TANK RINGWALL FOUNDATION DESIGN


Ring Wall
TK 001 TK 002 TK 003 TK 004
Calculation
Tank Foot
Wall Diameter 40.00 15.00 17.00 40.00 meter
External 42.40 17.40 19.40 42.40 meter
Diameter
Widht 1.00 1.00 1.00 1.00 cm
Lenght 157.00 157.00 157.00 157.00 meter
Height above 2.50 2.50 2.50 2.50 meter
Height underground 0.50 0.50 0.50 0.50 meter
Footer height 0.80 0.80 0.80 0.80 meter
Footer lenght 3.00 3.00 3.00 3.00 meter
Ring Walll Area 942.00 942.00 942.00 942.00 m2
Footer area 754.00 565.00 565.00 754.00 m2
Excavation 452.00 170.00 192.00 452.00 m3
Concrete volume
440.00 165.00 187.00 440.00 m3
Dike wallvolume
Concrete
377.00 141.00 160.00 377.00 m3
footer
Tak Bottom Area 126.10 47.60 53.88 126.10 m2
Rebar unit weight
Y16 1.58 1.58 1.58 1.58 kg/m
Y18 2.00 2.00 2.00 2.00 kg/m
Y20 2.47 2.47 2.47 2.47 kg/m
Y22
Provide Y22 @ 150 2.98 2.98 2.98 2.98 kg/m
C/C (Horizontal
Dike Wall
Reinforcement)
Reinforcement
Ast
SUM-1 ### ### ### ### mm2
(Mimimum
Provide Y22AstBars
Reinforcement
(0.45% CC 36.00 36.00 36.00 36.00 Nos
L=1000as mm per table
for wall(height
3.25, 2,8)
BS 8110 part 41.67 41.67 41.67 41.67 mm
Total
mm
1) Lenght of Y22
### ### ### ### meter
rebar
Vertical
Weight of Y22 rebar ### ### ### ### kg
Reinforcement=0,
SUM-2 Provide Y20@165 ### ### ### ### mm2
45*b*1000*1000/10
C/C
0 Bars L=1000 16.00 16.00 16.00 16.00 nos
Reinforcement
mm CC
62.50 62.50 62.50 62.50 mm
for 1000
Total mmof Y20
Lenght
### ### ### ### meter
rebar
Weight of Y20 rebar ### ### ### ### kg
Slab Footer
(Horizontal
SUM-5
Reinforcement
Reinforcement)
### ### ### ### mm2
0,45*tb*h4*1000*1
Provide Y20 @ 165
000/100 30.00 30.00 30.00 30.00 nos
Bars L=1000 mm
Reinforcement CC
66.67 66.67 66.67 66.67 mm
for 1000
Total mmof Y20
Lenght
### ### ### ### meter
rebar
Vertical
Weight of Y20 rebar ### ### ### ### kg
Reinforcement=0,4
SUM-7 ### ### ### ### mm2
5*h4*1000*1000/10
Provide Y20 @ 125
0 12.00 12.00 12.00 12.00 nos
Bars
Reinforcement CC
83.33 83.33 83.33 83.33 mm
for 1000
Total mmof Y20
Lenght
### ### ### ### meter
rebar
Weight of Y20 rebar ### ### ### ### kg
TANK QTY 1 2 1 2

SUMMARY BREAK DOWN FOR RING WALL


Backfilling and Unit
No Work Description Qty Total Unit
compacting, Price
1 Excavation works 550.00 ### 550.00 ### ### m3 22.00
leakage detection
2 126.10 95.20 53.88 252.20 275.00 m2 330.00
system, base slap
concrete and
asphalt
3 Wall formwork jobs ### ### ### ### ### m2 28.00
4 C25
RebarConcrete
materials 848.00 ### 848.00 ### ### m3 88.00
5 supply and ### ### ### ### ### TOTAL
kg 2.85
installation works WORK
S
Port Sudan
Ring Wall
Calculation
TANK RINGWALL FOUNDATION DESIGN
TK 002 TK 003 TK 004
TK
Wall 002
Tank Foot
Diameter 15.00 17.00 40.00 meter
TK 003
External 17.40 19.40 42.40 meter
TK 004
Diameter
Widht 1.00 1.00 1.00 cm
Lenght 157.00 157.00 157.00 meter
Height above 2.50 2.50 2.50 meter
Height underground 0.50 0.50 0.50 meter
Footer height 0.80 0.80 0.80 meter
Footer lenght 3.00 3.00 3.00 meter
Ring Walll Area 942.00 942.00 942.00 m2
Footer area 565.00 565.00 565.00 m2
Excavation 550.00 550.00 550.00 m3
Concrete volume
471.00 471.00 471.00 m3
Dike wallvolume
Concrete
377.00 377.00 377.00 m3
footer
Tak Bottom Area 47.60 53.88 126.10 m2
Rebar unit weight
Y16 1.58 1.58 1.58 kg/m
Y18 2.00 2.00 2.00 kg/m
Y20 2.47 2.47 2.47 kg/m
Y22 2.98 2.98 2.98 kg/m

Dike Wall
SUM-1 Reinforcement
Provide Y22 @ 150 ### ### ### mm2
C/C (Horizontal
Provide Y22 Bars 36.00 36.00 36.00 Nos
Reinforcement)
L=1000 mm CC
Reinforcement 41.67 41.67 41.67 mm
Ast
for wall(height
Total
(Mimimum of 2,8)
LenghtAst Y22 ### ### ### meter
mm
rebar
Weight
(0.45% ofas Y22
per rebar
table ### ### ### kg
SUM-2 Vertical
3.25, BS 8110 part ### ### ### mm2
Reinforcement=0,
1)
Provide Y20@165 16.00 16.00 16.00 nos
45*b*1000*1000/10
C/C Bars L=1000
Reinforcement CC 62.50 62.50 62.50 mm
0
mm
for 1000 mm
Total Lenght of Y20 ### ### ### meter
rebar
Weight of Y20 rebar ### ### ### kg
SUM-5 Slab Footer
Reinforcement
(Horizontal ### ### ### mm2
Reinforcement)
Provide Y20 @ 165 30.00 30.00 30.00 nos
0,45*tb*h4*1000*1
Bars L=1000 mm
Reinforcement CC 66.67 66.67 66.67 mm
000/100
for 1000 mm
Total Lenght of Y20 ### ### ### meter
rebar
Weight of Y20 rebar ### ### ### kg
SUM-7 Vertical ### ### ### mm2
Reinforcement=0,4
Provide Y20 @ 125 12.00 12.00 12.00 nos
5*h4*1000*1000/10
Bars
Reinforcement CC 83.33 83.33 83.33 mm
0
for 1000 mmof Y20
Total Lenght ### ### ### meter
rebar
Weight of Y20 rebar ### ### ### kg
TANK QTY 1 1 1

TK 004 SUMMARY BREAK DOWN FOR RING WALL


Total
No Backfilling and
Work Description Qty
Price compacting,
48,356.00 24,178.00 1 Excavation works 550.00 550.00 550.00 ###
leakage detection
90,809.40 83,226.00 2 47.60 53.88 126.10 101.00
system, base slap
concrete and
asphalt
### 84,403.00 3 Wall formwork jobs ### ### ### ###
### ### 4 C25 Concrete 848.00 848.00 848.00 ###
### ### 5 Rebar materials ### ### ### ###
### ### supply and
installation works
Kosti

TANK RINGWALL FOUNDATION DESIGN


Ring Wall Calculation
Tank Diameter 40.00 meter
TK
Wall004
Foot 42.40 meter
external
Widht Dia 1.00 cm
Lenght 157.00 meter
Height above 2.50 meter
Height underground 0.50 meter
Footer height 0.80 meter
Footer lenght 3.00 meter
Ring Walll Area 942.00 m2
Footer area 565.00 m2
Excavation 550.00 m3
Concrete volume 471.00 m3
Dike wallvolume
Concrete 377.00 m3
footer
Tak Bottom Area 126.10 m2
Rebar unit weight
Y16 1.58 kg/m
Y18 2.00 kg/m
Y20 2.47 kg/m
Y22 2.98 kg/m

Dike Wall
SUM-1 Reinforcement
Provide Y22 @ 150 ### mm2
C/C (Horizontal
Provide Y22 Bars 36.00 Nos
Reinforcement)
L=1000 mm CC
Reinforcement 41.67 mm
Ast
for wall(height
Total
(Mimimum of 2,8)
LenghtAst Y22 ### meter
mm
rebar
Weight
(0.45% ofas Y22
per rebar
table ### kg
SUM-2 Vertical
3.25, BS 8110 part ### mm2
Reinforcement=0,
1)
Provide Y20@165 16.00 nos
45*b*1000*1000/10
C/C Bars L=1000
Reinforcement CC 62.50 mm
0
mm
for 1000 mm
Total Lenght of Y20 ### meter
rebar
Weight of Y20 rebar ### kg
SUM-5 Slab Footer
Reinforcement
(Horizontal ### mm2
Reinforcement)
Provide Y20 @ 165 30.00 nos
0,45*tb*h4*1000*1
Bars L=1000 mm
Reinforcement CC 66.67 mm
000/100
for 1000 mm
Total Lenght of Y20 ### meter
rebar
Weight of Y20 rebar ### kg
SUM-7 Vertical ### mm2
Reinforcement=0,4
Provide Y20 @ 125 12.00 nos
5*h4*1000*1000/10
Bars
Reinforcement CC 83.33 mm
0
for 1000 mmof Y20
Total Lenght ### meter
rebar
Weight of Y20 rebar ### kg
TANK QTY 4

SUMMARY BREAK DOWN FOR RNG WALL


Unit Total Backfilling and
Total Unit No Work Description Qty Total
Price Price compacting,
m3 22.00 24,178.00 12,089.00 1 Excavation works ### ###
leakage detection
m2 330.00 33,488.40 41,613.00 2 504.40 ###
system, base slap
concrete and
asphalt
m2 28.00 84,403.20 42,202.00 3 Wall formwork jobs ### ###
m3 88.00 ### 74,606.00 4 C25 Concrete ### ###
kg 2.85 ### ### 5 Rebar materials ### ###
TOTAL ### ### supply and
WORKS installation works
ATION DESIGN

Unit Total
Unit
Price Price
m3 22.00 48,356.00
m2 330.00 ###
m2 28.00 ###
m3 88.00 ###
kg 2.85 ###
TOTAL ###
WORKS