FORMWORK SUPPORTPROP CHECK SHEET

General Contractor Hazama Ando Corporation Concrete Casting Date ColumnWall


Project : Beam Slab
Location Casting (Floor Area ) Inspector (Company)
(Name)
Inspection Date Check Check Check Check Check Check
Date: Date: Date: Date: Date: Date:
Formwork completed Formwork completed column/wall column/wall beam/slab beam/slab
Description of Checking Items
( completed partialy) (completed all) before casting casting time before casting casting time

1 Any material deform or corrosion?

2
If height is more than 3.5m, provide
horizontal connection pipe support in 2way direction within every
2m space ?

3 Pipe support should not be composed of more than 3 nos of pipe


connection ?
4
Any bracing (pipe)at end of horizontal connection pipe ?

5 Provided bridging pipe of floor post ?

6
Joint tightly by bolt or clamp for connection and crossing point ?

7 Provided diagnol brace for steel pipe stanchion between each


steel pipe frames?

8 Both end side of structure beam fixed by supporting structure


elements ?

10 Using sling type of bags(Tsuri bukuro) for bring up or down for


materials,tools or equipments?

11 Nailing to deck plate striked to all the drilling positions of the deck
?

12 Support for additional strength compensation of F-Deck should


be less than @950mm in one line and less than @1000mm in 2
line?

13 Horizontal support frame for beam formwork of F-Deck should be


less than @300mm ?

14 Over Lap for F-Deck should be more than 10mm?

15 Catch space for receiving F-Deck should be more than 50mm?

16 Any warping on formwork (plywood)?

17 Any looseness of form tie ?

18 Any looseness of clamps ?

19 Any looseness or warping of supportprop?

20 Checked height of concrete casting in one operation ?

Description of Corrective Action

Inspector signature

General contractor signature

Note: Check not required in case casing column,wall,beam and slab casting concrete same time
for "Good",X for "No Good" and imprvement items should be recorded.
244247 AA8-301-002

Das könnte Ihnen auch gefallen