Sie sind auf Seite 1von 15

CEDULA DE CULTIVO SIN PROYECTO

REA REAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

Pasto Natural + Rye Grass (rea topografica) 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

TOTAL 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

Fuente: Elaboracin Propia

CEDULA DE CULTIVO CON PROYECTO

REA REAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

Rye Grass + Trebol (rea topografica) 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

TOTAL 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Fuente: Elaboracin Propia
DULA DE CULTIVO SIN PROYECTO

REAS (ha)
DIC

11.00

11.00

DULA DE CULTIVO CON PROYECTO

REAS (ha)
DIC

11.00

11.00
CLCULO DE LA EVAPOTRANSPIRACIN POTENCIAL (mm/da)
MTODO DE HARGREAVES
ESTACIN: Huancabamba Lat.: 15 15' 1'' S Long.: 79 33' 1'' W Alt.:
Parmetros VALORES MENSUALES
Ene. Feb. Mar. Abr. May. Jun. Jul. Ago. Set. Oct.
TMC 14.19 13.94 13.65 13.76 13.26 12.57 12.53 12.67 13.33 13.72
TMF 57.54 57.10 56.58 56.76 55.87 54.63 54.55 54.81 56.00 56.69
HR 80.43 80.40 82.03 80.88 77.35 74.10 72.93 71.98 70.14 75.26
CH 0.73 0.73 0.70 0.73 0.79 0.84 0.86 0.88 0.91 0.83
CE 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
MF 1/ 2.72 2.33 2.33 2.43 1.68 1.48 1.59 1.85 2.12 2.50
Eto 120.33 102.49 96.90 104.61 77.76 71.59 78.62 93.38 112.92 122.38
Das 31 28 31 30 31 30 31 31 30 31
Eto mm/dia 3.88 3.66 3.13 3.49 2.51 2.39 2.54 3.01 3.76 3.95
Prec. Efec mm/da 1.42 2.27 2.38 1.83 0.94 0.54 0.31 0.30 0.44 1.19
Fuente: Estacin Huancabamba - Senamhi

1/ Promedio de los valores de 6 y 8 de Latitud Sur de la Tabla "FACTOR DE EVAPOTRANSPIRACIN POTENCIAL"


Frmulas Empleadas : ETo = MF x TMF x CH X CE; TMF = (9/5)TMC + 32; CE = 1.0 + 0.04(E/3000)
CH = 0.166 x ( 100 - HR )1/2 , para HR>64%; para HR<64%, CH = 1.
Donde:
ETo = Evapotranspiracin potencial (mm/da) MF = Factor mensual de latitud
TMF = Temperatura media mensual (F) CE = Factor de correccin para la altura del lugar
TMC = Temperatura media mensual (C)
HR = Humedad relativa media mensual (%) E = Altitud o elevacin del lugar (msnm)
OTRANSPIRACIN POTENCIAL (mm/da)
ODO DE HARGREAVES
3500 msnm
VALORES MENSUALES
Nov. Dic.
14.06 13.71
57.32 56.68
78.26 79.70
0.77 0.75
1.05 1.05
2.60 2.75
120.68 122.16
30 31
4.02 3.94
1.26 1.34

CE = Factor de correccin para la altura del lugar


KC SIN PROYECTO

REA REAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV
PASTO NATURAL + RYE GRASS (rea
11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
topografica)
Kc 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Fuente: Fao

KC CON PROYECTO

REA REAS (ha)


CULTIVO PRINCIPAL
(ha) ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

RYE GRASS + TREBOL 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Kc 11.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Fuente: Fao
KC SIN PROYECTO

REAS (ha) CULTIVO DE


REA (ha)
DIC ROTACIN

1.00

1.00

KC CON PROYECTO

REAS (ha) CULTIVO DE


REA (ha)
DIC ROTACIN

1.00

1.00
CALCULO DE LA PRECIPITACION EFECTIVA

PRECIPITACIN MENSUAL PRECIPITACIN EFECTIVA


Meses
(mm) (mm)
ENERO 47.80 44.15
FEBRERO 71.74 63.51
MARZO 85.63 73.90
ABRIL 60.95 55.01
MAYO 30.69 29.18
JUNIO 16.74 16.29
JULIO 9.80 9.65
AGOSTO 9.53 9.39
SETIEMBRE 13.41 13.12
OCTUBRE 39.42 36.93
NOVIEMBRE 40.36 37.76
DICIEMBRE 44.87 41.65
TOTAL 470.95 430.53
Pe = Pt (125 0.2 Pt)/125 Para Pt < 250mm
Pe = 125 + 0.1 Pt Para Pt > 250mm
DEMANDA DE AGUA CON PROYECTO

PARAMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV

1 Evapotranspiracin Potencial (mm/dia) 3.88 3.66 3.13 3.49 2.51 2.39 2.54 3.01 3.76 3.95 4.02
2 Kc ponderado 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

3 Evatrans. Real o Uso consuntivo (1x2) (mm/dia) 3.88 3.66 3.13 3.49 2.51 2.39 2.54 3.01 3.76 3.95 4.02

4 Precipitacin efectiva (mm/dia) 1.42 2.27 2.38 1.83 0.94 0.54 0.31 0.30 0.44 1.19 1.26
5 Deficit de humedad (3-4) (mm/dia) 2.46 1.39 0.74 1.65 1.57 1.84 2.22 2.71 3.33 2.76 2.76
6 Eficiencia de riego (%) 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
7 N dias del mes (dias) 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00
8 Requerimiento de agua (5/6) (mm/dia) 3.28 1.86 0.99 2.20 2.09 2.46 2.97 3.61 4.44 3.68 3.69
(m3/ha/dia) 32.77 18.56 9.89 22.04 20.89 24.58 29.66 36.13 44.36 36.75 36.85
(m3/ha/mes) 1,015.75 519.80 306.60 661.32 647.65 737.34 919.58 1,119.89 1,330.72 1,139.27 1,105.62
9 rea Total (ha) 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

10 Volumen demandado (m3/mes) 11,173.28 5,717.83 3,372.59 7,274.53 7,124.15 8,110.75 10,115.42 12,318.74 14,637.90 12,531.95 12,161.86

Fuente: Elaboracin propia


DEMANDA MAXIMA
DEMANDA MINIMA
DEMANDA PROMEDIO
DE AGUA CON PROYECTO

DIC TOTAL

3.94
1.00
3.94
1.34
2.60
0.75
31.00 365.00
3.46
34.63
1,073.51 10,577.06
11.00 11.00
11,808.63 116,347.63

4.44
3.46
2.89
OFERTA DE AGUA CON PROYECTO

Caudal (l/s) : 60 60
N Beneficiarios: 4
Total de horas por grupo: 14.4
Horas de riego prom/ benef:
frecuencia de riego (dias) 6
72/30

DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

l/s 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00
Caudal
m3/hr 216.00 216.00 216.00 216.00 216.00 216.00 216.00 216.00 216.00 216.00 216.00 216.00
Tiempo de riego hr/dia 14.40 14.40 14.40 14.40 14.40 14.40 14.40 14.40 14.40 14.40 14.40 14.40
Dotacin de riego dias 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
Nmero de das al mes dias 31.00 28.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00 31.00 30.00 31.00
Nmero de dotacin al mes Numero 5.17 4.67 5.17 5.00 5.17 5.00 5.17 5.17 5.00 5.17 5.00 5.17
Volumen promedio m3/mes 16,070.40 14,515.20 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40 16,070.40 15,552.00 16,070.40 15,552.00 16,070.40
rea ha 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Volumen Ofertado m3/ha-mes 1,460.95 1,319.56 1,460.95 1,413.82 1,460.95 1,413.82 1,460.95 1,460.95 1,413.82 1,460.95 1,413.82 1,460.95
Fuente: Elaboracin propia
TOTAL

189,216.00
11.00
17,201.45
BALANCE DE AGUA CON PROYECTO

DESCRIPCION UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

DEMANDA (m3/ha/mes) 1,015.75 519.80 306.60 661.32 647.65 737.34 919.58 1,119.89 1,330.72 1,139.27 1,105.62 1,073.51

OFERTA (m3/ha/mes) 1,460.95 1,319.56 1,460.95 1,413.82 1,460.95 1,413.82 1,460.95 1,460.95 1,413.82 1,460.95 1,413.82 1,460.95

BALANCE (m3/ha/mes) 445.19 799.76 1,154.35 752.50 813.30 676.48 541.36 341.06 83.10 321.68 308.19 387.43

Vo lu m n d e a g u a (m 3 /m e s )
Fuente:Elaboracin Propia

1,600.00

1,400.00

1,200.00

1,000.00

800.00

600.00
Demanda
400.00
Oferta
200.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO S ET OCT NOV DIC
CALC RESERVORIO

CALCULOS PARA DETERMINACION DE VOLMEN DEL RESERVORIO

Descripcin Unid Cant


Demanda mm/da 4.44
Demanda m3/ha/da 44.36
Area del proyecto Ha 11.00
Periodo entre dotacion de riego da 6.00
Volumen neto calculado del reservorio m3 2,927.58

3220.338274

Pgina 14
CALC RESERVORIO

31.0500935
310.500935
487.93
2,927.58

Pgina 15

Das könnte Ihnen auch gefallen