Beruflich Dokumente
Kultur Dokumente
Arq.Victor
11/Jul/2016 al 15/Auo/2016 DC-3 () 3 Personales
5W1H
1 KY KY 1 2 2 2
2 1 2 2 2
41
3 1 2 2 2
4 2 1 1 1 1
5 RC 2 1 2 2
4
6 2 1 2 1
7 RC 2 2 4 2
No6 1
8 3 2 6 3
8 3 2 6 3
9 RC 1 1 1 2
RCRC
10 2 1 2 1
RC
11 2 1 2 1
13 1 1 1 1
r Edificaciones
Victor
ersonales
1(4) 1(1/5)
2(43) 2(1/)
3(4) 3(1/)
Trabajo Demoliciones Equipo de proteccin casco, barbiquejo chaleco,Lentes,arnes, guantes Nom.Cabo Arq.Victor
Periodo 12/Dic/2016 al 24/Dic/2016 Licencia Necesarias DC-3 (Manejar la retroexcavadora) Num,Trabajador 5 Personales
Evaluacin
Posibilidad
Gravedad
Categora
Prioridad
Numero
FACTOR DE RIESGO(Accidente que puede suceder LAS MEDIDAS PARA ELIMINACIN Y REDUCCIN (Las medidas que debe
1
PROCEDIMIENTO (PASO)
concretamente) realizar para prevenir accidente)
1
Preparacin
6
Demolicin
9
9
10
Orden y limpieza
11
Deben tomar las medidas drasticas e inmediatas(9.6) Deben tomar medidas(432No es necesario
Grados de riesgo
medidas(1)
Created date 11-Mar-17 HAZAMA-ANDO
WORK PROCEDURE PILE WORK stamp
AUTHOR TORU MATSUHISA
tipe of work pile work Protective equipment grass/grove Work Reader Name
SIGN FULL NAME EVERYBADY
Period 14/FEB/2017-31/Mar/2017 License Required driving ricence for pile machine and crane Number of People
Probability
Evaluation
Category
Severity
Numero
Priority
THE MEASURES FOR ELIMINATION AND REDUCTION (The steps you must Who is going to
1
PROCEDURE (STEP) RISK FACTOR (Accident that can happen concretely) Indicates the weak point in plane (plant and cut) by a simple drawing. (Place of work, Placement of temporary equipment and personnel etc.)
take to prevent accidents) perform
1 *Caught between when setteling on the truck 2 2 2 2 * Strongly tightening with rope to delievery concrete pile * Invescorp
DERIVARY CONCRETE PILE *Falling Object Delievery area make the barrier
Preparation
*Caught between with machine base plate * ' Authorized Person Only' signage * Barrier
2 DERIVARI PILE MACHINE AND ASSEMBRY 2 1 3 2 for machine area * Yellow warning Invescorp
*Wire cable damage with piling machine tape put the machine base plate
*Caught between with pile machine base plate * Wear safety shoes * The yellow
4 MOVE PILE MACHINE FOR SETTING 2 1 3 2 warning tape put the machine base plate * Hung up wire Invescorp
*Wire cablle damage with piling machine cable with mobile stand
6
*Struck by with concrete pile 2 1 2 2 * Barrier tape for machine working area * Use Invescorp
HUNG UP CONCRETE PILE
*Falling object inspected lifting gear for hunging up
7 *Struck by with concrete pile 2 1 2 2 * Barrier tape for machine working area * Use Invescorp
SETTING LOCATION OF PILE *Falling object inspected lifting gear for hunging up
Probability
10 *Dust *Sharp 1 1 1 1 Invescorp 1 Low (1/5 years)
CLEAN SITE * Dust Mask * Safety Shoe
object 2 Average (1 / year)
3 High (1/6 times)
Severity
1 Light (no suspension, less than 4 days)
11 2 Medium (suspension more than 4 days, 3rd affected minor)
3 Severe (death, disability, 3rd seriously affected)
cleaning
Degree of risk Must take immediate and drastic measures (9.6) Must take action (4 3 2) No action
required (1)