Sie sind auf Seite 1von 8

Proceeding of 9th International Seminar on Industrial Engineering and Management

ISSN : 1978-774X

DESIGN OF STANDARD OPERATING PROCEDURE (SOP) OF DESIGN AND


DEVELOPMENT OF PRODUCT ACCORDING TO ISO 9001:2015 CLAUSE 8.3
BASED ON RISK BASED THINKING BY BUSINESS PROCESS
IMPROVEMENT METHOD AT CV. XYZ

Rindy Aprilina Gita Prastyanti1, Sri Widaningrum2, Heriyono Lalu3

Faculty of Industrial Engineering, Telkom University


Jl. Telekomunikasi No.1 Bandung Indonesia
1rindyaprilina@students.telkomuniversity.ac.id, 2swidaningrum@telkomuniversity.ac.id,
3heriyonolalu@telkomuniversity.ac.id

ABSTRACT
CV. XYZ is a manufacturing company that produces spare parts for motor vehicles. As an
organization of supplier spare parts, CV. XYZ important to determining quality of the product
and develop product design.To improve the quality of products, CV. XYZ needs to renew the
latest standard ISO 9001: 2015. In this standard application of risk-based thinking is done to
anticipate the risks that may occur. This paper proposes draft Standard Operating Procedure of
Design and Development of Product by clause 8.3 of ISO 9001: 2015. This procedure improved
by Business Process Improvement method to obtain simplification of business processes.
Key words: ISO 9001:2015, Business Process Improvement, Standard Operating Procedure

1. INTRODUCTION way that made by the company in carrying out


its work and guidance in implementing quality
CV. XYZ is one of the suppliers of spare management system.
parts for motor vehicles and play an important
role in determining the quality of the product 2. THEORETICAL BACKGROUND
and perform product design development.
Process design and development of products 2.1. ISO 9001:2015
already owned by CV. XYZ where the
company focuses on the manufacture of mold ISO 9001: 2015 is an international standard
of products. Although it has implemented for quality management systems. ISO 9001:
QMS (Quality Management System) ISO 2015 is a result of the review and a change
9001: 2008, but now the company has not from the previous ISO 9001 which is standard
implemented the ISO 9001: 2008 to its full requirement that is used to access the
potential due to documenting the design organization's ability to meet customer and
process and product development is still regulatory requirements as appropriate. ISO
done poorly. 9001: 2015 has the structural changes that
To improve the quality of products, CV. the High Level Structure (HLS) developed
XYZ needs to update its standards to ISO into 10 clauses to maintain harmony with all
9001: 2015. In this standard application of of the standard management of existing
risk-based thinking is done to anticipate the systems, as well as the necessary application
risks that may occur. Risk register is of risk-based thinking is that the organization
documented information that validates an must identify the risks in order to avoid
organization has done the risk-based thinking undesirable results in the running process
(Bob Deysher, 2015). business.
This research focuses on the design of Clause in ISO 9001:2015 structure are :
the Standard Operating Procedure (SOP) for a) Clause 4 - Context of the organization
the design and development of products by b) Clause 5 - Leadership
clause 8.3 of ISO 9001: 2015. From the c) Clause 6 - Planning
results of this design is expected to CV. XYZ d) Clause 7 - Support
has SOPs that can be used as a standard e) Clause 8 - Operation

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 1
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

f) Clause 9 - Performance Evaluation Table 2. Impact


g) Clause 10 - Improvement Impact Description Rating
Disaster All targets cannot be I
In ISO 9001:2015, PDCA cycle can be (D) reached
applied to all processes and quality High (H) Important goals II
management system as a whole that clause cannot be achieved
4 to clause 7 is phase plan, clause 8 is phase Medium Affect the III
do, clause 9 is phase check, and clause 10 is (H) achievement of some
phase action. This figure show how clause 4 targets
to clause 10 can related in the PDCA cycle. Low (L) Minor damage which IV
Quality Management System (4)
can easily repaired
Very Little impact against V
Support (7),
Operation (8)
Low targets that can be
Organization
and its context
(4)
(VL) ignored
Plan Do
(Source: Leo J. Susilo, 2010)
Customer
satisfaction

Customer
Performance Result of
Third stage is risk evaluation, which was to
requirements Planning (6) Leadership (5)
evaluation (9) the QMS
determine which risks require treatment.
Products Table 3. Risk Rating
and services

Act
Needs and
expectation of
Check
Impact
relevant interested Probability
parties (4)
Improvement VL L M H D
(10)

VH M H H VH VH
H M M H H VH
Figure 1. PDCA Cycle M L M H H H
L L L M M H
2.2. Risk Assessment VL L L M M H
The risk assessment is one of the risk (Source : Leo J. Susilo, 2010)
management process that have 4 stages.
First stage is risk identification, which lists the Last stage is treatment of risk, namely
risks that may affect the achievement of selecting the options that can reduce or
organizational goals. Second stage is risk eliminate the impact and likelihood of risk.
analysis, which analyzes the sources,
opportunities, and the impact of risk 2.3. Risk Register
occurrence. Risk register is simply a documented record
Table 1. Probability Matrix of the identified risks, their significance or
Criteria Probability Description Freq/year rating, and how they are managed or treated
Very 0.10 Hardly 1-5x (Bob Deysher, 2015).
Low possible
2.4. Standard Operating Procedure (SOP)
(VL)
Low (L) 0.30 Less likely 6-10x SOP is a guide to ensure the operational
occurred activities of the organization or company
Mediu 0.50 May occur 11-20x running smoothly (Arini, 2014).
m (M) may not. The benefits of such SOP such a explain in
fifty-fifty detail the activities of the process being
chances undertaken, standardize all activities
High 0.70 Likely to 21-50x undertaken by the parties concerned, and
(H) occur improving the consistency of a job.
Very 0.90 Almost more than
High certainly 50x 2.5. Business Process Improvement
(VH) occur
(Source: Leo J. Susilo, 2010) Business Process Improvement (BPI) is a
systematic methodology developed to help

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 2
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

an organization make significant advances in Data is lost or not available when R-08
the way its business processes operate needed
(Harrington, 1991). Do not have a copy of the data as R-09
information for companies
3. RESEARCH METHOD The design process can not proceed R-10
to the next stage
Actual Condition of CV. Requirement ISO Repeating the sample until approved R-11
XYZ 9001:2015 Clausal 8.3
customers

b. Risk analysis
Activity List of Risk
Gap
Identify This step is after risk identification in
which the author doing interview to
Risk Assesment determine how much impact and
probability for each failure in each
Risk Register process of design and development in the
organization. Then, doi the risk rating to
determine the level of risk that will be
SOP Design and Product Development Based on ISO 9001:2015 Clausal 8.3 selected for evaluation.
Metode Business
c. Risk evaluation
Process Improvement
(BPI)
From the risk analysis, then determination
of risks which require priority treatment
SOP Design and Product Development Based On ISO 9001:2015 Clausal 8.3 That
Has Meets Requirement Method Using BPI Method and how priority treatment of such risks.
Table 5. Risk Evaluation

Figure 2. Conceptual Model Proba Impact


bility VL L M H D
The initial stage is to fit the actual conditions VH
CV. XYZ with the requirements of ISO 9001: H
2015 clause 8.3 and will bring up the gap and R-02
the list of activities for the identification of R-03
M R-06
risks. Then, from the list of activities are R-09
R-08
carried out consideration of the risks that may R-04
occur from any activity undertaken, known as L R-05 R-11
a risk assessment process that includes the R-07
step are : R-01
a. Risk identification VL
R-10
Risk identification is obtained from
potensial risk and list of activities from d. Risk treatment
comparison between actual condition and This step is preparation of plan how the
requirements clause 8.3 ISO 9001:2015. selected risk treatment will be applied. In
Table 4. Risk Identification this step can be using fishbone diagram
to help to determine treatment of these
Risk Code
risks by determination about the cause of
Shortages of raw materials R-01
Nonconformity mold products with R-02 risks previously.
customer's wishes From the results of the risk assessment
Output not fullfiled the requirements R-03 process, and then will be done the
of input design and user desired manufacturing risk register where the risk
Nonconformity of output to input R-04 register and the identification gap will be input
design in the design manufacture SOP. In designing
Failure of product R-05 this SOP will produce SOP, then this SOP will
Failure of mold product R-06 be improve using Business Process
Unable to make improvement R-07 Improvement (BPI), which the BPI method is

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 3
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

done in 2 stages of analysis to business employees do the activity that way all the
process improvement. First, the value added time. Upgrading to making effective use of
analysis phase is an analysis of every activity capital equipment and the working
in the business process to determine its environment to improve overall performance.
contribution to meeting end-customer Automation and/or mechanization to applying
expectations (Harrington, 1991). This phase computers.
proposes to classify each activity of the The results of this study are SOP Design and
process into three types, among others, Real Product Development Based on ISO 9001:
Value Added (RVA), Business Value Added 2015 Clause 8.3 That Has Meets
(BVA), and Non-Value Added (NVA). Requirement Method Using BPI.
Second, streamlining stage suggests the
trimming of waste and excess, attention to 4. RESULT AND DISCUSSION
every minute detail that might lead to 4.1. Risk Register
improved performance and quality
(Harrington, 1991). Table 7. Risk Register
No R P IS RR RT
Table 6. Value-Added and Streamlining Nonconformity M M H Risk
Activity Classification Streamlining products with transfer
1
Conduct RVA Automation customer's
meetings and/or wishes
design input mechanization, Failure of mold M M H Risk
2
determinatio Standardization product Mitigation
n Data is lost or not M M H Risk
Conduct a BVA Standardization, 3 available when Mitigation
review of Automation needed
engineering and/or
drawings mechanization, Note :
Upgrading R : Risk
Preparation RVA Automation P : Probability
of production and/or IS : Impact Scale
mechanization RR : Risk Rating
Check BVA Automation RT : Risk Treatment
availability of and/or
material mechanization First risk is about nonconformity products
with customers wishes. Type of that risk
Review the BVA Simple treatment is risk transfer which is distribute
product Language, risk with other parties (customers). This risk
design output Standardization, treatment is listed in procedure in activity of
Automation giving product sample to customer. Second
and/or risk is about failure of mold product. Type of
mechanization, that risk treatment is risk mitigation which is
Upgrading action to reduce unwanted effect. This risk
Informing the BVA Upgrading treatment is listed in procedure in process of
results of making mold products, where the machine
design and operator must have the training and
development requirements ever experienced operate CNC
machines. Third risk is about data is lost or
not available when needed. Type of that risk
In this research will be used tools treatment is risk mitigation which is action to
streamlining that in accordance with business reduce unwanted effect. This risk treatment is
process that is. Simple language to making listed in procedure in activity design control in
our documents easy to comprehend by all which the organization should make a copy of
who use them. Standardization to selecting a the document as well as making the storage
single way of doing an activity and having all media.

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 4
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

4.2. Design SOP of Design and employee so that business processes can be
Development of Product controlled.
The design of SOP has considered, among 6. REFERENCES
others: First, SOP has considered of (a) Deysher, B. (2015). A Risk Based
requirement. Design SOP is done to meet
requirements of ISO 9001: 2015 clause 8.3, Thinking Model for ISO 9001:2015.
and to address the gap between the actual
conditions of companies with requirements. (b) Harrington, D. H. (1991). Business
Second, SOP has considered of risk register. Process Improvement. New York: Mc-
In addition to the results of gaps identification, Graw Hill.
risk register also be input in the design of (c) Hopkin, P. (2010). Fundamentals of Risk
SOP. Then the treatments result of the risks Management. United States: Kogan
inherent in the risk register are listed in the Page.
SOP on the activity product samples giving,
control design, and manufacture of molds (d) Leo J. Susilo, V. R. (2010). Manajemen
product. Third, SOP has considered of Risiko Berbasis ISO 31000. Jakarta:
streamlining in BPI method. The design of Penerbit PPM.
this SOP is the result of improved with BPI (e) Arini, T. (2014). Mudah Menyusun SOP.
method by streamlining tools i.e. language Jakarta: Penebar Plus.
simplification for reducing form complexity,
automation and/or mechanization to reduce
the use of paper, standardization to AUTHOR BIOGRAPHIES
standardize forms and processes, and
upgrading to improve job performance. Rindy Aprilina Gita Prastyanti is a student
Fourth, SOP has considered of company in Industrial Engineering, Faculty of Industrial
needs. The design of this SOP is expected to Engineering, Telkom University, Indonesia.
assist the company in establishing, She was a assistant of the Work Design and
implementing, and maintaining the design Ergonomic Laboratory and staff of Quality
and development process. Fifth, SOP has System Engineering Profession. Her e-mail
considered of effectiveness. The design of address is
SOP is already involves other related rindyaprilina@students.telkomuniversity.ac.i
procedures i.e. results for the output material d
procurement process design and production
processes for product realization. Sri Widaningrum is lecturer at Industrial
Engineering Faculty, Telkom University,
5. CONCLUSION Indonesia. She obtained BSc in Industrial
Risk registers contain information such as the Engineering, Universitas Pasundan,
risks of treatment elected to do. In this study, Indonesia, and Master in Industrial
the risks that is elected are, nonconformity Engineering, ITB, Indonesia. Her research
products with customer's wishes, failure of area is Quality Assurance and Management.
mold product, and data is lost or not available She is also a head of Quality Assurance
when needed. System in Telkom University. Her e-mail
This research result is the SOP design of address is
Product Design and Development that covers swidaningrum@telkomuniversity.ac.id.
all stages of design starts from design input,
control design, and output design. Heriyono Lalu is lecturer at Industrial
To improve business process with Engineering Faculty, Telkom University,
streamlining using automation and/or Indonesia. His research area is Agent Based
mechanization, can be reconsidered because Modeling and Simulation System Analysis
the organization need more cost for and Design System Thinking. His e-mail
implementation the application. address is
In applying the ISO 9001:2015, the heriyonolalu@telkomuniversity.ac.id
organization need to involve the entire

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 5
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

APPENDIX A
Design and Product Development Procedure (1)

Process Flow Process Description Record

Start

1.a. Director of design input determination to conduct


1. Director, PDND, dan and meetings and joint product development PDND 1. Design & Product
PRD manager and Manager of PRD. Input design specification Development Form
form, function, and form of products
Conduct meetings
1.b. Design products based on receipt of customer
determination of product
orders
design and development input
1.c. The results of this meeting will be documented in
the Form Designer and Product Development,
then submitted to PDND to be made the product
design.

2. PDND 2. PDF create engineering drawings of product 2.a. Engineering Drawing of


designs that will be made based on the design Design Product
Creating a product design and development input, using Solidworks 2.b. Design and Product
engineering drawings software. Development Form

3.a. Head of PDND reviewing engineering drawings 3.a. Engineering Drawing of


3. Head of PDND
whether in accordance with design input. Design Product
Conduct a review of the 3.b. If there are changes in technical drawing will be 3.b. Design and Product
engineering drawings recorded to the Form Design and Product Development Form
Development and then returned to the second
process.
3.c. If the engineering drawings have been completed
then will be done verification and validation to
ensure that the input meet the requirements and
the use is desired.
4. Director 4.a. If the product input does not match then back to 4. Design and Product
Perform verification and process 1. Development Form
validation of input products 4.b. If the input of products have been appropriate,
the Director approved the form and then handed
over to assistant manager of PRD, assistant
manager of machining, and head of PDND.
5. Assistant Manager of 5.a. Asman PRD and Asman Machining make 5. Production Preparation
PRD, Assistant Manager of preparations for the planned production of Form
Machining material needs, machinery, mold of products, and
production operators.
5.b. Needs are recorded in Form Production
Preparation of production Preparation.
5.c. Form submitted to the Human Resources
Manager to be verified and validated

6.a. Manager of PRD verify and validate Form


6. Manager of PRD 6. Production Preparation
Production Preparation.
Form
6.b. Form made copies, and handed over to the PRD
Perform verification and and Asman machining, PMTC, and warehouses
validation Form Preparation PIC
Production

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 6
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

Design and Product Development Procedure (2)

Process Flow Process Description Record

7.a. PIC of Warehouse check availability of material


required by Production Preparation Form.
7. PIC of Warehouse 7. Purchase Material
Submission Form
7.b. If the material is still available, then the process
Checking the availability of continues to manufacture mold design products.
material 7.c. If the material is not available, then apply for the
purchase of materials.

8. PMTC 8.a. PIC of maintenance required to check the 8. Machine Checking Form
readiness of the machine.
Check the readiness of 8.b. PIC of maintenance perform checklist in Testing
machines required Machine Form.

9. PDND 9.a. PDND make mold design products i.e. top dibble 9. Engineering Drawing of
plate and bottom dibble plate using Solidworks Products Mold
Make a mold design of software
products
9.b. The results of the design that have been made
then submitted to the programmer.

10. Programmer 10.a. The programmer checking the engineering


drawing of product s mold.
Creating a CNC program in
accordance with the product 10.b. If the mold engineering drawings according to
to be made the requirements then product has continued to
manufacture CNC program.
10.c. If the mold of engineering drawings has not
according to the requirements then the product
has returned to the process 8.
10.d. The results of the program and then submitted to
the CNC operators to resume production process
of products mold

11. Operator of CNC 11.a. CNC operator do the production process of


products mold using CNC machines and guided
Producing mold of product by the document Work Instruction of The Use of
CNC Machine.
11.b. CNC operators must fulfilling the requirements,
such as:
1. Attended training
2. Experienced operate CNC
11.c. The printed product delivered to the assembly
operator to be assembled.

12. Assembly operator assembles products mold into


12. Assembly Operator
finished products mold by combining the top
dibble plate, the bottom dibble plate, spring, and
Assemble mold of products ejector using open and wrench.

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 7
Proceeding of 9th International Seminar on Industrial Engineering and Management
ISSN : 1978-774X

Design and Product Development Procedure (3)

Process Flow Process Description Record

13. QC Operator 13.a. QC operator reviews and verifies finished 13. Inspection and Product
products mold. Measurement Form
Review and verify product
mold 13.b. If printed product conforms to the requirements
then proceed to production operators.
13.c If printed product does not meet the requirements
then it's back to the process 10.

14. Production Operator 14.a. Production operators experiment the production


output of the product design.
Experimenting production 14.b. Production process of product design output
output of product design based on Work Instruction Use of Injection
Machine.

15.a. Head of PDND conduct a review of output to


15. Design and Product
15. Head of PDND input predetermined design.
Development Form
15.b. Results of the review output recorded in Design
Review the product design and Product Development Form
output
15.c If it does not pass the review step then back to
the process 1.
15.d. If it passes the review stage then submitted to the
Director for verification and validation.
16. Director 16.a Director verifies and validaties the output of 16. Design and Product
Perform verification and Design and Development. Development Form
validation of the Output
Design 16.b The report that has been verified and validated
then made copies, and then submitted to PDND.
The original form stored in the archive at the
design and development of document control.

17. PDND inform product design and development 17. Handover Sheets of
17. PDND
results to PIC of Marketing Product Design and
Development Result
Informing the results of
design and development

18.a. PIC of Marketing provides sample design and 18. Official Report of Product
18. PIC of Marketing Samples
development of products to customers.

Providing product samples 18.b. Organizations must establish policies for each
results of design and customer to supervise the product samples before
development to customers mass production.

Finish

Design of Design & Development Procedure


(Rindy Aprilina Gita Prastyanti) 8

Das könnte Ihnen auch gefallen