Sie sind auf Seite 1von 32

Product End-of-Life Disassembly Instructions

Product Category: Notebooks and Tablet PCs

Marketing Name / Model


[List multiple models if applicable.]
HP EliteBook 8470p Notebook PC

Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Quantity
of items
Item Description Notes
included
in product
Printed Circuit Boards (PCB) or Printed Circuit With a surface greater than 10 sq cm 6
Assemblies (PCA)
Batteries All types including standard alkaline and lithium coin 2
or button style batteries
Mercury-containing components For example, mercury in lamps, display backlights, 0
scanner lamps, switches, batteries
Liquid Crystal Displays (LCD) with a surface greater Includes background illuminated displays with gas 1
than 100 sq cm discharge lamps
Cathode Ray Tubes (CRT) 0
Capacitors / condensers (Containing PCB/PCT) 0
Electrolytic Capacitors / Condensers measuring 0
greater than 2.5 cm in diameter or height
External electrical cables and cords 0
Gas Discharge Lamps 0
Plastics containing Brominated Flame Retardants 0
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink, Include the cartridges, print heads, tubes, vent 0
including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.
Components and waste containing asbestos 0

EL-MF877-00 Page 1
Template Revision B

PSG instructions for this template are available at EL-MF877-01


Components, parts and materials containing 0
refractory ceramic fibers
Components, parts and materials containing 0
radioactive substances
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components
and materials requiring selective treatment can be removed.
Tool Description Tool Size (if
applicable)
Cross head
Description #1
of screwdriver
TORX T8
Description #2
(2.31mm)
Description #3
Description #4
Description #5
3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:

1. Follow steps described in Disassembly instruction (file attached)


2. If parts can be removed without using a tool, remove it first.
3. Use correct screwdriver and torque value before unlock the screw.
4.
5.
6.
7.
8.

3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items
contained in the product that require selective treatment (with descriptions and arrows identifying locations).

EL-MF877-00 Page 2
Template Revision B

PSG instructions for this template are available at EL-MF877-01


MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY
MODEL : CT12
Sub-assembly name: CT12 FA DIS-ASSY
Document No.: SOP CT12 FA DIS-ASSY
Written by: Stanley Chen Revision: 0.1
Date: 2011/12/13 Page: 1

A. Current station version list


Station Ver. Station Ver. Station Ver. Station Ver.
1 0.1 9 0.1 17 0.1 25 0.1
2 0.1 10 0.1 18 0.1 26 0.1
3 0.1 11 0.1 19 0.1 27 0.1
4 0.1 12 0.1 20 0.1 28 0.1
5 0.1 13 0.1 21 0.1 29 0.1
6 0.1 14 0.1 22 0.1
7 0.1 15 0.1 23 0.1
8 0.1 16 0.1 24 0.1
B. Version Modify list
Revision Date Station Content Ver. Design
Stanley
0.1 2011/12/13 ALL FIRST VERSION 0.1
Chen

Alicia Chien
Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 1(1/1)
Name : Disassemble Battery Ver. : 0.1 Date : 2011/12/13


Step
Before
1. Slide the battery latch to the left, then remove
the battery. (Fig.1)

Battery Latch
1

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 2(1/1)
Name : Disassemble Cover Ver. : 0.1 Date : 2011/12/13


Step
Before 2
1. Slide the cover latch to the left, then remove
the cover. (Fig.1)

Cover Latch
1

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 3(1/1)
Name : Disassemble HDD Ver. : 0.1 Date : 2011/12/13

Before
Step
2 1. Loosen HDD set screw * 3. (Fig.1)

1 2. Remove the HDD.

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (0#) 1


HDD assistant fixture 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 4(1/1)
Name : Disassemble Modem Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen screw (6052A0004501) * 2.
2
2. Remove the modem.
1

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (0#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 5(1/1)
Name : Disassemble Bluetooth Ver. : 0.1 Date : 2011/12/13


Step
Before
1. Pull out the CNTR, then remove the bluetooth
and cable.

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 6(1/1)
Name : Disassemble FAN Ver. : 0.1 Date : 2011/12/13


Step
Before
1. Loosen FAN set screw * 2, then remove the
1
FAN. (Fig.1)

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 7(1/1)
Name : Loosen Keyboard set screw Ver. : 0.1 Date : 2011/12/13


Step

3 1. Loosen keyboard set screw * 3.


2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 8(1/1)
Name : Disassemble Keyboard Ver. : 0.1 Date : 2011/12/13


Step
1. Pull out the stick point FFC and keyboard
FPC. (Fig.2/Fig.3)

2. Turn the computer over.

Fig.1

Fig.2

Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 9(1/1)
Name : Disassemble Thermal Ver. : 0.1 Date : 2011/12/13


Step
Intel UMA
1. Loosen thermal screws.

2. Remove the thermal.


1 3

4 2

Intel DIS AMD UMA


1 3
6
3
1
5

2
2
4 4

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 10(1/1)
Name : Disassemble CPU Ver. : 0.1 Date : 2011/12/13


Step
Before
1. Disassemble the CPU by slot screwdriver and
vacuum pen.

Fig.1

After

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Slot screwdriver 1
Vacuum Pen 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 11(1/1)
Name : Loosen BTCB screws Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen BTCB screw * 4.

3 2 1

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 12(1/1)
Name : Disassemble ODD Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen ODD set screw * 1.

2. Remove the ODD.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 13(1/1)
Name : Loosen screws and pull out CNTR Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen the screw (6052B0101901)*2.
1 (Fig.1)

On the side of ODD 2. Pull out the speaker CNTR. (Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 14(1/1)
Name : Loosen Hinge screws Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen Hinge screw (6052B0155201) * 4.
(Fig.1/Fig.2)
2

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric torx screwdriver (T8) 1
Support fixture 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 15(1/1)
Name : Loosen BTCB screws Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen BTCB screw (6052B0155201) *4.

1 4

2
3

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric torx screwdriver (T8) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 16(1/1)
Name : Loosen BTCB screws Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen BTCB screw (6052B0155201) * 4.

1
2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric torx screwdriver (T8) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 17(1/1)
Name : Disassemble BTCB Ver. : 0.1 Date : 2011/12/13


Step
1. Disassemble the BTCB.

2. Must be sure there is a pad on the north


bridge, then attach a release paper to it.
(Fig.2)

3. Put the BTCB in material box.

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 18(1/1)
Name : Disassemble DDRs Ver. : 0.1 Date : 2011/12/13


Step
1. Remove all DDRs.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 19(1/1)
Name : Disassemble WWAN card Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen WWAN screw * 2.

2. Remove the WWAN card.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#0) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 20(1/1)
Name : Disassemble WLAN card Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen WLAN screw (6052A0004501) * 2.

2. Remove the WLAN card.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#0) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 21(1/1)
Name : Disassemble Hall Sensor/B Ver. : 0.1 Date : 2011/12/13


Step
1. Disassemble Hall Sensor/B.

2. Disassemble the cable from routing rib.


(marked in white circle)

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 22(1/1)
Name : Pull out CNTRs Ver. : 0.1 Date : 2011/12/13


Step
1. Pull out LCM CNTR and camera cable CNTR.
(Fig.1)

2. Pull out the F/P FFC. (Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 23(1/1)
Name : Loosen M/B screws Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen M/B screw * 3. (Fig.1)
1
3 2. Take out the small battery from routing rib.
(Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 24(1/1)
Name : Take out the M/B Ver. : 0.1 Date : 2011/12/13


Step
1. Take out the M/B.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 25(1/1)
Name : Loosen screws Ver. : 0.1 Date : 2011/12/13


Step
1. Disassemble the 4 cables from routing rib.
(Fig.1)

2. Loosen screw * 2. (Fig.2/Fig.3)

Fig.1

2
1

Fig.2 Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (1#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 26(1/1)
Name : Disassemble Top Case Ver. : 0.1 Date : 2011/12/13


Step
1. Have the hinge be vertical by wrench.

2. Disassemble the top case.

Fig.1

Fig.3

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Wrench 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 27(1/1)
Name : Disassemble RJ11 Ver. : 0.1 Date : 2011/12/13


Step
1. Disassemble RJ11 cable.

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 28(1/1)
Name : Disassemble Speaker Ver. : 0.1 Date : 2011/12/13


Step
1. Loosen screw (6052A0004501) * 2.(Fig.2)

2. Disassemble the speaker..

Fig.1

Fig.2
DO NOT PRESS

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (0#) 1

Tabulator Alicia Chien Issue department NPSU-SE


Standard Operation Procedure
Document No. : CT12 FA DIS ASSY SOP Station : 29(1/1)
Name : Inspect BTCB Ver. : 0.1 Date : 2011/12/13


Step
1. Inspect the BTCB.
 Check the latch. (Fig.1)
 Check the bracket. (Fig.2)
 Check the thermal pad. (Fig.3)

Fig.1

NO HOT MELT  NG

Fig.2 Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien Issue department NPSU-SE

Das könnte Ihnen auch gefallen