BOTIL PBR PKR SE

Keep 5/6 pins in the PBR


In the packer's packer element, keep 5/6, and 10/12 pins (above and below)
In Hydrotrip sub: keep 9/10 pins
PBR Packer Test Procedure:
DROP THE BALL
Increase the Pressure through cementing unit gradually in 500 interval to 2700 psi ( h
Bleed-off the pressure gradually to 1500 psi and hold it there and monitor and see if a
Now go to rig floor connect the rig/drilling pump to the annulus Section
Increase the pressure to 250 slowly and see if pressure is holding or not, if it holds for
Go slowly to 500, wait and see for pressure hold for 5 min, if it holds
Increase the pressure to 750 wait for 5 min and then go to 1000 and see for 5 min, if i
Bleed-off it gradually to 0
Now increase the pressure of tubing through the cementing section gradually upto 35
Pressure drop indicates PBR shearing
Now increase the pressure up to 4000-4400 psi gradually and observe for hydrotrip sh
Open the C-section partially and pump through the tubing gradually up to 500 using t
If there is no return that means packer is set and it is verified.
OTIL PBR PKR SETTING PROCEDURE

nd below)

erval to 2700 psi ( hold for 5 min to see if there is any pressure drop)and hold it there for 15 min (never go ab
monitor and see if any change in pressure is observed.

or not, if it holds for 5min

nd see for 5 min, if it holds,

n gradually upto 3500 psi while observe the pressure jurk/drop indication

erve for hydrotrip shearing, after shearing, bleed-off and stop the cementing unit pump.
ly up to 500 using the drilling pump for injection test at 2 bpm rate and see for any return in the C-section
or 15 min (never go above 3000 psi)

urn in the C-section


HALLIBURTON PBR PKR SETTING PROCEDURE
Keep 12/16(LARGE) AND 9/16( SMALL ) pins in the PBR
In the packer's packer element, keep PINS INTACT I.E THERE IS NO NEED TO CHANGE THE PINS
In Hydrotrip sub: keep #/# pins
PBR Packer Test Procedure:
DROP THE BALL
Increase the Pressure through cementing unit gradually in 500 interval to 2700 psi ( hold for 5 min to
Bleed-off the pressure gradually to 1500 psi and hold it there and monitor and see if any change in pr
Now go to rig floor connect the rig/drilling pump to the annulus Section
Increase the pressure to 250 slowly and see if pressure is holding or not, if it holds for 5min
Go slowly to 500, wait and see for pressure hold for 5 min, if it holds
Increase the pressure to 750 wait for 5 min and then go to 1000 and see for 5 min, if it holds,
Bleed-off it gradually to 0
Now increase the pressure of tubing through the cementing section gradually upto 3500 psi while obs
Pressure drop indicates PBR shearing
Now increase the pressure up to 4000-4400 psi gradually and observe for hydrotrip shearing, after she
Open the C-section partially and pump through the tubing gradually up to 500 using the drilling pump
If there is no return that means packer is set and it is verified.
URE

CHANGE THE PINS

00 psi ( hold for 5 min to see if there is any pressure drop)and hold it there for 15 min (never go above 3000 psi)
d see if any change in pressure is observed.

holds for 5min

5 min, if it holds,

upto 3500 psi while observe the pressure jurk/drop indication

drotrip shearing, after shearing, bleed-off and stop the cementing unit pump.
0 using the drilling pump for injection test at 2 bpm rate and see for any return in the C-section
never go above 3000 psi)