Time Activities

Site: (Observations)
Layout and staking of footings at Phase 2
8:00 AM 12:00 PM
Excavation of footings
Layout for tower crane footing

1:00 PM 5:00 PM Site: (Observations)


Excavation of tower crane footing

Site: (Observations)
6:00 PM 9:00 PM Rebar installation and slab formworks installation
at Kirov Tower

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 19
May 14, 2016
Saturday
Time Activities

Site: (Observations)
Sir Marjon discussed the possible reasons why the
formworks at S1 column failed
8:00 AM 12:00 PM Discussion with Maam Mac about rebar and some ideas
regarding concreting and the usage of concrete epoxy
Cleaning at 11F S2
5F and 6F checking with Sir Vaughan

Site:
1:00 PM 5:00 PM Checking of rebar quantity, splice lengths and
positioning of splices. Inspection on rebar installation at
Kirov Tower, 8F K2

Site: (Observations)
6:00 PM 8:00 PM Inspection with Sir Joffrey (QA / QC) of rebar slab at 8F
K2

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 20
May 16, 2016
Monday
Time Activities

Site:
Checking of elevation, reference points, and coordinates
at basement 2 with Sir Rj using total station
Checking ng reference points, coordinates and distances
8:00 AM 12:00 PM sa Basement 2
Concreting at 8th floor K2 slab
Checking of shear column formworks at 7th K2
Consider squareness, plumbness, and offset with sir
Mike

Site: (Observations)
1:00 PM 5:00 PM
Rebar installed and formworks installed at Kirov Tower
7F K2 are ready for concrete pouring

Site: (Observations)
6:00 PM 9:00 PM
Concrete pouring at Kirov Tower, 7F K2

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 21
May 17, 2016
Tuesday
Time Activities

Site:
Layout and checking of footing elevations at Phase
2 using dumpy level and total station.
8:00 AM 12:00 PM
Excavation of footings (1.5 - 3 meters depth) and
Mat footing (11.5 meters depth) of Proscenium
Tower

Site: (Observations)
1:00 PM 5:00 PM Installation of rebars and curing of slab at Sakura
Tower, 10F

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 22
May 18, 2016
Wednesday
Time Activities

General Toolbox Meeting


8:00 AM 12:00 PM
Site: (Observations)
Post tensioning of tendons at Sakura Tower, 9F

Site: (Observations)
1:00 PM 5:00 PM Removing of installed rebars at tower crane footing
at Phase 2
Excavation of mat footing of Proscenium Tower

Office works:
Estimate. Total number of CHB, cement, sand, and
6:00 PM 9:00 PM gravel to be used in the elevator lobby of Sakura
Tower, basement 2, basement 1, and lower ground
floor

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 23
May 19, 2016
Thursday
Time Activities

Office works:
Continuation of estimate for elevator lobby
8:00 AM 12:00 PM
Site: (Observations)
Excavation of tower crane footing at Phase 2

Site: (Observations)
1:00 PM 5:00 PM
Installation of slab reinforcements and formworks
of columns and shear walls at Sakura Tower, 11F

Site: (Observations)
Installation of slab formworks at Kirov Tower, 8F
6:00 9:00 PM nearly done
Slab formworks at K1 already installed
Rebar installation on-going

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 24
May 20, 2016
Friday
Time Activities

Site: (Observations)
Laying out references for zocallo installation for
8:00 AM 12:00 PM T&B at 11F S3
Slab reinforcement installation at 9F K1
Concrete application by sprayecrete corporation on
elevator walls at Sakura Tower, 2F

1:00 PM 5:00 PM Site: (Observations)


Continuation of monitoring at Kirov Tower active
floor

Site:
Checking of quantity of vertical bars and lateral ties
6:00 PM 9:00 PM at Sakura Tower, 11F S2 columns with Maam
Mac

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 25
May 21, 2016
Saturday
Time Activities

Site: (Observations)
8:00 AM 12:00 PM Spraycrete at Sakura Tower elevator lobby, 2F to
4F

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 26
May 23, 2016
Monday
Time Activities

Office works:
Simple discussion regarding OJT with the new
8:00 AM 12:00 PM intern from SLSU
Site:
Sight visit at Phase 2. Continuous excavation for
mat footing.

1:00 PM 5:00 PM Site: (Observations)


Rebar installation on slab at Kirov Tower, 9F K1

Site: (Observations)
Rebar installation at Sakura Tower, 11F S2
6:00 PM 9:00 PM
Concrete pouring on shear walls at Sakura tower,
11F S1

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 27
May 25, 2016
Wednesday
Time Activities

Genereal Toolbox Meeting


Site: (Observations)
8:00 AM 12:00 PM Concreting of slab at Sakura Tower, 12F S1
Progress observation at Sakura tower,7F 12F
Layout for T&B walls at Sakura Tower, 8F

Site: (Observations)
1:00 PM 5:00 PM
Pouring of concrete at Kirov Tower, 8F shear walls
and shear columns

Site: (Observations)
6:00 PM 9:00 PM Formworks installation at Sakura Tower, 12F
Concrete pouring at slab, 12F S2

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 28
May 26, 2016
Thursday
Time Activities

Site: (Observations)
Checking of slab reinforcements at Podium LGF
8:00 AM 12:00 PM Rebar installation, 12F S1
Pouring of concrete at shear walls, 11F S1
Curing of slab, 11F S3

.
Site: (Observations)
1:00 PM 5:00 PM
Concrete pouring at Kirov Tower, 8F - K3 and K4

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 29
May 27, 2016
Friday
Time Activities

Site:
Counting actual number of dowels installed at 8F
K3 and K4, and 9F K1
8:00 AM 12:00 PM
Office works:
Transferring counted dowels in the plan for billing
purposes

Site:
1:00 PM 5:00 PM Rebar inspection. Top bars, PBD, bottom bars,
spacer blocks, and chair bars at 8F K2 and K3

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 30
May 30, 2016
Monday
Time Activities

Office works:
8:00 AM 12:00 PM
Encoding of daily report

Site: (Observations)
Installation of dowels at Kirov Tower, 5F to be
1:00 PM 5:00 PM
used in the installation of reinforcement bars for
spraycrete

Site: (Observations)
6:00 PM 9:00 PM Sakura Tower, 12F , installation of slab
reinforcements

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 31
May 31, 2016
Tuesday
Time Activities

Site: (Observations)
Proscenium Tower excavation at Phase 2
8:00 AM 12:00 PM
Observation of site improvement at Sakura Tower
Observation of site improvement at Kirov Tower

Last day treat of interns from Polytechnic


1:00 PM 5:00 PM University of the Philippines and Eastern Samar
State University

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U
Republic of the Philippines
POLYTECHNIC UNIVERSITY OF THE PHILIPPINES
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

Day 32
June 1, 2016
Wednesday
Time Activities

Site: (Observations)
8:00 AM 12:00 PM
Proscenium Tower excavation at Phase 2

Site: (Observations)
1:00 PM 5:00 PM
Observation of site improvement at Sakura Tower
*rebar and formworks installation

Site: (Observations)
6:00 PM 9:00 PM Observation of site improvement at Kirov Tower
*rebar and formworks installation

Prepared By: Verified and Certified By:

KATRINE JOICE DG. CASINGAL ENGR. ARNEL N. POBRE, JR.

Trainee / Student CS Rebar, PGCDC / HCC

SECOND FLOOR, COLLEGE OF ENGINEERING AND ARCHITECTURE BUILDING, ANONAS ST., COR. PUREZA ST., STA.MESA, MANILA
Website: www.pup.edu.ph Tel no: 716-6273

ST
THE COUNTRYS 1 POLYTECHNIC U

Das könnte Ihnen auch gefallen