2. Perhitungan tulangan
Simbol Rumus Hasil Satuan Ket
> Tulangan Utama
Mu = 355000000 Nmm
Mn = = Mu/ 443750000 Nmm = 0.8
b= 1500 mm2
(()(0.5))/
1500
K= (2) 0.0149883248
ok 1022
As' = = n*0.25**D2 1519.76 mm2 asumsi pakai tul tekan 422
M2 = = As'*fy*(d-d') 292796961.6 Nmm
M1 = = Mn-M2 150953038.4 Nmm
F= = 1-1-2K1 0.0151023655
ok
As1 = = F*bw*d*RI/fy 142.5974642719
222
As hitung = = As1+As2 1662.3574642719 mm2
As terpasang = = n*0.25**D2 3799.4 mm2 dipakai tulangan tarik 1022
= = As terpasang/bw*d 0.0046305911
422
ok
> Tulangan Bagi
300
As tul bagi (As) = = 0.2*As tul utama 759.88 mm2
dipakai tulangan 222 As = 379.94 mm2
> Tulangan Geser
Vu = 77 kN 77000
Vu terpakai = = (L-d/L)*Vu terpakai 68576.2 N
Vn = = Vu terpakai/ 91434.933333333 N = 0.75
Vc = = *(1/6)*f'c*bw*d 105395.13330795 N
tdk butuh tul geser Jika Vu terpakai>Vc, maka butuh tulangan geser
Dipasang tulangan praktis 10
s<d/4 = d/4 136.75 mm
dipakai sengkang tulangan 10-100
4.8 kN 130 kN
65
12
kN
1 65 kN
2
15 kN
162.5 kNm
Perencanaan Balok A
Diketahui :
Uraian Simbol Rumus Hasil Satuan Keterangan
Mu akibat beban luar Mu = 1.2DL+1.6LL 278 kNm
Lebar balok bw = 300 mm
Tinggi balok T h= 600 mm
Tebal plat ht = 200 mm
Lebaf efektif flens be = 1250 mm ambil L/4
Tebal selimut beton p= 35 mm
Mutu beton f'c = 26.4 Mpa K-300
Mutu baja fy = 392 MPa BJTD-40
Modulus elastisitas baja Es = 200000 MPa
Modulus elastisitas beton Ec = 20000 Mpa
Tulangan tarik = 20 mm Asumsi
Jumlah n= 6
Luas tul terpasang Ast = =n*0.25**D2 1884 mm2
Tinggi efektif balok T d= = h-p-(0.5 tul utama)- sengkang 545 mm
1. Tulangan Utama (Tarik)
> Menghitung kapasitas penampang
Dianggap tulangan baja tarik mencapai tegangan luluh
NT = =As*fy 738528 N 738.528 kN
Gaya tekan total ND = = (0.85*f'c)*ht*b 5610000 N 5610 kN
balok T persegi
Mr = = *(0.85*f'c)*b*ht(d-0.5ht) 1997160000 N 1997.16 kNm
analisis balok T persegi
tulangan tunggal
()/
(0.85^
a= ) 26.32898396 mm
1 = 0.85
Letak garis netral c= = a/1 30.97527524 mm
analisa balok persegi
Tegangan beton c = 0.003
c*
Mencari tegangan baja s = ()/ 0.049784035
Mencari fs fs = = s*Es 9956.806919 MPa
baja sudah leleh
Perhitungan Volume
Pelat
a. Dimensi pelat
h= 200 mm
lx = 5000 mm
ly = 5000 mm
p= 35 mm
Volume plat = =h*lx*ly 5000000000 mm3 5 m3
b. Penulangan balok
Tulangan lapangan = 16-90
Tulangan tumpuan = 16-90
c. Volume tulangan lapangan arah x
As t = =0.25**d2 200.96 mm2
= 16 mm
jumlah tul per m =1000/Ast 11 buah
Vol tulangan = =Ast*L*n 11052800 mm3 0.011053 m3
d. Volume tulangan lapangan arah y
As t = =0.25**d2 200.96 mm2
= 16 mm
jumlah tul per m 11 buah
Vol tulangan = 11052800 mm3 0.011053 m3
e. Volume tulangan tumpuan arah x
As t = =0.25**d2 200.96 mm2
= 16 mm
jumlah tul per m =1000/Ast 4 buah
Vol tulangan = =Ast*L*n 4019200 mm3 0.004019 m3
f. Volume tulangan tumpuan arah x
As t = =0.25**d2 200.96 mm2
= 16 mm
jumlah tul per m =1000/Ast 4 buah
Vol tulangan = =Ast*L*n 4019200 mm3 0.004019 m3
Volume tulangan total = 30144000 mm3 0.030144 m3
Volume beton plat = 4969856000 mm3 4.969856 m3
Volume beton plat total = 39758848000 mm3 39.75885 m4
A
B
B
A
B
B
A
5000
A
A
5000
600
100
Potongan A-A
600
800
5000 5000
Potongan B-B
Perhitungan Momen
Jenis
k T Ec
Temper Momen
atur Tump 5.62 1.00E-07 1.00E-05 12.5 22,294.06 1000
Lap 2.81 1.00E-06 1.00E-05 12.5 22,294.06 1000
Jenis
k QMs S2 Momen
Berat Momen
Sendiri Tump 0.0833 4.8 6.25 2.499
Lap 0.0417 4.8 6.25 1.251
Berat Jenis
k Qma S2 Momen
Tambah Momen
an
Tump 0.1041 2.7 6.25 1.756688
15.625 0.0244712116
15.625 0.1223560578
Faktor Daya
Jenis Beban
Beban Layan
Berat sendiri Kms 1
Beban mati tambahan Kma 1
Kombinasi 1
Faktor M tump
Jenis Beban
Beban (kNm)
Kombinasi 2
Faktor M tump
Jenis Beban
Beban (kNm)
Berat sendiri 1.300 2.499
Beban mati tambahan 2.000 1.757
Beban truk 1.000 40.222
Beban angin 1.200 0.394
Pengaruh temperatur 1.200 0.022
Total Momen Ultimate
u = a+(2*ta)+h
v = b+(2*ta)+h
Tebal eff plat
Luas bid. Geser
Av = 2*(u+h)*d =
Gaya geser pons nominal
Pn = Av*fv =
2 40.222 36.230
1.2 0.394 0.355
1.2 0.024 0.122
1
M lap (kNm) Mu tump (kNm) Mu lap (kNm)
f
87.621 kNm
22.500 Mpa
390.000 MPa
200.000 mm
35.000 mm
200000.000 MPa
0.850
0.069 16.25625
9.537 3218.4090609217
0.800 0.027225
87.621 kNm 3.2184090609
165.000 mm
1000.000 mm
109.526 kNm
4.023
n<Rmax (ok)
19.125 Mpa
0.386
19.125
0.012 0.0490384615
0.001
1932.918 mm2
16.000 mm2
103.967 mm 200.96
2009.600 mm2
1004.800 mm2
12.000
112.500
76.376 kNm
22.500 Mpa
390.000 MPa
200.000 mm
35.000 mm
200000.000
0.850
0.069
9.537
0.800
76.376 kNm
165.000 mm
1000.000 mm
95.470 kNm
3.507
n<Rmax (ok)
19.125 Mpa
0.386
19.125
0.010 0.0490384615
0.001
1652.320 mm2
16.000 mm2
121.623 mm
2009.600 mm 200.96
1004.800 mm2
12.000
112.500
an Slab
f'c = 22.5 Mpa
fy = 390 MPa
Ec = 22,294.06 MPa
Es = 200,000.00 Mpa
h= 200 mm
d' = 35 mm
d= 165 mm
As = 2009.6 mm2
Lx = 2500 mm
b= 1000 mm
Ptt = 103 kN/m 103000
Q= 7.5 kN/m 7500
= 10.417 mm
fr = 3.320 Mpa
n= 8.971
=n*As 18,028.12 mm2
c= 18.028 mm
e = 3.93 mm Ie
3.13E-02
= 0.0122
e =
g = 0.2126969651
5
= 4.14 mm 1
ok 1.71E-01
3.8
3.9
= 297000 mm2
= 422638.4092815 N
=*Pn = 253583.0455689 N
Ktt = 2
Pu = 206000 N
ok
236.3636363636 0.0687764423
0.4207070668 0.5792929332 0.7611129569
0.2388870431 0.0117146531
3.14
200.96 10 2009.6
3.14
4.7434164903
1953125.93742769 21600.732772
391,373,782.72
Q/P
7.5 5.859375
103 64.375
70.234375
70234375
0
2.09E+07 4.00E+08
3.79E+08
Q/P Lx Ec*Ie
7500 1.56E+10 8.92E+12
103000 1.56E+10 8.92E+12
3.92E+08
130000 5.83E+09 23452.95
1.7180511342
7690 5832000000
0.0635183328 1.781569467
Perhitungan Balok A
Simbol Rumus Hasil
1. Data perhitungan balok
f'c = 26.4
fy = 392
fy = 240
1 = 0.85
RI = = 0.85*f'c 22.44
min = = 1.4/fy 0.0035714286
max = = 1[450/(600+fy)]*(RI/fy) 0.0220727555
F max = = 1*450/(600+fy) 0.3855846774
K max = = Fmax{1-(Fmax/2)} 0.3112469057
h= tinggi balok 600
bw = lebar balok 300
hf = tebal plat 200
p= tebal selimut beton 35
b= Lebar flens 1500
tulangan tekan = 22
tulangan tarik = 22
tulangan sengkang = 10
d= = h-p-(0.5*tul)- sengkang 544
d' = = p+ sengkang+ (0.5* tul) 56
Mu = Momen ultimate 355
Vu = Geser ultimate 77
2. Perhitungan Tulangan
Simbol Rumus Hasil
> Tulangan Utama
Mu = 355,000,000.00
Mn = = Mu/ 443,750,000.00
Cek bagian beton tertekan
(A) = Mn = 443,750,000.00
(B) = 597,801,600.00
tul persegi
/(2)
K= 0.22
tul single
As' = As2 = 1,519.76
b= 1500
1/(2)
K1 = 0.0445478199
ok
M2 = = As'*fy*(d-d') 290724008.96
M1 = = Mn-M2 153025991.04
1/(2)
K1 = 0.0768109779
F= = 1-1-2K1 0.0800119325
ok
As1 = = F*bw*d*RI/fy 747.5008659821
As = = As1+As2 2,267.26
As terpasang = 2279.64
Cek Tulangan
= = As terpasang/bw*d 0.0139683824
min = = 1.4/fy 0.0035714286
max = = 1[450/(600+fy)]*(RI/fy) 0.0220727555
ok
Av = 157
s=
Perhitungan Plat
5m
Direncanakan
Tebal plat (h) = 200
Mutu beton K-275 (f'c) = 24
Mutu baja U-39 (fy) = 390
BJ beton = 2400
BJ baja = 7700
> Perhitungan Beban Mati
Asumsi plat lantai menumpu pd keempat sisi
Menurut PBI
Mlx = = 0.001*25*Qms*lx2
Mly = = 0.001*25*Qms*lx2
Mtx = = 0.001*51*Qms*LX2
Mty = = 0.001*51*Qms*LX2
> Perhitungan Beban Truk
Beban roda (T) = 130
Bidang roda =
bx = 70
by = 40
Bidang kontak (bxy) = 2800
= T/bxy 464.2857142857
Muatan T disebarkan (T)
Mpa (K-300)
MPa U-40 Tulangan utama
Mpa U-240 Tulangan geser
Tegangan beton
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
kNm 355,000,000.00 Nmm
kN 77000 Nmm
Satuan Ket
Nmm
Nmm
Nmm
Nmm
mm2
mm2
Dicoba memakai tulangan tarik 1 lapis 6D22
Jadi min<<max
mm2
mm2 1.2 2
kN 77000 N
N
N
N
Dipasang tulangan praktis 10
130 kN
4.8 kNm
5m
mm
Mpa
MPa
kg/m3
kg/m3
lx = 5 m
25*Qms*lx2 3 kNm
25*Qms*lx2 3 kNm
51*Qms*LX2 6.12 kNm
51*Qms*LX2 6.12 kNm
kN
cm 0.7 m
cm 0.4 m
cm2 0.28 m2
kN/m2
70 cm
cm
cm
cm
cm
kNm
kNm
cm
cm fxm = 0.09264
cm
cm fym = 0.08664
kNm
kNm
cm
cm fxm = 0.32674
cm fym = 0.24714
cm
kNm
kNm
kNm
kNm
kNm
kNm
Satuan Keterangan
mm
Mpa
718.5903225806 0.7185903226
312
kNm
kNm 107725050
mm
mm2 24.8238296202
mm2
8
kNm
kNm 44777166.666667
mm
mm2 7.7806459054
mm2
3
kNm
kNm 43558350
mm
mm2 8.824580834
mm2
3
tul single
ly = 5m
20 cm
10 cm
10 cm
70 cm 40 cm
a b c
2981.16 -312 0.694396 5962.32
97344 8280.422 89063.58 298.4352
610.4352
0.102382
13.56478
0.002275
n/mm2
20-30
20-30
20-30
20-15
20-15
20-30
Perhitungan Balok B
Simbol Rumus
1. Data perhitungan balok
f'c =
fy =
fy =
1 =
RI = = 0.85*f'c
min = = 1.4/fy
max = = 1[450/(600+fy)]*(RI/fy)
F max = = 1*450/(600+fy)
K max = = Fmax{1-(Fmax/2)}
h= tinggi balok
bw = lebar balok
hf = tebal plat
p= tebal selimut beton
b= Lebar flens
tulangan tekan =
tulangan tarik =
tulangan sengkang =
d= 0
d' = 0
Mu = 0
Vu = 0
2. Perhitungan Tulangan
Simbol Rumus
> Tulangan Utama
Mu =
Mn = = Mu/
Cek bagian beton tertekan
(A) = Mn =
(B) =
tul persegi
/(2)
K=
tul single
As' = As2 =
b=
1/(2)
K1 =
ok
M2 = = As'*fy*(d-d')
M1 = = Mn-M2
1/(2)
K1 =
F= = 1-1-2K1
ok
As1 = = F*bw*d*RI/fy
As = = As1+As2
As terpasang =
Cek Tulangan
= = As terpasang/bw*d
min = = 1.4/fy
max = = 1[450/(600+fy)]*(RI/fy)
ok
355,000,000.00 Nmm
443,750,000.00 Nmm (A) (B)
443,750,000.00 Nmm
732,441,600.00 Nmm
0.16
Namun dipakai tul tarik 422
1,519.76 mm2
1500 mm2
0.031787218
pakai tul tarik 422
348511363.2 Nmm
95238636.8 Nmm
0.034111226
0.0347137481
385.8929778385
1,905.65 mm2
2279.64 Dicoba memakai tulangan tarik 1 lapis 6D22
0.0117993789
0.0035897436
0.0222307692
Jadi min<<max
455.928 mm2
379.94 mm2 1.2 2
77 kN 77000 N
67,082.40 N
89,443.20 N
124,084.95 N
Dipasang tulangan praktis 10
mm
722
10-100
222
422
1519.76 mm2