Sie sind auf Seite 1von 118

Technical Specification of 7500 DWT IMO II Chemical Tanker

TECHNICAL SPECIFICATION
For
7500 DWT OIL PRODUCT/CHEMICAL TANKER

Page 1 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Table of Contents

100 General Guidance and Administration ................................................................................... 8


101 Intent, Scope and General Guidance ...................................................................................... 8
102 General Description ............................................................................................................. 10
103 Class Notation and Flag ....................................................................................................... 12
104 Regulations .......................................................................................................................... 12
105 Certificates ........................................................................................................................... 13
106 Material ................................................................................................................................ 14
107 Workmanship ....................................................................................................................... 15
108 Spare Parts, tools and Accessories ....................................................................................... 15
109 Unit of Measure ................................................................................................................... 15
110 Operating Temperature ........................................................................................................ 15
111 Definitions Used In This Specification ................................................................................ 16
112 Language .............................................................................................................................. 16
113 Buyers Supplied Items ......................................................................................................... 16
114 Hull Form & Model Test ..................................................................................................... 19
115 Trim And Stability ............................................................................................................... 19
116 Determination Of Deadweight ............................................................................................. 21
117 Building Process .................................................................................................................. 22
118 Dry Docking......................................................................................................................... 22
119 Inspection Tests and Trials................................................................................................... 22
1191 General ........................................................................................................................ 22
1192 Progress ....................................................................................................................... 23
1193 Tests and Inspection .................................................................................................... 24
1194 Mooring Trial .............................................................................................................. 24
1195 Sea Trial....................................................................................................................... 25
120 Plans For Approval .............................................................................................................. 26
121 Finished Plan And Instruction Books................................................................................... 27
122 Name Plates And Identifications .......................................................................................... 27
123 Delivery ............................................................................................................................... 28
124 Exemption ............................................................................................................................ 28
200 General Particulars ............................................................................................................... 28
201 Principle Dimensions ........................................................................................................... 28
202 Speed and Endurance ........................................................................................................... 28
203 Installed Power ..................................................................................................................... 28
204 Deadweight and Capacity .................................................................................................... 29
205 Cargo List............................................................................................................................. 30
206 Bow Thruster ....................................................................................................................... 30

Page 2 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
207 Deck Heights, Sheer And Camber ....................................................................................... 30
2071 Height Between Decks At Centerline .......................................................................... 30
2072 Shear On Main Deck ............................................................................................................ 30
2073 Camber of Decks .................................................................................................................. 30
208 Complement ......................................................................................................................... 31
300 Hull Structure ....................................................................................................................... 32
301 General ................................................................................................................................. 32
302 Material and Welding........................................................................................................... 33
303 Main Hull ............................................................................................................................. 33
304 Stem and Stern ..................................................................................................................... 34
305 Keel Plate ............................................................................................................................. 35
306 Shell Plating ......................................................................................................................... 35
307 Bottom Structrue .................................................................................................................. 35
308 Side Shell Structure .............................................................................................................. 35
309 Decks ................................................................................................................................... 35
310 Pillars ................................................................................................................................... 36
311 Bulkhead .............................................................................................................................. 36
312 Peak Tanks ........................................................................................................................... 36
313 Superstructure and Deck House ........................................................................................... 36
314 Rudder .................................................................................................................................. 37
315 Miscellaneous ...................................................................................................................... 38
3151 Foundations ................................................................................................................. 38
3152 Bulwark and Hand Rails .............................................................................................. 38
3153 Catwalk and Sidewalk ................................................................................................. 38
3154 Bilge Keel .................................................................................................................... 38
3155 Chain Locker ............................................................................................................... 39
3156 Hawse Pipes ................................................................................................................. 39
3157 Sea Chests and Box Cooler .......................................................................................... 39
3158 Bottom Plug ................................................................................................................. 40
3159 Funnel .......................................................................................................................... 40
400 Paint and Corrosion Control ....................................................................................... 41
401 General ................................................................................................................................. 41
402 Surface Preparation .............................................................................................................. 42
4021 Primary Preparation ..................................................................................................... 42
4022 Galvanizing .................................................................................................................. 42
4023 Secondary Preparation ................................................................................................. 42
403 Shop Primer ......................................................................................................................... 43
404 Paint Works .......................................................................................................................... 43
405 Film Thickness ..................................................................................................................... 43
406 Measuring ............................................................................................................................ 43

Page 3 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
407 Inspection ............................................................................................................................. 43
408 General Cautions .................................................................................................................. 44
409 Paint Schedule ...................................................................................................................... 44
4091 Ballast Tanks Coating .................................................................................................. 44
4092 Cargo Oil Tanks Coating ............................................................................................. 44
4093 Decks Superstructures and Other Places Coating ........................................................ 44
4094 Painting Scheme .......................................................................................................... 44
410 Cathodic protection .............................................................................................................. 45
411 Antifouling System for Box Coolers .................................................................................... 45
500 Accommodation ................................................................................................................... 46
500 Accommodation ................................................................................................................... 46
501 General ................................................................................................................................. 46
502 Deck Covering ..................................................................................................................... 46
503 Insulation and Fire Protection .............................................................................................. 46
504 Cabin Furnishing and Fittings .............................................................................................. 48
5041 Captain and Chief Engineer Class ............................................................................... 48
5042 One Man Cabins .......................................................................................................... 48
5043 Two Men Cabins ...................... Error! Bookmark not defined.
5044 Wash Place Fittings ..................................................................................................... 49
5045 Laundry Equipment ..................................................................................................... 49
5046 Galley .......................................................................................................................... 49
5047 Wheel House ................................................................................................................ 50
5048 Interior Doors .............................................................................................................. 51
5049 Engine Control Room .................................................................................................. 51
50410 Cargo Control Room and Ships office to be combined Office .................................... 52
50411 Crew and Officer Mess Rooms .................................................................................... 52
50412 Dry Provision Store ..................................................................................................... 52
50413 Refrigerated Provision Store ........................................................................................ 53
50414 Forward Stores ............................................................................................................. 53
50415 Steering Gear Compartment ........................................................................................ 53
50416 Radio Space ................................................................................................................. 53
50417 Emergency Generator Room ....................................................................................... 54
50418 Workshop..................................................................................................................... 54
50419 Changing Room ........................................................................................................... 54
50420 Paint Store.................................................................................................................... 54
50421 Deck/Engine Store ....................................................................................................... 54
600 Deck Machinery and Outfitting ........................................................................................... 54
601 General ................................................................................................................................. 54
602 Anchor Windlasses .............................................................................................................. 55
603 Steering Gear ....................................................................................................................... 56

Page 4 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
604 Stern Mooring Winch ........................................................................................................ 56
605 Provision Handling Davit ..................................................................................................... 57
606 Hose Handling Crane ........................................................................................................... 57
607 Mooring Fitting .................................................................................................................... 57
608 Manifold ............................................................................................................................... 57
609 Oil Spill Drain Tank ............................................................................................................. 58
610 Mooring Equipment ............................................................................................................. 59
611 Ladders and Steps ................................................................................................................ 59
6111 Accommodation Ladders ............................................................................................. 59
6112 Steel Ladder and Steps ................................................................................................. 59
612 Access Hatch and Manhole .................................................................................................. 60
6121 Access Hatch and Manhole for Cargo Oil Tanks ........................................................ 60
6122 Access Manhole for Water Ballast Tank ..................................................................... 60
6123 Tank Cleaning Hatch ................................................................................................... 60
6124 Sample Hatches ........................................................................................................... 61
6124 Small Hatches .............................................................................................................. 61
6125 Manholes ..................................................................................................................... 61
613 Life Saving Appliances ........................................................................................................ 62
614 Fire Fighting System ............................................................................................................ 62
615 Fire Hydrant System ............................................................................................................ 63
616 Foam Fire Extinguish System .............................................................................................. 63
617 CO2 Smothering System ...................................................................................................... 64
618 Emergency Fire Pump .......................................................................................................... 64
619 Personal Protection .............................................................................................................. 64
620. Fire Fighting System ..................................................................................................................... 65
700 Equipment for Cargo ............................................................................................................ 66
701 General ................................................................................................................................. 66
702 Loading and Discharge System for Liquid Cargo ................................................................ 67
7021 Cargo & Stripping/Slop Pumps ................................................................................................... 67
703 Cargo Heating System ......................................................................................................... 69
704 Cargo Tank Vent/Gas Free System ...................................................................................... 70
7041 Cargo Tank Ventilation ............................................................................................... 70
7042 Gas Freeing System ..................................................................................................... 71
705. Vapour Return System .................................................................................................................. 71
706 Tank Cleaning System ......................................................................................................... 71
707 Auxiliary System & Equipment for Cargo ........................................................................... 74
708 Cargo Control Room ............................................................................................................ 74
709 Oil Discharge Monitoring and Control ................................................................................ 75
800 Hull Piping System .............................................................................................................. 76
801 Ballast System ...................................................................................................................... 76

Page 5 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
802 Bilge Piping ......................................................................................................................... 77
803 Drainage System .................................................................................................................. 78
804 Sounding System ................................................................................................................. 78
805 Air-conditioning System ...................................................................................................... 79
806 Mechanical Ventilation ........................................................................................................ 80
807 Natural Ventilation ............................................................................................................... 81
900 Machinery Part ..................................................................................................................... 81
901 General ................................................................................................................................. 81
902 Principal Particulars of Machinery ....................................................................................... 83
9021 Main Engine ................................................................................................................ 83
9022 Flexible couplings ........................................................................................................ 84
9023 Reduction gearbox ....................................................................................................... 84
9024 Shaft and Propeller ...................................................................................................... 84
9025 Boiler Plant .................................................................................................................. 85
9026 Electric Generating Plant ............................................................................................. 86
9027 Compressed Air Plant: ................................................................................................. 88
9028 Pumps .......................................................................................................................... 89
9029 Oil purifier ................................................................................................................... 91
90210 Fresh Water Generator: ................................................................................................ 92
90211 Heat Exchangers/Box coolers ...................................................................................... 92
90212 Engine room ventilating fans ....................................................................................... 93
90213 Incinerator .................................................................................................................... 93
90214 Sewage Treatment Plant .............................................................................................. 94
903 Piping System in Engine Room ........................................................................................... 94
9031 Material for Pipes and Valves ................................................................................................... 94
9032 Fuel oil system ............................................................................................................. 96
9033 Lub. oil system ............................................................................................................ 98
9034 Cooling Water System ............................................................................................... 100
9035 Compressed air system .............................................................................................. 101
9036 Exhaust Gas System .................................................................................................. 102
904 Workshop Machinery in Engine Room .............................................................................. 102
905 Miscellaneous Equipment in Engine Room ....................................................................... 103
906 Automatic Control and Monitoring Instrumentation .......................................................... 103
9061 General ...................................................................................................................... 103
9062 Manoeuvring control system ..................................................................................... 104
9063 Alarm / Monitoring system ........................................................................................ 105
9064 Boiler automatic system ............................................................................................ 106
9065 Generator control system ........................................................................................... 106
9066 Monitoring System for Liquid Tanks ........................................................................ 106
1000 Electric System.......................................................................................................................... 108

Page 6 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
1001 General ............................................................................................................................... 108
1002 Power System..................................................................................................................... 108
1003 Adoption of Cable .............................................................................................................. 108
1004 Primary Source ................................................................................................................... 110
1005 Main Switchboard .............................................................................................................. 111
1006 Emergency Switchboard .................................................................................................... 112
1007 Shore Connection Box ....................................................................................................... 112
1008 Secondary Source ............................................................................................................... 112
1009 Distribution System............................................................................................................ 112
1010 Power System..................................................................................................................... 113
1011 Lighting System ................................................................................................................. 113
1012 Navigation Lights and Signal Lights .................................................................................. 115
1013 Internal Communication, Alarm & Measuring System...................................................... 116
1014 Electric Nautical Equipment .............................................................................................. 117
1015 Radio Equipment ............................................................................................................... 118

Page 7 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

100 General Guidance and Administration

101 Intent, Scope and General Guidance

The vessel is to be designed according to the design as a twin engines, twin CPP propeller and twin rudders. The aft
ship will be modified to achieve more speed, the draft of the vessel must be according to the maximum
scantling/minimum freeboard and corrugated bulkhead in cargo tanks must be about 700 mm width. Vessel to be used
for worldwide services. Equipped with an appropriate propulsion system existing in twin medium speed engines driving
twin CPP propellers through two reduction gear boxes with clutches.

Following contract plans shall accompany and as part of this Building Specification;
General Arrangement Plan (Subject to the change as per designing)
Maker List

This specification and accompanied drawings shall form an integral part of the contract.

The vessel will be designed, constructed, equipped, tested and delivered to the Buyers by the Builder in
accordance with the Building specification and Working Plans.

Details in design, construction, fabrication, installation, inspection, tests, workmanship etc. shall not be
covered by these Specifications, shall be in accordance with Builders, Subcontractors and Manufacturers
normal practices based on the appropriate standards for this kind of vessel being adopted at the time of Vessels
construction.

Materials, apparatus and equipment intend to use in this tanker shall be in accordance with the International
Industrial Standards, equivalent to ISO, or equivalent to Chinese national standard.

Any item or construction necessary to complete the vessel safe and workable for its intended purpose shall be
supplied and installed by the Builder whether mentioned in the Specification or not as a mutual agreement
between the Builder and the Buyers.

It is to be understood that anything not mentioned in these Specifications but required by the Classification
Society or Regulatory Bodies listed herein, shall be supplied and/or equipped by the Builder.

Any requirement of the Buyers, which is in excess of the requirements of the Rules and Regulations as
specified in 104 and 105 and/or the content of this specifications shall be subject to the adjustment to the
contract price, deadweight, etc, which may be effected, in notified in writing by the Builder and accepted in
writing by the Buyers.

If the same item is repeated twice or more in these Specifications, it is to be understood that these items shall
be supplied and/or equipped once only.

If any inconsistency is found between the Contract, Specification and/or accompanied plans, the former one
shall prevail and govern unless otherwise agreed.

Page 8 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

If any inconsistency is found between the Hull, Machinery and Electric Specifications, the description of the
Specifications which governs the installation or equipment shall prevail.

Any amendments or changes in Rules and Regulations as described in 104 and 105 issued and coming into
effect after signing the Contract, is to be treated as a modification to the Contract. The price of changing
Contract shall be subject to separate negotiations between the Buyers and the Builder.

Any amendment or changes in this Specification and/or Plans shall be treated in a similar way as set out above.

If the Buyers will desire to apply the said amendment and/or changes to the vessel, the Builder shall submit in
a written document, the affects on the ships price, deadweight, delivery date or any other item which may
affect the Contract.

These amendments or changes shall come into effect after the agreement is reached between the Buyers and
the Builder, and a written consent has to be signed between both parties.

Whenever the term or equal is used after a brand or a type or a type of machinery equipment or component,
the term or equal shall mean that any substitute shall be of equivalent standard and quality.

Where ever in the Specification the term or , if necessary, when considered and other similar expressions
may be used, the final choice in all important matters are to be made by mutual agreement between Builder
and Buyers.

Details in design, construction, installation, inspection, test, workmanship etc., not covered by the
Specification, shall be in accordance with good international shipbuilding practices based on the appropriate
standards for this kind of Vessel being adopted at the time of Vessels construction, being generally used by
international shipyards and agreed by the Buyers.

The Builder shall furnish all items required for the completion of the vessel in accordance with this
specification except items specifically stated herein as to be furnished and supplied by the Buyers.

The description in 100 General Guidance and Administration shall be applied to all parts of the Specification,
whereas in the parts the description to be applied to the respective parts, if not stated otherwise.

The design and layout of machinery, electrical and automation system, ventilation and air condition to be
suitable for following environmental condition:
Ambient air temperature : 40 oC / - 20 c
Air temperature in engine room: 40 oC
Sea water temperature: 32 oC 2c
Rel, humidity max / non condensing: 50 oC
Sand and dust laden wind at times
Max, noise level in accordance with the SOLAS and IMO rule and Class COMF rules but not exceed the
following:

Wheelhouse: 65 db

Page 9 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Wheelhouse wings: 60 db
Office/Control rooms 65 db
Mess rooms: 65 db
Cabins: 60 db.
Engine room: 110 db
Galley: 75 db.

All rotating machinery should be properly and adequately provided with safety protection guards.

When sub-contractors are employed by shipyard to carry out the construction works for the contracted vessel,
sub-contractor qualifications and experiences should be sent to Buyers for approval. When sub-contractor(s)
found continuously carrying out works not meeting the standards and requirements of these specifications,
Sellers should replace the sub-contractor(s) immediately upon receiving written request from Buyers with
supporting facts.

All shipboard equipment delivered to shipyard should be properly stored and protected either in warehouses or when
installed onboard. Particular protection to be provided against blasting grits and rain water.

All shipboard equipment as per approved maker list to have BV certificates and/or BV type approval certificates and
provide to buyer prior to installation onboard.

All steel plates should have BV approved Mill Certificates and provide to buyer prior to be use for construction.

102 General Description


This ship is an Oil Product / Chemical Tanker designed primarily to load and carry petroleum product oil and
IMO type II chemicals. The deadweight of the vessel is approx. 7500 metric tons at design draft. All cargo
tanks shall be able to fully load cargoes with specific gravity up to 1.52 mt/m3. The cargo tanks shall be
suitable for cargo with NO flash point limitation.

The vessel shall be designed to meet the requirements of providing world wide trading service to transport
Product Oil/Chemicals. The vessel shall be designed as modern looking chemical tanker with a totally enclosed
bridge and separate funnel, a free fall boat on stern and a streamlined bulbous bow construction. The design
shall be approved by the Buyers prior to the construction.

There are seven pairs of cargo oil tanks with two deck cargo/slop tanks, they are of mild steel with internal
surround coat. Seven pairs of ballast tanks are arranged at the wing tanks and double bottom tanks within the
cargo oil space. Fore peak shall be used as water ballast tanks as well.

Sixteen sets of deep well type pumps driven by separate electric motors controlled by frequency converters and
controlled from the cargo control room. are provided to handle the cargo loading/unloading. The rpm of the
cargo pumps drive elec. motors shall be adjustable between the allowable minimum and maximum rpm. The
cargo loading/unloading piping system is able to load and discharge sixteen (16) different grades of cargo oil
or chemicals simultaneously without contamination. The cargo lines for all cargo tanks shall be provided.

Page 10 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Interconnections of discharge lines with proper isolation valves for stern discharge is allowed. (Buyers to
provide piping diagram as reference)

The cargo details shall refer to the agreed Cargo Diagram

One pair of deep fuel oil tank in double bottom and double side shall be arranged in engine room forward. The
engine room to be separated from cargo spaces by means of ballast pump room. Seperation of fuel oil and
lubricating oil from direct contact with the sea as required by CLEAN SEA notation to be allowed.

Propulsion is provided by means of two marine diesel medium speed engines located in the engine room after.
Two controlled pitch propellers are installed and are driven by reduction gearboxes and flexible couplings.

Maneuvering is accomplished via two balanced flap type or fish tail type rudders (Barkemeyer) and one
electrically driven bow thruster, meeting ICE Class 1A requirement..

Electrical power may be generated by shaft generator during voyage, how ever the speed of the vessel will be
affected accordantly if shaft generator is used. One generator when idle in port. For discharging with four
cargo oil pumps two generators should be used. Emergency generator can be used parallel with three main
generators and the two shaft generators with auto-load sharing.

Accommodation for 16 crews is provided at the after of the ship. In order to reduce the vibration and noise,
crew's accommodations, bridge, etc. shall be located at the forepart of deck house, funnel shall be arranged on
accommodation deck.

One light mast shall be arranged at the end of forecastle, one signal mast (radar mast) shall be arranged at the
top of the bridge. And also one light post shall be provided near the midship manifold, port and starboard
respectively.

Markings:
All to be made of eight-mm steel plate and welded to the hull if not otherwise specified. Plimsoll marks
amidships, draft marks, fore, aft, amidships, on the rudder sides, aft and transom. Bow thrusters mark. All
tanks length and boundaries to be marked by welding beads on bottom and just above ballast water line as well
as the tank name. All transfer bulkheads to be marked. Frame numbers for every 10 th frames to be marked on
bilge keel and just above ballast water line. Cargo compartments to be marked CC letters welded on access
to the trunks. All valves are to be identified. Air caps, filling and sounding pipes are to be marked tank name
and content non-corrosive material or by welding beads.

Ship name and Port of registry should be marked by spot welding and painting on bow sides and the stern.
IMO No. to be marked the same on the stern and on the engine room bulkhead.

Manhole covers to be clearly identified welded on tanks name and number. Marks to be made of 5-mm steel
plates and welded near the manhole and top of the covers. All cranes lifting rails, lugs etc. to be marked welded
on S.W.L. marks. Name sign and/or rank plates on all doors. Water line to be marked welding beads. On
superstructure and forecastle bulkheads safety warning (like NO SMOKING), welding bead marked and
painted. Marking of all vent openings for the area they serve and open-close instructions.

Page 11 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Ship draft marks to be verified by laser or similar means prior to vessel undock or launching in presence of
Class surveyor and Buyers representative. Any difference should be rectified immediately.

103 Class Notation and Flag


The vessel including its hull, machinery and equipment shall be build to the class of Bureau Veritas
(BV).(hereinafter called the Classification Society Or Class) or equivalent classification society (will be
decided by the Buyers) with following notation;

I HULL
OIL TANKER/CHEMICAL TANKER TYPE IMO II ESP,
NO FLASH POINT LIMITATION,
MACH
UNRESTRICTED NAVIGATION
AUT UMS
MON SHAFT
ICE CLASS 1A
AVM/APS
SHAFT GENERATOR- PTO
CLEAN SHIP-SUPER

Some class notation has been changed recently. The new class notations must be followed

The vessel will be registered under the Gibraltar Flag.

The Buyers may assist to provide specific regulation of the flag state only when flag will be Gibraltar.

104 Regulations
The vessel must comply with the flag authorities and following international rules and regulations. All rules
and regulations shall be updated with latest amendments if any.

Rules and Regulations of the Classification Society 2003 and it's Amendments (hereinafter called as
CLASS Rules)
National Maritime regulation of the Country of Registry
International Convention for the Safety of Life at Sea, 1974 (SOLAS), including first Amendments
1978, second set of Amendments1981, 1983, 1988(GMDSS), 1989, 1990, 1991, 1992, 1994, 1996,
1997, 1998, and 2000.
International Convention for the Prevention of Pollution from Ships, 1973 (MARPOL 1973) and
Amendments of 1984, 1985, 1987, 1989, 1990, 1991, 1992, 1994, 1997 and 1998 including Reg. 13F
and Annex I, II, IV, V and VI for Nox.
Code for the construction and equipment for ships carrying dangerous chemicals in bulk(IBC code).
Convention on the International Regulations for Preventing Collisions at Sea, 1972(COLREG 1972)
and Amendments of 1981, 1987 and 1989.
International Convention on Load Lines 1966 and Amendments of 1979.
International Conversion on Tonnage Measurement of ships, 1969.
International Electro-technical Commission (IEC) Regulation for Electrical Installation on Ships.

Page 12 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
IMO Resolution A-468 (XII), Code on Noise levels on board ships
ILO Concerning Crew Accommodation on Board (No.92 & No.133)
ISO No.6954 Guidelines for the Overall Evaluation of Vibration in Merchant Ships, 1979 and its
Amendments of 1984.
OCIMF Standards for Tanker Manifolds and Associated Equipment 1998 for reference only
IMO Standards & instructions concerning ventilation cleaning and gas-freeing of oil tanks
Exxon Minimum Safety Requirements, 2000 (for reference only)
IMO draft guidelines on Navigation Bridge Visibility
IMO Resolution A.751 (XVII) Interim Standards for Ship Maneuverability
Suez Canal Navigation Rules Tonnage measurements

Panama Canal Navigation Regulation (for reference only)


Kiel Canal Regulations
Suez Canal Navigation Rules Tonnage measurements

105 Certificates
The builder shall obtain following certificates and deliver to Buyers at the time of the ships delivery unless
otherwise mentioned. Each certificate shall be delivered as triplicates, one original and two copies.

No. Name of Certificate Issued by


1 Classification Certificate for Class Notation Class
2 International Load Line Certificate Class
3 Safety Construction Certificate Class
4 Safety Equipment Certificate Class
5 Safety Radiotelephone Certificate, incl. GMDSS Class
6 Safety Cargo Gear Certificate Class
7 Classification Certificates for Anchor, Chains and Hawsers, Machinery Class
and Equipment.
8 Certificate for Life Boats & Life Saving Equipment Class
9 Certificate for Navigation Light & Special Signal Light Class
10 Certificate for Crews Accommodation Class
11 Certificate for Deadweight Class
12 International Tonnage Certificate, including the SBT calculation. Class
13 International Oil Pollution Prevention Certificate Class
14 Certificate for Compass Adjustment & Direction Finder Government
15 Cargo Tank Calibration Tables the parties will be mutual agreed between
buyer and builder
16 Deratting Exemption Certificate Chinese
Government
17 Certificate for Magnetic Compass Builder
18 Builders Certificate Builder
19 P & A Manual Buyers supply and
Builder updates
and send for Class
approval.

Page 13 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
No. Name of Certificate Issued by
SMPPEP Manual. Buyers supply and
Builder updates
and send for Class
approval.
20 SOLAS Training Manual incl. The FSOP (Fire Safety Operation Plan Builder/Class
Manual)
21 International Pollution Prevention Certificate For The Carriage Of Class.
Noxious Liquid Substances In Bulk (NLS Certificate)

106 Material
Structural steel material of main hull structure shall be of quality as required by the Class and shall be free of
cracks, lamination, surface defects and other similar defects.

Manufacturers standard type, size and materials of machinery, equipment and fittings shall be adopted, unless
otherwise specifically described in the Specification provided above reference to standards are met and
provided according to good international standard.

If any of the materials or equipment described in the Specification is not available, the Builder may supply
other materials or equipment capable of meeting the requirements of the Classification Society and of the
Rules and Regulations.

Substitution of the materials or equipment shall be subject to the provisions of the Contract.
No asbestos to be used in/on the Vessel.

Quality and constructional arrangement shall be made to ensure easy and future maintenance as far as
practically possible for all machinery and equipment.

All structures and equipment to be carefully and properly planned and prepared before installation onboard to
avoid misalignment.

Any structural members and equipment found not meeting this specification and contracts and international
ship building standards to be replaced.

If any of the specific description for the machinery or equipment in the Specification is not consistent with the
finally selected manufacturers standard specification, then the detail design shall follow the manufacturers
standard specification, provided the manufacturers standards are according to good international standard.

All fittings on deck including bolts and nuts to be of stainless steel material unless otherwise specifically
specified.

Stainless steel without grade notation in the specification shall mean Chinese Standard equivalent to JIS SUS
304.

All stainless steel materials, if any, used during ships construction must be stored and protected in such way
that it cannot become contamination carbon steel. When installed, it must be very well protected. Especially

Page 14 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
when grinding or grit blasting will be carried out in the vicinity. After final installation all stainless steel
materials, pipes etc. must be in and outside pickled and passivated according the normal standards used in
stainless steel constructions or ASTM instructions, before delivery of the vessel.

All Grease nipples shall be of stainless steel pin type JIS B 1575 1/8 or equivalent ISO standard, but only one
type to be used throughout the vessel at Builders option.

All materials shall be new and unused.

Damages occurring to materials shall be suitably corrected or replaced with new before delivery of the vessel.

107 Workmanship
All workmanship used in the construction of the vessel shall be in accordance with good international
shipbuilding practice and all applicable rules, regulations and standards.

All structural members and openings on hull, all decks and inside tanks to have all free edges smoothly ground
straight with edge radius of 2 to 3 mm.

Special care shall be paid to secure easy future maintenance for all constructional/design arrangement.

In general, automatic or semi-automatic, low hydrogen, CO2 gas submerged arc, flux cored electode
welding are to be applied for structural member and hull members. All welding consumables should
be approved by BV.

All welders should hold BV class appropriate welder certificates. All welder qualifications should be
recorded and copies provided to the buyer

108 Spare Parts, tools and Accessories


Spare parts, tools and accessories for the machinery and equipment shall be supplied in accordance with the
Class recommendations and the manufacturers standards for one year spare parts supply, unless otherwise
specifically described in the Specification. A reasonable amount of additional spare parts supplied by the
Buyers should, however, be placed onboard during the outfitting period without extra cost.

Following spares shall be equipped for each ship in addition to the above items;
One controllable propellers blade
One spare anchor
Four garbage containers made of stainless steel sheets to meet MARPOL requirement.

109 Unit of Measure


Metric system shall be adopted for design and construction of hull, machinery, equipment, etc, in general.

All measuring units such as power, pressure gauge, thermometer, volume gauge, tanks scales etc., to be in
accordance with metric system unless specially required by the Buyerss at early designing stage.

110 Operating Temperature


Operating temperature of all exposed deck equipment such as, but not limited to, cranes, windlasses, hydraulic

Page 15 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
aggregates, hatch covers, navigating equipment shall be minus 40 degrees Centigrade. (or to meet ICE class 1A
requirement)

111 Definitions Used In This Specification


The following standards to be applied on construction of the vessel:

Japanese Industrial Standards (JIS) or equivalent ISO standards. The Builder may alternatively use the
following equivalent Chinese Standards, provided it is documented to Buyerss supervisors, that these
standards have quality level and dimensions at least equivalent to the comparable JIS/ISO:

Chinese Industrial Standard (GB)


Chinese shipbuilding Standard (CB)
Builders Engineering Standard
Chinese Metallurgical Standard (YB)
Chinese Machinery and Electric Standard (JB)

The ISO Standard to be applied as far as possible.


Special care to be paid of having standard for securing inter changeability of flanges, grease nipples etc.

112 Language
All documents, manuals and drawings for design and construction of the Vessel which shall be submitted to the
Buyers must be prepared in English.

113 Buyers Supplied Items


Following items shall be furnished and supplied by the Buyers at their own expense, and received, stored and
installed on the vessel by the Builder.
All hoses, etc., other than those required by the Rules, or mentioned in this Specification.
.
Steel wires, ropes and hawsers for mooring in excess of the requirements of the Classification Society
and/or this specification.
Deck, engine and cabin stores in excess of those specified in this Specification.
All bedding (pillows, blankets, sheets, covers, etc.) but excluding mattresses.
All napery (serviettes, table cloths, etc.)
All cooks and stewards utensils (crockery, cutlery, silver-wares, china, glasses, pots, pans, etc.)
All chandlery (soaps, lamp oil, etc. ) toilet papers, food and other consumables.
All charts, sailing books and flags.
All consumable stores.
All medicine and medical equipment.
All air tools and hoses except those specified herein.
Personal calculators.

Recreational equipment other than mentioned in these Specifications.
Typewriter and other office machines.

Hand tools other than specified in Specification.
Broadcasting radio receivers and stereophony (sockets installed by Builder).

Page 16 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Paintings and pictures.
TV sets.
Spare parts, navigation equipment, flags, etc., in excess of the requirements of the Rules and
Regulations as specified herein, and/or those specified in this Specification.
Water, fuel oil, lubricants and grease, working oil for deck machinery, all consumable liquids or gas
including remaining L.O. in pipe etc. to be of the Buyers's account excepting those which have been
consumed trials and tests which are to be borne by the Builder.

STANDARD TO DELIVERY INVENTORY LIST

Besides the already built in equipment for galley, mess rooms, cabins etc following equipment to be delivered. The to be
delivered equipment must be of first class quality like SIEMENS, PHILIPS, BOSCH or AEG. All cooking appliances,
pans etc heavy model stainless steel with re-enforced bottom designed for use on electric stoves. Kitchen tensile, linen,
blankets etc to be of good quality at buyers satisfaction. Alternatively, a fair amount of money can be reserved for this
purpose, and then ships crew can buy the required inventory at yards account.

The following is always included in the ships delivery.

Pieces. Equipment. Position.


1 Deep fat fryer domestic model. Galley.
2 Toaster domestic model. Galley / mess rooms.
1 Microwave oven. Galley / Pantry.
1 Domestic cooling boxes maximum possible size with front doors. Galley.
1 Domestic freezing box maximum possible size with front doors. Galley.
3 Coffee makers 12-cup model. Galley / mess / bridge.
2 Electric water heaters 1 lt. model. Galley / Bridge.
1 Domestic multi function kitchen machine with auxiliaries. Galley.
1 Fixed, easy to clean, chopping block. Galley.
1 Domestic model mixer wit auxiliaries. Galley.
6 set. Towels and linen for kitchen use. Galley.
2 Frying pans big size heavy model with cover. Galley.
1 Frying pan medium size. Galley.
2 Cooking pan big size heavy model approximately 10 Ltr. Galley.
4 Cooking pan medium size model approximately 5 Ltr. Galley.
2 Cooking pan small size model approximately 1 Ltr. Galley.
1 set. Cooking pans several sizes. Galley.
2 set. Serving ware including soup bowls, serving plates etc. Galley / mess rooms.
2 Roasting tins 20- x 30-cm. Sizes depending on oven. Galley.
2 Water kettle. Galley.
2 Coffee cans 1 litre model. Galley.
2 Tee cans 1 litre model. Galley.
1 set. Kitchen knives several sizes. Galley.
1 Kitchen axe. Galley.
1 set. Wooden spoons. Galley.
1 set. Spoons etc. for kitchen use. Galley.
2 Can openers. Galley.
2 Cork screws. Galley.
3 Bottle openers. Galley.
1 set. Tableware including plates cups, eggcups etc. for 12 persons. Galley / mess rooms.
1 set. Tableware including spoons forks table knives etc for 12 persons. Galley / mess rooms.

Page 17 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
20 Coffee cups big model. Galley.
3 Serving tray. Galley.
2 set. Salt Pepper container. Galley.
15 Eggs cups. Galley / mess rooms.
3 Butter container. Galley / mess rooms.
3 Breadbox. Galley / mess rooms.
2 set. Storing boxes for spices, flour etc. Galley.
4 Dish wash brushes. Galley.
2 Plastic dishes wash basins. Galley.
1 set. Cake tins. Galley.
1 set. Bread bakers tins. Galley.
2 pair. Oven gloves. Galley.
10 Buckets plastic 5-litre model. Galley, mess laundry.
4 Waste buckets self-closing 25-itre models. Galley.
10 Floor towels. Galley, mess laundry.
4 Dust pan with brush for tables. Galley / mess rooms.
Toilet brush and holder. For every toilet.
Floor mats heavy quality COCOS. For deck entrances.
Floor mats light duty. For every door.
2 Multi system PAL, SECAM and NTSC television sets. Big screen. Mess rooms.
2 Stereo radio sets. Mess rooms.
2 DVD player. Mess rooms.
1 Computer multimedia to be used for playing games etc. Mess rooms.
1 Flat iron. Laundry.
1 Iron plank. Laundry.
1 Vacuum cleaner domestic model. Mess rooms.
4 Cloth hooks Every cabin.
2 Towel hooks. Every wet space.
Mattresses. For every bed.
Pillows. For every bed.
Deck bed. For every bed.
2 pair. Sheet. For every bed.
2 Mattress covers. For every bed.
2 Pillow cover. For every bed.
1 Blanket. For every bed.
2 Towel big size. For every cabin.
2 Towel small size. For every cabin.

1 set. Gedore tool-locker 1400 with tools S 1400 GM. (altas) Deck workshop.
1 Roll. Air hoses 13 mm and air nozzle. Workshop.
1 Roll. Fresh water hoses 15 mm with spray nozzle. Engine room.
1 Hacksaw.
1 Ships bell to be installed on foremast. Acc. the rules
4 coils. Polypropylene mooring rope suitable for the vessel. Tipto 8 220 mtr each
2 Emergency (fire) towing wire with eyes according CDI. 25 mtr each
2 Raft ladders advance. Acc. the rules
2 Pilot ladder length 4-metres. Acc. the rules
1 Roll Hot water resistant deck cleaning hose 25-meter.
1 set. Stay wires for fore mast, if any, stainless steel.
1 set. Turnbuckles for stay wires fore mast.
1 set. Signalling equipment as class / flag state required.
1 set Clocks for mess room, officer cabins, bridge and cargo office.

Page 18 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Bridge equipment.
1 Sextant with certificate. Acc. the rules
1 Barometer with certificate. Acc. the rules
1 Chronometer in box. Acc. the rules
1 Clock with sectors. Acc. the rules
1 Air thermometer
1 Seawater thermometer.
1 Hand megaphone Acc. the rules
1 Flexible sounding rod.
1 Hand led 30 fathoms complete with led weight. Acc. the rules
1 Set of signalling flags 70 x 90 cm. Acc. the rules
1 Ships national flag.
10 National flags at buyers choice.
1 Parallel ruler.
2 Chart dividers.
2 Binoculars 7x50 in box.
1 Day (Aldis) signalling lamp with 24 connection and battery. Acc. the rules
4 Safety explosion proof torch.
1 List of life saving signals for bridge. Acc. the rules
1 Wheelhouse poster (filled in after sea trials) Acc. the rules
4 Oil record books. Part II-cargo ballast operations tankers. Acc. the rules
4 Oil record books engine room. Acc. the rules
1 British Admiralty chart atlas.
1 Marpol regulations last edition with annexes.
1 SOLAS regulations last edition.
1 IBC code regulation last edition.
To be corrected to all compulsory publications according SOLAS, IBC
code and EXXONMOBILE safety criteria.

114 Hull Form & Model Test


The Builder is to design the hull form, propeller and rudder suitable for the vessels speed and performance.

The vessel shall have bulbous bow, raked stem and transom stern. The fore end of the bulb shall not protrude
beyond the fore end of the forecastle bulwark.
The stern plates shall be welded together against a solid round bar (about 100 mm).

The builder to submit report of model tank test estimated fuel oil consumption and ships speed for designed
draft condition and scantling draft for suitable range of main engine RPM to Buyers within 3 months from
signing the Ship Building Contracts.
Model tests to include the following:
Resistance tests at the designed draft and ballasting draft
Self-propulsion tests with stock propeller at the design draft and ballasting draft
Wake survey
Flow line plan

115 Trim And Stability


Trim adjustment by using ballast water to obtain approximately even keel at fully load arrival condition shall
be possible.

Page 19 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
At the preliminary stage, the Builder will submit trim and stability calculations to the Buyers at the following
loading conditions intended for the ships service.
Light ship.

Homogeneously loaded condition at scantling draft. Departure and arrival. Homogeneously based on
the design specific gravity

Group loading condition. Departure and arrival.

Ballast condition. Departure and arrival.

Dry docking.

Tanks 2, and 4 empty rest full.


Tanks 1, 3,and 5 empty rest full
Tanks 3 and 5 full rest empty
Tanks 2 and 3 full rest empty
Tanks 3 and 5 full rest empty
Departure condition shall be based on the full supplies of bunkers and other consumables, and Arrival
condition on approx. 10% supplies of departure condition.

Final trim and stability calculation for above loading conditions shall be made on the basis of the center of
gravity and the light weight of the Vessel obtained from the inclining experiment.

Specific gravity of water and oil for the trim and stability calculation shall be as follows:

Sea water: 1.025


Fresh water: 1.00
Heavy fuel oil: 0.98
Diesel oil: 0.85
Lub. oil: 0.90

Both intact stability and damage stability calculation shall be carried out according to latest regulation as
Intact Stability
IMO A749
Damage Stability
IBC Code
MARPOL
The vessel shall always comply with the above damage stability criterias without the need to taken any ballast
when vessel is loaded with a full homogeneously deadweight cargo.

Hydrostatic tables, light ship weight with centers of gravity and longitudinal weight distribution to be supplied
to the Buyers at an early stage of the design.

Loading conditions shall include calculations of longitudinal hull girder bending moment and shear force.

It shall be demonstrated that the hull girder bending moment and shear force for all loading conditions are
below the allowable limits required by Class.

Page 20 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Preliminary Trim and Stability Booklet including bending moment and shear force will be submitted to Buyers
at an early design stage.

A preliminary Capacity Plan to be submitted together with the preliminary loading conditions.

If the final trim and stability booklet is under process of approval by the Classification Society and/or other
assigned Authority, the Builder shall provide the provisional trim and stability booklet upon the delivery of the
Vessel.

(1)
When the vessel is substantially completed, an inclining experiment to be carried out to ascertain the
position of center of gravity of the vessel at the finished light condition.
(1) Substantially completed shall mean that only some minor works remains as agreed by Class and Buyers.

The inclining experiment shall be carried out in the presence of the Buyerss Representative and the
Classification Society surveyor. The procedure of inclining experiment and deadweight measurement prepared
by the Builder shall be approved by the Classification Society or other assigned Authority.
Incline test to be carried out in calm water and calm weather, with all cargo tanks and ballast tanks all full or
empty, bilge all clear and free of water or oil.

Slack tanks shall be avoided as far as practicable, free surface of remaining tanks shall be easy controllable.

The results of the experiment shall be submitted to the Classification Society or other assigned Authority for
approval.

The Builder will send the results for Buyerss approval or comments, if any.

In case of series of sister vessels, the inclining experiment shall be carried out only for the first vessel of the
series, if not otherwise required by Classification society.

116 Determination Of Deadweight


The deadweight is to be expressed in metric tons unit.
The deadweights is to be the difference between the displacement including shell and appendages of the vessel
at the scantling draught of 6.5 meters in fresh water (specific gravity to be determined by measurement on
the spot) and the light weight, which consists of following items:
Hull steel

Fixed fittings, equipment and inventories as per rule requirement

Machinery in dry condition other than mentioned in here after

Spare parts and tools in accordance with the class requirements.

Fuel oil in main engine, auxiliary engines and in supply piping from the outlet of service tanks to each
engine.

Lub. oil in main engine and auxiliary engines, in coolers for main engine and auxiliary engines and in
circulating piping from sump tank to each engine

Sea water in fresh water coolers and circulating piping from sea chests to overboard

Page 21 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Fresh water in main engine, auxiliary engines, fresh water coolers for main engine and closed
circulating piping from and to cooling fresh water pumps through the engine

The following items shall not be included in the light weight:


Spare parts and tools which exceed the manufacturers standards and Class requirements

All consumable stores

Articles supplied by the Buyers, which is not defined as part of the lightship

Crew and their effects

Oil and water in hull pipings and tanks

Others not mentioned as lightweight items.

117 Building Process


Construction and outfitting of the vessel to be made under the Builders building process and practice specified
hereunder.

Suitable size of blocks shall be assembled at shop in general and then erected on building berth or at building
dock.

In general, if auxiliary machinery (except generators), beds or seats for such auxiliary machinery, pipes, valves,
etc, shall be assembled and if required inspected at shop as a unit, then, such unit shall be brought onboard the
vessel and installed.

After installation or such units in the vessel, centering of the auxiliary machinery shall be checked by the
Builder and corrected by shims if necessary. The auxiliary machinery and accessories fitted in such units shall
not be dismantled for such checking purpose unless otherwise considered necessary. The Buyerss supervisor
(hereinafter called the supervisor ) shall be informed and attend the checking of the centering.

Excessive misalignment shall not be allowed to correct by shims, Class to decide whether a misalignment is
excessive or not.

118 Dry Docking


Vessel shall be dry-docked for hull cleaning and completion of painting and repair before seatrials. Any defects
found should be rectified before undocking.

Box Coolers should be opened up for inspection and clean if found necessary.

119 Inspection Tests and Trials

1191 General
Reference is made to Shipbuilding contract.
The Builder shall at all time keep the Buyerss advised in every respect of the programs of work and upon
request, methods which he intends to use. Notices of major events, tests and trials shall be given sufficiently in
advance to the Buyer to permit them or the person they designate to make necessary arrangement in order to
attend the tests or event.

Page 22 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
All necessary drawings and information which are required for the inspector or permit him to carry out his
work and keep the Buyerss advised of construction details and work progress, shall be made available to him
upon request.

Inspection by the Buyerss representatives shall be regarded as a verification of the Builders own quality
control measures and shall not be used as a substitute for quality control.

In case the Buyer Inspector is unable to attend any test, he may designate a person to act on his behalf,
otherwise the inspector shall waive the right to have comments for such test, provided notice is given as
agreed.

Whenever materials, equipment and machinery etc., have been tested and inspected by the Buyerss supervisor,
such material and equipment shall be clearly marked and assigned to the vessel. Such materials and equipment
shall not be exchanged with any other without the Buyers written consent.

At the acceptance inspection each space shall be completely clean and finally painted if/as specified and fitted
out in accordance with specification.

All piping shall be proven tight and free of internal obstruction. Electric cabling and equipment shall have a
satisfactory megger test and prove operational.

All test programs as given in the list for inspection shall be submitted to the Buyerss representatives for
approval at least two weeks prior to the test. Application for inspections shall be submitted to the Buyerss
representative the day before inspection if such inspection is in the Yard.

In general, all work equipment, machinery, systems etc. whether belonging to hull part or machinery part shall
be tested sufficiently onboard to prove specified performance, safe operation, suitability in service compliance
with all applicable Rules and Regulations.

The Builder is to deliver the vessel in a clean and freshly painted condition, all valves, wires, machinery oiled
and greased, refrigerated stores cooled down to operating temperature, hatches, booms and stores securely
stowed and ready for sea.

1192 Progress
The Builder is to provide the Buyers the intended schedule of construction until delivery before keel-laying, In
case the Builder falls behind the intended schedule, the Builder shall try all possible efforts to bring the vessel
back on schedule in order to meet delivery date.

Builders standard programs for inspection, test and trials shall be submitted to Buyerss for review/comments
a.s.a.p.

Building and construction plan and schedules for each vessel should be prepared by Builder and submit to
Buyers representative in writing monthly.

Page 23 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
1193 Tests and Inspection

11931 Hull Structure Tests


All steel structures to be inspected and tightness to be tested for tanks, bulkheads and superstructure deck and
other wet space etc. as required by the Class Rules.

Tank shall be tested hydrostatically or by air as required by the Class Rules.

X-ray photographs or ultrasonic inspection to be taken mainly from cross-points of seams and butts block
assemblies of bottom shell, bilge strake, main deck and sheer strake as required by the Class Rules.

11932 Hull Inspection


The block inspection shall be carried out after completion of hull block steel works. If fittings are fitted wholly
or partially to the hull blocks, the inspection for the hull blocks shall be carried out without dismantling such
fittings provided satisfactory access to all hull parts. The internal inspection for hull construction works of
tanks, engine room, etc. to be carried out even if outfitting works in such spaces have not been finished yet but
any works in connection with strength and tightness of the hull construction shall be completed before the said
inspection, in which case, after completion of the outfitting work, final inspection of such parts to be made in
accordance with the mutual agreement between Buyers representatives and Builder. Inspection of the hull
construction shall be made before any paint work is done.

Shop tests shall be carried out for the machinery and equipment by the manufacturers at their shops.

Test results of major machinery and equipment shall be furnished to the Buyers in triplicate.

The Buyers shall be informed of the shop test schedule at least seven days in advance of the expected date of
the shop tests and the Buyers attendance shall confirm with the Builder four days in advance of the expected
date of the shop test.

11933 Installations and Equipments


Installations and equipment shall be tested on board in accordance with the Class Rules and/or Regulatory
bodies and the standard of the Builder and approved by the Buyers.

11934 Piping Test


As far as hydrostatic test is practicable for a part of piping system, such test shall be made for such part before
completion of the whole system. Working test shall be carried out after completion of the piping system.

1194 Mooring Trial


Mooring trial for the main engine with associated auxiliary machinery and equipment shall be carried out prior
to the sea trials while the Vessel is moored at the Builders quay:
Confirmation of starting position
Turning gear interlock test
Confirmation of control position

Safety device test (automatic trip by simulation)


Minimum revolution test

Page 24 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Test of starting air capacity
Inspection of crankcase

1195 Sea Trial


When the vessel is substantially completed, sea trial shall be carried out by the Builder in accordance with the
sea trial procedure which shall be prepared by the Builder according to Class requirements and Testing of New
Ships and Builders standard, and shall be submitted to the Buyers for approval.

Marine diesel oil and heavy fuel oil with viscosity as available on the domestic market shall be used during the
sea trial.

All lubricating oils used for trials should be international brand and approved by Buyers. (Castrol)

Sea trial shall be carried out at the designed draft condition.


Sea trial to ascertain that the vessel conforms with the terms of the contract and specification.

Machinery and sea trials schedules in writing to be submitted to Buyers for approval 14 days in advance.
11951 Progressive Speed Trial
Speed trial for the assessment of the guaranteed speed performance shall be conducted in deep water, by
means of the GPS and shaft power to be measured by torsion meter.
Results of speed trials shall be corrected to the calm water (no wind, wave).

Applied method for correction shall be based on internationally accepted methods. Corrections shall be carried
out by Builder and approved by Buyers.

The progressive speed trial shall consist of one (1) double run (alternating in direction) at main engine loads of
60% MCR, 75% MCR, NCR and MCR.

11952 Endurance Trial


Endurance trial shall be conducted for four hours at NCR load and one hour at MCR.

11953 Maneuvering Trials


The following tests shall be carried out to check the maneuverability of the Vessel:
Crash stop astern and ahead test

Turning test

Inertia test

Minimum revolution test

11954 Other tests and measurements


The following tests and measurements shall be conducted at proper time during the sea trials according to the
requirements of the Classification Society and the Rules and Regulations and the Builders practice.
Unmanned operation test (during endurance trial)

Steering gear test

Shaft torsional and axial vibration measurement

Page 25 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Electrical load measurement (during endurance trial)

Operation test of navigation equipment.

Confirmation of gyro compass and adjustment of magnetic compass

Anchoring test

Black-out test

Fire detection and alarm test (or during mooring test)

F.W. generator capacity test at NCR during endurance trials.

Exhaust gas economizer evaporation test

Shaft generator running and take over.

Bow thruster test.

Gearbox gear tooth contact tests as per Class Rules

Other tests and measurements shall be carried out by Builder as required by Class and regulatory bodies.

In case of the series vessels following trials and measurements shall be conducted only for the first vessel for
Buyers.
Progressive speed trial except for guarantee speed point

Maneuvering trials

Shaft torsional vibration measurement

Electrical load measurement

11955 Overhauling, Inspection after Sea Trial


After sea trial, working parts of main engine shall be opened for the Buyerss inspection in accordance with the
standard of the Builder approved by Buyers and refitted to working condition. A confirmation dock run after
overhauling for hours at low load to be carried out before delivery.

Above tests shall be deleted for further sister vessels for Buyers after mutual agreement and successful sea trial
for first ship for Buyers.

120 Plans For Approval


A list of the plans for approval shall be prepared by the Builder. The list shall be mutually agreed by Buyers
and Builder at early time of design stage.

Softcopy of each of the plans for approval in AUTOCAD files shall be submitted (one copy send by E-Mail) to
the Buyers for approval in accordance with the List of the Plans for Buyerss approval.

The Buyers shall, within fourteen (14) working days after receipt thereof, return to the Builder one copy of
such plans with the Buyerss approval or comments, if any, written thereon.

In the event that the Buyers shall fail to return the plans within the time limits as herein above provided, such
plans shall be deemed to have been approved or confirmed without any comment. (The Buyerss comments
Page 26 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
may be made by facsimile or email).

The Builder may submit the plans to the Buyerss Representative resident in the shipyard for approval, subject
to the provisions of the Contract.

The Representative shall, within seven (7) days after receipt there of, return one copy of those plans with
approval of comments, if any.

The Builders standard plans and the manufacturers plans with or without modifications may be used as plans
for approval and also working plans. The drawings can be submitted in softcopy via email. However the final
drawings submitted to Buyers shall have both one set of softcopy in AUTOCAD files and one set of hard print.

121 Finished Plan And Instruction Books


At the time of the Vessels delivery, finished plans both softcopy in CD Rom in pdf format and hard blueprint
shall be furnished to the Buyers in triplicate, one copy to the Buyerss site office and two (2) copies to the
vessel.

The scope of supply of the finished plans shall be in accordance with the Builders standard and the list of the
finished plans shall be submitted to the Buyers in due course for approval.

The following plans, one copy each, shall be provided in frames and placed on board the Vessel at such
locations as designated by the Buyerss Representative:
General arrangement (2 Sets)

Capacity plan with deadweight scale

Maneuvering characteristics

Safety plan (2 Sets)

Three copies of the instruction books of the Vessels major machinery and equipment shall be furnished, one
set of the Buyerss site office and two sets to the Vessel.

General Arrangement Plan, Capacity Plan and Pocket Capacity Plan shall be supplied as reproducible in
addition to copies.

122 Name Plates And Identifications


Name plates for main engine, deck machinery, auxiliaries and electrical equipment shall be described in
English and in metric system. Name plates of other installation shall be referred to respective specifications.

Name plates and caution plates shall be described in English.

All name plates and caution plates shall be approved by Buyers.

Name plates shall be screwed on, glue is not allowed for fixing name plates.

Boundaries of tanks and every 10th frame should be marked with welding beads.

Page 27 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
123 Delivery
When completed, the vessel shall be delivered to the Buyers in a seaworthy condition, safely afloating at the
Builders wharf or Shanghai area under the requisite legal formalities.

Tanks, cargo holds, bilges, accommodation and other spaces shall be free from tonnage and dirt, completed in
every respect and ready for service. Painted surfaces shall be touched up and cleaned, machinery to be in
running order, all electric lights to be in good working order, outfits, spares and stores to be properly stowed,
and compass to be adjusted.

124 Exemption
For the second and successive sister vessel, the submission of plans for the Buyerss approval may be exempted
with in so far as there involves no alteration of the design. Also the following tests may be exempted subject to
approval of the Buyers, Classification Society and other regulatory bodies.
Inclining test (deadweight measurement shall be carried out)

Stopping inertia test

Measurement of crash stop test

Turning test 360 degrees with the helm angles of 35 degrees port and starboard

Model tank test.

200 General Particulars

201 Principle Dimensions


Length overall: 111.50m approx..
Length b. p.: 106.00m approx
Breadth mld: 17.60 m approx.
Depth mld: 9.00 m approx.
Design Draft: 6.80 m approx.
Scantlings Draft: 7.20 mtr approx.

202 Speed and Endurance

Trial speed at design draft at 85% of. continuous output of main engine (MCR), with clean bottom in calm
and deep sea under beaufort scale of 2 or less about 14.0 knots.
Endurance based on 98% of heavy fuel oil tank capacity and service speed of 14.0 knots will be decided
according to the tank capacity plan with minimum 4000 sea miles.

Fuel oil consumption per day will be determined later at 90% of maximum continuous output for propulsion
(the figure is based on a lower calorific value of at least 42,700KJ/Kg and according to ISO 3046/I). Fuel rate
for main engine at MCR is with reference to main engine maker.

203 Installed Power

Main engine MAN B&W 7L28/32A


Number of set 2 sets

Page 28 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Max. continuous output (MCR) 1715KW
Max. continuous revolutions at MCR 775 rpm
Continuous service Rating (CSR)
Propeller
Type 4 Blades, controllable pitch type
Number of set 2 sets
Gearbox For details see item 9023
Revolution of propeller To be determined
Diameter of propeller To be determined
Ni-Al-Bronze
Material of propeller
Main generator set
No.of set & power Three (3) sets x according to power balance
Electric source calculation abt. 400 kw x 1800 rpm
A.C. three phases, 450V, 60Hz.
Emergency generator set Same as main generators
No.of set & power 1 set x 250 kW x 1800 rpm
Electric source A.C. three phases, 450V, 60Hz.

Main generator sets depends on the cargo pump driven system.


Electrical load balance has to be made before power of main generators can be decided.

Shaft Generator
Shaft Generator 2 sets
Electric Source A.C. Three phase, 450 Volt. 60 Hz.

Shaft generator should be of PTO only


Cooling system for all engine (except emergency generator) shall use box coolers as much as possible to avoid sea
water pumps and sea water pipe lines in engine room.

All generators are arranged and able to run in parallel with automatic load sharing.

When running the two sets of shaft generators, the generated power should cover all normal electricity consumption
onboard without running the main or emergency generators

204 Deadweight and Capacity


The guaranteed deadweight in sea water (specific gravity of 1.025) shall be 7500 metric tons at designed
draught of 6.80 m.

Scantling draft will be 7.20 mtr. Approx.

Following is the detail tank capacities of the vessel;

Page 29 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Cargo tanks capacity (98% full) abt. 8500 m3

Fuel oil tanks capacity, incl. Service & settling tank abt. 250 m3
Diesel oil tanks abt. 100 m3
Fresh water tanks capacity (98 % full) abt. 100 m3
Water ballast tank incl. F.P.T. & A.P.T. abt. 1950 m3

205 Cargo List


The cargo list of oil product and chemicals (Noxious liquid substances in bulk certificate) carried by this vessel
shall be according to the Class Notation. The cargo shall not be harmful to the vessels structure construction
and cargo handling system. Following is main cargo list:

1 Oil cargoes (MARPOL Annex I), exclude Asphalt, Bitumen, etc.


Included oil like substances.
2 IMO Type II Chemicals and etc.
3 Molasses

206 Bow Thruster


The vessel shall be equipped with a bow thruster at forward of ship to improve maneuvering performance.

400 kw electric driven motor shall be installed. The motor shall be soft started without causing black outs.

The four blades controlled pitch propeller is equipped or fixed pitch with 3 steps controller.

207 Deck Heights, Sheer And Camber

2071 Height Between Decks At Centerline

Item Metric (just for reference)


From upper deck to poop deck 2.70 m
From poop deck to boat deck 2.60m
From boat deck to navigation bridge deck 2.60 m
From navigation bridge deck to compass deck 2.60 m
From upper deck to forecastle deck 2.60 m

2072 Shear On Main Deck


Due to Camber

2073 Camber of Decks


Main deck, straight camber 0.32 m
Forecastle deck, straight camber 0.32 m
Other decks 0 m
Platform decks in engine room 0 m

Page 30 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
208 Complement
According to agreed G.A. and Accommodation plan.

Page 31 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

300 Hull Structure

301 General
The ship is designed at a scantling draft of abt 7.20 m and shall be approved by BV. It is of all-welded mild
steel construction. High tensile steel may be used for ice strengthened area to reduce the light ship weight.

Structure work shall be executed in accordance with the Builders standard practice with reference to JIS
standard which is approved by the classification society.

Welding shall be performed by manual, gravity, electroslag, CO2 and automatic welding. Continuous welds to
be applied in all tanks, wet spaces and external areas. Full penetration welds to be applied in cargo tanks.

The combined framing system is used for the hull structure. The main hull structure is designed and checked
against the class rules for carrying product oil and chemicals. Cargo oil tanks are suitable for partially loading
cargoes with specific gravity up to 1.52. The structure scantlings are suitable for any level of filling, including
alternative loading. The sloshing effects are to be considered for deck structure, bulkhead structure during
partial loading condition.

One central longitudinal continuous oil tight vertically corrugated bulkhead and seven transverse oil tight
vertically corrugated bulkheads are allocated in the cargo oil hold region. Two transverse bulkheads at the both
end of cargo area shall be flat bulkhead with vertical stiffeners face outside of cargo area. There will be no
frames stiffeners or what so ever inside the cargo tanks. The use of angle bar as framing is avoided as much as
possible.

Structural strength including buckling strength of the corrugated bulkheads should be calculated and approved
by BV classification.

Main hull structure shall be designed and calculated in accordance with the requirements for oil tanker with a
NLS certificate of BVs Rules. The hull structure to be designed to fully load liquids with specific gravity up to
1.52 t/m3 in cargo tanks and slop tanks with adjacent tanks to be empty, including slack tank conditions.

Longitudinal strength including bending moment and shear force at specified bulkheads for all loading
conditions will be calculated.

The scantling of all structural members shall comply with the rules of classification society unless specify here
after.

Before assembly, all steel plates with thickness 6 mm or more that are to be painted later shall be shot blasted
according to Swedish Standard SA 2.5 and painted with 15 micron zinc silicate primer.

Insert plates shall be used instead of doublers as much as possible.

The use of angle bars must be avoided, as much as possible. In principle angle bars should be only used for
framing gratings.

Page 32 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
If angle bars must be used outside they must be used as V shaped frames, fully welded and top and bottom
of such frames must be totally closed, so that the water cannot penetrate inside this frame.

302 Material and Welding


All mild steel higher grade steel, forgings, castings and anti-magnetic material manufactured in the hull
structure and deckhouse shall meet the quality as per required by classification society.

Steel material not specified by the Classification Society shall be in compliance with Chinese Industrial
Standard according to the Builder's practice.

In way of compass zone, non magnetic steel plates and sections shall be used as per requirement of rules.

Steel plates shall be free from lamination and segregation. Visible steel plates at outer shell plating above and
below waterline shall be smooth without defects and repairs.

Castings and forgings below waterline, such as shaft struts, bossing, rudder horn and stock shall be delivered
with first class surfaces without pins or blow holes. Sand and slag enclosures shall be avoided. Gas cutting
notches shall be smoothly rounded and uneven spots shall be smoothed by grinding.

Welding procedure including edge preparation shall be executed in accordance with the Builders established
modern welding procedure and practice with reference to EC/JIS standard and approved by the Classification
Society.

Automatic welding shall be used to the greatest extent. The welders engaged in the welding shall be fully
qualified and holding welding certificates from the Classification Society for the type of welding carried out.

Electrodes and other welding materials have to be properly selected for the special intended purposes.

All welding shall be continuous except in dry spaces in the superstructure and deckhouse where intermittent
welding is permitted.

Care shall be taken to avoid stress concentration due to welding, heating and discontinuity of the structure or
build in stress.

In order to ascertain the soundness of welding suitable number of X-rays photograph to be taken for the
important members according to the Rules' requirements. The X-ray photograph and report shall be submitted
to the Buyers for checking.

All fittings (including bolts and nuts) on deck unless otherwise specifically specified are of stainless steel
materials.

303 Main Hull


The ship shall be designed as double hull construction. Double skin and double bottom shall be provided as per
Rules requirements.

Page 33 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
The width of wing tanks shall be 1.0 m and the height of double bottom shall be 1.2 m.or smaller if allowed by
Marpol requirements for IMO type II ship .

The scantling, construction and materials of hull within a range of midship part shall be as shown on Midship
Section Plan.

In designing, longitudinal strength to be checked to all loading conditions required by the Rules. It is to supply
the calculation of main structure, midship section, construction plans (incl. profile, decks, bottom etc.) at the
technical designed stage.

Double bottom to be located in cargo oil tanks region, pump room and engine room.

The bottom plate and inner bottom plates in cargo oil tanks region shall be stiffened by longitudinals, and those
in engine room shall be stiffened by floors. The inner bottom plating in cargo tanks shall be sloped towards
cargo pump suction well (near centerline of vessel). The suction well structure for cargo pump to be designed
by the cargo pump Manufacturer and to be approved by the Buyers. The suction well must have round corners.
All suction wells with fittings, bolts and nuts for cargo pumps are of stainless steel AIS316L materials,

The bottom plate at the forward area shall be strengthened in accordance with the Rules.

One tier non-watertight platform deck shall be arranged in engine room.

Shell framing in engine room to be adopted transverse framing type and the web frame to be fitted. Pillars shall
be fitted in suitable frame and to be connected with the plate floors and transverses.

The fore and aft peak tanks to be used as water ballast tanks and shall be built with transverse framing system.

The shell plating in way of hawse and one plate below shall be strengthened with thicker plate. Stem frame
shall be of fair formed steel plate construction, well raked forward with round and to be of welded construction
with suitable breast hooks.

A sheerstrake shall be butt welded to the deck stringer plates. Openings of shell such as sea chest shall be in
accordance with the Rules.

The thickness of upper deck within 0.4L amidships to be met the requirements of longitudinal strength.

The transverse bulkheads and centre longitudinal bulkhead in cargo oil tank area shall be vertical corrugated
type bulkheads. However the transverse bulkhead for both end of cargo area shall be flat type bulkhead with
stiffening facing outside of cargo tank. Side longitudinal bulkheads formed wing tanks in cargo space shall be
flat type bulkhead with stiffening facing outside of cargo tank as well. The longitudinal bulkheads of double
hull construction shall be designed with longitudinal framing in wing tanks. NO frames and or stiffeners or
what so ever, are allowed inside the cargo tank.

304 Stem and Stern


The stem which is casting, throughout together with bulbous bow shall be of fabricated welded steel plate
constructions to the shell lines, and welded to the shell and keel plates.

Page 34 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Stern frame is to be of fabricated welded with steel plates and weldable steel castings.

Low hydrogen electrode shall be used for welding thick steel plate to casting.

305 Keel Plate


The plate keel shall be connected firmly with stem and stern frame.

306 Shell Plating


Stringer plates and sheer strake are to be connected welded "T" type corner fillet.

Section Plan welding quality and inspection are to be in accordance with the requirements of the Rules.

Extra thickness and stiffeners undersides are to be provided by inserted thicker plates in way of run of anchor,
anchor housing, around sea chest openings. Openings in shell plating to be well rounded and reinforced by
inserted thicker plates.

The thickness of the shell plates shall be reduced gradually from midship to fore and aft end in accordance
with the requirement of the Rules.

The lifting rings to be provided for propeller and rudder installation. Lifting lugs with SWL marking by
welding beads should be arranged in the longitudinal directions.

307 Bottom Structure


Longitudinal framing system are to be provided for hull bottom construction in cargo tank, and transverse
framing system for engine room space and fore and aft peak tanks.

Attention shall be paid to the members for the transition region of the longitudinal and transverse framings.

In double bottoms, solid floors to be fitted for suitable frame spaces, and watertight floors to be fitted at
watertight bulkheads. Bottom and inner bottom longitudinal as well as side girders shall be fitted.

Solid floors shall be fitted at every frame in fore peak and aft peak. Suitable drain holes to be arranged in
double bottom tanks so as to be able to discharge/drain easily.

308 Side Shell Structure


The upper part of side shell structure to be of longitudinal framing system. Web frame shall be fitted in
association with solid floors.

309 Decks
Upper deck shall be strength deck, longitudinal framing system shall be adopted.

Web beams shall be fitted in line with web frames.

The camber of upper deck shall be straight.

Page 35 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Structure shall be suitably strengthened under cranes, etc.

Deck plating under all machinery such as cranes, windlass, and mooring winches should have increased plating
thickness.

Platform deck to be provided in engine room, platform for the generators shall be reinforced necessarily.

310 Pillars
Pillars shall be provided where necessary in engine room in association with web trams and web beams.

Adequate number of pillars shall be provided under the superstructure decks or deck house walls under
concentrated loadings.

311 Bulkhead
Watertight transverse bulkhead shall be extended to the upper deck as shown on the General Arrangement
Plan.

The transverse bulkheads between cargo tanks shall be of vertical corrugated type without upper and lower
stool. The longitudinal bulkheads in cargo tanks shall be of plane type.

Outside boundary walls for the superstructure to be plane with vertical stiffeners. For the inner boundary walls,
the corrugated steel walls could be provided. The reasonable arrangement for steel walls in the deck houses to
be provided so as to reduce the vibrations to the least.

Boundary steel walls to be built for the carpenter's work room, stores, control rooms and other necessary space.

312 Peak Tanks


Fore and aft peak tanks to be reinforced with side transverses, side stringers or non-watertight opening
platform and to be used for water ballast tanks.

Fore peak and fore area shall be reinforced for panting and slamming.

313 Superstructure and Deck House


Four tires of superstructure shall be arranged on the after of main deck as per General Arrangement Plan.

Superstructure and deck house are of welded steel construction. In general, the plates thickness shall not be
less than following table;

Exposed deck: As per class regulations


External walls: 7 mm ,, ,,
Other area: 6 mm ,, ,,

The superstructure and deck house are steel flat plates watertight construction with vertical stiffeners.

Forecastle and poop deck shall be of transverse framing system in connection with strong beams, girders and
pillars. Deck house shall be of welded plating stiffened with beam and girder.

Page 36 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

A flat plate with stiffeners shall be applied for the accommodation front wall and accommodation house walls.
All accommodation block plate stiffeners are fitted internally.

Decks in superstructure and deck house shall be transversely/ longitudinally stiffened with beams, girders.
Continuous welding is employed at all wet spaces.

Wheel house front wall shall be inclined outwards from the navigation bridge deck as shown on the General
Arrangement Plan.

314 Rudder

Rudder will be Barkemeyer Flap type, rudder will enclosed gear.

All below paragraph depends on Barkemeyer specification.

Rudders shall be designed according to the speed at maximum continuous rating with fully loaded condition.
The working angle shall be 45 degrees from the rudders center vertical plane. Rudders shall have necessary
area to keep reasonable course stability and steering performance in accordance with good maneuverability.

Two sets of rudder with double plates, streamlined, semi balanced hanging high efficient rudder type
(Barkemeyer Flap type) and of welded steel construction and welded cast steel shall be installed in line with
the propeller according to makers instructions.

Two stainless steel (AISI 316L) plugs for filling and draining shall be fitted at the top and bottom of the
rudders (depends Barkemeyer design).

Water tightness shall be tested in accordance with the requirements of the classification society.

The lifting hole shall be provided on rudders which is able to be kept closing by welded plate.

Welded jumping stopper shall be provided on the top of lower pintle housing(clearance is approximately 2 mm)
to prevent the rudder from undue lifting and accidental up-shipping (depends Barkemeyer design).

Pintle housing on rudder shall be of cast steel and have cone part. The pintle bushes shall be renewable in
position without up-shipping the rudder.

Bottom clearance of the rudder and propeller shall be of minimum 200 mm above the baseline.

Rudder stock and pintles (upper and low) shall be of forged steel with stainless sleeve at the position of rudder
carrier of material recommended by the rudder manufactory. Rudder stock is coupled keyless with the rudder
ad fixed by the bottom nut.

The lower (wet bearing) of the rudder stock shall be made of ORKOT or RALCO bearing (artificial material)
or completely sealed bronze bearing. Rudder stock bearing, seal and all major bearings are to be lubricated by
means of an automatic electric driven lubricating device to circulate the grease. The complete rudder truck will

Page 37 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
be filled with grease. The Builder will install the pump and grease filling system.

A cast steel rudder carrier and bearing with bronze (BC 3) bush shall be fitted ton the steering gear deck and
will support the weight of rudder and rudder stock.

All above rudder construction in accordance with the manufactory instructions.

315 Miscellaneous

3151 Foundations
Foundations for main engine are constructed as part of double bottom construction in engine room. The soft
support may be used to reduce the vibration and noise in engine room.

The auxiliary engine and generator shall be provided with a common bed-frame foundations. The auxiliary
engines should be flexible mounted on there foundations.

The foundations for deck machinery and other equipment etc. shall be provided, where necessary.

The foundation shall be able to access for cleaning and drainage.

Deck machinery and equipment such as windlass, steering gear, pumps, motors, HVAC unit and etc are
generally provided with integral foundation of steel welded construction with reinforcement underneath if
necessary. The foundation shall be of proper height which enable easy maintaining.

3152 Bulwark and Hand Rails


Steel bulwark is provided in way of fore end of forecastle. The bulwark plate thickness shall be increased in
way of openings for fairleads, mooring chocks and etc.

Both sides of interior stairways and exterior stairs shall be fitted with stainless steel pipe hand rails. Galvanized
steel pipe handrails are fitted for accommodation deck, main deck, catwalk and sidewalk as shown on General
Arrangement Plan.

Storm handrails shall be fitted on exterior bulkheads of all superstructure and deck houses surrounded by free
decks. Protective rails, screens or guards shall be fitted. All handrails are installed at height of 1050 mm.

3153 Catwalk and Sidewalk


A passage bridge catwalk is installed to connect after superstructure with forecastle deck. The galvanized steel
grating will be used for catwalk floors. Sidewalks from fore ship to after on both portside and starboard side of
the ship will be installed. The galvanized steel grating will be used for sidewalk floors. Side path shall have be
fitted with railing with height at 1.1 m .

3154 Bilge Keel


Bilge keel with a length of approximately 30 percent of the vessels length to be arranged.

At the each side of the vessel the bilge keel shall be fairly tapered without special reinforcement.

Page 38 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
3155 Chain Locker
Two self stowing chain lockers are installed as shown on General Arrangement Plan. Chain lockers are square
type of all-welded watertight construction. All stiffeners of chain lockers are arranged on the outside of the
lockers.

Suitable foot holes are provided through the main deck level to the bottom and a watertight access manhole
shall be fitted. Access manholes are arranged on the chain lockers wall in boson store for the inspection of
lockers and chains.

Perforated steel gratings are laid above the bottom and adequately supported to be bear the weight load of the
chains.

Quick release for anchor chains with turning wheels to be provided as anchor chain end attachment.

3156 Hawse Pipes


The hawse pipes are built with separate pipes of welded steel. The hawse pipes are arranged to allow easy
dropping of the anchors clear of stem and supported substantially by deck, shell and web frames with enough
brackets, ribs and etc.

On the bow two-anchor pockets to build in. the thick walled hawse pipes to point in such direction that anchors when
dropped will always clear vessels bulbous bow. Design of anchor pocket and recess to meet Keil Canal requirements.
Anchors to stow securely in pockets so as not to rattle or shift due to motion of the vessel of force of the areas.
Additonal heavy anchor locking wire devices to be provided to enable the anchors are securely fasten in place when
stowed. On places where anchors and chain touches the ships hull, reinforced worn out protections of solid half round
steel bars to be made. These protections to be made from solid half round bars and to be fitted around the hawser pipes
on deck and at the sides of the pockets. The hawser pipes to be provided a chain-wash device connected to the fire
fighting system. Chain-wash device to be controlled by means of a valve in the close neighborhood of the anchor winch.
On top of each hawser pipes easy to remove 12 mm steel plates to close the hawse pipes with stainless steel bolts and
butterfly nuts.

Three jet nozzles are provided in each hawse pipe for chain cleaning. The jet nozzles shall be connected with
fire fighting system. Chain wash device shall be controlled by means of valve close to the anchor winch.

3157 Sea Chests and Box Cooler


Sea chests shall be installed to suite requirements of the ice class( 1A) rules. Chest openings have proper shape
so as to avoid reinforcement of shell plates such as fitting doublers or inserted thicker plates.

Box cooler shall be installed along with sea chest for the purpose of cooling main engines and generators.

Sufficient zinc anodes shall be installed in sea chests as per requirements of class notation. Anti fouling
protection (Impressed current will be fitted for box cooler.

Lifting lugs with SWL marking by welding to be provided on top of the box coolers in the engine room.
Hinged grating covers to be provided for all sea chest suctions and secure by 316L stainless steel bolts, nuts
and locking wires.

Page 39 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
3158 Bottom Plug
Double bottom ballast tanks shall be provided with two bottom plugs.

Other tanks and cofferdam connected to the Vessels bottom shall be


fitted with one bottom plug which shall be allocated away from keel plate as far as practicable.

The bottom plugs shall be of stainless steel (AISI 316L).

No bottom plugs in fuel oil and fresh water tanks

Drain plugs to be secured by sport welding when fiited in place.

3159 Funnel
The rectangular funnel shall be welded construction with vertical stiffeners and horizontal stringers, and with
closed top plate, adequate number of eye plate, and a steel door on it.

Funnel structure shall be strengthened at supports for exhaust pipes etc. Eyes or rail for painting stage shall be
provided outside.

Access ladder to be installed inside the funnel to access the funnel top platform.

Company funnel logo to be marked by spot welds on both sides of the funnel. Logo to be painted as per sample
provided by Buyers.

Funnel logo illumination flood lights to be provided on both sides of the funnel.

Page 40 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

400 Paint and Corrosion Control

401 General
All painting works including surface preparation and painting inspection shall be carried out according to ISO
8501 standard, the paint makers guidelines and Builders practice and standard as well as this specification.

The painting life of peak tanks and water ballast tanks shall be guaranteed for five years. The coating life of the
cargo tanks (Marinline Coating) shall be in accordance maximum period given by makers and not less than 5
years.

All other paint system shall be guaranteed for three years.

Paint shall be applied by airless spray in general. Where the spray is difficult to apply, brush or rollers may be
used. All in accordance of the makers instructions.

No paint shall be applied to the following surfaces:


Copper, brass, bronze, aluminum, aluminum alloy and other non corrosive metals except
specifically mentioned in this specification.

Wooden work in stores.

Galvanized fittings in hidden spaces and in tanks except cargo oil tanks.

Inner surfaces of doublers and steel surface enclosed tightly.

Internal steel decks covered with deck covering.

If necessary the damaged parts of galvanized surface shall be pickled SIS ST3 grade touched up with one cost
of zinc rich paint or equivalent (immersion part: touch up with finish paint same as surround area).

Walkway, vertical ladder, U-bolt/nut and others

Inside: Galvanized

Outside: Galvanized and touch up with finish paint as surround area

Final color shall be approved by Buyer. However the colors of each coat other than the final one shall be in
accordance with the paint makers guideline which will take consideration of the final finish color. Each coat
shall have different color. Pipes shall be colored as per ISO colour code.

Ballast tank and Cargo oils tank coating procedure after completion of hot works and tank testing shall be
carried out in accordance with the Builders practice and be mutually agreed by Builder, Paint Manufacturer
and Buyers.

All rubber gaskets, jointing, electric cables and door seals should be protected before painting the surrounding.

Page 41 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
When the above are found covered with paint have to be replaced or renewed.

402 Surface Preparation

4021 Primary Preparation


All steel plates and section shall be shot blasted to SIS Sa 2.5 and immediately primed with one cost of
inorganic zinc silicate shop prime applied to dry film thickness of 15 microns which will be suitable for next
coating scheme. The inorganic zinc silicate shop primer has to be approved by Class and coating manufactory

The thin plate with thickness under 6 mm and profile with length under 3 m shall be de-rusted to SIS ST3.

All sharp edges of gas cut plate shall be ground smooth with abt. 2 mm radius. Irregular leads of welding shall
be ground smooth before application of paint. Surface damages such as pitting, undercut and etc shall be
welded up and ground smooth before application of paint.

The painting of the exposed surfaces such as outside shell, superstructure, deck house, funnel and living space
shall be free from nag and run.

After the specified coating is applied, the paint film for the damaged parts shall be prepared at proper time.
When such damage comes to the surface of steel and rust occurs, the surface shall be cleaned to secondary
surface preparation grade and coated as originally specified.

When such damage does not reach to the steel surface, the surface can be touched up to the specified film
thickness.

4022 Galvanizing
Galvanizing can be done by hot dip method according to normal practice..

Damaged area of galvanizing part shall be touched up by one coat with zinc rich epoxy.

4023 Secondary Preparation


Before the first coat is applied, the damages on shop primer by welding, burning, rubbing etc., and the rusted
steel surface shall be prepared in accordance with following table,
Location Surface Preparation Grade
Block stage At slip way or docking /
mooring
Outside shell ST3 ST3
Upper deck ST3 ST3
Outside accommodation & Mast ST3 ST3
Water ballast tanks According to makers ST3
instruction
Cargo oil tanks SA 2,5 according makers SA2.5
instruction
Slop tanks As cargo tank
Void space and cofferdam ST3 ST3

Page 42 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Engine room ST2 ST2
F.O. and L.O. tanks ST2 ST2
F.W. tanks No treatment Sa2.5

403 Shop Primer


The shop primer serves to protect the steel from corrosion during construction before application of the hull
paint scheme.

Shop primer must be acceptable for the follow up paint system.

404 Paint Works


During construction, any damage to the shop primed surface shall be cleaned by power tools and directly
painted with the first coat primer according to paint scheme without touch up of shop primer.

Minimum over coating time of painting application shall reference to Manufacturers guideline.

Welding slag, weld splatter, gas cutting edge shall be removed/ground smooth prior to paint application.

Watertight weld lines via manual welding shall be painted after the air test.

Non watertight weld lines and fillet welding for stiffening member shall be painted after block inspection.

Any structure/spots except above to be painted before inspection shall have consent from classification society
and Buyer.

All machineries and electric equipments shall be coated in accordance with makers standard. The damaged
part shall only be touched up in accordance with Builders practice with one coat of finish coat of compatible
type.

Prior painting, the surface shall be cleaned of oil, moisture, dust, zinc, salt and other foreign material with
thinner, fresh water, wire brush and etc..

405 Film Thickness


Measurement of dry file may be done with magnetic film gauge such as MICRO tester or ELCO meter.
The dry file thickness specified in the painting scheme shall be achieved for at least 90% of the total area.

406 Measuring
Dry film thickness shall be measured after application of final coat of paint. The records shall be submitted to
Buyer.

No measurement shall be made for about 100 mm breadth from the free edges of painted steel members,
surfaces of fittings.

407 Inspection
The surface preparation and checking of paint dry film thickness shall be carried out by the Builder in the
presence of Buyers representative and paint Manufacturer.

Page 43 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Record of temperature and humidity shall be maintained during the painting work.

408 General Cautions


Mixing and thinning of paint material, conditions/methods of application and time interval between each coat
shall be observed to the paint Manufacturers guideline. The paint shall not be applied during the period of rain,
snow, fog or mist and not be applied when the weather condition may cause condensation ie RH above 85%
and steel temperature lower than 30C below dew point. Further more, during cargo oil tank coating, the
humidity level shall be maintained relatively under 60%. According to makers specification.

409 Paint Schedule

4091 Ballast Tanks Coating


Ballast tanks shall be coated as epoxy light color paint layers. Black paint layers are not allowed.

Fresh Water tanks shall be coated as epoxy light color paint layers according makers instruction.

4092 Cargo Oil Tanks Coating


Cargo oil tanks shall have surround coating which is listed in the maker list The coating shall comply with
attached cargo list as 205 . Supervision of the application shall be executed carefully. The Builder shall provide
at least guarantee along with insurance in accordance maximum period given by makers

4093 Decks Superstructures and Other Places Coating


Epoxy system shall be used as per following specification.

4094 Painting Scheme


Painting scheme shall follow the below specification.

Painting scheme for the parts and spaces which are not specified herein shall be similar to surrounding space or
comparable spaces.

The finished paint for weather part shall be applied by semi gloss or matt material.

All paint thickness specified are dry file thickness.

Area Type of Paint Film Thickness


(micron)
Bottom & Vertical Bottom up to Epoxy 1 x 150
ballast water line Epoxy 1 x 150
Self-polishing A/F coat 2 x 125
Topside Epoxy primer 1 x 150
Epoxy primer, Semi gloss 1 x 150
1x 50
Exposed deck, cranes, Epoxy primer 1 x 150
deck-machinery, etc. Epoxy primer 1 x 150

Page 44 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Area Type of Paint Film Thickness
(micron)
Epoxy finish semi gloss 1x 50
Polyurethane
External superstructure Epoxy primer 1 x 150
Mast, davits, decks Deck Deck Epoxy primer 1 x 150
houses Epoxy finish High gloss 1x 50
Polyurethane
Cargo/Slop tanks Marine Line Coatings U.S.A. 2 x up to makers
specification
st
Water ballast tanks, cofferdams, 1 epoxy buff
nd
bow thruster space, chain 2 Epoxy gray Up to makers
lockers, all bilges and void specification
spaces.
Fresh water tanks Pure epoxy 2 x 125
Peak tanks Same as ballast tanks 2 x 125
Fuel oil/Lub. oil tanks Rust inhibitive oil
Interior deck part, engine-room Epoxy primer 2 x 125
stores etc. Polyurethane 1x 50
Interior walls behind insulation Epoxy primer 1 x 75
and paneling
Other area Conventional paint

Painting Maker to be furnished the final painting schedule based on the discussion between the Buyers and
Shipyard. The final painting schedule shall be submitted to the Buyers for their approval.

Following paint makers are acceptable:


Sigma, Hempel, Kansai, Chugoku, International and Jotun.

410 Cathodic protection


Cathodic protection shall be provided for the hull, bow thrusters pip, ballast tanks, sea chest and etc by means
of sufficient amount of zinc anodes with average current density at 5 ma/m2. Anodes shall be certificated as
non sparking. Anodes plan shall be submitted for Buyers approval. The anodes shall be placed so that they
can not be easily damaged during vessels mooring maneuver. Life expectancy of anodes shall be three years
for hull and five years for water ballast tanks. The dimension and arrangement of the zince anodes shall be
proposed by the manufacturer and approved by the Buyers.

All zinc anodes should be properly protected and covered before painting the surrounding.

Zinc anodes should not be placed on or near to fuel oil and lubricating oil tanks.

411 Antifouling System for Box Coolers


Antifouling system Impressed Current system (Buyers will investigate the impressed current system for box
cooler) for box coolers shall be installed. According makers advise.

Page 45 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
500 Accommodation

501 General
Accommodation shall be arranged for sixteen (16) crews as shown on the General Arrangement Plan. The
construction shall be in accordance with SOLAS 1974 and latest amendments. The accommodation shall be of
European Standard with individual cabin, shower and private toilet . The clear height in cabins shall be 2.1 m
minimum.
The cabins shall be arranged as shown on the General Arrangement Plan.

Public rooms and duty rooms to be provided as following

2 Mess rooms for Officers & crews


1 Ships office
1 Deck changing room
1 Engineer changing room
1 Cargo control room
1 Engine control room in engine room
1 Wheel house combined with chart space and radio space
1 Galley with pantry
1 Refrigerating provision store
1 Ships laundry/drying room
The accommodation plan shall be approved by the Buyers prior the construction.

502 Deck Covering


All Living Spaces, public area, : Vinyl sheet 3mm thick on deck covering
officers & wheelhouse
: Carpet on deck covering
Wheelhouse Interior : Vinyl sheet 3 mm thick on deck covering
No finish coating of composition nor vinyl sheet
shall be provide in enclosed spaces under built-in
furniture but underlay shall be provided.
Non-skid rubber mat to be provided between
doors and in front of consoles.
Washroom, galley & laundry : 150mm x 150mm non-slip quarry tiles on 50mm
cement underlay.

All wash places and showers shall be similarly laid with ceramic tiles. All exposed steel decks shall be finished
with deck paint.
Anti slip paint on working places.

503 Insulation and Fire Protection


All insulation and fire protection shall be fitted according to Class rules.
The insulation for fire protection shall be constructed in accordance with the SOLAS 1974, includes the
protocol of 1978 and its amendment of 1981 and 1983 and the latest updated rules and regulations and
associated amendments till the date the contracts are signed.

Page 46 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Sound insulation shall be provided for accommodation quarters, where necessary.

Exterior boundaries of the poop and deckhouses in the vessel are to be insulated to 'A-60' class for the whole of
the portions which face cargo oil tanks and 3m aft of the front boundary.

It is to be insulated to A-60 class for upper deck of top upper deck of engine room within superstructure and
top of other machinery spaces except minor fire risk spaces with the consent of the Register to apply only steel
plate.

Overhead ceiling of accommodation spaces under wheelhouse, chartroom, radio room etc. to be insulated to
A-60 class.

Enclosed walls of multi-ply engine casing bounding living quarters are to be insulated to A-60 class. Except
casing bounding other machinery spaces having A-0 class insulation and casing bounding exposed to the
weather, it may be only steel wall.

Walls dividing stairway and passageway from engine casing and other space of greater fire risk are to be
insulated to A-60 class.

All heavy fuel oil tanks when located adjacent to accommodation, cargo spaces and engine rooms should be
insulated and separated by void spaces.

Thermal insulation shall be provided as follows:

Application Material Remarks


Corridor bulkhead 50 mm thick rock wool board and 0.5
mm thick galvanized steel sheets with ---
decorative PVC film on both sides.
Division bulkhead Ditto ---
Lining 25 mm thick rock wool board and 0.5 25 mm thick rock wool board and
mm thick galvanized steel sheets with 0.5 mm thick stainless steel sheets
decorative PVC film on visible side. on visible side for galley and
pantry.
Ceilling 25 mm thick rock wool board and 0.5 Ditto
mm thick steel sheets with baked
enamel.
Thermal insulation 50 mm thick rock wool (16-24 kg/ m3 Exposed surface of
density) accommodation.
3
Sound insulation 50 mm thick rock wool (16-24 kg/ m Where required space
density)
Fire insulation According to rules. As per Rules and Regulations
Deck covering Wall-to-wall carpet on 6 mm thick Captain class and senior officers
latex type deck composition. quarter,

2 mm thick vinyl sheet on 6 mm thick Other cabins, public space, office

Page 47 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Application Material Remarks
latex type deck composition. space, wheel house, chart space

Cement and tile. Galley, pantry, laundry and public


toilet.
Tile on steel plate. Unit type toilet.
Furniture Wooden furniture ---

All materials shall be class approved and appropriately fire rated in accordance with SOLAS requirements.

Wash place, changing room and laundry internal bulkheads will not have lining. The bolts shall be suitably
painted.

All insulation materials should be properly secured with end supports of angle bars or equivalent.

504 Cabin Furnishing and Fittings


All furniture shall be of high quality marine standard made of hard wood or hard wood covered solid plywood.
All plywood should be certified toxic gas and toxic glue free. All tables and desks shall be covered with hard
plastic material except steel desk.

5041 Captain and Chief Engineer Class


- One(1) Single tier varnished plywood bunk with drawer and bunk light.
Approximate dimensions 2000mm x 1000mm x 150mm with foam matterss.
- One(1) wardrobe with long mirror
Adequate filing shelves
- Two(2) coat and hat hook
- One(1) sofa
- One(1) sideboard combined with book case
- One(1) coffee table
- One(1) upholstered chair
- One(1) small steel safe (Masters only)
- One(1) writing desk with drawers (double pedestal type)
- One(1) Quartz clock
- Two(2) spare power slots
One(1) table top regrigerator
Curtains shall be provided for windows.

5042 One Man Cabins


- One(1) sofa
- One(1) coffee table
- One(1) book case and one filing shelve.
- One(1) writing desk with drawers (double pedestal type)
- One(1) upholstered chair
- Two(2) coat and hat hook
- One(1) single varnished plywood bunk complete with light and foam mattress
approximate dimension of 2000mm x 1000mm x 150mm.

Page 48 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
- One(1) wardrobe
- Two(2) spare power slots
Where the sidelights or window exist, curtains will be provided.
All in accordance with G.A. and accommodation plan.

Where the side light or window exists, curtains will be fitted.

5044 Wash Place Fittings (All fittings, including bolts and nuts, are of stainless steel materials)
Private toilet Prefabricated unit, including Shower, Toilet cabinet, Soap dish,
Water closet, Paper holder, Towel rack, Hand grip, etc.
Public toilet Assembly toilet
Fresh water Hydrophore system with a sterilizer, (fresh washing, shower,
WC)
Hot water Continuous circulating system with a calorifier
Sanitary supply line Copper pipe
Sanitary drain line PVC pipe
Sewage drain method Sewage treatment system to be provided.
Sewage drain method Gravity toilet system

5045 Laundry Equipment


2 - Marine type 5 kg washing machine for cleaning clothes, motor driven with integral spin dryer and 1
tumble dryer.
1 - Marine type 5 kg washing machine for dirty clothes
1 Marine type 5 kg Dryer
1 - Rinsing tub.
2 - Ironing table
1 - Wooden rack

1 - Heating radiator (Drying room). (Black heat type electrical


radiator, 1~2 kw with high temperature cut out thermostat).
2 Heavy duty Electric irons.

5046 Galley
1 - Electric range 4 hot plates, comes with stainless steel exhaust canopy and fan over.
1 - Baking oven with 1 oven
1 - Soup boiler fixed type, 10 litres.
1 - Dressing table with under locker
1 - Cooking table with under shelf.
1 - Cutting board - (nylon or similar).
1 - Marine microwave oven.
1 - Dough mixer, 0.75 kw.
1 - Elect. refrigerator, 200 litres.
1 - Elect. universal machine.
1 - Potato peeler.
1 - Dish, pan and glass rack.
1 - Stainless wash bowl with cold & hot water.

Page 49 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
1 Dishwasher machine.
1- Heavy duty electric mincer
1- electric potato chip deep fryer

5047 Wheel House


The wheelhouse is to be located on bridge deck as shown in the General Arrangement Plan and to be fitted out
with navigation, communication and control equipment.

Front center window to be one piece and as large as possible, arranged with pillars on sides and not in midship
area,

Wheelhouse windows are to be arranged to give good visibility all around as indicated in General Arrangement
Plan.

Storm rails shall be provided on outside of wheelhouse as well as inside the wheelhouse front console.

All electric controls and indicator lights on the bridge console to be provided with adjustable dimmers.

All emergency stops should be provided with protection guards to avoid accidental tripping.

Wheelhouse to be accessible from both sides of the bridge deck by means gastight watertight aluminum or
stainless steel doors with stainless steel fittings with single lever operation. Doors to bridge deck to be equipped
with a window and insulated. Access from the superstructure trunk by stairs and door in a corridor. Access door
from superstructure to be provided a switch and connected to the electric light system (instant ON/OFF type) in
such way the light in the upper part of corridor switches of when the door opens. Mentioned switch to be
activated or by passed from the wheelhouse desk.

The wheelhouse is to be fitted with:-


- Steering control and instrumentation
- Rudder angle indicator (panoramic deckhead mounted type)
- Main engine alarms and group alarms for auxiliary engine (common alarm
indicating generator engines failure) and steering gear
- Horns (one electrical air horn and mechanical plunger for horn)
- One searchlight with remote control, positioned off steering wheel, 1000W
- Five (5) sets of horizontal fan type, heavy duty marine type windscreen wiper on
fwd (P. C & S) window c/w FW washing. Central wheelhouse window heated. At
least 3 interval positions with controls on the bridge consoles. Five (5) spare blades
to be provided.
- Two Helmsmans chair (pilot chair with adjustable height, on 1.5 meter length
sliding rails on the deck)
- VHF, radar as agreed in the electric nautical equipment
- Clinometer, thermometer, dial barometer
- Wooden grating for steering column
- Chart table curtain/collapsible lamp
- Navigation instrument sets

Page 50 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
- Two(2) Binoculars c/w case
- One(1) chart table with drawers
- Central public address system
- Flag box c/w flags
- Assorted book racks, filing shelving and cabinets
- Spare power slots
- Space D.C. power slots
- Emergency stop button for cargo pump motor
- First aid kit bag
- Quartz clock
- Anemometer

5048 Interior Doors


All interior doors materials are to be fire rated as the surrounding bulkheads and as required by SOLAS.

- To be hung on stainless steel hinges and fitted with stainless steel door fittings
- To have stainless steel lever handles and hook retainers
- To have stainless steel engraved labels overhead indicating compartment name

All locks and latches shall be stainless steel and have rim or mortise type easing to meet the requirements of
the particular installations.

Lock shall be furnished so that each lock shall have a different key and all locks onboard except those in the
engine room shall be operated by a master key for each rim and mortise type lock.

Doors in public rooms except stores shall be provided with mortise type cylinder lock.

All non-watertight steel doors shall be provided with cylinder locks.

Stainless steel self-closer shall be fitted on doors leading to mess rooms, common wash place and engine
room from living quarters, doors inside the lobby of weather exposed to entrance of living quarters on upper
deck, doors at weather exposed entrance of living quarters and doors of stairway trunk.

5049 Engine Control Room

To be situated on upper platform deck and to be air-conditioned unit ( water- cooled type).
Additional mechanical fresh air ventilation for 10 times/hr air change with emergency stops and fire damper,
also to be supplied in case of failure of the air conditioning unit.

The following will also be located within the room:


- Main switchboard
- Engine control and alarm panel
- Intercom telephone system
- Machinery alarm panel
- The cargo pump frequence convertors.
One(1) writing desk with drawers (single pedestal type)

Page 51 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
- One(1) file cabinet with 2 drawers
- One(1) book case and one filing shelve.
- Two(2) coat and hat hook
- One(1) coffee rack
- One(1) white board
- One(1) control room unit cooler
- One (1) set group starter for essential motor
- Two(2) Swivel chairs
-

50410 Cargo Control Room and Ships office to be combined Office


A cargo control room shall be located on the poop deck.
The cargo control room shall accommodate necessary controls required for the remote control of the cargo and
ballast systems, namely start-stop push button for cargo and ballast and tank cleaning pump and pressure
indicators, cargo tank high-level alarm system, oily discharge monitoring panel, clinometer and necessary
gauges and cargo temperature indicator.The layout shall be with reference to G.A. and Accomodation plan.

The following equipment shall be provided on console or separate board in cargo control room:-

Telephone, clock, P.A., high level alarm, level gauges, pump control buttons and gauges

Other Fittings
One(1) white board c/w markings of ships tanks for daily record entry.
One(1) desk c/w chair (Single pedestal type)
One(1) filing cabinet
One(1) clock
Two(2) spare power slots
Three(3) coat hangers
One(1) Load computer system
Upholstered chairs and settees as per G.A. and accommodation plan.

50411 Crew and Officer Mess Rooms


Followings shall be fitted in the mess rooms:
- One(1) sideboard with drawers/cutlery drawers & hanging cabinet
- One(1) clock, battery Quartz type
- Four(4) spare power slots
- One(1) white notice board
- One(1) public address speaker
- Ten(10) coat hook
- Upholstered chairs & settees as shown on general arrangement
- One(1) 250 liters refrigerator

50412 Dry Provision Store


This compartment is to be fitted with wooden shelves and retaining bars.

All store rooms to be provide with suitable and adequate shelving and storage facilities.

Page 52 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
50413 Refrigerated Provision Store
Two refrigerating plants (one working, one as stand-by) each having a sufficient capacity to keep the following
insulated refrigeration provision chambers at specified temperatures within 16 hours of automatic operation per
day is fitted. These refrigerating chambers shall have vegetable, meat & fish chamber with deep freezer.

Cabinet Type Volume Temperature


approximate
Vegetable Reachin 10 m3 + 40C
Fish Reachin 6 m3 -180C
Meat Reachin 6 m3 -180C
Dry provision 8 m3 + 80C
Capacities must be agreed on GA and accommodation plan

Refrigerant shall be R-404a. Each chamber shall be cooled by fan coil unit type air cooler. Remote temperature
indicators shall be provided for each chamber with read out in galley. Valve panel shall be located adjacent to
each cooler as per makers standard. One push button with alarm in each chamber with alarm bell shall be
provided in the galley.

Cooling water shall be supplied by central cooling system. The cooler in meat & fish chamber shall have
electric defrosting. Refrigeration compressors shall be regulated by temperature switches. Two spare
refrigerant containers to be supplied.

Gratings, shelves, lockers, potato bin of wood on galvanized steel etc. shall be provided in dry provision. One
storage rack of stainless steel with hardwood shelves shall be provided for each vegetable, meat & fish
chamber.

50414 Forward Stores


The spaces under the forecastle deck shall be divided into Hydraulic Power Pack, store, paint store which are
fitted with steel shelving with retaining bars. Ample lighting, portable fire extinguishers and natural ventilators
shall be arranged to meet the classification requirements.

Wooden grating shall be provided in Bosun store area.

50415 Steering Gear Compartment


The steering gear compartment is to be fitted with necessary steering gear machinery, suitable ventilations and
sound powered telephone fitted for communication between wheelhouse and engine control room.

Steering gear room to be provided with adequate and suitable shelving and storage facitlities.

50416 Radio Space


Radio area in the wheelhouse is to be fitted with:-
- One writing desk with drawers (single pedestal type)
- One swivel arm chair
- One file cabinet with 2 drawers
- One book case

Page 53 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
- One whiteboard
- Two coat and hat hook
- Radio and communication equipment

50417 Emergency Generator Room


This room is to be fitted out with suitable insulation to meet SOLAS requirements as an emergency generator
room. Appropriate ventilation is to be provided.

50418 Workshop

See 904

50419 Changing Room


The compartment is to be fitted out with:
- Lockers
- Bench seats
- Clothes hooks
- Coat hooks
- Washbasin

50420 Paint Store


It is to be fitted with steel shelves and suitable ventilation. All electrical fittings and safety requirement shall
meet SOLAS requirements.

50421 Deck/Engine Store


This store is to be fitted out with steel or wood shelves. Doors to be fitted with padlock. The store shall be
natural ventilated.

600 Deck Machinery and Outfitting

601 General
Deck machinery shall be arranged as shown on the General Arrangement Plan. The layout shall be approved by
the Buyers prior to construction. Deck machinery consists two electro hydraulic motor driven anchor
windlass/winch located at forecastle deck and one electro hydraulic motor driven anchor winch located at after
of poop deck as shown on General Arrangement Plan.

Hydraulic power shall be supplied for deck machinery (windlass, mooring winch etc.) from the hydraulic power
station and the hydraulic motors directly coupled to the winch or through reduction gears if necessary. Hydraulic
pump station for deck machinery shall be arranged in engine room or suitable location.

Following is the summary of main particulars of the deck machineries;


No. Duty capacity
Name of of Type Prime motor

Page 54 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
equipment set tons x m/min

Steering gear 1 Elec-hyd. Type 10 t-m 2 Hydraulic motor


(Actual capacity to
meet classification
requirements)
Windlass 2 Hydraulic type At gypsy wheel Hydraulic motor
Each 1 gypsy wheel, 1 12 t x 9 m/min
hawser drum & 1 At hawser drum 6 t
warping head x15 m/min At warping
head 3 t
(Actual capacities to
meet classification
requirements)
Anchor winch 2 Hydraulic type At gypsy wheel 12 t x Hydraulic motor,
Each 1 hawser drums 9 m/min without auto-tension
and 1 warping head At hawser drum device
6 t x15 m/min
At warping head 3.5 t
(Actual capacity to
meet classification
requirements)
Hose handling crane 1 Elec-hyd. type crane 2 t x appr.16 mtr. Hydraulic motor
To be arranged near
manifold
Provision davit/ 1 Electric type 1.5 t x 5 m Electric motor
Combined with
MOB boat davit and
stern cargo hose.
Bow thruster 1 Electric, CPP or 3 step 400 kw Electric motor
fixed pitch
M.O.B.boat davit 1 According to the
relevant rules.
Liferaft Davit/ 1 According to the
combined with MOB relevant rules.
boat davit.
Free Fall boat davit 1 According to the
(recovery davit only) relevant rules.

602 Anchor Windlasses


Two electro hydraulic anchor windlasses each having a gypsy double mooring drum and a warp head. The
gypsy capacity to be approx. 12 tonnes pull at 9 m/min, suitable for 48 mm diameter chain and mooring drum
capacity 6 tonnes @ 15m/min at 1st layer. The cable lifters and hawser drums are to be independently
clutched. The warping head capacity is 3.5 tonnes pull at 30 m/min. Actual capacity to meet classification
and rule requirements.

Page 55 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Gypsy : Suitable for 48 mm diameter chain
Hawser Drum : Suitable for handling 170m of 250kn breaking strength
tipto 12 rope
Control : Mounted on steel pedestal suitable for on deck
installation
Seating : The windlass shall be mounted on chock fast seating
using corrosive resistance bolts with a save-all and
gutter

603 Steering Gear

This steering gear paragraph, all depend on the specification of classification requirement.

Two sets of steering gears shall be arranged for high efficient rudder. The two pump units shall be able to
supply enough power to steer the rudder from 35 portside to 30 starboard hard-over within 28 seconds when
the vessel is running at maximum speed at design draft.
All in accordance with the agreed makers instruction and classification requirements.

Arrangements for connection with auto pilot and manual control shall be made. Steering gear motors shall be
remote started & stopped from wheelhouse bridge console. Local manual operation shall be able to done via
operation of solenoid control valve at the side of the gear.

A spare hydraulic tank shall placed above the hydraulic tank.


All change over procedure shall be clearly identified.
All to be in accordance with Class, SOLAS and Flag state rules.
Torque rating is about 10 metric ton m.

604 Stern Mooring Winch

Two sets of electro-hydraulic Single Mooring Winches accompanied with each one slip type hawser drum
and one warping head is fitted as following:
Rating : 6 tonnes at 10 m/min at 1st layer. Hauling in speed
for Hawser drum & warping head 30 m/min
(Actual capacity to meet classification requirements)
Capacity : 170m of 250 kn breaking strength tipto 8 rope
Warping : Cast steel keyed on both ends of the main rotating
shaft
Control : Mounted on steel pedestal suitable for on deck
installation
Seating : The winch shall be mounted on chock fast seating
using corrosion resistance bolts with a save-all and
gutter
Power pack : Suitable for both winches operating simultaneously
and with one motor/pump standby for the other

Page 56 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
605 Provision Handling Davit/Combined with MOB Boat davit.
One(1) set electric-hydraulic lifting crane shall be fitted. The crane structure consists of fixed crane boom
mounted on pedestal base with 1.5 tonnes SWL lifting capacity at maximum radius of ~5m.

The hydraulic lifting winch comprising of single drum driven by hydraulic motor and pre-wiring for hoisting.

606 Hose Handling Crane


One set electric-hydraulic hose handling crane, telescopic type, lifting capacity 2.0 ton at 16 m outreach. The
working area of the crane shall cover the cargo manifolds and deck tanks without interfere the cargo piping
system as indicated in the GA plan.

607 Mooring Fitting


Anchors, chain cables and mooring ropes shall be equipped in accordance with the rule requirements as per
following table.
2 Bow Anchor Stockless SPEK type, about 3200 kg, Cast steel construction,
(Actual weight to meet classification requirements)
1 Spare anchor Stockless SPEK type, Cast steel construction. One for each
vessel as per above specifications.
1 Anchor chain 46 mm dia. X 495 m in length, Grade NV K3 with Kenter
shackles (actual size to meet classification requirement)
2 Chain releaser Fastened type in chain locker and operable from outside.
6 Mooring Rope Mooring rope Tipto12, 220metres, (B.S. 2250 KN) including
loop end.
4 rope reels with greasing points on forecastle deck
4 rope reels with greasing points on poop deck
2 Fire wire 32 mm dia. Steel wire x 45 m with manual stowage reel.
1 Towing stopper To be installed on fore and after deck in accordance with
IMO Regulation. The number & size are suitable for Tipto 12
ropes.

Mooring fittings, such as panama chock, bollards, panama fair leaders, guide rollers and mooring holes shall
be arranged in accordance with OCIMF requirement for reference as shown on the General Arrangement Plan
and mooring arrangement. The mooring arrangement shall be approved by the Buyers prior the construction.

608 Manifold
In way of cargo manifold on upper deck, additional deck fitting, such as bollard, cross bitt and closed chock
shall be fitted refer to the OCIMF recommendation Category A for reference only.

The vessel cargo manifold to be installed amidships. To be designed and arranged as much as possible in accordance
O.C.I.M.F. Recommendations for Oil Tanker Manifold and Associated Equipment where applicable. All manifold
flanges must be ANSI 150 STANDARD. All flanges with bolts and nuts of stainless steel aIS316L material. Type of
manifold crossover. Flanges of manifold valves PN-16. ANSI 150 standard flanges shall be used. Other connections by
means of reducers. The manifolds are slopping down to the middle.

Page 57 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
The following distance are proposed, and to be followed as close as possible:
Height above the deck to center of pipeline: 2.00 Mt.
Distance between pipelines from center to center: 1.00 Mt.
Distance from ships side to the 8-inch flange: 2.50 Mt.

The manifolds are connected together and to the stripping system via a 3-inch pipeline valves. In addition, to a 3-inch
pipeline for pressing to slop tank and butter wash tank. On the outer side, (between valve and hose) of the manifold stop
valves. On the connection between stop valve and hose, a pressure meter and temperature meter. A pressure and
temperature sensor to be installed readout from cargo office. In addition, a bottom connection for, 1-inch air valve, and
a sample valve.

All manometers and thermometers in the cargo system to be delivered calibration certificate.

Underneath of the manifold a drip tray, with a suction well. Minimum depth 60 cm. Covered gratings approximately 50
mm from the top to establish a safe working platform. No frames allowed on the inside of the drip tray. Drip tray to be
coated with a suitable cargo tank coating. (Marineline coating) Coating according to the same procedure as for cargo
tanks. The drip tray suction well to be connected the stripping system. The bottom sloping to suction point, 2-inch
drains ball on the outside of the well. The railing near the manifold must be a collapsible. Surrounded with stanchions to
make a temporary portable railing for operation time. Chafing protection for the cargo hoses must be made on the top of
the spill barrier on ships sides.

Near the cargo manifold on both sides a heavy-duty container a watertight-hinged cover for oil spill containment
materials to be made. Sizes approximately 200 x 80 x 80 cm. Above cargo manifold a platform gratings for storage
hoses etc. Platform to be provided access from catwalk and drip tray.

Cargo manifold drip trays to be coated with Marineline coating.

Reducers For Cargo Hoses:


Near the manifold storing facilities for the several reducers of AISI 316-L material to be provided. Minimum following
reducers are required and must be installed in the delivery (to be completed as per OCIMF rules):
Base on cargo pipe diameter is 10 inch.
ANSI to ANSI 150 STANDARD
Two pieces: 10 to 8 inch
Two pieces: 10 to 6 inch
One: Y-pieces 2 x 10 to 1 x 10 inch
Three more as per needs.
ANSI to DIN
One piece: 10 inch ANSI standard to 10 inch DIN standard (12 holes).
One piece: 10 inch ANSI to 8 inch DIN

609 Oil Spill Drain Tank


Above pump room deck, oil spill collection tank shall be made. On each side of the main deck in the most aft
part a scupper to be made which drains of in the Deck oil spill tank.

Page 58 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

The tank should be emptied with overboard valve controlled from the main deck and with the slop/stripping
pump to the slop tank.

610 Mooring Equipment


All figures need to be futher checked.

Bollard : 355mm diameter double-bitts as shown on General Arrangement


Mooring pipes : 355mm nominal size, cast steel as shown on General Arrangement

Closed Chock : 315mm nominal cast steel as shown on General Arrangement

Fairleads : 200mm dia single vertical rollers open type as shown on General
Arrangement
200mm dia double rollers open type as shown on General Arrangement.

Only mooring equipment of the vessel to be suitable for ship to ship transfer operations, such as bollard and
panama chocks.

Mooring layout of vessel and detailed drawings of equipment shall be submitted to the Buyers for approval.

611 Ladders and Steps

6111 Accommodation Ladders


Accommodation ladder shall not be provided. Instead two portable aluminum wharf ladders one with 6 m in
length and one with 10 meters in length shall be supplied. Both portside and starboard side near superstructure
shall fit platform for the wharf ladder. Loading certificates to be provided for the ladders.

6112 Steel Ladder and Steps


All ladders inside tanks should be bolted on and made of 316L stainless steel materials, including all fittings,
bolts and nuts.

All cargo oil and slop tanks shall be fitted with vertical bolted on inclined ladders face afterwards. The
maximum inclining angle shall not be exceed 75 degree. The ladders and all fittings shall be made of 316L
stainless steel and not coated . The width of the ladders shall be approximately 450 mm. The step shall be
made of two square bars with dimension of 22 x 22 mm. The arrangement of the ladder shall not obstruct the
radar sensor.

Protection plates of stainless steel AIS316L marterials (1.5mX1.5MX3mm) to be provided at the bottom part
of all the ladders inside the cargo and slop tanks. Plates should be fully welded on the tank top plates before
coating.

The steel vertical ladder of 300 mm width and with 300 mm step spacing shall be provided in all bunkers,
ballast and fresh water tanks for access.

Steel vertical ladders or steps to be also provided to deep tanks, service and settling tanks, unless space is

Page 59 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
limited and approval duty obtained from Buyers, monkey steps will be acceptable.

Vertical ladders shall be fabricated with 65 mm x 9 mm mild steel flat bar and step of a 19 mm square bar with
vertical diagonal.

Sufficient stairs and ladders shall be arranged to provide convenient access to all decks and platforms. All steps
of stairs inside the accommodation shall be made of steel covered with appropriate sound absorbing material and
finished with non slippery top layer. Aluminum or stainless steel angle bar shall be installed on front of each
step above the covering.

Ladders shall be generally bolted to the structure. No vertical ladders are allowed in pump room and paint
store.

612 Access Hatch and Manhole

6121 Access Hatch and Manhole for Cargo Oil Tanks


One set of access hatch (swing away type) for each cargo oil tank, slop tank and deck tank shall be fitted. The
clear opening of the access hatch is about 850 mm. The access hatch shall be arranged as per General
Arrangement Plan and be approved by the Buyers prior to construction. The hatch shall be installed as much
forward as possible. The swing away hatch cover shall be used along with enough number of butterfly cleats.
Each cargo tank entrance shall be marked with C.C. (Cargo Compartment) and tank number by welding bead.
The round bar shall be placed on top of hatch coaming made of stainless steel AISI 316L. Gaskets shall be able
to resist the cargo spill out in the cargo list. Hinge pins, lifting screws, pivoting axles, bushings and threaded
fasteners to be of stainless steel AISI 316L.

All hatches (not including the covers) should be of stainless steel 316L materials.

The height of swing away type hatch coaming shall be around 700 mm. The internal hatch coaming shall be
painted with same surrounding coat applied to the cargo hold.

All cargo tank hatch and opening gaskets to be of TEFLON materials.

6122 Access Manhole for Water Ballast Tank


Two watertight bolted flush type manholes cover with clear opening 600 x 800 mm(according to the Class
rules) shall be fitted on each water ballast tank. Each ballast tank to be provided with a sample hatch (2-inch)
for sampling the atmosphere in the tank bottom and top. Each ballast tank manhole shall be clearly marked
with tank name by welding bead.

6123 Tank Cleaning Hatch

At least two set of hanged tank cleaning hatches of mild steel construction, of suitable size for use with portable
tank cleaning machine shall be provided on each cargo tank and slop tank. Tank cleaning hatch dimensions are
355 mm diameter, with a height of 200 mm above longitudinals, which to be internally coated same as
surrounding tank coating.

The round bar on top of coaming and the coaming to be of stainless steel AISI 316L. Gaskets must be cargo
resistance and of TEFLON materials.
Page 60 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
6124 Sample Hatches
Each cargo & slop tanks should be provided with a sample hatch with a minimum diameter of 125 mm fitted
with flame arrestor according the rules.

Sample hatches are of self enclosed type during sampling.

Certificates and instructions in English to be provided for the flame arrestors.

Hatch gaskets to be of TEFLON materials.

6124 Small Hatches


Following small hatch shall be of hinged or bolted type shall be provided. The height of hatch coaming shall
comply with the requirement of class.

Location No Type Opening Operated by


Upper deck for engine 1 Watertight, 800 x 1200 Manual
room spare parts lifting bolted
Poop deck for pump 1 Watertight, 800 x 1200 Manual
room hanged
Forecastle deck for rope 1 Watertight, 600 x 600 with Manual
hanged coaming
Upper deck aft for 1 Watertight, 800 x 800 with Manual
steering gear room hanged coaming

6125 Manholes
Manholes shall have steel plate cover secured with stainless steel studs and nuts. Each manhole cover shall be
fitted with one or two hand grip and marked with the name of the compartment.

The construction, materials of the manhole with covers shall be in accordance with the Builders standards
unless otherwise specified.

Location No Type Opening Operated by


Aft. Peak tank 1 Watertight, 600 x 800 with Manual
bolted or coaming
hinged type
Bunker tank 1 Oil tight, 600 x 450 Manual
bolted
Double bottom in Oil tight, 600 x 450 Manual
engine room bolted with
100 mm
coaming
Each manhole shall be clearly marked with tank number/name by welding bead.

Page 61 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
613 Life Saving Appliances
Life saving appliances shall be furnished completely in accordance with SOLAS requirements and its
Amendments 1981,1983, 1988 and 1994 and all amendments until the contract has been signed All equipment
to be type approved by the maritime authority of the registered nation or its assigned authority.

All LSA equipment should be EC approved types with wheel marks.

1 Lifeboat Suitable for GRP, enclosed free fall type, water cooled diesel engine
Oil Tanker driven for 16 persons with spare spaces to meet SOLAS.
Safety harnesses inside the lifeboat should be adjustable type
to suit difference in the sizes and build of the crews.
Two additional heavy duty securing point with stainless steel
fittings, turnbuckles and wires to be provided for securing
the lifeboat lifting hooks.
1 Lifeboat davit Recovered A type, driven by fixed electric motor.
1 Rescue boat GRP, driven by diesel engine with 6 persons
Nylon straps with stainless steel fittings to be provided for
securing the rescue boat for open sea conditions.
1 Rescue boat davit To compliance with Rules and SOLAS required.
2 Life raft Inflatable type, with 14 persons for each stowed in fiberglass
containers with approved launching device. One for each side
(P&S)
as per SOLAS regulation.
8 Life buoy 2 with self-igniting light of electric battery type.
2 with self-activating smoke signal
4 with 30 meters life lines
15 Life jacket 15 Inflatable SOLAS approved life jackets stowed in the
wardrobes of cabin
5 stowed in the public place
1 Line throwing Complete with four life lines and four (4) projectiles not less
appliance than 230 m.
12 Parachute distress As per SOLAS requirement.
rocket signals
6 Rocket signals As per SOLAS requirement.
14 Survival suits as per SOLAS requirement.

All safety equipment to mark in distinct color of ship name and home port as per SOLAS.

614 Fire Fighting System


Fire fighting system shall be installed in accordance with the latest requirements of SOLAS/IBC Code/Class
and Flag State
All fire fighting equipment should be EC approved with wheel marks.
Cargo tank deck area Fixed low expansion deck foam suitable for chemicals.
Sea water (alcohol resistance foam liquid)
Engine room & Pump Fixed high pressure CO2 system,

Page 62 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
room Sea water,
Portable fire extinguisher.
Portable foam extinguisher near boiler space.
Accommodation Sea water,
Portable fire extinguisher,
Fire detection System (1A method in SOLAS Reg.)
Paint store Water spray connected to fire main line, controlled just outside the paint
store.

A fixed local application fire fighting water mist system to be protecting high risk item/area (main engine, aux.
engine, boiler and purifier, etc.) in engine room to comply with SOLAS, 2000 Amendment.

615 Fire Hydrant System


Fire hydrant system with stortz couplings combined with the wash deck service to be installed for
accommodation quarters, open decks and engine room. Sea water to be supplied from the Fire/G.S
pump.Particulars for Fire/General Service pump: ( Capacaties according to the regulations)

No. of sets Two (2) sets


Type Vertical centrifugal pump with self-priming.
Capacity About 70 m3/h
Pressure 8 bar
Drive Electric motor
Casing Cast bronze
Impeller Stainless cast steel
Shaft Stainless steel
Shaft seal Mechanical

The main line shall be laid on the upper deck. Two international shore connection pieces shall be supplied.

The fire hoses shall be 50 mm hard duraline with stortz coupling, except for 19 mm hard rubber on recessed
reels with stortz couplings in the accommodation.

Deck fire line hydrants and hoses should be same size as the fixed foam system.

616 Foam Fire Extinguish System


Foam shall be of Alcohol resistant type. A fixed deck foam system shall be installed as per the requirement of
SOLAS. The arrangement for providing foam shall be capable of delivering foam to the entire cargo tank area
as well as into any cargo tank and the deck of which has been ruptured.

Necessary amount of monitors on the deck within cargo oil tank region shall be provided as per the
requirement of the Regulations. Portable foam nozzles to be supplied as well.

Two sets of foam tank and proportioner shall be arranged in foram tank space. One is installed for spare.In
accordance with the latest Solas rules. The foam solution tank is to store sufficient capacity of foam
concentrate to ensure at least 30 minutes of foam generation through a balanced pressure proportioner with a
foam pump. Capacity of foam tank to meet SOLAS requirements.
Page 63 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Sea water for foam fire extinguishing system shall be supplied from foam water pump in engine room.

All fixed foam line hydrants and hoses should be the same size as the deck fire line equipment.

A portable connection should be arranged for flushing the foam lines by sea water from the deck fire line.

617 CO2 Smothering System


An approved CO2 extinguishing system is to be provided for engine room and pump room. The system shall
comply with the latest SOLAS regulations.

CO2 bottle room is to be located on after bridge deck. The necessary pipes and controls shall be supplied to
provide the CO2 to accommodate.

Fire alarm shall be provided according to latest SOLAS and Flag state requirements. In engine room, pump
room and accommodations.

Portable foam, CO2 fire extinguisher, safety equipment and firemans outfits shall be supplied and installed at
suitable location in accordance with SOLAS/CLASS rules and Flag state.

CO2 bottle level measuring equipment to be provided.

Break glass key box with key to be provided outside the CO2 room to meet both ISM and ISPS requirements.

618 Emergency Fire Pump


One emergency fire pump shall be installed in the bow thrusters room to take direct suction from the sea chest
and connect with the fire line /hydrants.

No. of sets One (1) set


Type Vertical centrifugal pump with self priming.
Capacity According to class rules and authority, abt. 40 m3/h,
Pressure 8 bar
Drive Electric motor
Casing Cast bronze
Impeller Stainless cast steel
Shaft Stainless steel
Shaft seal Mechanical
Emergency fire pump shall be centrifugal type pump driven by electric motor with the power supplied by
emergency generator.

619 Personal Protection

Protective equipment and safety equipment shall be provided in accordance with Authority requirements.

Fire extinguisher As per the rules and regulations

Page 64 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
4 Firemans outfit 4 Self-containing air-breathing apparatus
4 Protective clothing, boots, gloves and tight-fitting
goggles
4 Fireproof lifeline with belt resistant to the cargo
4 Explosion-proof lamp
1 Fully charged spare air For each breathing apparatus.
bottles
1 Stretcher with lifting device As per SOLAS
15 Respiratory and eye One for each crew
protection
1 First aid equipment In wheel house/cargo office/eng.control room and galley.
2 Flammable gas detector As per SOLAS
2 Toxic gas detector As per SOLAS
2 Oxygen detector As per SOLAS
1 Oxygen resuscitation As per SOLAS
2 Decontamination shower & As per Solas & IBC Code
eye washer

Minimum two safety showers to be provided at both sides of the catwalk near cargo manifold. The outside
safety showers to be provided provisions to ensure its integrity during freezing. This may be done by means of
drains: a magnetic operated valve for supply water, controlled by a push button near the shower. The
connection between push button and magnetic valve must be intrinsically safe. Alternatively, other acceptable
solution is to be discussed.
Instruction plates to be provided in engraved stainless steel to be provided at the showers.

EEBD sets according the latest SOLAS requirements


3 Breathing Apparatus according to the IBC Code requirements.
Protective clothing according the IBC Code requirements
Compressor for filling the Breathing apparatus Air bottles. Min 300 bar.
All breathing apparatus must be from the same type and same pressure (300bar)
40 ltr Oxygen bottle fixed near the hospital and a fixed pipeline sytem and outlet manifold inside the hospital
in accordance the latest Solas regulations.
All in accordance with the Solas and IBC code.

620. Fire Fighting System


Fire fighting system to be installed in accordance with requirements of SOLAS / IBC code/Class and Flag state
Regulations.

Cargo tank deck area Fixed low expansion deck foam suitable for chemicals.
Sea water (alcohol resistance foam liquid)
Engine room & Pump Fixed high pressure CO2 system,
room Sea water,
Portable fire extinguisher.
Portable foam extinguisher near boiler space.
Accommodation Sea water hydrants.
Portable fire extinguisher,

Page 65 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Fire detection System (1A method in SOLAS Reg.)
Paint store Water spray connected to fire main line, controlled just outside the paint
store.
Pump room Fixed gas and oxygen detector

A fixed local application fire fighting water mist system to be protecting high risk item/area (main engine, aux.
engine, boiler and purifier, etc.) in engine room to comply with SOLAS, 2000 Amendment.

700 Equipment for Cargo

701 General
The vessel shall be designed to have fourteen cargo oil tanks. and two deck/slop tanks.

Slop tanks to be used as cargo tanks as well wash tank.

No copper, copper alloys, bronze and brass are allowed to present in the cargo system as required by the
FOSFA Rules.

Sixteen sets of all stainless steel AIS316L deep well type cargo oil pump shall be provided by buyer. The cargo
pump shall be driven by independent electric motor controlled by a frequency converter and controlled from
the ccr. .

The capacity of each cargo pump shall be as following:.


The below for refernce only, final capacities to be final with recommendations form pump maker.
14 sets Deep well type, 300 m3/h for each cargo tank
2 sets Deep well type, 100 m3/h for each deck/slop tank

The system shall be able to load and discharge sixteen (16) different grades of cargo simultaneously without
contamination. Each grade using its own line/filter and cargo pumps.

Separation each other by double shut valve during cargo handling except stripping operation. That means the
cargo pumping system shall be designed to facilitate easy loading and cleaning operations.

The general discharge and loading design criteria are as follows:

Design pumping criteria Pressure head: 90mLc. at pump outlet with cargo S.G. 0.8 t/m3
Cargo viscosity 1.0 cSt up to 380 cSt
Design discharge time 6 hours at design criteria with 5 cargo pumps running
simultaneously, incl. stripping.
Maximum discharge rate Total 1500 m3/h at 90mLC., S.G. 0.8 t/m3
Maximum loading rate Total 2000 m3/h.
Segregation -- Full segregation
-- Simultaneous discharge of Sixteen(16) grades via separate
pumps/lines and manifolds.

Page 66 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
-- Simultaneous loading of Sixteen (16) grades over manifolds to
cargo tanks.

Cargo pipeline system will be attached to the contract and to be agreed by Buyers prior the construction.

Inside cargo tanks, on tank ceiling and bottom sufficient amount of stainless steel 316-L lifting lugs to
be welded. By means of these lifting lugs, it must be possible to hoist the complete tank-heating coil
system. In addition, by use of this system it must be possible to use of hanging staging. Lifting lugs to
be made according to shipyards standards.

702 Loading and Discharge System for Liquid Cargo

All cargo tanks to be subjected to structural tests when tank coatings are completed. If muddy water is used to press up
the tanks, all tanks should be flushed out with clean sea water and then with fresh water. All tanks and piping system
must be clean and free from contamination before delivery of vessel to Buyers.

All pressure gauges and thermometer connection should have isolating valves or cocks fitted as close to the main pipe
lines as possible as required by class rule.

All piping support securing bolts and nuts to be provided with anti-vibration devices, such as double nuts

Cargo valves in cargo tanks fully stainless steel executed ball or butterfly type. Valves after pumps to be remotely
operated by glycerin hydraulic system. Controls and valve position indications are provided in the cargo control
consoles in the control station on the bridge.

Cargo valves, make Econosto, Mason or Ari. Make and type to be agreed upon mutually. Comply with class rules.
Designed for two way flows and 100% secured close for suction and loading flow directions. Seals inside valve
re-enforced Teflon resistant against all possible cargoes, mentioned in cargo list. Heat resistant till at least 180 degree
centigrade. All butterfly valves un-eccentric water type.

All cargo line strainers should have drain lines with isolating valves and portable connections to the stripping suctions.
Breather valves also to be arranged on top of the strainers.

All flame arrestors to be provided with certificates and instructions in English.

7021 Cargo & Stripping/Slop Pumps

Stripping to be provided by the deep well cargo pumps.

1) Cargo pump (with alarms etc. according the latest Class regulation.)

Page 67 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Number of units Sixteen (16) sets
Type Deep well
Design capacity 14 sets x 300 m3/h and 2 sets X 100 m3/h for each. The
electric motor shall be controlled by frequency converter
controlled from CCR.

2) The cargo stripping to be provided by the deep well cargo pumps.


3) Cargo Piping
The system shall be able to discharge and load sixteen (16) different grades of cargo oil or chemicals
simultaneously without contamination.

When discharging oil, five (5) sets of deep well type cargo pump shall be worked simultaneously, total
discharge rate to be 1500 m3/h at 90 mLc and to be capable of discharging cargo completely during 6 hours,
including stripping.

Piping arrangement in principle according the drawing: Cargo piping system, to be all segregrated for each
tank with individual loading and discharge pipes. Discharge pipes are interconnected with isolation valves to
one discharge line to the ship stern.

Buyers will provide the cargo piping diagram as example for designing.

All cargo piping on deck are insulated with hard covers protections to allow carrying of cargo up to 85 deg C
The manifold and associated equipment and their arrangement shall refer to OCIMF recommendation, as
practice.

Cargo pipe systems in cargo tanks and on upper deck shall Stainless Steel AISI 316L (designing pressure 1.5
MPa). Shall use 45 elbows with real looping. Butt welding shall be used. No sleeve shall be applied. On valves
loose flanges can be used. All cargo piping on deck are insulated with hard covers protections to allow carrying
of cargo up to 85 deg C.

For electric ground of cargo pipe lines, yard can choose the way of using cable or plate. The manifold will
follow ANSI standard. The rest of piping system shall follow ISO standard.

See cargo pipeline diagram.

All jointing should be of Teflon materials.


Individual connecting pipe to be installed in the left and right slop tank to let oily water two stage deposit.
Sections to both tanks to be connected an insulated 5-inch crossover line, close to the bottom without upward
loop.

Each cargo oil tank has a loading and discharge pipe. The cargo piping lines in cargo tanks shall be of Stainless
Steel AISI 316L as well with reference to cargo pipeline diagram.

Page 68 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
The Oil Companies International Marine Forum's (OCIMF) Standard for Tanker Manifold and Associated
Equipment, latest issue), to be accordance with, where relevant.

The cargo piping system to be arranged as follows: See Cargo pipeline diagram.

Cargo piping
according to the
agreed Cargo
pipeline diagram.
Drip trays Drip trays with gratings and drains to be fitted underneath Port &
Starboard cross over line manifold. Size and volume of trays shall
generally be according to IMO and OCIMF regulations. Drain lines
to be of mild steel also.
Cargo valve All valve to be remote operated by glycerin hydraulic system from
cargo control room.

After completion of the discharge phase the stripping of the cargo system to be carried out by the cargo pump
through stripping pipe in cargo tank suction well.

A cargo control room shall be fitted for remote control of the cargo pumps, stripping/slop pump, ballast pumps,
cargo valves and ballast valves. Also a remote tank level gauging system, an oil discharge monitoring system.

7022 Cargo Valves

Cargo valves should be in accordance with the agreed cargo pipe line diagram diagram. All material which
will be in contact with the cargo must be of stainless steel AISI316L and PTFE lining / sealing. Cargo valves
in cargo tank fully S.S AISI316L.

Butterfly valves, wafer type designed for two way flow direction.

703 Cargo Heating System

The cargo heating system to be capable of maintaining cargo at 850C with sea temperature 00C and ambient air
temperature -50C.

The heating capacity shall be sufficient to raise temperature of a full cargo load from 440C to 850C in 96 hours
with ambient air temp. 50C and sea water temperature 00C. Slop tank heating shall be capable of raising the
temp. of a full slop tank from 150 C to 660 C in 24 hours under the same ambient conditions.

The cargo should be heated with steam coils directly. Each heating coil should have a sampling cock on the

Page 69 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
return line and the common return line should have a observation tank inside the pump room.

All Steam and Heating pipe and fittings on deck shall be of pre-insulated AIS 316L stainless steel materials.

Heating system valves to be manually operated from tank deck.

7031 Valves for heating coils

Steam supply valves, condense return valves and steam trap for cargo tank heating coils to be cast steel
material.

704 Cargo Tank Vent/Gas Free System

Inert Gas Line & System:

At appropriate place a Nitrogen Generator Room with adequate spaces, electric power supply, fixed piping on deck and
fittings, lighting, ventilation to be provided for Buyers to install the Nitrogen generator at later stage.

7041 Cargo Tank Ventilation

A ventilation system shall be installed providing for individual ventilation of each cargo tank. Each cargo tank
and slop tank shall be fitted with a gas freeing/venting line from tank hatch fitted with pressure/vacuum valve
and high velocity nozzle with discharges outlet according to request of Class above main deck.

P/V valves to be arranged and installed with adequate spaces from other equipment to allow easy access for
greasing and maintenance.

Each cargo tank and slop tank shall fit a high velocity pressure/vacuum valve for cargo tank ventilation.

All tank vent-lines to be gathered to two (2) central venting towers respectively.

No. of sets One (1) for each cargo and slop tanks, total 16 sets
Type Class approved type High Velocity Press/Vac valve
Setting press + 0.2 Kg/cm2
- 0.035 Kg/ cm2
Venting velocity Min. 30 m/sec. According the press/vac manufactory pressure drop
calculation
Location In two venting towers/ position to be agreed by buyers prior the
construction.

All vent pipes shall be sloped to tank for drainage. AISI 316L stainless material shall be used. The cargo
ventilation pipes to be fitted with a ball valve(DN15).

Page 70 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
7042 Gas Freeing System

Sufficient gas freeing arrangements shall be provided to allow gas freeing according to IBC - Code 8.5. 12 for
minimum two (2) cargo tanks simultaneously.

Gas freeing system shall be provided by means of portable water/or air driven gas free fans.

Portable gas free fan

Number of set Two (2) set


Capacity 60 m3/min x 30 mm Ag

705. Vapour Return System

One vapour collecting main line on deck with valves connections to cargo tank vent lines are to be provided
for each cargo tank vapour emission.

Four (4) vapour connection shall be provided, two on each side of the ship, with presentation flanges at the
cargo manifold area.

One vapour connection shall be located forward of the manifold and one located aft of the manifold on each
side of ship.

Lines to be of stainless steel AISI 316L.

A sensor for remote reading of vapour pressure in cargo tanks shall be arranged as an integral part in deck
units for radar level system.

Vapour emission control system to be provided in accordance with USCG requirements except lightening
provisions.

706 Tank Cleaning System


Tank cleaning system and equipments shall be agreed in corporation with the Maker and Buyers and to comply
with SOLAS & MARPOL regulation. The tank cleaning system shall be arranged for washing with fresh water
and/or seawater, hot or cold with cleaning solutions. The washing system shall consist in a washing tank. This
tank shall be earlier mentioned deck tank. Tank wash pump, wash-water heater, tank wash lines and valves,
portable washing machines, tank wash pump and the already mentioned stripping pump. in principle it must be
possible to wash tanks with seawater and re-circulation of fresh water.

Page 71 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
All tank cleaning systems and equipment should be tested in presence of Class surveyors and Buyers
representative to confirm performance.

Tank cleaning pump shall take fresh water from clean fresh water tanks and/or sea water from sea chest.

Tank cleaning pump placed in pump room and driven by the motor connect through a gas tight oil filled
bulkhead gland

Arrangement for using cargo pumps to deliver re-circulated washing water to cleaning machines shall be
included.

Two (2) fixed tank washing machine twin nozzle 7mm. (abt.10 m3/h x 7.0 bar) to be installed on the top of
each cargo oil tank and one (1) set for each slop tanks. It shall be decided based on Manufacturers
recommendation.

The tank cleaning system to be designed to wash two (2) cargo tanks ( 4 washing machines apr.50 cbm/hr)
simultaneously.

Seawater shall be pumped by tank cleaning pump through a tank cleaning heater to provide to cleaning
machines with hot sea water at 600C from sea water supply of 50C.

i.e. the butter wash heater must be able to heat up apr. 60 cubic meter of water from 5 degrees up to 60
degrees.

The tank cleaning main pipes shall be arranged on the upper deck in way of cargo oil space, which to be fitted
with flexible connection (butterwash hoses) to the branch pipes with stop valve and to be connected with each
fixed tank washing machine.

The material of tank cleaning pipe to be stainless steel (AIS316L) on upper deck and stainless steel (AISI 316L)
in cargo tank.

A minimum of two tank washing hatches for each cargo tank to be provided for portable washing machines (9
m3/h x 8.0 bar). It to be situated to best advantage the shadow area of the fixed machines, which will be
verified by Manufacturer and approved by buyers prior construction.

Two (2) portable tank-washing machines and connected hoses to be supplied by the shipyard for tank cleaning
through tank washing hatches.

The wash tank heater must be designed especially for heating seawater for tank cleaning. Internally be made
with U shaped both sided welded pipes. Steam and condense flow trough the U pipes. All seawater

Page 72 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
contacted parts made of seawater resistant material. The heater must be resistant to accidental heating up to the
steam temperature without water inside the cooler. Heating capacity sufficient heat seawater from 15 degree to
90 degree while using the normal capacity of the boilers.

Heater unit must exist in heater and condense cooler in series, complete automatic temperature regulating
valve makes CLORIUS SAMSON or equal. To be completed, strainers, steam trap, pressure relief valve on
waterside, thermometers on seawater in and outlet, pressure meter for steam, and thermometers for outlet
condense. The capacity of this system is designed so that the total steam production of main boiler system can
be taken for heating up seawater. The wash water heater must be installed in the pump room. Installed in such
way that the heater can be removed for inspection/cleaning. Water flow from the tank wash pump to be pressed
trough the heater into the washing line on deck. Also possible to by pass and shortcut the heater. Wash water
heater.

High Pressure Cleaning System:


Ship to be provided separate high-pressure water cleaning system KARCHER or similar pump. pump to be
feed with pressurized water from a hydrophore that uses industrial water.
This system should be tested and demonstrated proper operation to buyer.
High-pressure Cleaning Pump:
In the engine room to be installed a high-pressure pumps make KARCHER or equal. Pressure approximately
180 bars. This pump must be secured for running dry, switch on/off automatically when the trigger on spray
gun is pulled.

Lines, Hoses & Spray Gun:


Pump connected to a fixed High Pressure pipe over total length of cargo area. Dimension 1 inch. Special
High pressure stainless steel quick connection coupling to be made near each tank-cover. System to be
completed two hands held trigger operated spray guns. Length of high pressure hose sufficient to reach all part
of tank and cargo deck.

After tank cleaning, the washed oily water in each cargo tank to be pumped by its own cargo pump to slop tank
or to the tank washing tank on deck and to be deposited through to be discharged out of side by the pump from
slop tank under oily water discharge monitor.(O.D.M.E.)

Tank cleaning pump Fixed cleaning machine Portable cleaning Cleaning heater
machine
Number 1 set 30 sets 2 sets 1 set
Type Hyd. Cent. Twin nozzle 7 mm Twin nozzle 7 mm Shell & tube
Capacity 150m3x80mlc 10 m3/hr x 7 bar 9 m3/h x 7 bar 75degC
Material AISI316L AISI 316L AISI 316L AISI 316L

Page 73 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
707 Auxiliary System & Equipment for Cargo

Cargo operations to be carried out from the cargo control room.

There shall be a loading and operational computer with terminal, display unit and printer installed in the cargo
control room.

Cargo and ballast pump control -- Remote start/stop the cargo & stripping pump, /tank cleaning
pump and ballast pumps from cargo control room.

-- Emergency stop from cargo control room and near the manifold
both sides..

Cargo/ballast valve remote control Cargo and ballast valves remote controlled by glycerin hydraulic
system.
Manifold valve control. Local operation at manifold side.
Cargo tank level gauge.& Radar type with remote readout in C.C.R. for each cargo and slop
Tank pressure gage. tank, Tank pressure sensor build in the radar unit.
Independent high level and One (1) dual sensor for each cargo oil tank and slop tank with
high-high level alarm audible and visible alarm.
Cargo tank temperature gauge At least two (2) sensors for each cargo & slop tank with remote
readout in cargo control room.
Ballast tank level gauge Electro-pneumatic type or sensor type with remote readout from
cargo control room.
Draught gauge (2 points) Electro-pneumatic or sensor type with remote readout from cargo
control room.
Oil pollution prevention system 1 - Oil discharge monitoring & control system according to
MARPOL 73/78 (Annex I) and light chemicals
Portable cargo monitoring 1 - For ullage measuring, oil/water interface detecting, hand
equipment dipping, temperature measuring by means of portable
oil/water interface detece on upper deck.

708 Cargo Control Room

One (1) cargo control room to be arranged at accommodation deck forward.

One (1) micro-processor based cargo monitoring and loading computer including two (2) screens, two (2)
keyboards and printer at the control console and panel in cargo control room to cover the following functions:

Remote level measurement alarm in cargo /slop tank.


Remote Cargo Tank pressure measurement read out with alarms in CCR.
Remote level gauging of all ballast tanks, F.O. tanks, F.W. tanks.
Independent high level (95%) & high-high level (98%) (overflow) alarm for cargo/slop tank.
Temperature monitoring of all cargo tanks F.O. tanks and slop tanks.
Draft of the vessel (2 points)

Page 74 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Oil discharge monitoring & control system
Hydraulic power station for valve operation
Position indication of remotely controlled valves
Loading computer with software programs (on line with the monitoring system.)
Remote read out pressure and vacuum meters of All Cargo pumps in CCR.
Remote read out pressure and vacuum meters of ballast/tank cleaning pumps in CCR.
Remote read out of temp. and alarms of cargo pump readings and all bulkhead glands.
Remote read out of Cargo temperature and Pressure from manifold.

709 Oil Discharge Monitoring and Control

For the prevention of marine pollution, an oil discharge monitor, control system and potable oil/water interface
device to be provided to meet IMO RES. A586 (XIV) requirements. The system comprised the following main
components.

(1) Oil content meter in pump room


(2) Flow meter in pump room
(3) Operator's console in CCR
(4) Valve control unit in pump room
(5) Electric motor in engine room.

Drip trays with mild steel grating shall be fitted beneath port and starboard manifolds. Which size and volume
of trays shall refer to IMO & OCIMF requirements.

Page 75 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

800 Hull Piping System

801 Ballast System


Ballasting and de-ballasting system to be provided for double bottom and wing ballast tanks as well as fore
peak tank and after peak tank. Two (2) sets of single stage, horizontal centrifugal type water ballast pump
placed in pump room driven through a gas tight oil filled bulkhead gland by electric motor placed in engine
room. Ballast pump and gastight bulkhead passing according to class. One (1) ballast ejector of 50 m3/h to be
fitted in pump room, which driven by the ballast pumps. Ballast Pumps mechanical connected trough a
Stromag Periflex or Fenner coupling and a oil filled, gastight bulkhead passing to a electromotor placed in the
engine room. Bulkhead passing provided with high temperature alarm with read out in CCR.

The pumps to be remotely operated from cargo control room, and shall have piping arrangement for effective
filling and discharge of water ballast tanks.

Remote read out Pressure and Vacuum meters in CCR.

The ballast pumps to have suction from sea chests in pump room and deliver to two (2) main ballast lines
installed in each side of the double bottom with branches to each ballast double bottom and wing tank as well
as fore peak tank.

The particulars of water ballast pump to be as follows for each to deballast the vessel within five (5) hours.

No. of sets Two (2)


Type Single stage, horizontal centrifugal type pump
Capacity 300 m3/h
Pressure 25 mLc
Drive Electric motor driven
Casing Bronze
Impeller Bronze
Shaft Stainless steel
Seal Mechanical

A ballast delivery line to deck in cargo manifold area for connection to cargo cross over by spool-piece for
emergency ballasting to be arranged.

Shifting of ballast water between tanks shall not be considered.

Ballast valves shall be of butterfly type and remote control by glycerin hydraulic system from CCR.

For the remote level measuring system of water ballast tanks to be controlled and readout at cargo control
room.

Page 76 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Arrangement of small hatches for local gas detection in ballast tanks and closed space in dangerous area to be
fitted ( Pipes on main deck, designed for portable gas detection equipment).

The fire/general service pump shall be connected to the sea main suction line and serve as aft peak tank ballast
pump.

All piping support securing bolts and nuts to be provided with anti-vibration arrangement such as double nuts.

Piping material

Piping Dia. Piping Flanges and fittings Remarks


Material
WB pipes All artificial ISO

Valves

Valve type No. Dia. Casing material Trim Material Remarks


Butterfly valve acc.drwg All Cast Iron Bronze
Non-return acc.drwg All Cast Iron Bronze
valve

802 Bilge Piping

Bilge piping shall be arranged according to the Class Rules and Authorities requirements.

Emergency bilge connection shall be arranged as required by class rules.

Water in steering gear room shall be drained to engine room and bilge wells through self-closing valve in
engine room.

Chain lockers, stores rooms in forecastle, cofferdam and bow thruster room to be served by bilge ejectors of
40~50 m3/h. Drive water supplied by fire/deck-wash line.

Bilge, fire & general service pumps in E/R take suction from bilge wells and discharge overboard directly in
emergency case only. One small bilge pump takes suction from bilge wells and discharge into the bilge water
holding tank or overboard.

One (1) set of oily water separator shall be provided.


The oily bilge separator takes suction from bilge wells and bilge water holding tank, the oil in the bilge water
will be separated from the bilge water and separated bilge water (<15ppm) will be discharged overboard. The
oily water separator shall be provided an automatic oil drain control device, oil content monitor and a 15 ppm

Page 77 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
alarm and necessary fittings such as valves and a pressure gauge. Oil content in discharge water shall be
constantly monitored.

In case of the high oil content effluent will be automatically directed back to bilge water holding tank and give
out an alarm signal.

bilge water holding tank and dirty oil tank with capacity according to rules to be arranged.

Oily bilge pump

No. of sets One (1) set


Type Screw or piston type or Manufacturers standard
Capacity To be according to oily water separator capacity
Pressure ~3 bar
Drive Electric motor

Oily water separator

No. of sets One (1) set


Type Gravity difference separator without filter cartridge
Capacity 1.0 m3/hr, below 15 PPM
Automation Automatic oil contents monitoring and 15 ppm alarm system accordance
the regulations to be used also in special area annex 1
Heating if any Elec. heating

803 Drainage System


Sufficient number of scuppers of suitable dimension to be fitted to all decks, deck house and casing tops, etc.

Spill tank shall be allocated at the after ballast tank.


Deck opening to be closed off by mechanical expanding plugs.

804 Sounding System


Sounding pipes for manual sounding shall be fitted to F.O. tanks, F.W. tanks, W.B. tanks, sludge tanks, drain tanks,
cofferdams, void spaces, chain locker etc., except cargo and slop tanks. Pipes shall terminate at accessible
locations.

Each sounding pipe shall be clearly marked with the tank number by welding bead.

Graded view glass to be used where suitable, for instance for LO tanks.
The sounding points shall be located as near to the suction pipes as possible. Small tank sounding connection
shall terminate at the tank.

No sounding pipes to pass through cargo tanks.

Page 78 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Sounding pipes extending to open deck to be fitted with bronze cap.

Self closing sounding head to be fitted for sounding pipe of double bottom tanks in engine room with self-closing
cocks and screwed caps..

The material of sounding pipes for WB and FW tanks shall be galvanized steel and for oil tanks (not cargo tanks)
shall be mild steel.

The material of sounding/ullage pipe of cargo tanks should be of stainless steel and should be perforated pipe with
calibrated vapour lock and on top a valve connection for the UTI .

A remote sounding system for draught, water ballast tanks, F.O. tanks and F.W. tanks based on electric pneumatic
measurement to be fitted.

Sounding and filling pipes for drinking water tanks to be provided with locks to meet ISPS codes.

805 Air-conditioning System


Air-Conditioning system to be installed to serve as ventilation, cooling and heating for all living rooms, public
rooms, offices and wheel house.

All air-conditioning and ventilation systems to be tested and measured during sea trials. Full report to be
submitted to Buyers for approval and acceptance.

Heating shall be executed with both electrical and steam elements.


Main particular of air-conditioning system to be as follows:

R-404A direct expansion, electric motor driven. With condenser, receiver, gas dryer and separator.

Central units, consist of supply fan, heating chamber, cooling chamber, sound dampers, filters and necessary
attachments. The air supply to be interconnected between the outlets of central units. Steam heating coils to be
installed in unit.

The system is to consist of a high velocity, central unit, single duct system consisting of light pre-fabricated and
pre-insulated pipes, preferably two concentric tubes mineral wool in between and designed to meet following
conditions:

Tropical Winter
condition Condition
O
Water temperature +32 C 0OC
Outside air temperature / Relative Humidity +35OC / min. 70 % -20OC / 50 %
Inside air temperature / Relative Humidity +22OC / 50 % +20OC / 30 %

In mild climates for certain sailing area when cooling is not required, the system to serve as mechanical
ventilation for the accommodations, supplying fresh air only. And air changes are to be about 6 times per hour for
living room and to be about 8 times per hour for public room.~ 8 times/b for wheel house spot cooling

Page 79 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Central exhaust re-circulation system shall be applied, 40% fresh air supply shall be maintained.

One (1) packaged air conditioning unit to be arranged for engine control room.

Tropical condition
Outside air temperature / Relative Humidity +35OC / 70 %
Inside air temperature / Relative Humidity +20OC / 50 %

At least 2 air changes per hour.

Refrigerant for all air conditioning plants to be R-404a.

In addition a mechanical fresh air supply of 10 times//hr air change with emergency stop and fire damper to be
arranged.

806 Mechanical Ventilation


Mechanical Ventilation for Accommodation

Following compartments to be served by mechanical supply or exhaust ventilation system, capable of giving
the following rate of air changes per hour.

Air change Mechanical Supply Mechanical


Compartment (times/hour) (times/hour) Exhaust
(times/hour)
Living space 6 - -
Public space 8 - -
Office space 8 - -
Wheelhouse & chart space 8-10 - -
Cargo control room 10 - -
Sanitary space - - 15
Laundry, shower rooms - - 10
Galley - 40 40
Locker - - 10
Purifier Room 45 45
Ballast Pump room 45 45
Paint store 20 20

The ventilation system to be of low pressure system.


For compartments where only mechanical exhaust ventilation is applied, the air to be supplied from adjoining
passageways through louvers on the entrance door and/or by natural ventilators.

Mechanical Ventilation for Machinery Space

(1) Engine room fan The fans for engine room to be axial flow type. The ventilation fan to supply fresh air to
the operating stations and necessary places in the engine room through air ducts.

Page 80 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Number of set 2 sets


Capacity each 100% higher than consumption of all combustion machinery and boilers
according to class rules. Not less than 50000 cum/hr.
Type -- Axial flow
-- Reversible el.-motor driven.
-- One of the fans to have start/stop outside engine room.

(2) Engine control room ventilation


supply fresh air from engine room duct.

(3) Purifier room supply fans

Number of set Exhaust


Capacity each According to size of compartment for 45 times/hr air change
Type Axial flow
Non-reversible, el.-motor driven.

(4) CO2 room exhaust fan

Number of set 1
Capacity each According to size of compartment
Type Axial flow
El.-motor driven.

(5) Bow thruster room fan

Number of set 1
Capacity each Sufficient to achieve 25 air changes per hour
Type Axial flow , El.-motor driven.

In the ventilator ducts just below the fan unit silencers to be installed.

The fan and driving motor to be incorporated in the fan casing, the fan and motor to be mounted in common
bed plate. Fan impeller to be dynamically balanced.

807 Natural Ventilation


Mushroom, gooseneck or wall ventilators to be fitted for ventilation of store spaces, steering gear room, etc.,
wherever.

900 Machinery Part

901 General
The main propulsion unit shall be two medium speed diesel engines through gear boxes, and driving two
controllable pitch propellers through line of shafting respectively.

Page 81 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
The engines to be arranged with clock wise direction looking forward.

Both main engines must run in the same rotation direction.

Counter rotation as required by the CPP propellers to be provided by the gearboxes.

The maneuvering stand for the main engines shall be located in wheel house central console and bridge
wings .and in the centralized control room in the engine room. For emergency condition it shall be controlled
at engine side.

The machinery installation of the ship to be designed, constructed and installed in accordance with the
requirements of Classification Society.

The main engines shall be designed so as to burn heavy fuel oil with a viscosity up to 380 cSt and temp. in
accordance with makers instruction under a normal sea going condition & maneuvering, and also heavy fuel
oil shall be used for, starting as well as before stopping conditions.

The electric generating system shall consist of three (3) main diesel generators, and one (1) emergency
generator. And 1 shaft generator

The main switchboard shall be suitably arranged in the centralized control room and emergency switch board
shall be arranged in the emergency generator engine room.

The capacity of the power plant to be based on the following conditions:

Condition Number of sets working


Normal sea service One D/G or two shaft generators
Sea service with tank washing Two D/G or one D/G with shaft generators
Full Discharging cargo Two D/G
Maneuvering with bow thruster One D/G and two shaft generators
Harbor One D/G or one emergency generator

Generator engines shall be designed to burn marine diesel oil.

The heating plant for the vessel shall consist of two (2) oil-fired steam boilers and two (2) exhaust gas
economizer. Two combined oil fired/exhaust gas boilers can be the alternative arrangement.
The oil fired steam boiler is used for fulfilling the usage of cargo oil tank heating, cargo oil tank cleaning sea
water heating, lube oil heating, and hot water heating for domestic usage.

The oil fired steam boiler shall be designed to burn heavy fuel oil with a viscosity up to 380 cSt and temp. as
per makers instruction. ( same as main engine)

Air compressors and pumps for the propulsion system shall be so designed that the main engine is
satisfactorily operated at maximum continuous output with following design conditions:

Page 82 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Sea water temperature 320C
Fresh water temperature 360C
Ambient temperature 450C
Atmospheric pressure 0.1 Mpa
Relative humidity 60%

Centralized and automatic controls shall be provided for the propulsion plant, auxiliaries, etc. and to comply
with the requirements of BV AUT- _ UMS notation.

Emergency escapes to be provided with locking device from the inside to meet ISPS and ISM
requirement.

One set of Master Calibration Gauges with certificates for calibrating all manometers and
thermometers onboard to be provided.

902 Principal Particulars of Machinery

Transfer Arrangement:
The design and arrangement of the machinery space shall be such that components, as a dismantled diesel generating set,
pumps, electric motors etc., can be removed from their positions and easily be unshipped through hatches. One flush
hatch in upper deck above main engine room or other appropriate position. Size must be proportional to the size of the
shaft generator or turbo-charger or one coil of the steam generator/boiler which ever is greatest. One lifting beam from
engine room to the machinery workshop to be arranged a runner for 2 tonnes if possible.

9021 Main Engine


Two (2) MAN B&W 7L28/32A approx. 1715 kW each

4-stroke cycle, in-line, water cooled, direct injection, single acting, trunk piston unreversible, medium speed
type marine diesel engine with turbocharger and air cooler.

Type MAN B&W


Number of set Two (2) set
Max. Continuous Output 1715KW each
Continuous Service Rating
No. of cylinder 7
Dia. of cylinder Acc B&W specification
Stroke of piston
Brake mean eff. Press
Fuel oil consumption rate

Acceptance test run shall be carried out with MDO-fuel on makers test bed according to the program of the
makers standard test bed run.

Page 83 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Fuel oil consumption according to ISO Standards 3046/l, based on a net calorific value of 42700kJ/kg (10200
kcal/kg) at maximum continues rating:

Main engine to comply with MARPOL 73/78 Annex VI Regulation 13 (Mandatory code on NOx emission).

9022 Flexible couplings


Maker Vulkan or similar. final coupling type will be based on the toisional vibration calculation.

One(1) Flexible coupling engine gearbox


One(1)Flexible coupling engine gearbox PTO

9023 Reduction gearbox


Model:
Type: Single stage reduction gear, vertical offset with Hydraulically operated
multi-disc clutch
Number: Two(2) sets each with counter rotation direction
Reduction ratio: Approx. 3.5 :1
Propeller speed: To be determined

9024 Shaft and Propeller


Shaft
The construction and components of shafting is according to the standard of maker and rule of class.
Gear ,shafting and propeller shall be supplied with package by
The maker including controlling device.

Shaft shall consists of:


Two(2) propeller shafts
Two (2) intermediate shaft, if any
The shafting of forged steel to consist of one propeller shaft with gear box subject to main engine maker final
configuration.

Aft end of the propeller shaft to be of solid coupling flange. Fwd end the propeller shaft to be of hydraulic
flange coupling.

Aft and fwd end of the intermediate shaft to be of solid coupling flange.

The hollow bored shaft, containing oil pipes for propeller blade adjustments has an integral forged flange at
propeller sides and a hydraulic coupling at forward side, so that with draw of the shaft to aft is possible.

Stern Tube and Bearing


The stern tube shall be of welded construction of steel plate and welded to the stern frame boss and constructed
as a part of hull structure.

The stern tube to be provided with white metal lined cast iron bushes having dimensions as per rules
requirements. The stern tube inner part to be oil filled.

Page 84 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Oil pressure to be provided by gravity tank installed at suitable height in accordance with the seal makers
recommendations. Lubricating of the stern tube bearings to be carried out in accordance with Builders
standard practice.

A Torsional analysis for the propulsion system, consisting of the main engine shafting , propeller & PTO
system will be carried out by the manufacture of the main engine in accordance with Classification Societies.

Bush bearings shall be installed in accordance with makers instruction.

Two (2) controllable-pitch propellers shall be installed in accordance with the CPP manufacturer's standards.
The propeller rated for maximum continuous rating at Propeller speed rpm. The propeller shall be 4
bladed.

The blades are bolted to the hub and the hub to


contain a hydraulically operated actuating cylinder for propeller blade adjustment. The hub is flange mounted
to the propeller shaft.

Type Controllable pitch type


Number Two (2) sets, counter-rotation
Diameter of propeller Te be determined
Revolution of propeller To be determinded
Material Ni-Al-Bronze
Manufacturing tolerance Class I of ISO 484/1
Spare propeller One (1) spare blade for each propeller
each ship

A hydraulic power system to be supplied, consisting of one set of hydraulic oil tank and electric motor driven
pumps according to Makers recommendation.

Manoeuvring by pitch and speed control to be operated from the wheelhouse.

The propulsion package from one source as a matched system such as a complete MAN B&W propulsion
package or similar to be provided.

Propulsion control, monitoring and alarm system should be package supply from main engine maker or from
Lynsoe.

9025 Boiler Plant


The vessel to be fitted with two (2) oil-fired steam boilers and two (2) exhaust gas economisers. (Two
combined oil fired/exhaust gas boilers are acceptable as alternative) The boilers capacity to be suitable for
max. cargo heating and tank washing requirements.
Two (2) boiler feed water pumps to be provided.
HFO/MDO Change over unit to be supplied.
The boiler to supply heated steam to the following system:
Page 85 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

-- Heating coils for cargo tanks (AISI 316L)


-- Heating coils for slop tanks (AISI 316L)
-- Tank washing heat exchanger
-- Heating coils for HFO storage, service and settling tanks
-- Heating coils in sludge and dirty oil tanks.
-- Steam heating of fuel system components as required
-- Accommodation heating via. Air conditioning unit
-- Domestic hot water heating
Cleaning flush lines for sea chests and box coolers
Deck machinery to meet ICE class 1A requirements

Oil-fired Boilers

Type Oil fired steam boiler Heavy Oil 380 cSt.


Number Two(2) sets
Capacity To be calculated
Fuel Heavy Oil 380 cSt. and Marine diesel oil at ignite & before stop furnace

The boiler will be oil-fired type of vertical or horizontal cylindrical design, completely insulated and provided
with the following valves and gauges.
Main steam valve, safety valves, level gauges, feed water shut-off and non-return valves, scum valves and
pressure gauges.

Remote actuation devices to be provided for all boiler safety valves for testing purpose.

Exhaust gas economisers:

Type Exhaust gas combined boiler


Number Two (2) sets
Capacity, exhaust heated Max. utilisation of available waste heat in main engine exhaust,
according to manufacturers recommendation
Burner capacity to be calculated.
Pressure As per manufacturers
Steam pressure: 0.7 MPa

9026 Electric Generating Plant


General
The diesel driven generators are arranged in the engine room, while the diesel emergency generator is installed
outside of the engine room in accordance with Classification Societies requirements. Three (3) main generator
sets and one (1) emergency generator set to be provided.
Two (2) PTO shaft generators from M.E. & gearbox also shall be installed .
All generators to be of drip-proof marine type, brushless and self-magnetizing with voltage regulation. The
power plant to include:

Page 86 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Three (3) --- Diesel generator sets
One (1) --- Emergency generator
Two (2) -- Shaft Generators

Two shaft generators to be fitted on a primary PTO from the gearboxes.


Shaft generators must be able to run parallel with the main generators during take over only.

Shaft generator to feed the bow thruster during maneuvering

Main diesel generator sets


(A) Diesel engine:

Type Turbo-charged, 4-stroke marine diesel engine.


Rated According to Electrical power calculation in connection with the electrical
Kw pump drive system.

Rated revolution about 1800 rpm


Cooling Fresh water, Box cooler
Lubrication Sump
Fuel type Marine diesel oil
Starting Compressed air
Output of main generating diesel shall be at one end to drive generator,
Arrangement for pre-lubrication of stand-by engine is to be provided. Start/stop from ECR or local, whichever
is in control mode.

Diesel engines for main generators driving to have continuous rated output to drive the generator under the
ambient conditions stipulated by the Classification Society.

The engines to be of the marine high speed, four-stroke type, with direct injection, supercharging with internal
fresh cooling water and lub oil system.

Each engines together with its generator to be installed elasticity to the ship structure. Engine to be fresh
water-cooled.(Box coolers) Each engine to have attached freshwater circulating pump, F.W. cooler and L.O.
cooler, and being fitted with suitable prefabricating equipment

Cooling system Box coolers


Cylinder cooling: internals F.W. cooling system
Charge air cooling: F.W.cooled
Lubricating oil cooling: internal F. w. cooled
Starting air system: compressed air 30 bar
Fuel oil system: MDO

(B) Alternator:
Drip proof, self-ventilated, brushless type about ) AC.450V, 60Hz. at 1800 r/min. According to Electrical power
calculation in connection with the electrical pump drive system

Page 87 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Emergency generator set

A diesel driven emergency generator set to be provided in emergency generator room. The emergency generator
room is to be well insulated and diesel generator to be mounted on resilient foundations to minimise noise
transmission.

(A) Emergency Diesel

Type 4-stroke, marine type,


Rated Output abt. 250 kw
Rated revolution 1800 r/min.
Cooling Air-cooled (Radiator cooler)
Lubrication Sump
Fuel type Light diesel oil
Starting Electric batteries / Manual hydraulically

Diesel engine to have a continuous output suitable for driving the generator under those conditions stipulated by
the Classification Society.
The engine to be of the four-stroke type and to be air-cooled.
The diesel and generator are assembled on a common base plate and mounted elasticity.

Engine Revolution: 1800 rpm


Cooling system: air/water
Fuel oil: MDO
Starting of the engine will be arranged by 2 independent starting devices.

(B) Emergency Alternator:


Drip proof, self-ventilated, brushless type about 200 KVA (about 250 Kw) AC.450V, 60Hz. at 1800 r/min.

Output 250 kw
Revolution 1800 rpm
Voltage 450 V
Frequency 3 phase, 60 Hz

9027 Compressed Air Plant:


Air compressor and air vessel
The main. air compressors to be of single acting two stages, piston type and to be driven by electric motors.
Main air compressors to be of air cooled. Its air cooled.

Main air compressors to be fitted with safety valves, inlet air strainer, pressure gauge, cooler, drain cock, trip
device for lub. Oil low pressure and compressed air high temperature, and other necessary fittings, according to
the manufacturers standard.

Automatic stop and start device to be provided for main air compressors. Air compressor to be actuated by the
pressure of the main air and aux. Vessels.

Page 88 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Air Compressors:
Pressure
Name Type No. Capacity
(MPa)
Main air Motor driven vertical
2 ~ 20 m3/h 3.0
compressor 2- stages
Working air
Screw or lave 1 200 m3 8 ~1.0 MPa
compressor
It looks like the air compressors are to small must be calculated. The capacity of air compressor will be
investigated.

Air Reservoirs:

Name No. Type Capacity (m3) Pressure (MPa)


Main start-air vessel 2 Cylindrical ,Welded 0.5 3
steel construction
Auxiliary air vessel 1 Ditto 0.1 m3 1.0 MPa

9028 The main start-air vessel shall supply to the control air system through pressure reducing valve Pumps

Capacity of pumps to be selected according to Class and Regulations and actual requirements Capacity and
pressure to be sufficient for the service intended. Pumps shall have non-overloading characteristics. In general
the water pumps to be of centrifugal type and to be driven by electric motor.

Small pumps for circulating sanitary and hot water services will be of horizontal centrifugal type. Centrifugal
pumps, where necessary, to be fitted with priming equipment for self-priming.

And the oil pumps to be of screw type and gear type and to be driven by electric motor.

The capacity of pumps to be selected according to Class and Regulations and actual requirements also. The
Motor power and revolution shall be decided finally by the manufacturer's standard.

Sludge and oil bilge pumps to be of the worm or gear type.

Centrifugal Pumps
Principal material to be as follows:

Component Fresh water pump Sea water pump Boiler water circulating
pump

Casing Cast iron Bronze Ductile cast iron

Page 89 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Impeller Bronze Phosphor bronze Stainless steel

Shaft Stainless steel Stainless steel Stainless steel

Gland seal Gland packing (*) Gland packing (*) Gland packing

Note: * means some of them to be of mechanical seal type as per the makers standard.

Note ++ Buyers prefer all pumps with mechanical seal.

Gear pump and screw pump


One (1) relief valve to be provided at the pump discharge side against excessive pressure.

Principal material to be as follows:

Gear pump Screw pump

Casing Cast iron

Gear rotor Carbon steel

Shaft Carbon steel

Power rotor shaft Carbon steel

Idle rotor shaft Carbon steel

Gland packing or oil seal as


Gland seal Mechanical seal
per makers standard

Following pumps to be provided:

(A) Electric Motor Driven Centrifugal Pumps:


Capacity Head
Name Number Type
A bt(m3/h) (MPa)
Box coolers V.C. ~ 0.3
A air conditioning cool. s.w. pump 1 V.C. ~ 0.3
Fresh water generator 1 According to
s.w. pump Maker
M M/E L.T. cool. f.w. stand-by pump1 V.C. 0.3
M M /E H.T. cool. f.w. stand-by
1 V.C. 0.3
pump
Bil Bilge, fire & general service pump 2 V.C. 75/50 0.35/0.70
SP.
Emergency fire pump 1 V.C. 40 0.70
SP.
Tank cleaning pump 1 V.C. 70 1
Deck foam water pump 1 V.C. 100 1
Daily fresh water pump 2 H.C. 5 0.45
Hot water cir. Pump 1 H.C. 1.0 0.2

Page 90 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Boiler Feed water pump 2 H.C. Makers
standard
ballast pump 2 V.C. 200 0.25

(B) Electric Motor Driven Screw, Gear and Mono Rotor:


Capacity Head
Name No. Type
m3/h (MPa)
Main L.O. stand-by pump 1 V.S. ~
M/E fuel oil supply stand-by
1 H.G.
pump
Diesel oil transfer pump 2 H.G. 10 0.33
HFO transfer pump 2
Lub oil transfer pump 1 H.G. 5 0.33
Stern tube lub oil pump 1 handle 1 0.3
Sludge pump 1 H.M. 3 0.5
Bilge pump 1 H.M. 3 0.5

Note:
* Cargo pumps to be driven by Electrical motors with converters

Final capacity of pumps shall be decided from system design of equipment and selecting type of the pumps

V.: Vertical. H.: Horizontal


S.: Screw G.: Gear.
C.: Centrifugal M.: Mono Rotor
SP.: Self-priming

9029 Oil purifier

Purifiers for fuel oils to be of enclosed, centrifugal and each to be driven by an electric motor. Each mineral oil
purifier to have sufficient capacity for running the main engine, diesel generator and boiler.

Lubricating oil purifier to be of enclosed, centrifugal and to be driven by an electric motor.

Materials to be in accordance with manufacturers standard.

Each purifier to be provided with one (1) feed pump and other necessary fittings according to the manufacturers
standard.

Duplex trainer to be provided for purifier feed pumps.

The purifiers to be arranged with alarm equipment for abnormal separation.

Page 91 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Name No Type Capacity for each Max. density
at 150C
H.F.O. purifier 2 E.C. auto Sufficient capacity to serve 130% 0.991 kg/m3
(two sets) self-cleaning fuel consumption of M/E at 100%
MCR. And boiler simultaneously
D.O. purifier 1 E.C. auto Same as HFO purifier and when
(1 set) self-cleaning HFO purifier is failure the DO
purifier can work as HFO purifier.
Lub. oil purifier 2 E.C. auto In accordance with engine maker's
(two sets) self-cleaning recommendation.

90210 Fresh Water Generator:

No of sets One (1) set


Capacity, each Max production with M.E. at CSR abt. 10 t/day
Type Low pressure, plate type
Seawater temp. 320C
Salinity Below 10 PPM.

90211 Heat Exchangers/Box coolers


Capacity of exchangers/boxcoolers to be decided according to heat dissipation and actuating medium
temperature of exchanger inlet/outlet.

The heaters to be tube-shell type with steam heating.

The shell and tube type cooler and the auxiliary condenser shall be of horizontal shell and straight tube type with
fixed tube plates and cooling tubes shall be expanded into the tube plate at both ends. The shell shall have an
expansion joint.

The sea water end shall be internally coated with tar-epoxy and fitted with zinc protecting plates.

The cooler and the auxiliary condenser shall be provided with an air cock seat, a drain cock seat, a soda cock
seat, thermometers, a boiling steam valve seat etc.

Each oil heater shall be shell and tube and shall be provided with an air vent valve a drain valve, an oil relief
valve on inlet line and thermometers.

Capacity of the coolers and auxiliary condenser shall be based on the sea water temperature of 32 0C with tube
cleanliness factor of 85%.

Portable connections by steam and compressed air to be provided for cleaning the box coolers in situ. Isolation
valves on the cooler casing to be of 316L stainless steel materials.

Material of cooler to be as follows: As per manufactory details.


For shell & tube type cooler

Page 92 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Tube Aluminum brass
Tube plate Naval brass
Cover Cast iron or steel plate with tar epoxy coating inside
Shell Steel plate or steel pipe

For shell & tube type oil heater, construction and material to be in accordance with the makers standard.
Name Type No. Remark
Auxiliary condenser Shell & tube 1
M/E L.T. F.W. cooler Shell & tube 1
coolers
M/E lub oil cooler 1 Makers standard
M/E J.W. preheater 1 Makers standard
Purifier L.O. heater 1 Makers standard
Purifier F.O. heater 1 Makers standard

90212 Engine room ventilating fans

Engine room ventilating to be installed on the upper part of engine room and to supply fresh air into the
machinery space.

Each ventilating fan to be of a vertical, totally enclosed, motor driven, axial flow type. In the ventilator ducts,
just below the fan units, silencers to be placed.

Materials to be as follows:
Casing steel plate (painted with rust preventive paint)
Impeller aluminum alloy casting
Impeller shaft carbon steel

Capacity Pressure
Name No Remark
(m3/h) (static)
V Vertical axial flow and split
E/R supply fan 2 50,000 ~500 Pa casing type. One is
reversible
Purifier room
1 ~3000 ~500 PaCentrifuge type
exhaust fan

90213 Incinerator
Makers standard it to be capable of burning waste oil and solid waste.
A control and indicating panel shall be fitted for the incinerator.
This panel shall contain all indication and alarm lights necessary for safe operating of the unit.

Accessories and fittings including burner, door and fan for the incinerator shall be provided according to the
manufacturers standard.

One (1) waste oil tank with an agitator shall be provided according to manufacturers standard.
Page 93 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

The capacity of incinerator is according to the size of the vessel

1 -- Incinerator, capacity according to the size of the vessel

90214 Sewage Treatment Plant


One set of sewage treatment plant shall be installed in engine room. It shall be bio-chemical type. The capacity
will be according to the rule requirement.

903 Piping System in Engine Room

Insulation for pipings inside machinery spaces and pump room to have outer cover that resist damage and not soaking
fluid as required by class rules. (such as Glass tapes or equivalent)

9031 Material for Pipes and Valves


Material and size of pipes, valves, and fittings are to be in accordance with following tables. All
accordance to Class and manufactory.
Pipe Material of
System
Nominal dia. (mm) Material Wall thickness Valve Body
3Mpa 50mm and above Seamless steel A Forged steel
Compressed 40mm to 15mm
air 10mm and below Copper
0.7Mpa 50mm and above Seamless steel A Forged steel
Compressed 40mm to 15mm
air 10mm and below Copper
50mm and above Seamless steel STD and A for Cast steel or
Fuel oil 40mm to 15mm 50mm & below Bronze
10mm and below Copper
50mm and above Seamless steel STD and A for Cast iron, Cast
Lubricating
40mm to 15mm 50mm & below steel or Bronze
oil
10mm and below Copper
Fire 50mm and above Seamless steel, STD and A for Cast iron
fighting, 40mm to 15mm Hot galvanized 50mm & below Cast iron or
Sanitary, Bronze
Bilge, 10mm and below Copper Bronze
Ballast
Sea suction
80mm and above Cast steel
and
65mm and below Bronze
overboard,
discharge
valves on
shell
50mm and above Seamless A for 100mm & Cast iron
Cooling
40mm to 15mm steel, Hot below, STD for Cast iron or
seawater
galvanized 125 & above Bronze

Page 94 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Pipe Material of
System
Nominal dia. (mm) Material Wall thickness Valve Body
10mm and below Copper Bronze
50mm and above Seamless steel, STD and A for Cast iron
Cooling 40mm to 15mm Galvanized 50mm & below Cast iron or
fresh water Bronze
10mm and below Copper Bronze
50mm and above Seamless steel, STD and A for Cast iron
Domestic
40mm to 15mm Galvanized 50mm & below Cast iron or
fresh, Tank
Bronze
filling line
10mm and below Copper Bronze
Feed water, 50mm and above Seamless steel A Cast steel
Boiler blow, 40mm to 15mm Bronze
Boiler water 10mm and below Copper Bronze
circulating
Domestic All size Copper Bronze
hot water
450mm and above Welded steel 5mm Cast iron or
Exhaust gas
plate Bronze
system
40050mm and below Seamless steel STD
0.7Mpa 50mm and above Seamless steel A Cast steel
Steam, 40mm to 15mm Cast steel or
0.4Mpa Bronze
steam, 10mm and below Copper Bronze
Steam drain
Steam All size Seamless steel A
heating coils
cargo and All size DN 40 STD
slop tank stainless steel
steam AISI 316L
heating coils

Escape pipe All size Seamless steel STD and A for


from safety 50mm & below
valve of
boiler
Overflow All size Seamless steel STD and A for
pipe, Air 50mm & below
vent, Escape
pipes from
misc. or relief
valve
CO2 All
firesize Seamless steel As per Class Manufacturers
extinguishin Rule standard
g
Scupper soil
All size Seamless steel, STD and A for

Page 95 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
Pipe Material of
System
Nominal dia. (mm) Material Wall thickness Valve Body
hot galvanize 50mm & below

Remarks:
Material of pipes fitted on the main engine, generator engines and auxiliary machinery shall be in accordance
with manufacturers standards.

Material of the butterfly valve shall be in accordance with the manufacturers standards.

The wall thickness of ballast pipes to be in accordance with Sch80, but not more than 12mm.

(A) Seamless steel pipe


Nominal diameter Outside diameter Wall thickness (mm)
(mm) (mm) STD A B C
15 22 2.5 2.5 3.5 4.0
20 27 2.5 2.5 3.5 4.0
25 34 2.5 3.0 4.0 4.5
32 42 3.0 3.0 4.5 6.5
40 48 3.0 3.0 4.5 6.5
50 60 3.0 3.0 4.5 6.5
65 76 3.0 3.0 4.5 6.5
80 89 3.5 3.5 4.5 7.0
100 114 4.5 4.5 5.0 8.0
125 140 4.5 4.5 5.5 8.0
150 168 5.0 5.0 6.0 9.0
200 219 6.0 6.0- 7.0 9.0
250 273 6.5 6.5 8.0 9.0
300 325 6.5 6.5 9.0 10.0
350 377 6.5 - - 12.0

(B) Copper pipe


Nominal diameter Outside diameter (mm) Wall thickness (mm)
(mm) Ordinary pipe Press. pipe
4 6 1.0
6 8 1.0 1.5
10 15 1.5 2.0
15 20 1.5 2.0
20 25 1.5 2.0
25 30 1.5 2.0
40 45 2.0 2.5

9032 Fuel oil system


general
Fuel oil system shall be installed for main engine, auxiliary engines, steam boiler and emergency generator

Page 96 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
engine, and arranged with bunkering, purifying, supply and drain system.

2 -- F.O. transfer pumps, horizontal, gear type


1 -- F.O. purifier, filter type, sludge & water discharged, automatic, self-cleaning, (max. specific gravity of
0.991) each capacity to serve 130% fuel consumption of the main engine at 100% MCR based on 50 sec.
at 500C.
1 D.O. purifier, filter type, sluudge & water discharged, automatic, self-cleaning, capacity to serve for D.O.
and/or H.F.O.Same as F.O.purifier.
One set of F.O. supply & boost unit shall be installed for M.E. including flow:
1 -- M/E F.O. supply pumps, horizontal, gear type
1 -- Sludge pump, horizontal, monoscrew type
1 -- M/E viscosity controller
1 -- F.O. filter, automatic oil back-flushing type (10 micron)
etc.
1 -- A/E F.O. circ. pump
1 -- A/E F.O. supply pump
1 -- F.O. purifier feed pumps, horiz. gear type
1 -- A/E cviscosity controller
1 -- F.O. settling tank
1 -- F.O. service tank
1 -- F.O. overflow tank
1 -- Sludge tank
1 -- Waste oil tank

All fuel oil and lubricating oil tanks actual capacity to be verified by filling with fresh water or equivalent means. Tanks
to be completely dried out, treated as per coating specification and inspected by buyer supervisor before close up.

Filling and Transfer


The aux. diesel engines shall to burn marine diesel oil.
Main engine and Boiler shall burn Heavy fuel oil ( 380 cst.)

FO bunker lines to be fitted with fuel sampling cocks at filling connections.

Bunker system must be arranged through a central bunker manifold with overflow glasses in each overflow
line. See bunker diagram.
The diameter of the F.O.Bunker line to be calculated for minimum 100 cbm/hr.

A separate bunkerline for gas oil must be provided


The diameter for G.O. bunker line to be calculated for minimum 60 cbm./hr.

Diesel oil transfer pumps in the engine room to be arranged to transfer diesel oil from diesel oil tanks to diesel l
oil steeling tank or ship side via the deck filling connections.

Pressure gauges to be provided at bunkering stations P/S.


Sample points to be made at each bunkering station p/s.

Page 97 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
A strainer to be provided at the suction side of each transfer pump.

Excessive diesel oil from tanks other than double bottom tanks to be led to a diesel oil overflow tank built in
the double bottom.

Fuel Oil Service System


A)Main engine
M/E driven fuel oil supply pump or M/E fuel oil supply stand-by pump to draw from the diesel fuel oil service
tank through a strainer, a flow meter and then to discharge to main engine fuel injection. Excessive fuel oil from
M/E injection pumps through pressure regulating valve to be led the fuel oil service tank.

B)Generator Diesel Engines


The attached diesel oil supply pumps at auxiliary diesel engine draw from daily service tank throughout filter
and discharge to the injection pumps of diesel engines. Excessive fuel oil from A/E injection pumps through
pressure regulating valve to be led the diesel oil service tank.

C)Oil-fired boiler
Fuel oil for the auxiliary boiler to be drawn from the HFOl oil settling or service tank by the boiler fuel oil
circulating pump discharge to the burner.
Any excessive fuel oil from Boiler to be lead back to the Setting tank.

Purifying System
F.O. after settled in the settling tank, to be draw by the suction pump of the F.O. purifier and to be delivered to
the F.O.purifiers through the heater. After purification the clean fuel oil to be discharged into the F.O.service
tanks.

F.O. Service tank will be overflow in the F.O. settling tank.


Sludge from purifiers to be discharged into the sludge tank.

Fuel oil drain


Save-all to be provided at the foot of pumps, purifiers and oil heaters and to be led to the separated bilge oil tank.
Below valves on the tanks, flat bar for save-all to be arranged. Drain from above save-all to be led to the
separated bilge oil tank.

9033 Lub. oil system


GENERAL
The lubricating oil coolers shall be designed with fresh water temperature of 36C (for M/E) or sea water
temperature of 32C.

1 L.O. transfer pump, Screw type


1 -- L.O. purifiers, automatic, self-cleaning, partial discharge type, each capacity as per maker
recommendation (same mark & type as F.O. and G.O.purifier)
1 -- L.O. purifier heaters, steam heated
1 -- L.O. purifier feed pumps, horizontal, gear type,
1 -- Sludge pump, Rotary displacement type, 15 m3/hr at 2.5 bar
2 -- Main engine L.O. pump (Stand-by), capacity based on makers standard.

Page 98 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker
1 -- Main engine L.O. Cooler, plate type, capacity based on makers standard.
1 -- Main engine L.O. Filter, auto. back flushing type
1 -- Main L.O. pumps, tank mounted deep well type.
1 -- L.O. fine filter and pump for M/E stuffing box.
1 -- Lube oil storage tank
2 Lube oil drop tank
1 -- M/E cylinder oil storage tank
1 -- M/E cylinder oil service tank
1 -- Hydr. oil storage tank
1 -- Hydr. oil drop tank
1 -- Stern tube L.O. gravity tank
1 -- CPP lube Oil tank
1 -- Waste lube Oil tank

Filling & transfer


Separate deck filling connections to be provided main engine lube oil and generator diesel engine lube oil.

The filling lines also to be used for pumping lubricating oil up to the deck.
Lube. oil transfer pump to be arranged to transfer system oil between lube. oil tanks in the engine room or to
discharge overboard via on-deck Marpol connection.

A strainer to be provided at the suction side of lube. oil transfer pump.

Lube oil service system


M/E lubricating oil pumps or main L.O. stand-by pump to draw from the sump tank through simplex magnetic
suction strainers and to discharge to the main engine through the oil cooler and a strainer of back flushing type.

Main engine lube oil filter to be of automatic oil back-flushing type, fineness 90% separation above 20 m
(absolute mesh width max. 35m with alarm for high differential pressure.

Lubricating oil to flow out directly from the engine crankcase into the sump tank after lubrication.

Lube. oil cooler to have a by-pass temperature control valve on the oil side for temperature control.

The lube oil sump tank to be arranged in the double bottom.

Each generator diesel engine to have its own forced lubrication oil system, and to be provided with a built in
L.O. pump, a L.O. cooler, a filter and a lube oil sump tank for this purpose.

Purifying System
Lube oil purifier to be connected so that batch purification on the main engine system may be carried out from
the lube oil settling tank or the main engine sump tank to lube oil purified and storage tank or the main engine
sump tank.

Sludge and water from the purifier to be led to sludge tank and then discharged to waste oil tank for incinerator
by the sludge pump or to deck via the marpol flange

Page 99 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Lube oil drain


Save-all drip pans to be provided at the foot of pumps, purifier and tanks and to be led as far as possible to
separated bilge oil tank.

Drain line from the main engine bed-plate to be connected to separated bilge oil tank.

9034 Cooling Water System


General BOX COOLERS
The cooling water system for cooling of main engine to be a central Box cooler /fresh water cooling system,
main engine shall be provided with one independent cooling system. Main engine to be provided with double
cooling system as described in the engine makers project guide.

The main engine shall be provided with a stand still heating system.

The cooling system shall be designed based on the machinery maker's recommendations and system schematics
to be approved by the Buyers.

A) Sea Water Cooling System Only for auxiliary pumps such as Airco/Freshwater maker etc.
1 -- Aux. sea water cooling pump, vertical, cent. type, capacity subject to heat balance calculation
1 -- Atmospheric condition cooling S.W. pump, vertical type, capacity subject to heat balance calculation
1 -- Ejector pump for F.W. generator, cent. type
1 -- Air. condition cool. S.W. pump, vertical cent. type
2 -- Sea chest in engine room (one high and one low)
2 Sea chest in wing ballast tank (port and starboard side)
2 -- Sea water strainers (strainer element: galvanized steel)

B) Fresh Water Coolong System


According to engine maker instruction. Box coolers.
1 Central cooler,
1 -- Low temp. cooling F.W. pumps, Cent. 2-speed type, Capacity based on central cooling F.W. heat
balance
1 -- High temp. cooling F.W. pumps, Cent. 2-speed type, Capacity based on central cooling F.W. heat
balance
1 -- Cooling F.W. pumps for aux. engines
1 -- Air compressor cool. F.W. cooler horizontal, tubular type, cooled by S.W
1 -- M/E jacket cool. water pre-heater
2 -- F.W expansion tank
1 -- M/E air cooler cleaning water circ. pump and tank

Sea Cooling Water System Only by Box coolers.According makers instructions.


1) Diesel engine cooling sea water system

The L.T. cooling fresh water from main engine, auxiliary diesel engines, auxiliary condenser and etc. are led
through central coolers and cooled by seawater. Two central coolers to be provided. Each central cooler has 60%
heat capacity of total heat capacity.

Page 100 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

Fresh Water Cooling System


Generator engine cooling fresh water system, which is to be separated from that for main engine, is to consist of
generator engine cooling fresh water pump driven.

The system is to compose a closed circuit with the expansion tank connected to the pump suction.

Outlet temperature of generator engine fresh water cooler is to be automatically controlled by the temperature
control valve.

9035 Compressed air system


2 -- Main air compressors, 2-stage, air cooled, piston type, motor driven each capacity 20 m3 /h x 30 kg/ cm2
Capacity of Air compressors seems to be to small, mut be calculated.

2 -- Main air reservoirs, each capacity 0.5 m3 x 30 kg./cm2


1 Aux. air reservoirs, each capacity 0.5 m3 x 10 kg./cm2Working air compressor:

1 One working air compressor to be installed. Screw or Vane type.


Capacity apr. 200 cbm/hr at 0.8 1 mPa.

Compressed air to be provided to various services at following pressure


3.0 MPa Main engine starting
Generator engine starting
0.7 MPa Control air service
Engine room miscellaneous service
Main engine turbo charger cleaning
0.4 MPa Main air vessels and auxiliary air vessel to be charged with compressed air
by main air compressors.

And auxiliary air vessel to be charged with compressed air by working air compressors.

Air driven membrane pumps, flushing sea chest and used for deck etc. shall be supplied from aux. air vessel.

From the air compressors, pipes to be drawn to an oil and water separating filter.

Compressed air for starting the main engine to be supplied from main air vessels. Generator engines to be also
supplied from the main air vessel for starting.

Control air to be supplied from the main air vessels through oily drain separator, two pressure reducing valves
arranged in parallel and a control air dryer.

Working air system.

Working air compressor:


Compressed Working air to be provided to various services at following pressure
1 One working air compressor to be installed. Screw or Vane type.

Page 101 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
Capacity apr. 200 cbm/hr at 0.8 1 mPa.
0.7 Mpa for working air to deck and to several points in engine room.
0.4 Mpa for sea chest purging

Compressed air at reduced pressure to be supplied to the ships service air system from the main air vessels
through pressure reducing valves.

The pressure reducing valve to be provided with a pressure safety valve and a pressure gauge at its outlet.

Air hose connections to be provided at suitable locations in the engine room.


Air hose connection to be provided near each tank hatch on deck and near the manifold each side.

Escape air from safety valves or fusible plugs of air vessels to be led by fixed pipelines to safe locations.

One (1) Control air dryer of about 40 m3/hr (free air) to be provided

9036 Exhaust Gas System


Main engine exhaust gas pipe to be flexible connected to the diesel engine and led to funnel through bellow type
expansion pieces. Silencer with flame arrester to be arranged in suitable location and entire system adequate
supported.

Exhaust gas pipes from generator engines to be flexible connected to the diesel engines and lead to funnel.
Silencers with flame arrester to be arranged.

Exhaust gas pipes of oil-fired boiler and incinerator to be led to the top of funnel. Flame arrester to be installed
at suitable location of exhaust pipes of oil-fired boiler and incinerator.

904 Workshop Machinery in Engine Room


1 -- Lathe, of suitable size with necessary tools (multi-purpose lathe)
1 -- Vertical drilling machine, max.dia. 25mm
1 -- Grinding machine, double wheel type, dia. 255 mm
1 -- Electric welding transformer, inverter type capacity AC 250 Amp.

1 -- Welding table
1 -- Fuel valve testing equipment each for M/E and A/E in suitable cabinet for retaining and draining fuel oil
1 -- Work bench with one 12 vice
2 -- Steel cabinets of ample size
2-- Steel tool cabinets of ample size
1 -- Stainless steel wash basins with fresh water supply and drain valve (1mtrX0.75mtrX0.75mtr)

All rotating machines with suitable safety and eye guards.

Welding Equipment:
1 Set of acetylene welding equipment (Unitor or Drew Ameroid) existing in:
2 Oxygen bottles.

Page 102 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
1 Acetylene bottle.
1 outlet station placed in workshop.
1 Set of standard cutting & welding equipment including 4 x 25 meters of hoses.
1 Set of various welding rods etc.
O2 and Acetylene to be stored in lockable cabinets on open deck to meet ISPS codes

The acetylene and oxygen bottles to be located in a separate room or space outside machinery spaces. Gas outlet station
manometer and reducer valves and flame arrestor for bottles to be arranged. Fixed piping, easy to remove spool pieces
for oxygen and acetylene, to workshop welding table.

Electric Welding Equipment:


1 200 Ampere portable welding rectifier. Primary input 440 Volt 60 Hz. Necessary equipment including a
standard box electric welding tools, rods, 30 m power cable and 25 m welding cable. 440 Volt Plus sockets to be
arranged in engine room, fore ship store and an appropriate place in the aft ship. So, arranged that each place in
the ship van be reached.

905 Miscellaneous Equipment in Engine Room


1 -- E/R overhead cranes, SWL 1.5 ton double rails with center beam type, with electric controllable chain hoist.
(Test certificates to be provided)
1 -- Incinerator, capacity 150,000 kcal/h, capable of burning waste oil sludge 14 L/hr and solid waste
200L / 4~6 hours
1 -- Bilge water separator, capacity 0.6~1.0 m3/h
2 -- E/R ventilation fans, axial flow type, each minimum 50,000 cum/hr.
1 -- Purifier room exhaust fan, axial flow type
1 One stainless steel cleaning tank with drain valves and one work table inside purifier room for servicing
purfiers

906 Automatic Control and Monitoring Instrumentation

All emergency stops to be provided with safety guards to avoid accidental tripping.

Maker of propulsion control, monitoring and alarm systems should be package supply from main engine maker or from
Lynsoe or Norcontrol of equivalent.

9061 General
Automatic control, remote operation and central supervision to be provided in accordance with the requirements of
the Classification Society (Class Notation AUT-UMS and builders practice).

Propulsion plant to be started from engine control room, and to be stopped either from bridge or engine control
room.
Control function of the main engine to be provided for emergency in accordance with manufacturer's standard.

The instrument, gauges and alarms to be arranged in good order for safety operation and easy maintenance.

Audio and visual alarm shall be provided in engine room.

Page 103 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

Alarm and monitoring system to be fed from UPS (Uninterrupted Power Supply - 15 minutes) in case of power
failure.

9062 Manoeuvring control system


The Main control console to be located at the centre of navigation bridge and bridge wing control consoles (port &
starboard) to be located at the navigation bridge wings and meet the requirement as workstation for docking
operations.
Console and panels in wheelhouse.The console and panels incorporating electric equipment are to be provided
and installed in the wheelhouse,engine control room and Cargo control room as specified below but not limited
to:

Central console:
-- Steering gear start/stop button & run/alarm lamps. -- Panoramic Rudder angle indicator and
rate-of-turn indicator
-- Steering lever and wheel
-- Instrument light dimmer
-- Bow thruster control panel
-- Navigation light panel with x-mas tree MIMIC panel
-- General alarm push button
-- Fire alarm panel
-- Emergency stop buttons
-- Light switches for outside lights
-- Window wiper control and washing / heating switches
-- Telegraph transmitter panel (selector type)
-- Machinery alarm system according to Class
-- Dead man alarm buttons
-- M.E. and propeller control panel with indicators
-- Air whistle

Console on bridge wings


-- Steering lever
-- Rudder angle indicator
-- M.E. control panel with indicators
-- Morse signal light receptacle
-- Bow thruster control panel
-- Air-whistle push button
-- Search light control handle over each console

Console in ECR
-- M.E. control panel with indicators including start and stop.
-- Revolution indicators for ME and turbochargers
-- M.E. safety system (M.E. shut down and slow down)
-- Machinery alarm and monitoring system with watch panel
-- Telegraph receiver panel(selector type)
-- Telephones

Page 104 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
-- Rudder angle indicator
-- Propeller shaft revolution indicator.
-- Propeller pitch indicators.-- Fire alarm push button
-- Remote start and stop of diesel generator engines
-- All other necessary equipment for controlling the engines, according to
manufacturer's specification and class notation AUT-UMS.

Console in Cargo Control Room (CCR)


All cargo pumps and valves control
All ballast pump and valves, tank cleaning,Fire fighting pumps
Pump room and cargo tank ventilation
Start/Stop button with indication light Deck crane and Working air compressor
Remote readout pressure and vacuum meters all pumps which are controlled for CCR.
Loading computer monitor
Cargo tank level computer monitorODME Monitor
Fixed gas detection pump room monitor

9063 Alarm / Monitoring system


The alarm and monitoring plant shall meet the requirements for the Classification notation for and secure safe
operation of the ship and machinery at all times.

A centralised and computerised engine room alarm and monitoring system with alarm and monitoring points
according to the Registers requirements and manufacturers proposal comprising sensors digital or analogue
and on/off signals, to be located in the engine control room. Sub-panels in accommodation and in wheelhouse.

Presentation of most important parameters by digital or analogue instruments, in accordance with class and
Buyerss requirements.

All alarm and measuring points will be presented by 2 CRT monitors, divided in logical functional groups.
Continuous registration of important parameters to disk, and printer to be arranged.

Audio-visual alarms to be installed according to rules. Included in the audio-visual alarm signal system there is
to be rotating lights and sirens in all engine spaces.

When the machinery is stopped manually, none of the alarms to become operational.

A Dead Man System and duty indicator panel, indicating engineer on duty, to be incorporated in the control
room and bridge manoeuvre console. Deadman alarm should meet the IMO guides.

In the engineers' cabins, in the officers' day- and mess rooms and in the ships office there will be installed an
alarm with sound and visual alarm.

Bilge well alarms for pump room, bow thruster room and fire emergency pump room, if placed below forecastle,
will be arranged to the Cargo control room alarm system ,

Bilge alarms for engine room bilge etc to be arranged to the engine control room.

Page 105 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

For acquisition and monitoring of measured data form the machinery plant in the engine room, the engine room
monitoring and alarm system shall be provided on the monitoring control console. System functions are as
follows but not limited to:
1) Connection of binary transmitters.
2) Connection of analog transmitters.
Time delay of alarm signals.
Suppression of alarm signals.
Audible alarm by means of integrated buzzer and by external hooters.
Group alarm formation for extension alarm system.
Monitoring of exhaust gas mean value deviation.
Alarm recording and data lopping with printer.
System self - monitoring.

Extension alarm and engineer call system electrically separated.

9064 Boiler automatic system


Automatic control device for auxiliary boiler to be arranged at the auxiliary boiler side.

9065 Generator control system


Generator engines to have automatic starting and stopping device and to be controlled from the engine control
room and engine side.

One (1) set of auto synchronizer load sharing and load shifting device to be provided.

One (1) set of self-supported , drip-proof, steel plate and dead-front type main switchboard to be installed in the
engine control room and to consist of.

9066 Monitoring System for Liquid Tanks


For acquisition and monitoring of measured data from tanks. The system shall be provided in control panel on
upper deck. Functions of the monitoring and alarming are as follows but not limited to:

Monitoring and alarm of liquid level in cargo tanks.


Monitoring and alarm of temperature in cargo tanks.
Monitoring and alarm of pressure in cargo tanks.
Monitoring and alarm of pressure/vacuum and temperature on discharging/loading manifold.
Visual and audible alarms in the cargo control panel and on upper deck.
Monitoring Level in Ballast tank and peak tanks.
Monitoriung level in Freswater tanks
Monitoring and alarm of level and temperature in F.O. service/settling and storage tanks
Monitoring and alarm of level and temperature in D.O.service.settling and storage tanks.

Loading Master Computer prefer Autoload from Autoship Systems Corporation.

A Class approved loading master and program should be delivered and installed

Page 106 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

The loading master must be on-line with the tank monitoring system.

Program to be able to calculate intact and damage stability, longitudinal stress, bending moments, share forces
etc.

The loading master should be able to produce a draft survey and a ullage report accepted by the major oil
companies and mayor surveyor societies.

The loading master must have all API tables inside to correct Temperature and Volume.

Page 107 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

1000 Electric System

1001 General
All electric installations and equipment to comply with the Rules and regulations etc. All electric equipment
and materials intended to be used must be suitable for shipboard use. All electric equipment to be located on
easy accessible places. All electrical equipments should be earthen correctly with earth wire. The use of the
cable shield for safety earthen is not permitted. Care to be taken for reducing the risk of damage of equipment by
leakage of water and oil, etc. from pipes or tanks, or by excessive heat, or mechanical damage. and as possible
as to avoid vibration on all electrical equipments.

All electric cables should have outer cover of PVC.

The use of ship return for safety earthen is not permitted.

The protect class of installation of electric equipment to be in accordance with IEC.

Cables for power supply to installations must be of approved type accompanied with class certificates. Cables
passing trays and support must be according to the Rules.
Spare parts are to be i provided to cover one year operation.

All cables should be marked clearly at both ends with function and color codes.

1002 Power System


The power system is to be as follows:
All systems should be insulated against hull throughout the vessel except for ground detecting circuits,
secondary circuits of potential and current transformers to be grounded at switchboard or control panel.

Item Voltage Frequency Phase Conductor


Generator 450V AC. 60 Hz 3 4 wire
Electric motor 440V AC. 60 Hz 3 4 wire
Heating 440 V.AC 60 Hz 3 or 1 4 wire
General lighting 220V AC. 60 Hz 1 3 wire
Emergency Lighting 220V AC. 60 Hz 1 3 wire
Temporary emer. lighting 24V DC. 1 3 wire
Nautical Equipment 220V AC. 60 Hz 1 3 wire
Radio Equipment 220VAC./24 60 Hz 1 3 wire
DC
Interior communication 220VAC./24 60 Hz 1 3 wire
DC
General alarm, etc. 220VAC./24 60 Hz 1 3 wire
DC

1003 Adoption of Cable


Insulation conductors and protecting covering of cables shall be in accordance with the relative Rules of
Classification and to be compatible with the voltage wherever they are used.
Page 108 of 118
Technical Specification of 7500 DWT IMO II Chemical Tanker

Ethylene-propylene rubber insulated marine type power cables polychloroprene sheathed and steel wires with
braided for a max. rated conductor temperature of 85 C shall be provided for all power-circuits and for
lighting circuits and PVC over-sheathed shall be used for weather deck and battery room, etc.
All electrical cable must be PVC over sheeted.

For telephone system ethylene-propylene rubber insulated communication cables with polychloroprene sheath
with copper braid for a maximum rated conductor temperature of 85 C is to be provided.
Special cable to be used for communication and alarm systems.
Colors to be in accordance with the latest AIACS rules.

Rubber insulated flexible cables or cords to be used for portable equipment. It shall be oil proof heavy-duty
rubber cover type.

Internal wiring of switchboards and distribution panels to be carried out in PVC insulated conductors. It is flame
retardant.

Special cable or conductor types, such as coaxial cables etc. for certain electronic circuits and antenna
connection to be used where required to obtain the best possible operation and a reduction of losses and
interference, all as recommended by the equipment manufacturers.

All cables shall be flame retardant. Non combustible cable shall be used in accordance with the requirements of
Class.
Cable feeding electrical rooms and distribution panel boards shall have at least 15% spare capacity over rated
rate.

Cable Layout
All cables shall be laid according to Rules of classification Society.Cables shall be laid as far as possible in
protected places to avoid the locations exposed to the weather. Cables for weather deck-mounted fixtures to be
installed as possible on the inside surface of house structures supporting such fixtures where cables are liable to
damaged they shall be protected by steel pipes or plates.

Electronic and special cables shall be kept at a distance from power cable as far as practical and also in
accordance with the recommendation of equipment manufacturers.

Cables passing through dangerous space shall be protected with steel pipe.
In general, cables running in group is to be fixed with tape hoops on steel hangers as far as practicable to permit
painting of the surrounding structure without undue disturbance to the installation.

In the rooms and inner passages where lining is applied, cables shall be laid behind the lining as far as
practicable, and cables in other places, such as on the partition wall, shall be concealed with internal conduits as
far as possible. The insulation of the concealed cable shall be suitable for that purpose.

Where cables are exposed to any mechanical damage, they shall be protected with galvanized steel pipe. All
cables on the weather deck running to the foreship shall be running in galvanised pipes.

Page 109 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker

All cables passing through fire-proof deck or bulkheads shall be provided with fire-proofing cable glands or
other approved materials.

1004 Primary Source


Three sets of main diesel generator abt 400 kW which to be defined as per electric load calculation should be
installed in the engine room and one set of main switchboard should be installed in the engine control room.

Two sets of shaft generator should be installed in the engine room.

One set of emergency diesel generator of 250 kW and one set of emergency switchboard should be installed in
the emergency generator room.
Main generators
Particular of diesel engine generator as follows:

Type : Synchronous
Enclosure: IP23
Cooling system: Self-ventilated
Rated output: According to load calculation. Voltage: 450V AC
Phase: 3
Frequency: 60Hz
Power factor: 0.8
Revolution: 1800 rpm
Rating: Continuous at full load
Insulation: Class"F" for generator
Class"B" for excitor
Exciting system: Brushless self-excitation

Three sets of diesel engine generator should be arranged for parallel operation.
Shaft Generator

Particular of Shaft generator as follow: (two sets)


Type Synchronous
Enclosure IP23
Cooling system Self-ventilated
Rated output Enough to supply power without running main generators and start and feed the
bow thruster with both sets running.
Voltage 450 V AC
Phase 3
Frequency 60HZ
Power factor 0.8
Revolution 1800 rpm
Rating Continuous at full load
Exciting Self-excitation

Shaft generator must be able to run parallel with the main generators only during power take over, to avoid black

Page 110 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
outs.

One Shaft generator to feed the bow thruster during maneuvering

Emergency Generator
Particular of emergency generator as follow:
(same as main generators)
Type Synchronous
Enclosure IP23
Cooling system Self-ventilated
Rated output 250 kW
Voltage 450 V AC
Phase 3
Frequency 60HZ
Power factor 0.8
Revolution 1800 rpm
Rating Continuous at full load
Exciting Self-excitation

The emergency generator should be used for supplying the loads such as gyro compass, auto-pilot, radio station,
interior communication equipments, automation equipments, nautical instruments, emergency lights, steering
gear, emergency fire pump, emergency air compressor and etc. when main generator doesnt work.

The emergency generator must be able to run continuous parallel with main generators and it must be possible to
use it as harbour generator with supply to emergency and main switchboard. The emergency generator must be
provided with all sensors and alarm warning system the same as the main generator.

This generator should be started automatically in case of failure of the main power supply and automatically
supply an electric power to the loads mentioned above.

The generator engine should be stopped manually.

1005 Main Switchboard


One main switchboard is for control and protection of the main generators with 450 V and 230V AC. installed
in engine control room.

The whole equipment of the switchboard should be capable of with the standard maximum rated short circuit.

Main switchboard should be of upright dead-front type and consists of main generators, 440 V feeder
panel , 220V feeder panel and complete with switch gears, ammeters, voltmeters, a frequency meter,
synchroscope, wattmeters, earth lamps, pilot lamps, signal lamps, current and potential transformers.

The main switchboard should be consist of:


Four (4) - generator panels
Two (2) -group starters for 440V essential consumers with adequate number of outgoing feeders.

Page 111 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
One (1) - load panel for 220 V with adequate number of outgoing feeds.
One (2) - load panels for 440V consumers with adequate number of outgoing feeds.

1006 Emergency Switchboard


One Emergency switchboard is for control and protection of the main generators with 450 V and 230V AC.
installed in engine control room.
The whole equipment of the switchboard should be capable of with the standard maximum rated short circuit.

Emergency switchboard should be of upright dead-front type and consists of Emergency generators, 440 V
and 220V feeder panel and complete with switch gears, ammeters, voltmeters, a frequency meter, watt meters,
earth lamps, pilot lamps, signal lamps, current and potential transformers.

The Emergency switchboard should be consist of:


One (1) - generator panels
One (1) -load panel for 440V and 220 V with adequate number of outgoing feeds.

In principle, the construction of the emergency switchboard to be similar to the main switchboard.

1007 Shore Connection Box


One (1) set of shore connection box for receiving AC.440 V, 300A, 3-phase, 60Hz shore source should be
wired to the main switchboard.

The box should be drip-proof type with a ammeter, KW hour-meter, three (3) pole moulded case type circuit
breaks, connecting terminals and phase sequence indicator.

1008 Secondary Source


Transformers
The power transformers should be three phases, 60Hz, drip proof, dry type, air cooled by natural circulation
with class B insulation.

For general service two (2) 60 KVA 450/230V according to load calculation. one (1) standby
For emergency service two(2) 25 KVA 450/230V according to load calculation. one (1) standby

Electric power balance to be calculated

Storage Batteries
One (1) set of 24V DC storage batteries for general use should be installed in the battery room. Its capacity
will be 400 AH.
One (1) set of 24V DC storage batteries for automation use should be installed in the battery room. Its capacity
will be 400 AH.
One (1) set of 24 V DC storage batteries for radio emergency source should be provided. Its capacity will be
about 200 AH.

1009 Distribution System


In general, power of high-power motors should be supplied from the main switchboard directly to section

Page 112 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
boards and other small power consumers should be supplied through section boards and/or distribution boards
from the main switchboard.

1010 Power System


Motor
All motors, unless otherwise noted, should be totally enclosed or drip-proof and be of squirrel cage induction
type.

The motors, in general, should be designed to operate on 440V, AC 3-phase, 60Hz. and the motors of
fractional horse power should be designed to operate on 220V, AC. Single phases AC.

Bearings should be provided in accordance with maker's standard.

In general all stator windings shall be Class 'B' insulation should be applied, except for special service motors.

Starters
In general, starters should be of marine magnetic control type except that small motors of single phase may be
manually operated by line switch with protective fuse on each pole, or thermal trip device.

In general, starters should be assembled in group starter panels or semi-group starter panels as far as
practicable.

Motors more than 40 KW using soft starters.

1011 Lighting System


Lighting Fixtures:
Sufficient and suitable lighting installations. All items in the lighting system to be of good marine or heavy duty
industrial quality. Open deck, deck stores and fore ship lighting IP 65 minimum. In engine room, steering gear
compartment, in exterior and interior passageways, bathrooms, galley, laundry, miscellaneous workrooms, cabins, mess
rooms, recreation rooms, offices, and wheelhouse store rooms, etc., fluorescent lighting fixtures to be installed. In all
wet spaces will be of spray-proof types. On open decks watertight types. Where applicable to be combined with correct
EEX requirements. Where subject to damage, such as in work areas, fixtures to be protected with guards.

Lighting Arrangement:
Sufficient light to meet international standards in all stores, corridors, cabins, particularly in engine room and purifier
room spaces etc., by means of T.L. armatures 40/60 watts. Armatures to be used must meet SOLAS and class rules.
Lighting system in cabins to be provided two switches, one near the doorpost and one near the bed. Lighting system in
pump room by means of explosion proof T.L. armatures EEX class required for that space. In addition, these light
armatures must be watertight. On deck besides the superstructure by means of watertight T.L. armatures of appropriate
watertight type. The number of armatures to be proposed by builder.

If light armatures are placed in the cargo area, they must be explosion-proof. Pay special attention on rules and
regulations for SOLAS required lights for lifeboat stations, safety stations etc. These lights must be feed from
emergency source. As far as reasonable on request of buyers additional armatures to be installed if, light levels are not
sufficient. The use of bull eyes normal glow lamps must be reduced as much as possible.

Page 113 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
Cabin & Accommodation Lights:
In ceiling, integrated main light system by means of T.L. armatures 20-watt double tubes. Numbers of armatures
depends on size of cabin and alleyways. This light to be switched on/off near the doorpost. T.L. lamps 8-watt (reading
light) build in switch above in each bed. Two above double beds. Above desks fixed desk lamps build in switch 8-watt
TL. Atmospheric lighting to be placed in each cabin and mess rooms. Wet space light switch outside the wet area.

Outside Accommodation & Main Deck Lighting:


Wheelhouse aft side: TL 2 pcs. 2 x 20 watt.
Boat deck : TL 4 pc. 2 x 20 watt.
Poop deck aft side: TL 3 pcs. 2 x 20 watt.
Poop deck port stbd side: TL 2 x 3 pcs. 2 x 20 watt.
Accommodation front lower part: TL 2 pcs. 2 x 36 watt ex. Proof.
Manifold both sides TL 2 pcs. 2 x 36 watt. Halogen ex.proof.
Accommodation front top: 2 pcs. 1500 watt halogen.
Fwd. Mast: 2 pcs 1500 watt halogen.
Fwd. Mast fore deck light: 2 pcs. 500 watt halogen
Manifold area: 2 pcs 1000 watt halogen ex. proof.

All above items to have separate switch located in the wheelhouse.


All TL. Lights (fluorescent lighting ) facing down.

Flood Lights:
Flood lights, each 500 W or as required. watertight halogen to be installed in sufficient number for adequate
illumination of forecastle deck, gangways, cargo deck, upper deck, after deck and lifeboat stations. Light switches to be
placed in wheelhouse desk.

Forecastle Space, Paint-store & Pump Room Lighting:


Bow thruster room: TL 3 pcs. 2 x 20 watt.
Paint store: TL 1 pc. 2 x 20 watt. Ex. Proof.
Forecastle store TL 4 pcs 2 x 20 watt.
Pump room: TL 6 pcs. 2 x 36 watt. Ex. Proof.
St.b. main deck store : TL 1 pcs. 2 x 20 watt.
Poop deck port stbd side: TL 2 x 3 pcs. 2 x 20 watt.
Sample room on catwalk: TL 1 pcs.2 x 20 watt ex proof

Light switch for paint-store to be placed outside of paint store inside the forecastle space. Light switch for pump room
located in cargo control room. Pump room lighting installation is to be connected the ventilation system in such way
that the ventilation is on when the light is on. When the ventilation will be switched off, the light must be delayed for
approximately five minutes before it switches off.

Emergency Lighting Arrangement:


The emergency group must be supplied from 440/220 volts transformer supplied from emergency switchboard. If in a
space more than one light is installed, one light must be supplied from main source and one from the emergency source.
All from emergency sources supplied lights to be marked an orange dot.

Emergency lights must be installed in engine spaces, alleyways, accommodation, staircase, control rooms, CO2 room,

Page 114 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
operating places for fire fighting equipment and at embarkation stations as per regulations. This remark is also valid for
the cabins. If the main light is supplied trough, the emergency system the bed-lamp must be supplied from the main
system or visa versa.

Wall Sockets & Plugs:


All wall-sockets for domestic use according European models and earthen. On request of buyers, if reasonable,
additional wall sockets to be installed.

440 Volt Power Sockets:


Waterproof CEE form plug sockets for welding transformer to be provided in engine room, workshop, on after deck, or
appropriate place aft and in the fore ship. Minimum 32 Amp. 3-waterproof marine type sockets in engine room and
workshop.

230 Volt Sockets:


2-Plug sockets switch to be installed in all cabins (above desks), mess rooms and
recreation rooms, and in cabins a 2-plug socket under the desk.
2-plug sockets in offices, and wheelhouse and one multiple on chart table.
2 waterproof marine type sockets switch shall be installed in galley and in each store.
2 waterproof marine type sockets switch shall be installed in engine room and workshop.
2 spare waterproof marine type sockets shall be installed in laundry.
1 shaving socket integral isolating transformer to be installed in each bathroom.

Sufficient sockets in galley for domestic appliances.


Suez light socket in forecastle.

24 Volt Sockets:
2-Plug sockets at port and starboard side in wheelhouse for day signal lamp. At least two pcs step-down safety
transformers of 220/24 Volts must be installed. 3-waterproof type sockets in engine room and on an appropriate place
outside cargo area inside fore and aft ship. From special safety transformers (or 3 portable safety transformers to be
delivered).

1012 Navigation Lights and Signal Lights


Navigation and signal lights should be provided in accordance with the
requirement of the Regulations and Rules and the Buyers's proposal.
One (1) set double executed Anchor light fore mast
One (1) set double executed Top light fore mast.
One (1) set double executed stern light
One (1) set double executed side light port
One (1) set double executed side light starboard
One (1) set double executed Top light aft mast
One (1) set double executed Anchor light aft mast
One (1) Morse lamp
Two (2) not-under command, red
One (1) white light between the NUC Light
All Navigation lights should be of Plastic material and bulb fitting must be special for navigation lights P28S.

Page 115 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
Audio and visual alarms to be installed if one of the lamps or fuses are broken.

Search lights and Day-signal should be delivered and installed in accordance with Rules and Regulations:

One navigation search lights, 220V, 1000 watts, should be installed on top of wheel house and electrical remote
controlled from WHC.

One (1) day-signal lamp, 24 volts, 60 watts, with special box. Receptacles of this lamp should be provided on
both bridge wings.

Signal lights should be equipped as per Rules and Buyerss proposal.

1013 Internal Communication, Alarm & Measuring System


The system herein specified shall be suitable designed to meet the requirements for Regulations and rules:

One (1) set Sound powered telephone system shall be provided as follows:
Wheelhouse / Engine control room / Engine control stand (Headset) / Steering gear room / Emergency
Generator room / Capt./ Ch. Engineer.

One (1) set of twenty (20) circuits automatic telephone system should be installed on the vessel. from
wheelhouse to all cabins , mess rooms and control stations.

One (1) set of public addressor, with talk back stations should be designed for ship's maneuvering, emergency
information, crew call and public broadcasting. The system can be connected with automatic telephone
exchanger and can be called by telephone extensions.
Speakers and talk back stations arrangement shall be according to accommodation plan.

One (1) set of engine telegraph plant shall be provided, this plant shall be integrated with the engine remote
control equipment.

One (1) engine telegraph logger should be installed.

Steering gear should be able to give audible and individual visual alarm in the wheelhouse and in the engine
control compartment.

One (1) set of general alarm system should be provided with public addressor, that is, one manually operated
push button switch in the wheelhouse, the audible alarm shall be given by speakers through the public
addressor and the visual alarms shall be given by flash lamps.

One (1) set of fire detection and alarm system shall be provided.

One (1) set of CO2 release alarm system should be provided.

Necessary electric horns and flash lights should be fixed in engine room area.

Leakage of CO2 shall also make audible and visual alarm in wheelhouse. And other patrol alarm engineer's call

Page 116 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
shall also be provided.

One (1) A Three sides overhead Panoramic steering rudder angle indicator system to be installed.

One (1) set horn with electric motor, respective cylinder, mounted on the forward mast.

An automatic fog signal device equipment, pneumatically operated, to be arranged in the aft mast. Operation
switches and/or push buttons for control to be arranged in wheelhouse control console and on each bridge
wing.
Necessary accessories should be provided, designed and installed to achieve an optimum operation.

1014 Electric Nautical Equipment


Equipments as hereinafter specified are the major components and characteristics of the installations, all
accessories necessary for complete operation to be delivered by shipyard

Gyrocompass & auto-pilot 1


and (2)bridge wing repeaters incl. Azimuth cirkel.

Magnetic compass with repeater in the wheelhouse 1

Echo sounder with recording capabilities 1

Speed Log. 1
With one Transducer

Radar X Band with ARPA. 1


Radar S Band with ARPA 1
DGPS 1

GPS 1

Window wiper (horizontal moving ) 5

Anemometer and anemoscope 1


Weather facsimile receiver 1
Navtex receiver 1
ECDIS (Electronic charting) 2
Quartz clock (chrono meter) 1
SSAS with two activation points 1
Automatic identification system (AIS) 1
Displayed in the radar screen.
Voyage data recorder (VDR) 1

All rules and regulations should be updated with the latest requirements till the date the contracts be signed.

Page 117 of 118


Technical Specification of 7500 DWT IMO II Chemical Tanker
1015 Radio Equipment
Equipments as hereinafter specified are the major components and characteristics of the installations, all
accessories necessary for complete operation should be delivered by shipyard.
Equipments installed on this vessel shall completely comply with SOLAS 1988 amendments to meet the
requirements of GMDSS (A1+A2+A3).
All equipment shall have a NEMA in and outputs and able to communicate with the other relevant
navigation/radio communication equipment

Radio (250W PEP SSB MF/HF) transmitter incl. DSC 1


VHF radio telephone with DCS. 2
INMARSAT Mini M Phone/fax 1
Satellite EPIRB 1
VHF for GMDSS 3
use only
Radar transponder 2

VHF radio telephone Intrinsically safe for tanker deck 3 pc.


working with at least three(3) private channels
VHF radio telephone without DSC for CCR. 1 pc.
Satcom C Unit 2 Pc.

All rules and regulations to be up-dated with the latest requirements till the date the contract has been signed.

Page 118 of 118