Sandbox, 100- Golden, 180- Unit
Test.
- QAS may again have mutiple clients for ex: 300- Integration Test, 700 to 710
Training.
- PROD may have something like a 200 Production.
DEV-Development
QAS-Quality Analysis
Can any one tell me what is the diff between Customisation & Configuration
configuration: what is the standard settings available in R/3 ; customization :
changes done as per client requirment
configuration means selecting the oprions what we have already in SAP i.e.
standard options. Customisation means making our own options, i.e. creating our
own options.
configuration: -configure the system to meet the needs of client requirements by the
using existing data.
where as customisationis: -- customise or adopt the system to meet the needs of
client requirements by the process of maping sap to client
bussiness process

We are using batch management for products that have multiple countries of origin.
Every origin has it's own batch (E.G. China, Netherlands,
Romania....made in MSC1N). Only problem is that it is very hard to make a product
batch management when it is already a excisting material. Therefor we want to
make every products batch managed. Only thing we don't want is to bother people
in the warehouse to enter the batch when creating the T.O. Therefor we want to fill
this field automatically (in P.O., Inb. del. or T.O.) when there is only 1 batch
available. We only use the batches that are already made with transaction MSC1N.
Can somebody tell me if this is possible?

I create a new plant and activate split valuation for this. But when I am creating a
material Valuation Category in 'Accouning View' is not enabled but list is displayed
for Split Valuation.Pls give the solution.
First Go to SPRO and Configuring Split Valuation and if you want to create your
own valuation category create it otherwise if you want to use the sap
standard use that. Then say if you have selected split valuation by quality then you
create your valuation types(ex first quality,second quality etc) and then activate it.
Now when you extend the material you will find the list. I hope I have answered to
your question and if you have further doubts please mail me.

Can anyone know how can i use first in first out (FIFO)during good issue (i.e) i
wanna good issue to consumption ----1st those goods are received ist need to
go 1st to consumption.
Maintaine the Accounting2 view in material master for FIFO
U need to have batch mgmt active, for the system to understand FIFO concept.
You then have to activate the batch search strategy for issue to happen on FIFO
basis.
How can I access to a specific partition in a shelf in MM.......eg. ..my client has a 5
shelves or rack(A,B,C,D, E) in a storage location and each rack or shelve has
more than 50 small partition(1. .......50) .......and they wanna get acess on
each small partition directly through the MM module .....is it possible if how???
can anyone tell me the way to handle the rejection against the material provided by
customer with the movement type 501
Use Mvt type 651- To get the material Back from Customer which is sold. (Here the
material is not posted directly to Unrestricted, it is posted to Blocked stock returns
to check the quality (only physically not in system), from here transfer posting is to
be carried out to transfer it to Unrestricted Mvt type 453.)
453- Transfer posting from Blocked stock returns to unrestricted.
Can u use MVT type 451 Please try (Sales Return)
If you are receving the Customer material through MIGO- 501 movement, you can
reverse the same through MIGO -502. use the reversal materaial document, make
DC and send it back to customer ( You can enter the reason for return )
MVT 501 mean Goods Receipt without ref of PO to Un restricted stock i dont think
that MVT will hepl you out please look the same through SD point of View as the
same is yr finished goods which you have rec back from yr customer.

Can any one explain me SAP hierarchy?


Sap hierarchy is the systematic order in which various organisational units are
placed in sap. In Fico for example hierarchy is operating concern , Chart of
accounts , controlling area , Company code, Business Area.
compnay code--plant- --sotrage location--purchasin g organisation this is the sap
heirarchy
think storage location is at the lowest level. It should be client - company code -
plant - storage location. Purchasing organization can be defined at plant level or
company code level based on org structure the company having i.e. centralized
purchasing
Mainly or plant to
it is ralavent wise purchasing.
ur module. Might be it is also possible to ask about your
Project @ the time of Interview.
Sap hierarchy is nothing but the organisation structrure in SAP,ie Client,Co. Code
,Plant,Pur.Orgn,Storage Location,so on and soforth
answer to your question is module hirearchy in sap

1.t code for list of prs which are not converted as either rfq or po
2.t code for list of rfqs which are not maintained
3.step by step procedure for giving authoristion for VL31N
4.t code for list of pos not delivered/invoiced
1. ME5A, processing status:N
2.ME4M,L,... choose selection parameter as u required
3.
4. ME2M,L,...choose selection parameter as u required
1. PLease can u help me in getting the T code to list the material which are
assigned to respective Purchase Group
2. T code to list the Vendors corresponding to the material (ie material assigned to
vendor
Try IH09list)
or MM60

i have posted GRN without PO . I want automatic PO should be created with the
reference to the same GRN, is it possible if yes how can we do this, pllzzz explain
me stepwise
Yes it's possible, while posting GR select Non ordered item in item details. In
material master, Automatic PO indicator should be selected. In vendor master
Automatic PO indicator should be selected. In customization, settings to be made
for automatic
Presently I amPO .
dealing in Raw materials, in this type of bulky material party is
finalized after confirmation (i.e after quality inspection report) of sample qty
supplied by them and only after that total Purchase order qty finalized including this
qty, This takes four or five days. In this case without SAP purchase order I am not
able to update my stock, Which is required at the time of making 103 movement.
So kindly advice me can I update my stock with these goods entry before making
SAP purchase order and after making the same in SAP on the basis of manual
PO, I relate this PO with these GRNS.

Please help me to answer the following Certification Questions. (some answers


should be yes/no and if yes or no what is that?)
1.A service master record has information at the plant level?
2.The order in which the condition technique in PO pricing occurs is Access
Sequence Condition Type Calculation SchemaCondition Table
Condition Record
3.Invoices for blankets POs can be entered through Conventional IV or LIV?
4.Invoice reduction can be done through Conventional IV or LIV?
5.Invoice verification in the background can be done through Conventional IV or
LIV?
1. No, service mater doesn't have an information at plant level. but if u can maintain
pricing condition at plant lvel.
2. i didn't understand this question.
3. can u tell me what do u mean by convention IV.

Could anyone guide me what is the procedure to be a MM certifier?


What is the pre-requisite for it?
What is the fees for it?
Where to be applied to get it?
To appear for certification without attending any SAP course you need to fulfil the
following criterias:
- Minimum 2 years of SAP Implementation Experience in the particular module with
minimum of 6 months experience in the version in which you wishe to take up
certification.
- Out of the 2 years 1 year should be with your present employer
- Your present employer should be a CUSTOMER or PARTNER of SAP in INDIA
If you fulfil the above criterias please send us your updated project profile as per
the attached format for direct certification evaluation. On establishing your eligibility
we will giude you through the process of registration.
I created a vendor and didn't give schema group. then created p.o and system
picked pricing z1. now i gave schema group in vendor ,i want pricing as
z2 now. now how to change the pricing in p.o.even i made update and selected
carry out new pricing,pricing is not changed to z2.

In implementation in which server we configure the releaseprocedures (PO/PR).


If we have 3 servers 1. Development 2.Quality 3. Production. Many of our
configurations will be done inDevelopment server. But whether Release procedure
also
at theconfigured inthis or not?u need to do release Procedure in Development server.
time of development,
If u have Request concept Containts to be trasfered.and remaining to me
maintained inQuality server manually and test it. for Authorisation for Release the
Document , u need to maintain manually. This Procedure is as pur our last project.
If is there
The issue any Procedure
of release please
strategy let me
is very know Config. activities are to be carried out
simple.
in Dev server only, i.e as already mentioned by a member in this communication,
Rel groups,release codes, release strategies etc are to configured in DEv and
transported to Quality & from Quality to Production.
What is required here is , in each server, under each client one has redo the
class/characteristi cs again. Apart from that The values assigned to characteristics
in DEv client never gets transported, so the assignment of values are to be done
again in each client in different servers. The production client is also to be opened
for
Thethis activity
steps under careful
you outlined observation.
are correct except for the part about opening the production
client. Why would you have to do that?
Rel Groups, Codes, Indicators and Strategy arecreated and released from DEV
server. However Table Cl24n have to bemaintained in each server.
System giving message "Table CL24n does not exist in T-code SE11.where i can
find this table.
CL24n is a transaction NOT a table
Rel Groups, Codes, Indicators and Strategy are created and released from DEV
server. However Table Cl24n have to be maintained in each server.

Stock Trafer and Transfer Posting Importances are same up to Plant to Plat . How
ever Customer ( Client ) Prefer Stock Transfer than Transfer Posting . See the
Below Adevantages of Stock Transfer more than Transfer Postings :
The transfer of stock using a stock transport order has the following advantages
over the transfer of stock without a stock transport order:
A goods receipt can be planned in the receiving plant.
You can enter a vendor (transport vendor) in the stock transport order.
Delivery costs can be entered in the stock transport order.
The stock transfer order is part of MRP: Purchase requisitions that were created in
MRP can be converted into stock transport orders.
The goods issue can be entered using a delivery via Shipping (LE-SHP
The goods receipt can be posted directly to consumption.
The entire process can be monitored via the purchase order history.
How ever We need to do some times Plant to Plant Trasfer Postings only in some
industires . this is based on Customer Requirement.

how can I print migo screen? I want to print a special documant from migo secreen.
But print button is passive. How can I activate this button?

When I am capturing an entry service in trans. ML81N, I am getting the error


SE323: You cannot enter the unplanned service. And yet, in the PO my limit has
not been exceeded yet. How to resolve this issue?
try to maintain PO->itemdetails->Limits......then it will allows un-planned services.

tell me how to genrate or see sale in transit stock report ?


mb5t, MB52

I am looking for report which can give following details: List of purchase contracts ,
Created by , Creation date , Released by , Released date , Changes made after
creation, Note: Above info can be obtained in individual contract. But is there any
report which can details for range of contracts.
ME3N. Change Scope of List to ALLES.
ME2L-THIS MAY SOLVE UR REQUEST
u can try T-CODE ME3L and in that use scope of list as ALV and generate report .
U can filter it as per requirement ,
I had raised a job order in J1IF01 for a particular material. Before receiving the
processed material against that job order completely within 60 days, I should not
raise another job order for the same material. Is there any setting for this?

I have sale order in which 5 line items are there and i am entering frieght and
insurance as header item but in g.l account it is coming as 5 line items can i get this
as consolidated

I need to move the intermediate product of production in 1st stage, in to container


and store them in stotrage before the 2nd stage of same production starts. How do
I go abt it? Can i do it without HU or its required? the major reason is , the plant
moves the semi-finished goods in container to storage.how can i do it?

while creating vendor master record i am getting an error message. i have created
vendor account group. initialy i have created vendor taking the new created
account numbe but now i am getting an error. the error is "ENTER PARTNER
NUMBER" plzzz help me as asap.

During the creation of PO if u give account assignment category just like for
example K ,in the item details we get a new tab to enter cost centre.In extreme left
there is a icon click on it we get 2 methods of multiple account assignment for the
same material 1)Progressive fill up method 2)propotionate distribution method.we
can select anyone method to distribute our material to different accounts. Multiple
account assignment is posting a material to seperate accounts as per our
requirement
Currently i amforworking
quick valuation
on me21n, etcme22n, me23n. I have added customer data tab
in ITEM DETAILS of PR. Under this tab i am having three fields. I am having the
same tab in PO also.Now when i create PO i want the values of these three fields
of (respective) PR tobe there on PO. THese values are not coming what should i
look for. The following is the sentence on which i have to work on. The three fields
need to copy from the requisition to the PO when a requisition is copied to the PO

is there any tcode which can tell that to which G/Laccount the posting is done.
Use T-code OBYC ,with respect to the posting keys and chart of accounts you can
check the Debit and Credit posting to the defined GL accounts.
generally t-code is OBYC,w.r.t. posting keys and chart of accounts.if u have already
created a material with out posting the G/L acc'ts,we can use MMPV month by
month for the fisical year.
can u anybody tell me . while i am creating purchase order i got one error .That
error is ( No commitment item 00010 43300).
commitment item u have to maintain while creating po and then save it
In the same screen, at the bottom u can find one tab "Account Assignment"-
>Commitment Item (Enter the commitment Number and save it)

i have one qurie creation of vendor master (XK01) in that payment transation
screen what i ahve to enter in the fields
1.ctry , 2.bank key , 3.bank accoount can any one please explain this
It is given for the purpose if you want to directly deposit the amount in vendors
bank account. Generally, In india vendor's are paid by cheque hence it is not used.
However if u want u may use
thanks for your input .the requirements is we are going to make a bank transfer to
the vendor account so in that case what i have to maintain in the below
three fields
you need to contact Basis & FICO consultant in this case
Details asf Country Bank key is a number ( alpha numeric) which is provided by the
bank itself normally for forex transactions. Say Deutsche bank provides - DEUT IN
Bank account number details
This creation of vendor is done in the module of FI but the demand for Purchase to
Pay functionality makes MM Guy to be versed with this.
Country-- The country in which the bank or the bank account exist.
Bank Key-- it should be provided by the bank or the vendor it is unique for country
and bank.
Banki A/C
may knowno.-- shouldmodule
for which be provided for vendor.
ur taking training ? if u r in mm then u dont have to
fillup this field u just left it blank and go ahead understand this work if of fico

Can anybody tell me what is mean by multiple account assignment ?How multiple
G/L account assign to same material number ,
while posting GR there is option in item details - Assign multiple accounts
During the creation of PO if u give account assignment category just like for
example K ,in the item details we get a ne tab to enter cost center.in extreme left
there is a icon click on it we get 2 methods of multiple account assignment for the
same material 1)Progressive fill up method 2)propotionate distribution method.we
can select anyone method to distribute our material to different accounts.
Multiple account assignment is posting a material to seperate accounts as per our
requirement for quick valuation etc
Can any body help in building a custom info structure similar to MC.9 /MC$G report
but should be able to run the report by specific dates or fiscal year periods
We know that delivery without charge for materials subject to MAP no accounting
document is created. What about for standard price? Please help.
no a/c document will take place in both the case.
For STD price the a/c document will get generated & for the Diff the Prices Diff a/c
will get effected.

I want to know how we create a PO for a Non Valuated Material. Pl describe. How
can i Tick on Item > Delivery > GR Non valuated at the time of PO Creation.
If you are making PO for non valuate material thenfor line time go to delivery tab
there you select the good reciept and GR nonvaluted .for such PO if you are doing
Good reciept then it should be non valuated one.as the non valuated stock are not
managed
the answerson below
value are
basis
not. totally correct as also for the valuated stock in case of
flag for "GR-Non val" the GR will be NOT valuated! I strongly suggest to check the
standard SAP help for this field (available in the PO line item):
Goods Receipt, Non-Valuated
Specifies that the goods receipt for this item is not to be valuated.
Use
Set the indicator if goods receipts involving this material are not to be valuated.
The valuation of the purchase order item will then take place at the time of invoice
verification. This indicator must be set in the case of multiple account assignment
for example.
Note
If the indicator has been set for an item with the material type non- valuated, the
quantity recorded in Inventory Management can differ from the value in Financial
Accounting during the period between goods receipt and invoice receipt, since the
value is not body
what some updated until the
is writng firstinvoice is posted
have look on thatinsolution
Financial Accounting.
then make comment .In
my sloution i have written that if you are doing the GR for nonvaluted material then
this tick must be there . further tell me in which situation for valute dmaterial goods
recipet is no valuated (n that is tick non valuated is done). please explain me.
I have checked the question and answer and again, according to me, even if dhaka
was referring only to the "NON-Valuated stock",
it was good to provide also the option of valuated goods as this flag is mainly used
to minimize the PPV in case of uncertain price (at the time of the PO creation) and
having all the booking done at the time of LIV.
while creating po there is tab of delivery go to that there remove the tick invoice
verification required.
can any one tell me how to maintain market price . which is used to calculate price
variance in vendor evaluation.
Market prices is mean value of the quotation you received

is there any tcode which can tell that to which G/L account the posting is done.
Use T-code OBYC ,with respect to the posting keys and chart of accounts you can
check the Debit and Credit posting to the defined GL accounts

pl.clarify me " What is the use of solution manager during Implementation? How we
can track which data we maintained/implemen ted in reference IMG?
solution manager is used for preparing readymade teplate .there are buisness
scenario mapped which you can utilise .
http://www.sap. com/services/ pdf/BWP_SB_ SAP_Solution_ Manager.pdf you can
refer to this link.
Previously we used asap methodlogy but now the the same way we have to use
the solution manager. In solution manger we have to define the from to date fro
each configuration . based on that we can track how much we completed

I need report from SAP in the following format.


i can give selection e.g 01.08.2007 to 31.08.2007
plant-xxxx
Company code-yyy

BILL NO. QTY PARTY MATERIAL PURCHASE DATE


Use MB51 report with mvt type 101 & 102 for Good Receipt & Returns & change
the layout as per your requirement.

In calculation schema I defined procedure as G then went to control data and I


entered my two condition type as Gross price and discount rate so what will be the
exact formula for getting net price.
in the calculation you have included two condition types one is gross price and
other is discount in the calculation you have to give on what you have define on
what value you to calculate the discount .Net value = Gross value- Discount
That will pick up accordingly. ......... ...you have to give value if itis valued bassed
condition and % if it is % based condition.
u entered in that the sub total u will get net price

Is it possible to have the msg output in PO as print, fax & email at a time. If yes
how? as well as how to create msg output request in different POs at a time in
bulk?
Create conditon record for the message type for PO using T.code MN05........ .........
......... ......... ......... .for print email ............ ......... ......... ........then the system will
automatically allocate the message type as soon as the PO is saved. if you have
defined for the message type as Master data -> Messages -> <Purchasing
document> -> Create or Change from the Purchasing menu.
1. Enter the message type and choose the key combination. The latter determines
the condition table in which the condition record is stored.
2. Make the necessary entries. ( key combination print email,...... ....)
3. On the next screen, create the individual condition records.
4. Via the menu options Goto -> Means of communication, enter the desired means
of communication ( e.g. EDI, or an output device such as a printer) for each
message record.
5. Save your data
can anyone please explain the difference between non valuated material type and
the non stock material type
Non valuated stock are managed stock quantity basis not on value basis.Material
type UNBW are nonvaluated stock Nonstock material NLAG is non stock material
.is managed on value base not on aty basis .an example to this operating supplies
which are consumed
I am facing a weird problem. For the material "Base Unit Of measure " > is " G" and
Order Unit is maintained as "KG" in the material master. User wants to key in the
"order Unit " in Info record . System is not allowing with the message that"base unit
of measure is diferent in material master and info record. I dont understand how the
info record got creaeted with the "Base Unit Of Measure" field as blank (Although
this is required entry) and should have come as default value from material master.
The base unit in Info-record gets picked from material master automatically, What
is required, In info-record you have to enter the conversion factor if it is not there, i.
e relation between Gram---> Kilogram. Check this out if this is the issue if not coem
with exactiserror/situation
skmmap to the
right. you should setforum.
your conversion factor in Material Master
Additional data b/w Gram and Kilogram, set KG as your order unit in ME12
.Consider the timing difference when you change the Info record and create the
PO...you should update first the Info record prior to PO creation.
Setting for material mmaster is done ..Both "Base unit of measure" and " Order
Unit" is correctly populated... When I go into info record and try to update the same
in Inforecord I get the message " Base Unit Of Measure in Material master
Inforecord is not the same. I find the "Base Unit Of Measure" field set as blank in
the Info record.and its a greyed field as it auotmatically gets populated fro material
master.I could not understand how an info record can be
created with this field as blank and greyed as its a required entry not optional.Any
one of you are aware any OSS note ..To me it seems a program error.
I am new to MM, plz tell where to link inspection lot , PO & Vendor. I have PO &
vendor code , now i want to check inspection lot.
U activate QM view & related insp type u will get insp lot
there are tow ways to create inpection lot in the system .for that you have activate
the QM i.e that you have maintain quality view for the material in material master or
in the purchasing view set the indicator Q inspection tick . please the t.code QA01
Create Inspection Lot , QA01A Create Inspection Lot for creating the inspection
lot. QA03
the answerforbelow
displaying
is not the Inspection
totally correct! lot.
The Inspection Lot will be created
(automaticfally or manually) ONLY if the QM module has been activated using the
standard settings at material master and customizing level. While the QM box
available in the purchasing view is only available if teh QM is NOT active and in
that case (if not removed during the PO/GR creation) the gods will be received in
quality
Let me inspection status butare
clear one thing.You NO right
Inpsection
that whyLotinwill be generated.
reply i have writtten that you have
cretae Inspection lot using T.code Qa01 with tick in the purchasing Choose
Logistics Quality management Quality inspection Inspection lot processing
Inspection lot Create(QA01) .These are possible only when you hvae done the
required setting are done in system(customising) . and other possiblity is by making
QM active ( and maintaing QM view in material master)
use t-cd mmbe and check quality inspection qty

plzz tell me how to check for the relaese of service entry, how will i come to know if
service is released or not.
try to check in T-Code: ML85, if it display after that execution of T-Code, means it is
not released/accepted, if its displayed means SES(service entry sheet) is not
accepted/released.

OR

display that SES in ML81N in top side indicator will display accepte/not (like traffic
signal lights).
Use Tcode ML81N
The service entry sheet you have created has the status No acceptance , if it is not
accepted or released

To release it

Choose Entry sheet Set status Acceptance.


The entry sheet status Will be accepted .
First open the service Entry Sheet using Tcode ML81n
Then click on Goto ---> Entry Sheet ---> Release Stategy and check the release
status.

can anyone tell me how to create a new special stock type.


SAP has provided you special stock .What is your requirement which is not
fullfileed by what is provided by SAP.
SAP has provided each type of stock then again which type of stock u want to
create ? pl give me details i will provide u the customization

While doing the PGI of stock transfre order. it is showing acoount determination for
entry UMB is not possible. how to resolve it????
See manish when ever there change in price then there is revaluation of material
for this UMB key is defiend and account is given where this value due the change
in price will go, use t.cod e: obyc there select UMB and maintain the missing G/l
account
What for your
is the Fullevalution area(plant)
error description?

we are facing some problem at the time of PO, GR, GI related to material
Description For example Material Code 500001 Description in System : belt SPZ-
1400 but some deptt use the same code in PR but he change the Description (Belt
SPZ-1545) at the time of PR & system Save the PR and print is same, but we are
facing the problem at the time of PO , system automatically use the actual
description
it should notso pls freeze/lock
happen the material
as per DBMS in SAP.Description
for the same code, how he can edit and
that mat description will be picked automatically while doing
PR. whether he is doing service PR or material PR while creating this PR????????
it should not happen.
See the description is picked from the material master which is master data .You
can change that in PO/PR .But if there is differenet description why dont you use
the different material code .
Check the Po print form(smartform/ sapscript) , their the field which u r picking is
from MAKT table, change it to EKPO-TXZ01. It will work.
Please check you printing program. It may be your own custom development.
Change the program to print the text from purchasing document rather that Material
master
You can restrict the user while creating PR, For material description change.You
can make this field as display only. Then it will appear as per the material code.
The issue is, how the same same material no. can have 2 descriptions at different
levels. During PO the system definitely will pick material master description only.
The issue, if One wants to print with different description of a particular material,
this has to be done by picking the field into PO print fromat instead of actuals. For
this a Function design document is required to carry out all the tasks given to
ABAPer.
i am unable to move forward after entering material, MRP, Plant As per my
knowlage i have to select plant order but I am unable to locate the same.
What is the error staement?
I am not able to move forward to complete the TC MD04. Roadblock in between is
not finding the Key/text Plant Order

In order to run Open Invoice (especially PO with GR-based IV is unchecked), Can I


use ME2N and select the paramter 'OPEN INVCE')?
u can go ahead with this

what is the t-code of report of open stock transfer order.


you can use transaction ME2W (WA351)

is there any possibilty of comaparing terms and conditions along with price? in ME
49
check all the options in the t-code me49 and reply

pl tell me how to separate the pr's which has converted as rfq(separate report) and
pending pos not yet delivered.

Could someone tell me how to incoporate Workflow into Release Procedure. I


know we need to assign the Agent ID to the release code, my question is how do
we create the Agent ID and also please let me know if I have to do any other
settings to make this thing work.

i required urgently freight reconcialliation abap sample program please help me.

Plz tell if there is any report that show only PR whose PO has yet to be made, other
information should not come in the same.Blocked, deleted, closed Pr should also
not come. ONLY PR whose PO is yet to be GENERATED.
Use t-code me5a with processing status =N
Use Transaction code - ME5A List display purchase requisitions. on the screen in
processing status field - Select criteria - N not edited. You will get the list of
Purchase requisitions whose PO is not created yet. Again you have many selection
criterias in the same field, check for it.
what is the step by step procedure to realease an P.R in sapmm.Hope to get your
response soon
release procedure is like approval by senior authorities who has given authorisation
to release the document

Currently i am working on Purchase Requisition. I have copied 3 fields under the


customer data tab. these three fields needs to copy from requisition to PO when
requisition is copied to PO. can any one explain me how i can do this. OR how can
iCurrently
trace When
i amPR is copied
working withTO PO.
Purchase requisition. i have three fields under
tab Customer data but i am not able to do the following requirement.

fields are zzref_matnr, zz_tool_ind Tooling indicator , and one more


field.

The requirement is *The three fields need to copy from the


requisition to the PO when a requisition is copied to the PO.Also

The fields should be required on the requisition if the PO type is ZTG.


For this requirement where do i have to make the changes. Please help me
out in this. i am new to this.

We have a consignment which will be supplied to us as free goods but we will bear
all the cost such as freight, customs etc. When we create the Purchase order as
free goods we cannot enter any condition records for freight/customs duty. Could
anyone
Try help auscalculation
creating on this?. procedure with new condition types for Freight , customs
duty etc as ZXXX .Maintain correct access sequence to the respective new
condition types,ensure condition class as price and calculation type as quantity
dependent.You can create a new tax code if feasibile.Assign Account keys similar
to the regular freight ,customs duty condition types in the calcution (Pricing)
procedure for new condition types.ensure enabling of new condition types in new
tax code.Same ACCOUNT keys as former is assigned inorder to ensure postings to
the actual GL accounts.Also Maintain condition records for the afore specified new
condition types. These sequence can be performed by following T-codes New
condition
pls check type--OBQ1
mvt type 511,and
Enhance Pricing
make the procedure--OBQ3
IR field New TAXcondition
should be in " unticked" code--FTXP
in
PO and make price column"0" in PO.
I am in the Retail Industry and our company is having a problem as below:
* Sap Implementation is Failed so the company is using mainframe and at the
same time SAP as well.
* There is 4 months Gap for Inventory and data.
* There is no documentation for implementation.
My question is what shall be my first step to correct all these?

Inspite of creating my own realease code,stratergy, indicator, it is not assigned


properly by t.c omgs. pls tell me about the step by step procedure to realease a p.r
in sap mm.Hope to get your answer soon.

Plz tell meT-Code for a list of Unreleased Pos?

If we are using ERS, vendor will not send his invoice. But from the vendor
perspective, will he generate an invoice at all? (outside of SAP perspective - this is
a domain question) If so, how does he link his invoice number with the payment
cheque number what we make? I mean, how does he tally his PIS

we have two types of subcontract activities. 1. Printing 2.Loan licensing We want


entries to hit different GL code for each type (Ours is a Pharma Industry). In FI
config Auto Posting only 1 GL is getting hit.

have one query regardin MIRO. in our configuration, system allows the user to
change the vendor in the MIRO screen. Even
if the GRN is for goods from one vendor, in the MIRO screen, the system allows me
to change the vendor code to any other vendor. I wanted to know if there is any way
to disable the vendor text box so that whatever the system suggests remains as it
is .

pl explain me what are the gross price , net price , surcharge , frieght charges ?
calculation schema , schema group schema determination means what ?access
sequence , accruals , automatic account determination means what ?if u have any
document then pl supply me asap pl reply as soon as possible
Go to www.sap-img. com or www.sap123.com it will solve your most of issues.
These are different condition types in PO..we call it pricing procedure in short (as
termed in SD side) for the calculation Schema, this is sequence in which the price
is determined.( say Gross less Discount =Net +taxesas an example) Freight
Charges , this is a delivery Cost..part of the total landed cost when we purchased a
Material. Schema Group, you group together the same Calc sequence valid to the
the vendors or Orgn Automatic Account Determination, a certain condition type is
automatically posting the amount to Revenue Account or the GL Account . Say
when we have a Freight Charges , this is automatically posted to Revenue Acct
Freight Charge in FI side. I don't have a complete documentation, i would suggest
can anyone please tell me the difference between transfer postings and stock
taransfers. what are the material documents are generated.and what are the
accountsposting
Transfer hits. : plant to plant/ Storage location to Storage Location.
In which if the valuation area is same. i.e. Sloc to Sloc within one plant then there
will be no accounting entry occurs. however if the its Sloc to Sloc but with two
different plant. and valuation area+valuation price is diff then there will accounting
doc and material doc created for the same.
Stock Transfer:
there are unrestriected stock, quality inspection stock, blocked stock.
Also you can have GR Blocked stock, special stock too.
it will
In update
transfer the quantity.
posting, only material doc will generate. While, in stock transfrer:
material and accounting document will generate but not neccessary that accounting
doctowill
try generate.
under stand that, for any transaction material doc. is generated in Inventory
management. but the accounting document is generated only it leads to change
any inventory value. if goods movements are with in a plant, no a/c doc. generated,
it the goods movements between plants means a/c doc. generated.
Stock Transfer = physically stock transfer of goods,
Trasfer posting= may physical (or) logical(not physical) stock transfer of goods.

I want to make Businness Area filed in Details tab of MIRO Screen as Mandatory.
Can you please tel me the path and how to make mandatory
Use T-code OMBW select the mov types and field selections in the field group
Account assignment u can make Business area as mandatory field.
That's right, but this is in Goods Movement that is MIGO transaction not the MIRO.
Please reply back.
You are right OMBW is field selection for MIGO transaction with respect to goods
movement.You can select T-code OB41 and select respective posting key for
invoices defined for the posting to respective GL accounts. Enter into field status
tab of the specified posting key and select account assignments. Here in account
assignments you can mark Business area as required entry. Kindly revert back with
the results.
Can u please explain the procedure to release the CONTRACT.
Through ME35/ME35K/ME35L transaction. Please try but before this you have to
set all the customizing setting for release procedure.

Which reports are available in SAP MM to view list of amendments made to


Purchase Orders in a specific time period?
use Trans ME2M ....Scope of list ALLES

How do you create movement types? What are the steps involved? When will you
recommend a new movement type?
OMJJ
but can you tell about the steps involved in it .

Plz guide me how to block list of vendors at the same time as xk05 allows only
one?
Use XK99 (vendor block)
You can use MASS transaction, object LFA1
You can you use txn code "XK99", Select "LFA1" table, and field " SPERQ" -
Blocking Function. Execute and follow the screen requirements.

Can any body teach me about import p.o and duty? Please explain what the
procedure is for the same.
Indian Import cycle is bit more complicated and SAP is not geared to handle in a
straight manner through single MIGO as the cycle consists of multiple vendors.
This requires special Schema to be developed and needs Both FICO and MM
consultants to work together.
Imports will have two categories .
Category 1: Bonding and De-bonding cycle ( Freight and Insurance during Bonding
and other duties during De-bonding )
Category 2 : Home consumption ( all charges to be accounted at one stage )
Further Import cycle also has two types : Type 1 for Manufacturing plant ( CENvat
credit for certain duties to be availed )
Type 2 for trading plant ( no credit of duties )
In altogether there are 4 procedures to be adopted for the above.
The schema should be such that, at PO stage, We should be able to assign
multiple vendors : Import supplier for Items ( foreign currency ) , India customs for
Duties ( Indian currency ) , Freight and Insurance separately ( Indian or foreign
currency as the case may be ). During schema, duties have to be defiend as
VATable and non VATable. Accordingly, accounting posting keys to be defined.
Most important aspect is the FI transactions and mapping it to import cycle. In case
of Import cycle, MIRO is done first and then MIGO is carried out later steps.
Payment of Advance to Supplier : Vendor advance and corresponding enctry in GL
account, credit Bank a/c , debit Vendor A/c
MIRO is done in Three or four instances ( may be five also if cenvat credit for
duties to be taken ).
Step 1
You have to maintain the pricing procedure for the same. My suggestion is you
have two plants, let us say your impoted cargo is arriving at PORT 1, then have two
plants PORT 1 INBOND and PORT 1 EXBOND. the cargo for which you have not
paid import duty yet, [ie. it is lying in bond] will be in plant inbond. hence each
import PO to have GR in the INBOND plant. Then when you do file the bill of entry
to pay the import duty then you create a STO [with diff pricing procedure - PO type]
in which the import duty, the AED, BED, CVD etc are maintained.
In my organization we have implemented DMS(Document Management System)
but now my client wants that all the document witch is has store in DMS Server can
be view from our company Internet site , so that our external Customer like ,
Vendor and View those document, so kindly give some input how to configure this

pls explain the difference between one step and two steps material transfer
between plants, company and sloc??? what will be the effect in accounting and
what is triggering to two step procedure instead of one step procedure of material
transfer.
in one step material transfer , material is directly transfered from the plant to plant
, or storage location. but in two step material is withdrawn from the issuing plant or
s loc and in next step it is received by the receiving plant. till that till material is
shown as in transit. Two step is normally done when a person is not having an
authorisation of two plants. or when it takes some time to transfer material. for
accounting
In one Steppoint of view
material , therematerial
transfer, is no diffisin one be
could step or two step.
transfered from plant to plant
with particular storage location using the movement type 311. This process usually
done for those materials located with same location of warehouse and
management. There are no implication in accounting side, just only the movement
of stock from one another negartive (-) from the supllying plant and (+) to receiving
plant.
In two step material, needs an request/order to transfer or issue the material to
another plant. The systems will generate requiements to issue a material or what
we called Stock Transfer Requisition (STR) that could be subject for approval
before itup
Adding willtoconvert to Stock Transfer
2 step procedure, Order
you have (STO).
invoke movement type 315 to inward the
goods in receiving plant. Then only,the stock will get updated.

Please clarify my doubts regarding the placement assistance provided by microsat


corporation. I came to know that the company is providing placement service with
good mnc's but thing is that i have been asked to pay 25000.Could some one tell
me is it really worth paying 25000?
will they really help me in getting job? how far i could believe them? the money i
paid wouldn't be refunded if i dont get job Since it is located in noida(i reside at
kanyakumari) i feel very difficult to find if they are doing it really. i have got 11
months of experience in sap mm but i dont have any implementation experience.
Kindly
Do not help me . I am
get carried waiting
away by anyforplacement
the reply only then i could
assurance take which
agencies some ask
finalfor
upfront money. All good placement agencies do it for free. Post your resume in
internet job sites and keep reading the news papers

how to see stock with vendor on a particular date.kindly help me with the t.code
MB5B, MBLB
TO my knowledge, there is no single report to get this statement. Though ME2O
gives the statement on the day of running the report, it can not give the vendor's
stock for a previous date.
We use the following method which is fairly accepted by out auditors TR code :
MB51 enter plant code and select all storage locations in that plant leave the
vendor column open ( so that you will get for all vendors ) enter posting date ( The
date for which you need the report )
Enter movement types : 541( out ward ), 542 ( reversal of 541 ), 543 ( consumption
through MIGO ) , 544 ( reversal of 543 ) so that you will get the Net quantity as on
the psoting date
Export this report to a XL file so that you can arrive at the desired statement by
algebraic summation of quanitities. This report will not give the value of the stock .
It will only give the net quantity.
Normaly auditors ask for the value of stock, for which you need to multiply the
quantity by respectve
An excellent MM solution,
work around price( MAP or STD
Good job as the case may be ). once you are
In SAP standard only MBLB is the tcode for stocks at subcon vendor. You can also
try MBLB and MB51 with mov type 541. But there is no report to check sub con
stock
try for athe
to use particular date type 541 or MC.9 if you could see the particular stock with
MB51 Movt
the given date
ME2O
ME2O is not working according to requirement. ex:i issued qty 100 on 12.09.07,qty
100 on 15.09.2007,qty 100 on 17.09.2007 now when i execute me2o and entered
date as 12.09.2007 the result is 300.but the issue is only 100. what ever might be
the dates the result is showing as total 300.

cany one tell me in detail about the document types . how a new document types
arecreated. and what are the configuration setting done .

pls advise me that what are all the documents required/ to be prepared for doign
sap mm implementation.

pls explain about return delivery PO and its requirement and configuration with mvt
types
the movt type for return delivery po is 161. for this you have two check the indicator
in t code me21n .
Thanks a lot for ur info and what will be the effects in accounting and inventory

List of pending invoices


Go to ME2L or ME2M in selection parameters select RECHNUNG it shows list of
pending imvoices
I think to view the pending invoices in respect of the vendor we can try FBL1N
Transaction
I have a reqirement as below and request advise. SO and Invoice created with 2
materials(2 line items) Item 1 - Excisable material and Item 2 non-excisable
material. Is there a way other than user exits to ensure that item 2(non excisable
material) from the invoice is NOT to be copied to Excise invoice.

whats the procedure to release a contract.as i pursue through the release


procedure of the contract and create for the contract the already existing procedure
of purchase order gets deleted.please clarify me how to release a contract.Without
releasing a contract i cant adopt it to create a purchase order.Thank u to all my
friends in advance for ur help.

While configuring RFQ, I observed that, whenever I add vendors,system is


generating new RFQ numbers. Business scenario - i want to create an RFQ which
has to be sent to 8 vendors. While adding 8 vendors one by one, system generates
new documents (6000000051 to 59) Why is this so?
Conceptually, RFQ number is ONLY ONE eventhough it is sent to 1 or 100
vendors.Can somebody suggest how do i create an RFQ with a SINGLE NUMBER
to be sent
System willtoalways
8 vendors?
generate new no., however, u can enter collective RFQ no.
manually at header level while generating RFQ for 8 vendors, through which u can
do comparsion also later on
RFQ Numbers will different wrt to vendor. because this is required to maintain
quotations & price comparisions. As per your requirement, If only one RFQ Number
will come. Then how can you go further ? Please check in the system.
You are absolutely right .. this is how system is designed. But the Mr. Saama is
taking about the genuine business requirement. Business want tarck the various
quotations released aginst a single requirement. To the my opinion you can make
use either "Collective Number" form RFQ header or requirement tracking number
from PR absolutely
You are item level. right.As
Best is collective
per the RFQnumber.
business process there should be only
ONE NUMBER FOR A particular set of RFQ'S for a item or a number of items. I
have been trying to find a solution for this for a long time as I had done a similar
development on the Main frame . The real problem will come when the Buyer
handles large number of Purchase Requistions such as MRO items,etc.
you can not create single RFQ for many vendors. the reason is while maintaining a
rfq it ll be a problem, different vendors gives a different price for a single material.
then how will u maintain in single RFQ. You will create a PO wrt to RFQ, if u
maintain single RFQ how will u create a PO for that RFQ. Plse verify, if u found
solution
Only waygive me the same
of tracking RFQs against a single requirement is the use of the Collective
number. That way you can track all RFQs and get comparisons etc.
based on a single requirement. The system WILL create multiple RFQs for diff
vendors. The term RFQ is not to be confused with Tender based bid invitations. A
RFQ is a request for quotation from a SINGLE vendor. That is the way the system
has been designed. And that is the way it WILL work.
I agree what my friend said, to be precise: RFQ - Request for Quotation is used
for inviting quotations from suppliers / contractors for a defined set of services or
items, by the purchaser. After providing the set of services / items in RFQ, for every
vendor the system generates individual nos. (which needs to be different for
different vendors for the sake of identification) . However, you need to compulsarily
feed the collective no. (identical 10 digit no) for a particular RFQ (for all vendors).
On saving, the RFQ will provide different nos. for different vendors for the sake of
carrying that particular quote for PO. Hence, Collective no. will be identical and
RFQ no. will be continuous numbers. For display purpose, if one RFQ no. is
providedfurther
Adding by system,
to Jai you cannot differenciate
comments, please makethe various
sure quotes
that the provided
Collective by the
number is a
unique number.
Secondly, SAP has records which are based on its numbering system. Each
vendor has a material number. If you sent just one RFQ to various vendors ( 1 or
100) how are you going to maintain history in SAP for each vendor. In order to keep
track of each vendor and to enable you to compare the princes and conditions,
SAP uniquely assigns a new RFQ nu for each vendor. Collective number is the only
number which corelates similar RFQ and help you to analyse comparative
statement.
In ECC 5.0 certification curriculum there is a topic "Orders", not "PO". and also we
can see in the document overview of MIGO both PO and Orders. My question is
what is the difference between Orders and PO. Are they same? If same why there
are two options in document overview of MIGO as "Orders" and "PO"? Please help.
Mahesh is it possible to give me your phone no. so that I can call you and clarify my
issue with regard to STO. I think there is a misinterpretation of the issue which I can
clarify by phone.
pl explain me what are the gross price , net price , surcharge , frieght charges ?*
calculation schema , schema group schema determination means what ?access
sequence , accruals , automatic account determination means what ?if u have any
document then pl supply me asap

can any one explain me what are the types of accounts chart of account ,inventory--
raw account , gr/ir account, vendor account means what pl explain me in details
with example or if any one have some soft copy s regarding this then pl forward it to
me

HOW TO SEE STOCK ON POSTING DATES ACCORDING TO MATERIAL


GROUP
You WISE?
can use MB5B
try to use the MC.1 to Mc.9

I have 2 POs created: a. 1 for a specific service material (using DIEN material) & b.
another one specifying no material master, just material grp (services). I just
entered service items in the SERVICES tab. For the first PO, I did a GR via MIGO.
For the second one, I did a GR via ML81N. May I know what is the difference
between those two receipts? and what is the impact in the business? I have a client
that procures service to a vendor, and I am not exactly sure whether I will setup a
serviceismaterial
MIGO or just create
use for receiving PO using
the goods option
in your b.
warehouse. We need to use a material
master to be able to recieve the goods delivered by the vendor with a supporting
documents of D/R. If the material master is a stock item the recieved goods will
store on a particular storage location with bin code. So, the item that being recieved
can be monitored by the warehosue man.
ML81N is use for service entry. it requires a document that statting the particular
services being done by the contractor or service prvider. The documents should be
signed by the focal point before going to make an service entry. Service master
defined the specific description and meaningful. Service group and valuation class
Could anyone please let me know the t-code of changing moving average price of
material in the master data. After creation of material the moving average price field
is deactivated.
Try MK12 ..
MK12 is for change in Vendor not for change in Price in material master
hi try mr21
Try to use the MR21 or MR22

i have a requirement to create one condition type in the ex. system what are all the
steps i have to follow can any help me in this i am very new to procing proceudre
How to restrict the items for further consumption/ movement whose shelf life has
been expired. We found so many items whose expiry passed & still they are
usable. Should we restrict from Material Master from Plant Data/Stor.1 view. Pls.
give us the
activate suitable
FEFO methodsolution ASAP
Pl update SLED field while posting GR also update SLED check in customization
Thanks for the valuable suggestion. Is it necessary to activate BATCH
MANAGEMENT for workout of the same. B'coz SLED/BBD field is coming while
making GR for only those material where Batch Management is active. In
customization, whether I need to assign SLED check for each movement type.

For the present client we are planning to upgrade the sap system from 4.7 to ECC
6.0.....Can any body help how to proceed from MM point of view ...
1.What are the differnce between 4.7 and ECC6.0
2.What are the advantages and disadvantages of ECC6.0
Any documents from your end ......
I'm not sure whether this will help you are not but i suggest you to check it out .
step 1 : open this link http://solutionbrow ser.erp.sap. fmpmedia. com/
Step 2: Select Source relation version : R/3 Enterprise
Step 3: Select target release version: SAP ERP 6.0
Step 4 : Select Solution Area : Procurement & Logistics
Step 5: Select Module : MM
Step 6 : Click on Search
Now check out the screen on right hand side.
Now put tick on select all option on right hand side then scroll down and click : view
selected details.
You can also download this information.
As per my opnion there are no major changes form functionality point of view.
Changes are huge for archieving tech.
you can refere above document and learn by yourself.

Three fields under the customer tab are not getting copied into the PO. What
should i check.for this.

COULD U PL EXPLAIN ME HOW TO VIEW THE CONVERSION FACTOR


BETWEEN UOM AND ORDER UNIT AND METHOD OF CHANGING THE
SAME
You canIFview
REQUIRED?
these on material master transaction "MM03", select Additional data"
tab, then Units of Measure. Chnaging this can be done on MM02
In matl master, u have specify order unit beside that u have issue unit. If uhave
given other unit than order unit it will ask convertion factor. This is the only way i
think so.
iam comparing the two quotations for a material wrt two vendors, thing is it is only
taking the Basic Price and comparing, if i include Effective Price option it is taking
only extra charges without Basic Price, but what i need is it should compare the
prices inclusive of all the condition types and the Tax value how it can be obtained

I am doing STO between two plants without SD and billing. I have explained to you
in details in my last posting what I am doing. I have to use tcode:ME21N with
document type UB and Item category U. Please guide me in this line. I don't want to
use tcode ME27 and moreover tcode OMGN doesn't work in ECC 5.0
In ME21N you don't have an option of maintaining details of Supplying plant like in
ME27.You can can create a standard purchase order (NB) in case you are using
ME21N T-code.Then you need to create a Sale order , then a relevant delivery and
then create a Billing doc.This will be a laborious process instead creating a STO
with T-code ME27 and then creating a direct delivery relevant to the ST order and
the GR for the delivery should be a easier path. Kindly clarify your usage of T-Code
ME21N for STO than ME27. also try the path if you are accessible for SPRO
screen, SPRO----->MATERIALS MANAGEMENT-- -->PURCHASING- -----
>PURCHASE ORDER PROCESSING-- ----SET UP STOCK TRANSPORT
ORDER. Using this you should activate the details provided in my previous mail.
*Stock Transport Order with Delivery and Billing Document/Invoice
<http://help. sap.com/saphelp_ erp2004/helpdata /EN/4d/2b911d43a
d11d189410000e82 9fbbd/frameset. htm>
*

*Purpose*

With this type of stock transfer, the transfer posting is not valuated at
the valuation price of the material in the issuing plant, but is defined in
both the issuing and receiving plants using conditions.

Stock transfers that include deliveries and billing documents/invoices are


only possible between plants belonging to different company codes.
If you want to carry out a cross-company- code stock transport order with
delivery but without a billing document, you must set the *Relevant for
Billing* (data element *FKREL*) indicator in Customizing of the item type to
"blank" (*Not relevant for billing*).

The following applications are involved in this type of stock transfer:

- Purchasing (*MM-PUR*) in entering the order


- Shipping (*LE-SHP*) in making the delivery from the issuing plant
- Billing (*SD-BIL*) in creating the billing document for the delivery

Our organisation wants release strategy to be applied to delivery schedule


generated mannuly.(not for MRP generated)
kindly give me the procedure for the same.
Try Customization, Materials management - Purchasing- Outline agreements -
Define release strategy.

go to the customising activity of info record in the define screen layout for
inforecord activity select ME11 and check the the settings for the field

Presently we issue the material for project against 261/281, against which we want
separate GL code to be hit for Utilities in project plant.
In our SAP system, it was observed that items ordered though overseas purchase
orders were wrongly valued by the system when they were received in two or more
consignments. While CIF values were correclty apportioned, only part of total
amount of local charges incurred was added to value of the stock items.
Example: There are 2 consignment. 6/7 of the local charges incurred on the first
consignment is allocated to stock received through the second shipment. Local
charges incurred for the second consignment are not fully allocated to stocks
received. Hence, 1/7 remains unallocated - i.e only 6/7 of the costs incurred have
been included in stock value.

can anyone explain me the steps to create release procedure? my client wants all
po's to be blocked ,but po's should be printable
In the Rel Strategy for PO, there is an option to create a Release Indicator. In the
release code you define "B" for Blocked and "R" for released. Here you define that
POs should be printable even if its not released. SPRO-Mat Mgmt-Pruchasing- PO-
Release Strategy for PO-Define Release Indicator
what is is your requirement to define the release indicator... ......... ......... .........
.........could you explain this to me.

**When I perform the S.loc to S.loc transfer, in WM level it's creating a


posting change notice. **

**Usually Positng change notice will be created for the following cases,**

**1) Releasing stock from inspection**


**2) Designating available material as inspection stock**
**3) Changing a material number**
**4) Splitting materials into two or more batches**
**5) Converting special stock, such as consignment stock or returned stock,
into company stock**
**6) Changing ownership of stock from one plant to another**

**My Question is: For S.loc to S.loc transfer, In WM level it has to create
a posting change notice (or) Transfer Requirement..??**

Can someone explain to me i detail how i can use transaction and screen variants
to restrict display of cetrain fields to users
If any one knows the proceedure for setting screen variants and transaction
variants, please mail me. Now i need to change 'invoice party field' in MIRO to
Idisplay
have amode.
question related to purchase order and asset accounting. The issue is of
putting the goods receipt to the settle an asset.The problem is that when you enter
the purchase order for say $1000, and then when you enter the goods receipt, the
goods receipt is posted to zero rather than $1000.
Please check if there is a GR Non-Valuated indicator ticked under DELIVERY tab
of ITEM DETAIL. If it is ticked, then remove that.Then it'l work
Extracts from the SAP Document.. TCode: SHD0
Transaction variants simplify transaction flow by:
1. Inserting default values in fields
2. Changing the ready for input status of fields
3. Hiding various screen elements and menu functions, or even entire screens
4. Adjusting table control settings
When you create a transaction variant, you run through the transaction in a special
mode. In this mode, you decide which elements you no longer need in your
transaction and which values should be inserted where. If you choose to hide an
entire screen, the system will no longer display that screen in the transaction and
will proceed on to the next screen in the series. You can also adjust table control
settings and determine the width of columns and the order in which you want them
displayed. In tab strips, you can suppress tabs that you no longer need by setting
them to invisible.
You may also create as many variants for a transaction as you desire. One of these
variants can be defined as a standard variant. This variant is then valid across all
clients. You may also assign different variants to specific users. This is done using
*Variant Transactions *Variant transactions are then places in those users' user
i hve probelem while creating info record in purch org dat 1 tab page there is in
condition ..valid date field is deactivate and its required entry how can i activate it ?
Go to Customizing - SPRO, Materials Management. change screen layout for Info
Record. make that particular field mandatory instead of hidden.
check the field status group for thr Info record .confirm the setting there. there you
can make that as mandtory /........... .......

I want to see all delivery line generated after MRP run, which will give me details
like name of vendor ,material,qty and date
Go to MD04 Choose details or ME3L Selection Parameter - WE101& change
layout as per requirement.

Can anyone help me in butch number assignement? I want to define in


Customising a externe number for butch of a material types in a plant?
go to SNRO and check the object BATCH_CLT for the number range...from there
you can tick EXT for external assgnment you only mention that you want to activate
external assignment for material types, does this mean that your Batch Internal
assignment was activated already? this is a running number..you have the option to
do both external or internal..edit your message ID in OCHS and make it a warning
message only so the system will allow you to assign external or internal during
Goods Mvt. this is what we've done coz we cannot limit by material type. Maybe
somebody from the group have a better solution.
Message "Materials for PReq XXXXXXXX, item XXXXX, already partially ordered".
Schedule line exist for the material. PR created from sale order schedule line.
Order quantity 3, PR Qty 3, PO Qty 1. If i go for pending qty PO, system suggest
above message

We have maintained Se CEss condition type JA1s in Taxinj. We are getting the
SeCess value in PO in Invoice tab (Taxes)in development server but not in
production server. I have checked almost all the excise relevant configuration and
comared with development & production. but I could not figure out the reason.
Check the data in PRD server with the help of abaper in debugging mode.

i have a requirement to create one condition type in the ex. system what are all the
steps i have to follow can any help me in this i am very new to procing proceudre

i am a phd student from Malaysia. I am trying to optimize the indirect material of a


production line. CAn anyone share with me some literature regarding how to
calculate the idm at different companies?

Recently in one interview, they have asked me what business processes used in
the project. some one tell me what it is

Can any one please tell me what is COGI? & how to clear it?
I have a problem when I try to create Good receipt in MIGO. The system give me
an error message saying that "Maintain tolerance limits for tolerance key VP
(CoCode...)" I go to transaction OMC0 to add new entry for tolerance key VP in my
company code however I am not sure what should be the tolerance limit so I use
"do not check" for both lower limit and upper limit. When I try MIGO again, I am still
get the same error Does anyone know what should be the cause of this problem?
Not only for VP, u have to complete all the settings for the following keys. (TC-
OMC6)
AN Amount for item without order reference
AP Amount for item with order reference
BD Form small differences automatically
BR Percentage OPUn variance (IR before GR)
BW Percentage OPUn variance (GR before IR)
DQ Exceed amount: quantity variance
KW Var. from condition value
LA Amount of blanket purchase order
LD Blanket PO time limit exceeded
PP Price variance
PS Price variance: estimated price
ST Date variance (value x days)
VP
try tMoving average
code omr6 price
and set variancelimit for VP
tolerance

I have a problem to create the production order confirmation, the error message
displayed is "no price could be determined for material .... plant ....... because none
of the valuation strategies in valuation variant 007 was successful". What caused
this error message ? I have checked the Moving average price in the material
master (MM03), the value is zero. And i also check the PIR , it has a value (not
zero) and the period is correct. Is the problem caused by the Moving average price.
I also tried to change the moving average price through mr21, but the error
message display "No valuation types maintain for this material". Actually the
valuation
I dont knowtype of thishow
exactlly material hasyou
to help already been defined
in determination of (Moving
cost. but Average Price) in
if itsnt necessary
to calculate cost you can create production order confirmation, but before do that
you must desactivate cost in control keys operations in custo transaction OPJ8
My question is whether there is a way to link MSEG and BSEG items Let me
give an example:
MSEG contains 2 records, for a 551 movement for 2 items on a material document
BSEG contains 4 records, for the 2 G/L postings per material on the mat doc (DR &
CR)
How do I link item 1 on MSEG to items 1 & 2 on BSEG, and item 2 on MSEG to
items 3 & 4 on BSEG? Does such a link even exist?
This is for a customised report which shows the GL postings for each material
adjustment (typically 551's, 701's etc).

while creating the plant , u forgot to copy from existing plant that's why u dont find in
T/C OMJ8 * what you have to do ?
extend the material by T/C MM01 , give the material name , put cursor on second
field , enter , select all views , again enter , give ur plant name , storage location no.
say enter , like wise finish copying/ extending all views then save it..

I am facing the problem while posting the grn the system gives the error "Material
control record missing in company code en12" can you please any one
Kindly check the entries in SPRO-Logistics general,Material master-Basic Settings-
Maintain Company code for Material Management. Here for the copany code in
which you are getting the Error try to enter 1.Current year,current month 2.Current
year,Previous month 3Previous year,Last month of the previous year.
Thanks for you excellent support . i tried the same again the system gives the error
your entering the wrong peroid to this company code like that .i hope while creating
the company code the fi person may be not use the copy function .or what is your
ideaOB52,
Try in thischeck the FY years are open for the company codes your are working
on.
i will check and come back to you.thanks lot and one ,more thing i am facing the
problem in vendor partner function i created new vendor gruop number assign
ment and partner function also . i saw the same in xk03 partner function all the four
waht i did gs,vn,pa,ip ok but i created on po using the same
vendor in not showing any partener function in po header what can i do pl. help me
The configuration you have done in Partner
> determination is Generic.
> When you create a PO, you can also define the
> partner functions in the header and it would accept
> if the configuration is done right.
i have a requirement to create one condition type in
the ex. system what are all the steps i have to
follow can any help me in this i am very new to
procing proceudre

Messages In This Digest (25 Messages)

1a.

Re: Error while posting the GRN From: Mahesh Baddireddi

1b.

Re: Error while posting the GRN From: murugan jayaraman

2.

Quality Management From: pavankulkarni03

3a.

output determination From: sure

3b.

Re: output determination From: monika.hubanova@ cchbc.com

4a.
In external services in purchase requisitions, RFQ or PO, I would like to have the
following

1.0 For standard services taken from service master, the gross price field picks
value from pricing data maintained thro ML51, I require that this field should be
display only

2.0 For non standard services, where gross price field value is manual entered, I
require that the field should be input field & changeable

Can any one suggest, how to achieve both together. If I change setting in SPRO
thro External service>Screen layout, then it becomes display for both
I am facing one problem i maintained the partner function it shows in xk03 all the
four fun. again i raised the po in that po header partner function only two partner
function is coming i want all the four what i created in partner function (gs,ve,ip,pa)
what can i do pl. help me

Im landed on a very strange Issue that when i do the Scrap material using 551
movement type, system is not updating stock Quantities.. how it is possible..?? ? is
there Availibility Check will be effect..?? or any other Configs required..Please LEt
me
haveknow
a scenario where a po is raised on a vendor .vendor has 3 different branches
from there he supplies goods and sends invoice from that diff branches. how to
record this gr and ir. how to solve this
see if there are different address then you have create three different address and if
you reiceve invoice from diffrenet party then make that as partner function that is
invoicing
try party.in partner functions in Vendor Master Record
to maintain

I am a student currently taking a course in SAP MM and most of it self learning. I


have come across a problem where when i create a PO for a particular item i get
the error message "material not maintained by> purchasing" I have gone into the
material master for the item but i cannot figure out which field is causing this error
message. Someone
Kindly ensure please
purchasing advise.
view is created in material master using T-Code MM03.If
not, Maintain the purchasing view with relevant fields using T-code MM01.
Kindly ensure purchasing view is created in material master using T-Code MM03.If
not, Maintain the purchasing view with relevant fields using T-code MM01.
try to check your parameters in material master (MM01/MM02) and the said
materials also extended on what particular plant. Organizational Level, Purchasing,
Plant level. Hope this should fine
you have to maintain purchasing view for the material.
For that particular material, in that particular plant, Purchasing view to be
maintained in material master. Do this and try again.
Thanks Mahesh, it worked. Can you please give me an example of an NLAG
material. I would like to create one in Material Master as a practice exercise.

I am trying to create a Stock Transport Order (STO) with document type UB and
item category U. My objective is to transfer material from Plant (supplying plant)
100 to Plant (receiving plant) 1100 within one company code (1000) with STO. For
this purpose I created a raw material 1434 in plant 1000 with sales org 1 view and
in that view entered in delivering plant field 1000 as delivery plant. After that I
extended material 1434 to plant 1100 without changing anything what I did while
creating the material first in Plant 1000 except in organizational level I entered 1100
in the plant field. I entered Sales org 1000 and distribution channel 10 in
organization level for both plant while creating and extending the material. In
me21n I chose Stock Transport Order with document type UB and item category as
U also receiving Plant as 1100. With this when I tried to save the sto the message I
am getting as Can not determine shipping data for the material 1434 What else I
need to do to create STO please explain step by step. I am doing solely mm
function
Kindly trywhy
out Ithe
need to create
following Customer
things, Usingmaster? In this ensure
T-code OMGN case plant 1100 is
following the
things,
1. You have to maintain details of customer master record code/Sales organisation
code/Distribution channel code/Division for inter company billing in the receiving
plant.
2.Maintain Checking Rule
3.Define Checking rule and group with availability check
4.Assign delivery type/checking to the supplying plant Maintain delivery type as 'NL'
Replenishment delivery/and checking rule.
5.Maintain purchasing document type UB to the combination of Supplying plant and
Receiving plant.
Hoping you have created customer master record for the receiving plant and
maintained the material master record at both the organisation levels. Using T-code
ME27 create a STO. enter the relevant data. Using the T-code VL01 create a
delivery for the respective STO. complete the activity of picking and post goods
issue. GR can be accomplished using T-code VL07 i.e, GR with regard to Delivery.
1. Mat.(1434)should be maintained in both the plants.(@1000& 1100). 2.Should
have enough stock in supplying plant(1000). 3.Make its supplying plant as a
vendor in vendor master record in receiving plant(1100). 4.Make it receiving plant
as a customer in customization. Create customer (xd01) & and define the shipping
data for plants in both the plants. Path: spro img m.mgmt purchasing po
set up STO define
shipping data (1 by1 ) In Receiving plant (1100) in Supplying plant (1000)
Customer num. 123345 (for ex.) Customer num. ---------(don't fill)
Sales org.yyy Dist. Channel Sales div. y
5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign
doc. Type is "NLCC". Position doc type is "UB" Enter supplying plant(1000) &
doc type (NL)&checking rule (ex:01)
6.Assign doc. Type is "UB" to u'r plants.(PO) Go for new entries Enter supplying
plant(1000) & Receiving plant (1100)&doc type (UB).
7. Create a PO, choose the doc type is `UB' & item cat.'U', Enter supplying plant as
a vendor in PO of the receiving plant(1100).
8. Provide this num (PO) to SD people, they will do the delivery by using
transactional code is VL10B.
9.sales people they will provide "out bound delivery num".
10 Do the GR. In GR the second tab 05 out bound delivery instead of PO mov.type
101.
Still I am getting the same message "Can not determine shipping data for the
material 1434". I am sending material 1434 from plant 1000 to plant 1100.Both the
plants are under same company code 1000.According to your suggestion I created
a raw material 1434 and maintained sales org 1 view and in that view I entered in
delivering plant field Plant 1000. I also exteded the material for plant 1100. I
maintained the Sales org as 1000, distribution Channel.10.You told to create
customer code and vendor code. what do you mean by that? Do you mean
Customer master record and vendor master record? Please explain me in details. I
know
Kindlyyou r veryme
provide knowledgeable. Please
the detailed steps youhelp.
are performing for STO. Lets solve the
problem more specifically
Ask your FI person on the team to create an Internal Customer for the Delivering
Plant. The delivering plant has to be assigned a customer # . Also make sure that
you configured the following objects for STO in MM --> Purchasing --> PO --> Set
up Stock Transport Order : -Define Shipping Data for Plants -Assign Delivery Type
and Checking Rule -Assign Document Type, One-Step Procedure, Underdelivery
Tolerance
can any body tell me how to make the short text in PO non editable. Bcoz when
making a PO if we enter a material code it will take the
short text from the Material Master description field, but the thing is any body can
chane it for ex if it is 50ml then v can change it to 500ml but the material code
remains
You can the same.short text in info record as well. i.e. in texts. Don't forget to tick No
maintain
mat master text indicator. This text will appear in PO & won't be editable
I did'nt find such type of text in Inforecord,Can u elaborate little bit.

Is stock items quantity and average price is independent of fiscal year? Meaning
Suppose I have 2 fiscal years (2007, 2008) and both are opened
Suppose I have Item "Tel" (Average Cost) Now If I purchase 60 "Tel" in 2007, What
will be the "Tel" Quantity in 2008? (Notice that I don't run End-
Of-Year Procedure for 2007) Am I allowed to buy and sell in 2008 without End-Of-
Year Closing for 2007?

Can we have a report of Pending MIROs for a particular month?


use t.code MB5S or just use as a display with T.code MR11

there is one scenario. our client takes mat from trader not from main vendor .trader
takes mat from main vendor and sends us. suppose main vendor sells trader in
100Rs and 16% BED so he pays vendor 116Rs. trader sells client in suppose in
150 rs and 4 % sales tax so client pays him 156 rs. all these r fine. when we go for
migo, base value for BED should be 100 rs not 156 i.e only 16 rs should go in
cenvat account. if i do it manually then who 156 will go in GR/IR account. i want
140 should come from GR/IR account and rest 16 should come from cenvat
account to pay 156 to vendor. i did setting vendor master date cin tab page and
define
YOUR trader but not
WORKING ISworking.
SOMEHERE WRONG. I WIL EXPLAIN YOU. PL SEE IS IT
RIGHT AND SUITABLE TO YOU. PRINCIPAL PRICE IS RS100+RS16.48ED+
CST TRADERS PRICE SHALL RS150+CST WHEN TRDERS DIRCTING
MATERIAL FROM THEIR PRINCIPAL ,THEN IT IS CALLED E1 TRANSACTION
AND FOR STEPS ARE LIKE THIS:
IN PO PUT BASIC PRICE AS RS 150 AND IN FV11 MAINTAIN
JMOP,JMX1,JEC1, JEX1,JSEP, JHX1 & JIPC FOR MATL/VENDOR/ PLANT
COMBINATION
.NOW IN MIGO WHILE CATURING EXCISE INVOICE BASE VALUE WILL BE
RS150 TO BE CORRECTED AS 100 TI GET ED AMOUNT RS16.48 OFFERED
BY PRINCIPAL.
I am creating Good Issue data for a Pipe Line material.but I am getting an error
(doc attached). Can anybody suggest something to relosve this error?

I am new in ERP world and need some help in Inventory and End-Of-Year Closing
relation. As SAP is the Number One ERP Solution in the
world, i assume it is the most perfect in the Concepts too. If you have some time,
please read on
Suppose we
Open physical year 2007 (1-1-2007 / 12-31-2007)
Define Item "Tel" with AverageCost as valuation method
At 11/05/2007 Purchase 50 Tel with 40$/Unit so AVCost = 40$
At the end of 2007 we open another year 2008, and leave 2007 open until Stock
Count is finished
The Questions
Can I make purchasing / Sales in 2008 before I make End-Of-Year Closing
procedure for 2007?
What is the current Qty for item "Tel" in 2008? Is it zero (till I close 2007) or it is 50
units?

Anybody can tell me where i can find informations (maybe period by period)> about
Moving Average Price changes for an article? I know that i could re-calculate the
Moving Average Price after each stock movement but it's a bit tricky! The fact is
that the Mov. Average Price for an article is incredibly high, but as the article
documents are regularly archived, i've got no view of what can have happened to
explain
You that.
could useWe have
the not Material
Tcode: MR21 forLedger implemented
chnaging the MAP. However, you have to set
an formal documentation for a justification

i got a problem in material document and po print out and my abaper is asking for
the program to change. where can i find out this?
SPRO->Material management-> Inventory Management and Phisical Inventory-
>Output Determination- >Maintain Output Types Choose Output Type and from
Processing routines you can find the program, form /smartform

When Im doing UD, system is giving error that No Char. Results are available for
Inspection lot..?? what might be the Problem.. and also when i activate the Ins. Set
up in Material Master Data, Im unable to dot he GR.. pls let me know the reasona n
d do the needful
How can I view the object classification structure. Is there any Tcode?

The client wants to give access/change to select no. of users for Conditions in
Consignment Info Re. only. The other three info rec. can be used by all the users. If
I make display (button) on ME12 Tcode., all the info. rec. will be on display mode.

How can I configure a new movement type such that I can have an automatic
population of a G/L account. In another thread tcode OBYC was discussed, I went
there but there is no direct link to a movement type. How can I do this or even if it is
possible.
You can configure new movement type by using OMJJ.

Thank you for your help. I did the step 1 & 2 as you advised. Step 3 is not clear to
me; please make it more specific with my supplying plant 1000 and receiving plant
1100.In step 4 in which plant should I enter Customer number (created by tcode:
xd01). Please mention separately all entries to define shipping data for my both
plants 1000 and 1100. I mean what fields I have to fill up and with what data for
supplying plant and receiving plant. Please dont be annoyed these are the
very new people who really want to learn SAP from knowledgeable people.
From step 5 to 10 are inter company Stock transport order with SD and billing. Here
document type is not UB it is NB. I am doing intracompany STO within one
company code. When I would be comfortable with intra company STO I will get
back to you with steps 5 to 10 for intercompany STO.Now please help me to clear

i will have a resolution of the problem of Reference (MARA-XBLNR) .(report de


reference). for example i have the materiel number 108 this reference is a123, i
modify the reference of 108 on b123. , result: the new reference of 108 is : b123.
; the old reference of 108 is : a123. ; if i research the materiel 108 by
reference the result is: ; - reference b123 : result 108. ; - reference a123 : no
result.

Can I GR/IR clearing list for a particular month, as the current Txn code MB5S
does not have the duration

Currently we have release strategy set up on POs, we are wanting to now set up
release strategy on Contracts. What we want to do is that if the Contract has been
released, all the POs for that contract should not have to be released. Is it possibe
Does anyone know if it is possible to print out the schedule of materials that
pending to be counting for the next month or next quarter?

any body explanin (or) send doc. for *Free Goods Handling in MM point of view
(configuration & process).*

Even though i dont have any stock....pending purchase order or any production
order i cant change valuation class for materials. would someone give me some
idea how can i change the class
only if u are having no stock in the warehouse, nor any open p.o's or production
orders then u can change the valuation class of a material. if u r having any stock
then u have to post the stocks out to an intermidiate account ,then change the
val.class and again post the stocks back into the warehouse.
if u r having any open p.o's then u have to delete them (mark them for deletion)
then u can change the val.class.
as u mentioned, how to move the material to the intermediate account and what
effect does it have.
You can use 561/562 to ckear stock, posting usual is make to non-balance account
In config change system messages MM326 & MM327 to warning only, to allow
changing valuation class on materials with pending purchase orders.

what is the* Message Class for Invoice verification? *


Message class for Invoice Verification is M8

pls advice reg my querry in consignment. I created a material,vendor and created


consignment inforecord. I made PO for that consignment material. when i intended
to transfer post that consignment material,an error message is
coming....PURCHASIN G INFORECORD NOT FOUND IN PURCHASING
ORGANISATION. ...pls advice. and also pls send me the correct CONSIGNMENT
procedure
try to checkif in
i am wrong info record in ME11 purchase organisation u maintained or
Purchase
not.
During part 2 excise credit, we are not able to take credit, because the cenvat
amount is showing in Inventorised duty column. By mistake we have selected Non
deductable tax code in PO. Now we need to take the cenvat credit which is in
Inventorised duty. Can anyone please suggest how take credit
Just change the tax code while doing the Invoice verification.
We need to take cenvat credit for this. In J1IEX, we are not able take cenvat credit,
because of Inventorised duty amount.

How to assign two or three plants in one company code. It is possible I think but
can u tell me steps.
Go into SPRO. & go in enterprises - > then - >assign -> plant to company code. just
double click on ur company code it will show u the list of the plant.u just select your
plant & save it
can anyone explain me the whole procurment cycyle of mm ? what stock /
consumable / automated material ?

can any one explain me what is good issue in migo and how to do it ?

I want to assign a cost center in subcontracting 453 movement. Thats when the
GRN is done for the PO, automatically the expenses should be charged to pre
configured cost centers. Where can I maintain these cost centers other than in PO
level

Tcode : ME2L, Problem: There is a bug in the the report, the result of the still to be
invoiced is not the same if you choose the scope list BEST or ALV
I correct that by the OSS note 670708 but the problem still remain for the deleted
item: The still to be delivered and the still to be invoiced are not the same in
BEST or ALV.

Can any one help me in migration of PP Master Data I need a model of excel file to
load BOM and Routing With LSMW

I am getting following 2 Errors while transfer material from consigment stock to


unrestricted stock. 1. Pipeline/consignmen t movement posted without value 2.
Deficit of VC Qual. inspection 5 TO : MS PLATES SC01 CP01 K

I am looking at the stock value in mb52 and mc.1, i find always there is a
difference. Stock quantity is always matching between these two reports , only
values are not matching .Can you pls. help out why there is difference
The stock value in MB52 is always current. That is, as of the date when running the
report. Notice, there is no date range in MB52. MC.1 stock value will always be as
at the end of the accounting period, whether 30 or 31 days depending on the
number
too haveofan
days in month.
issue. I took the 31st Aug 07 Stock data on 1st Sep 07 from MB52 to
know my stock material no wise. MB5b T code gives stock value as on the date of
posing. Today If I execute MB5B Report with 31st Aug 07, this is not matching with
my MB52 Report Why and what is the reason

I am a student practising configuration for procurement process. I have a problem


when I executed MIGO. The system generated an error said "For material XXX, no
material master data exists in plant Y and storage location Z" I have already
created the storage location Z in the plant Y and I am sure all the assignment for
Organisational units are correct. The problem seems to be When I copied Material
master data from the existing one. I only copied data from 5 views which are Basic
Data1, Sales: Sales Org. Data1, Sales: General/Plant Data, Purchasing and
Accounting1 The problem is solved after I created new material and also copied
Plant data/storage 1-2 as well. However in the system that my university use to
provide SAP course, student executing procurement process only required to
copied 5 views of Material Master Data from the existing one as mentioned above.
They are able to generate good receipt without having the error that I encounter
when I create good receipt in my environment. My environment means I have
created my own data for the entire company using the system being used in my
university as a reference. All data used in my environment are brandnew, not
copied from the existing data in the system.Could anybody explain me why this
problem occurred in my environment but not in the system being used in my
university? Is there another way to specify which material is stored in a particular
plant anddo
u cannot storage
a GR location?
unless the(without specifyisinextended,
store location material master data)
either u can Ifextend
you are
it using
mm01 with view general plant data storage 1 or
using mmsc tcode after creating the material..u saw ur students creating the view
but u did'nt see it properly, u r trying to create the
same using sales:general plant data stoarge view which is a different thing.
Go to OMJ8 (in SPRO) and activate Create storage location automatically for your
plant and if necessary for movement type. It would allow you to post a Goods
receipt automatically even if the material is not extended to Storage Location
When I go to OMJ8, there is no entry for my plant and the system doesn't have an
option to create new entry. (from menu bar-> Edit -> New Entries become gray)
How can I create new entry for my plant?
1. How to configure the system for automatic conversion of Purchase Requisition to
Purchase Order.
2.Configuration for automatic creation and selection of storage locations in
Inventory Management.
3. How to maintain automatic determination of G/L accounts during GR/GI/Transfer
posting
Kindly find the following solutions,
1. Ensure automatic purchase order field in Material Master (purchasing view) and
Vendor Master is ticked,Maintain the source list for respective materials and vendor
Also maintain correct data at the MRP views. On the MRP run system will generate
purchase requisitions for the following materials . Using T-code ME59 conversion
of purchase requisition to Purchase orders is possible.
2. Auto creation of storage location in inventory management can be created with
respect to the movement type and plant.Using t-code OBM2/OBM3.
For automatic storage location selection Storage location data can be specified in
procurement storage location field of MRP view in Material master and Issue
storage location fielD in Bill Of Material.
3.Automatic account determination of GL account can be maintained using T-code
OBYC by specifying GL code for specific valuation class within the posting key(TE-
KEY) maintained for respective movement types.

Do anyone know when release are sent out to suppliers where does the mode of
transportation date pulls from? 1. (MMO2) material master 2. The Sch Agreement
3. ZSHIP. Please respond soon

Can somebody please let me know how a purchase order type is linked to item and
header pricing schema/procedure
doc type is noway connected to pricing procedure/cal schema. unless and
otherwise if u customize (create) condn table and linked to access seq.
Thanks Prasanna, but my question would be then how does a the conditions
autopopulate into a purchasing req or order (or may be it doesnt). of you could
shed some on
Depending light on it Schema gp in vendor Master , the pricing conditions
vendor
populated
In in Order is under the following combinations. .
Pricing Schema
for Standard PO, Schema group vor vendor-Schema group for Purchase
org=Schema
for STO, Schema group for Purchase org-*Dcoument type*-Supply plant=Schema
CAN ANYONE HELP ME OUT BY LETTING ME KNOW THE DIFFERENCE
BETWEEN MATERIAL REQUIREMENT PLANNING(MRP) AND STOCK
REQUIREMENT PLANNING(SRP) ?
i have problem with sto i make daily sto for branch to branch and store to store
through outbound delivery we complete this prosses i creat daily one sto for
location to location now in vl10b i have previous too much sto i want sloution how i
can delete previous sto or cancel

Can we send the same Dependent components/material s to 2 different vendors to


produce the same finished product.(i think it is possible in real scenario). if vendors
have sent only half the quantity of PO. how can we see our stock(i.e rawmaterials)
available at vendors place, for both the vendors. I require more clarity on my
question plz let me know.

I want to round off amount after being calculated from various duties and taxes.
Where is the option in SPRO wherein I can maintain settings for decimal places
I have created a Scheduling agreement (LPA), but it is not asking for release? what
could be the reasons??
for round off currencies refer this path spro->SAP netweaver->general settings-
>set decimal places for currencies.

The business scenario is that all PO must be released before sending to vendor
except a purchase group's PO. Meaning, the POs created by this Purchase Group
do not need release. Does anyone tell me the steps of this configuration? It's
urgent!
Just u did not add that purchase group to that characeristic value in (T-Code:CT04)
.
Please help me very urgent . what are different between importpurchase order and
domestic purchase order.
instead of BED it will be CVD pricing pro. will be different for the customs amount
we havw to assign third vendour

I have a list of 600 part nos. i want to close all pos in one stroke (in 600 part nos.)
can any one help me.
Step 1 - USe t code me2m to find all PO having these particular code.
Step 2- Use t ocde -mass and Further Purchase order to delete/ change Status
I thought one option That is Mass Maintenance but in this case
require Basis Module helf but I am not sure You tri It.
pl help me,after doing miro of customs miro, i tried migo of import consignment, but
i am not getting excise tab, shall i go ahead?if i post the migo shall i get the
CVD,Additional duty inJ1IEX.
After Customs Payments u need to capture Exicse Invoice

hello i am new this protal can anybody tell me the Diff. between Standard price and
moving price in material master in accouting views
standard price of a material is one which donot change with the Qty of the stock in
warehouse..ie it is defined by the warehouse with a stanadrd value regardless of
PO price.. In case of MOving avg price, it will vary with qty of Storage location. eg: if
a vendor supplies soaps for 100 pcs @ 10/- each = 1000 if the other vendor
supplies for 100pcs @9/- each = 900 then MVG avg price : (1000+900)/200 = 9.5/-
upto that stock finishes.. I think u understood ..if any problem let me know...
Thanks for your reply. But what i asked was slightly different from
what u have answered. I asked why and what is the criterion by which
a company decides that a particular material is demmed as S or V??

Generally the materials purchased from outside (external procurement) the


company will be made as "V" type the material made inside the company will be "S"
Here 'S' stands for standard valuation and 'V' for variable. These are for the
valuation of inventory and booking consunmption whether standard or variable.
Does MAP also consider the inventory carrying cost?
With most common things in SAP that what type of price are you maintaining in
your company if you are maintaining standard price than your price will be fixed but
in moving price (total quantity / total price) = moving price, in this procedure system
automatically calculate moving average price. If you need to know more pl. do not
wait.
standard/moving average price come under price cotrol,in accounting viewof
material master(mm01)
standard price means a material is always valuated at fixed price. if an invoice
receipt(IR) or a good reciept(GR) has a different price for the material,the variance
is not taken into account, and differences are posted to a price difference account.
moving average price is the ratio of the current total value to the current total
quuantity in stock. if any price difference between IR and GR posted to the
inventory/stock account. MAP is itself updated
standard price is considered as constant value for stock material irrespective of
purchase cost from differant vendors. where as variable cost is change as and
when you purchase the stock from differant vendors at diff value this can be called
as book value of the stock or MAP value this will change at each and every
transactions. standard price is considered in manufacturing units for stock
valuation. they may change this price in diff periods as per the production
requirement changes or production cost estimates takes place. variable cost is
considered in trading organisations. since there is no further process of the
material.
Standard Price:
Irrespective of purchase/manufactur ing cost,the specified materials book value
remain same.The difference between purchase cost and book value will be
accouted in PRD account as profit/loss. On review of PRD account over a
period,book value will be revised.Standard price is activated for a material whose
value is insignificant in fixing the end product selling price.Here a standard price
with a high margin is fixed.However on reviewing the PRD a/c the price can be
revised.The advantage is all consumtion are debited uniformly.

MAP
For every GR or IR,if there is a difference with book value and sufficient stock
coverage is available,the differnece will be accounted in book value itself.If there is
no stock coverage,then only accounted in PRD.MAP will be activated for the
material whose value is having high importance in fixing the end product value.The
advantange here is all consumption are debited precisely.
When creating STO, error is coming as "shipping data is not maintained for the
material. am doing Stock Transport Order with Delivery via Shipping. Kindly pls
give me the solution and pls tell me if any further SPRO settings and the inventory
partcheck
plz for theyour
same.
material's master 1 plant data, 2 Sales data. i'm confirm, this is
your problem solution.
There are two propable reasons for this Error. 1.Material is not extended for the
Sales Org. 2. Customer is not assigned to the plant in OMGN
Have you maintained the shipping points- data in Plant Profile for the two Company
codes?
Can anyone explain in detail the various tax types like excise, freight charges, etc
with example. What is its impact & use in MM & SD? How is it linked?
Tax Types are like below :
Excise : Excise is relevant to Indian Excisable materials . for this u have to
configure Excise Components.
VAT : Value Added Tax.Earlier know as LST
CST : Central Sales Tax
Import Tax's : which occurs in material Imports
About Freight , is one of the Condition. u can use this condition in your pricing
procedure only . other than there are few conditions in pricing and Excise, u can
find this in Financial Accounting >FI Global Settings >Tax on Sales / Pru chases
>Check Cal . Procedure. > Define Condition Types. and as well as in Pricing
related condition types. I'm not clear on your Query:: Impact& use in SD&MM How
it is linked
Can you explain the steps to configure various taxes in system.

alot of GR/IR stuck in GR/IR Account due to wrong entry of posting date in the
system. PO had tick on GR based IV Entered LIV posting date is previous then GR
Posting date System shows both entry as incomplete in MR11. The net effect
become zero Please help me how to remove from MR11 or GR/IR account

plzz help me out .wut r the steps for carrying out physical inventory
step 1 MI01' , Step 2 MI04, Step 3 MI20 , Step 4 MI07 i hope this is the answer to
ur Question these are simple transaction that u can use i need further elaboration
pls let me know
T-CODE

MI01 CREATE PHYSICAL INVENTORY DOCUMENT


MI02 CHANGE PHYSICAL INVENTORY DOCUMENT
MI03 DISPLAY PHYSICAL INVENTORY DOCUMENT
MI04 ENTER INVENTORY COUNT
MI05 CHANGE INVENTORY COUNT
MI06 DISPLAY INVENTORY COUNT
MI07 POST INVENTORY DIFFERENCE
MI08 POST COUNT & DIFFERENCE
MI20 LIST OF INVENTORY DIFFERENCE
MI21 PRINT OF PHYSICAL INVENTORY DOCUMENT

MOVEMENT TYPE

701 ACESS IN PHYSICAL INVENTORY


702 DEFICIT IN PHYSICAL INVENTORY

I HOPE YOUR PROBLEM IS SOLVED.

I have done mvt type 101 move the qty to blocked stock. Now i want revese this qty
unrestricted use stock. How can I do it.
Please do Migo Transfer posting and use the mobvement types 343 it will definitely
solve the problem
Use MB1B transaction with Movement type 343 with your Plant and Strorage
Location and post the document so the stock from Blocked to Unrestricted will
takeshave
You place.
to use MIGO transaction for releasing GR blocked stock with reference to
Purchase Order. Only thing is that you have to use Movt Type
105 instead of 101. 105 stands for "Release GR Blocked stock for Warehouse".
Maintain the data on the initial screen and specify stock type as
Unres.useand also specify Storage location if required.
This is not GR blocked stock. This is only blocked stock for this I have used 101
mov type. Now I want reverse the same.
If you want to reverse blocked stock, cancel that material document and the
process will be reversed or simply move the material from blocked to unrestricted
thru transferany
To reverse posting
goods(343)
movement done with Movt Type 101, you have to simple use
*Movt Type 102*.
The following error observed during info record creation "company code not
assigned to country or country to calculation procedure"
Conform while creating a plant given country or not

I am facing problem regarding Purchase return. I had purchased material from a


vendor and was accepted by quality. But during production it was rejected. I want to
send the material back to the vendor with invoice through purchase cycle.
Transfer post the material to blocked stock and if you have post the invoice, do
credit memo for the purchase order for that particular material and then do the
return delivery. Try this out and pls reply whether it is ok or not.

Can a source list be coppied from one Pur Org to another pur Org ?
YES
We Maitain a Source list with Material Plant Validity Period Purchasing
Organization/ Outline agreement. if you want to extend that material source from
one Purchasing organization other frst maintain that vendor for that Purch. Org.
then simply add this as a line item under Source List Maintainence ME01.
I was advised that the conditons and contracts with plant specific pur.org can be
used by Standar pur Org if mapping/Assigning of Plant specfic Pur Org toStandard
Pur Org is done. Does this Mapping/Assigning cannot use the same source list ?

My client was go live in april 2005 they are not using MR11 for a/c maintainance.
now they want to post MR11 with new G/L code (banance sheet) developed for this
purpose until 2006 and remaining GR/IR with normal posting. I have checked
MR11 for customer specified G/L but unsucceed. I posted FI entry F-02 but it is not
reflected
Client in PO
want history
to post neworG/L
MR11 or mb5s
instated or f.19 a/c ; GR Inventory a/c ( 106) Dr ;
of inventory
GR/IR a/c (217) Cr ; Now MR11 New a/c (275) Cr, GR/IR (217) Dr
We r using SAP 4.7 transition key WRX GR/IR clearing a/c

One of our customer, wants a third party to come down to do a study of their
existing IT Infrastructure in terms of Hareware, Softwre, Network, their RFP made
for Data center and ERP, their received quotations from multiple vendors etc and
submit them a independent report on processes and suggest the right steps to go
forward and place their recommendations there on. May be only one person or one
technical and one functional person will need to fly down to do that study. Nature of
their group business : Project, construciton, education, etc. Look forward for your
immediate reply. With good communication skills, and final report preparation. Its
2 weeks assignemnt, with excellent pay and if anybody will meet the above, let me
know immediately. Location : Middle east.
With reference to your mail of 5 May 07 concerning the Third Party Audit, We are
pleased to introduce ourselves as Global Consulting Services, A SAP consulting
services firm with its offices in Hyderabad & Singapore. We arevery much
interested in doing this third party audit, hence, provide us any further details in
order to arrange a visit at the earliest.
My client have one requirement. They want to restrict few materials in particular
storage location. They have to create PO and do MIGO with that particular
storage location only. Can anyone tell how to do this one?
See for GR u can maintain the field Storage location for EXt procurement for Goods
issue u can maintain the field producton storage location Both are in MRP 2 view If
u maintain some sloc in this field it will be defaulted while GR and Goods Issue
Thanks for your mail. But I am not getting which view I have to maintaing default SL
for PO/GR/GI.
if u want to do GRn to a prticular storage Location you can Enter Storage Location
at the time of PO Creation in the Line Item, it will pick this Storage Location at the
time
U canoftry
GRNthis.automatically.
in po default settings for items choose the st loc which u want to be
default. and proceed MIGO. u can be alter the field unless the fied is made
display/supress.
in material master in plant/ st.loc view u have field called Default st.loc for EP..
there enter st.loc for each material so that during GR ir wil be copied
No such field is found in Material master.
In the materail master MRP2 VIEW,Storage location for EP field is there,you can
give the Default storage location for external procurement.

Subcon PO services for same material (for example Repair service case ) here we
are not using PP Module nd we are using Batch Management My business senario
is that I want to issue and receive the same material. what will be the best solution
for this scenario and how the accounting will take care at time of GR posting.
For Subcontracting PO services what you need to do is create a Material Master for
this Service materials with Standard Price Control "S" and value maintained in the
Material master should be Zero, As these are not stock materials you don't find any
stock in your plant or Company(Repair service materials) But you need a Stock to
issue the material to Subcontractor. So Create a stock using 202 mvt type in MB1A
transaction in the Plant as the Value is zero u don't worry about accounting
documents. Create the Subcontracting PO with same materials in both side means
in main screen and also components Provided also, with Subcontracting charges
and do the goods movement with 541 mvt type to Vendor So stock will be updated
at the Vendor side check in Transaction MBLB
Once the Subcontractor process your service material (means after repairing) he
raises his invoice and sends the material to your Plant. Based on Subcontracting
PO material will be inwarded with same material code and stock will be updated in
the Plant or Company.
After this you need to reverse this stock in the MB1A transaction with movement
type 201 with zero value only. So 201 & 202 will match and your
subcontracting charges will be updated as per GR and IR and Payment process to
I am trying to create PO automatically for 161 movement type. for this i configured
material purchasing view and vendor purchase view and created info record. while
doing 161 movement type in MB01 T.Code and PO Unknown option it is giving
error "Please enter net price". But i was mainted price in info record. I am not
understanding why this error is comming. can anyone help me out on this.
If I am not wrong, for Auto PO you need to maintain Std.POrg and info record
should be maintained against that Std.POrg. Also check for 161 Auto PO is
selected.
yes sidd is right
Thanks for your mail. You are right. We should maintain Std POrg in inforecord

In SPRO, under split valuation I created 1 global valuation catergory (Q) and 3
global valuation types( high, medium, low). I activated them for plant 1000 in the
local definition for account cat ref 0001 (raw material). I created a raw material with
item catergory (Q) and valuation class 3000. After that when change the
material(MM02) i can see the valuation type field but high, medium and low is not
displayed. (msg: No values found) I have checked the split valutation for the
material and it is Cat.
check Valuation active.
Maintained in Accounting Data 1 Screen or not
Please extend the materail in transaction code MM01 at valuation type level. Then
your valuation type will be available.
First create a material with valuation category in accounting view. Again goto the
same material in creation mode MM01 (but you have choosen change mode).Here
it will ask the valuation type.
I am facing the proble inPr release. I have configure the release strategy with four
release code C1->E2->A3-> T4. I have set the prerequsite and check the
simultaion.All working fine there.But when i cheked it in the PR it is not.Problem is
that when A3 rlease the Pr Release indicator for teh T4 automaitically set and vice
versa.I dont know where is the problem.While all other release working fine.I have
configure more than 2800PR and PO release in our system and find this is the only
case
Checkwhihc
your is not working
Release accordingly.
Prerequisites Where
in the shoud
Release i check. for PR in IMG settings
Procedure
whether combination for the release codes is correct or not. All the check boxes are
selected or you left any. check this
I have done all settings for PR release, like characteristics, class, release group,
release code but in me54, i cudnot enter the screen..where is the problem
check authorisation details
Check the history.

I hope you can help me. I am looking for a way to restrict a user that created a
Purchase Order from using MIGO on their PO's. Can this be done? I have gone
through the IMG and can't find anything related to it. We have situations here where
someone place the order and receive it. Management wants to know if it can be
restricted.
For that user, dont give authorization to create MIGO. You can restrict him by
defining unique authorizations of task he/she can do. Take help of Basis.
Pls correct if I am wrong
This can be done through Authorization procedure. Get your co. SAP Authorization
team and request them to remove the receipt role from that user's profile. Or
Ask them to create a new role, Copy all the existing role and remove the "MIGO"
Transaction.
Thank you. But what if this user still needs to use MIGO for other PO's created by
someone else (other than themselves)?
But I think that is not correct. You can not allow user to perform Creation of PO's
and do goods receipt PO at the same time unless you want to run into problems. (
Segregation of duties) Remember, when performing goods receipt, the system
does not check the PO creator, it only checks if Goods Receipt has been done or
not. The other check that you can implement is in the authorization goods receipt
role is, On the goods receipt for each user, restrict it by receiving plant AND on the
PO Creation role, you should also restrict it on the requesting plant not the same as
the receiving plant. Please consider that deeply as that can impact your yearly
audit.
Ask your ABAB guys to create a user exit for you it must include your conditions.i
mean it's possible,put it's an ABAB programm not config.
Step1> check plant vendors are mantianed for both plant
step2> check plant costmers are mantined for both sales org. and sales view you
have to mainatian shipping data confirm that becoz of ur getting that error.
step3> check OMGN setting and let me know if you have clarification

The client created the PO with service material item (erect staging) one unit .
Posted GR for the PO and cancelled it next day. They posted IR after that for the
full amount plus tax. (No GR PO). Then they posted GR for one unit, but the value
picked is 50% of the invoice amount. I have replicated the same in test server, it is
picking up the value as invoice amount. What will be the error?

SAP provides a warning message when creating a purchase order with item price
different from material master price. Please investigate and advise current
tolerance. Create a report of when this occurs including date, plant, purchasing
group, PO creator, PO number, vendor number and name and percentage
difference. Provide transaction to pull report.Selection criteria should allow by
vendor, purchasing org, purchasing group, plant or document date.

have someCIN scenarios if someone knows how to configure pls help out Partial
Credt -how to configure ; Plant non-excisable , but material and vendor excisable-
how to configure ; Vendor non excisable , but plant and material excisable- how
to configure

Can anybody provide the Business flow of Mining processes

Is is possible to flag a PO/STO so that the shipping location is informed that all line
items must be shipped together? (i.e. the whole order must wait for delivery until all
materials are available). This is desirable in the cases like customer do not want to
receive their order in multiple deliveries.
I am stilling strugling with error in po. I check accounting & MM assinment in SPRO.
All assinment is ok in my openion. finally my
problem is same. I am enable to continue my work so i request please help me to
solve the problem so. I am facing error when i genrate Po sthrough ME21N it give
me error Customization For VILj_1iindcus missing in Table. Message No. 81303
Maintain the Company Setting. Above error come exect when i enter Tax Code is
V0. it wants Jurisdict code when i press F4 the list is empety. So. Please help me to
configure Jurisdict code
Customize your Jur. Code in SPRO. If you ar using VAT, Please Switch off Jur.
Code Option in SPRO Settings
I check your suggestion. (Switch off TAXTransation between local and document )
When I use this option there is no transaction i assign entry there do accourding
your advise. The problem is remain same.
Please Check your Plant define in Enterprise Structure whether have you assigned
any Tax jurisidicion code and any county code check properly. This Tax jurisdiction
is applicable in US only. If you want to Config this Jurisdiction Code the IMG path is
as follows
SPRO - Financial Accounting ---Fin A/c Global settings -Tax on Sales/ purchases --
IBasic
checkSettings -- Define
all the setting Tax jurisdictions
in Financial AccountBut
or first check your Invoice
MM->Logistics Plant define
Verification-
>Define Tax Jurisdiction etc..
As per your suggesstion it's not applicabel in India. How we close the option.
Can you check your Factory Calender in the Plant define. I think you have assigned
the US Factory calender.
I check and assign Factory calender is Z1. there. I check and assign Z1 inf
Factory calender in the plant define. But one thing is there region is empty.
Keep that region as empty only , don't enter any county code or region code there.
Now you can process your tax codes.If any error comes let me know

Can any one help me with the transaction code or report name that I can use to run
a Stock Value report for a specific date.
try T-Code MC.1, MC.9, mc.5
you can use transaction MB5B , stock type valuated stock
try MB53... it will give you by month wise
sorry.. not Mb533 . Please try with MC.B
Use MC.9 for particluar period. Then go to Extras->Detailed Info->Stock Movement-
>Stock quantity (will provide stock on particular date for that period) similarly, if you
select Stock Value (will provide stock value for all particular date).
Try transaction MB5B
I have been asked following questions which I was unable to answer to the client
Please help me out :
1. Is it possible to prevent service entry when the contract end date has already
expired?
2. Is automatic price determination possible for services? If so,how?
3. How will you automate G/L account determination in service procurement?
4. Explain functions of Service Outlines? Can you assign services items to outline
levels?
5. Explain the use of Model Service Specifications? Can you have text based
services and service outlines in this master?
6. What are the tools available for data migration in SAP?

i have stock of 200 items in Sloc X. when i try to issue 25 items from the 200 items,
iam getting a message telling me that i have a deficit and cannot issue. what could
be the problem?
Please check the available Quantity (Txn.MMBE) before you do the issue
On mmbe, check if you do not hav any deliveries assigned to your available stock
and also check if your stock is not assigned to any other storage location except
"Unrestricted
you check in which stock the material is for issuing it should be in unristricted use
stock
check the stock in mmbe and also in md04.it is possible that you have already
taken delivery note for that material and not cancelled the same.
Pls Check Issue Sloc
You can check what is the "stock type" of the material stored in the Storage location
X. I mean, you can issue material from Unrestricted use stock type. Just check that
it is
u not blocked
might stock.
have taken delivery note for the balance qty or if not u moight not have
cancelled any old del note for the same qty or stock might be in quality check

I want to see the Inventory of a Material which is Batch & Serial Managed. Is there
a Standard SAP report available? Kindly let me know the reports available to see
the inventory of a Material based on Serial Numbers.
try ME16N
I think there is no T.code as ME16N. May be The T.Code IQ03 may be useful for
you.
check iq09 specify plant/slock wher you want to know

while creating stock in [MB1C]and overview in [MMBE], created stock is not seen
with an error message reading: MOVEMENT TYPE XXX NOT ALLOWED
FOR WAREHOUSE No.YYY. Please guide where to assign movement type to WH
NO.with T.code n menupath.
Each Inventory Management movement type that is relevant to the WM system is
allocated to a reference movement type, with which the system determines the
corresponding movement type in the WM system. Inventory Management
movement types that do not initiate any activity in the Warehouse Management
System have the reference movement type 999.
You define the Mvt 561/501 in IMG > Logistic exc > warehouse Mgt >Interface >
Define Mvt type . In that you do two activity
1. Assign WM Movement Type References to IM Movement
2. LE-WM Interface to Inventory Management
Also check whether the movment type is updated here also
Follow this path in Img settings.
SPRO- Logistics Execution-Warehouse Mgmt-Activities- Transfers -Define
Dlv. type (dlv. catgry OD for mat. 442959 and BWART 411) cannot be determined
Message no. VL295 while doing transfer posting.(mb1b, mvt type 411 E) Also
applicable to Handling unit movement (Tcode HUMO).How to get delivery type,
delivety category, material and mvt type combination. I tried various methods and I
couldn't get. Anyone can help me?

an auditor saw that we did not have safety stock on many of our low usage items
example 5 items a year
90 days to mfg ; 10 days to process the order ; 10 days to ship ; 2 days to QC ;
cost 300 each
how do you calculate the safety stock on this item? then figure 20 items 100
items same parameters
I don't know how SAP dynamically calculates the numbers

How to include discount for some vendor exceeding some price. Scenario: When
ever for vendor x P.O values is greater than 1 Lack rupees it triggers discount of
15%. PO can be both PO for materials or service.
TCode: MEKE Create a condition for the vendor with respect to Pruchasing Org. In
this case use scales option when creating this discount

How can i maintain drawing details in material master? In material master, in basic
data 2, the field called (RMMOU - MMZUO) documents linking icon,
how can i activate this tick, presently this is in display mode? or if there is different
solution then pls let me know?
You can try In material master goto additonal data,then select document data there
u can enter the details.
we have one requirement. .. for few materials, they dont want to procure material
externally(i. e they dont want to raise PO and GR), but they will issue material for
production order. can anyone teell how to do configuration for this requirement.
In OMS2 select 'No PO's allowed' for external purchase orders and also look for
type of the message it should. If it should restrict completely, customise it to 'error'
message
Do you mean you want to manufacture the material in In-house production?
u can do it in matl type settings ( oms2) choose the proc type as internal. and
choose the no external po allowed indicator. u can also do in matl master in
purchasing view in plant staus field as block matl for purchasing.
Thanks for your mail. what your saying is right. we can do that setting for material
type level. but my requeriment is material level only. for materieal i tried for basic
data, purchasing data, MRP2 views. but these are not satisfying our requirement.
Actually our requirement is we have to use material for in-house production, but
cant procure
There is field meterial externally(no
in basic data PO).master "X-plant matl status" try to configure
1 in material
for Purchasing.
For making a mtrl only for inhouse production check MRP2 view and maitain "E" in
the Procurement type.
I doubt whether u can do like that! Unless otherwise u have stock (inventory) how
can u issue to Produciton Order. Any dummy strategic will help- just think it out!
Try creating the material to act assigned and input the material in BOM as a non
stock material and this will resolve your issue. Similarly this happens to low value
items like glue, stapler pins etc in some seat manufacturing industry.
I beleive that ur trying to manufacture the material inhouse instead of going for
external procurement. In this case in the material master Basic data 1 tab you can
specify in the field material status that the material is restricted for external
procurement. This will serve ur purpose,bcoz nobody will able to procre the
material from external vender.
How to configure a new plant in SAP system, what are the components / steps I
need
Go to to do?
http://www.sap- img.com/sap- mm.htm. It contains almost all the basic config
information that you require.

i realised what the problem was. in the PO the material was assigned to a particular
cost center, and the user was trying to issue the same to another cost center. so
the system detected a deficit because the mateial had already been charged off
(consumed) . what i did was to cancell the grn , go to the p.o and remove the
account assignment, so that the material goes to stock first then it can be issued to
the cost center.
I am facing problem in Cenvat Clearing. Scenario si as follows: While doing J1IEX
Cenvat A/C Credited and while doing MIRO Cenvat Clearing A/C for BED & Cess
has been debited on separate lines. I ran F.13 for knocking. Then checked in
FBL3N for open items. I could able see both documents of J1IEX & MIRO
accounting documents , but those were not knocked. It is a Std. SAP transaction.
My client have accumulated nearly 2lac such entries which were open from 2005 &
2006 yr. How to proceed further. But in some cases it is knocking.

could you please help with the attached error. I am trying to reverse the received
Assets on MIGO. I am getting following error message Balance for transaction type
group 10 negative for the area 01
you have capitalized the asset. now u open the asset for posting am i right. check
GR/IR amount and post accordingly
U pls used MB1B transaction code to take asset in. Then go for the MIGO reverse

Actually i am facing a problem, when i go for create schedule agreement(ME31L) ,


afer puting all the data when i enter or save , the system gives a erroe like Account
Assignment create, wht should i do now? plz help me out.

We all know that movement 551 used to take out the obsolete and scrap materials
from the stock. What about surplus is there any different movement type or we
should use
WHAT the T/CODE
IS THE same? FOR THIS MOVEMENT TYPE?
Txn codes : MB1A or MIGO_GI
about surplus: maybe MI01 create, MI04 count, MI07 post - this will post your diff to
the gain and lost account

What is the best practice for keeping catalyst and chemicals as stock item? These
items will be stored for long period and definitely will be affecting the Turnover
Ratio. Most of all our items under ERSA MRO spare parts. Any idea how we can
we handle this issue.

Please kindly reply to me the steps to make movement 561 creates TR and can be
putaway normally as a GR. Also if you can help me with the basic configuration to
process a two step confirmation to a determined storage type

I have created P.O For service entry sheet. I got problrm while doing service entry
sheet. Its asking cost center and G/L a/c.Which nos. i have to enter.
U had to ask your department regarding the G/L account and cost center.
I hope u will be creating PO with some PR reference adopt the cost centre from
that otherwise ask the dept that asked you to raise PO to give their work centre
code. at worst case download or check work centre list data and name the work
centre.
Another SES is also given the same problem in which I have not done through PR
First Check u select K in item Account assignment category & also check that u
enter cost center & G/L no. properly in Account assignment category tab in item
level
How you. create the Service Po without entering the G/L account and cost centre. if
it is default be taken from background setting. So check the PO again. If you have
maintain the PO it will not ask you again to enter in the Service entry sheet it will
defaultly come from PO and copied to SES.

Please let me know the step of configuration of POSTO with delivery and how to
make delivery.

Use tcode OMS4 and make new status for purchasing block.

While posting a parked invoice its giving an error: "Account 613220 is set as not
relevant for Tax" check invoice document.

We have a requirement to set up a stock transport order using PO type UB. Here
only the freight charges are to be paid to the vendor. Hence we have a freight
condition type in the PO with the SPRO setting of entering vendor seperatley at the
time of GR. But during GR, we do not get the freight tab to enter the vendor. Any
idea what
Stock the is
tansfer problem could
possible onlybe?
between Plants/Str Loc, I have not heard of vendor
doing stock transfer. Please clarify
i know sto happens only b/w plants & not with vendors. But i have seen one querry
where client i snot getting his freight conditions in INVOICE but it is there in PO. Pls
help get
You me those
with the same when you select *'Goods/service items + planned
conditions
delivery'* option in the invoice entry screen in the PO reference section.

it is just a begining for me in SAP. help me out in defining calculation schema from
MM prospective. What are all steps for this. Any Config doc available, pl share it
with me.

This question may be a redundent. I need to know is there anyway of getting the
material changes in a report (like a standard report). I know using MM04 i can get a
changes on the material, also using CHDHR i can write some abap program to
generate the changes. Is there any other way i can get this info.
Use t-code IH09

There is 1 User Exit available(QEVA0008) which an be applied to transaction QA


13 for reversing the Usage decision. Can any one explain me how to write the code
for the same.

am facing a problem, when i going to create Auto PO and i put the required data.
when i execute than the system shows error like PO not generate due to some
erroe. when i click this line the system shows PUT THE NET PRICE.

Please let me know if you know the steps to configure the movement 501 to make
after perform MB1C SAP creates an Inbound Delivery?

While doing MIGO for subcontractor I have received the erorr as follows. 543 mvt
type in not valid.
Movement Type 543 is applicable to the items those are to be provided to the
subcontracting party/vendor and not to the final item( final item which
should have Mvt type 101). Pls check.
Yea final product mvt type is 101 only the materail provided to SC is in 543

Could any one explain, where i do the customize for Restrict GR before Delivery
Date...I expecting ur replies ya.....
in purchase order you select latest gr date and in exeption massage set error
message.
i have a problem plzz help me out,I want automatic creation of PO while doing
GRN. i am doing GRN using mvt. type 161 than an error message is coming,
like "Business area not entered in line item 0000000002" wut is this message n
how to rectify this plzz help.

Can anyone tell me how many Chapter IDs are there ?

While doing MIGO for Imported material, Higher & Secondary Education Cess
(SECess) value is not getting displayed. Where BED, Education Cess is displayed
well. Kindly provide the solution at the earliest.
Automatic updation of inforecord can be done by setting the valid info update
indicator in "Maintain Quotation".- (T.code ME47).But i cannot able to find the
Indiactor.can u please guide me.
In ME47, Double click the material in the line item you will find the Infoupdate.

can anybody tell me whether we can create an inforecord for a material and
vendor? and the material or does not have a master record?
Yes you can do that,provided u mention the material group and short text in the info
record. Also other than material no. u enter the other details like plant, pur org. in
the initialscreen
yes u can create info record for material group
Please say the use of creating a info record with out a material . Later if you create
purchase order it will ask for the material

While using the Release in RequestForQuotation (T.Code me41),error message


:Thpurchase document**** *** not suitable to release strategy is comming,what are
all the steps to be followed before doing release in RFQ.Please Guide me.

Can anyone tell me how many Chapter IDs are there ?


there are large no of chapterids it is given by government for materials for ex-
electrical goods, mechanical goods - etc
It all depends on the product you manufacture and the raw materials used for the
manufacruing process

did anyy body know what's table name for conditions amount on PO header as you
see on the attachement. did any one know what's table name for PO estimated
condition Open
CMIIW on POEKKO
header.
table and find knumv Open KONV table, input knumv
number .. you will see the amount in KBETR field
komv

Please tell me how to find Fright and discount amounts in ME80FN Tcode.
Otherwise tell me Tcode for find Fright and discount amounts and also
Invoice amount in a Purchase Order.
You can find the Freight,Discount amounts in the Conditions Tab-Item Details of
the PO. Invoice amount can be seen in the invoice Tab- Item details of the PO-
ME23N -T.Code.
We have seperate Material Types for Import Parts & Local Parts. Is it Possible in
SAP to keep the one material code for above types?. i.e. We do not want to change
the material code even material type is changed.
You can use this transaction MMAM If You dont want to change the material code
,only change material type.
As material code is maintain at cetain organizational levels it is not maintained on
material types so u can not create two same material code at the same
organizational levels. Instead u can try split valuation.
you are right.

I am having doubt on how Manual Excise ( condition JEXC ) Amount in Pricing


Procedure is transferred to BED amount of Tax Procedure ( of FTXP).
It will transafer based on Requirement type given in Pricing Procedure .
But i am not clear with specifing requirment type in pricing procedure.

How to add "Contract" selection criteria to ME05? I have "Plant" and "Material"
criterias, and I need to have a possibility to create source lists by Contract. May be
someone knows how to do this?

These are MM certification Exam. Please help me with 100% accuracy. For real
SAP MM Gurus it is nothing difficult. Thank you in advance.
1. GI/IR clearing account is value based or quantity based? 2. In automatic
reorderpoint planning SAFETY STOCK is created automatically. If SATETY
STOCK falls below the minium level can we fix it manually? 3. What is the
relation between Purchasig Organization and Purchasing
Group. Is it mandatory that we have to assign Purchasing Group to Purchasing
Organization?
1.The GR/IR Clearing account is a value based .
1.The GR/IR Clearing account is a value based .
2. if u select automatic reorder point planning , manual selection is not possible ,
but u can change it .
3. pur org isa the org which takes the care of procurement, pur group is the
responcible for procuring the material.
4. there is no assignment of pur group to pur org.
1. Quantity differences between goods receipt and invoice receipt for a purchase
order result in a balance on the GR/IR clearing account
It is value diff. or qty dif.?
PURCHASE GROUP IS RESPONSIBLE FOR PROCUREMENT OF SPECIFIC
GROUP OF MATERIAL,THERE IS NO RELATION BETWEEN PURCHASE
ORG.AND PURCHASE GROUP.
With automatic reorder point planning and forecast-based planning, the system
determines and adjusts the value automatically for forecasting
purposes.With manual reorder point planning, you can enter a value in the material
master record. However, it is merely for information.
it is value difference and it is not mandatory to assign a purchasing group to a
purchasing org
I have just joined this group. I have a problem in stock transfer from GR Blocked to
Unrestricted use. For this first I did Migo to release the GR Blocked Stock to Block
Stock by using movement type 105+3, It came out good . But when i check
MMBE(Stock) it doesn't show any quantity in Blocked stock. And also tried MB1B(
Trnasfer Posting) by movement type 343(From Blocked stock to Unrestricted use)
and system show message that Dificit SL Bloclked 10 PC.
Please find details for the GR/IR Clearance account in SAP system

GR/IR Clearing Account Maintenance

Quantity differences between goods receipt and invoice receipt for a


purchase order result in a

balance on the GR/IR clearing account.

_ If the quantity invoiced is larger than the quantity received, the


system then expects further

goods receipts for this purchase order to clear the balance.

_ If the quantity received is larger than the quantity invoiced, the


system then expects further

invoices for this purchase order to clear the balance.

You can also clear differences for delivery costs.

If no more goods or invoices are to be received, you must clear the


balance manually.

my client requirement: while releasing the p.o authority must know the delivered &
landed cost of the p.o(item wise)which is not available in the system.
The po release is at header level as c is configured with ekko that is header level
release if they whant to now item wise then enanhcement needs to be done that is
c must be configured with ekpo table.i hope it may help you.

If anybody can explain, on what are the issues will be in Retail master data. List of
master data in retail module???

Pls clarify my problemHow can we create conditions for vendor discount.Senario: If


the purchase order value is for example more than one lakh rupees (irrespective of
materials), the vendor will give us 10% discount. If we select that particular vendor
the system should automatically take the discount when the PO value exceeds one
lakh. I tried with Tcode MEKE, but for one line item only, the discount applies (if the
PO contains only one line item it is OK). If I entered more than one line item, it
doesn\'t
select take thecondition
discount discount.asPls do the
group need fulin condition type and check the result
condition

I would like to know if you have any website that I could view and read a full cycle
implemenation of Material Management.

can any one tell me, what all steps / configuration settings are required for vendor
master record, so that i can create vendor master data.

pls tell me how to block a vendor and customer


You can block vendor by t-code xk05,for purchasing organization for purchase
order or total block
if u want to block vendor for all procurement u can block it by usinf command mk05
and if u want to block one particulr materrial u can block it into source list for
material
If andtovedor
you want block the Vendors use transaction XK05 here you block this vendor
with respect to all the company codes or only to Purchasing
Organisation If you want to block the Customers use transaction VD05 here you
can block this Customer with respect to Sales areas( Sales Dist--Dist ch-- Division
combination)
My scenerio is as follows : We are goint to implement Split Valuation. I know for
this following condition should meet :
1. There should not be any stock.
2. There should be no open purchasing documents exists.
transfer material or physical inventory can be done. After creating valuation
category & valuation type, I can put them in rerspective type.
While I am changing material for Valuation category it is telling that combination of
material, plant & s.loc. has stock. System is not allowing to
change for this reason. But when I check there is no stock but it has certain qty.
resevred for this combination. These reservations are made thru automation thru
production order (mov. type 261H).

If there is one material type (eg:raw material) & four material groups (eg:-remote,
spk,ic ,chasis) is it possible for us to assign this four material groups to one
material type while customising in define number ranges for material group.
According to my knowledge, that won't be a problem. Subject to correction.
we can assign more than one material type to one material group,but i want to
assign more than one material group to one material type which is not happening.
please show how to do it.
Pls tell me how can change the valuation Class of material .
Issue out the stock, then change the valuation class on the accounting view of the
material master. You can then cancel the GI.
You can change valuation class of material in t-code mm02,but there should not
goods movement for material.

I am a beginner in SAP MM, i want to ask you about tax in pricing condition. Can I
have a journal like this, when do MIGO :
Expense 100 ; Tax (accrual) 10 ; GR/IR 100 ; Tax 10 ;
Or when do MIRO : ; GR/IR 100 ; Tax (accrual) 10 ; A/P Vendor 100 ;
Tax 10 How can I configure it?

STO has been created for 16 items, during outbound delivery (VL01) it is just
picking 13 items. What could be the reason for this? I am aware it is
not related to MM, still this issue is given to me. Also, a brief explanation of working
of STO using SD route/WM would be appreciated.
Can you check the STO whether all the line item Materials have shipping data in
the item level of the STO and also the delivery type.
One more thing VL01 is doing Outbound delivery w.r.t Sales order. what you do
with STO there You can Use VL10B

I need some good material which shows how exactly workflow can be linked to a
PO release strategy. I tried to search for it in SAP library but could not get the
same. The scenario is very simple. There are 2 release codes M1 and M2. M1 will
first approve the PO followed by M2. Initially M1 shud get a mail in his SAP inbox
that PO is for approval followed by the same to M2. But I did not understand how
the positions, agent id's etc are to be created and linked to the release codes.

can we relate p.Group to Accounting assignment cat.if yes then send me the
procedure.(Ex. - if i select P.G. which is responsible for service while making
P.O.,then in account assigment cat. value will default take 'K' & Item cat value will
take cannot
This 'D'.& disable so that
be done user cann't
in Standard SAP. change.)
You need to use User Exit and through
ABAP coding you can control this.

Can anyone provide me with the difference betwene single and multiple account
assingment in points or business scenario adopting between these 2. I have some
understanding but as it is more affecting on FI i am not able to make up the exact
definition
The of these
difference two. the Single and Multiple account assignment is How you
between
can divide this quantity and Value of this PO among the account
assignment category means take an example of Cost centre as Account
Assignment catagory. If it is Single account assignment the quantity & value will
be to single cost centre say A only If it is Multiple account assignment it will divide
among all the
If you want cost item
to post centres say A,B
material and C cost elements then you can distribute
to different
item for this cost elements. This is multiple account ssignments.
While creating po on account assignment tab you can distribute by quantity or %
basis.
If i have to split the qty to different account assignment category then in item level
itself i can put as line item 10 with 5 qty and item 20 with remaingin 5 qty. where do
u maintain this cost centre? are u mentioning about the acocunt assignment
category = cost centre "K" ?
How can the following requirement be met in MM. Creation of a one single PO
based on Contract on Time basis, wherein the Quantity and Price will vary every
quarter. Also we dont want to do any changes in the PO.
what is the procedure/method/ t-code for re-open the the previous period. for
example:the current period is 02 2007 but some one closed this
period and made it to 05 2007,and already so many postings are done. the
question is i need the period back from 05 2007 to 02 2007
Try the Tcodes MMRV or MMPV For allowing to post the Previous Year Data .
These Tcodes are for display and close period only. To my knowledge, it is next to
impossible to open / post already closed periods. Can you check and confirm?
To reopen previous period t-code is mmrv, with this you can open previous period
only.
Use MMPI
I think MMRV is for allow posting to previous period.my question is to change the
posting period from 05 2007 to 02 2007
You cannot change the Period now to 02 2007 once you open the next period say
05 2007 system will not allow you to again open the closed period using any
transaction like MMPV, MMRV. MMRV will allows you to post to only one month
for previous period not for 2-3 months So you need to post the documents which
are pending from 02 2007 to either 04 2007 or 05 2007 month only not to any other
previous month. So be careful while opening any periods in MM or FI side.
You can use MMPI ( But SAP never recommends this , it will mess up all stock
valuations ) however, using this T-code please go through OSS note 487381, the
main contents as follow: Before you start period closing with initialization, you must
be aware of the consequences of period closing with initialization. This note
describes the possible data inconsistencies that might occur if you carry out the
initialization in a productive system. The resulting inconsistencies are not to be
traced back to a system error but they are a result of the period closing program
with initialization The initialization of the posting period to a previous or to any
posting period may lead to the loss of the information of the inventory balances of
the previous periods. The book value of the current posting period is taken as the
basis also for values of the previous period in this case. If you want to continue
working with this new posting period, in addition you should execute report
Z_DEL_HIST_ENTRIES
Please send me the report attached so that
Z_DEL_HIST_ENTRIES to my e-mail address as this
forum does not deliver or accept attachments.
You misunderstand my reply. I didn't attach any document in my reply.
Z_DEL_HIST_ENTRIES is a program. If you need to know deeply, contact
your Basis or ABAP person. Or please read SAP Note...
I never done this process directly or indirectly in my system, coz of SAP not
recommended this process.
This is a post I found on SAP Blog which explain some basic steps to reopen the
MM period.
1. Lock all users out of PRD
2. Take snapshot of MB5L for all materials at company code for current and
previous periods
3. Add User parameter MMPI_READ_NOTE with value = current date in this format
YYYYMMDD
4. Stop all processing that updates inventory values
5. Run t-code MMPI with correct period
6. Run Z_DEl_HIST_ENTRIES program
7. Take MB5L snapshot for all materials at company code fs01 for current and
previous periods
8. Validate that values match on MB5L pre-post snapshots or are appropriate.
9. Unlock all users in PRD
10. Remove
All the User parameter
Z* programs MMPI_READ_NOTE
are the user program from user ID
I just said it's a program (XorY) More clarification, should connect ABAPers

I have created SA and line while doing GR. I have entered the SA no it showing
difference in the price determination. Net price should not zero. But I have enterd
the price
Kindly in SA.
check your Acess sequence

We we use top level BOM for all "A" part forecasted in ZPLA. We cannot view
forecasts for our "B" or "C" (ABC Indicator Parts) as we
leave MRP 3 "Planning" blank for these two Indicators. Is there anyway we can
use the forecast based planning of MRP Type (VV), would we need to enter
anything in the MRP 3 "Planning" section in order to view the forecasts?
The B and C parts have a long leadtime and when the demand is placed on us by a
Pld Ord or Dep Req - it is usually too late to respond and get parts from vendors.

hi, does anybody knows how to customize Replenishment for Fixed Storage Bins
with automatic TO creation during confirmation.
can anybody provide a me some material on configuration for stock transport order,
stock transfer. can somebody correct me on the following idea i have, I think stock
transport order is between plants of different company codes(intercompany) and
stock transfer is between the plants of same company code(intra company). correct
me
It is ifIntra-Company
i'm wrong. transfer.

can body send some real time production support queries with answers to me your
help is highly appreciated

Good Afternoon. So long time we are talking. I Have a issue regarding UOM which
is NO. But in transaction MMBE ith stock shows 0.3.
I check in cuni transaction for NO. Please give me the solution, whenevr you have
a time.
NO unit is nothing but No unit for that material as per CUNI. I am not getting you
why u are relating UOM with MMBE. I think you have inward the material with UOM
- NO ( i.e No Unit ) for quantity 0.3. now it is showing the Stock in MMBE as 0.3.
Then what is the Problem you are facing so please explain in detail. Material should
have some Unit may be you defined the UOM as NO.
There is one message in the message group ME with message number 678
.Please check that message and i n the customisation make this message in the
messsage attributes as an error .thena the system will not be allowing such qty.

How does the system calculate taxes


You need to maintain Tx code in PO. System will calculate the taxes as per rates
maintained w.r.t. condition types in tax code. T. Code FTXP In India , TAXINJ and
TAXINN is tax calculation procedure used for Tax calculation. T. code OBQ3
While in pricing procedure the taxes are calculated statistically for JEXS conditioan
type. T. Code M/08 I hope it would have given fair idea about it.
How does the system calculate all the taxes at condition type NAVS in MM
For condition type NAVS- Non-Deductible Tax,You need to select statistically
indicator [This indicator causes a surcharge or discount to be set in the document
statistically (that is, without altering the value). ] . You need to assign relevant
routines. then system calculate the taxes accordingly The system calculates
NAVS- Non-Deductible Tax which are usually Sales Tax
The net price is calculated by summing up the gross price condition type and
subtracting /adding all discount/surcharge type condition types respectively. Any
condition type which is not marked as statistical will be considered for net price
calculation. Create Pricing Schema with all condition not marked in Statistical
column if you need all condition Record to be calculated. For Example : Level
CondTy Description From To
100 PB00 Gross Price
200 RA01 Discount % on Gross
300 ZMUP Mark Up (value)
400 Base Value for Tax 100 300
500 ZDIS Disc. Excluded Tax
600 Net Amount
700 MST Tax 400 400
800 Net Amount
With this Schema:
- Net Amount will be calculated from PB00, RA01, ZMUP, ZDIS.
- Tax will be calculated from PB00, RA01, ZMUP.
Total amount will be calculated from net amount and Tax. So, ZDIS will included in
Net Amount and
As mentioned by excluded
you , If weforhave
Tax.selected JEXS in M/08 ,we need not do it in
OBQ3 FOR TAX Calculation. (In India , TAXINJ and TAXINN is tax calculation
procedure used for Tax calculation. T. code OBQ3 While in pricing procedure the
taxes are calculated statistically for JEXS condition type. T. Code M/08)

How are you all. Iam a new team memeber. My querry is - 1) How can I extend all
materials of a material type to a new plant.Similarly how can I extend all info of
master data like vendor master data, info record & source list to a new plant. 2)
When a material is deleted from a material master how do you remove the records
from info records,
regarding the first POs,
part ofPr, reservation
your etc. t-code MC.9. Generate output in Excel.
problem use
Ask ABAP team to upload in new plant using LSMW.
1. Use transaction SE16, Tabel name MARA. Click on MATNR and Run the report.
It will give all materials listing. Now download this and upload using LSMW for new
plant. Also, you can define new parameters for some fields, like delivery time which
may change depending on plant location.
2. Ideally, material is not deleted till stock last in the plant. You cannot delete PO for
which material is to be supplied.
my company has its own pricing procedure assigned.now management wants that
they want to feed each nd every condition type manually and not to take it from
pricing procedure assigned while creating purchase order.it shouldnot affect the
inforecord also. kindly let me know the process in detail to carryout this process.

How do we block material n for wut reasons we block materials.


There are different reason why the material can be blocked, eg. Payment
Investigation/ Not Manufactured any longer/ No movement after a certain period /
Receiving faulty items from vendor/There is a replacement material / too much
stock etc and the blocking of the materials will depend on the reason customized
within your org. e.g. Block for Purchasing / Block for Inventory /Item Discontinued /
Block
Try to for
useallthe
transactions etc. Flag for Deletion, you could select per Client Level or
T.code: MM06
Plant Level. If the particular material identified as an obsolete or totally will not able
to use you may flag for deletion. But you have to consider the affected areas such
as PRs, PO, STR, STO, stock and BOM. You have to clear the active transactions.
Also, you have to consult your end-user for the changes.

Can you please give clear idea between this two stocks. Specially in what situation
we receive goods in blocked stock ( not GR blocked stock)

What transaction can I use to find out how many requisitions were issued last fiscal
year?
1. Which fields are mandatory when creating a Purchase Requisition? 2. Can you
make certain fields mandatory?
Use ME80A.

i got a doubt i want that the system has to show the error message when i post the
GR before the delivery date that is where we do configuration so that i can restrict
the GR posting for a particulat PO before the delivery date.plzz its an urgetnt.
Set Message number " *M7 254* Earliest possible delivery date is & " as error.
*Path :* IMG -> Materials Management-> Inventory Management and Physical
Inventory->Define Attributes of System Messages

I need your urgent help. I need to increase the no of rows in item overview ( of P.O
screen). Could you tell me how to increase
One of my customer requirement is make setting in MIRO (invoice verification) in
such a way that system should not allow MIRO to get posted
for GR which are yet to be cleared from Quality inspection stock . That is , if a
material is subjected to quality stock and unless the material is moved to
unrestricted stock system to be configured in such a way that MIRO can not be
done. If we do MIRO , system should tell that MIRO can not be done because the
item is still in QI stock . Is there any standard setting/configurati on available . If
there is no standard setting can it be done through exit ? if yes pls let me know the
userstandard
No exit. setting is available for the same but a user exit definitely exists
You can do this by maintaining the Quality View in Material Master. In this
Procurement Data, QM Proc. active tick is made, QM Control Key should be 0007
which is nothing but Del. Release. Invoice Block, Certificate type enter,Maintain the
Inspection Setup 01,15,89 which is applicable to your system. Please do this
changes to Material Master. Check the scenarios. Correct me if i am wrong.
i have maintained the QM Proc.Active with QM control key 0007. now, i made a
GR with the goods lying in quality and then cleared partial
qty to unrestricted store and partial qty to blocked store. even when the goods lying
in blocked store the system allows to do IR and once it is done, it is blocked for
payment. fine but what i need is the system should not allow to make IR for the
goods lying in blocked store. is there any settings available for this. pls let me
know.
This is not possible because Blocked Stock is as well the Valuated Stock, So IR is
possible, but when the stock is in quality stock, IR is allowed, but payment can be
blocked. Please try this. Or you can do this in other way by creating 103 MVT which
is nothing but the GR Blocked stock which is Non-Valuated. Then transfer this 103
to 105
Pl. makeafter check
quality the Quality
inspection manually.
setup active for material, it will not allow invoice
verification it material in Quality inspection stock.
Just take the material first in block stock,it will not allow you to do invoice
verification, when you need to material then first take the material in un-restricted &
do the verifation of the same qty.there is no standard setting to stop invoice
verifation after material recipt in QI.
Could u pl. tell me t.code for finding the list of items which are in GR Blocked Stock
.U Can Use the Tcode MB52 to view the Blocked Stock. If any Seperate Tcode
Exists kindly Let me Know.
for a single material u can check in MMBE for list of materials goto MB52
There are some reason to move stock into blocked area e.g Internal plant transfers
using movt type 911. I will adviise you to use table "Mard" and capture in your
blocked storage location "1003" depending on your Org config. or Use txn cd
" mb51", also key in your blocked storage location.
There is no field for finding the GR Blocked Stock in mb52. Blocked Stock is
different from GR blocked Stock . GR Blocked stock is pending 103 Document for
105 Conversion
Thanks .
For U'r Clarification Mr.Ramakrishnan I Think No Standard Report is
Availabe .We r using the Zreports to view the GR Blocked Stock. If Anyone is
aware of it,kindly let me know.
i had a querry relating to creation of vendors, while creating vendors even for
regular vendors like external number for one time vendor it is asking. My question
is how to make vendor number in VMR creation screen mandatory or not. Pls
explain
can youmetell with steps.the difference & types of deductable & nondeductable taxes .
me about

Wut is pricing procedure,n how does it works.if i have made a pricing procedure
than how does it acts for a material

How do I get a list of open / pending POs by inputting a date-range?


Use command MMBE. If you need information at plant level keep your cursor there
and press shift +F2. You will get complete list of open POs only. If you need
information at SLoc level keep your cursor there and press shift +F2. You will get
complete list
something is of openItPOs
wrong. only.work. Pls. check.
dosen't
Go to Environment - Open Pos , check on ME2L or ME2M for getting open PO
qtys
Try to use the ME80FN, with the functionality of Dynamic Selections, select the
delivery completed and key in the not equal to "X".
IN MB1B trabsfer poting, there is a provision for 4 line items to enter. My clients
wants to have 30 line items in Item entry screen. Is there any way to increase the
line items. Shall be grateful, if you anyone can help me out
Try the following T.CODE: ME2B REQT TRACKING NO: AS REQD
PURCH ORGN: AS REQD SCOPE OF LIST: BEST SELECTION
PARAMETERS: WE101 PLANT: AS REQD DOC DATE : AS REQD THEN
EXECUTE (F8)
By mistake one user has done GRN more than PO qty. Due to which the extra qty
is uploaded in stock with 501 M mov type in RT package. we cann't reverse by
using 502 M movment type. Is there any transaction code to reverse from RT
package
PL REVERSEto vendor.
COMPLETE DOCUMENT THEN MAKES GRN WITH ACTUAL
QUANTITY.
One of my my client is having is having following scenario:
1. While in process, material gets failed and the goods received are sent back to
vendor as return to P.O. once we do system will generate the debit note to vendor.
But the issue is while we return to vendor the debit should also include both the
P.O price and the process cost incurred by him. Is it done by any of the standard
SAP transaction.
2. While we return to Vendor i include the items which are not processed having the
same material status as we receive against the P.O. But once it has changed it
form from one process to another, how to include this item also for return to vendor.
Even though some how i include the transformed items also for returns to P.O,
whatthe
For i will doproblem
first for the excise
there ispart. How cansolution
no standard i capturein the excise
SAP. pricehad
We also for faced
the a
similar problem in one of our clients.
for the first one, vendor will not take responsibility as these material is damaged
while processing and for these the responsible person is your material GRN signed
people only. for the second one, ( the same material and it is not yet used) you can
reverse the GRN after checking with
excise dept whetehr part 1 and part2 is submitted or not????? this is my view and
am i correct?????
For first problem you can raise either return PO and mentioned the amount or raise
subsequent debit / credit option

In one one of my client, Scenario is: They are using tools after some process is
tranformed to other status of Material:
SAY X IS THE TOOL AND DURING OPERATION THIS TOOL IS DAMAGED AND
TRANSFORMS TO SAY Y.
BOTH OF THESE TOOLS X AND Y ARE USED IN PROCESS. AND FOR TAKING
Y INTO INVENTORY I USE MATERIAL TO MATERIAL TRANSFER. BUT HERE
THE ISSUE IS SAY MATERIAL X IS HAVING SOME VALUE 10 AND MATERIAL
Y IS HAVING VALUE 8. THEN WHEN WE DO MATERIAL TO MATERIAL
TRANSFER THE IT ALSO HIT THE PRICE DIFFERENCE ACCOUNT AND IN
TIME WHEN THIS CONTINUES, THIS PRICE DIFFERENCE ACCOUNT WILL
PILE UP VERY MUCH TO THE EXTENT, WHICH MY CLENT DOES NOT WANT.
HOW CAN
Use split ADDRESS
valuation THIS. x and y.
for material
SAP recommends a different material code for any material changing its
charecteristics, so you can go for a diff mat code.material to material transfer can
still be done provided both are in same UOM. Second option is go for split
valuation.
how you will get the stock for the item "y" which is coming from the damaged item
"x" in order to transfer from material to material transfer??
material "y" is occuring due to the damage of material "x" in the processing. So,
where you will get the stock of material "y" in stock????
You would need to make a transfer posting from Material X to Material Y. So
automatically, the material X stock will be reduced by that quantity and the stock of
material Y will increase by the same quantity.
I would suggest that after you made the transfering of material to material with
same UoM. You may use the MR21 to adjust the Moving average price of course
with the approval of Finance people. So in that case the MAP will maintain of that
level. I hope this suggestion could give you an options of what to do.
In t-code MB1B you can transfer one material to the other provided they have the
same unit of measure

What is the movement type for issuing goods against STO? and also the Tcode
please.
Once STO is created then create and out bound delivery by t.code vl10b and then
change that delivery by using transaction vl02n there you pick the qty and do PGI
fromwhat
Ok there
movement type should be used for posting goods issue.
You will not give any mvt type sytem will pick the mvt type if i am not wrong i think
641 mvt type and do recieve the material wrt to outboun delivery in th plant from
where you have issued the STOP

While doing MIGO for subcontractor I have received the erorr as follows. 543 mvt
type in not valid.
Mvt type 543 is automatic mvt type.Say for example subcontatcting vendor is doing
some operations and after that he is giving back you materials .He has consumed
some of the raw materials provided then when you will do the GR for that
subcontarcting vendor wrt to PO then theraw materials which were issued ( transfer
posting to SC vendor ) will be shown in the GR line with the mvt type 541.

In normal subcontracting scenario we will issue components to vendor and we will


get final assembly but i want know about reversal scenario we will provide final
assembly and we have to get all components from vendor. How this scenario can
be configured in MM . Plz give me the solution. I am faced this in a interview
See this is situtaion where customer is placing and order to your organisation for
the final product and you are providing the final product to the party .You will place
order to the vendor for the materailk required for materials you need for
manufacturing
Use thatUNBW
materail type fianl product.
only qty is updated but no value
The scenario is like this .we are giving a car to a vendor and we have to get back
all the componets.how we will configure in MM Please explain me in steps
While creating PO I am gettitn the error message " Enter rate / EUR rate type M for
17.05.2007 in the system setting" . Can anyone please help ASAP.
By default the Vendor currency will be the PO currency. Confirm your venodor
currency and the PO currency first.May the problem with this otherwise just come
back for further assistance. We have to analse the FI settings.
I think u can solve this problem by exchange rate setting in FI.
go to OB08, set currency / exchange rate,for M... it wil be corrected

I had a problem with material valuation when i am posting a document with MVT
type 561 (i.e intial entry)It is giving me tha error,"Material valuation is incosistent in
_____ valuation area",for this material(val. area) material ledger is active.
Pl maintain transaction key BSA g/l account.

i have an issue " When materials (Stock) transferred with in a plant b/w two Storage
location Subsequent Document (FI) is not generating".
the solution i found from the books is Accounting Document is generate only if the
materials is Split valuated and valuation type changes in the course of the transfer"
Can you please tell me where this materials is split valuated and where this
valuation type changes in the course of stock transfer.... .

I am trying to implement PM PCS interface through which I want to download


vibration reading data from a CSI software and also some other measurement point
data from other Plant other level-II automation system to SAP. Can anybody throw
some light.
I want to restrict maintenance notification and order creation based on
measurement value crosses the prescribed limit and also with my intervention. I
have deceded to use PM-PCS interface and available function modules

I am facing one problem. when ever i open Transaction ME21n and MIGO system
proposes document date and posting date as 02.02.2007. and each time i have to
change this date. I have set my posting period as 05.05.2007by OMSY and MMPV
transaction . Also in subcontracting when
i tried to provide vendor components with ME2O system giving error that posting is
only possible in current period 5.5.2007 and i cannot provide materials. I have
created PO and BOM date in current period only. also tried with OB 52 but i could
not sove this problem. Please help me in solving this problem.
How to create info record for split valuated material(Ex. Having price rs. 10 for
domestic and rs. 15 for international) . Please explain procedure to do the same in
SAP.

Hi, mGinger.com pays you to read ads on your cellphone! These ads are only
about your interests. Not only that, you get to decide when you want these ads.
Based on my calculations I can easily make enough money to free up my cell
phone bill. Check it out... http://www.mginger. com/index. jsp?inviteId= 152768
See how much you can make. Have fun calculating. ..and sign up.

Is it possible to run MRP for newly created material which is having all
views?????? i maintained all requirements like safety stock, ROL
and minimum stock and MRP type also.

is it possible to upload all material view while migrating the material from legacy
system into SAP by LSMW or some other means????
Ofcourse it is posible it depends upon the lsmw program u make ,u can open all the
views in lsmw

what is the impact in accounting documents by valuation class while transfering


some material from one plane to another if these two plants are having different
valuation
With class??
two step procedure : At issuing plant: A material document is generated
along with an accounting document is generated @ valuation price form issuing
plant.
At receiving
This plant: A material
is Intra-Company document
transfer within is generated
the company. .No about
What accounting document is
the Cross-
company transfer. Please specify which document and accounting entry is
generated, Also please give the customization setting both for Intra as well as
Inter Company Stock Transfer. Waiting for your positive reply from you.
For different co. code , system will generate addiitonal accounting document at
receiving plant too. I will get back you on customization for different co. code.
Need to carry out following customization as per my logic goes. didn't finished full
customization due to other urgent requirements
1.0 Create co. code.
2.0 Create Plant
3.0 Assign plant to co. code.
5.0 Prepare Stock driver " UB " Document type .
6.0 MIGO : Goods Issue : MVT 351
7.0 MIGO : Goods Receipt : MVT 101
This should finish your requirement.
if your valution is at plant level and your doing stock transfer between plants
recieving plant will generate 1 accounting and 1 matrial docment
and issuing plant will also generate the same in one step procedure check for mov
type 301
could any one let me know the difference between the BOM (bill of material) and
configural material with examples.

Plz explain me the sequence steps of scrap handling in subcontracting what is the
procedure ,how to handle it,explain in brief7give steps for practice.
Scrap in subcontracting can be handled in two ways 1. Give scrap percentage in
the BOM itself, So that when your transferring material to vendor , system will also
consider the scrap percentage Eg: Let us say for making 1 Part You are giving 10
kg in BOM. If you put 10% scrap, system will transfer 11kg.
2. Another method is Create new material code for scrap and In BOM put it as
negative quantity.So when you transfer the material to vendor this scrap is
generated automatically by 545 movement type to stock at vendor. Then you can
transfer it into unrestricted stock by using movement type 542.
I want to address two questions to you. First one How to handled BYE-PRODUCT
in the Subcontracting Process. Second one is how to reverse all the transactions in
the Subcontracting Process with details explanation along with the accounting
entries. Please give the details steps of reversals of this process. Waiting for your
valuable reply form you.
Please help me in getting clarification
1. Can price control be changed from moving avg price to std price or vice versa?
What if transactions have been done, stock is available, material movement done.
2. What are the benefits of defining sales depot as plant? What if sales depot is
defined as depot only.
3. What is the need of defining separate rejection store? Can we avoid it even if in
our plant rejection is generated during production
Following is the extraction of SAP help on change in proce control : Under certain
conditions, you can change the type of price control: From standard price to moving
average price You can make this change at any time. The moving average price
(which until now has been updated for informational purposes only) replaces the
standard price and is used for valuation from now on. From moving average price
to standard price You cannot make this change in the following two cases: If the
material master record is set up as a valuation header record for a material subject
to split valuation For more information, see Split Valuation. If the standard price
comes from costing and is not equal to the moving average price If the change is
possible, the moving average price becomes the standard price, which is then used
for valuation. You change the type of price control by overwriting the price control
indicator
Appart in the
from thismaterial master record
if you deselect with the
the indicator new Control
: Price indicator.
Mandatory , while
customizing the material type, then only it will allow you to select/change price
control
It means type
we can change price control at any time. But not getting clear about the
implication on material valuation. In my case split valuation is not there. What are
the benefits of taking std price control for semi-finished & finished goods and if as
per client demand we make price control for semi-finished & finished goods as std
price control and latter we change it to moving avg price, what will be the impact?
Need clarification on sales depot defined as plant (cash sale is there from sales
depot) and requirement of separate rejection store (rejection is generted during
production process).
Please help me on following issues:-
1. We require a report whereby on processing ME2M for open pos,current stock as
on date, plant wise, storage location wise(globally) appears
2. Requirement for Debit Note printout as per user format.how to map?

When repair/rework sale order is created and MRP is run, system is netting the
repair order quantity also. Since repair / rework does not require raw material, I
want MRP to plan for the entire forecast quantity and netting off not required. For
example: Forecast quantity for finished goods - 1000 Nos. (Demand reqt) Repair /
rewor sale order quantiy - 200 Nos. (Supply, treated by SAP) After MRP, system
creates planned / prod order for 800 numbers.
rework QUANTITY is treated as supply in SAP and netted off against the demand
quantity of 1000, net planing made for 800 numbers. pls provide solution for this

how we give quotas to different vendors, plzz help me out with step
Currently, we are facing of valuation of imported raw material in the SAP, this is
mainly because of improper loading of local expenses on the
inventory at the time of grn preparation. To overcome this following procedure is
proposed:- This will require creation of a virtual plant location called "EXIM" .All
import will be stored first in the virtual location. after collecting all the local
expenses,material will be transfer to the main
plant location. In short only material cost will charged on EXIM plant & all other cost
is charged upon MAIN plant. Pls. comment whether it is feasible /implications on

Can anybody give me infomation on how to change the date which is coming as
default when opening me21n and Migo transaction. Because of
this i cant issue materials to vendor by me2o.I am getting error posting only
possible in 05.2007 which i have set by mmpv.
the error is not due to the default date in po and migo it is due to the month openng
u have already closed the month of april ,so u can do postings in may only ,only two
months can be opened at a time in logistics. if u want to open april u can use mmrv
the default date is no problem of ur error
Check MMPV again. System should allow for current and previous month posting.
otherwise you can post document back dated also.
Thank you for your reply for solving my problem. Actually problem was not because
of open periods.It was because of my system date only. Now i can post goods
issue to vendor by me2o.I had set my posting periods right my mmpv. But even
with out using MMPV you can set it by removing plant Co code assignment
temporarly and after setting period in omsy you can reassign it .I want to know this
procedure
Thank you is
forright
yourorreply
not .for solving my problem. Actually problem was not because
of open periods.It was because of my system date only. Now i can post goods
issue to vendor by me2o.I had set my posting periods right my mmpv. But even
with out using MMPV you can set it by removing plant Co code assignment
temporarly and after setting period in omsy you can reassign it .I want to know this
procedure
If u removeistheright or not . than it can hav e some financila implications over the
assignment
valuation of the postings better consider some other idea

I want to enquire that how we can fix the cost centerwise quota arrangements for
goods issue.Pls. give me the right way to implement this issue in my industry.
Please help me on following issues:- 1. We require a report whereby on
processing ME2M for open pos,current stock as on date, plant wise, storage
location wise(globally) appears 2. Requirement for Debit Note printout as per user
format.how to map?
How do you handle this scenario in SAP.
1. Material A is imported from USA and cleared thru a port In India.
2. The payment is made in advance to bank.
3. The material is shipped from port to factory thru different trucks and the freight
charges for individual trucks will be paid.
4. Now the entire consignment is consists of product cost + clearing cost + freight
charges.
5. How do you calculate the total cost of the product.
6. and
you how
have toare the necessary
create different documents linkedas
condition types with
pereach other
the requirement. Mainly in
Import pricing all the costs are known at the time of GRN i.e. in the condition types
delivery charges tab will marked if u c the condition types. U can create frieght
eg.FR1,FR2,FR3 like that and give description as u wish Other condition types are
Insurance,CIF, CVD,Customs duty,Custom education chess like that.

Can anyone send me all customization steps for Vedor Evalution,with Screen shot
will be better

I want to have PO release by vendor. I did the configuration, but when I am


checking the classification in release strategy in SPRO (OMGS), I am getting "error
in classification"

want to know which is cost account when doing the goods receipt. when doing GR
sysytem post as follows.
Dr stock (is this the cost of sales?) Cr GR/IR (what exactly is GR/IR) and
when do IV it post Dr GR/IR Cr Vendor
DR Stock (101) -> Inventory Cost.
Goods Receipts/Invoice Receipts for Purchase Order
Transaction OMW1 allows you to set whether the Price Control is a mandatory "S"
or "V".
V indicate that you want the system to value the stocks with the latest price.
S indicate that you want the system to value the stocks with a fixed price method.
Price Control V - Moving Average Price
Assume Material Master current price is 10
Goods Receipts for Purchase Order - Movement Type 101
Material Document Posting created - inventory increases
Accounting Document Posting created
Debit 12345 Inventory 12
Credit 67890 GR/IR 12
New Moving Average Price = ( GR value + Total value ) / ( GR quantity + Total
stock )
Invoice Recipts for Purchase Order - MR01
Accounting Document Posting created
Debit 67890 GR/IR 12
Debit 12345 Inventory 3
Credit 45678 Vendor 15
New Moving Average Price = ( Inventory difference of 2 + Total value ) / ( Total
Stock)
Price Control S - Standard Price
Material and Accounting Document is the same.
The one with the lower value will be posted with a price variance entry.
Event of RawMaterials triggers FI entries based on valuation class, right ? Same
way, it could be WIP, FG and so... I would like to know the list of Account codes
(FI) built in the system where it is being mapped against different type of material
valuation
T classes!
code : OBYC : To make assignment of Respective G/L account to respective V.
class. & T. code : OMSK : to make assignment of V. Class to Accoutn category
and Material Type.
Whether any report available for DELIVERY CONDITION GRN & LINE ITEM
WISE. I want the report for particular PO or GRN prepared in specific period. Is
there any standard functionality or I need to develop Y-Report.
In ME2L : Seelct scope of list : everything possible This will give the item wise GR
and opened qty
itry cooispi for various reports
You can use FB1LN REPORT TO SEE DELIVERY CONDITION GRN & LINE
ITEM WISE.
I am new to SAP and in learning phase. Can any body help me getting details
about CIN, it's use and customisation in MM prospective.
Could you please let me know what are the Special Stock Indicators. Please help
me.
Special stock indicators are the ones that identifies special stock material like
vendor consigment material(K), pipeline stock(P), project stock(Q), orders on
hand(E), etc., Usually it is combined with the movement types.( you could see a
single character field close to the movement typesfield like in MIGO).
Special stocks are stocks that are managed separately as a result of their not
belonging to your company or being stored at a particular location. There are
several types of special stocks. e.g. Stock of material provided to vendor
(Subcontracting) , consignment stock, returnable transport packaging etc. You can
find a single character "item type" indicator while creating Purchase Order for each
line
If item, which
i assume indicates
that your queryspecial stocks
is about the special stocks available at your plant, the
stocks are differentiated in MB52 warehouse stock report where the the stocks of
each material available is specifically differenciated for example "E" is for Sales
order stock and "O" for Vendor stock check the report for other types.

Request you to please explain me what is Account Reference Key.

Can anyone give me some examples of user exit that is applied in MM area in a
real time scenario?
1.User exits can be found out using a development class or a package.
2.For which transaction you would like know whether user exit is available or not.
example 1. When ever i will crate a purchase order my vendor is same for a
particular purchasing group and a particular purchasing organization . Procedure
to find out the user exit .
3.Foer which transaction u would like to see the user exits forst got to trandsaction
got system status and find out the technical name i.e is package.
4. By going to the SMOD transaction give package name and find out the real user
exits available or not .once it is available go ing to edit attributes write program by
givng the filed name = '9999' (some vendor) and save ,ceck ,save ,activte.
5. go top CMOD transaction gove that user exit in the filed area and activate .
6.Go and observe in me21 and see that 9999 vendor by default will come when
ever you will crteate po.
Find this Develop Enhancements for Purchasing In this step, you develop
enhancements for Purchasing. The following SAP enhancements are available for
the Purchasing area:
AMPL0001 User subscreen for additional AMPL data (manufacturer part number)
LMELA002 Adoption of batch number from shipping notification at time of posting
of a goods receipt
LMELA010 Incoming shipping notification: adoption of item data from IDoc
LMEQR001 User exit for source determination
M06B0001 Role determination for release of requisitions
M06B0001 Changes to communication structure for release of requisitions
M06B0003 Number range and document number
M06B0004 Number range and document number
M06B0005 Changes to communication structure for overall release of purchase
requisitions
M06E0004 Changes to communication structure for release of purchasing
document
M06E0005 Role determination for release of purchasing documents
ME590001 Grouping of requisitions for PO split in transaction ME59
MEETA001 Determination of schedule line type (backlog, immediate requirement,
forecast)
MEFLD004 Determination of earliest delivery date for checking at time of goods
receipt (PO only)
MELAB001 Generation of forecast delivery schedule: realization via creation profile
MEQUERY1 Enhancement for document overview ME21N / ME51N

I wanna create a PO, which when printed should include different delivery ( ship-to)
addresses, with a common invoice (bill-to)address.
Apart from manually entering the delivery info in the header text of the PO ( which
is laborious), is there a way out? any BAPIs u can think of???
Use trans. code "MEAN" to create the ship to address. When making POs goto
item detail and enter the code in the tab "Delivery address" field "address".
You may type plant code for the delivery address billing address could be different.

In case of standard PO,Schema group is attached to vendor in Vendor Master and


this scema group decides the Pricing Procedure to be picked up in Purchase order.
In case of Stock transport Order (STO) how does system picks the pricing
Procedure. Also in STO the condition tab does not come up as SAP standard.So
what is required to be done for condition tab to come up during STO creation
For stock transfer order , pricing schema is attached to document type.
Suppose i have to transfer material from Bhivandi to Mumbai plant because of
which the valuation of material changes.To get the effect of change in valuation of
hte material what r the settings.
Use Stock Transport Order for this txn.
There is an option caleed Split Valuation. It can be used to solve this issue. Same
Item code at two different plants can be maintained at two different valuation levels.
is it Inter company or intra company
Plz.guide me for both the cases.

How to get the Pending Purchase Order details considering the Inbound delivery
document(Intransit Entry Details).

what is vendor evaluation.. what is its transaction code..pls tell the procedure..pls
ME61

Good Morning.I Have 2 Problems in Subcontract System in SAp. We send the


Material to vendor (thru 541 mvt type) .we Create a Challan For this and material is
send out. 1. My Problem is when we send the Material in 2 Batches we are
notable to reconcile the Challan . 2.Also it is a long Process For the User.
Creating the challan,Reconceilin g it. Is there any Possibility to minimize the steps
of Subcontract
You Process.
have to create separate separate challens for two batches. After grn you can
reconcile challen by t-code J1IFQ.YOU MINIMIZE the steps incorporating
reconciliation of challens at grn itself

Ask to your Technical Consultants to write a program which will chage the tables
MARV, - BUKRS & MARV - LFGJA ..

If I want to mainatin source list for RFQ & at the same time for general Vendors too
for same matearial. IS it Possible?If Yes then How to do it.
YES POSSIBLE,FOR THAT WHILE CREATING RFQ YOU CAN MAINTAIN
SOURCE LIST THROUGH ENVIRONMENT TAB. FOR GENERAL VENDORS
USE
I thnkT-CODE
you haveME01
to maintain the source list, putiing all the vendors which you have
identified. Also you could also maintain the Quota Arrangement to put the ratio /
percenatge of all the vendors indicated to your source list

can you tell me about the difference & types of deductable & nondeductable taxes .
Difference between PB00 &PBxx how they take axes sequence. Like this way plz
explain for some imp condition types
PB00- automatic pricing
PBXX- manual pricing
To explain it in details.....
1. If you create an info record manually or automatically, the gross price entered or
adopted is assigned to the condition type PB00. When a PO is created without
reference to a contract or quotation, a vendors gross price for the material is
adopted from the info record conditions (or wherever appropriate from the order
price history) as the default value for condition type PB00.

If no valid info record conditions exist and no order price history is found, R/3
system is not able to suggest a price and requires the manual entry of the net price.
The manually
There are two entered
types of price is assigned
condition type thatto one
condition typetype
condition PBXX.
which have access
sequence associated with them.In such types of the condition record are
maintained and the records are read based on t he search startegy defined in the
Acess sequence.
PB00 is condition type for price havig acess sequence associated .
Where
Both theasCondition
the condition
Typestype PBXX
PB00 is manual
& PBXX condition Types
are Condition ( access sequence
related attached
to Gross
Price.Both the Condition types will ahve the same Step number with a different
counter.
PBXX is a manual Condition Type and will not have any Access Sequence
assigned to it. It can be entered only manually in the Purchasing document.
PB00 is an Automatic Condition type and an Access Sequence will be assigned to
it. whenever a Condition record founds, then it will be updated in the Purchasing
document with the price from the Condition Record.If there is no Valid Condition
record
PB00 isfounds, then PB00
with access Seq iewill
thenot be included
valuse for this instead
conditionPBXX can beup
are pickec entered
from
condition records

PBXX is
PB00 is mainly
with outused
Access Seqautomatic
for the ie u will have
priceto
inmanually
purchaseput the ifvalues
order, u haveinany
PO
condition record like info record, contract or any other condition record, in the PO
system will fetch PB00, otherwise the system will fetch the PBXX, because for the
conditon type of PBXX in the control data it has been given as manual entry has
priority. Only PB00 will be there in the condition record. u cant find the PBXX.
Difference between CType PB00, PR00 & PBXX
Can someone pl. explain the difference betwenn Condition type PB00, PR00 &
PBXX. Also which are the condition types do not have Access sequence and why.
PB00 is the price entered manually in the info record.
When no PB00 is found, the standard pricing procedures look if there has already
been created a purchase order. If so, it tries to copy the price of the last purchase
order. This is noted in the purchase order as PBxx.
PR00 is the standard sales price.
Some condition types like PB00 and PBxx do not have an access sequence.
This means that those pricing conditions have to be filled in via the info record.
Nice reply only it's wrong. PB00 is the price found using any condition access, not
just info record. ANd PB00 does have an access sequence assigned to it.
My honest mistake. PB00 does indeed have an access sequence.
Conditions like FRx1 don't have an access sequence.
This means that you enter those conditions on the inforecord or directly on the
purchase
PBXX is the order.
PRICE considered for the PRICING PROCEDURE,where in PB00 is
the BASE PRICE considered for TAX calculation,example if you have maintained
PBXX=100 and FRIEGHT=10 you have configured you pricing procedure such way
that ,the freight gets added up to the BASE PRICE(PBXX) and on that TAX is
applicable ,in such scenario's PBXX=100 ,where in PB00=110 ,on which TAX is
calculated
can you tell me about the difference & types of deductable & nondeductable taxes
Deductible:
If the tax is deductible means that the taxes will be taken seperatley from the base
amount based VAT,Service tax,Excise etc and will be assigned to separate GL
accounts which will be used further for Utilisation

Non-Deductible:
If the tax is Non-Deductible,the taxes will not be taken separately to GL accounts
and will be added to material accounts.
In case of some materials, the tax paid on purchase of items can be availed back
from the goverment, This is called deductible tax. Here tax portion is not loaded to
material inventory, It is posted to a separete GL account as per the config and later
stage it will be cleared-off by finance
In case of non-deductible tax, the tax amount will be loaded to material inventory.
Here company can not claim this amount back from govt.
regarding configuration, u have to define a new account key in case of deductible
tax and assign gl accounts
in case of non-deductible tax u can use SAP standard key NVV
How to get price automatically in the purchase order?
Price in PR doesnot get picked up from a contract or, an Inforecord.It always get
picked up from the Valuation price in the Material Master.But,when you convert that
PR to PO,it automatically picks up the Contract price if reference of contract is
given.
How to make the PR price come to PO automatically
1. Go to SPRO > MM > Purchasing > Authorization Management > Define Function
Authorizations for Buyers > Function Authorizations: Purchase Order > Here "New
Entries" and define Function Authorization Key as "01" and give description.
OR use T. Code - OMET
Here under "General parameters" subscreen, cctivate "Adopt PO Price" indicator
and select "Enter conditions"
In "Possible ref. objects", select "W/o reference" otherwise reference documents
(for e.g. PR, RFQ, etc...) for PO creation will become mandatory.
2. Now go to SU01 > Enter User ID > Parameters Tab > Here for Parameter ID
EFB i.e. Function Authorization: Purchase Order, maintain value "01" and check in
PO, PR will become mandatory for that user.
3. Now during creation of PR in ME51N, under "Valuation" Tab, you will get option
for PO Price Adoption as Net or Gross. Select as per your requirement and it will
copy Price to PO.

In order to create purchasing document is mandatory with PR reference . I have


done in config "Define Function Authorizations for Buyers" for all Purchasing
Document such as PO, Contract and RFQ then assign them in SU01 for parameter
EFB, however, only PO works others do not affect. Is there any parameters besides
EFB shold be set in parameter? Thanks.
.The function authorization is defined only for Purchase order documents not for all
purchasing documents.
2.The user parameter ID EFB only controls the Purchase order Function

Consignment process in SAP


SAP MM Consignment
SAP Consignment is process wherein you buy the goods from vendor, but dont
valuate that stock. Only when goods are withdrawn from your stores, are you liable
to your vendor for your payments. Best example would be big TV shop which buys
the goods from its vendors for advertising and display purposes and only when they
sold, vendor charges him.
Consignment process in SAP MM is handled through item category in purchasing
documentand it has certain prerequisites/steps for consignment process to work.
1) There must be price maintained in inforecord for consignment (info type 2 in
EINE table) for certain material, vendor, purchasing organization and plant.
Prices need to be maintained in inforecord which will be used when settling
liabilities with vendor.(ME11)

2) Create the Purchase Order with item category K in ME21N to order the goods
from vendor for consignment.
3) On requested delivery date in Purchase Order, do MB01 -101 that is Goods
Receipt for above goods on consignment. Again one important point is, you are still
not liable to pay your vendor. These goods will not be valuated, accounting
document will not be posted unless stock is withdrawn from consignment for your
own use.

4) You withdraw the goods for your own purpose. Like in our example of TV shop,
customer buys the TV. So that means shop keeper withdraws the goods from his
consignment
I am having astock andwith
problem nowconsignment
vendor will be his liability.While trying to settle the
settlement.
consignment in MRKO, I am getting the following error message:
Consignmnt settlement: No message was found for partner 123/company code
1000. Is there any message indicator which needs to be turned on?

You can goto tcode MRM1, specify the condition type = "KONS" for consignment
and Company code = 1000
Remember not to specify the partner in the condition record. Then proceed to
MRKO to do your consignment settlement.

I did what you suggested and now I am able to settle the consignment. I am able to
see the invoice document that is created. Thanks once again for the help!

will system create different record nos during different info record creation for the
same material and vendor?
System will consider only one info record no. for three different categories of info
records (standard, subcon, consignment) for the same material & vendor

am facing a problem we want to reverse some goods movement Done in jan 2007
& i know that in MM period i just cant do that am allowed only to post in the current
& the previous period. is there any other solution so that user can post this
movement
Actually in jan &difficult
It seems we now to in may 2007
reverse some movements to go backward. Since we
already on the month of May'07. If its one month ahead we could open the previous
period (MMPV / MMRV). The only you thing you could address that issue if you
conduct a quartely inventory count. So , that is the time you could correct your
inventory with valid justifciations.
could anyone tell me the procedure for bidding process where in the vendors give
security deposit(EMD) ?how do we map this in sap

I want to know one thing.Is this possible to post an invoice and credit memmo
simultaneously. How to confiure that, putting invoice reduction as allocation and
reason as "vendor error" if vendor charges more.Will system generate two
accounting documents.One invoce document and one credit memmo.I cant able to
post invoice and cant generate two accounting documents.Can anybody tell me
how to configure it.

When creating parts order via custom transaction got the following short dump
message 'DYNPRO_FIELD_ CONVERSION' Custom tranaction is equivalent to
VA01

I was created witholding tax for TDS and E.cess. While doing MIRO E.cess is
calculating on base amount, it is not caluculating on TDS. Can anyone help onthis.

Would anyone know what the REPLY TO dataname is of an SAP/Internet SMTP


email? We have been able to pass an email address to the TO attribute, but
currently the email is getting set up with the SAP logon userID and user email
address. We need to override that value from a lookup table of Customer Service
Rep email addresses. Then when the customer REPLIES to the email, we can
dictate to whom it will be returned.
Another question has arisen concerning the SAP/Internet email object. Does
anyone know about the FORWARDER field? This shows up in the code, but seems
to always be null. We are running SAP v4.7, and desire to re-populate the FROM or
REPLY TO field such that when the SMTP SAP/Internet email becomes delivered
to a customer, if they choose to REPLY to the note, the email REPLY TO value will
be populated or formatted by programatic choices, rather than using the SAP logon
userID email address of the person who created the iniital outgoing email object.
We want the email to become replied to another email address than the person
who sent it out.

I would like to know the concept of Split Valuation in material. Anybody could
explain and make a scenario as well.

How to execute this scenario? Set up intercompany movement of finished goods


based on triggering a "background" Stock Transport Order/Materials Movement to
shift ownership of Finished Goods from Parent Company to Sales Company upon
receipt of inventory from either manufacturing order or purchase order (incase of
Third Party manufactured items) to allow appropriate intercompanyaccount ing to
occur.
This is a case where both MM and SD are involved. We have to use Standard
Purchase order for the same. The movement types to be used for transfer of Goods
is 643 and the GR at the receiving plant should have the movement type 101.
Steps involved are:
1. Creation of PO 2. Delivery of Goods (Dely Type NLCC) 3. Billing 4. Receipt
of Goods
Stock 5. Invoice
Transport OrderVerification Can
is created for anybody throm
Intra-company some Is
transfer. light on case
it the "background"
of sub-
contracting?
Can anyone tell me how the t.code MC46(SLOW MOVING ITEMS) works . I mean
how system calculate the slow moving item by considering & excluding which
movement types. What are the selection criteria I need to enter

How to extract report form the system regarding Dead Stock,Non Moving,Slow
Moving,Fast Moving Items from the system. Please give me the Standard SAP
Transaction , and how to run that. Please explain, it is urgent.
Please try MB5B
Please try MC46 for report on slow moving. Non moving
Try the Tcodes Mc46 and Mc50 For Dead Stock,Non Moving,Slow Moving,Fast
Moving Items
How can i configure, so that during GR for raw material sap will: Debit Stock
Account ; Credit GR/IR ; and at the sametime, Debit Purchase account ; Credit
Purchase Offset account ; I have already activated the purchase account
management, and also i have done a tick in Receipt Value and Delivery Cost at
SPRO : Calculation of Value Purchase Account. Also I have assigne a GL account
to FREis and
What FR1 in
the error OBYC.
that But it still doesn't work.
you receive?
There is no errror , but the purchase account still doesn't work. When I do GR, the
jurnal generated is :
Db Stock Account 1100 Cr GR/IR 1000 Cr Freight 100
I want the jurnal generated is : Db Stock Account 1000 Db Freight Offset 100
Cr GR/IR 1000 Cr Freight 100 Thanks for your help.

can u help me to ealuate two vendor on cost quality and delivery basis , the case is
vendor 1 vendor 2 Quality 30% 85% 90% Cost 30% 100.00 110.00
Delivery 40% 8 days 10 days How do i evaluate plz guide me, I am new
in MM.

Plz tell me whats the difference between Valuated stock & Non Valuated stock.
Valuated stocks are those stock which carry inventory values and non valuated
stocks are those which are having no values (ur inventory value is nil)

Can anyone please tell me the steps involved in configuring Workflow for Invoice
Parking?

want to set a new field reference with name ( Industry Sector )


Use OMS3 to create new field reference

I have a question about release strategies. Can I create more than one release
strategy for the same transaction? For instance, our approval process for Assets is
different than it is for Expenses. My relase procedure for assets has already been
created and is working properly, it uses fields fields CEBAN-GSWRT (value),
CEBAN-KNTTP( Acct. Assignment). I want to create a new one for Expenses. (both
for PReq Release). The new release procedure would use fields CEBAN-GSWRT
(value), CEBAN-KNTTP(Acct. Assignment) and CEBAN-MATKL( Material Group),
since I need to exclude some material groups we don't want affected by the release
strategy.
Can you
Yes I create a create
could new one?one,orbut
does
thethe system
existing only
one allows
MUST be one RS? as well to
changed
include the new characteristic - material group since only one class can be
assigned to release group.
We are planning the beneficts of migrating from 4.6C to 4.7, 5 or version 6 of SAP.
We were wondering if anyone knows about the cost of the migration between
version, the cost of consulting and waht kind of techinal issues you have to
considerer before making this step.

According to SAP, the recipient of an email will reply to the FROM value, unless the
REPLY TO HEADER of the email object is populated. We are having trouble trying
to locate where you can populate this REPLY TO HEADER. Does anyone know of
some field or datanames they we could track down? Our goal is to send the email
and have the recipient REPLY TO a different person than the SAP logonID of the
sender.

I have been following this forum for a while and this is my first post. Hope you can
help me on the following issue:
Scenario is that a Corrective type Work Order is created for a component of an
equipment. The activity type is Replacement. This is a stock item with no available
stock and thus generated a Purchase Requisition against the Work Order. This PR
goes through the procurement process for the new component from the vendor.
When received, it is received against the work order and the work order is closed.
Now, it is decided that the defective component from that equipment needs to be
repaired/refurbishe d. So how can I (through a Work Order):
a) Put it back into inventory and under what cost (salvage value)?
b) What will indicate in the Purchase Requisition that this component is owned by
us and just needs a refurbishment service at vendor site w/o entering
subcontracting (it is out of scope for this project..don' t ask me why)
c) How will I receive it back into inventory when the service is performed by the
vendor
d) What value do I put it back with in inventory?
e) When I put it back in stock, how will this close the work order?
To give you some further background as per our current design we currently have
split valuation
If your fortonew
not going andSAP
utilize refurbished only. there is no way to reflect the
subcontracting
inventory in vendor except as TEXT. Also, there would be difficulty on the
accounting posting since it will be posted to subcontracting account instead of part
of inventory costs.
Unless, your willing to do manual monitoring, account re-classification then its
possible, but let me warned you its a long process. Kindly try to persuade your boss
to give subcontracting a second look.
Through MM route it is not possible
Use PM module for this :
Create Refurbishment Order : IW81 Transaction
Do goods issue to vendor against this .
Then do GRN for this .
Refurbishment cost will be loaded on material Value .

I need the Complete Release Procedure For Purchase Requisition .Can Any Body
Expalin me in Detail.

Could u pl. tell me how to do the mass deletion of old Schedules and POs.
Use TXN: MEMASSPO, Select 'Deletion Indicator' from Fields tab and mark 'X' for
selected PO's. Execute!
Try txn cd "MEMASSPO"

i hv a problem & have to solve it by today. my cllient wants that while creating
purchase order,d vendor-material data 4m inforecord shouldnot follow in PO.but at
same time d inforecord souldbe uptodated as usual. how to solve this problem.pls
help
u can change the p.o. manualy . If anybody knows other than this , kindly give the
feedback .
How to get SLED (Shelf Life Expiration Date) report?
Try MB51 and sort (ascending/descendi ng) SLED/BBD wise
U can get thro lx27
Is there any tcode or report for reporting lead time of all materials (diff between po
date and gr date)

can anybody tell me about printer output settings or EDI settings for any purchasing
documents. in the sense if i want to take output of a finalised purchasinfg doc
,howto make that settings

Is it possible in sap for mass deletion of old reservations. pl. tell me the t.code and
how to set the parameter for deletion of old reservations.
Mass deletion of reservations is not possible as per my understanding

I Want to Know the User Exit Enhancement Object For Tcode ME28 ( Purchase
Order Release).
Actually there are some User exits are there for Purchasing documents release
some of them are
M06E0004---Changes to communication structure for release purch. doc.
M06E0005 --Role determination for release of purchasing documents
i have Written the Paasword Checking Details in M06E0004 For Me29N. It is
Working Fine .But I Need the Same Checking Procedure For Me28 Also. I am Not
able to Find Out the Specific One.
If it not available in the standard lists of User exits, you need to adopt the same
user exit here also. You cannot get a specific User exit like one for one transaction,
Try to utilize the same one for this transaction ME28

i have question,is it possible to do GRN with out PO n due to that GRN PO is


created automatically. if yes than plzz tell me the steps. Like we create PR and PO
can be automatically created the same way.
Automatic creation of POI think it is not possible
I think it is not possible .
IN VENDOR MASTER SELECT INDICATOR OF AUTO PO ACTIVATE SAME IN
CUSTOMIZING
You can receive material without PO into stock. Use movement type 501
501 mvt. type is ok. but suppose i am using 501 movemt and doing GRN.but i want
automatic creation of PO againt the same GRN.how can we do this
In Customizing -- Material Management-- Purchasing- -Goods Receipt--Automatic
creation of purchase Order and make it active for Plant and Movement Type 101.
then on transaction do the following, Use MIGO and select - Goods Receipt,
Refrence - Purchase Order, and click settings and choose Default values, and
select 101 movement type against Material. Click Ok. On Item Overview line
Choose+ for additional receipts without Purchase Order, and this will allow you to
enter material and quantity storage location and Vendor. PO will be generated with
the goods receipt.
In Customizing -- Material Management-- inventory management-- Goods Receipt--
Automatic creation of purchase Order and make it active for Plant and Movement
Type 101 and for other movement types as required. then on transaction do the
following, Use MIGO and select - Goods Receipt, Refrence - Purchase Order, and
click settings and choose Default values, and select 101 movement type against
Material. Click OkOn Item Overview line Choose+ for additional receipts without
Purchase Order, and this will allow you to enter material and quantity storage
location and VendorPO
It is possible to do GRN will be generated
without PO and atwith
timethe
of goods
postingreceipt.
GRN po created
automatically. Auto PO tick in Vendor Master and Movement type 101
Create Info redord with Standard Purchase Org., Enter Goods Receipt / Other /
101.
1.In Customizing -- Material Management-- inventory management-- Goods
Receipt--Automatic creation of purchase Order and make it active for Plantand
Movement Type 101
2. then use t code migo and select reference to PO
3. Below the item overview screen select Non ordered items and enter the material
& qty
4. In item detail enter the vendor.
5. prerequiste: A info record for material and vendor combination should exist.
i6.need
postto and display auto
configure the respective material
po generation docmtype
for the and click
161,on anthe
amPO tab.
able to work on the
same for mtype 101, what facing problem with mtype 161. can anybody tell the
configuration steps ?
try ---------MIGO_ ----setting- --------- default values------ --------- ----change mtype
101 to 161 in non order item.
not only that we need to go to OMJJ transaction, and select 101 movment type and
select the feild selection enjoy and place lifnr also. Then only you can do Auto PO
creation
What is the significance of Industry sector in Materials Master creation?

Kindly guide me on the selection of Materials Block as mentioned in the system


there are Exclusive & Late Material Block, plz tell me which type is prefered & what
are the merits & demerits of the same.

Specifications, Functional and Technical. who creates them and why it is required
and if possible briefly what does they contain inside? Do a specification is to be
written during a user-exit creation giving tables reference etc.

Is there a way that I can change the layout of a std sap report , example "execute
txn cd "ml84". I want to streamline the output into 1 single line. Please advise on
how to do that apart from re-coding it.

I'm facing a problem. Until release 4.6C we got send mail to more than 1 people
after we release PO. 'But now on ECC 6.0 only one is possible. Could I do it by
abap program ? Does anyone has already faced this problem ?
In line with below query, I am also having one query. How to send PO to supplier
by email. I have tried sending but it goes in text format as an attatchment which
contains only PO no. not other details.

In line with below query, I am also having one query. How to send PO to supplier by
email. I have tried sending but it goes in text format as an attatchment which
contains only PO no. not other details.

Plz guide me regarding the settings for the Drop Down Icon. I have created plants
in my co code however after droping down the options the list i get is of my plants
alongwith all the plants which are created by others. Plz guide its very
urgent.Instant
You response
cannot remove will bdown
the drop apreciated.
list completely. But you set your plants to your
personalised list. so only those will appear when you press F4. What you need to
do run the transaction and press F4 there Near to find button you will find the insert
in personal list, so select your plants and put in the personal list, then come out of
the transaction and then again check in the F4 you will find only your selected
plants will be seen in the list. This is a temporary if any body removes that
personalised list then again other plants will shown in the drop down list.
How to send Purchase order by email.

I have setup the PO output for STO to be DP, but after creating STO the message
output is not finding the delivering plant. How to assign a partner to the plant?

The purchase request is subjected to line item approval by cost center... there are
totally 300 cost centers and one release code is applicable to 10 to 50 cost centers.
How to assign the characteristic value in Mass (like 50 cost centers).

Looking for some knowledgable person to address this fundamental question:


HOW DO I POPULATE THE "REPLY TO" PROPERTY OF AN OUTGOING SAP
EMAIL? We are running SAP v.4.7. We have located the function module called
SO_OBJECT_SEND but cannot populate the Reply To field. Recipients respond to
an email and it returns back to the FROM field, which contains the SAP logonID.
Can we fill the REPLY TO field such that we control where the recipient email will
return the email?
I have an issue with sub contracting PO. In our company we create a subcontract
PO for items based on customer PO. i.e., Sales order creation drives the PR and
so PO ( 3rd Party order processing). This PO item category is S-3rd party as per
standard SAP. For subcontracting items, we want it to be L-subcontracting in the
PO. So our requirement is: If you get a 3rd party order for sub contracting items,
system should create a subcontracting PR/PO. Any ideas/suggestions please.
Can u tell pricing procedure steps.

After Evaluation of Vendor by ME 65 We found the ratings as below:- SCORE 02


Unequal Weighing PRICE 43 20% Quality 100 40% Delivery 44 40%
Overall score 66
We don't no how system calculate the price and Delivery In the above vendor is of
single source. Its price has to 100% but it showing less.
Please
For clarify howdelivery
price,quality, systemcriteria
calculate the price
l there and Delivery.
is varience of % by whichvendor is
deviated as per that system gives score of mark

Can any one help me out and explain me how to handle loss in transit when
transfering material from warehouse to stores or from plant to plant ......
In sap show material as scrap in receiving or sending plant in any one of them.
Alternate way is to receive full qty at receiving plant then post scrap movement to
the cost center who is responsible for loss.

When We raise the P.O for value of Rs.1000/- but when we receive the invoice for
the value of Rs.1100/- Please give explanation how to process document entry is
any configuration I have to change.
You can sue invoice reduction in this Customization required : OBYC : Select
RKA : maintain g/l account number ; OMRA : Select document type in invoice
verification --> Select MIRO --> Select Document type ; OBF4: Define document
type if required or use standard SAP settings.
Transactional : MIRO 1.0 Header Amount should be same as Vendor amount.
2.0 Line item amount : Actual amount 3.0 Invoice amount to vendor ( Same
amount as item no 1)
System will generate two documents 1.0 Invoice document Vendor A/c : Credit
1100 G/R A/C : Debit 1000 Invoice reduction a/c : Debit 100
2.0 Creditthe
AMEND Memo Invoice reduction a/c : Credit : 100 Vendor a/c : Debit : 100
po value
Basically the value of PO is 1000 and printed Po as well. The vendor will
acknowledge the amount indicated on PO. The Invoice to be recieved sholud have
the same value of PO. So, during the goods receipt and invoice verification it will
have the same amount.
i am having a problem & i have to get the solution by today. my client wants that
while creating purchase order the vendor-material data maintained in the inforecord
shouldnot flow in the PO but at the same point the inforecord should be uptodated
as usual. pls show me the way how to solve this problem as quickly as possible.

Plz tell me how to create Graduated Pricing scale.

I couldn't able to capture Freight cost in MIRO against each delivery note. Scenerio
is like this : We have freight condition defined and are attached to PO. GR based IV
is selected in PO. Freight vendor is same. For single line item of PO, 4 GR were
booked. In this accounting entries are correct , i.e. Inventory Dr , GR /IR Cr , Freight
Cr. I want to make IR for one GR with freight cost. I selected Purchase order
/schedule agreement along with line item, then select all information + planned
deliver cost lay out , then select delivey note. I selected required delivery note no. in
lines. when I am going to select another line for Freight cost , I observed system
took TOTAL AMOUNT OF 4 GRs (it accumulated all pending GRs ) . In this I need
to change freight cost manually for this one GR. Is there any way to do IR for
perticular
Check layoutline you
itemare
, one GRinalong
using MIROwith
Youfreight
have cost.
three otions to choose. 1.0
Goods/Serivce Items 2.0 Planned delviery cost 3.0 Goods/Serivce Items +
Planned delviery cost Let me know which layout you have choosed, that will
decides further probing.
You cannot allocate delivery note for Freight cost, you have to call in the bill of
lading for freight. pl see table below.
Allocation to:
More Allocation Criteria
Type of invoice items
Purchase order/Scheduling agreement
Multiple allocation

Goods and services only


Planned delivery costs only
Goods, services, and planned delivery costs

Delivery note
You can enter a delivery note number for every goods receipt. The number can
then be referenced later in the invoice for a goods item.
You can use the delivery note to uniquely match up the invoice by selecting goods-
receipt- based invoice verification in the order item.

Multiple allocation
Selection vendor

Goods and services only

Bill
I amofusing
lading
Goods/Serivce Items + Planned delviery cost lay out.

I want to add planned delivery cost (freight ) to GR / IR account. For getting above
result I did as per following customisation :
1. I checked freight conditions. checked pricing procedure. Made one new account
key and assigned to this freight condition. Removed accrual key against this freight
condition.
2. Assign the same G/ L account no. which assigned to GR / IR accout (WRX).
Made PO. Did GR. In GR accounting are : inventory Dr, GR / IR cr , GR / IR Cr (this
cost is freigt). there are two lines for GR / IR.
While doing IR (MIRO) I found that system is considering only one line amount of
GR / IR , not two. It is taking freight cost amount which was converted to GR/ IR
another line. For doing correct amount of GR / IR in MIRO can change account for
that freight condition as WRX in pricing procedure. Is there any other implication.
I AM FACING A PROBLEM WHICH I HAVE TO SOLVE BY TODAY,SO PLS IF
ANYONE CAN HELP ME. I HAVE CREATED A TAX CODE(16%ED+3% CESS)
AND HAVE MAINTAINED IT IN J1ID CODE. NOW I HAVE CREATED A NEW
SCRAP MATERIAL AND MAINTAINED IT IN J1ID CODE. WHILE MAKING A
PURCHASE ORDER WITH THAT NEWLY CREATED MATERIAL AND
APPLYING THE TAX CODE IN THE INVOICE TAB AT ITEM LEVEL,I AM
FINDING THAT THE TAX CLASSIFICATION ISNOT TAKEN.
AT THE SAME TIME IF I AM USING ANY PREVIOUSLY MAINTAINED MATERIAL
WITH THE NEWLY CREATED TAX CODE,THEN THE TAX CLASSIFICATION IS
TAKING PLACE.
IS THERE
Have ANYTHINGthe
you maintained WRONG WHILE
input and outputCREATING THE MATERIAL?
for that material and also the WHAT
tax type
(full or partial) in J1id plz try the same.

we have a scenario that we have subcontracting PO and components are drawn


from the different plants in same COMPANY and when we are doing GR for that
PO we got the error as special stock O (vendor no) (material ) doesnot exist
message
Before no M7076
Goods Receipts against PO , First you have to issue material to
Subcontractor for processing. Then this error does not come. please try this.

how to get back the PIR for a material that is flagged for deletion.
Goto MD62 delete the pir for that material and save and than can do the mrp run
go to t.code:me5m
You need to remove deletion flag of material by using Tr. code MM06
Pls. check, There is no such transaction

when we have PO for 3 materials and when we invoice it we want diffrent TAX
assigned to each material.how do we do that
As soon as you Oder material with diff line items , you need to maintain tax code
respective to line item. This default information get flows to MIRO when you will
select line item to process for IR. You can check on TAX tab on header of
document. Hope this would have cleared your doubt

where to maintain condition groups for a material in IMG

can anyone send me mm-cin configuration and business process overview


You need to caary out configuration in Logisitics General--> TAxes of Goods
Movment --> India. Refer SAP help for Contry India version
Can anyone tell me how to find the change record on an Info Record? I trid to use
the ME13--> Extras--> Changes. But, it needs to key in a date.This is not what I like
because I don't know when the change happens. And, I don't want to check the
change on price. I want to check the change on other fields, like Minimum qty, etc.
Per me you are on right path. This will also display the qty changes too.
If I don't know the date when someone changed the mini qty, how can I find the
change
try, me14 record?
and make the date towards beginning of year that way you get a listing of
all changes.
Plz tell me how to create Graduated Pricing scale.
You can maintain in respective condition for purhcasing documents.

I have a problem while doing Good Receipt without any reference (OTHERS). I am
getting following message. "Cost element 191100 does not exist in chart of
accounts INT" Can anybody help me on this?
Go to T.Code-FS00 and put the G.L a/C no-191100 then
click the edit tab then You see top of the screen one
Tabb Cost Element and create the cost element.

I got the error -GR based invoice verification not active for line items 8-10 of a PO #
10004092. I tried to tick the GR-based IV flags in transaction code ME22N but they
remain grayed out when I tried to do so, even though the GR postings have been
reversed already. I checked on this PO in ME23 and noted however that the
garbage can icon is showing up for the line items 8-10. Can this be the reason why
I cannot select the GR-based IV flag? Please advise what should be done in order
to
Youcorrect thethe
can find error.
GR Thanks
BASEDinIVadvance for yourMaster
tab in Material assistance.
& Vendor
Master. You can go there and maintain it.

cancell the gr and go to the vendor (xk02) purchase data and check the gr base iv
box then check the gr base iv box also in p.o. and make the gr. i think it shoud
work. plz let me know the result.

yes that can be a possible reason as it Garbage bin says that this items are no
longer in PO so u can not do any change in this item. One more thing is that if u
have deleted this items before u do GR it should not be appear in MIGO.

Please check you have not selected the free item tab in the po for that line items

It is not possible in SAP one thing you do split valuation in This case maintain in
system same material in different valu.
We have seperate Material Types for Import Parts & Local Parts. Is it Possible in
SAP to keep the one material code for above types?. i.e. We do not want to change
the material code even material type is changed.

I need your help, hints on EDI. How to make the link with suppliers. I need a steps
by steps configuration and functional ideas.

Please provide Tansaction code & Path for Define Procurement type. In system
only 2 procurement types are defined. I want to create another
procurement type. so please tell where i have to go for the same. This field will
come in Material master record-> MRP2 View-> Procurement Tab
-> Procurement type.

How can one find table name for a field that is associated with some structure? E.g:
I need to find out the table name for field 'Delivery Note' in MIGO. Structure for
which is GOHEAD. Please help
Use the Tcode Se15 .Abap Dictionary -> Fields -> Table Fields. Expand the Tree
and Remove the Tick of the Views and the Pools and Cluster Table. Search Only in
Transparent Table. U get the Table Name.

when i tried to create a PO iam getting the following problem.I went to OB08 and
entered the specified date but still i could not solve it.Pl help in solving this problem.
"Enter rate / EUR rate type M for 20.05.2007 in the system settings Message no.
SG 105
Diagnosis : For the conversion of an amount into another currency, an entry is
missing in the currency conversion table."

Plz tell me what does Material activation means & how to activate it .

How can i see 1. who created the reservation 2. reservation creation date
The reservations created for a material can be viewed through T.Code MB1A.
Enter the TCode,give the specified mandatory requirements and select the tab "To
Order".In that screen it will askm for order numbers.Below that you will see a
column asking for material.Just give the material number and pressF6(Adopt) . You
will be able to see the reservations for that material.You can change the layout of
this screen and view the required fields. Please let me know whether it was useful
to you.
Please use MB25 it will definitely provide the info required by u
U can use mb25 for viewing all the required details.

do anyone have idea for creating a service entry sheet in ml81n and taking all the
line items of the po in the same Entry Sheet
You need to seelct PO Select New Adopt services from po. flag accepatance
Save serive entry.
while adopting service we can adopt a single line item from the po, i m looking for
adopting 20 to 25 line items of the po can u suggest something
Enter ML81N --> click other purchase order(above) , enter ur PO no. Then click
create button, beside that.. enter description of service of render. then below click
button service selection... enter ur PO no again.. then select ALL THE LINE ITEMS
OF UR PO..( AS U REQUIRE THIS) then select copy services.. then entry sheet
will have all line items of ur po. then click green flag (release), service will be
accepted, then note down Entry sheet No. then save.. then MIRO (t-code) select
PO preference tab.. select service entry sheet.. then enter that entry sheet no..
simulate
but when&we post..
enter ml81n and enter the po number it takes a line item along with it
it doesnt gives option for multiple line items can u please give me a screen shot
Sorry i am not able to do this. In my service PO in header there is 4 main line item,
and each main line item there is a 4 services , so total 16 services are there for the
4 Main service line items. I want to create the service entry sheet for all the 4 Main
service line items which is total 16 services. So how to go about that. Please
explain in details. Waiting for your positive reply from you
create a new entry sheet with reference to your Po. Click select service and then
services a pop up window will appear, give your po number and then check adopt
all then okay. Surely all services will be adopted from po
while selecting po in the first place when i click on other PO to select a po in ml81n
the line items comes with it ,if i one line item there are several services i can adopt
all but if in one po there are several line items i m not able to make SES for all in
one SES. i hope u understood the problem.
For each line you should repeat the same process as you did first.
do any one have idea of configuring a new unit of measure i have already
configured them in the transaction code CUNI ,but still i cannot see them in
mm01,do i have to assign them or carry out some others steps,please let me know
,a bit urgent

plzz throw some light on reservation, how to make a reservcation. wut is the
transaction to do this.
Run MB21 transaction
use MB21 to create reservation document.
MB26 to pic up material.
MB1A is to issue goods against reservation.
MB21 OR YOU CAN RESERVE THROUGH IW31 ( use L in the item category)

I want to Write a User Exit For the Screen MIGO. My Problem is User's Enter the
105 Date Earlier than the 103 Date. I want to avoid this. Is there any other Settings
in SPRO or i should Go For the User Exit.

We are working on both SAP & Web CRM.Now we got a task to connect both SAP
& Web CRM in such a way so that if i update any entry in web CRM it should get
automatically updated in SAP.Please help us.

While adopting services we can adopt a single line item from the PO. I am looking
for adopting multiple line items of the PO. Can You throw some light and
suggestion on same. Is there any customization setting on that. Waiting for positive
reply from you.

Can anyone tell me if there is any way other than FBL1N to see whether the
materials bill of a vendor has been paid??
U Can View the Bill Pass Status in Tcode MB5S. If the Invoice Ampunt is 0.Bill Not
Passed.
Thank you very much.But do I have any option to view the same data only for a
particular period or posting date???Please clarify

Can anybody throw some light on TAXINN Procedure Configuration changes


required for VAT and Service Tax Implementation. if anybody knows about the
releavnt SAP Note, please provide me. i will be very thankful to you. i need TAXINN
with VAT and Service Tax Conditions. Please throw some light on this.

Where are PO attachments stored ?


In T.Code ME2L

i ve created a stock transport order for a stock from plant1 to plant2..it created..now
i wanted to receice the goods using MIGO..when i choose the same PO as
reference ..it is displaying the msg as DOC contains no items..pls help me ..hw can
i reveive
Try the material
and receiving the in Plant2. against the "Outbound Delivery" not the P.O.
materials
First check whether the Stock transfer Po is released or not? If not, Please release
it. Second check where Outbound Delivery is created against the Stock transfer
PO. Third check against the Outbound Delivery that the PGI is made or not? if not
then do PGI so that stock goes to In Transit.
Fourth you do Good Receipts against the Outbound Delivery at the destination
Plant where the material is required. This is the complete steps of Stock Transfer
activity. Please do this steps then you are enable to do goods receipts. Waiting for
yourthe
For valuable
Case ofreply from
Stock you.
Transport Order, first we need to create a outbound delivery
using t-code: VL10b, then Post goods issue and then GR for the plant2.
The transaction code mentioned is for purchase orders-fast display.please specify
the correct code.(is it VL01n??)
No.. The T Code is Currect VL10B only.. for Purchase Order delivery. VL01N is for
Sales Order Delivery
i have been working on Stock transport order. After creating a Stock transport
order, when i go to VL10B i don't see any delivery there?
Tcode For OutBound Delivery is VL01N
VL10N is the correct Tcode, u select ur S.T.O ,then create an Outbound delivery
Document ,Then pick the delivery quantity and do a P.G.I.,then in the receiving
plant ,do GR(MIGO) against the outbound delivery.
For delivery of stock tranfer the T.Code is VL10D & somebody trying VL10b i.e they
are not getting deliveries
After creating PO u go to VL10d there u remove the date & click on purchase
order there u give po no. click execute u find ur order with qty u select the box left
hand side then click on background then ur order qty zero it converted into green
then select the box green one again click on
dialog box black box next to backgroung then select the line click on documet u
will find the doc no. after this u can do PGI with T.code VL02N there u give actual
posting date & under picking u the qty then click on Post good issue. after this u try
Migo
here i want to receive goods against STO, when i used ur process with my STO no,
in is displaying that list contains no data. pls help me to receive goods against STO.
when i created STO with some Qty, the same is appearing as open type Qty in the
receiving plant /Storage location. what is this open type Qty. i just want to receive
that openintype
it means Qty tothere
ur plant unrestricted.
is no stock for transfer u do one thing u can upload stock
by T.code MB1C M Type 561

I am doing MIRO invoice receipts. I would like default the currency as USD in the
MIRO scrren. Can anybody throw some lights on this.
if u want to keep usd default at the time of miro u do one think u can make the
changes in vendor mater in purchasing data there is order currency under that u
can give usd & save
While entering an invoice,the system is giving an error message'Maximum no. of
internal tax items is reached'.When seen the description it shows that you have
entered more than 999 items.whreas the total enteries are 345. when entered in
two steps i.e.,first 300 enteries and then the remaining,the system allows to do the
transaction.
Check the Default values for Invoice Document how much it is ... might be it was
set as 345 only.. change it as required
Please explain me in detail or if possible give me the path.
u go to T.Code OBA7 select document type RE & double click u entered inti doc
type u find no. range code for eg.02 right side u click on number range information
then give company code click on display interval there u ckeck ur code 02. & check
the interval number that is finished or not
The problem is in no. of fields available for entering invoice items, not in the
no.range.
I have been trying to add a storage location for materials through tcode MMSC, but
prompted by following dialog message: "Material not fully maintained for this
transaction/ event." Thereafter, I've looked at material master transaction e.g
MM02, unfortunately only a few maintenance views are activated (as I found just
Basic Data and Accounting view). Is it the right path for me to add storage location
through this way?
How could I activated other maintenance status (as I need to activate Warehouse
Management view or Storage Location stocks view) ?
As I have tried to use tcode MM50 but somehow when I clicked the maintenance
status button the screen directed into MM01 (only a few maintenance status
activated). The system
What you need to do is is in version
goto R/3 4.7.
transaction MM01 and put your created material
number there then select the views General Plant Data / Storage 1 or General
Plant Data /Storage 2 , put your plant and storage location and Just extend this
view to that material code and save the material number. Then You can use MMSC
transaction for extending the other storage location to that material code.
To be able to add new views in material master (e.g. MRP1, MRP2, Acounting
View, Storage Location etc) you need to extend the material of a required view. You
may use the MM01 or Extend / Replication Program. Then you could now add/
extend storage location or use the MMSC.
I hope this input could help to address your query
In addition to mm01, better you can use mm50 to extend the required views. In
mm50 you have field called "Maintenance status" from where you can select the
views. for example below;
B Accounting
K Basic data
C Classification
G Costing
P Forecasting
D MRP
X Plant stocks
F Production resources/tools
E Purchasing
Q Quality management
V Sales
L Storage
Z Storage location stocks
S Warehouse management
A Work scheduling
Please do let
First create mematerial
your know foratfurther clarification.
purchasing level through MM01 then only you can
maintain SLOC through MMSC.

I'm having problem with the material master creation, I actually assigned a coding
mask on the config, which looks like XXXX-XXX-XXXXXXXXX. Afterwards, I assign
the material type to external number assignment with the same coding. Now, the
issue is on the creation of material master record a message keeps prompting up
which reads like Mess:BMG141 Entry is too long; format is XXXX-XXX-XXXXXXXX.
THe number and format is the same yet I still receive the error. Do I need to use
user-exit? If yes, do you want exit?

i have defined no. range and document type but i dont know how to assign this for
the PO or PR for which i have defined,plzz help me out.
go to purchae order type under type u have to assign no range

Please explain me where to configure procurement type. I want to create more


procurement type. This field comes under in MM01 in purchasing view. Please
anyone of you
Go, to split reply for
valuation, this.
and create different procurement types, like Domestic,
Imports etc
Goto-Production- ->>Material Requirements Planning---> >Master Data-->>Define
Special Procurement Type.
Please follow these steps first you select IMG, Logistic General, Material Master,
Basic Settings, Material Type. Now we can make new type of material.

What u configure in split valuation is Valuation Type... Not Procurement type..


Pl.correct
vineet urself.about procurement type, not material type. dont confuse
is asking
Does it make any sence???
why would u want more procurement types??...I mean arent external,in- house and
both along with the various special procurement types enough??
standard procurement types are:
1) Consignment
2) Subcontracting
3) 3rd part
4) outline agreement
these are used while issuing Purchase orders and with the help of transfor posting.
IMG - MATERIAL MANAGEMENT - CONSUMPTION BASE PLANNING -
MASTER DATA - DEFINE SPECIAL PROCUREMENT TYPE.
Due to Seggregation we will be adopted different procurement types. Yes
I would like to run my consumption base planning. Pl send how to run.
i think imports&domestics will come under valuation(global )catagories, in house
production & external procurements types come under procurement( valuation)
types. may be i dont have much knowledge in MM

I have configured CIN using tax procedure TAXINJ. Did all the required settings in
customizing and also maintained all the values in J1ID. Also in FTXP I have
maintained 100% against the condition type JMO1. Now when I am creating a PO
the system is calculating ED as 100% on the basic value instead of 16%
maintained in J1ID.

I am new in this sector.Though I have lots of domain experience.In this moment I


am facing problem deleting a plant.How is it passible?Will anyone help me?

what is the procudure to delete a plant entirely from the company code?
As SAP standard we should not delte the plant, you can delink the assignements
which you made for that plant with other organisational elements like company
code, purchasing organisation, shipping points etc.. Hope it is clear, still if you want
any assistance on this issue please let me know.
u can delete the plant if no transaction done under the plant by T.code OX10 select
the plant click on Delete icon & save
But tell me Why we are not supposed to delete the plant. Waiting for positive reply
form you.
Why U should not do so, it is because a lot of transactions will be there to
close and finalise.
u can delete a plant if no transaction done under a particular plant

I have Written a User Exit For ME29N in Development Server.It is Working


Fine.But i Production Server it is Not Working. What will be the Problem.I have u
Give the might
problem Sln Today.
be with CTS(CORRECTION AND TRANSPORTATION
SYSTEM).TRY SE10,SE01.STMS
just copy the production client config. into development and then debug the
program .. then u can find the problem is it logic problem are any config. problem..

after creating an sto with delivery go to vl10b,give the purchase order no-execute-
on the next screen select our po and click the radio button -create in background-
click enter on info screen-select the line item with green traffic light-and click on
details-note down the sd document number. that document number is nothing but
delivery document num

can anyone give me details about how to configure third party subcontracting
process.

have u maintained the excise rate for the chapter id.? if not, maintain the excise
rate over there as 16 %. then it will take 100 % of 16 % of the base value. i hope u
maintain the other J1ID Settings properly. like material and chapter id relation. i/o
and o/p and material relation. excise parameters for the plant and all.

can any body tell me where I can change the quantity of decimals that I need to the
net price in a PO.?
Use transaction code OY04
Goto Main Main--->>System- -->>User Profile--->> Own data. You can set however
you want as per your convinent.
Do Transaction code SU3 , set the decimal points in defaults tab.
That's that I need, but, I've only this manner of do it. On the other hand, when I can
change the decimals point for quantity in PO?
Use transaction code OY04
I am working on setting up a subcontracting scheduling agreement. I am now stuck
at the point of receiving in the finished good. When i try
to receive the parts in i get the following msg "Account 650085 requires assignment
to a CO object". but when i assign a CO object such as a cost center to the account
then the parts do not go into my inventory. Can someone please explain to me how
i can do a MVT101 on the finished component from the vendor and put it into
inventory??
u do one thing go to that particular material master select view costing1 under that
fill costthis
Since center
is Subcontracting type..u should use movement type 101 with special
stock indicator 'O'. Try and lets see whether u could solve it
out...Also what i understand from this is whenever you are doing subcontracting
type of GR there is no question of any account assignment ans
thus there is no cost centre. try with movement type 101+'O'.
i dont have the option to receive in the finished part as 'O'. The two sub
components are type 'O' and are mvt543. And if i were to receive the finished part
in as type 'O' then wouldnt that put it in "material provided to vendor" stock?
MVT 101 IS FOR INVENTORY AND DOES NOT REQUIRE COST OBJECT
ASSIGNMENT. THE COST OBJECT ASSIGNMENT IS REQUIRED FOR MVT 543
UNDER WHICH THE SYSTEM CONSUMES THE MATERIAL SENT FOR SUB-
CONTRACTING. PLEASE DO THE FOLLOWING STEPS: 1. ASSIGN COST
CENTER IN THE GR FOR SUB-CONTRACTED MATERIAL CONSUMED IE SUB-
ITEM OF THE MAIN ITEM. 2. GIVE A DEFAULT COST CENTER IN
TRANSACTION CODE OKB9 FOR SUB-CONTRACTING CHARGES ACCOUNT.
Thanks for the help Kailish, i was able to receive the parts in now. But i have one
more question. Right now we are only using subcontracting for 1 line/cost center,
but if in the future i want to use multiple cost centers how would i be able to set up
multiple cost centers for subcontracting and how would i be able to pick the correct
one upon receipt?
ECC 5.0 We are running standard SAP batch program RLINV050 to create and
activate cycle counting inventory documents. There does not appear to be any
parameters for printing the count sheets for those inventory documents. Standard
SAP program RLLI0400 does not have any selection parameters and does not
support any variants. Online transaction LI04 does support any variants for picking
the warehouse, storage type, printer, etc. How do run a batch job that will create,
activate AND print inventory documents? Any help would be greatly appreciated! !!!

I HAVE A PROBLEM IN DEVELOPING AN USER EXIT FOR ME21N. CAN


ANYONE PROVIDE ME A COMPLETE PROCESS ON HOW TO CREATE AN
USER EXIT FOR ME21N
can anybody explain me what is dunning procedure? How it is used in sap(mm).
It is a reminder letter it is used to remind the customer abt their dues

i want to create the new material , relevent to that initially i need to create 1)
NEW company code 2) new plant 3) new purchasing organisation can some
one suggest me the same how do the same step by step procedure would be
helpful.
For Company Creation SPRO -> Enterprise Structure -> Definition -> Finicial
Accounting -> Define Company For Plant Creation Tcode is OX10
U Should Assign the Plant to a Company. For that SPRO -> Enterprise Structure -
>Assignment .
No u cant assign plant to company u can assign plant to company code

i hav following problems while creating the release procedure for the purchase
order type........ can any body explain the release prosedure for the purchase order
with an example.( using 3 strtigies) what is the procedure for assigning the object
to the assignment to class/ classes. what it mens " no assingment for the classtype
032"? how to solve this? "XX is not in the table T16FS" ------- ???? i can see the
"XX" code in the table T16FS but still it is showing an error. how to solve this???
I had extensive experience in release strategy configuration and considering its
complexity, I don't think it can be explained simply by email. My suggestion is bring
an MM consultant on-site and let him configure your system.
We are at material and maintenance consultancy organization and providing
consultancy services in the area of : MM & PM
MM
Master data set up and global data maintenance
- Data cleansing, enrichment, and conversion
- Material master data preparation
- Material coding and cataloguing
- Material standardization
- Vendor master preparation
- Data Dictionary
- Base data preparation
- Materials functional audit
- Spare parts management
- Inventory optimization
- Inventory audit & analysis
- Warehouse management
- Physical inventory and optimization
- Project material handling
- External service management

PM
- Master data set up and global data maintenance
- Asset hierarchy build / Functional location
- Equipment master

Can anyone please help me understand the consequences of deleting a


Purchasing Group? If there are open SAs or Info-Records, would this affect?

Can some one help me that MM-FI balance comparison.It shows like, In a sme
co.code 1000 MM SAP is showing balance difference in Inventiry accounts for MM
& FI. We have executed report RM07MMFI . MM has value 691,583.50-INR FI
has value 1,244,444.97- INR THe difference 9,567.27-INR The difference is
also be seen through MB5B and FBL3N How can it be manged to match the
difference as Zero.
Can you please Canyou
tell how anybody suggest
ran the how to do?
report RM07MMFI?? Iam not able to find it
out.(No such report in SAP)
This is a sap developed program.Here i have attached the screenshot. How can
we match the diff.of the MM-FI?
This is program name ,so goto SE38 ,in the program field give this RM07MMFI and
Execute it (F8).
My company is upgrading from 4.6 C to ECC 5.0 . In my company they have an
issue with MIRO.Due to that in 4.6 C also they are using MRHR for posting invoice
transactions. But in ecc 5.0 MRHR transaction code is not available.How to resolve
this issue in MIRO of ecc 5.0. The following are reasons why they use this tran
code (MRHR) in place of MIRO in 4.6c :
1. when invoice has shipping charges which are not taxable.
2. when the PO has the G/L account 110420 with Asset # (Contra account:
acquisition value could not be found).
In miro of ecc 5.0 the above issues to be resolved. Please find solution.

how do i create UOM kgf/mm2 , in t code CUNI , where do i enter the conversions

is there a report where i can get the exact qty of material issued to cost centre
work centre Asset
use MB51 and then select movement type 201 for cost centre

plz help me gurus 1. how i delete PO 2. how i change of main vendor, plant
delivery vendor & vendor's amount in PO after MIGO & MIRO. 3. how can i genrate
pending & completed MIRO report date & month wise.
1) You can delete the PO by deleting all the items one by one in that PO. 2) You
cannot change main vendor You can change the amount in PO by first reversing
the MIGO ( mvt type 102) & MIRO & then in ME22n u can change the amount in
PO
I have a scenario where a material is plannesd in one plant say 1100 but due to
some problem it has to be processed in second plant say 1200, how to complete
the pp & mm cycle?We do not want to create stock transport order.
You have to do Stock transfer order there is no option as you cannot map the
subcontracting scenario in plant to plant of same company code.
So your option is Stock transfer order and do the PP cycle and MM cycle once the
stock transfers in b/w plants
Please tell the complete steps of this process. As per your reply suppose we do
Stock Transfer PO between plants. Give the complete steps of the PP cycle and
MM cycle once the stock transfers in b/w plants.
1) Once the Stock transfer Order is created by receiving plant , the supplying plant
supplies the material through 351 mvt type to recieving plant then there the
receiving plant will do the GR w.r.t that STO
2) So stock updates in the receiving plant then there the PP Dept will creates the
Production order with BOM structure and then the finished product will be produced
by using this materials supplied by then plant.
3) Then the supplying plant will creates one more STO for that finished product to
other plant, then that plant will process the same 351 mvt type doc and sends the
finished materials,so the supplying plant will recieve the finished product in there
stock.
Don't confuse here supplying and recieving plant , this are 2 mutual process done
on the same
Thanks procedure
for giving in both
complete the plants.
process. I want to know the complete process of Inter
Company Stock Transfer. Also the related Customization if any. Lastly the detail
difference between the Intra and Inter Company Stock Transfer. Explain the
accounting document generated in the both the process. Sorry i am troubling you.
But you can detail answer whenever you have a spare time. I know that you do not
have spare time, but please to give the detail answer for this question.

I Have Written a BADI .I want to Attach this to My Program. Can AnyOne Help Me.

Please tell me where to define valuation grouping code. I know thats the part of
financial department, but still if anyone knows pls guide me.
You can define valuationj grouping code in IMG\Materials management\Valuatio n
& a/c assignment\a/ c detemination\ without wizard\group
together aluation area
just go to spro-materials management-valuatio n and account assignment-account
determination- account determination with out wizard-group valuation
areas(valuation
Try OBYC. grouping code).

While running MB5B ( Stock Posting on date ) for a material 600061( Moving
Average Price 221.10 INR defined in material master ) for valuated stock we
observe amount to be 221.10 INR per unit as defined moving average price in its
material master. Now if see valuated stock through transaction MC.9 for the same
material valuated with standard valuation option in MC.9 ( used for moving average
price defined materials) , we observe amount to be 138.60 INR instead of 221.10
INR If we run do valuation with Material Ledger active option in MC.9 than the
amount comes 221.10 per unit as equal with MB5B transaction. What could be the
reason for this . Please explain at earliest.
There could be many reason. One reason which i know is such that If material
value or material moving averrage price is increased/decreased through TCode
MR22. then this effect is included in MB5B but this effect is not shown in MC.9.
Thanks for your reply. Please find snap shots for MB5B and and MC.9. In our case
the moving average price of this material is never changed since last 3 years and it
is always procured at 221.10 INR. While running valuation in MB5B for last 2
months the material the valuation comes to be 221.10 INR , but in MC.9 for same
period it comes to be 138.60 INR with standard valuation. Since the price is always
same than why is the difference . Can you list out number of probable reason.

I have a problem can any one take me through this problem? I have 3 company
codes for my client and I have to assign a purchasing organization to only 2 of
these company codes. Can any one tell me if this is possible and if it is so then how
can we do it?

Iam facing following in the below given scenerio. I want to make freight cost entries
to GR / IR account. I am facing problem in tax procedure, condition is not
calulating. Changes in Pricing procedure: Add one new condition for freight qty.
based, removed accrual & key for
this. This cost adds to Basic cost. It is OK.
Changes in Tax procedure:
In this I will deduct freight cost before applying duties like Excise etc. by adding one
more condition, so that it will work fine.
In that condition,
condition class: Discount & surchages,
Calculation type : qty. based ,
Condition categpry : Freight
Access sequence : JTAX
taken as negative.
I addthis condition in tax procedure before Excise.
Made condition record (we are using TAXINN).
When I made PO in tax. procedure value is showing for single, but it didn't calculate
based on qty.
I want to know can we do without SUBROUTINE or not. If so pls. let me know.
For ur understanding I am sending screen shot also. In the screen shot problem is
with last page.
Can any body tell how to write routine in tax pricing procedure. What information we
need to give to ABAP. My requirement is given below :
I want to make freight cost entries to GR / IR account.
Changes in Pricing procedure:
Added one new condition for freight qty. based, removed accrual & account key for
this. Now cost adds to Basic cost. It is OK.
Changes in Tax procedure: In this I want to deduct freight cost before applying
duties like Excise etc. Here I want to write one routine to deduct this freight amount.
can any body suggest how to write . what codes needed. Does I need to write in
requirement or Alternate condition type or alternate condition value

understand in the material master there is a field to indicate if the material is A, B


or C item. However, we would like to do 2 kinds of ABC analysis for each material:
1) based on 'dollar volume' (price X total qty issued)
2) based on 'transaction volume' (no. of goods issued transaction)
First analysis can help to set inventory policies, second type can help to optimize
storage location in warehouse for example. Can SAP R/3 support multiple ABC
analysis on same material ?

can any one help me out to answer these questions,


1.wat is the hierarchy of an SAP Functional guy and where do i fall in this
hierarchy?
2.Is it possible to configure delivery date based RFQ comparision?
3.Is it possible to configure the GR date as our required date?
4.What is the advantage of two step and one step plant to plant goods movement?
5.Wat is the difference between mvt type 303 and 305 and 351 and 301?
6.wat wil be the a/c doc when goods issue ?
7.By seeing the PR is it possible to say whether it si MRP run PR or manual PR?
8.Why do we have valuation area as plant other than company code?
9.explain about SLA?
10.Where do we give the procurment type in which view?
11.where do we configure order unit?
12.In STO how price is taken?
1. Project manager ---> Module lead ---> Consultant(Function al)
2. This is possible with the development.
3. Through user Exit
4. Advantage of two step movement, is to track the material.
5. 301 is single step material transfer from Plant to Plant where as 303 Stock in
transit 305 is receing of the material in the receiver plant.
351 is the movement used when there is a devliery or shipping point.
6. Material account and offset account will be to the cost centre or storage location
based on the movement type.
7.In the PR we can see in the display of the item details in the Contact person tab
you can see the creation indiacator.
8.In the Given compan y code when many plants are available inorder to track the
individual performance, it is always to go with Plant as Valuation area.
9. SLA is Schedule line agreement is one of the outline agreement and it is the type
of PO where specified material for which quantity is required and at what time it is
required. These individual schedule lines will be creatred as individual PO's as and
when the time of GR.
10. I cannot explain properly.
11. In the Purchasing view, if the base unit of measure and Purchasing unit is
varied then we have to give the conversion factor.
12. Price is calculated from the material master. If the company policy of transport
cost to be added to the material then we have to add in the GR/IR account.
Can any body tell me regarding Forerign Trade Imports scenario. What all things
we maintain in this. Kindly help me regarding this.

Address is larger than the space provided in the pre- printed stationary invoice slip
provided by our client, how to adjust the font, that fits for print out sheet of A- 4
size.kindly tell me how to adjust the size of layout. is there any need for ABAPer, to
work on re-sizing of the layout of the slip, which is suitable for taking printout ?
kindly sugggest how to dot this layout adjustements.

When I have tried to post Inovoice the system give me following error The entry
1000 1000 is missing in table T043G 1000-Vendor 1000-company so plase tell me
solution
think thefor this error
vendor 1000 has not been made for co code 1000,the masterdata is
missing
U go to vendor master & just check u assign reconcillation account or not
you have to create vendor master record centrally through T.code: xk01, here u can
mention vendor name or number and company code
How I change base unit measure after cration of mmr
for changing the uom ,there should be no open pr or po or contracts or even stocks
etc...,first u have to delete them and than only can change the base UOM.when u
try to change the UOM in MM01 the error will be diplayed and when u click on the
display errors u can see why u cant change the UOM and what are the open
documents.
Changing base unit of measure (UOM) in material master is very tedious and
complex task. I have sent this message in the past and I am sending this again.

Here is an outline of what needs to be checked and done in SAP. This is


mandatory and must be completed if you need to change the UOM.

1. Production Data: If it is a finished good or a component of a BOM, then remove


BOM, remove assignment to Routing, delete production versions. Delete any
process/production orders or complete then and set status to TECO.

2. Purchasing: the deletion flag must be set in all current and old purchase orders
and purchase info recs. Delete entries in source lists, contracts and outline
agreements.

3. Planning Data. Delete any forecasts or planned independent requirements or


SOP/Flexible planning plans.

4. Sales: Cancel or complete the process for any sales documents (eg orders,
deliveries). Remove or disable pricing records.

5. Warehouse Management: Cancel or complete transfer orders, transfer


requirements, posting change notices. Ensure that no negative bin stock exists that
cannot otherwise be balanced by other positive bin stocks.

I have 3 company code 1000, 2000, 3000


CCode 1000 has 2 plant. Equipment had been booked under 1000, plant 1. MRP
has been run. Material received.
Now I want to produce the equipment under Ccode 2000, which is a Special
Economic Zone and also I want to dispatch the material through CCode 2000 only.
Try changing the delivery plant in the Sale order. - Tranfer all the materials to the
plant in the company code 2000.
Hi go stock transfer to company code 2000 and to transfer to plant do inter stock
transfer and dispatch the goods from the CCOde 2000.
I have gone thru MASS transaction and I have the following questions:
1. I dont see an Object for mass-updating Contracts. How can I add/create an
object to resolve this problem. I have 1000+ contracts where certain header
information need to be changed.
2. I saw object BUS2012 for updating POs. However, I have a Z-field (Cost Center)
in PO header, and this field is not being updated through MASS. How can I add the
Z-field sothere
Actually, that this
is afield
mass is contact
also changed with new value in all CT
t-code:MEMASSCONTRA my see
2000+ POs.
if that Anyits
helps
object BUS2014

1. Can anybody help me how to view PLA report or Balance of PLA 2. Without
GR no. how to do JV entry to adjust the balance of Basic & Ecess either dr or cr.

Can you pls give me an example why i need to create new movement type
it is use to move the material from one place ro another
Let us say that you have production activity but have not got PP module, you need
to self produce mango juice from mango stock. you will need to create material
types [by copying from others] to
1. consume mango stock to the appropriate GLs
2. Recieve mango juice into stock from appropriate GLs
take care both GLs are P&L GLs in this example.
there can be many more such examples. Oh and yes you will need to create the
propper reversal movements for these movements you create.

i hav join sap mm module 10 days ago. can anybody tell me in mm module, how
implementation is done.
WHAT DO YOU MEAN BY IMPLEMENTATION?

Can you pls give me some idea for USER EXIT. Can you pls give me an example.

Can anybody tell me how to create service PO for a material with material no?
Senario:
I created a material with material type HALB & material group 001. Now I want to
send the material for service. I can't able to create a frame work PO with item
category
Looks likeD.you
Howarecan I create?
sending your material for subcontracting. In this case you may
have to use item category " L"

Could anyone pls inform me how can i get a report with PO creation date, PO total
value and PO number using standard SAP feature
ME2L and ME2M, ME2L

how one can see the total landed cost of po i.e.including delivery charges in
standard report

plzz tell me how do we define inventory posting account that is used in automatic
account determination( AAD) in BSX.
we can do the cofig part in OBYC there we define n configure.
in OBYC how do create new account in BSX,if we r giving new account than error is
coming
How to get the material overview on a particular day.
Use MB5B & mc.9, Use MMBE transaction

Friend I'm facing the following problem : We have 2 materials in our database , but
this materials are exactly the same.(same description , same usage as well.) The
company decided use 2 materials because we control batch. Now we need to
planning material (purchasing purpose) based on stock of both materials. Does
anyone knows an way to MRP run looking into stocks of material A and B to
planning them ! like an unique material ?
Could I do that ? I have found user exit EXIT_SAPMM61X_ 001 , could I use it to

Please explain me the GRIR entry. Specifically with moving average price and
standard price. Also if there is any difference in the entries when the variance exists
Refer SAP help. It will provide all illustrated examples what you required.

please give me t code of p.o. cancel and j1iex desplay


to cancel po use me22n and delete all the line items
Your question is not clear. for canceling PO . Use ME22N. Delete line item. J1IEX
used for posting /capturing/Cancelli ng excise invoice.

please give me T CODE of RG1 production & despatch report grade wise
Please use T code J2I5 first and then use J2I6

I need help in configuring a Return PO. I want to default the Returns indicator to be
flagged when document type Return PO is chosen. This would help when there are
many line items being returned. As of now I have looked in SPRO -> GR/IR control
and the R indicator is marked as required. Any suggestions?
How do you configure a movement type to be non-value updating? I have used
transaction OMJJ to create a new movement type from 501 & 502 but do not see
where to change the value updating flag. Is there another transaction? Any help
would be greatly appreciated. We are on release
4.6C.
You are refering correct transaction. Select respective movment type -->Go into
accounting grouping --> Select indicator of value updation.
The indicator is grayed out there. Transaction OMS2 allows you to change it based
on material type.

Can anyone elaborate the difference between transaction key BSD and BSX. And
where do we use BSD.
At the time of closing entries in the quarter or year end account dept will create the
supplimentary stock account to accomodate the certain valuations like
taxes,commercial into one single account this is what they maintain for BSD
transaction event key, At the end they will add up this supplimentary account(BSD)
with the stock account (BSX) to determine the final stock account
Thanks for the info. Would you know what particular transacion does the
accounting dept need execute in order to perform valuation adjustments? And also,
would it be possible to provide documentations and specific business case for
better understanding.
Please I want report of all PO's how i can run in which report
You can go for ME2L or ME2M and choose selection values for particular vendors
or material groups as per your requirements. ME2N
You can also use T Code ME80FN

Can you pl explain me,how to create Service Catalog and Service Specifications.

Please let me know a SAP TCODE to view GR(Goods Reciepts) Report for a
particular
Use T.Codeperiod.
MB02, MB1C, mB51

Please let me know a SAP TCODE to view Nonstock Goods Reciepts (Account
Assignment = "F" & "K")
Why can't you try txn cd " me80fn" / me2n /me2w /me2k

Please tell me the use of purchasing value key in purchasing view of material
master. How it controls over and under delivery,
please see the following Purchasing Value Key is useful for setting reminder for
the material you can find in material master in Purchasing view.
Purchasing value key determines the following things:
1) Reminders keys- There are 3 keys which determine in how many days before or
after the vendor has to be reminded or urging letters for the material procurement.
2) Over and under deliveries tolerances. 3) Order acknowlegdement
requirements in PO.
It gives all the conditons in which the procurement is made. You can have different
purchasing value keys which has to be customized in IMG - MM - Purchasing - MM -
Define Purchasing Value Keys.
Need your valuable help on following topic. I have maintained taxinn as a tax
procedure and for taxcode v1 16% Excise 2 % ecess. After GR following a/c entry
appears: A/C No. A/C Amount
24340000 RM&bought out comp 116.00
13110100 GR/IR-ext proc 116.00-
Where 160 is the excise duty. After MIRO--
A/c No A/c name Amt.
1 31 KONIPEX Konipex Engg 130.86-
2 86 13110100 GR/IR-ext proc 116.00
3 99 24340000 RM&bought out comp 16.00-
4 40 13113920 CENVAT clearing 16.00
5 40 13113920 CENVAT clearing 0.32
6 40 13113310 VAT INPUT @ 12.5 14.54
from entry it is clear tht GR/IR is credited for Excise duty 16% and RM debited with
Material + Excise duty then cleared to Cenvat a/c during IV.
Actually
RM material should be posted for material cost only during GR and during miro only
cenvat clearing ac should be posted for excise duty.
Plz help me to configure tht. I have checked OBYC, taxprocedure allsettings for
CIN , unable to find theproblem.

what is the importance of gr based invoice verification? what happens if u tick mark
in vendor master/material master? what happens if u not tick mark in vendor
master/material master? please explain me in detail
There are two types GR base IV PO based IV Incase of GR based IV, the
reference document is the GR document or delivery
note.Here all the documents pertaining to the delivery note or GR document are
proposed for the IV. Incase of PO based IV the referencce document is PO and all
the GRs pending for IV will be proposed during IV stage.
am not able to cancel the Invoice verification document using MR8M for specific
document which is posted in the previous year. I am geting the
following error. Invoice document 5101000308 cannot be processed further
Message no.M8422
Diagnosis
The invoice document 5101000308 contains the purchasing document
4500005989, and the item 00010. You cannot enter the invoice for
this item, or you cannot cancel the invoice document. This can have various
causes, for example:
- The PO item is locked
- THE PO item is flagged for deletion
- Another employee is currently processing the purchase order
- The purchase order has not yet been released
- The corresponding service entry sheet has been deleted
- For a held invoice for planned delivery costs: the vendor in the held invoice does
not match the vendor in the purchase order condition or
with the vendor from the purchase order history. This is because the vendor in the
purchase order condition has been changed in the meantime.
-> In this case, you can no longer process the held document. You can use report
Z_MRM_DELETE_ PP from note 501905 to delete the document. We checked in
PO also, we have not deleted the item or flagged for deletion. Now I want to clear
the GR/IR account. Can anyone help me in this regard.
Hi! Try to issue a Credit note... on MIRO
I tried in MR11. This type of GR/IR pending is not showing.
Sometimes this may happen,ie.,the invoice cannot be reversed because of non
availability of stock of that material currently also.So please check whether
sufficient stock is available for that material.Otherwise, you can use T.Code F-02 to
pass a journal entry giving effect to the same amount as mentioned in the
invoice,and then you can knock off those items through T.Code F-44.
Please reply whether this was useful to you
What you had given is for clearing the Vendor Account. I want to clear GR/IR
Account. In Import case, we do Clearing Invoice verification first.
After that we do MIGO posting. In this case we have done Invoice verification, but
MIGO posting has not been done. So GR/IR account is showing as debit amount. I
want to clear this GR/IR clearing account.
Use t. code MR11
You can generate a credit memo for the invoice in MIRO itself.Please try it and
inform whether it was useful.
I tried in Credit Memo also. It is showing error. I have attached the error message.
Kinndly check the attachment.
You can follow the procedure what I said earlier,but instead of using T Code F-
44(Vendor Clearing),you can use TCode F-03 (G/L clearing) and give the FI doc
number of the Invoice ver.doc and the journal doc number to clear it off(You should
use the GR/IR A/c ledger code). PLease let me know whether it was useful.

can anybody explain what is Automatic Account Determination

Can anyone help me with table names for the following data.
1.Invoices made by Vendors for a particular period.
2.Materials for which 105 mvt has been made for a particular period.
3.Invoices which have been booked through T.Code MIRO for a particular period.
Materials For 105 Movement MKPF - Header,MSEG - Details Invoices VBRK -
Header ,VBRP - Detail For MIRO BSEG - Detail ,BKPF - Header

I need to change a material from CBP based planning type to Regular MRP based
planning. I changed the following in the Material Master
1) MRP Type from PV to PD
2) changed the MRP Profile suitable for Regular MRP
3) Changed the Forecasting type from G --> N
Still the material is being planned under CBP mode.
I am new but I am guessing that the material still has an entry in the planning file.
Try doing a consistency check using OMDU and this should
delete the invalid planning file entries and would add the changed materials. It
might work.
Can any body through some light on difference b/w ME27 and ME21N....mainly
User want to use for Stock Transport Order ...can any body help?
Usually ME27 is for creation of stock transport order (Intra Company), and by
ME21N you can create all kind of POs including STOs.
Can u tell me user can use ME27 for STO Purchase Orders instead of ME21N...i
would like to know whther ME27 is outdated like ME21....Basically user happy with
ME27 bcas data entry is easy in that for many items at a time..If any major differnce
is there letteam/Owner
Business me know... needs to decide which transaction they would like to use.
Technically they can use both ME21 & ME27, but if they use ME21N, they would
have many advantages, and they need not to go for different screen/transaction
everytime for different kind of orders. I would recommend you to go for Enjoy
transaction
if instead
u want a stock of one
from old transactions.
plant to other plant by means fo PO, we need to go for
ME27.ME21N, here we can go for a normal standard PO, consignment and
subcontract.
Generally Me21n is use for domestic stock transfer & ME27 is for stock transfer
from out side country
I think the better option is to go with the latest transaction SAP has provided. Who
knows, down the line ME27 may not be supported by SAP.

i created a PO for a material with consignment type..but when i doing Goods


receipt with MVT type 411K..it is giving error message :purchase info record not
found with the Pur.org .. but actually i've created consignment inforecord.. but still
that msg i am getting ..hw can i receive goods..pls guide me
1.Why do yu want to do GR with 411K. It should be 101K. 2.Please check the
validity of your info record.
While the creation of Inforecord, the Pur Org should be of Standard one, which U
can define using the following path: Spro - Enterprise Structure - Assignment - MM -
Assign Std Pur Org to Plant
what I think there is a difference between GR with 101K and GR with 411K. If you
do GR with 101K the stcok goes to vendor consignment unrestricted stock for
which there is no accounting document also and it is not in the plant unrestricted
use stock, while with 411K goes to plant unrestricted use stock from which you can
issue to concerned department. Correct me if I am wrong.
You are right

We need to send the material from sales order stock to subcontracting


stock.Material is having serial number.
Please do Transfer Posting through Mov. Type 411 'E' and move the stock to
unrestricted use (free it from Sales Order stock). Then use Mov type 541 for Goods
issue to Sub-contractor.
plz explain me the concept of vendor subrange in detail wat spro setting we have to
do in customizing

Can I see in SAP report of Production Break downs or breakages. Did SAP generat
any report this purpose.

I am new to this group We use t. code Me21n in Real time what are the field
required to fill for prepartion of P.O. i required details step. When we receive the
Invoice, If we find P.O value differ from Invoice what are procedure to follow.

can any body plz explain about the taxinn nd tax calculation nd plz give me the
path.
Img - Financial Acctg - FA Glob setting - Tax on pur /sale
thanks for the reply,but i need the path for fv11,plz reply asap.
which tax procedure you are using ? TAXINJ or TAXINN ? FV11 is used for
TAXINN while OBQ1 for TAXINJ
You need to define condition type : OBQ1 While calculation schema for tax
calculation can be defined by OBQ3. then only respective condition types with
schema will be available in Tax code maintenance : FTXP

Please gimme some idea about message determination in MM. Step by step
configuration is appreciated.
spro-materials management-logistic s invoice verification- message determination-
maintain conditions-change conditions.
xk03-purchasing doc.-ers check invoice tab of po item details-ers check run ers in
mrrl with ers vendor.
i think u r wrong about.as u write about the ers check , means evaluated receipt
settlement(ers) , without posting the invoice , the system will take the invoice if u
checks it in pur.data in vendor.
I want to use reference condition type for taxes. when i m giving condn as a
reference condition & when try to craete PO the condition
will not appear in condition tab in PO. I want to make all tax conditions in pricing as
reference conditions i.e. when i will make condition records for taxes that will
automatically
For flow in pricing.
pricing conditions : T code : M/08 & For Tax conditions ( TAXINJ ) : OBQ1

How can i have a report on all the PR's which are yet to be released. Is there any
standard report. It should show which release's is affected and which haven't and
the documentr status. If i wanna take help of ABAPer for own reports what are the
tables is
me5a i should search
the t code for.
for verifying the pending PR's
Try T code ME55
You can develop a query by using table EBAN there you need to set the layout as
per your requirement. also take a help from ABAPers regarding which will be
helpful to you.
I need a material to be blocked only for procurement. i should be able to release a
production order for this material. What settings should I change in the Material
Master for blocking the material for procurement.
In material master's veiw (MRP2) --> E In-house production F External
procurement No procurement X Both procurement types Choose E procuremt
type
In the material master in the basic view screen you can set the cross plant status
field as Blocked for Procurement,
IN MM02, in the Purchasing view in the feild Plant specific material status we can
select either for procurement or for total block.
Block the material in source list, if only one vendor is supplying that material.

i request you to kindly share the general Implementation problems in MM . This will
help the guys who don't have implementation experience.
From my whatever experience, number ranges are not usually well taken care of.
Many of them cannot be reset once you have the master data in the system like
Lexicographic, Vendor number ranges etc. So make sure from Number ranges
perspective you are good to go. Other things are like maintaining source lists, quota
arrangements and conditions. Make sure that during the As is - To be analysis, you
gather the requirements on how to include freights, customs duty etc. We havent
done that before and we are fire fighting alot these days.
WANT TO A REPORT OF A PARTICULAR DATE & MONTH WISE WITH
FOLLOWING DETAILS 1 WITH OPENING & CLOSING QUANTITY
2 WITH RECEIPTS & ISSUES QUANTITY 3 WITH OPENING & CLOSING
VALUE 4 WITH RECEIPTS & ISSUES VALUE BUT I DON'T KNOW T-CODE.
PLZ can
You HELPall ME.
these details by using the standard report MB5B transaction

I want to download MB5B report at everyday night @ 12'o clock into my local
system/sap server. Is there any possibilities to schedule a background job and
download the report in excel format in my pc/server automatically.
Please go through as per the below steps
1. Goto Trans -> SM36
2. Define a job with the report name and variant if any
3. Click on start condition in application tool bar
4. In the pop-up window, click on Date/Time
5. Below you can see a check box "Periodic Job"
6. Next click on Period Values
7. Select "Other Period"
8. Now give '15' for Minutes
9. Save the job
When i am getting the output, the date on which the output has been ran is not
appearing in the report. How to setup the same.

I have customised the screen of SAP material master,Under foreign trade import
customization is for excise data now actuall I don't know how to transport this
screen in material master i.e in SAP user menu
We are Material Dept People.We are working on both SAP as well as web CRM
.Please tell me how to link both this software so that if i make a entry in web CRM
then it should get automatically update in SAP.

Iam Booking the vendor invoices for materials under TCode MIRO.Iam using the
doc.no generated during 105 mvt as a reference.I want to check whether MIRO has
been made for all 105 documents.Is there any standard report linking the two
documents.Or if I can make a Quickviewer, What are the tables that I have to link??
Step by: report
MB5S step procedure will be helpful.
of GR/IR balances.

The scenario is like that- all the Purchase orders should be released by the
Manager and if the P.O. value is above Rs. 50000, then Auditor should release the
document after Manager. I have tried my level best but both the conditions are not
satisfied
you at a one
can add timemore characteristics in release Strategy as PO ValueBy that you
can COntrol the same as per u asked for.
This can be done through Workflow; you have to change the workflow; so that
when auditor release; manager should receive the workflow workitem.

I want to know that what is the split valuation and how many types of valuation exist
in my SAP ERP system.
With split valuation, we have the option of differentiating between partial stocks of a
material according to particular criteria and handling them differently, regarding the
valuation, within a plant. A split valuation may be necessary in the following cases:
1-When the stock of material from in-house production has a different valuation
price to the stock of the same material from external procurement
2- When the stock of a material is to be distinguished by quality and the value is
also determined depending on the quality
3-When the different batch stocks of a material have different valuation prices
For every valuation type, there are two types of data in the system, as follows:
1.Valuation data (for example, valuation price, total stock quantity, total stock
value), which is defined for every valuation type at valuation-area level and applies
to all dependent storage locations.
2. Stock data, which, like batch data, is managed separately for each storage
location. If a material that is subject to split valuation is also subject to management
in batches, its stock data is not managed by valuation type, but rather by batch.
Every batch is assigned to a valuation type.
The stock quantity, stock value, and valuation price for all valuation types are
managed cumulatively at valuation-area level.
The split valuation can also be done depending on the origin of the material.
Example: Value of the procured material from India could be different and material
purchased from other country could be different.
Here split valuation is simplified
1.0 You need to activate split valuation: T code : OMWO
2.0 Define Valuation categories and Valuation type and local categories: T code
OMWC
3.0 IN MMR assign Vlautation category in Accounting view. Maintain MMR then for
plant level and valuation type.
4.0 Pin PO select valuation type on delivery Tab.
5.0 In goods receipt it will take according to valuation type in PO
6.0 for Goods Issue : you need to select the valuation type

Interviewer will ask following questions :


How you will configure : Answer : step 1 and 2
How you will maintain split valuation in MMR Answer : Step 3,
How you will use split valuation for ordering materials Answer : Step 4
How you will carry out GR/GI of Split valuated materials Answer : Step 5 and 6
I want to maintain an inforecord for split valuated materials I created a catogery
type as
valuation catogiry = z valuation types = A external B internal
i want to maintain split valuated materials for a & b
can u plz explain me step by step how to maintain inforecords for materials from
Externalur&catagory
Assign internal to aterial & then assign ur Valuation type in Info records

I have a specific query to you all. How many maovement type are there in Standard
SAP to provide stocks to a sub-contractor. As fer as my knowledge goes there are
3 ie 101 O , 561 O , 541 O Is there anything more than that ?? If it is then please
let me
GR for know .
individual components through movement type: 501 or 561 ; GI to
subcontracting vendor: through movement type 541. ; GR from sub contracting
vendor: through movement type: 101 ; Movement type 543 is displayed to cancel
the material
Mvt type 121cost account. ADJUSTMENT.
for Susequent

I WANTO CREATE A CONSIGNMENT MATERIAL AND WANT TO RECEIVE


MATERIAL FROM THAT CONSIFNMENT TO UNRESTRICTED. .PLS HELP ME
WITH DETAILED STEPS..I AM GETTING ERRORS WITH MY PROCEDURE
create material master record for consignment material(mm01) and maintain
inforecord (ME11) for consignment material, info catagory as consignment. create
PO (ME21N) select item catagory as consignmaent( K) and post it, recieve the
material through MIGO(101) transaction, post it. then goods are automatically
posted into vendor consignment. check the stock over view (MMBE). here we can
see material at vendor consignment, check the the material document. here we can
see the the movement type,what system would be taken.
NO accounting documents will be generated during MiGO transaction, once you
issue the material to consumtion then only A/C documents are generated. check it
out,
u andtomail
want to me
create what kind of material
a consignment G/L accounts aretogenerated
but acc. me i dont think that
consignment material will be created. bcz u can create a material for only mat.type
and industry sector. consignment material is a special stock type that u store .u can
create a material and then u can store it as consignment stock in info.record.ans.of
q2.- u can moves the stock type of consignment to un rest. by using movement type-
343 and for reversal 344.
WHEN I AM DOING TRANSFORPOSTING WITH 411k FROM CONSIGNMENT
..ERRORS
1) "CONSIGNMENT INFORECORD NOT FOUND IN PURCHASE ORG"..
2) VENDOR IS DETERMINED AUTOMATICALLY (WARNING) COMING..
BUT I VE CREATED PO (WITH THE HELP OF CONSIGNMENT INFORECORD)
TO THAT MATERIAL WITH CONSIGNMENT ATTRIBUTE AND IS SHOWING AS
CONSIGNMENT STOCK IN MMBE TRANSACTION. BUT UNABLE TO DO
TRANSFOR
You can solvePOSTING HOW
this problem byTO SOLVE IT..PLS
maintaining HELP organisation
std purchase ME..IF I AM WRONG
hw to maintain std pur org..when i go for assigning std pur org , iam unable to do it(
which is non editable mode)..pls help me

Kindly explain me the configuration steps for creation of cost centre , profit centre &
cost element . Kindly also explain the relation and the significance of these terms, if
possible.
KA01 for creating Cost element & fr creating cost center KS01
Thats ok, but whether I need to configure something on the spro before making
creating the cost centres and the cost element etc. using tcodes ka01 & ks01 and
how ? A step by step will be appreciated
These configuration to be done by FICO consultant. The T code provided are
configuration t. code. For more details you need to visit controlling section of SPRO
That true, it needs to be configured by a fico personnel. as I am working on ides, I
need to configure all these fico relevent settings , while working with a newly
created company code , not with 1000 etc. I have ventured in the Controlling part,
but nothing much could be achived. kindly suggest me the configuration steps in
controling.
We have problem in bill passing for VMI items Fund is being consumed during
consumption of material and also during Bill Passing .We are issing Consignment
Stock through Movement type 201k and MRKO transactionfor settlent and not
MIRO

What are T.code for interest paid to vendor and interest received from the customer
and what programe have to run. interest payment to vedor whether to post T.Code
F-58 or through APP If it through APP how to make payment

When create P.O t.code Me21N what are the configuration have to MIGO and
MIRO and what is required field to Fill and how it is used since I am new to the
groupcreating
After i requirePO
details
with information
T. Code Me21n you can run Migo with Goods Receipt and
Purchase order, ensure that the movement type is 101. after doing GRN, run the T.
Code MIRO and reference the PO. System will propose the amount which you can
change .
In SPRO, we r creating purchasing groups which we r not assigning to anywhere.
Then why we are telling that Purch grps comes below Purch Org. in organisation
structure. A purch Grp can be used with any Purch org and any plant or company
code.
Puchasing group is not assigned in enterprise strcture. Puchasing group help for
reporting purpose. Pls. let me know if it is wrong.
Purchasing Groups can also be used in: 1. Release strategies 2. Output
determination 3. Authorization
Purchasing group is group of persons/buyer resposible for purchasing of
materials,it is maintain in Purchaing view in Material Master before maintaing it you
have to specify plant.it is maintain at Plant Level Pls. let me know if it is wrong.
In my openion Puchasing group can be used for purchaser order of any plant. MMR
can not restrict you on this. Pls. have your valuable suggestion on this.
please note that purchasing group in not part of the organization structure as you
said it can be used across the SAP organization structure
Purchasing Group is just like a label for our identification purpose for the
procurment of materials and it will come under Purchase Organisation and we can
use across the plant. Normally Purchasing Grp is for the identication of persons
who is dealing with what kind of materials. for example, in big organisation, for
Mechanical related items, we have to identify the buyer(Purchaser) who is
responsible and with whom we are able to contact for the procurement of materials.
as per RIL, purchasing GRP are ME1 - for mechanical spares, ME0 - Electrical
Spares like that.. for the easeness of identication of persons(buyer) who is
repsonsible for the procurement.
We are working in Material Dept.We are working on both on SAP as well as Web
CRM .Please tell me how i can link both this software so that if i pass a entry in
Web CRM,then it should get automatically update in SAP.
Use t code CF8M to link CRM to R/3
Thank you for providing the T CODE,but will you be able to make me understand
this transcation step by step.

I have received certain quantity of a material through 501Movement type that is


goods receipt without PO refference & now i want to do
Invoice verification for the same,Kindly guide me how could i go about it. Plz tell
me whether i will have to do MIRO or any other Transaction code for settlement of
this material receipt. Plz reply at the earliest as Tommorrow (12.06.07) is my
presentation
You atthis
can settle client site.
type of goods reciept through by entering in vendor invoice
settlement , so you can use the transaction FB60 --Enter the vendor invoice, here
you can post this directly to the vendor account, so need any reference document
like PO etc... so post directly to Vendor account in FB60
while doing GR from 501 mvt type, enter delivery note above say. 123xyz. Then go
to MIRO, in PO reference tab below select delivery note, then
infront of that enter that delivery note.
501 mvt is used for stock adjustement or at intial stage when ur starting
implemntation to get stock for material. I donot think u have to do any transaction
like miro
501 is not used for stock adjustment it is used for GR without reference to PO some
times we need to purchase the materials without PO but need to book for inventory
that time we use this mvt type and the invoice will be processed through FB60
transaction.
561 is the mvt type used at the initial stage for stock upload to sap system when u r
starting
Mvt Codethe561
implementation,
is used for initial loading of inventory in SAP (from Legacy). For GR
with Mvt 501, you receive settle the invoice using FB60.

delhimk <delhimk@gmail. com> wrote:


We are looking for a person who is having around 10 years of functional experience
in purchase / planning / stores and at least 2 years in SAP
environment. Compensation will be based upon the merit and experience. Location
is Uttranchal - Haridwar Please send your resume in Doc stating current CTC &
Expected CTC.
When we receive the material we will make following entry Raw Material DR
100 GI / IR a/c cr 90 Excise payable 10
I Ecise payable of Rs.10 will shoud take in RG23A credit What is procedure for take
in Credit of RG 23 A and please send the what are Excise configuration are with
T.Code
If consider you are procuring CENVATABLE material of Rs. 100.00 with Excise tax
16@ BED , 2@ Educess and 1% Higher Edu Cess and 4% Sales Tax
Then following will be entries
GR : Debit Rs. 104.66 : Stock Account basic price + ST
Credit Rs. 104.66 : GR IR
Part 2 entry while GR
CENVAT ON HOLD 8.24
Higher ECS 0.08
ED PAID 8.00
ECS 0.16
CENVAT CLEARING -16.48
For credit transfer use code J2I8 for configuration : SPRO --> Logistics General -->
Tax on Goods Movement --> India

Could u pl. tell me how to introudce Batch Management for already existing
material ? I have tried by putting tick in the Batch Mangement in material master
,after making zero in STOCK qty & P.O Qty , But system not allowing me to
change by giving the Following reasons "Storage Location and Stock is already
exists " Expecting ur immedite answer .

Could u pl. tell me how to do mass deletion of assinged subcontracitng chalaan for
particular material and particular P.O. ?

Batch is activated at the time of creation of the materials. now in your case the
material is craeted and you want to activate the batch. Issue all the mataerisl athat
are there in the stoc . The stoc level (MMBE) for that material should be zero. After
doing this in the change mode of the material Master for that material , put the tick
for the Batch. The batch filed will be there in many views like Plant data . It needs to
be activated in one of the views . Hope this will resolve your problem.
There has been some changes in the address details of our company. Whats the
effect if the Master data (in IMG) is not updated with the same.
For documents like Inv / DN / Sales order / C/n / PO, I've changed the address in
the form layout.

I have a question about maintaining the material description in the PO instead of


material number. can you tell in which case this is used. I created a PO with
material description( without any material number) which is a asset item. then i
created GR now i do not see any stock avail for the GR material. is it std? if i have
to do a return
Generally usedGRforitconsumables.
gives error saying no qty available.
or material which does not have materials code
and used for consumption basis.
GR of Asset is cosumbales and no valuated
the asset is not the stockable for any company. It can only be capitalised.
So how to return it back? imagine the same material description maintained for std
account assignment still there will be no stock received at time of GR so nothing
can be returned also. how to overcome this?
In this case when you do the MIGO for Asset PO, Asset gets capitalised. Now if you
want to return this to vendor you have to do the IV and after doing IV, This asset
will be retired by FI module and accounting entry will be done thru FI.
I am not sure what your concern is. I had a similar condition when I created
a PO and tried to do MIGO it said there are no items in the PO.

Is this what you are getting?

I am working on reorder point planning and getting puchase requisitions in ME57.


how can I assign these purchase requisitions to scheduling agreements and by
which transaction code I can confirm the assignment.

Can any body explain to me in detail about the Release Procedure if possible with
a simple example and the relevant steps which are involved in it?? I am a bit
confused
This qury about it.
were answered by member. He has provided link for downloading
document. It is really nice one. Pls. serach on group.

Purchaing Group is group of buyers/persons responsible for purchasing of certain


materials/sevices. in a Plant While maintaining purchasing group in purchasing
view you must specify plant Let me know,if i am wrong
give the clarification for TAXINJ and TAXINN is it both are same also explain how
to configure with T.code
Both Tax procedure are diff. either of one can be used in system Pls. visit spro in
your system To create Tax code use T code : FTXP
TAXINJ -> Is STD Formulae based Tax procedure For
Country India
TAXINN--> Is STD Condition based Tax Procedure for
Country India
You can choose one of the above for your tax
calculation in MM / SD Pricing ( This is thru the TAX
Conditon type UTXJ- Taxcode for other country like
Germany / Japan its is MWST)
T code Description
OBQ1 - Define TAX Condition type
OBQ2- Define Ascess Sequence
QBQ3 - Maintain Tax Procedure
OBYC- Maintain Acc Keys
OBCN - Assign GL account to Acct Keys
FTXP - Maintain Tax Code
Assign the Tax Procedure to the Country ID in
Finacial Accounting - Global setting- Tax on
Sale/ Purchase - Basic setting

Extremely comprehensive. Appreciated for posting.

I want to know what is use of Classification view,How it Create? how to create it


class,characteristi cs?is it possible to have bdc program for uploading
characteristics for all Material?

Does any one has gone through the additional excise duty for domestic purchase of
imported goods (ZADC ) in ECC6.0. How to go about the config ?
I have a problem in 412 E move ment type. once the goode are being transferd to
sloc to sloc ( to a sales order) . before do the goods movement moveing average
price has changed ( T code MR21) Then do the MB1B transaction. after being done
the trans action material document (MB51)still show the previous value. how this
new pricecan be included . Is it a configuration cvhange or costing config. If so
please let me know the steps. . Is it possible to change in VK12 .

can any one tell me, how tax code is linked to pricing schema? Or how tax comes
in to purchase order?like excies...cdt/ vat/servie tax......
Tax code is linked with Tax calculation procedure. You need to maintain tax code in
po . Standard program calculates then taxes on po.
the tax code is linked to tax procedure which in turn linked to the company code. for
GL ac determination the tax is linked thruogh transacton ev key VST through
condition type MWST/MWAS

I defined some scrap qty in planned order for repetitive manufacturing and process
order in MFBF. Please tell me By which transaction code I
can see that scrap movement or material consumption (MT 551) for that scrap qty.

I delete TAXINJ. Can any option to recover the deleted entry

My Problem is the User is Entering the Posting date less than Docuement Date
while posting the 105 document..
I want the Posting Date to be Sysdate.The User Should not Change that.if He
Changes , the Error Message Should be Displayed that the Posting Date shouldbe
Sysdate.
Is there Any Configuration Settings or i have to go to User Exit. i have Wriittne
coding in allcan
I think You theuse
8 User Exit.OB52
TCode It is not Working.What
to open shall i Do
or block different ?
periods for posting.If
you keep only the period in which you want the entries to be posted as open,then if
the user tries to posta document in a different period,system will show errort
message.
Our Users Correct
Post theme if Iam
105 wrong Earlier than the 103 Docuemnt Date.i want to
Document
Avoid that. What Should i Do For that.
There are different ways to resolve your problem.You try the following one if your
not satisfied i shall tell you other way.
Method:1
IN spro>mm>Inventory management and phy.inventory> setting for enjoy
transaction> settings for goods movement>field selection for miro>here you select
GOHEAD-BUDAT as display mode.
This problem will come when you are posting the GR documents at the beginning
of the month, as at the beggining for the financial purposes the
FI guys will not close the posting periods for the previous month, so the stores
users will have some documents pending when they are receiving the goods at the
end of the month so they have to book that goods for the previous month only
otherwise it will be problem to inventory, so users
change the posting date to previous month.
You can set this field as display mode as per mani guidance (below) in IMG
settings by using transaction OMJX (ver ECC 6.0) but will create a problem at the
month beggining for closing the accounts of previous month for pending GR's so
take care and consult the concerned dept and advise them whether they need and
take further step
I need your help. Here is the procedure and error message. In tthe inventory
sampling, I want to set up cycle counting ( T-Code:omco) , I can not put a new
entries for my plant, the system give me the following error, see the screen dump in
the attached ffile.. My factory calendor is updated for this plant.
You can't send attachments in this email group. They all get deleted before we get
the email.Include the error in the main body of your email
acco. to me i think u go to the relevant material master and select the cc indicator. it
also related to plant.try this.if i am right then revert back to me.

Pls guide me that how to maintain the pricing conditions in Blanket PO for the
consumable materials or services. I have also given the limits for the same.

It is advisable to delete the existing material group or is there a way that someone
can put an indicator for whatever reason that can be to block/disallow any user to
make use of that particular material group in the system. Bearing in mind that there
might be open docs, ie. Pending invoices/Open Orders etc.

Is it possible to change a IM location to WM level? What are the steps?


I want to know the difference between Deductable tax and Non-deductable tax in
which situation this both be used.Moreover i also want the CIN notes if any one
having this,please send to my mail i.d.If any one send its very helpful for me ya....

Nice that ur doing controlling part.


Use OKKP to set up controlling area
use KS01 to create cost center
use KA01 to create cost element.
First in OBY6 set all ur company code details like fiscal year variant, field status
variant, chart of accounts,etc. .
then go to OKKP, to maintain controlling area. then link it with company code.
then after controlling area has been set, create cost center from KS01 t-code in that
control area.
then use KA01 for cost element means GL account say G/L 400000
then go FS00 (g/l account maintenance) enter that Cost element that u created say
400000
enter company code.. then press button " Edit cost Element" above in that screen.
then enter ur cost center there.

Is it there any way to set a default value for the Price Unit field when creating a
Material Master Record?
I am giving details of my scenerio. We want to add freight cost to GR / IR account.
Presently we are making PO with settings : GR based IV and freight condition. PO
made & 5 GRs done. While doing MIRO in Std. SAP we can't do delivery note and
planned delivery cost. For this reason I select purchase order/ schedule agreement,
item no. then lay out goods services + planned delivery cost and delivery note.By
this all open GR details will come , I selected required delivery note.
"When I saw another line for freight it shows accumulating all 5 GRs freight cost."
This is problem area for customer. Whether he has to accept all cost or elese
manually change this freight amount. In this whole process they are wasting much
time in processing. For that reason simply they book amount in unplanned delivery
cost & complete MIRO which is correct way.
For this reason customer wants this freight cost to hit directly GR/ IR A/C
To do this I tried following way:
Made freight condition in pricing procedure with manual has priority
+ve
Cond. class:Discount or surcharge
cal. type : qty
cond. cat: delivey cost
without accrual
add this condition in pricing schema without accrual key, manual.

Made another condition


manual has priority
-ve

I tried setting value update indicator at account grouping but it wouldn't allow me to
as it is greyed out. could you please tell, how one could chnage value or quantity
indiactors as they are greyed out. any programming required
I have tried out again on system. When you will copy movement type then select
copy all entries. As soon as system goes into section update control and wM
section , you can select /delect both indicator for each entry with and w/o special
stock.
The purchasing organization is further subdivided into purchasing groups (buyer
groups), which are responsible for day-to-day buying activities.
A purchasing group can also act for several purchasing organizations. Purchasing
organization can be maintained at Plant level/company code level/Corporate level.
While Creating Master data-Material Master,while Maintaining Purchasing group
field,you have to mention plant,thus it get directly allocated to respective
Purchasing organization of Plant/company Code Thus if you have assign
purchasing org. at company code level,there should not be any error.
i have one error while recieving the G.R i'm facing the problem of Excise Tab is not
available.
Check Whether the Material Has Tax. Check the Entries in J1iD.
maintain chapter id, exice duty, educess, h.cess in t code J1id by this u will get it
After JIID entries, check whether you have filled excise details in material master
(foreign data imports - purchasing view details and also
CIN details of vendor master

I want to get a list that is material number and its planning material number. Does
anyone can give me some advice ?
try MB52
MB52 gives warehouse stocks of material on hand. I think this is not the specific
answer to the question.
Please try MD04 and MMBE

while creating data i am getting the below error. system error in routine
FI_TAX_CHK_PRICING_ DATA error code 13 function builder TAX2

I'm getting error while posting G/L. I did not touch the tax section, still I'm getting
this error...
"System error in routine FI_TAX_CHK_PRICING_ DATA error code 13 function
builder TAX2".
The description of error is:
"System error in routine FI_TAX_CHK_PRICING_ DATA error code 13 function
builder TAX2 Message no. FF769
Diagnosis
A serious program error has occurred.
System Response
The current processing step cannot be carried out.
Procedure
If the program error occurred
In a standard
i don't SAP
know the program,
exact then
location create
of the bug.an OSS
but message
i came across the error. and it is
related to the company code and tax procedure. get necessary help from ur FI
consultants. if u do for some other company it'll work nice.

I have a problem regarding printing of Contracts. Contracts created in the


production server using Tcode ME31K are not getting printed
despite having all the message settings right. The output type, device, form ..etc.
are all in place, similar to those in the settings for PO's which are getting printed
successfully.
first what is valuation class ? where valuation class in material master entered ?
and how G/L account and commitment item assign to valuation class ? It is done in
MM or FICO
Valuation module
class is something related to account Dept. It will create a problem while
updating MRP views if this is not maintained.I hope this is ok?

Could anyone give information on KANBAN and how to implement it.


KANBAN System is used for controlling the material flow, which is based on the
actual stock consumed in production. (It is a visual control system). A different
terminology is being used in SAP-KANBAN which are given below:
The work center / Super market storage location that requires the material is called
Demand Source.
The work center / Unit stores / Vendor that is responsible for manufacturing the
material is called Supply Source.
The link between supply source & demand source is established by Control cycle.
Control cycle will have details of no: of Kanban, Qty per Kanban, Who is the supply
source, Mode of JIT CALL Transmission etc.,
When Kanban becomes empty in demand source, a message called JIT CALL will
be sent to the supply source.

CAN ANYBODY HELP ME IN CREATING USER EXIT FOR MIGO? MY


PROBLEM IS WHILE DOING MIGO I WANT TO HAVE A CHECK ON THE
DOCUMENT DATE SO THAT WHENEVER A MATERIAL CHALLAN ARRIVES
AFTER ITS ORIGINAL DELIVERY DATE MENTIONED IN THE SCHEDULING
AGGREMENT IT WILL BLOCK ME TO DO THE GR.

I am trying to create a PR for a material with master record , where the items are to
be procured for two different cost centres, by the use of multiple account
assignment with distribution according to quantity. But, while trying this , I am
finding the single account assignment selection as the default in the item menu
under the account assignment head. I cant make any changes and select the
multiple account assignment. Can u guys can explain the procedure ? Is it a
system
Iam newproblem or else?
to this group and SAP MM as well. I have a suggestion in this regard. In
the Item Detail - Account Assignment Tab- did you clicked on the icon for changing
the Single Account Assignment to Multiple Account assignement? ?
We can make a settings like some of the G/L accounts(cost element here) can be
defaulted for some valuation class to avoid end user confusion of entering the
correct G/L account( Cost element) in the Purchase requisitions and Purchase
orders. So in your case this is the problem,(most cases in the Non stock items,&
Non valuated Material types) So take a help from FI guy and check which accounts
has been assigned. This is not a System problem,as this is preconfigured G/L
accounts and the FI guys knows that which materials need this G/L account
number no need to worry, but for your information please check with FI guys
we are implementing now SAP R/3 4.70 system, and i am the administrator of the
MM module. I got the LO020 manuals for the MM module, but i heard that their are
more specific manuals for MM module like LO515,LO520, LO525,LO540, LO55,
LO510, LO925,LO930 and other more manuals for Inventory Management. I
wonder, can any one help me and give me web site to download these manuals as
PDF Files, or can any one send me these files. thank you alot for your support.
Which website did you download the ones you are having?

I tried simulating the scenario on my system. i did the same thing, system wouldn't
allow me to tick the value/quantity update indicator even at update control/wm
section. the system copies all and wouldn't stop at update control and wm section.
if u did it right, would u send me the screen shots please?

Please provide the procedure for goods receipt through inbound delivery. Please
expalin what actually is the Goods receipt through inbound delivery .

Can we define a New Item Category ..if yes ..where ?


its not possible to define new item catecories in standard system bse there s no
option for provided to do so.
Does SAP Support Open tendering process for Vendor Selection. I men in my
clients scenario. For vendor selection process for any material starts with
advertisement of tender innewspaper. Vendor replies back with his quotation. After
receiving technical and commercial quotation, the organization go for technical
bidding and those who qualify in technical bidding they contest for commercial
bidding. After commercial bidding, comparative statement is prepared and then
purchase committee approves the vendor. The problem is that any no. of vendors
from any where can give their reply to the tender as it is a government organization.
So, how to map this process in SAP as we are not directly sending RFQ to the
vendor, instead he reply back with quotation directly once he sees the
iadvertisement
can suggest uintonewspaper. I want
go for bidding RFQ you
byall
docto type
suggest
AB. me whether
by doing thistou keep this
can have
some
For idea.
open tendering in SAP, we have to have an seprate desk for creating vendors
in SAP as soon as the RFQ comes for a particular tender on paper. Otherwise we
cant maintain data in SAP for that vendor, Second step will be creation of RFQs for
all quations. Technical comparison cant be done in SAP, there shall be diffrent
team of expert who decided whos fit and whos not. After that only selected vendors
will be there for commercial bid.
Second option is SRM, or E-tendering, where Tender will be posted on the website
and registered vendors who will have user ids and password will login and maintain
there quations on website. The only solution of open tender where any vendor can
quote is instant
The exact creation
process of vendors
oof Tendering is in
notSAP.
supported in SAP and we have to do it
outside.I have been working on this area for quite some time trying to find out how
to integrate the Tendering and Rfq PROCESS(AS PER GOVERNMENT
PRCEDURES)in the SAP and we have done some development work on this
specificstill
There area.
would be an issue if you are closing a Service PO's that has not used all
committed funds set aside in PO#. Selecting the delivery complete check in the
PO, as shown below, does not decommit the funds for a service PO. . A "Final"
entry must be made on the service entry sheet. That is the only way to decommit
the funds if not all dollars are used in the service PO. .
Can any one guide me how to close PO in MM?
Tick delivery complete indicator in PO .

i have read in help file that, you link the tax procedure to MM via a condition type
NAVS, which we mainatin in mek1. and this will help in automatic determination of
tax in purchase order. and also in PO, item level, invoice tab, we have a feild for
taxcode... i am looking for how that particular tax code came there , eventhough i
have other taxcodes which are having tax category as INPUT tax. hope you got my
point.. the same procedure is done for the sd part also, they use the cond:type utxj
to link to tax procedure... ..
U can see planning file in MD21 with material and planning file. And if MRP has
been run for any material, planning file is automatically created,u can see in MD21
U can also create ur own planning file in MD20

anyone suggest me that can we have release strategy for material type/ qty or else
which is not found in the structure CEKKO. it was asked in 1 of my inteview.
my 2nd query is when we do inter STO, while GR what is the difference between
refering the PO or refering the outbound delivery. in system both are accepted.
as per my knowledge there is no release stratergy for mat type.
2 nd question the sto in GR is only when you want to block the stock which is
supplied by the vendor.
if the answer is correct ples revert back
but how u can say it s for blocking the stocks while doing GR in STO? my question
s by refering both by PO or by Outbound delivery we can recieve the Stock in inter
STO. what s the difference between them?
When you enter the GR w.r.t to Outbound delivery the system will picks the
quantity whatever in the Outbound delivery means the exact quantity you did
the PGI(Post goods issue).

When you enter the GR w.r.t to Purchase Orders the system will show all the
ordered quantity(full qty of PO) that you mentioned in the PO and you need
to select the quantity of entry that did for the PGI ,

So always better to do the Inter Company STO GR w.r.t to Outbound delivery,


other wise you can inward all the open quantity from PO if you do w.r.t PO

I think you understand the difference b/w among them.

How to blcok the plant for procurement. We had closed one plant. I need to block
the respective plant for purchasing only.
Can you please help me in this regard.
Set the Plant-sp.matl status 01/BP as blocked for Procurement for that particular
material in the Material master data in the Purchasing view screen so that you can
block that material for any further purchasing
I want to block entire plant itself, not material.
Can anybody give me detail information about how ABC Analysis done from
transaction Code-MC40 process

I had posted this message earlier on the group but I have not yet received any
advise. Kindly help me on this issue, please! I have a problem regarding printing of
Contracts. Contracts created in the production server using Tcode ME31K are not
getting printed
despite having all the message settings right. The output type, device, form ..etc.
are all
acc. to in
meplace, similar
first get to those
it release in theu settings
it, then wil able for PO'sit.make
to print which are getting
it i am printed
wrong or right
plz revert back to me.
Thanks a ton for your reply. However, the contracts are released successfully but in
the message output the indicator is set to RED colour when we try to print.
Strangely enough, some Contracts are printing while most of them are not, all
having
If somethe same config
Contracts settings
is printing andinsome SPRO.are not printing is not the problem of SPRO,
Better check the transaction MN08 i.e messages condition records means the key
combination for the Output is correct or not with that Pur Org, Vendor, and
Document type, And also you are telling the message indicator is showing the red
button so better check this message condition record.May be combination is not
working properly. First check this transaction MN08/MN09 then get back on the
same.
Ihave a dought plz clear Iraised a P.o with gross price = 25 rs Fright value = 10
rs when ever i'm doing G.R system was posting
Gross price into mat a/c & fra1 into fright clearing a/c But i want 25+10=35 should
be posted into mat a/c Can u plz clear & tell me what pre-defined settins can be
done
this frieght charges and extra duties u just congirute it in info record from there u
pick the details to PO then it will cumulate
as ur problem, in gr posting enter rs 25 in mat. a/c and rs 10 in
freight clearing a/c but when u are going to post the invoice then enter
rs + 35 in vendor a/c and mat.a/c rs -25 and fri.clearing a/c rs -
10. i hope u understand, if i am wrong then revert back to me and right

Can anybody help me Return Process in Intercompany STO like what are the pre
requisites like configuration required and process in details.
I would like to seek a help. Our dept planning to change the structure to commodity
buying or by category (i.e. Electrical, Mechanical, Instrumentation and OThers).
However our purchasing group classified as per Department (i.e. IO3-
>Maintenance, IO4-> Engineering, IO5-> Operations) If we are going to change the
classification of purchasing group it will create a resistance from the end-user. So,
we will not change the classification. From the SCM side how we could classify
and assign to buyer the commodity buiying.
Do we need to add an additional field during the creation of Work Order. Example
E = Electrical M = Mechanical I = Intrumentation
Which field in Master Data to be configured (Material Master) ? The category would
be populated to PR, PO and also in report.
From that perception the buyer could see or run a report for relaease PR base on
the commodity / category field as we mentioned above.
IInneed
SPROyour immediate
you suggestion
can configure and feedback
that,i mean as soon
under creation of purchasing group you can
put description as a buyer instead of mantenance and just keep the I03,so now the
new config will be I03=the name of the buyer
A possible solution is to use Material Group, you need to maintain this in Material
Master and it will be copied to your PO upon creation. Reports and authorization
can also be set at material group level.
Other than the material group what other parameters we could use?

I got one mail from client. It is a word document. In that word file, client has inserted
on excel file (by icon) My other team mates can open it on their PC. But I can't open
that excel file. (I can open word file) Seems there is some problem in my PC's MS-
Office - Excel Programme. I think it is related to Macros. Security level i changed
for Macros (low, medium, high). Still can't open file.
Open file name with All files / Excel file once u open ur excel sheet Just place ur
cursor at font menu bar in the excel file and change the font it will get open, try and
see. It is nothing related with macros.
Yes I agree with Satish. When others can open that file in their PCs, then problem
could be with your computer only

Does anyone knows a way to charge MRP reas into the system ? Im not able to
find other objects, like direct input , idoc, bapi etc tried to work with batch input
but several errors occur !
Use have the same material master in two different Plants. Plant A and B. We are
trying to remove the Batch control to material in only one Plant (B). But after do that
, Plant A and B remain without this flag activated. I think that system is having a
wrongly behavior. Does anyone have passed for this situation ? Does SAP is right
?
Check if the Batch Management is enabled at the client level. If so activate it for
only Plant level in OMCE

Can Service Entry sheet be used for Service Management, without setting up the
Service Master Data. If so any leads to the basics of using Service Entry Sheet will
be greatly appreciated at the earliest.

In our organisation MRP gives schedule lines. Our production controller did a
mistake he entered wrong production order into the system. He ran the MRP it
gave schedule lines later he realized that he did a mistaake. How to solve this
problem.
Ours is a process industry. MRP gives schedule lines for weekend as well but, we
dont want to receive any goods over weekend. We want to receive only
weekedays. How to fix this problem. Can some one explain step by stem

Ours is a process industry, we have some expensive motors. We buy those motors
and also we get it repaired, it depends on problem. In house person examines the
motor creates a work order for repair in that he includes what are the components
need to be sent to external service person along with Motor. We have two purchase
organizations and two info records. One for purchasing and other for repairs. We
work with reservations. When ever we run MRP it picks up the reservation on motor
and creates PR. The purchaser has to change the item category to sub contracting
then store person has to send Motor along with components to service person. This
is the business flow.
Here I couldn't understand how to differentiate PR for new motor and repair. The
only way I could understand is by email Maintenance person has to send an email
to purchaser with PR number and components required to be sent to service
person. Can some one suggest me any other options.

Use t-code NACE

in priceing procedure ( M/08 ), make necessary settings like in freight condition,


click statistical button. Save. Now in PO u can see that freight cost is added to
material cost.
For inter company STO, u need to maintain company code clearing account in
OBYA,

could any one explain the important movement types used in Inventory
management, and also give complete overview of how it effects on material
valuation and accounting documents,and also give picture of how G/L accounts are
allocated
AS to particular
UR QUESTION movement
I KNOW THATtypes.
A LARGE NO. OF MVMT TYPE ARE
THERE.SO ITS IMPOSSIBLE TO DESCRIBE ALL OF THESE. BUT I AM GIVING
SOME.
101- GR FOR PO
201- GI TO COST CENTER
301- TRANSFER OF MATERIAL FROM ONE PLANT TO ANOTHER PLANT
343- MATERIAL MVMT FROM BLOCKED STOCK TO UNRESTRICTED STOCK
344- ,, ,, ,, UNRESTRICTED STOCK TO BLOCKED STOCK
AND I AM GIVING U HOW MOVMENT TYPES CONFIGURE.

STOCK TRANSFER
PLANT TO PLANT STIRAGE LOCATION TO STORGE LOCTION

TRANSFER POSTING
1.STOCK TYPE CHANGE- QUALITY STOCK TO BLOCKED STOCK LIKE THIS
2. BATCH TYPE CHANGE
3. MATERIAL NO. CHANGE- OLD TO NEW MATERIAL
4. PHYSICAL MOVEMENT OCCURS

MATERIAL VALUTION:
WHEN GR OCCURED MATERIAL STOCK INCREASE AND IN ACCOUNTIN
DOC. U CAN
SEE MOVING AVA. PRICES CHANGES WITH EVERY GR OR GI.
ALSO U CAN SEE AFTER EVERY GR THAT U GO TO THE ACCOUNTING TAB
pls give me a solution for the following scenario: In purchase order i have to set the
Document date in '*DISPLAY'* mode. how can i make this possible. and also let
me know how to set the remainig options(Required and optional) for the same
document date in purchase order. i checked the screen layout for purchase order
but there is not field entry in the name of document date. pls give me a solution
how to do this.
You don't have the option to set the field document date as per options in the
SPRO settings for Screen layout for Purchase order in the SAP standard process.
So what you need is contact the ABAP guy , and ask him to do Screen variant for
this ME21N transaction for the field document date. This can be done through that
screen variants there you will have the options -- Required, invisible, display only
and optional.
So take its
Thanks a help fromfine
working ABAPers, its simple for them.

Can you plz tell me the basic settings for implement reorder point planning for
consumable(' C' class) items and how it will work.
What is RTP?
Kindly give an example for our understanding

RTP is nothing but returnable transport packages. eg:ballets used for carry the
milks in milk shop. after selling the milk it is returned to the owner
that is the property belonger.
The company orders goods from a vendor. The goods are delivered with returnable
transport packaging (pallets, containers) that belongs to the vendor and is stored
on the customer premises until they return it to the company.

reorder point are of 2 types manual and automatic it depends on mrp type that is
mrp type indicator vb for manual reorder point and vm for automatic reorder point.

I am very new to MM field.Our industry wants to physical inventory for a storage


location.Basically we want to first make total stock zero for this storage location and
then from excel sheet we update stock physical inventory posting batch and quality
wise. Now I want to know the total process of physical inventory in SAP along with
step by step T.Code.Also I want to maintain posting block at the time of physical
inventory.After completion of process how posting block remove for this material.
SAP provides Clear Process on Physical Inventory.As your requirement ,System
Automatically Block the Trasnactions ( GR & GI ) at the time of Physical Inventory.
How ever u have to make some setting for this. Physical Inventory Process is like
Below :
1 . Create Physical Inventory Document (PID ) Using t. Code : MI01. or If materials
are large number use T. Code MI 31 for Interval.
2 . Print the PID Using T. Code : MI21.
3 .than go to physical count of material and get count from Ware house Clerk
4. Enter the Physical Count in to the system Using T. code : MI04.
5. is there any Recount Use T. Code MI11
6.Send Deferences to Finance Department . Take Defferences Report Using MI20.
7.Post
You the
can Deference
use Count Using
the Transaction codesTMI
code : MI07.
01 to enter the material,and MI04 to enter
the physical stock that you have taken.Then if you go to TCode MI07,you will see
the differences between your physical stock and system stock there.You check it
one time and post it.Your system stock will be reconciled.You can use the option of
Posting block
physical also details.
inventory in these tc.-MI01
TCodes.CREATION OF PI AND IF MORE THAN 1
MATERIAL THEN FOR THIS tc.-MI37 then
print pi doc. tc.-MI21 THEN ENTER PI COUNT TC.-MI04 THEN POST PI
DIFFERENCE TC.-MI07 CHECK PI DOC. FOR MATERIAL TC.- MI22
OK I THINK U WILL GET IT.

I want to make Batch Management is mandatory for Raw Materials how we will
configure please give me solution. Please give me solution in stepwise
while creating rawmwterial in mm01,check the batch management indicator
What u told is that i have to do for every material but i need that the
batchmanagement is to be made mandatory for all raw materials. if any setting is
there in customizing for batchmangement please tell me
Go to OMS9, select ROH and the field selection group 75 for ROH. This selection
group is usually checked as optional entry and you can check this selection group
to be a required entry and for all ROHs the system would throw an error message if
the indicator is not checked.
Can you tell me what is the Batch Management? And uses also.
Create Frame work order. I used doc type FO,Validity dates,item category
B,account assignment U,no material/service number but description, overall limit
and expected value.But I get error as "Indicator for invoice receipt used not
allowed".Message no. MEPO 026.I found that invoice receipt box is checked and
grey in colour.I tried to make this message as warning only in SPRO at "Define
system messages attributes" by creating this message with version & application
area.
I could not succeed in p.o creation.Can you suggest what is to be done.
Also for Frame work p.o,no GR/Service entry sheet is required.Invoice verification
Ican
alsobefaced
donesame
without GR.Then
problem withhow
thatthe control
invoice of GR/Service
receipt indicator inentry is monitored.
po item overview
found gray in colour. I proceeded with item category definition through spro screen
and found invoice receipt binding in po in item category configuration but problem
is that it also showing in gray and i cant change the indicator invoice receipt binding
in po box there. can u anybody tell me how to solve this problem.Is this the method
to solve
As per my this problem.
logic goes . IR indicator is mandatory for theitem category " B".

could any one explain the follwing scenario briefly, this is one of my interview
question.many companies willing to install the SAP ERP package not for ORACLE
software,why? what are the differences between the these two applications.
oracle is more focused on financials (apps), and database administration(
DBA),moreover its not complete industry solution,unlike sap which is integrated
ERP package.suppose if a company which implemented oracle wanna go for
production means want to include production scenarion, they need to buy one more
add-on to integrate it.which cost extra. But sap is like shopping mall wre all
modules are integrated. if u buy sap software it wil come with complete pckg. One
more thing sap is known for data security and data integration. and versatile
compared to rival oracle.now a days mysap has hit the market which covers
adavanced industry
Oracle - is expert solutionsModule.
in Finance like dataHence,
sharingpeople
like in are
cProjects, cFolders,
preferred crm,
to for SAP

Can we create New Item Catergory in SAP . If yes ..pls tell where we do it ...SPRO
or ABAP
we cant create new item category we can just rename it.
I think you can create a new one in OS13
In a SAP standard enterprise system, Item categories are neither created nor
changed.They are defined in SAP system.

My request is stop replying mails on this subject. We need knowledge members


like Mr. Manohar. He really explain solutions in lucid manner. I respect his
knowledge.
I have a doubt regrading the line item number in P.Req or P.O or any other
document..
To make it more clear..Is it possible to change or configure the line item number
such as 10, 20, 30 etc to 1, 2, 3 etc...
10. Pencils
20. Pen
30. Eraser
If yes,spro/material
Goto could you please explain where i should
management/purchase make these
/document settings??
type in that you can change
item no either you can increase or decrease
hi, u go to spro-mm -pr-document types there u find item intervals u can configure.

I am creating a PO with Pricing attached to it(I mean Gross Price,Discount etc). It is


calculating the net price perfectly but on saving the document there is an error msg
saying "Unable to determine net price" But if I dissociate the pricing procedure from
the vendor the PO goes through.
u have to maintain the condition in img guide. go to img-mm-purchasing- condition-
there a drop down list is there m maintain all fields.then make it to po. if wrong
revertdid
That back
notto me. All the conditions were already maintianed in IMG. In the PO
work....
even if I remove all other condition types and keep only Gross price I am getting the
same error i.e. "Error in net Price calculation"

there is value string in automatic account postings how to define value string
we01,we06
You can not define vlaue string and item category. These are SAP standard
settings.
Kindly help me in resolving my problem as i m new to sap. I have creatd two tax
code namely V1 & V2 & i m using TAXINJ & all
the settings related to calculation of Tax are done & they are OK. Because when i
had created Just one tax code i.e V1 the systeme was
calculating the tax properly.However when i created second Tax code V2 for
Service tax the system was not able to calculate the tax &
gave wrong results i.e after the calculation of the tax certain amount was left
balance in Balance coloumn at the Time of Invoice verification.
Hence i tried to deactivate the erlier tax code i.e V1. & i got an error following error.
System error: Error in routine
CHANGE_CONDITION_ MULTIPLE A053TXJIP2
Later i Tried to delete the tax rate & saved it.
Now my concern is how could i make the systeme to calculate the tax properly with
the either of my tax codes plz tell me if any tCode is
there for the same.
Its very urgent.As i have a presentation in front of client on Monday(18.06.2007) .
its better to delete that tax code as JIp2 condition is overlapping. So go to FTXP
enter tax code(already existing) jurisdiction code if any. check whether JIP2 is
activated (above click tax account and levels) then in menu bar, delete tax code is
there.
Thanks for ur prompt reply however Condition JIp2 is cativated for both the Tax
codes & hence i am not able to delete any of them if anyother solution is there for
my problem plz let me know.
I want to know the stock Qty given to cost center, where i want to see this issuing
stock Qty details its very urgent,please reply ya
Try report MB51 or MB59 with movement type 201 (Goods Issue to costcenter)

Cna anybody explain more about the Serial No.Profile field in the Plant Data1 view
under Material Master..
The serial number profile defines under which
> conditions and in which transactions serial numbers
> can be entered. You define serial number profiles in
> Customizing.
> Serial number profiles include the following
> control data:
>
> Business transactions during which serialization:
> Must take place
> Can take place
> May not take place
>
> Information about whether, during a business
> transaction, you can:
> Enter new serial numbers
> Select from serial numbers already created and
> stored in the system
>
> Business transactions where, during
> serialization: :
> You must create an equipment master record
> You do not need to create an equipment master record
>
> Profile
Could anynumber
body explain about the serial number profile and the purpose of
serilization. pls explian me on the business transactions which are
used in profiles as well.
Serialization at GR is to track the material during GI or in case of any complaints on
a later date.

I use MM71 to archive a material. But, I found that the 2 views, basic
data 1 and basic data 2, can not be archived. When I use MM03 to
display this material, the 2 views are always appeared. How can I
archive the material completely?
I have a scenario where my Local supplier is suppling me materials with CVD Cess
& Additional import duty

In this i can declare CVD as BED but for additional import duty i did not have any
option
it should also reflact in the MIGO.
Additional duty is getting calculated before CST but after BED+CESS

How to handle his duty and is there any standard codition available or do i have to
call for a development

I am not able to do Goods receipt (MIGO) due to following error


Excise modvat accounts not defined for GRPO transaction and EO excise group

The error states that proper settings have not been done for the postings during
GR. the proper GL accounts need to be linked for the positngs to happen during
GR. In case, you are doing the config yourself, you need to discuss with the FI
person and proceed further.

In ME49, price comparison is based on inforecord and not on the price that was
maintained in RFQ (ME47). An inforecord for a particular material that is supplied
by a certain vendor needs to be created first in order to show price in ME49. If an
inforecord has not been created yet, no price is registered in ME49 eventhough
there's one maintained in the RFQ. Is there a way to compare quotation prices
based
You canoncompare
the RFQtheandprices
not the inforecord?
from all quotations received as a result of a
competitive bidding process using the price comparison list . The comparison list
ranks the quotations by item from lowest to highest price.
Before you generate the price comparison list, you need to consider the following: If
possible, each quotation should have pricing data for the same item. Only then is
the correct interpretation of the mean and total values possible. If quotations 1 and
2 have pricing data for item 1, but quotation 3 only has price information for item 2,
then the system does not have enough information to accurately compare the
prices of all three quotations. If a quotation is submitted in a foreign currency, the
price is automatically translated into the currency of the company code, which is
determined by your purchasing organization. You should therefore make certain
that up-to-date exchange rates are defined in your system.
Actually, i'm more concerned with the source of data when quotation prices are
being compared. As I was comparing my quotations in transaction ME49, I noticed
that they are based on Purchasing Inforecord (Transaction ME12) and not the
prices that I indicated when I maintained the quotation (transaction ME47).
If the vendor for the material being quoted has been defined in the material master
prior to the creation of the Request for Quotation (RFQ), ME49 gets the price from
the inforecord. On the other hand, if the vendor is only being defined for the
material during the creation of RFQ, there is no price shown in ME49 even if I have
maintained a price in ME47.
Either way, ME49 does not get the price from what has been maintained in ME47.
Is therestrange...
Looks a way to let
do me
this?
tell you what I did and tested in my system.
1. Create RFQ for 1 material to 3 vendors in ME41
2. Convert the RFQ into Quotations in ME47
3. Ran ME49 and got the result correctly. Ty to do the same and see if it works.
There must be something I've missed in the configuration. How did you set it up?
see that you have grouped the respective RFQ's under the same collective
number, this coll number is also an important aspect in comparing quotations.
i've done this already. any more ideas?
I am Getting the result up to ME49-with No 1 , 2 and 3 Vdrs Thanks
Can you pls explain me Whether the system Adopts the No 1 Vendor, when we
create ME21 , Auotomatically ??
Or We need to enter the no 1 vdr manually Looking forward for yr Reply
system will show the lowest vendor , but u have to assign source manually . by
clicking assign souce in po.

Change the Item number interval from 10 to 1 for the document type (for POs t
code OMEC).
Can we set tolerance for delivery date. i.e. if we mentioned in PO delivery date as
20.06.07, system should not do GR for say after 5 days of 20.06.07. Where can we
do settings . Days can be changed as per requirement.
U can do the settings in Schedule marin key.Wherein u maintain floats & these
floats will act as a controllers.

while creating material by mm01 in organization levels valuation typp pe field


screen is not visible,this problem i have faced for creating split valuation
as i saw ur problem, and i think if valuation type is not
visible. then u go to
img-materials management -valu. & account assignment-configur e split
valu..
then u find global type ,go to and click and maintain valu. type and
all attrbutes.
then u maintain global categories. then assign valu. type to valu.
categories for the material type.
then u find a activate and deactivate buttons .
u first select a valu.type and then select activate button
then u find the valu. type for relevant material type in mmo1
org.level.
i think u will get it.if not then convey me.ok
First you will create material with Accounting Views, Thereafter you will extend the
material code with valuation.
First u Create material by MM01,and Maintain Accounting views and save
data.Then again goto MM01 give material Code u have Created,System will
asked Plant and Valuation type.
Can anybody give me a broad outline about configuring Field Selection Group for
Material master. The problem is the field 'Automatic PO Creation' in Purchasing
view is not to be seen in my client whereas its available in other clients.
AS UR PROBLEM I THINK GO TO TC- OMSR AND OMS9
OMSR - FOR ASSIGN FIELDS TO FIELD SELECTION GROUP
OMS9- MAINTAIN FIELD SELECTION ON THE DATA SCREEN
TRY THIS , IF U FIND AUTO. PO THEN ITS RIGHT OTHERWISE GO FOR THE
HELP OF ABAPERS BCZ ITS SCREEN LAYOUT OR MASS MAINTENCE.
OK

acc. to me when u maintain the accounting views in mm


record , u have maintained all related data.once u created a material
for one material type then u can display or change the material by
going to mm03 or mm02 respectively.
if u again goto mm01 then u are trying another mate.
creation.then i am sure system will asked for plant and valuation
type.
by going to mm03 or mm02. in this TC. ALSO SYSTEM ASKS FOR PLANT AND
VALUTION TYPE.
PLZ CHECK.
I would like to know about IDoc. Can you give me information about the same.
Hi idocs are intermediate documents these are used where edi is there , first
customer sends his requirements in raw file,inovace converts this in to idoc and
updates sales order ,which by batch job run creates purchase order, immediately
another idoc goes to vendor, and vendor sends mtl and sends another idoc,which
triggers goods receipt inbound delivary-etc this is simple process.idocs are used for
fast processing
Can you please and redusing
explain cost.process.
in details
What is this term "inovace ".
Please explain the process on my personnel Id.
Please give your cell no if you do not mind for MM Discussion.
Waiting for your valuable reply.

Hi ajit u may contact me on-9920742741


I did not understand clearly.

example:

example: i am customer and sending requirement to Vendor

then how sales order is created in the vendor's system.

then how sales order is creating purchase order in my system.

pls explain EDI & IDOC

Can you please explain in details process. What is this term "inovace ". Please
explain the process on my personnel Id. Please give your cell no if you do not mind
for MM Discussion. Waiting for your valuable reply.
Kindly explain us below query How does the PO pick up the pricing schema?
The pricing procedure assigned to a vendor has a calculation schema attached to
it. This schema defines the various conditions pre-requisite, calculation &
sequence in the PO. Generally, only one type of pricing procedure is followed for all
the vendors.scema is there which contains condition types, this calculation schema
calculation
is assined to vendor schema,this vendor scema is assined in vendor master record
in purchasing view, if that is blank means standard calculation is asined.this vendor
is assined to purchase order
Can you explain What is a reference purchase organization? When can it be used?
I have creatred business scenario and tried to configured. It works fine. Pls. let me
know whether it helps you.
Here are details
Reference purchasing organization defined same as normal purchasing
organization.
You need not to assign reference purchasing organization to any company code
or plant
You can either assign a reference purchasing organization to a company code or
not assign it to any company codes. As a rule, no plants are assigned to the
purchasing organization. However, if you wish, you can assign one, two, or several
plants to it.
Vendor
what master
do you meannumber should beissame
by INOVACE for local
it invoice or and reference purchasing
interface
A purchasing organization whose conditions or contracts other purchasing
organizations linked to it may access and use.
A reference purchasing organization can make especially favorable conditions or
contracts available to other purchasing organizations.

I would like to verify that the free indicator on the PO can be automatically set by
Document Type using the field selection $DE1 - Without entry of Price. The
sandbox were are using does check the free inicator and also grays out. It also
removes the invoice receipt indicator. However other clients do not work. It maybe
be other BAPi's or enhancement are causing this. I just want verification regard
setting the document type with field selection $DE1. MM>Purchasing> Purchase
Order>Define document types > set field selection to $DE1

It may sound funny to you all,but I am confused. What will be the


material type of the main material when we are creating main material
with BOM to send to the Subcontractor? would it be finihed product or
semifinished product. Mind it when we are sending the main material
with the components to vendor,it is not a finihed product but when we
receive it from the vendor it is a finished product. Please clarify me
with examples. Thanks in advance for your help.

If the finished product which you processed at the subcontrator will again go for
some process at the other vendors or at your plant then keep this material type as
Semifinished only. If this is the final product to your customer and the billing will be
on this material then keep the material type as Finished material.
in subcontracting po i gone throughly ur queries. acc. to me we are making a po for
the main material/assembly product in subcontracting. but not sending the main
material what u have quoated.i am giving the whole process. in subcontracting we
want a finished or assembly product but we dont have a arrangements. so we are
sending the components are to be used in asseembly product. while u make a po
aganist a assembly in item line just u enter a assembly product and quantity and u
will find a source of component in header button , click it, then enter no of
components.when u procure a finished product from vendor then it goes to finish
material type.component type - semifinished product u can store in ur mm record or
in subcontracting
A inventory.on billing
can just vendor
be with semiwill charge finisshed
aswellas the labourproduct.
cost or see,
processing cost for
the material
which you want to get it done from your s.c. knows to you very well(whether semi or
finished). so,naturally you will generate the p.o. for that and you also know what
components it requires. e.g.,if you want to get the BALL PEN manufactured from
your s.c. then you will generate the p.o. for BALL PEN.and attach the components
like plastics,colour, metel etc. in the BOM.
the concept of navs is that, it has to add to the cost of material..so how it adds to
the value, where and how its linked? any way...navs is condition type for non
deductable tax..and it will be added to material cost.....any one....pls help
You need to maintain NAVS conditions type in purchasing procedure ( m/08) You
need select statistical indicator and try to use routine 60 in reqt column w.r.t.
condition type. Pls. check and let me know whether it solves your full problem.
req 60 is there, its says,.dont use if service tax comes, the reason is there is no
setoff available on st. can u say how its added to the cost of materail.... where i can
see that......
I HAVE JUST COMPLETED TRANING AND DOING WORK ON DUMMY
PROJECT WHILE CRATING INFO RECORD (ME11) ON PURCHASING
ORGANISATION 1 AFTER FEELING EACH ENTRY THE SYSTEM SHOWS
THAT MAKE ENTRY IN ALL REQUIRE FIELD AND DUE TO THIS PROBLEM I
AM UNABLE TO CREATE INFO RECORD PZ HELP ME TO SOLVE MY
PROBLEM
Hi while creating info record there is a sum fields are mandatory like curency
purchasing org,u must to entre the fields then only u can move further or u can
savego
you urto
record.
transaction code me12 you fill mandatories (compulsary fill), then no
problem creating
hi..while arise, Info record such problem i too faced..may be it is
due to planned del'y period not entered ..enter 0(zero) in it..or
make it as optional entry with
Goto SPRO..customize ur inforrecord screen with planned del'y period
as optional entry..save it..
try this procedure..let me know whether u created inforecord or not
I have created Import PO for retail sector. When i try to release using ME29N it
gets released and saved.When i try to make inbound wrt this PO system doesn't
allow me. On checking PO in display mode i found that PO release was not
effected i.e. released PO is not getting saved. Suggest me where i need to check
(data entry / configuration) . I made POs for local procurement, STO & service PO
and
are ufor theseany
getting POserror
release is effected
massage but not
?, what's the for import PO.
document type have u used to crate
import PO?....
I have received the goods against a Purchase Order that is linked to sale order.
Hence the goods are now available under sales order stock. No delivery is created
against the sale order. Now when I try to reverse this material document using
movement type 102E, the system gives the error "Date for creating delivery is
incomplete".
HI u just checkWhat
the might bedate
delivery the reason.
which u have mentined in PO and use the same
delivery date in the sale order.
I have recived the goods against Production Order and not Purchase Order.

While confirming the transfer order using LT12 in warehouse mgmt active site for
retail industry, system gives error "there were no deliveries that matched the criteria
you specified". I tried to checked the delivery document in the system but system
doesn't show this delivery document. Probably some one has deleted the delivery
document after creating transfer order..
# How delivery document can be deleted after making transfer order? # And if
possible, how an out bound delivery document can be retrieved?

I would like to know how movement type 561 is blocked from use once the initial
stock upload has been done.
why don't you just restrict the movement type from roles, so only the consultants
could be able to use it?
Contact your Basis person and request him to block all users for 561 movement.
561 movement is very dangerous and is used only in the initial up load or closure of
SAP ( forever ) as it creates entries in Dummy account. only on need basis, and
clear approval from Financial authorities, the block to be opened.
Or you can block the G/L account assigned to movement type 561 for posting, by
so doing no one can use until you unblock it.
You can do this by removing the 'Allowed Transactions' for the movement type 561
in IMG. T.Code - OMJJ.

While maintaing a quotation for a vendor net price is picked as '0' (From where
does this price gets picked?) Moreover the Net Price Field is Greyed and hence it is
not allowing any editing. Can somebody throw some light on it ???
Please let me know why SAP does not allow me to cancel a GR (MIGO) . It is
throwing an error saying "Account Determination for entry not possible"
pls setup OBYC

Can anybody highlight me how to maintain Material Master Data, creation Of BOM
for civil work. Actually I am working in a Construction Company whose major
project is making road, rail etc. Brief me how to implement is SAP.
For services you need to maintain service master. T. code AC03 for materials :
MM01
I am doing some research and need to know when a purchase order was created in
SAP MM, not changed, created? I've checked the EKKO and EKPO tables with no
luck.
Dont know if anyone has given you a reply on this. If you want to know the date and
time a PO was created, you can go to SE16. The table is CDHDR. CLick on the
TABLE CONTENTS icon. This will bring you to a next screen. Object Class is
EINKBELEG. OBject ID is your PO#. In our case, we had to key in 3 zeros and then
our PO#. This depends on the number of digits you have assigned in your PO
numbering system. There might be an easier and faster method of finding the time
of table
In PO creation. SOmeone
ekko field AEDAT isin the
thiscreated
group might
on. be able to enlighten us
it worked! I appreciate your reply.

how to assign the same material to different plant can any one help me
copy the material to the other plant using t. code "MM01"
Hi friend mmo1 to create new material. my querie is how to procure the same
material for different plant
u can go by mm01,,,evry time u can assign created mat to different plant,,,b'coz the
material is created at company code level,,,,at plant level,,u can maintain different
purchse data of different plant.
MM01 is not only for the creation of new material and it can be used for the
extending/copying the material from one plant to another by maintaining the same
material type and industry. there we can select the plant and storage location from
where we are copying and to where we are going to maintain.
as ur queries, u can maintain same material in diff. plant by creating new material
and enter a diff. plant in ur org.levels while creating material mm01 for the same
mate. type and industry sector,
We're upgrading to ECC6.0 from 4.6C we use movement type 551 to do a transfer
to scrap in MB1A which doesnt ask for a cost centre Now that this functionality is
rolled up into MIGO, when we try do same thing using 551, it now wont process
unless we put in a cost centre Anyone know how to use MIGO to do a 551 without
having to put in a cost centre (if you're scrapping why would you need to charge a
cost centre?) inventory, the system needs to balance the GL accounts between
For valuated
issue and receipt. If you are scrapping the goods, you are not really issuing the
goods to any order and since accounting document has to be generated, it asks for
a cost
Just center. why SAP would have allowed it then when using MB1A
wondering
You say that in MB1A there is no cost centre, but in ECC6.0 the system asks you to
enter a G/L ac and a cost centre. Just check it once again.

I've created my own company at my home PC and did configuration while creating
a PO i am getting the error as --> FI_TAX_CHK_PRICING_ DATA error code 13
Ifunction
too got builder
the sameTAX2
error just try below and let me know if it works gud. Are you
using US Tax jusrisdiction Code? I found some Notes in OSS:
117983, 337706, 306506, 565864 & 561472. I also found Program RFCORR26
that is able to take inconsistencies between the tax Codes in the different relevant
tables.
Check that the following Transactions have been configured:
1 Basic Settings
1.1 Assign Country to Calculation Procedure (OBBG)
1.2 Check Calculation Procedure (OBQ3)
1.3 Check and Change Settings for Tax Processing (OBCN)
1.4 Specify Structure for Tax Jurisdiction Code (OBPO)
1.5 Define Tax Jurisdictions (OBPC)
1.6 Change Field Control for Tax Base Amount (SPRO)
1.7 Switch Off Tax Translation between Local and Document Currency (SPRO)
2 Calculation
2.1 Define Tax Codes for Sales and Purchases (FTXP)
2.2 Assign Company Code to Document Date for Tax Determination (OBCK)
2.3 Specify Base Amount (OB69)
2.4 Change Foreign Currency Translation (OBC8)
3 Posting
3.1 Define Tax Accounts (OB40)
3.2 Define Account for Exchange Rate Difference Posting (OBYY)
3.3 Assign Tax Codes for Non-Taxable Transactions (OBCL)
3.4 Transfer Posting of Tax for Cross-Company Code Transactions (SPRO)
Can somebody tell me how to print "PR"
Is it possible that whenever the (spare parts)material stock is below the min. stock
level, SAP automatically sends a mail to the super-user?
If yes, how (please elaborate on the steps/config) .If no, whats the alternative?

Do any body have access to screen shots of SAP IS_OIL , IRS (Inspection Report
System) ? The report contains different tabs like Inspetion company,Official Sample
analysys etc., each tab contains multiple fields for data entries by Inspectors.
Request to forward if anynone has access to those.

this is physical inventory procedure used for material counting at different intervals
in a fiscal year. could anyone explain how to configure in SPRO
In spro, go to .. Material management -> Inventory management -> physical
inventory -> cycle counting.. Here you shall see the settings for each ABC indicator
ifor
amcycle
verycounting.
thankful your reply, can you explain short cut about ABC indicators,
physical intervals. percentages and float time.and how set these are all in that
partcular
and also utable
have to assign this indicator in material master

How can we delete/archieve the Purchase order and Material. How Can we take
print out of RFQ.
use ME9A to print rfq
You need to do 2 steps: 1. Flag the material for deletion - mm06 2. Run the
archiving progam - mm71

This is regarding the problem i am facing during Requirement Planning run for the
requirement i have created diffrent STO doc type and want to use this doc type
while running RP but when i am running the replenishment cycle system is picking
up the standard doc type not the one i have created . Can anyone tell me where am
i going wrong ......

WE ARE RECEIVING SUB CONTRACTED MATERIAL FROM ONE VENDOR


AND ISSUED TO MACHINE SHOP. MATERIAL IS MOVED TO NEXT
OPERATION. SOME MATERIAL GET REJECTED DUE TO SUB
CONTRACTOR,S FAULT . NOW WE WANT TO SEND BAC K THE REJECTION.
KINDLY GIVE PROCEDURE TO RETURN THE REJECTION ,DURING WHICH
CHILD PARTS GET UPDATED AT SUB CONTRACTOR END.
While doing MIR7,ONE MESSAGE IS COMING- " TAX CODE VO COUNTRY IN
DOES NOT EXIST IN PROCEDURE TAXINJ". PLS. GIVE ME THE SOLUTION
IMMED. TO RECTIFY THE ERROR.
Pls use T. Code FTXP to assign the V0 tax code with country India.
use FTXP, enter country(before that taxinj should be assigned to country key IN)
enter taxcode V0, enter tax account

The company where Im working has used release strategies to Contract ! But until
now only Contracts WK=Quantity Contrat was used, and from now we want to use
Contracts MK = Value contract. Does anyone use this type of document with
release strategies by Quantity ? If yes could give me some help to setup release
strategy quantity based !?

hi gurs while creating po i am getting this msg how to solve this " define a chart of
accounts first for company code 8001"
first assign chart of account to the company code..b'coz evry company code
maintains its individual chart of account,,,
Are you copied the Company code or Define the new company code, If you copied I
don't think you will face this error.If you defined the new
company codes, then all the tables related to Chart of Accounts is not copied to the
new company,
One more thing are you assign the controlling area to your company code 8001 in
the Enterprise structure
Contact to your FI consultant, as this is the problem at FI end not at MM

Does anyone tell me how to change the buyer's address displyed on the PO sheet
printed by ME9F?

We know that reservation of material is always particular to amovement type and


account assignment.
Our client has requirement of making virtual reservation i.e a general reservation
without any particular account assignment.
i.e. User want to create reservation of a material (MB21)without reference to an
Asset
Actual asset number at the time of material consumption can be entered in MIGO -
Good Issue with reference to that Reservation
OR If above is not possible in SAP then alternate requirement is as follows >>>>
User want to create reservation to a temporary cost center/asset number.
At the time of material issuance with reference to that reservation, user can replace
actual cost centre/asset number with the temporary one.
my users from my company issued 100 EA to a vendor using ME2O but they
supposed to issue only 90 EA. How can I bring the 10 back to my unrestricted
stock?
do a transfer posting using movement type 542 for the 10pcs.

Where Can I get the relation between sales order & production order like which
production order is created for which sales order. Pl help. It's urgent .
1. use CO03 to display the production order.
> 2. in production order, select tab page "Assignment".
> 3. then you find the sales order and order item number .
Thanks for your reply, but in this way I'll have to find out one by one. I need a
consolidated list e.g. in a table.
try T-code: COOIS
have tried COOIS & it is partially successful, however it doesn't accept STO as
sales order is not created for STO however production order is created. is there any
table available for the same which I can see in SE16.
If sales order is booked in system, same can be linked to Prod order in COOIS. But
production is also planned & dispatched against STO - Stock transfer order to
another plants for which production order is made but same can't be tracked in
COOIS. I need a table or consolidated list of sales orders & STOs linked with
corresponding
In Make to Orderprod orders. , By defining strategy in MRP : We can see sales order
Scenarios
is assigned to production order. basically it applicable only for MTO scenario
.Production Order will be created for particular Sales Order.
Thanks for your reply, however I know this. I need a consolidated list of production
order which are assigned as per sales order

Kindly suggest, how can I block Vendor Payment if materials are unapproved or
rejected? I want to block MIRO.

Can I get GR/IR clearing list for a particular month, as the current Txn code MB5S
does not have the duration

I want to change material type PERISHABLE to SEMI-FINISHED, but system gives


me following error - The old and new material types have different material type
IDs.
ID of new material type: No material type ID ID of old material type:
Perishables Please help me out
USE T CODE MMAM AND CHANGE MATERIAL TYPE
under that code only we r getting that error
Did you check your valuation class? is it same for both mateial type? pls check at tx
code OMS2

When I am Creating Vendor master , I am getting A Warning message that Country


IN has not been assigned with any calculation schema Kindly explain how to
correct this Also explain what error is likely to occur in later stage

have some trouble when using MI04. Before physical inventory count, i always
download current data from MB52 to Ms Excel, then insert one column for physical
counted. I want to copy the data from excel to SAP, but the problem is, MI04 screen
user 2 rows for each material. Using copy-paste from excel to SAP just can do one
by one, not all item. My question is, can i copy all material from excel to MI04? Or
at least
12 materials
You can get alike
listMB1B? Not one number
of all materials by one. you want, in session in pyhsical inventory
menu. But in the list there isn't any stock value orquantity.
Kindly explain the Steps Involved in Physical inventory We will be greatful to u
as ur queries i am giving u the steps do
following .
tc.MI01 -creation of pi docu.
TC MI37 - FOR MORE THAN ONE MATERIAL
TC. MI04 - ENTER PHYSICAL COUNT
TC. MI07 - POST COUNT RESULTS
TC. MI21- PRINT DOCUMENT
TC. MI22- POST THE DIFFERENCE
TC.MI24- CHECK RESULTS(PI LIST)
For physical inventory first it needs to create inventory document t-code MI01, then
it needs to count materials and to enter in inventory document for that use T-CODE
MI04, after counting it needs to post the count in the system for that use T-code,
MI07. then check material documents and accountind documents generated it
becomes
Pls clarify more
what clear.
is the Difference between Stock transfer from one plant to another
of same company code And to that of plants of different company code
Within a Company Code assume 1111, any transfers say from Plant A to Plant B
will be called as transfer within a company code & from Plant A of company
code 1111 to Plant A of company code 2222 will be called as different
level.

Trust it clarifies.

as ur queries,
stock transfer from one plant to another plant of same company code
called- intra company stock transfer and only stock is less in plant-
1 and stock rise in plant -2 and
account or liabilites is same because it is maintained in company
(same co.code).
but stock transfer from one plant of co.code -1 to one plant of
other co.code-2 called inter co.code stock transfer. in this
stock lessens in one plant and risens in another plant and also
account or liabilites are changed totaly bcz of different co.code.

i think u will catch it properly .if any problem then revert back to
me.

Thanks for yr Reply and explanation


Can ypu pls brief what are the Steps involved in these 2 transactions

as ur acknowledgement and ur request , just give me


some time bcz i am busy with my work . so i will send it to u with
in a day or 2 days . sure . acknowledge it .

How to find out shortages of material against sales order if configurated BOM is
attached in sales order. tried MF60 but unless it is converted in planned order, it
doesn't show. But if it is converted in production order it shows. I wanna find out
shortagesorder
Planned against planned
is just orders. proposal and I dont think you can really check
a procurement
shortages. Even if you have zero quantity you can commit quantity against the
planned order.
This problem related to Indian taxes. We are facing following problem :
While posting excise invoice some times value goes to Credit due, rather than
credit availed.
Material is Raw material. In J1ID, we maintainted this as ra wmaterial.
For this material & same Po many times we did GR , J1IEX_C, J1IEX_P and
MIRO. Entries were perfect.
But some time when we do GR it shows qty. & excise details OK. When do
J1IEX_C value shows as credit available. But when post in J1IEX_P value goes to
credit due.
For this transaction I checked tables : J_1IPART1 , J_1IPART2 , J_1IEXCDTL,
J_1IEXCHDR and found entries of qty. & value OK.
When I checked table J_1IGRXREF , I found following entries.
GR qty. - 10
qty. in excise invoice - 10
qty. credited - 0

How can convert sheduling agrment and contract in purchase order


Hi in po at item level outlineagreement option is there u enter outlineagreement
number then system picks up data from outline agreement.
Please explain in details.
I think you are asking about creating a PO referencing Outline agreement.

if you create a PO refering contract then its a contract release order. In


PO screen top left hand side there's a option document overview there click
on selection variant and choose contracts, a new screen is displayed enter
your contract number and execute. Click adopt or click on the
contract number and drag the same into basket ( near PO docu type).

For scheduling agreement you can rmaintain delivery schedules using ME38 i
think no need to go for PO.

Plase tell me whole process of cration of third party purchase order

Is there away to hide safety stock? This is the problem that I am having, because of
work in process (wip) materials are always running low. So I need to know if wip
can be turned off so that system will continue to suggest deliveries and not look at
WIP as available inventory?
Hi u can hide the saftey stock field in material master, for this configuration
required. go to t-code omsr there select field marc-eisbe then there is yellow arrow
mark select that for saftey stock field selection group is 51 and field reference is
cad infront of that hide option is there select that then saftey stock field will not
appear
Thanks in material
a lot. I havemaster.
one more question in transaction MD04 the inventory displayed
shows whse inventory as well as inventory that is tied up in Wip is there a way to
not show inventory in wip. Please let me know soon as possible?

This is Vikram, I am new to MM module, right now I am working as a end user for a
automibile company, ours is ECC5.0. We have scenario like this, We raise sub-
contracting PO to vendor using ME21N for one month delivery with 44 line
items(Every day to loads we receive), then issue goods using ME2O. To receive
the goods we have to create inbound delivery with 44 line items deliveries are for a
month.
What is the transaction code to create inbound delivery and what are the fields do i
need to maintan? (I tried VL31N and VL34)
what is the transaction code to create shipping n filds to be maintained?
What is the transaction code to create shipping PO n fields to be maintained?
What is the transaction code to do G/R n fields to be maintained?
Ours is lean WM. If any one got documents to create above with screen shots can
you please send me.

Can u please tell me.If Batch management is not active for a products & we dont
want to system ask for a batch at the time of MIGO and generate the Batch ,What
procedure we can follow.Also Plesse advice me this Batch Nos generation is
system generated or we have assign the nos.Please advice the path
2. What is SPRO function. How it works and what its linkage with system.
3.IN MD04 when we are converting PR to PO its PR qty value change from its
orginal qty why its happen .

I Have faced a peculiar problem while creating the Goods Receipt ( MIGO ) in the
receiving Plant . Stock Transfer PO : Number fo Line items : 30
1. IN J1IS, BED Value in the Suppling plant is 12152.00 ( Assume )
2. While Creating J!IEX in the Receiving Plant the same BED value is Populated
(i.e 12152.00)
3.But while creating MIGO ( On Refer to the Excise Invoice ) the BED Value is
displayed only for the First line items ( Say 10.00) the Remaining 29 line items BED
values are not calculated .
Please check whether J1id & Excise part is maintain for remaining item
If your excise invoice number is same for all items then it should not be problem as
excise invoice is at header level and applicable for all items. System wont accept if
it is is different. Pls. correct me if I am wrong.
The Excise Invoice number is same for all the items .While creating MIGO , we are
just referring the Excise Invoice only .
Excise Related master data's are captured for all the items . We are in ECC 6.0 ,
TAXINN procedure All the masters are maintained correctly . If we capture
individually ( line item by line item ) in J1IS and J1iex , no problem arises while
creating the MIGO. But if we capture all the items ( 30 Items ) in the Single J1IS
and J!IEX
Wht is use, of
thePIPE
incorrect
LINE value populates
MATERIAL in the MIGO ? What are the different
CONFIGURATION
Steps involved ?

CAN ANYONE DEFINE TRACKING NUMBER AND ITS USE IN PURCHASING


PLS?
tracking number is used to group purchasing documents as per user requirment. it
makes possible to easly track the purchasing documents created by particular user.

I AM PRESENTLY FACING A PROBLEM WHILE CREATING SERVICE ENTRY


SHEET. WHILE CREATING A SERVICE ENTRY SHEET WITH REFERENCE TO
A PO BY TAKING 100%,I AM SEEING THAT MY NET VALUE INCL. TAX IS
COMING HALF THE TOTAL VALUE i.e.IF THE TOTAL VALUE IN PO IS
2000,THE NET VALUE INCL. TAX IS COMING 1000. PLS HELP ME AND SHOW
SOME
Pls LIGHT
check WHERE
whether THE
all the ERROR
items in PO IS
areCAUSING
taken in to service entry sheet. also chek
the prices of the same in PO
i have checked each and every thing.i think that there is some error in the
setup.because when i am doing the service entry sheet in quality server the error is
taking place.but when i am doing it in IDEAS everything is coming properly.where
can be the fault?
I have configured Release strategy for PO. User can take print of the PO only after
it is released by respecttive authorities thru transaction ME9F. But what I have
observed is printing of PO is possible thru ME22n even if it is not released. Please
let me know how to avoid this printing of PO prior to release thru ME22n
----Original Message-----
From: sapmaterialsmanagem ent@yahoogroups. com
[mailto:sapmaterialsmanagem ent@yahoogroups. com] On Behalf Of shivakkumar
venkatesan
Sent: Thursday, June 21, 2007 9:09 PM
To: sapmaterialsmanagem ent@yahoogroups. com
Subject: [sap mm] kindly help -give blood donation

dear friends,
kindly help: by giving blood donation.

Hi All,

My Brother's Son 6 years old, suffering from Brain tumor. He is


admitted in V.S Hospital, Chetpet, Chennai.

He requires A2B+ve blood platelets. Since this is one of the rare


groups, they need more donors.

Pls pass this message to all your friends to save a child.

If any one is interested, Pls contact me(Chandrasekar 9840093863)

For your information: For a normal person blood platelets will be


Dear chanderasekar ,
There is site :
<http://www.rediffma il.com/cgi- bin/red.cgi? red=http% 3A%2F%2Fwww%
2Eindian
blooddonors% 2Ecom&isImage= 0&BlockImage= 0> www.indianblooddono rs.com
where in you can search for
a particular blood group. You will get 100s of donors address(that too
city wise).
Can you pls look in to this
Thanks and regards
Bharathivinayagam. S
9940083745
Dear Mr Chandera Sekar
There is one more site given below wher you will get immediate support
<http://www.friends2 support.org/> www.friends2support .org

I will come back if I get any other address


Thanks
BharathiVinayagam
9940083745

Could you please explain about item category "L" In MM we are using this item
category L in subcontracting. In Project System the same letter "L" used to
represent stock item. Can you please explain more with examples
Following are the item categories used in MM. Project system may have its own.
Standard
B Limit
K Consignment
L Subcontracting
S Third-party
T Text
D Service

CAN YOU GIVE SOME REALTIME SCENERIOS ON STO

CAN YOU GIVE SOME REALTIME SCENERIOS ON PRICING PROCEDURE


(CALCULATION SCHEMA)
Where do we have to Assign Customised Document Type for Purchse Order to the
Plant.
No need to assign P.O doc. type to plant, because when you create you have to
enter plant. Assign allowed item categories and link Purh. req. -
doc.type with Tcode OMEC.

I want to delete a material.

when users want to use this material, system should propose alternative/ new
material.

we don't have SD module.

how can we do that. it should also carry out MRP functionalities.

A lot of material we are buying without material number. So we are using free text
and buying it. Now my question is how can make a report to see: how much we are
buying with matetial number how much we are buying with free text how much we
buying through service PO (ITEM CATEGORY D)

I have faced one problem i will explained u. In SAP MM Module MM60 Tcode is
there. In that MM60 screen ihave to insert one more field that is profit center. any
body tellrequest
Should me. your ABAP team to create a new field and tie it to the table where
you have this value.
If u have authorisation in SPRO Pleas go to spro OBC4 Select material
management & selt the fields what ever u whant u will find
Supress
Optional
mandatory
i thing it will guide u pleas reply ok

Is there any way to see how many PO has QUALITY INSPECTION OR if i have list
of po, how can see from a report that will show a list of QI PO
T Code QA32, You will select in Insp.lot origin as per your requirement (01) then
execute,
How can I attach a file in Material Master record?.
Use Services for object foound in the PO. Use t.code ME22N to access the PO. At
the beginning of the title bar that tells you the PO number and who made it, you will
see an icon. Click on it, then select "create attachment". You should be able to
figure it out from there.......
This question has been posted earlier but i could not find the answer. Therefore i'm
reposting it. I would like to know the solution steps.
Does SAP Support Open tendering process for Vendor Selection. For vendor
selection process for any material starts with advertisement of tender in newspaper.
Vendor replies back with his quotation. After receiving technical and commercial
quotation, the organization goes for technical bidding and those who qualify in
technical bidding they contest for commercial bidding. After commercial bidding,
comparative statement is prepared and then purchase committee approves the
vendor. The problem is that any no. of vendors from any where can give their reply
to the tender as it is a government organization. So, how to map this process in
SAP as we are not directly sending RFQ to the vendor, instead he reply back with
quotation directly once he sees the advertisement in newspaper. I want you all to
suggest
Either youmeneed
whether
to gotofor
keep
SRMthis
or process
develop in SAP or out
ZTendring of SAP
process.
This problem related to Indian taxes.
>
>
>
> We are facing following problem :
>
>
>
> While posting excise invoice some times value goes to Credit due, rather
> than credit availed.
>
>
>
> Material is Raw material. In J1ID, we maintainted this as ra wmaterial.
>
>
>
> For this material & same Po many times we did GR , J1IEX_C, J1IEX_P and
> MIRO. Entries were perfect.
>
>
>
> But some time when we do GR it shows qty. & excise details OK. When do
> J1IEX_C value shows as credit available. But when post in J1IEX_P value

While doing GR cancel , system picks new value rather than value at whcih GR
capture. Here material is raw material. Price control is MAP. Can anybody tell how
this can rectified. GR captured at 10, after that another GR took place place and
MAP changed to 12. When we are trying to cancel 1st GR it is picking material
price as 12, rather than 10.

Does anyone tell me how to get a list / report of all of the POs that are generated
manually instead of coverted from PRs?
T.code;ME2L or ME2M
By ME2L or ME2M, I don't think it can list the PO that is not converted from PR. Pls
tell me in details.

Does anyone know how to make the INCOTERMS field in Purchase Order creation
a required field?
You can define it as follows SPRO-->Materials Management --> Purchasing -->
Purchase Order --> Define screen lay out at document level --> The selelct
respective field selection group --> Select group of Terms of delivery and payment --
> Make the Incoterm as mandatory field.
how r you this is sisi ur friend from sap groups and sunil i have some doubts plzz
send me with scenarios and also the procedures for how to do subscequent debit
and credit and also credit memo actually when we use them and plzz send me the
steps as early as possible and iam waiting for ur reply.

can any body tell where can I get details of roll out project, what activities to be
done. If roll out is in different country, what steps need to be taken.
Roll out is depends on client. normally when new structure or functional activity is
added to client bussiness rollout will be executed.
Client has many plants, they implemented in some plants which are in other
countries. Now they want to do in another country / plant.

Can we send material from Vendor to Customer with Subcontract PO like third
party.......if it is possible then how....
send through zdub type po
Yes you can do it: Mention the delivering address of your subcontractor in the PO
Item Details for Third party vendor by selecting the vendor and tick the SC check
box
I am sending this message third time within two weeks but i am not found any ans
from fourm side. Chekc it.
I delete TAXINJ. Can any option to recover the deleted entry.

after confoguring split valuation and creating valuation type and making it active in
valuation category H, and changing material mater it is still saying to maintain
valuation
Check thedata while GR.
valuation data at the Purchase order item level whether have youentered
the valuation type in the item level, unless you maintain the valuation type in item
level of PO it will not allow you to do GR for that material as already you have
activated
but i havethe Split valuation
entered for this
the valuation typematerial.
in po while creating in item overview. but it is
still showing error.
try to create new PO and see

Can anyone provide step by step configuration detail for Catalog and vendor
managed inventory for ECC 5.0.
PLS HELP ME OUT IN CONFIGURING MESSAGE RECORD FOR OUTPUT OF
MESSAGE IN CASE OF OUTLINE AGGREMENT FOR TRANSACTION CODE
ME31L ON URGENT BASIS.

Could u pl. tell me how to find the no of batches avaialble in stock for a particular
material group ?
Please try MMBE
I need for a particular group which contains more than 100 items . Not for a single
item.
Please Check MB52,MB53

for physical inventory the steps r


MI01
MI21
MI04
MI11
MI20
MI07
but while doing MI01 i am getting an error as
" Number range for trans./event type IB in year 2007 does not exist"
plzz help me out from this n guide me
You need to define number range for year 2007 year using T Code OMBT.

Can any one give the clear information about release procedure for purchase
order(PO).

I am new to SAP MM.I am a beginner infact in learning stage.I have a few queries.
1.)Hey can anyone tell me the full form of SPRO is it "SAP Project Runtime Object"
2.)I have got SAP 4.6 installed on my system for practice but I have to change the
system date from 2007 to previous years like 2002 or 2005 to get it working
properly.Can anyone guide me what changes should I make so that I need not
change the system date to previous years again n again.
Full form of SPRO IS SAP PROJECT REFERENCE OBJECT
Using T-code "MMPV" change the last Periord to current date
Hai instead of changing the system time go to ob52 to change your SAP year from
2002 to 2007.Then go to mmpv and open and close every month from 2002 up to
2007.
I hope you might have received the reply frm the users nevertheless
you can follow as under.

1. There is no full form of SPRO.

2. No matter you install SAP 4.7 its good to start off. You should
know how drive a car no matter its upgradation once you are perfect
upgradation vechile takes no time to takeoff.

3. One way to practice is to change the dates or once you create


company code, assign plan to company code goto T.code OMSY update
the period to the company assigned.

how i can create the table K9RC110070001 using the configuratuion

Plz guide me with the following issues


1.Whether customer master is to be maintained for STO between two co-
codes.Does it mean this customer is the supplying Plant
2.What r the Transaction Codes for creating STO.
3.What kind of document such as PO/STO is created for the Stock transfer
between two plants of same co code & what are the T Codes?

I'm using MRP type VB and we want to include into MRP Run the Reservations
created by PM module. We have setting up the MRP type VB to use external
requirements (field V438A-ICBED with value 2 from customizing) but no
Reservations were taken into account. Does anyone know a way to MRP type VB
consider
In reorderthis reservations
point from PM
planning,where youmodule?
use MRP type VB the net requirements
calculation is only carried out once the stock level has fallen below the reorder
level. Issue elements, such as, customer requirements, planned independent
requirements, or reservations are only displayed but are not included in the net
requirements
Use MRP typecalculation.
PD
I am using FRC schedules with scheduling agreement, can someone please
share your expertise about how to resolve the issue related to release
number. My issue is once I execute ME84 and then ME9E to release/ print
delivery schedules. Next time when i execute ME84, new release number
is not getting generated and therefore i dont have new transmission
number.

Can someone please share your experience about how to resolve this
issue?

Can anybodey tell me the whole process of third party purchase order. I want to
procure the materail from vendor and delivery should be at customer directly. So
please tell me How is it possible?
maintain cusomer master data (VD01),if u want to maintain customer material info
record maintain it. create PO item catagory as third party, give the delivery address
at customer place in po either at header level or item over view screen,if the
delivery is completed at customer place then vendor send a invoice to ur place. if i
am wrong revert back
What report can I run or which tables should I join to get the following information
on what report
1. Company Code
2. Vendor Number
3. Vendor Primary Address (Postal)
4. Vendor Telephone
5. Vendor Fax
6. Vat Number
7. Vendor email address
8.
Gocontact person
to T-code Se16at&Vendor
give the Table name LFA1 & execute,you will get all the
details.
I got EKKO, EKPO, etc. Have written several queries in SQVI, but can't find where
all those texts are and how to join up to get them. Any help?
We can bring in fully assembled parts from sister plants or make them ourselves.
What techniques, if any, exist to be able to do both at the same time with w/o
wreaking havoc on MRP? Currently, we can only have one part number in the
system and it can only be make OR buy, not both (obviously). So, short of creating
two parts for each part this applies to (one number for making, one for buying) are
there any other ideas?

Please respond with 100% accuracy.Those who are like me, please wait
for the real people to answer. In this way we all will be benefitted.
Thank you for your help.
Sachin

Certification Questions:

1.Can a purchasing document (PO or PR) in their procurements item


have more than one item category?
2.A company has 0 initial stocks. MAP is $10/pc. Received goods 50pcs
@$10/pc and then issues 10pcs. Invoices was received for 50 pc
@$20/pc, Show the different account postings.
3.Physical inventory is done in the following levels (tick the right
one)
a. Plant
b. Material
c. Stock type
d. Plant/storage location//Stock type.

4.A accounting document will be created when stocks are transfer to (


more than one answer is correct)
a. GR block to Unrestricted use of stock
b. Quality inspection stocks to Unrestricted use of stock
c.
1) Materials
Yes with different valuation types from one Storage
3) Plant/SLoc/Stock Type
4) Will be created only for A & D
5) Yes
6) Yes
1.Can a purchasing document (PO or PR) in their
procurements item have more than one item category?
Ans. yes

2.A company has 0 initial stocks. MAP is $10/pc.


Received goods 50pcs
@$10/pc and then issues 10pcs. Invoices was received
for 50 pc @$20/pc, Show the different account
postings.
Ans.

3.Physical inventory is done in the following levels


(tick the right one)
a.Plant
b.Material
c.Stock type
d.Plant/storage location//Stock type.

Ans.

4.A accounting document will be created when stocks


are transfer to (more than one answer is correct)
a.GR block to Unrestricted use of stock
b.Quality inspection stocks to Unrestricted use of
Can you please explain what are the differences between SAP 4.7EE version and
SAP 5.0 version?
Some one has replied me on this subject. Please refer the link http://solutionbrow
ser.erp.sap. fmpmedia. com/ It gives good info about difference in functionality of
two version
I met a very strange question. 2 POs are converted by ME28 from one PR. The 2
POs are exactly same except the creation time. The quantity of one PO equals to
the quantity of the PR. Only the creation time of the 2 POs are not the same. There
are about 10 hours between. Does anyone tell me the possible reason?
I think the material are subject to source determination or quota arrangement,
another possiblity is that the two materials are ordered from two different vendors, if
you procure both materials from a single vendor and the materials are source
determined to same vendor 1 PR will be converted to 1 PO or else two. hope you
go it right,
I think you revert me if you
are created onehave any
PR for confussion.
2 items with different source of supply,might be
release stratagy exited at item level for 2 items in PR.
if I am wrong revert back
The reaon for that is " On your transaction code - me59, Processing status (Eban-
statu) field was blank", so they system will obviuosly allow you to create another
STO
How to add extra text field in MIGO transaction al Header level.

am here sitting in the internet caffe. Found your email and decided to write. I am
25 y.o.girl. I have a picture if you want. No need to reply here as
this is not may email. Write me at alauren072@supervisioncare.info

i am facing a strange problem.if anyone can help me out. while doing entry sheet
in ml81n,i am finding that the netvalue exclusive tax is becoming half the total
value. this is taking place whenever i am doing this in quality server.while doing it in
ideas or production server it is taking place as desired which clearly depicts that it
is a setup problem. pls help me in finding where the problem in setup has occured.

It doesnt provide email details


If you wants Vendor Email details In Table Name ADR6 you can gat Email Id and
address no. As per address no. you can find Vendor code etc

My clients wants to carry out MIRO with reference to Bill of Lading. There is a
provision in MIGO at the header level to put some number in "Bill of Lading "field.
The necesssary number has been uodated in the " BILL of LADING " Filed at the
time Goods receipt ( against Out bound Delivery), but while trying to do MIRO with
referencing to Bill of lading Number ( given at the time of GR), it is showing that the
said Bill of Lading number does not exits. Shall be grateful, if you could help me our
urgently to address the problem

Normally we know that Stock Transfer from Plant to plant is possible with using 301
movement type or using 303 & 305 ( 2 steps ) . But Using STO ( Stock Transport
Oder ) benifits are Like below : A goods receipt can be planned in the receiving
plant. You can enter a vendor (transport vendor) in the stock transport order.
Delivery costs can be entered in the stock transport order. The stock transfer order
is part of MRP: Purchase requisitions that were created in MRP can be converted
into stock transport orders. The goods issue can be entered using a delivery via
Shipping (LE-SHP). The goods receipt can be posted directly to consumption. the
Entire Process can be monitored via the Purchase Order History. U can Get more
Information in SAP.help.com on STO
pl tell me how to make purchase requisition mandatory at the time of making
purchase
Go order
to SPRO->Pur->Authoriz ation mgmt->func author PO ->flag checkbox for PR

We are going to ease the strain of your monthly expenses in a quick, and hassle-
free manner. Here is a simple easy way to pay them off quickly and have more
money for the things you have not been able get for a while. We have several
options just for you at http://aaaaa.meterram.info/default/. So why wait until it gets
worse? We simply have a better solution. No cost to you all credit histories
accepted. You can remove on the site.

Pls clear me following questions:

1. What is difference between material type and material group? with proper
defination
2. What is the difference between non-deductable taxes and deductable taxes?
3. Is the BOM is mandatory for Subcontracting and consignment?
4. Is Info Record is mandatory for Subcontracting and Consignment?
5. For purchase service, how will be the excise duty calculated? what will
be key combination for maintaining condition record?

This question is related to Indian taxes (CIN). Scenerio is given below :


We made PO with base price as 100 & did GR on 20/06/07. GR picked base
amount as 100 . PO price changed on 21/06/07 to 105. Excise captured with J1IEX
on 22/06/07. J1IEx base amount is 105, rather than 100.
While doing IR against GR, base amount is 100.
My problem is while IR is taking GR price , why J1IEX is considering current price
as 105 rather than 100.
Is std. SAP. Is it correct. As per me it is not correct. Pls. cooment & give solution if
any one knows.
While creating the IR you may referencing the GR delivery note number not the
Purchase Order number.(my guessing) thats why it is taking the Old PO price.If you
reference the PO definatly it will pick the new PO price. so Check the IR once again
But in the J1IEX transaction you are referencing the Purchase Order and that too
new changed PO reference thats why it is picking the new base amount of Rs.105
not Rs.100.
So check the Reference document for IR.Please check and confirm on the
same.Then will look for alternate.
Both J1IEX and IR is done with ref. GR/ dlivery note not PO. We can book J1IEX
against vendor delivery note or PO.
I think if you cancel the GR material document & make a fresh GR your problem
would be solved. This is because the GR has taken the P.O price before the P.O
was changed.
GR made correctly. Pls. see my mail clearly, I had given all info in that
I already confirmed that J1IEX & IR is based on vendor delivery note. I want to pay
only 100 (old price) to vendor. In case of Ir it is picking GR price only. I want to
know is there any setting to be done at SPRO for getting old price in J1IEX like in
IR or else is it SAP std. functionaly
By mistake if I close the current period in MMPV, how to open / reverse it. Is it
possible. When I try it is throwing error.
it can not be reversed. now there is no alternative but to create a new company
code.
there should be some answer. We didn't get correct way. Do think u can create
comapny code whatever like in the real scenerio, in production environment.
Use Tcode MMRV to open the closing period

When i try to post the custom duty through T.Code J1iex, the system does not allow
to put any value in the column S&H ECESS though one can
put the rate of duty in the column. What could the fault and how it can be removed.
Plz help me out,
1.wats the A/C DOCUMENT FOR MVT TYPE 101?
2.vALUATION GROUPING CODES AND ITS USES?
3.WHY WE USE GR BLOCKED STOCK
4.IN PRICING PROCEDURE DO WE USE STATISTICALS?
5.WAT IS BSX AND WRX
6.WHAT DOES VENDOR A/C GRP DETERMINE
7.IS IT POSSIBLE TO CREATE MATERIAL INFORECORD WITHOUT MATERIAL
CODE AND WHERE IT IS USED
8.IF YOU UPDATE INFORECORD IN PO THEN WHILE DOING ANOTHER PO
WHETHER PRICE TAKEN FROM PURCHASE ORDER HISTORY OR INFO
CONDITION.?IS IT POSSIBLE TO SEE THE CONDITIONS IN INFORECORD
FOR SAME MATERIAL AND VENDOR?
9.IF YOU UPDATE INFORECORD IN RFQ THEN WHILE DOING ANOTHER RFQ
WHETHER PRICE TAKEN FROM RFQ HISTORY OR INFO CONDITION.?
10.HOW FRIEGHT IS MANAGED IN STOWHAT WIL BE THE MAP IN TWO
PLANTS
11.WAT R THE A/C LINES GENERATED WHILE DOING MIGO FOR
SUBCONTRACTING
12.WHERE DOES THE A/C MODIFIER LINKED
13.IS IT POSSIBLE TO HAVE ONE PURCHASE ORG FOR TWO PLANTS
BELONGING TO TWO COMPANY CODE
14.ACC DOC FOR GI IN MVT TYPE 351
Hi Gurus,
>
> Plz help me out,

1.wats the A/C DOCUMENT FOR MVT TYPE 101?

2.VALUATION GROUPING CODES AND ITS USES?


Ans. Valuation Grouping Code is used to Group
different valuation areas(Plants) . Once this grouping
is activated, system uses the same Automatic Account
Determination process for all Val area under the
group. Other wise you'l have to define Auto Account
Determination for each val area ie plant.

3.WHY WE USE GR BLOCKED STOCK


Ans. If you dont want to take the custody of material
in value terms ie the material is not to be taken in
your valuated inventory, then you use GR Blocked
Stock. For eg, if soe documents are missing or
material is totally damaged or a decision to accept
the material is pending.

4.IN PRICING PROCEDURE DO WE USE STATISTICALS?


Ans. Yes
help me out,
1.how tax is configured and linked in PO
2.what s the output type for Po
3.can a/c category reference fixed for any material type
4.how delivery cost met in STO
1.how tax is configured and linked in PO
@@@ Tax code is assigned to purchasing document with T code : FTXP in case
of TAXINJ procedure.

2.what s the output type for Po


@@@ NEU

3.can a/c category reference fixed for any material type


@@@ one a/c category can be assigned to many material types.

4.how delivery cost met in STO


@@@ You need to maintain respective conditions n STO.

My client want to receive the packaging material from vendor-1 to another vendor-2
site, then he will supply the finished goods for packing to the vendor-2 as a
subcontracting. Finnaly he received the packed material. Pl explain the steps.
Hi in po at item level sc vendor check box is there select and give vendor.
From what I understand with your scenario is

You Client receiving packaging material from Vendor 1.


Your Client supply the packaging materail with Vendor 2.
Vendor 2 supply the finished goods to your Client (Company).

Is the correct Correct? If Yes,

The following Steps are;

1.Create the Vendor Master for V1 and V2.


2.Create Info Records for V1 as Standard PO for V2 as sub-contract PO.
3.Create a BOM for the Assembly to be produced.
-> Components of Assembly will supply by V1
-> Components of Assembly will issue to V2
-> Assembly units will supply by the Sub Contratctor (V2)
4. Run the the MRP to create Planned Order.
5. Convert the PR to PO
-> PO (Standard) for the components
-> PO (Sub-Contract) for the Assembly

6. SAP will list the Vendor Information Supply Slip with respect to PO for
Sub-Con. It will list all the
materials to be issued to V2. Movement Type (541)
Hey Kishore,

Account group also determines


1)Number Range
2)Number assignment
3)Field Selection
4)One time or Regular Vendor
5)Partner Roles/Schemas are allowed or not
6)Screen/Areas of Vendor Master Records
7)Plant specific data..whether it can be maintained or not

Regards

Sonu

--- In sapmaterialsmanagem ent@yahoogroups. com, amit Choudhary


<amitnchoudhary@ ...> wrote:
>
>
> --- kishore kumar <kishoresuuri@ ...> wrote:
>
> > Hi Gurus,
>>
> > Plz help me out,
Pl explaine what is Inbound Delivery and how we use this.
Hi inbound delivery is a shipping notification from vendor through which goods
receipt is made , inbound delivery and outbound delivery are used where EDI
interface
Can is used.
u explane me an example with 2 to 3 steps where we use Inbound Delivery
HI for example if a gr is to be made through inbound despatch idoc, it first makes
inbound delivery or if u wanted to make gr for scheduling agreement then go to
vl31n then vl32n post goods receipt.

Pls go thru the scnario and suggest the way to resolve the problem. I have created
on PO on 27/06/07. Done the GRN on 29/06/07. But when I have issued the
material to cost center on 28/06/07, system is not showing any error. It is allowed in
the system which I think should not be allowed. Pls reply the solution.
System can not issue any goods w/o stock in warehouse.
According to navneet the GRN date is 26/06 and the issue date is 28/06. Logically
the system should not allow to issue.
it will not be possible while seeing your GRN and Material Issued date.
THERE MUST BE STOCK AVAILABLE ERLIER HENCE NO ERROR.
Ideally the system should not allow future date GRN.(29/06/2007) ...Backdated is
OK but nor future date. Just check the posting date for the GRN.
This will be posible in following two cases:
1. There was earlier stock available in the system
2. Secondly and most probably, Negative stock is activated for the plant in config
and material in the material master
hi check whether negative stock is allowed
no, system response is correct since you already GR, it does not matter after GR
that when you done GR. at the time of GI system checks the existing stock. If you
making reservation, so reservation take open quantity
Also if negative stock is allowed no error is displayed.

In sap material management what is the meaning of material consumption (i.e


goods issue is treated as consumption or when the goods are actually consumed in
production order?)Are there any standard reports whcih show the material
Iconsumption and when
would think that to which costare
goods centres.
issued. T. code MB51, MC.A and MC.2 for goods
issue
Good issue automatic consumption upon the execution of production results.

The ff movement type for consumption are:

1. 261- automatic consumption of ROH upon posting of production results.


2. 201 -DIrect consumption for with out any references
3. 601 -Post Good issues for Delivert (D/R)
4. 543 - Post Good issues for Sub_Contract stocks.

how to create a new g/l account for the transaction key BSX
You can define new G/L Account in Transaction - FS00 Then assign the same
account to Transaction Key BSX

can u pls explain how to issue goods against STO


use 351 movement type by putting STO NO IS MIGO
Use t. code MB1B to transfer the goods with movement type 351
Using STO with out delivery: doc.type: UB GI:351, GR:101
Use the Transactions Code MIGO Movement Type 641(-) for the supplying plant
and for the demanding plant 641(+) and 101.
Im Facing on eproblem in ECC6.0.When I tried to configure the Excise Part., there
is no any such a condition types for Excise. Like., for Excise normally we need
Setoff Conditions like JMO1. this is not there in ECC6.0 as well as there is no
condition types for BED, AED ECESS (JAO1,JSO1,JEC1 )
So how we have to get it in to ECC...?? is there any Procedure or We need to copy
from any other exsist one.. I think SAP Provided some Note on this...Please share
with me and also please let me know any Procedure if you have.....Waiting for your
very valuable reply..

hi dear friends someone tell me when i try to change the user password then an
error occured that user is locked which t code can unlocked it
close all the screen and make sure no one else login with user name.
SU01
try su01. Fill-in the user ID that you desire to chnage or lock/unlock then press the
lock icon to unlock and right beside the lock icon is the change password icon.
At the time of Log In just click on New password lefh hand corner than u change ur
password
dear friends which t code can be used to restrict the whole user that they cant be
able to log on sap
hi user ewz5
How to Lock / Unlock users? Use t code EWZ5 Or Execute program EWULKUSR
in SE38
One query... Could anyone tell me whether it is possible to view the total PO
amount (including Taxes, overheads, etc.) in any SAP reports?

dear friend when i use this t code su10 to lock the user then again how we can
unlock it

WE ARE HAVING SINGLE MATERIAL IN TWO PLANTS OF DIFFERENT


MATERIAL TYPE,NAMELY ROH AND CONSUMABLE. KINDLY ADVICE WHAT
TREATMENT TO BE GIVEN WHILE EXTENDING THE MATERIAL.
Also maintain description of material separate
i guess the material attributes lies at the client level so the material at one plant is
roh and at another plant to be hawa is not possible. if u wanna to extend the
material views go to mm50
Just Check Plant Parameters whether you have allowed Negative Stock for the
Plant & Sloc Combination.
These are the questions i faced in the interview.This is the scenario.
1) In our company we create a subcontract PO for items based on customer PO.
i.e., Sales order creation drives the PR and so PO (3rd Party order processing).
This PO item category is S-3rd party as per standard SAP. For subcontracting
items, we want it to be L-subcontracting in the PO. So our requirement is: If you get
a 3rd party order for sub contracting items, system should create a subcontracting
PR/PO. Any ideas/suggestions please?
2) Can anybody tell me about workflow and its relevance with release procedure?

can anyone please tell how to create material subgoup. and assign it to a material
group.
Use T.Code SPRO. THEN SCREEN APPEARS CUSTOMISING: EXECUTE
PROJECT. GO TO SAP REFERENCE IMG-SAP CUSTOMIZING
IMPLEMENTATION GUIDE-LOGISTIC GENERAL--MATERIAL MASTER-
SETTING FOR KEY FIELDS-DEFINE MATERIAL GROUP-ASSIGN MATERIAL
GROUP AND DESCRIPTION CLICK ON SAVE BUTTON AND TRANSPORT THE
REQUEST TO PRD.
Please explain me that, in which Table Materials purchase order text have stored,

How to cancel one material document created through t-code COGI. How it can be
reversed. early reply will be highly appreaciated by me.

Can anybody explain me the following scenario. Whenever i create a sales order
and a delivery is created,the system should check which batch is due to expire
soon and pick up stock from that batch and then it should look for the next batch
Idue to expire.you
preassume How will Batch
know we configure for this?
determination:
In the Batch Condition type: incorporate the Sort
rule. In the sort rule you set if for Charactersitic
LOBM_SLED ( Self life expiry date) in descending
order. The system will check & select the earliest
SLED.
Scenario -
We have more than one plant and PRs are generated manually (not thru MRP)from
Plants/storage location/cost centre for common materials.
1. Is it possible to get consolidated PR ?
2. Since we are getting seperate PR from different location, that many line items
need to be created in the PO by referencing individual PRs. can it be avoided ?
3. Party supply the total PO qty as single item, Store keeper will have book qty
against each line items in the PO considering tolerance.

I want to create a BOM for finish material pl. tell me the Tcode or steps.
USE CS01
tcode cs01

Enter finish material


enter Plant
enter bom usage
enter
item no
ict L
child partno
no off
save

T CODES
FOR MASTER BOM'S
CS01 CREATE
CS02 CHANGE
CS03 DISPLAY

FOR CHILD BOM'S


CS61
CS62
CS63
FIRST CREATE BOM IN EXCEL AND THEN U CAN COPY OT IN SAP FROM
EXCEL
Our system has been configured to (Check Purch. OrderNo=A) in sales order type.

But, in standard system, only display Warning message.


We can change message category to E for Error message;.

But all user in all plant will be affected.

My question:

Is it possible to create specific Error message that only applied to a specificUser/


user group? Or may be plant?
Let know how to configure!

thanks

ahnugroho

WHAT IS THE ACTUAL MEANING OF INITIAL ENTRY. MOVT TYPE 561 WITH
MB1C
1. When SAP is implemented in any company, after complete configuration, All
master data and transaction data are uploaded in the system. The Initial Entry
means the initial stock (available stock) that is getting registered / booked to the
system.

2. After implementation, if there is stock of any material, for which material master
is not created in SAP system (for some reasons) and if that material need to be
tracked
it is ues through the
to upload system,
the then
stock or for the available
opening stockstock is entered into the system

Please tell me what is the usage of component in SCAT Programme.


m a member of sap yahoogroup, can u please help me .
while doing pricing for po
net price is different than the cal culated price

i have mentioned condition type


gross price as 50
vendor dis 1%
packaging cost 10
excise duty 10%
education cess 1%
discount 1%
insurance 1%
freight charge rs

but net price is showing 47.87

I have three companys with different company codes (Ex: A,B,C). Now i have to
combine these three company into one company (with one
code ). Can you please give me overview how configure.

What is the way to make a credit memo to the vendor for the goods returned
(RTV) after invoicing. Please consider it has to include the conditions of
P.O as well like freight, duty...etc. Please include transaction code for
credit memo as well. the codes that i know is MIRO and FB65. MIRO with ref.
to the returns PO does not show freight and duty, but does show original
price of goods. I have no idea how FB65 works.

The real issue is conditions (freight and duty) not being displayed for a
credit memo being sent to the vendor.

FYI.. I use goods movement 122 and 161 for goods return process.

Try MR8M

Can anyone explain in detail all the 16 fields of Pricing Procedure?


can anyone explain how to find netoff vat in price comparison?
IS THERE ANY REPORT OR TRANSACTION AVAILABLE FOR LISTING OUT
GR BLOCKED DOCS (MATERIAL DOCS GENERATED AFTER MATERIAL MOV
103) PENDING FOR POSTING TO UNRESTRICTED STOCK. (PENDING FOR
MATERIAL MOVthe
MB51 and enter 105)
corresponding movement types.
PLS USE MMBE USE MOVEMENT TYPE 103
you can use LIS
HOW CAN I USE LIS
MC01
THIS WILL GIVE ENTIRE LIST OF 103 DOCS GENERATED. HOWEVER THE
REQT IS TO GET PENDING LIST OF 103 DOCS.(105 MOV NOT POSTED)

we are not using SD. If i delete material, how can i make sure that system will
propose alternate material

Is it possible to have many warehouse under 1 plant


Yes, it's possible.
If you want to have many warehouse in one plant, so you must create many
Sloc in one plant.

Is it possible to CHANGE SERIAL PROFILE of a material in MM02

My question is I will send the material to Subcon Vendor. Now I would like to send
the Material to Customer from Subcon Vendor.

What you have replied that if I want to send the componets from Vendor to SubCon
Vendor by activating the check box SC Vendor.

This is virupaksha. Answer for ur question.

1st mathod: As you said you can tick SC vendor in the PO. Here you have to
maintain your customer as a vendor master.( This is the prerequisite)

2nd step: You can do business as THIRD PARTY. ie you can create third party po.

Check with these two and plse give feed back.


Can you pls shed some light on MPN. If i wanna maintain Non stock material how
MPN can be used.
even material is non stock you can create material master record. create the
material master, and maintain MPN profile in IMG. assign this file to your material.

IN ONE OF THE STO, WHE HALF OF THE PO QTY IS EXHAUSTED


AUTOMATICALLY OUTBOUND DELIVERY IS GENERATE FOR THE BALANCE
QTY . BUT PO STATUS SHOWS BALANCE QTY SINCE NOT CELIVERED AND
INVOICED?IT IS HAPPENING IN A PARTICULAR VENDOR ORDER ONLY.
KINDLY RECTIFY ME

Can the service entry sheet be cancelled?


If yes could you please tell me the procedure.

1) Open service entry sheet


(2) Go in change mode
(3) use ctr+f2 or "Revoke acceptance" button & then
save.

Could you please clarify me whether GR can be done


against Contracts and Scheduling agreements.
If yes, what could be the prerequisites.
Thanks in advance.

My client is planning to use RWD as a training and


script recording tool.Can anybody give some idea/info
about it.

Thanks in advance. I will appreciate your quick reply.

can anyone help me how to up load material master in real time implementation.
thru' LSMW

Can any body please let me know how to add more material groups in SAP?
USE TCODE OMSF
Pl note the path IMG-Logistic general-Material Master-setting for key fields-Define
Material Groups. & get the result.

I need create and maintenance from "release strategy/release group" and purchase
group (PO).. please send me steps-by-step of SPRO...CUSTOMIZING. ..

In what condition we use Scheduling agreement or PO?


If the the frequency of material inward is more like daily or weakly then you will use
SA.SA generally use for packing materials which are more space consuming. In SA
you can make agreement for any quantity require in year & inform your supplier
weakly schedule of dispatches.

In PO, whole PO quantity we generally inward at a time depends on availability of


material with supplier
I have assigned a number range to a Customised PO document type.I created a
PO but was not able to see the output message for the aforesaid PO. I clicked the
Print Preview option but system gives a message "No Output Defined". Please help
me inprinter
Give fixing the
nameproblem,
LP01
where,which T.code.....
Is it fixed to be at document type level.
For print preview or printout you need to set up
messages.

Following path will take you to print preview option

ME23N and go to messages,

Select output type NEU print then select medium as


printer.

and press enter. and pop up will be appeared and give


the print name and press save.

Then again execute txn me23n and select print preview


you will get the printout

if no config done on messages, you need to configure.

We are implementing for an engineering client who deals with Titanium


and tantulum metal sheets. He purchases the metals in Sheets of
various dimensions. the base unit is KG. serial numbers are followed for the
individual sheeets. The sheets are issued to the production in full and
the left over sheet after production is returned back to the stores.
the store people will cut the maximum size of the sheet and stock it.
the left over bits are managed as cutbit material code. like this the
metals are optimum utilised.

My questions are
where can I capture the sheet dimensions in material master?(length,
width & thickness)
how can I generate reports on dimension basis?(length, width &
thickness).
if i give the dimensions my report should give me the weight of the
sheet i have in the inventory.

In Basic Data1 view of material master you enter weight,dimensions. & also get a
report by using this field name in your report.
You could alternatively think of a differnet approach. If you use batch
management it would be easy to accomplish.

Let us assume that


1. all sheets of a particular material code are of standard [same] Length ,
Width and Thickness. That gives us a standard volume for the sheet.

2. All sheets of a particular material code are of standard density

by having 1 and 2 we have a weight per sheet. As all sheets are numbered, we
can easily have a batch for a sheet or a bunch of sheets. So for all batches
we have weight. All you need to do for your report [custom] is to do a total
of all the weights of all the batches and you will have your stock in weight
and in number of sheets.

in case of the cut sheets, all you need to do is change the characteristic
value for volume in the batch classification.

i hope this has been helpful. in case you have a better idea i would love to
hear of it.

Dear All can anyone explain to me the report MC50 for Dead Stock analaysis coz i
think am missing reading it

There is such report for pending 105 material


documents means we have done 103 posting and still
waiting for 105 material documents.

You need to develop the report for the same.

Also remember in SAP there wont be link between 103


material document to 105 material document after doing
MIGO-105.

T code MBLB reflects the delay between 103 and 105


MBLB gives stocks at subcontractor
I have created a P.O. w.r.t P.REQ , maintained RS. 5/- EACH in P.REQ

and RS.500/-EACH in P.O.

no error / warning comes

I WANT TO PUT A CHECK , plz suggest how i can do this ?

you have not send the error , any maintain the same error as errror message
in message settings,
if it is false reply back.

Hi Kishore

Good Job, keep up the good work

Naveen

On 6/28/07, amit Choudhary <amitnchoudhary@ yahoo.co. in> wrote:


>
>
> --- kishore kumar <kishoresuuri@ hotmail.com <kishoresuuri% 40hotmail. com>>
> wrote:
>
> > Hi Gurus,
>>
> > Plz help me out,
>
> 1.wats the A/C DOCUMENT FOR MVT TYPE 101?
>
> 2.VALUATION GROUPING CODES AND ITS USES?
> Ans. Valuation Grouping Code is used to Group
> different valuation areas(Plants) . Once this grouping
> is activated, system uses the same Automatic Account
> Determination process for all Val area under the
> group. Other wise you'l have to define Auto Account
I'm new to SAP-MM and learning a lot from this forum. I've a doubt regarding
exchange rates in Purchasing. How do I know if the pricing (exch. Rate conversion)
is done using the rate on PO date or GR date? Is there any configuration / settings
for this? Any docs / links to know more about this is appreciated
Exchange rate is maintained by FI person periodically. The T-code For maintain
Exchange rate is OB08.Hope it will work.

Can someone tell me detailed procedure to configure GR Message to Buyer?


reply to the qustion is mark indicator in vendor master record for order
Iacknoledgement
require message. to be generated & sent to Buyer when store person posts GR.

I am working in a constructions company whose main work is making highway,


laying rail etc. My requirement is how to generate Purchase Requisition
automatically without making BOM. we are using WBS for various level. Kindly
guide methe
maintain andmrp
tell data
me the details
in the illaborately.
material master record.

Can someone explain me detailed steps for Configuring GR Message to the


Buyer?

I hav some issues

1.how to create a standard purchase organisation for a consigment process?


2.I have created a new material type using OMS2 but that was not appearing while
creating a material (MM01)
3.What is invoice verification in back ground and what is its use?
Ans to Q1-
Go to SPRO->Enterprise Structure->Definiti on->Materials Management-> Maintain
purchasing organization ( here you define the Pur Org)
Then you go to SPRO->Assignment- >Materials Management-> Assign standard
purchasing organization to plant
( here you assign the std PO to the plant)

Ans to Q2-
Just check that you have copied the material type from a similar type and
maintained the details and qty & value updating in oms2 and then save.

Ans to Q3- Inv verification in background is used when there are a no of


line items and you need not check each line items. you run a program and the
inv ver is done.

can anyone tell me about the part of MM consultant in CBP

I tried to assign MM02 to my Query list(Material list query) and succeed. But when I
double click one of the row of the list , sap brings mm02 without selected row's
material code. what can be done?
can you pls guide me how to make query list

We have a requirement of maintaining all the stock in our warehouse as non


valuated and still be able to track Usage Value ($$$) and i
proposed the following options:
1: Maintain a Z-table and copy the logic behind Moving Averabe Price calculation
and multiply it with the quantity provided by standard reports in SAP (LT22-LT26)
2: Add a New View to Master data (a new field) Moving average price and not use it
anywhere else except for calculation of value based on the quantity at a given
instance.
3: Use either SAP standard R3 report and modify it or use a Z table logic in R3 and
get reporting (analysis) done in BW and get reports We haven`t finalized on this
....but what do you think about the above options....and
My question is...did any one go through a similar situation?? if so how did you guys

Does anyone know how to change the Base Unit of Measure for a material after
you have started using it? The material has inventory and open purchase orders in
the Base unit of Measure.
Base is set once created. (We've had to create a few new parts because of this.)
However, you can change the Ordered U of M and the Unit of Issue.
Thanks Todd, this has been my experience as well. I have also used the Order unit,
the sales unit and unit of issue.
Do a PGI of all stock using mov typ 562 and close all open PO's then you can
change the UOM
Following are the ans. for your question:-

amit Choudhary <amitnchoudhary@ yahoo.co. in> wrote:


1.Can a purchasing document (PO or PR) in their
procurements item have more than one item category?
Ans. yes

2.A company has 0 initial stocks. MAP is $10/pc.


Received goods 50pcs
@$10/pc and then issues 10pcs. Invoices was received
for 50 pc @$20/pc, Show the different account
postings.
Ans. Ist at the time of goods receipt the stock A/C will get debited with @$10 /pc
and GR/IR A/C will get credited with @$10 .
at the time of Inv. verifi.it will becomes
GR/IR A/C ........DR $10/pc
PRD A/C......... .....CR $10/pc
VENDOR A/C ............ .....CR $10/pc
at the time of issue,
goods issue a/c dr. $20/PC
PRD A/C......... .....CR $10/pc
stock a/c......... ...CR$10/ pc

3.Physical inventory is done in the following levels

In my opinion , you can maintain TEXT , in P.O.


the same should get adopted.
since GRN is made wrt P.O.

i am afraid , you can't change base unit of measure the condition is , there should
be no stocks. there should be no open P.O'S etc
Mr.Kalidas/Mr. AMit

Ans to Question 2

I at the time of goods receipt


stock A/C will get debited with i.e $500/- @$10 /pc and
GR/IR A/C will get credited with $500/-

II at the time of issue,


Consumption a/c dr. $100-@$10/PC
stock a/c......... ...CR$100

III at the time of Inv. verifi.it will becomes


> GR/IR A/C ........DR $500
> PRD A/C......... .....DR $100 for 10 pieces
> VENDOR A/C ............ .....CR $1000 - @ $20/pc
> Stock a/c--------- --------- -DR $400 - for 40 pieces

Ans to Question 4
A&D

regards
epm
We have a requirement of maintaining all the stock in our warehouse
as non valuated and still be able to track Usage Value ($$$) and i
proposed the following options:

1: Maintain a Z-table and copy the logic behind Moving Averabe Price
calculation and multiply it with the quantity provided by standard
reports in SAP (LT22-LT26)

2: Add a New View to Master data (a new field) Moving average price
and not use it anywhere else except for calculation of value based on
the quantity at a given instance.

3: Use either SAP standard R3 report and modify it or use a Z table


logic in R3 and get reporting (analysis) done in BW and get reports

We haven`t finalized on this ....but what do you think about the


above options....and

My question is...did any one go through a similar situation?? if so


how did you guys deal with it?

Please help me with the following:

My client would like to bring the retention functionality in the


Purchase Order. For example, if the PO value is $1000 only $900 will
e paid to the vendor upon goods receipt and invoice receipt and the
remaining $100 should be posted to a retention payable account. The
accounting should lokk like as follows:

Dr. 1000.00 - Expense account


CR. 900.00 - Vendor Account (Accounts Payable)
CR. 100.00 - Retention Payable account.

Is there any way to configure this? Did any one of you has come
across with retention funtionality like this? Appreciate your reply.
I am adarsh here , you can configure SPRO-->IMG-- >MM-->P.O- -> SET
TOLERANCE LIMITS ( SET IT FOR 10% , ) ( this i am rock sure ) also , you can
create a separate G/L account for retention value check with FI/CO guys for
postings related to RETENTION ACCOUNT POSTINGS i think you can also try
RECONCILLATION ACCOUNT
The purpose of tolerance , please
is totally check
different and ifI highly
it works
doubt whether that will work
for us.
Tolerance and reconcilation will not help.

However a separate GL account which is related to the same vendor account could
help.But during IR,MRIR will get DR for X,Vendor a/c get CR for 90%X and Vendor
retention a/c get CR 10%X.How to differentiate the CR to 2 different a/c on
percentage basis?Also retention is for a specified period.If there are 'N' purchases
in a year,then there will be 'N' retention amounts.Each need to be paid after expiry
of each retention expiry date.How to handle this?

when you open the configration part , & do it the invoice which is parked will accept
ten percent less then p.o. value , i hope that serves the purpose

issue: i want to settle in mrko for invoicing party not for goods supplier, i
maintained in vendor master for invoicing party at partner functions. please help me
it is very urgent
customising:
material manage ment ->purchasing- >purchase order ->release procedure for po.
edit characteristic
edit class
define releaseprocedure for po
in this create release group
then release code
then release strategy
click on release pre requite
then release status
then classification
enter and save

Adailson Batista <adailsoncb@gmail. com> wrote:


Hello Colleagues,

I need create and maintenance from "release strategy/release group" and


purchase group (PO)..

please send me steps-by-step of SPRO...CUSTOMIZING.

HI , DON'T feel panicky over there ,

plz follow , this may help you

1)take consignment material


2)take a vendor ( central ), don't include invoicing party , not required here
3)make info record ( consignment)
4)make a P.O ,item category consignment only, DON'T give price here
5)make GR
6) MB1A , TWO ONE ONE ,mvt type
or MB1B , FOUR ONE ONE , mvt type
finally go for MRKO settlement , (include invoicing party iff asks as
VENDOR SO CREATED )thats ALL
HI , DON'T feel panicky over there ,

plz follow , this may help you

1)take consignment material


2)take a vendor ( central ), don't include invoicing party , not required here
3)make info record ( consignment)
4)make a P.O ,item category consignment only, DON'T give price here
5)make GR
6) MB1A , TWO ZERO ONE ,mvt type
or MB1B , FOUR ONE ONE , mvt type
finally go for MRKO settlement , (include invoicing party iff asks as
VENDOR SO CREATED )thats ALL

On 7/4/07, adarsh srivastava <adarshsriv@gmail. com> wrote:


> HI , DON'T feel panicky over there ,
>
> plz follow , this may help you
>
> 1)take consignment material
> 2)take a vendor ( central ), don't include invoicing party , not required
> here
> 3)make info record ( consignment)
> 4)make a P.O ,item category consignment only, DON'T give price here

I am facing one problem while invoice posting.I am able to park the invoice, but
unable to post. The error is as mentioned below - Internal error in
FORM/FUNCTION CKML_F_BUILD_ INDEX in position 1 with RC 0 The material
is a non-valuated material type, no accounting & costing views are maintained. PO
type is a refined purchase order. Is their anything to deal with period or automatic
a/c determination? I am able to make posting in the sandbox. But in Development
& Quality server I am facing the error. Secondly, I didnt receive this error in
previous month while posting the invoices. But, I have started receiving this error
from this month. Is it possible that the no costing / accounting view is maintained
for a material, but in IMG some costing / accounting related settings are done for
the material type.
I looked for the OSS notes 933809, 950466. But before applying these notes I am

Whether the SCAT is working in ECC6.0


Yes it works in ECC6.0
The Record Transaction & Record functional module is not active ( greyed ) . Pl
advice me how this can be activated.
I could not able to create any Test cases.

Hello, does anyone know how to set up land load UPC numbers in Basic Data 1
in the material master? Is there customizing that needs to be done? If so
what would I need to do. For example I have a product with a UPC code 57379
10501 and I tried to load it but I got the message 'The interval 14 was not
found'

Plz.Help Me to solve the following issue of the TAXINN.


I have done all the settins i.e Basic Settings,Master Data,Account Detrminition,
Incoming Invoices in Business transactions i Logistics genereal.
However Ihave not changed anything in Define Processing Modes Per Transaction
& will be using standard modes.
Even in Define Reference Documents Per Transaction i have not made any
changes.
I have taken the same movement types from Specify Which Movement Types
Involve Excise Invoices.Which are 101 & 103.
I have created Tax code to & havent maintained any Tax Rate
I have maintained all the Condition types i.e JMOP,JSOP & JAOP via VK11.
Ihave maintained all the required data in tax Maintainance Via.J1ID.
But i am not able to have Excise Tabs in Migo so that i can maintain the Excise
Data.

Pl explane how we use Alternet BOM for a subcontracting PO


I am working for a client who wants a common GRN note for all the items
maintained in MATERIAL DOCUMENT / GR

I have seen configuration part for printer control , there they are giving
print code 1 , applicable for any GR

my question is CAN'T WE RESTRICT IT TO SHOW COMMON GRN NOTE for all


items
accountable for material document ?

please accept thanks in advance

for a subcontract p.o., follow this ,


1) you must be using finish good / trading good here
* create all materials which will be components for finish good
* create a bom by T/C CS01( In this give name of ur master material
say finish good , then go for universal type of bom , in second screen
, include components then save it )
2) take a central vendor
3) create info record , subcontract type include bom here.
4)go to p.o. with item category subcontracting
5)T/C MB1C , for keeping materials in our stock , mvt type 561
6) provide material to vendor T/C MB1B , mvt type 541
7)make GRN against P.O mvt type 101
8)then subsquent settlement T/C MB04
9)VERIFY STOCKS WITH VENDOR T/C ME 2 Oh
10) stocks with subcontractor T/C ME2M
I want to create 2 BOMS for the one Finish Material.

1st is main BOM and 2nd is alternet BOM.

if any material is not available in 1st BOM, we have a option for using 2nd
BOM for subcontracting

or anywhere else, Please describe me how we use 2 BOMS (Choice Option of any
one BOMS)

Please enlighten some ideas for implementing procedures in ECC 6.0. Currently
we are going to implement ECC 6.0 in construction industry.
If there is any site/SAP notes available please let me know .Thanks in advance.

could you plz tell me answers for the following questions?


1. What are the major problems or hurdles faced during implementation, how do
you solve the same as a consultant?
2. What are Tickets? Give some examples of the Ticket which you have solved ?
3. What is meant by SLA,what are the different means by which tickets are transfer
ed to SAP consultant?
4. What is meant by SAP integration of different modules ?
5. What is Configuration and Customisation in SAP ?
6. What is difference between End to End Implementation and Life Cycle
implementation ?
7. How can distinguish between MRP run PR and Manual PR ?
8. What is ABC analysis in SAP? What is its significance?
9. What is meant by Distributed Contracts (Outline Agreement) ?
10.What is the role of Work-flow in Release Strategy ?
11.What is meant by Accruals ?
12.What is condition Exclusion? What is its role in pricing procedure ? What are the
DATA retention levels for&nbsp; Master DATA in MM ?
13.What do you mean by Match codes explain briefly ?
14.What does "Administer" function do in scheduling agg ?
we have created a physical inventory document and posted the physical document
and as a result material document has been generated . But we found that qty is
showing under both as 'unrestricted' and as well 'blocked' . Now I want to know .
1. can i cancel the physical invenotry document or material document.
2.If not , I want to remove the stock from 'Blocked' to 'Scrapped' , in that case what
is the movement type I should use and if i do so will there be any future implication.
Please let me know ASAP.

I use EDI method to transfer invoice data into SAP. Can SAP hold the
invoice instead of posting the invoice automatically even if there is
no difference among PO, GR and IR?

I am looking for information regarding release number and transmission number


used in scheduling agreements. What is the process to generate a new release
number, as in our system, SAP is showing the release number always 1 and it is
not getting incremented even after we send the delivery schedule to vendor. I
appreciate your suggestions/ comments.

How do i block or stop the creation of purchase orders that do not reference a
purchase requisition. in IMG or any other environment.
Use OMET, there tick the Ref to PR. In Authorisation assign parameter EFB with
the value given in omet.

* material document can be cancelled ,


go to MIGO , select cancellation , give material document no. , take
mvt type as 102

* for scrapped quantity , create another material say it as scrap & proceed

I want to know that how can I get the infoupdate checkbox ticked for every PO
qutomatically. Where is this set in the config

How can we change Sequence of Views in Material Master,How can we customize


this. Please elaborate the steps involved
Use Txn OMT3R and change the sequence number. example: Baic Data 10
PURCHASING 20 If you want purchasing view as first change the number to 10
and basic data
to 20.
Where is the Release creation profile assigned to Vendor Master? I checked LFM1
and LFM2 tables and the Field ABUEB (Release creation profile) is available . But I
am not able to locate the same in the Vendor Master Purchasing Data. I checked
the Screen layout for Account groups also and I am not able tp locate the same in
Purchasing data. Can some one throw light in this issue?
Release creation profile is not assigned in vendor master record; you can assign it
in scheduling agreement in details view.Pl assign release creation profile there.

how batch to batch transfer is there any movement type plz tell me

plz tell me is there any movement type to transfer batch to batch.


Movement type 309, let try

In transaction code IW32 Change Re-Active Maintenance Order Fleet. when you
choose Components tab and check delivery address I am getting a default address
in Equipment Master Data. How can i have it default to the address in the Plant.

I just wanted to know or the very basic understanding of the use of Standard Price
and Moving Average Price. I know how the G/L accounts are updated and all those
things. But i need to get a clear idea of why a company would like to have either 'S'
or 'V'? What is the criterion or how does they decide that a particular material
should be valuated as S or V? Can any one explain it from Domain point of view as
well as from
standard SAP??
price of a material is one which donot change with the Qty of the stock in
warehouse..ie it is defined by the warehouse with a stanadrd value regardless of
PO price.. In case of MOving avg price, it will vary with qty of Storage location. eg:
if a vendor supplies soaps for 100 pcs @ 10/- each = 1000 if the other vendor
supplies for 100pcs @9/- each = 900 then MVG avg price : (1000+900)/200 = 9.5/-
upto that stock finishes.. I think u understood ..if any problem let me know...

How can i round figure the Excise duty / Education Cess in print as well as in P.O.
price calculation.
When I am trying for the above subject, by clicking on option, "Create Batch" in
Purchase Order (ME21N) , I am geting optiona msg pop box "Catuation! Internal
number Allocation for material handled in batches" with yes, no & cancel option.
When I am going for yes option I am geting msg "Number Range Object not found".

For this I had already chked


1. Activate Batch Number Assign - Active
2. Internal Batch Number Assignment for Assigned Good - chked for plant
3. Maintain Internal Batch Number Assignment Range - for object "BATCH_CLT"
with Ext indicator un chked.

Can any one help me further to this seeting what else I had to do for geting internal
number for batch automatically.

yaar i have not come across yet two BOMS

but i know there exist something like super BOM

what i have gathered so far is

STANDARD PRICE :applicable for FINISH GOODS

MAP : applicable mostly for RAW materials

LIKE suppose you have a stock inhouse valuated for fifty per kg

you need some more stock say hundred kg, so bought out stocks are at price
of say hundred kg
then average price of inhouse stocks plus bought out stocks will be MAP.

We are taking printout of P.O. from T-code Me9f.i want to add new Field in
selection opition as well as output screen.
While doing Asset G.R. Storage location is not coming in item level.and if we do
G.R.,it's not showing in MMBE. It's urgent.Please help me out.
Asset materials are Non-Stocking materials... .so stop scratching your head in
amazement!!
Anybody tell me which T-code shown me All GRN (Goods Received note.) in
desiered
Use MB51 period
& Mvt type 101 for desired date range.
TCode MB51 mvt type 103

I Believe you can go for ENHANCEMENT FEATURE of SAP ,

a TECHNICAL GUY like ABAPER could of great help ,

he must be knowing coding & all , he can definatly help you with that

Need help regarding a problem i am getting during implementation:

Golden Client: Excise groups defined and transported to test client

Test Client: Excise groups got transported properly. When doing MIGO, excise
group is getting attached properly. When checking i am getting the folllowing error:

Maintain number range object for object J_1IRG23A1, year 2007, excise.

Once in transaction SNRO for maintenance of number ranges for RG registers, I


am not getting the defined excise group in the dropdown and system saying input
excise group does not exist. As a result i am not able to maintain number range
and post GR.

1) can anybody explain me the processflow from the point of goods receipt until the
stock gets stored in the warehouse in storage bins.
2) also explain me the linkage between any Inventory activity and financial linkage.
for ex in goods receipt how will the system know what G/l account to hit and etc.
All process is started When you Receive goods from Transport.
1) can anybody explain me the process flow from the point of goods
receipt until the stock gets stored in the warehouse in storage bins.
Ans.
1. Count the articles (C/B, Gunny, W/C, Loose etc.) as per L.R. &
Invoice. Check all goods defected or damaged.
2. Check P.O. No. all goods are ok or not also count and get
inspected from concern person. For goods is ok as per requirement.
3. Put Sap code or tag on all item and description too.
4. If everything is ok then you can make G.R. And goods stored in
bins.

2) also explain me the linkage between any Inventory activity and


financial linkage. for ex in goods receipt how will the system know what
G/l account to hit and etc.

Ans.

Financial activity is started When you complete GR. You have to dispatch
original document (invoice) to H.O. HO is informed that you made GR it
means you received goods. After this they will make payment to vendor.

Regards,
Thanks a lot.
If more concept is there we want to understand from you.
Waiting for your positive reply.
*Question No: 1*
*Ans:----*
**
*Goods receipt: physical process* When goods are received, they are usually
transferred first to the goods receipt (GR) area. Stock placement into the
warehouse takes place after a suitable storage bin has been determined for
the goods.

*Goods receipt: process within the system*

*Inventory Management (IM)*

A Material Document is created to represent the movement of goods into the


warehouse. It is possible to enter palletization data at this point.

An Accounting Document is created to represent the change in value of the


goods in the warehouse.

*Warehouse Management (WM)*

A quant is created in the Goods Receipt area to represent the existence of


goods now in the warehouse.

A Transfer Requirement is created since the goods must later be transferred


1.What are the types of inforecords?
2.What is meant by consignment stock?
3.What are the steps involved in consignment cycle?
4.How is scrap accounted in subcontracting?
5.How are the byproducts taken care of in subcontracting?
6.What is meant by a release strategy?
7.What is the movement type for return to vendor? How to reverse it?
8.What is the difference between LSMW and CATT?
9.What is RTP?
10.What is the movement type used in receipt of RTP?
1.a.Standard b.Consignment
2.Vendor material available at our premises.It is physically available at our
premises but not valuated in our stock.No liability to us till it is consumed or
transferred to our own stock.
3.Create a consignment info record and release p.o with item category K.On
material receipt only material document generated.While consumtion or transfer to
own stock,accounting document generated along with a material
document.Message can be send to vendor on each withdrawal from
stock.Settlement will be done for each agreed period.
4.Either value of scrap is taken care while negotiating the price or get back the
scrap as a by-product.
5.Can be taken care in S/C BOM itself.
6.Electronic form of approval.Ex. PR-release strategy mean whether that item can
be procured or not,whether enquiry can be send or not,whether p.o can be placed
or not.Different approval stages are depending on approval level and their
authority.
7.I think 161 & 162
8.LSMW is a tool used for migration of legacy datas into SAP system. I think CATT
also
FORsameSR NOkind
10of tool. AND T CODE IS 501 M
;MIGO
) The different types of Info Records are

a) Standard Info Record


b) Sub Contracting Info Record
c) Consignment Info Record
d) Pipe Line Info Record

Can any one help me urgrntly.


Currently two Pur.Orgs are maintained A & B for 8 Plants. Now for one
specific plant ( out of 8 plants) needs to change the Pur.Org 'A" to
C. Is it possible? if possible, what are the steps to be followed
You may try the following: Assign the plant to Pur.Org 'C' also in addition to
'A'.Once all pending p.o's in 'A' for this plant are completed,you can deassign 'A'
form plant.Otherwise all pending p.o in 'A' are need to be cancelled and reissued in
'C'.
Many many thanks for prompt reply. I have some doubt on the following what will
happen , if the P,Org is deasigned after all the pending P.O's are completed, but
yet to do invoice verification ?
I urgently need help on planning consumables. The problem is there is
not a good method to determine actually usage of consumables in the
BOMs. The exact quantities do not backflush in SAP. What is the best
method to determine what quantities should be ordered?

I create material Zbikebob. And created Class & Character. How I will assign
material to Class. How I will assign material to Character. How I will create the
order with order number. I did not have order number. would you please explain
step by step. I will appreciate if you will help me out
In MM01 T-Code, Classification View you can assign material to class. In
classification View first you will select class then Enter. In QS61 T-Code, you can
assign Material to characteristics,
Can u pls help with any table which will show the reserved stock field. I wanna see
what is the reserved stock (booked against production orders, planned orders,
sales orders ) for all materials in tabular form. I can see it for individual material in
MMBE , but for all materials at a time ????
hi u can try it in table RKPF or in field BDMNG
It shows reservation no. i.e. for mvt. 261 etc. I want the reserved stock of material
which will be required for booked production orders. N where to see the field
BDMNG.
can anybody tell the following master datas will be maintained at which level ?
1. Material Master
2. Vendor Master
3. Service Master
4. Inforecords
5. source lists
6. quata arrangement
power user level
If I am not wrong, Syed is asking whether this masters and info. recs. are used at
Plant Level / Company Level / Client Level. Am i correct mr. syed??
Yes that is what i am expecting.
material master at plant level
Vendor master at company level
inforecords at plant level
sourcelist at company level
Quota Arrangement at plant level
hi can can you please tell me who will write the program for ABAP Query whether
Functional Cunsoltant or ABAPer
ABAper only write a program Functional cunsoltant - check that program
Functional consultants will give the technical specifications like table n field names
and the goals of the program, based on the specs ABAPers will write a technical
program to achieve the end result.
To develop Query is not only work of ABAPer,Funtional consultant can also
develop Query if they knows the table only.if you want how tha develop i will
explain.what is the steps involve to make a Query.

iam new to mm.i have a problem regarding message out put determination. when
iam assigning my own out put device(with all IMG settings),after creating a
purchase order,iam getting the purchase order number also.but when iam checking
with me9f,the message is "no such documents are avilable ". I don't under stand
where is the problem.please can any one give me the answer.

Can anyone post type of questions for support function projects

can anyone suggest me how to take back some broken or rejected consumables
which have been issued to the cost center by movt type 201 ,till now we were
taking it back by movt type 202 ,but when we take it back as 202,there are
accounting documents being created and the consuption to that cost center is
negative,but actually that consumables are already consumed and the one which is
coming back cannot be used ,so we want that the accounting documents should
not be created and the stocks can be put to block stock .can anyone suggest ,if my
question
U can do is not clear
it with ,please ask for
split valuation,but more clarification
it should be planned at the initial stage.
We are going to start Bonding & Exbonding scenario for import materials in
SAP.

Can anyone explain me how this will work in SAP and also give me the steps
involved in SAP.

I Need the following scenario in SAP.

1. Purchase requisiton for import material


2. PO for import material
3. During Bonding time,
a) MIGO for the Material and MIRO for Vendor should happen ( Goods
value) & Warehouse charges MIRO
4. During Exbonding time,
a) MIGO for Material and MIRO for Import duty and clearing charges.
Material should go to Quality.
b) Part 2 Excise posting should happen at the time of Exbonding.

Note: Material should credit only once, during exbonding time. We need
Goods receipt during Bonding time also.

Is this secanrio will work in sap? If this is correct, can you explain me
how to implement step by step.
We are going to start Bonding & Exbonding scenario for import materials in
SAP.

Can anyone explain me how this will work in SAP and also give me the steps
involved in SAP.

I Need the following scenario in SAP.

1. Purchase requisiton for import material


2. PO for import material
3. During Bonding time,
a) MIGO for the Material and MIRO for Vendor should happen ( Goods
value) & Warehouse charges MIRO
4. During Exbonding time,
a) MIGO for Material and MIRO for Import duty and clearing charges.
Material should go to Quality.
b) Part 2 Excise posting should happen at the time of Exbonding.

Note: Material should credit only once, during exbonding time. We need
Goods receipt during Bonding time also.

Is this secanrio will work in sap? If this is correct, can you explain me
how to implement step by step.

How to process returnable transport packaging in the purchasing module, there is a


function that you provide the transport package to vendor and you also ask vendor
to return this kind of transport package.
1. how to appear in the PO item that this material is transport package material?
2. GI and GR process and account affects?
3. how to return this goods?
does anybody know this function usage?

I tried on this.Goto CUNI and select units of dimensions anddefine new UOM and
save. No need of assigning any where.It will come automatically to MMR base
UOM f4 help. I have not worked on this earlier.I tried and was able to get it in MMR.
Select the field and go to F1.Select technical fields and from there u get what is the
table name and field name etc

Do u want to create spl pro.type.Proc. type is defined in the system or enough


Try SPRO-Production- Material Requirement Planning-Master Data-Define Special
Procurement Type

I have a quick question. Hope you guys can answer. I am required to reassign all
the purchasing documents from one P Grp to another P Grp. There are about 400
documents existing that need to be reassigned. Please advise what is the
procedure. The end users are not willing to do it due to the quantity.
u can do it by mass maintainance PO

Can anyone guide me as how to change the Unit of Measurement in Material


Master against which PR already exists.

We have a scenario in which we need to trigger a workflow when an error occured


while processing an idoc. Please lemme know the steps to configure the same.

I have a question? can we have name for a material rather than a number. For ex
in MM01 transaction we create the material and give some name to it. Finally when
the material is created it is given a number like material 1260 created etc etc. I want
to have like material cell phone chip created. ( name of my material is cell phone
chip).
You have to set the number range for the Material from 00000...(18 zeros) to
ZZZZZZZ(18 Zs).. Then you need to configure for External assignment for Material
name.
surely you can. Assign an external number with alphabetical intervals. You can use
t code MMNR for this.
YES BUT THERE WILL BE LIMITATION IN RANGE.
YES U CAN CREATE material with alphanumeric code.
There is material number range in the config and you need to activate wether
internal or external number range you want
similarly alpha numeric or numeric which one you want , you may config

Can anyone tell me about a scenario where we are required to create new
movement types apart from using the movement types what SAP has delivered.
can u pls elaborate hw 2 get table name & field name of field which is there in a
transaction. .let us say MM01 where i want to get storage location deatils in which
table it is storing and its field name of that table ..pls
Select the field and go to F1.Select technical fields and from there u get what is the
table name and field name etc
Got to mm01 tcode. Then go to Production/Storage Location view and in the field
where it says Storage location, select F1 and then click Technical information as
mentioned
Use earlier. to find table name SE15 can be used
Table MARD,
I am able to find out table name & field name, but in SE16 it says it's a structure not
table. How to see the table.?
u will try to enter the table name in SE11 t-code.
A structure is not a table,it is some kind of a programm
As kalyan said,
- Click in the field for which you want to know the table name
- Press F1
- Click on 'Technical Info'
This will show you a lot of information about the field, where you'll find table name,
field name etc.

What are the function of BOM and where they are used ?
BOM (Bill of Materials) is a structre of all the Part Numbers showing how each
component and how many of each component is used to form an assembly.
Lets say a Transmission has 600 parts.
200 parts are 1per Transmission
300 parts are 2 per transmisison
100 parts are 3 per Transmission.
When you get a BOM, this shows the tree structure of how each parts are used and
at what level.
3 types of BOM

1.Production BOM - used in production to explode the components to manufature


the main product
3.Materail Bom - use in Engineering or subcontract orders where find the
componenets
4.Sales BOM - BOM used to explode when some body orders the main materail
.Eg
can Sales
we showkit. main item (parent item) and sub-items (child item) in BOM .
these are nothing but formulation, which are used by PP...BOM-> Bill Of Materials
one product may have different formulations, and these different formulations can
be listed as alternate BOM by CS01
susequently we need to create production version for each alternate BOM bs C201

What are alternate BOM ? How are they created and where are they used ?

If the consignment (for example 10000nos) coming in batches (6 batches) how can
we create the grn for partial qty. Please give the solution immly very urgent
No problem, you can post as many no. of GR as u want. Change qty in MIGO to
partial which is received. PO will be open until you receive the total GR subject to
you have not specified the delivery date or you are receiving total qty before due
date.
First understand my question Same invoice number how can we create more than
one consignment coming in batches thats i want the result.
1. Your reply is very rude
2. If he didnt understand your question on epossibility is that you didn't ask what
you wanted to. He replied that is it possible to carry out several goods receipt for an
order. You didn't mention anything about any invoice.
3. This is a free forum and people post here to help others. Asking people to reply
immediately doen't help very much. They could simply tell you to go away and learn
how to work with the SAP system.
If you are doing IR after your last consignment and also if it is GR based IR,you will
be posting only one invoice for that p.o.
If I understand you, do you want to receive this stock in 6 batches?

I want a report about non stock item particular material with cost centre.
you mean to say that stock & value update. If that is the case select the option qty
update and value update in material type in customizing
Step 1
Assign Characteristics to Class
First you maintain all Characteristics in respective Class by transaction
CL02.
Step 2
Naw you can assign material to class by two ways :
MM02 : Select Classification view and Maintain data.
CL24N : Select the Class,and assign material to it

Note :As Class is get assign to material,Characteri stics are also get
assign.

what is full form IMG and SPRO ? How are they different from each other ?
IMG :- Implementation Guide. SPRO :- SAP Project Reference Object. SPRO----
-->IMG. Type in the T-Code SPRO under That got to Main Menu which is IMG.
I dont find any difference. For both meanings are same but usage is different.
dear there is no difference as such but if u think logically u will understand hw these
two differs.
Please let me know a SAP - TCODE to carry out Vendor Evaluation . Thanks
try MC$6
I have tried MC$6 but cannot get any existing data - should any configuration be
done HAVE
YOU before?to go to SPRO-->MM--> PURCHSING- ->VENDOR EVALUATION--
>*DEFINE WEIGHTING KEYS
*DEFINE CRITERIA
* DEFINE SCOPE OF LIST
*DEFINE PURCH.ORGN. DATA 4 VENDOR EVALUATION
Trnsn code for vendor evaluation is ME49.

One material document has been created in past in the period 03 2007. Now I want
to reverse that document. System is allowing me to do that . How can I do that .
first you have to approach FI for reversal of ERS then only you can cancel the
document
Goto MBST and try to do it

go to T/C MIGO , SELECT CANCELLATION , MATERIAL DOCUMENT give


document no. use mvt. type I O TWO

What is the integration between PM and QM in SAP ?


I Am working in an orgn where they are using name ,but you have to config number
ranges , external acceptable

What is the integration between PM,MM,FI,CO in SAP ?

I think there should not be a open P.O / P.REQ,


then only stock value can be changed,
similarly then only unit can be changed in M.MASTER

delivery schedule pending should also be nill,change info recod also.and then
change base unit of measurement

I have a different scenario. I have plant A with storage Locs A and B. The
requirements comes through on the sales side and are loaded as schedule lines for
each storage location( Representing different subsidaries) . We buy and sell at the
same time.
My problem is that I need to transfer this requirements as individual requirements
when I buy from the supplier. I'm also using plant A on the purchasing side. Up to
now it was ok to consolidate requirements from both requirements when generating
delivery schedules, now the process has to change.
I tried MRP areas before but I can't flag source list at this level. I use source list to
determine the outline agreement that MRP passes the nett requirements.

I am trying to create a new physical inventory document but I am getting an error


message as Physical invenotry document 9001 0001 50001 is already active.How I
can check that which are the previous physical invenotry documents still active.
Can you suggest me any t-code or any table from there I can get some information
of the previous physical invenotry document which are still active.
Use t. code MI24
Go to T-code MI03,in the Phys inventory doc text feild,click the drop down list and
on the next screen put your plant,you will see all the documents under your plant
and their status. Hope it will help

can anyone tell me about account category ref transaction key account grouping
key valuation grouping code how they are related what's there role in material
valuation.
Five key elements - Chart of accounts,account category ref,transaction key,account
grouping key,valuation grouping code will help to identify the G/L account which
has to be updated for any value involved transaction.
Chart of accounts - Group of G/L accounts.
ACR - Helps to group several valuation class and attached to material type.
Transaction key - For each transaction key,posting rule is predefined in SAP
through movement type and value string.BSX,WRX, PRD and GBB are the
transaction keys.
Account Group - An element which helps to further classify the G/L for offsetting
entries.(GBB)
Valuation
what grouping
is offsetting code -please
entries, Groupsexplain
together
thisseveral valuation areas for which G/L
with examples

Can anybody share some real time scenarios(user exits and BADI's) in purchasing,
IM and WM

suppose there is one material wherein the quality is active. After wrong stock
posting through T.Code QA32 how can one reverse the same to quality.
cancel the material document and you can see the inspection lot status will be
changed as cancel

My company wants to extract all the processed POs in a certian period ,for legal
purposes.They want to put the data on a CD Diskette. Can anyone help me to
achieve this. I'd appreciate your help.
go to table level and extract al those relevent datas

I have an urgent question. i have 2 items. I want to set up pricingprocure with a


frieght condition type at the header level and this should distribute the value at the
item conditions.

Suppose $ 100 for total freight entered at the header and it should get split in the
item. Problem is that i am getting 100$ for the both the items.

Could you let me know what config i need to do.

And the frieght 100$ should the hit the freight vendor account defined as a partner
function(FA)
you have to check the group condition in customizing of condition type
1.In consignment PO settlement when I run MRKO and choose processing
option "display" and display option "withdrawals not settled" I don't
get the document created during this transaction, I got the document no
which was created during MBIB with mvt type 411. After running MRKO
the info column says "not settled". If I change the processing option
to "settle" and display option to "settled withdrawals" same thing
happens with only difference in info column shows "No tax info found".
In this case also I don't find the document no. Then how I will settle
the vendor liabilities and see the detailed ac postings? Please help me
in details.

2. What is the difference between PB00 and PBXX. Can you please give an
example with business scenario where we can change the condition in
PBOO according to business need?

Maintain the taxes in consign info record. Then run the settlement program again
ans for 1st question:
any invoice if u want to post u should have
1.Consignment info record with taxcode.
2. In vendor master u should tick an option ERS settlement i.e.u have to activate
this vendor is an ERS vendor(In purchasing screen)
3. this means that wrt to GR u r doing IR. so u also have to select an option GR
based IV.
If u have these prerequisites u can do MRKO.
the function of this T-Code is system automatically creates Invoice instead of
manual.
for 2nd question:
If the system picks the price by any source (i.e. masters like inforecord,
quotation,and SA) the condtion is PB00.(condition with
masters maintained)
We have a requirement to maintain in SAP stock levels of material xyz.

We will have the following scenario where a particular tonnage of the


stock will be owned by the company and therefore will need to be
valuated but we will also have stock of material xyz where we are only
performing a service by storing the stock in our warehouse, client will
be charged by the tonne, there can be multiple clients for material xyz,
we do not want to value this stock in SAP.

The business requirement is to report on total stock levels of material


xyz, as well as to differentiate between company owned stock and stock
warehoused for clients.

The question is what is the best way to configure SAP to support this
business process? Want to maintain only one material if at all possible

my client has many plants (each state as a plant)


he wants saperate release strategy for each plant for PO.
for example in up plant the PO limit is >50000 to released by plant
hod. How it is possible ?. because in PO release procedure we maintain
Co. wise Release Strategy. Pl explane steps.

You can maintain Plant (as many as you have in SAP )while defining the release
stragies.
if release stratedy has to work for individual plants,u have to
maintain strategy for plants. For the following field maintain edit
characteristics and assign to ur class.

hints
Table name:cekko
Field name:werks.

Check and Reply,


Can anybody tell me the following master datas will be maintained at what level ?
that is either client level/company level/plant level/ Purchase organization level ?
1. Material Master
2. Vendor Master
3. Service Master
4. Inforecords
5. source lists
6. quata arrangement
MMR at Client, Plant and stor olc
VMR at client, Comp Code and Pur Org
SMR at client, Plant
Info Rec at client plant and pur org level
Source list at Plant level
Quota arrangement at Plant level.
I hope this will help u.

Pls.guide me with the following. I have configured CIN for my client & have reached
till Invoce capture & Posting too. However i am not able to see any excise Register
updated.
For ref : I have maintained the Bed Set off % (JMOP),AED Set off % (JAOP),SED
Set off% (JSOP). Because of the maintainance of these Condition type the excise
duty is getting calculated in PO (ME21N),I am able to capture Invoice at MIGO too.
However
FV11, after posting the same Excise Invoice my Excise Registers are not getting
J1ID

I wants to attach a word document with PO. How it is possible.


The word doc can be attached by clicking the icon for " SERVICES FOR OBJECT"
just above the icon " DOC OVERVIEW".
SAVE your P.O.
Again go for change P.O
GO FOR menu-->system- ->service for object button
click this ,
say create attachment ..
select the file fm window directory ,
system shows massage " service create attachment started ..."
save the P.O again
If the Validity End Date of a scheduling agreement is in the past, meaning that this
Scheduling Agreement is overdue, what can I do on it? GR? IV? Pay? Create new
delivery note? Change the Validity End Date ? Change target QTY?.... Can anyone
give me a clear summary on this issue?
U just check that SA release with JIT schedule. It may help u to solve the
Problem.Customise in MMR and VMR.

what are the types of procurements in MM

I am in a tricky situation , after GRN / INVOICE & CREDIT MEMO , How can i
cancel
First GRN..
You have to reverse Invoive / Credit Memo.without that you cann't revese
GRN. , use t-code mbst to cancell grn
There is setting in customization for doc reversal after invoice creation please
check in Materials management-- > Inventory Management and Physical Inventory--
> Goods Receipt-->For GR-Based IV, Reversal of GR Despite Invoice.

In Purchase Order, there are Invoice with Tax details ,which I can see. But at the
time of Goods Receipt(Movt Type 105), Excise Invoice Tab is not getting displayed.
Pls. suggest the solution for the same.
Pl. maintain excise relevent information through t code j1id
Before GRN you have to maintain J1id for material with required excise details.
Then in the Tax box you can check excise calculation is coming and Excise Invoice
tab will also appear in GR.
Scenario is as follows:

(Rate unknown) Manufacture( nirma)

Rate Known Dealer(jain acid


PO

(Rate, Amount Qty is mentioned and remarks provided for provision Excise
Duty

Continue

GRN

continue

Invoice

(Tax Invoice + Duplicate for Transporter Copy)

Dealer Manufacture

For provision of Excise Duty


This scenrio is called first stage dealer. You make the P.O against your supplying
vendor. maintain exception rate in j1id also.

can anyone tell me about call tracking system in sap?

can anyone tell me about the release procedure for purchase requisition. what are
the table and feild name required for it

iam new to mm.i have a problem regarding message out put determination. when
iam assigning my own out put device(with all IMG settings),after creating a
purchase order,iam getting the purchase order number also.but when iam checking
with me9f,the message is "no such documents are avilable ". I don't under stand
where is the problem.please can any one give me the answer.
I have configured pricing procedure with header freight condition type.(FRB1) with
Vendor in GR field as 2.

I have configured the partner function, VN for vendor, CR for frieight forwarder for
purchase order also.

When i do good receipt for the PO , i get a freight tab in which only the vendor
defined for partner function VN is displayed. I have to manually change to frieght
forwarder CR for each and every item in MIGO. After this i was able to process
MIRO for goods vendor VN and frieght vendor CR seperately.

But i want the partner function CR-frieght forwarder to be automatically picked up


from the partner schema when i do MIGO.

Has anyone come across this scenario and could help me?

go the the condition record itself and maintain the CR-frieght forwarder in the
details.
what are the types of procurements in MM.
They are External Procurement and Internal Procurement

How do we handle unplanned and planned scrap in subcontracting?

Anybody can guide me how to mainatain fuel management in SAP ECC 6.0. I need
the techonology urgently.
This is pipeline material accordingly the configuration to be done.

I shall forward you EXCISE FOLDER attachment which would help you in excise
issues ( possible to post on or before saturday )
Don't be so panicky ,
i
I feel you need to maintain FUEL as
*material type PIPE.
*CREATE P.I.R. with info category as " PIPI LINE "
* NO P.O.
*NO G.R.
*G.I.with mvt type two oh one ( 201 )
ACCOUNTING DOCUMENT :
consumption account :+
consignment /pipiline payables ( minus )
SETTLEMENT OF PIPI LINE :
* go to MRKO
*GIVE VENDOR / COMPANY CODE
* check "PIPILINE " , " Not Settled "
*RUN
system generates invoice for all documents
ACCOUNTING DOCS :
VENDOR :( MINUS )
CONSIGNMENT PAYABLES :( PLUS )

Thanks for the idea, but I want to know how to issue the fuel among say 500 nos of
various vehicles in one sort, we are having PM module .
So i need to distribute a lumpsum qty of fuel among the 500 nos of vehicle, how to
manage ?

I m facing a problem for making release orders for value contract. System is
allowing to create release order exceeding target value. For example, if target value
for contract is 50000, then system should give error msg if it creates PO more than
value
u 50000
've to make settings in system messages the path is SPRO -> MM -> Purchasing -
> Environment data - Definne attributes for system messages. in that u've to
maintain (00-06-042) Version 00 - appln area 06 - No. 042. as error / warning.
thanks its done

Cleint want to create a reservation on cost centre(201) and then want to issue
material using same reservation to a Asset(241). Is it possible or any workaround.
In reservation once you create you can't change account assignment catagory. so
from cost centre to asset account you can't change
Please give me the answers of the following interview questions. I
have to face an interview this week.

1. What is segregation of materials?You are procuring same


material from 2 vendors, one of them has consignment Contract with
you.How the materials would will be segregated or procured?

2. Release PO/PR with classification. What is Classification?

3. Give the business scenario for automatic creation of storage


location. Where, when and why we need it?

4. You need to change the price shown in PB00, Can you change
it? How?

5. How client will know that material procured will go to the consignment stock?
(With item category K in PO but how it will be configured in the system so that
every time you don't have to mention it in the PO).
2. in classification you can check both at item and at header level.
4. you can change it in po or in info record in condition.
The following are the answer of your questions:

Ans 1:
You can split the material by using batch management. For this you have to
extend the material in MM01.

Ans 2:
Classification means that you can release the document either at item level
or header level. We can release PO only at header level means with
classification. For PR we can use both. All the external documnets we use
with classification and for Internal documents we can use both.

Ans 3:
When we do the GR then we have to decide that we want to creat automatic
storage location at that time or not. If not then we give manually storage
location in GR. If Yes the we have two scenarios for creating automatic
storage location: 1. Plant Level 2. Movement Level. In this you can
customized for which particular plant or for which particular movement type
you want to create automatic storage location.

Ans 4:
Yes you can change the price by changing the calculation schema. In which
you have to change the condition type and the values assigned to it.

can you please clarify me about

1.what is meant by standard purchase org. and where to we define it?

2.In a consignment process we make a PO with otem category K and while making
a GR what is the movement type to be used 411 K or 101? please explain me the
consigmn\ent process.

3.when i am posting the invoice documents it is throwing an error 51 number range


for year 2007 is missing and when trying to maintain in FBN1 it is showing no free
intervals exit or enter intrevals with out over lap.
Question 1
*Ans: *If for your plant you have more than one purchasing org then you can assign
one purchasing org as standard pur org for the transaction *Piplline procurement,
Consignment and Stock Transfer*. We only assign one pur org to plant as a
standard pur org in *IMG-Enterprise structure-Assignmen t-Material management-
Assign standard pur org to plant*
Ques 2
*Ans: *First of all you have to recieve the Consignment PO by doing MIGO with 101
K. And after that you have to do the Transfer posting by MB1B using 411 K. The
process is very simple: As you recieve the Consignment PO, the material is still
belong to the vendor but in our premisses. Thats why we do the transfer posting for
the quantity of material you need from consignment stock. You can transfer the full
quantity in to your own stock.

Ques 3
*Ans:* You can maintaine the number in FBN1, if you are still facing problem ask
can u please explain me about the role of mm consultant in CBP consumption
based planning?

I am using ECC 5.00. Can you please tell me what change number in MM01 initial
screen. How can I create or see the change number,please

when i am trying to create rate routing(ca21) ,i am getting a warning message while


allocating work centre to activity type. the error is as follows:Activity type 1422 is not
set up for cost center 1000 4230 in the year 2007. if i ingone this message and
proceed,i am not able to get the cost in prouct cost collector,

Please tell me the report of materila list with rate


MM60 & MC.a
Try ti use the T.Code: MC.a Materials Anlaysis. The said report will show the
Material Number (Material MAster) and the moving average (MAP).

Please help me how to get the details in the material type

I have a specific requirment. I want the document type of purchase order to be


displayed somewhere in MIRO screen when I do the MIRO. Pls help me out.
I feel that when the cost of P.O. is divided into several objects, The only option will
be to go for " MULTIPLE ACCOUNT ASSIGNMENT ", we have * account assign
P.O. , When procurement is for consumption ,material is issued for cost centres for
consumption. .. * I would love to hear if there is any other possibilities. ..

Can any body tell me what is meaning of "EVALUATED RECEIPT


SETTELMENTS" , in SAP MM we are using MRRLT-code for this. Kindly give me
some
if example
you have also.
an agreement with the vendor that they do not need to send you a
physical invoice every times something is delivered you use ERS. Using this
procedure whenever a goods recipt is posted against a PO you can run the
transaction MRRL which in turn creates an invoice against that vendor.
BEfore you use ERS for that vendor in the vendor master ERS & GR based IV
fields must be flagged. also in the PO we should mae sure that the ERS flag
ison(generally this flows in from the vendor master)

I want to know why I am unable to create a P.O. with reference to a Scehduling


Agreement. Please help me ASAP.
I had noted some points while implementing Scheduling agreement at my place. try
to go through it & let me know, it's working or not. Find attachment here

I want to know
1) Can we change the storage location in material master record once it is saved. If
yes how, if not why?
2) In the scenario like " if we are sending some unfinished material to vendor to
carry out some operations on it and return it back. Ex: we r subcontracting
automobile Engine to carryout operations like milling/reaming and return it back to
complete inhouse operation. how can we do this?

i want to pay the freight to freight. pl tell me how it is possible in miro


We can add freight charges as unplanned delivery cost in inovice item in HEADER -
Detail Tab while MIRO.
Pls go throgh this
If you want to block MIRO, first of all you have to do
some settings in Vendor master.
Go through - XK02 Vendor change mode select Company
Code Data in that Automatic payment transactions, in
this tab select payment block and give the block
indicator A. If you set this indicator it will be
affected on invoice during MIRO.

Hi

Please find details for the GR/IR Clearance account in SAP system

GR/IR Clearing Account Maintenance

Quantity differences between goods receipt and invoice receipt for a


purchase order result in a

balance on the GR/IR clearing account.

_ If the quantity invoiced is larger than the quantity received, the


system then expects further

goods receipts for this purchase order to clear the balance.

_ If the quantity received is larger than the quantity invoiced, the


system then expects further

invoices for this purchase order to clear the balance.

You can also clear differences for delivery costs.

If no more goods or invoices are to be received, you must clear the

Das könnte Ihnen auch gefallen