Sie sind auf Seite 1von 12
far FUTUR FRAME SHORING SYSTEM HIGH CAPACITY WITH RAPID STRIPPING & ERECTION Light Weight is the Key Future Form Frame Shoring System Future Frame Shoring System System Introduction Lightweight aluminium frames with high capacity and flexibility. Unique design for rapid stripping and erection. It can be erected by only 2 men with no help from a crane. Main Advantages: + Safe working load of over 80 KN * Unique turn lock bracing system allows 2 workers with a hammer erect & rapid stripping the system + Light weight aluminium frames not more than 20 kg + The aluminium alloy structure eliminates the metal rusty factor of structure collapse and lasts longer. + 4-way frame connection between the leg which improves stability. + Provides high cost efficiency and fast workflow + Provides maximum safety even with large shoring heights + High recovery value for the used materials + Variety of applications which suits any structure Why Aluminium Alloy 6061 + Light weight and durable + 2workers can make the building happen, which could save the construction cost greatly Alloy 6061 Chemical Analysis Liquicus Temperature: 12067 —Soliaus Temperewre: 1080'F Density: 0.098 fn* Porcent Woight Elomonts Others thors Sf Gyn MQ Ge 2) Tatal) = lumizum Minimum oo = Ss @ Fo ow FS = = Maximum 8740184235 545 Remainder Mechanical Properties: Ultimate Tensile Strength= 310 Mpa_Density Tensile Yield Strength = 280Mpa__ Modulus of Elasticity Elongation at Break = 10% Poisson's Ratio ‘Alloy 6061 is one of the mast widely used alloys in the 6000 Series. Alloy 6061 has excellent corrosion resistance to atmospheric ‘This standard structural ally, one of the most versatle of the heat- conditions and good corrosion resistance to sea water. This alloy treatable alloys, is popular for medium to high strength requirements also offers good finishing characteristics and responds well to land has good toughness characteristics. Applications range from anodizing: however, where cosmetic appearance is critical, consider transportation components to machinery and equipment applications the use of alloy 6063. The most comman anodizing mothods include to recreation products and consumer durables. clear, olear and color dye, and hardooat. Light Weight is the Key Future Form ERIE] Frame Shoring System Future Frame Shoring System Main parts of Future Frame System 1- Base & Top Leg: Aunique double aluminium section which greatly improves the stability and offer the 4 grooves for the frame bracing to be connected easily The hooks at the bottom or top could hook the screw jacks tightly The function of the base & top leg is assembled with the base or top screw jack ‘ | | ’ Assembled with base Assembled with spigot Assembled with Bracing Frame screw jack & Main leg Assembly Reference Light Weight is the Key Future Form Frame Shoring System Future Frame Shoring System 2- Main Leg: + The section of the main leg is the same as the bottom & top leg + Main leg is assembled with the bottom or top leg by the spigot + Main leg is connected to bracing frame by the fast lock coupler + Maximum working load capacity of the leg is 80 kN Main Leg 1200mm 4.14kg Main Leg 1500mm 5.17kg Main Leg 1800mm 6.20kg Main Leg 2100mm 7.24kg Main Leg 2400mm 8.27kg Assembly Reference The unique design of the bracing frame guarantee that all the assemble work is just turn and lock in 3- Steel Bracing: Lateral Bi Si Galvanized steel lateral braces are ateral Braces Sizes used to connect frames together to Hole to Hole Total form the slab grid, easly connected Dimension Dimension to main leg grooves with A-Bolt Light Weight is the Key Future Form Frame Shoring System Future Frame Shoring System 4- Main Beam & Drop Head: 100mm drop can be achieved using the Drop Head which gives room to strike all the horizontal components including the Hori- zontal & Diagonal Braces of the main frame assembly and leaving only the vertical components as back-propping, 3 to 4 days cycle can be achieved with a cost effective solution (2 sets of vertical components + 1 set of horizontal components) fhe 5- Frames assembled: A= Main Leg length in m B= Horizontal Brace length in m 1.20 1.80 2.10 2.50 1.20 0601212 | 0601218 | 0601221 | 0601225 1.50 0601512 | 0601518 | 0601521 | 0601525 1.80 0601812 | 0601818 | 0601821 | 0601825 2.10 0602112 | 0602118 | 0602121 | 0602125 2.40 0602412 | 0602418 | 0602421 | 0602425 ZN ZN ZN ZN Light Weight is the Key Future Form | Frame Shoring System Future Frame Shoring System System Applications: Highly efficient in different types of civil works: > Construction of viaduct, overpass junctions > Construction of light rails, bridges & channels > Water works & power plant projects > Office building, shopping malls projects Aluminium Beams Types Sn ‘ i i » P aa = Peery Serr [ePeTErT} Breen t ret Pree Pris a Weig item aCy 2 Future Form Frame Shoring System Future Frame Shoring System System Applications: N Table form which is highly efficient and cost effec- tive in high rise residential, commercial & hotel buildings The flexibility of the FUTURE Frame System permits using same units and components of the table form to be used to cast non typical floors like basements and podiums using individual towers ri Future Form EETG] Frame Shoring System Future Frame Shoring System System Applications: Early striking a time & cost effective utilization of FUTURE Frame System which allows dismantling of all horizontal components after 24 to 36 hours from pouring. These horizontal components can be shifted to the next floor or area to be used with another set of vertical components in the next floor leaving the already casted slab back propped STEP 4 Main and infill beams removed Other horizontal components removed Light Weight is the Key Future Form Lc) Frame Shoring System Future Frame Shoring System Weight (Kg) Arti Future 140 H-Beam 3.145 Lm 2010000 Future 140 H-Beam with Timber 3.141 Lm 2030000 Future 122 H-Beam 2.73/Lm 2040000 Future Main Leg 12m 4.14 Kg 0601200 15m 5.17 Kg 0601500 18m 6.20 Kg 0601800 21m 7.24 Kg 0602100 24m 8.27 Kg 0602400 Universal Jack 800 4.20 Kg 0630003 Handle Nut 1.35 Kg 0630004 Base Plate 1.5 Kg 0630001, J Screw Jack 600 1.95 Kg 0630002 Future Form Frame Shoring System Future Frame Shoring System Spigot Connector 0.75 kg 9630005 <—> |S Future Drop Head 4.15 Kg 0640001 Future Bs U-Head 2.75 Kg 0520001 ead 7 J-Head 1.67 Kg 0630006 “Ah Future °o ABolt Asssembly 0.05 Ka 7000000 > u-Pin 0.91 Kg 0351001 > Future Clamp 0.10 Kg 0630010 oO Bearing Cap 0.10 Kg 0630007 A Frame Clamp 0.15 Kg 0630008 ce holder Fast Lock Coupler 0.70 Kg 0630009 Future Form Frame Shoring System Future Frame Shoring System Weight (Kg) COG Future Extension Staff 1.20m 2.80 Kg 0341200 . 1.80 m 4.20 Kg 0341800 ~> NL Brace 1.26/Lm 0610000 Diagonal Brace 1.39/Lm 0620000 Lateral Brace 3.0m 3.050 Kg 0331300 2.7m 2.730 Kg 0331270 2.4m 2.410 Kg 0331240 2.1m 2.090 Kg 0331210 1.8m 1.780 Kg 0331800 4.5m 1.460 Kg 0331500 4.2m 1.140 Kg 0331200 Base Plate Pin m18x75 0.10 kg 7010001 Hitch Pin “ 7040001, Main Leg Pin miaxtis 0.14 Kg 7010002 Light Weight is the Key Head Office Dubai P.O. Box: 52360 Plot No: 34009 Dubai Industrial City Dubai, UAE Phone: +971 4 8858003 Fax : +971 4 885 8002 BX Email: Info@futureformwork.com eB www.Futureformwork.com Kingdom of Saudi Arabia P.O.Box: 1619 Al Khobar 31952, Riyadh Phone: +966 38580838/ 38571556 Fax: +966 38570655 Kuwait P.O. Box: 22700 Salmia-Salim Mubarak St. Al Safa Telephone: +965 25723208 Fax 24965 25724124

Das könnte Ihnen auch gefallen