1
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
INDEX
I. PURPOSE
II. SCOPE OF APPLICATION
III. REFERENCE DOCUMENTATION
IV. WORK ARRANGEMENT, SAFETY ANALYSIS
V. MAIN CONTENS
2
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
I/ PURPOSE:
- To guide peoples repair cooling circulation pump casing at STT FFD platform.
- To ensure that casing pump will be repair properly and safety.
Disassemble and
investigation
3
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
Casing No
repairable Casing replace
assessment
Yes
Casing repair
Pump installation
De-isolated, restart
and hand over
- Arrange permit to work as per CLJOC required for pump repair work
- Isolation system: switch off power supply, de-pressure and ventilation in pipeline
in pump system. Take out all of instrument equipment from package.
- Set up tools & alignment checking before remove pump, record and save.
- Remove nuts of mounting bolts of pump side, lift out pump from package.
4
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
- Blind of suction and discharge pipeline by plastic cover and tape to prevent
falling object.
- NDT check whole casing to find out any more defects or cracked on casing
5
acceptance criteria is not clearly for each case determination & conclusion?
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
- Base on NDT reported and visual inspected results, the casing repairable or it
may have to replace will be determine by SPX/ TTE/ CLJOC/ PTSC MC
- If casing can be repair then send to repair, if not casing will be replace by new
one.
6. Casing repair
- In this case, we will grind hole for bigger (diameter from 1,5 to 2 hole diameter),
remove all the rust
thickness of casing repair segment shall be determined and record
- Tig welding in both side in and out with the size of welding deeper than casing
thickness and bigger than hole diameter.
- Grinding both inside and outside casing surface to make smooth surface like
original condition.
Pls specify the NDT methods will be applied in this case(MPI/DPI & RT..)?
- Arrange steel plate as same material with casing and same dimension with hole
we made by cutting before.
- Tig welding this plate to casing and then grinding welding line get smooth for
surface
Pls specify the NDT methods will be applied (MPI and RT)?
PWHT shall be done in accordance with the procedure qualification used, refer ASTM A216
6
TOAN THANG TECHNICAL SERVICE JSC
- Please specify the test pressure & holding time or address
COOLING CIRCULATION PUMP CASING
the approved procedure no. for more clearly.
- TTE shall double check and confirm the availability of "blind
casing dummy" for pressure test.REPAIR PROCEDURE
- In the last, we plating this area by Ni-Cb alloy by electro plating method for
prevent corrosion in future.
C) After repaired, casing will be hydrostatic test in workshop witness by CLJOC/ PTSC
MC with pressure test and duration as per manufacture standard
- Putting new gasket to casing and install back pump rotor and bearing housing.
Tight the casing bolts while pump rotor was hold in perpendicular with pump
casing.
- Slowly turn shaft by hand, make sure rotor free turn without touching and
abnormal noise.
8. Pump installation
- Open discharge and suction vales, fill up pump by full water ready to restart,
closed permit to work.
- Start pump, keep monitoring around 4h and record operation data: pressure,
temperature, vibration.
- After 04 hours normal running, hand over to operation team and close the job.
7
TOAN THANG TECHNICAL SERVICE JSC
COOLING CIRCULATION PUMP CASING
REPAIR PROCEDURE
10. Reported
All record and report during repair process will be summit later on that:
- The approved Repair Method/procedure attached all related docs e.g WPS/PQR/WPQ, NDT, pwht procedure &
facility calib certificate, ...reference STD/Code