AND STANDARDS Long-Range Financial Plan Once actual performance has been Engineering firms will require determined, this will be compared longer term financial plans due with what the organization seeks to to the long lead times needed achieve. for capital projects. Actual production output will be Financial plan recommends a compared with the target output. direction for financial activities.
TAKING NECESSARY ACTION Operating Budget
indicates the expenditures, revenues, or profits planned for Hire additional personnel some future period regarding Use more equipment operations Require overtime Performance Appraisal measures employee TYPES OF CONTROL performance and provides employees with a guide on how Feed forward Control to do their jobs better in the undertaken when management future anticipates problems and functions as effective checks prevents their occurrence on new policies and programs Concurrent Control undertaken when operations Statistical Reports are already ongoing and pertain to those that contain activities to detect variances data on various developments are made within the firm Feedback Control Contains the following undertaken when information information: is gathered about a completed Labor efficiency rates activity and in order that Quality control rejects evaluation and steps for Accounts receivable improvement are derived Accounts payable Sales report COMPONENTS OF Accident reports ORGANIZATIONAL CONTROL Power consumption SYSTEM report Strategic Plan Policies and Procedures it provides the basic control mechanism for the Policies -refer to the framework organization within which the objectives of the When there are indications that organization must be pursued. activities do not facilitate the accomplishment of strategic Procedure- is a plan that goals, these activities are describes the exact series of actions or steps to be taken in a given situation