Conclusion

In this project the truss bridge over Mahanadi River rests on the well
foundations except pier no. A1, A2, P1, and P2. As the hard soil level is in a
lesser depth. Pier no. A1, A2, P1, P2 are simply open foundations.

We have also analysed the bridge truss members considering 22.84 tonnes of
axle load on the truss railway bridge. After analysing the bridge, it is seen that
the maximum force on a member of the truss bridge is__. So the steel girders
should have the minimum Strength of __ to withstand the load caused due to
heavily loaded freight locomotives.