Project: Four laning of Hubli - Gadag - Karnataka/AP Border section of NH-63 (Km 128.850 to 190.

to 190.280) in the State of Karnataka under EPC Mode

Subject: HBS
Detailed project report - Proposal for structures (Minor bridges , underpasses , major bridges , Flyovers & ROBs)

Chainage
Sno
Existing Design

2 159.494 160+030

3 170+880
Annigeri Bypass

4 183.481 185+240

5 186.315 188+060

CULVERTS Total 239 culverts

New Construction
1 Pipe Culvert 29

2 Slab Culvert 165

3 Arch Culvert 0

Type PKG-1

PSC beams 37.5 m 2x5x2= 20 nos

34 m 3x2x4=24 nos

RC beams 23.5 m 3x4x4 + 3x2x4= 72 nos

22.2 m 3x2x4=24 nos

20 m 1x2x5 + 4x2x4= 42 nos

18 m 3x2x4=24 nos
15 m 1x4x4= 16 nos

13.68 m 1x2x5+1x2x5+2x2x5= 40 nos

13.5 m 3x2x4=24 nos

13.3 m 2x2x4= 16 nos

13 m 1x1x4 + 1x1x4= 8 nos


ST steel composite -STD 30.00 m 1x2x6=12 nos

7
Proposed
Span arrangement (C/C of Expansion Action as per SCH
Type of Structure Joints) B/DPR c/w o/w Proposed Superstructure Type

FOB 2 x 21.00 x 5.50 New Construction NA 3.5 St Steel Composite

FOB 2 x 21.00 x 5.50 New Construction NA 3.5 St Steel Composite

FOB 1 x 26.00 x 5.50 New Construction NA 3.5 St Steel Composite

FOB 2 x 21.00 x 5.50 New Construction NA 3.5 St Steel Composite

Widening Reconstruction
36 4

2 2

0 0
Proposed type of Foundation Skew Remarks (any variations)

As recommended according to sub soil Normal


investigation
As recommended according to sub soil Normal
investigation
As recommended according to sub soil Normal
investigation
As recommended according to sub soil Normal
investigation