Sie sind auf Seite 1von 1

QUALITY CONTROL PROJECT

INSPECTION CHECKLIST STONOR 3

PHASE: Document Ref.:


BLOCK NO.: CAST IN-SITU RC RFI No:
UNIT NO.: (DURING POUR) Received By:
Date: Time:

Location: Effective Date: 20/10/16 Rev. 0 Page 1 of 1

Item Inspection Attributes Contractor LHS Consultant

(Representative's name in block letter)


Pass Fail Pass Fail Pass Fail
2 CHECK DURING CASTING AND POST CASTING

a Compaction in horizontal layers of less than 450mm

b Thoroughly worked between forms and reinforcement

c Poring time START FINISH

d Alignment, elevations and supports checked during pouring

e Construction joints (horizontal) in required position

f Finish of concrete as specified (type/ class of finish .)

g Concrete curing applied as specified (type of curing ..)

h Amount of concrete poured .m3

(Representative's name in block letter)


Pass Fail Pass Fail Pass Fail
Final Inspection
Review of all records including required test results

Reason for Failure or Re-inspection:

Nonconformance Report raised during inspection/ re-inspection YES NO NCR No.:

Signature of Sub-contractor Rep: Date: Time:

Full name in block letters:

Signature of LHS Rep: Date: Time:

Full name in block letters:

Signature of Consultant Rep: Date: Time:

Full name in block letters:

Das könnte Ihnen auch gefallen