Beruflich Dokumente
Kultur Dokumente
User
benefits
> Improve
user comfort
by optimising
lighting
operation.
> Increase
the lighting
installation
life time
LOW B: Lighting Optimisation (by up to 20%).
in Warehouse
> Postpone
light
Solution
M
anage building work hours, peak activities and
days off. replacement
expenditure.
A
utomatically adapt brightness.
P
reserve lifecycle with progressive powering up
> Save money:
and balanced wear.
up to
O
verride and bypass control of the installation. 16,000 kwh/year
S
chedule maintenance by the measure of light for a 4,000 m
time operation. logistic building.
LOW B: Lighting Optimisation in Warehouse
LOW B
Sensors
I1 I2 I3 I4 I5 I6 I7 I8 I9 IA IB IC ID IE IF IG
ZELIO logic
26 I/O - 240 VAC
Control circuit
of power Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 QA
relays
PHASE 1 PHASE 2 PHASE 3
Your EcoXpert
Features
+ Simple integration with existing installed products
(contactors, impulse relays, etc.).
+ Single bypass override for warning and
2012 - Schneider Electric - All rights reserved.
emergency situation.
+ Easily adjusts to natural light.
Schneider Electric Industries SAS As standards, specification and designs change from time to time, please ask for confirmation
35, rue Joseph Monier of the information given in this publication
CS 30323
F- 92506 Rueil Malmaison Cedex This document has been printed on ecological paper
COM-POWER-WP29_EN 12-2012