Sie sind auf Seite 1von 123

Hindustan Lever Limited | SAP SCM -Demand Planning

Hindustan Unilever Limited


mySAP SCM Demand Planning

SCM APO Monthly Forecast


Cycle User Document
Version 1.1 | December, 2007

Page i of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Revision History
Version Pages Description Date Author/Reviewer
1.0 30 SCM APO Monthly Forecast Cycle User 14/07/2007 Vishwanath .V
Document
1.1 103 SCM APO Monthly Forecast Cycle User 18/12/2008 Jayant D / Sharlin S
Document

References
Reader should read the this document in conjunction with the following documents

No Document Name Version File Name Location

Page ii of
123
Hindustan Lever Limited | SAP SCM -Demand Planning

Table of Contents
Revision History ii
References ii
Purpose of the Document 5
Definitions, Abbreviation and Acronyms 5
1 Backup Existing Forecast Profile 6
1.1 Data Browser: Initial Screen............................................................6
1.1.1 Overview.......................................................................................6
1.1.2 Procedure to download the table contents in to local file...................6
2 Forecast Profile List 10
2.1.1 Sample Forecast Profile List.........................................................10
3 Selection IDs 11
3.1 Manual Forecast Selection IDs......................................................11
4 Sales History Loading 13
5 Incremental CVC creation for SO to CSO 18
6 Copying SO to CSO 21
6.1.1 Copy SO to CSO..........................................................................21
6.1.2 De-listed Pack deletion.................................................................26
6.1.3 CSO Realignments......................................................................26
7 Back up Adjusted Proportion Factor 27
7.1 Steps to Backup Adjusted Proportional Factor.............................27
8 Generate Proportional Factor 42
8.1 Generate Proportional Factor........................................................42
8.2 Steps to Generate Proportional Factor..........................................42
9 Copy Proportional Factor to Adjusted Proportional Factor 48
9.1 Steps to Copy PF to APF...............................................................48
9.1.1 Change Demand Planning in Background.....................................48
9.1.2 Schedule Demand Planning in Background...................................52
9.2 Process Chain for Calculate Proportion Factor and copy PF to APF 57
9.2.1 APF Realignments.......................................................................63
10 Assign Forecast Profiles 64
10.1 Assign Forecast Profile to a selection...........................................64
10.2 Assign Forecast Profile using LSWM process..............................68
11 Baseline Forecast 86
11.1 Maintain Forecast Profiles.............................................................86
11.2 Initialise Proposed Baseline..........................................................89
Page iii of
123
Hindustan Lever Limited | SAP SCM -Demand Planning

11.3 Generate Proposed Baseline.........................................................90


11.4 Propose Vs Actual Report.............................................................90
12 Correction to Proposed Baseline 92
13 Backup Current Baseline 93
14 Backup Demand Drivers 94
15 Initialise Current Baseline 100
16 Movement of Proposed baseline to Current Baseline 101
17 Apply Back Demand Drivers Basis New Baseline 102
18 Backup Forecast profiles 103
19 Roll Back Current Baseline 107
20 Forecast Generation for Specific Selection 112
21 Seasonal Forecasting 118

Page iv of
123
Hindustan Lever Limited | SAP SCM -Demand Planning

Purpose of the Document


This Document is intended to provide detailed information on the Monthly Forecast Cycle procedure.

Definitions, Abbreviation and Acronyms


The terms in use in the document are explained/expanded below

Acronym Description
TDP Ten Day Period
MOC Monthly Operating Cycle
PF Proportional Factor
APF Adjusted Proportional Factor

Page 5 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

SCM APO: - DP Monthly Forecast Cycle.


1 Backup Existing Forecast Profile

This section explains the steps to take backup of the existing forecast profiles from the table
/SAPAPO/DP_FCST2.

1.1 Data Browser: Initial Screen

1.1.1 Overview
The Data Browser Initial Screen is used to view the contents of a Table or a structure.

1.1.2 Procedure to download the table contents in to local file.


1) Start transaction SE16.

2) Enter table name /SAPAPO/DP_FCST2.

Page 6 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

3) Choose Display Table Contents.


a. Change the value in Width of Output List field to 650.
b. Change the value in Maximum No. of Hits field to 100000.

Page 7 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

4) Choose Execute.
The Table contents are displayed.

Page 8 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

5) Select the Download option from the Edit menu and save the file in Spreadsheet
format.

Page 9 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

2 Forecast Profile List

On 22nd of every month separate list for All, Manual, Seasonal and NoForecast profiles are made from
the forecast profile backup file and sent to the L2 team and the CDP Team. The CDP Team will go
through the list and revert if there are any changes to be made to the existing profiles.

This file contains Category, Channel Type wise list of Basepacks for Manual, NoForecast and
seasonal profiles which runs in only a particular state and basepacks which runs in all states. Refer
the file given below for more details.

2.1.1 Sample Forecast Profile List

Forecas t_Profile_Lis t.zip

Page 10 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

3 Selection IDs

Separate selections IDs for Manual, NoForecast and Seasonal profiles are created in the system. The
list of selection IDs are given below.

3.1 Manual Forecast Selection IDs

Channel
Selection Type
MF_BMT_H1MMET MT
MF_BMT_H1MUMUNA MT
MF_BMT_H2KMET MT
MF_BMT_H2U2METBIHJHA MT
MF_BMT_H3DMET MT
MF_BMT_H4APAND MT
MF_BMT_H4CMET MT
MF_BMT_H4KARN MT
MF_BMT_H4KER MT
MF_BMT_H4U2KARKER MT
MF_BP_*1_DUMMY_CODE NON-CSD
MF_BP_*1_OLD_CODE NON-CSD
MF_BP_*2_DUMMY_CODE NON-CSD
MF_BP_*2_OLD_CODE NON-CSD
MF_BP_*3_DUMMY_CODE NON-CSD
MF_BP_*3_OLD_CODE NON-CSD
MF_BP_*4_DUMMY_CODE NON-CSD
MF_BP_*4_OLD_CODE NON-CSD
MF_BP_H1GUJ NON-CSD
MF_BP_H1MMET NON-CSD
MF_BP_H1MPCHAT NON-CSD
MF_BP_H1MUMUNA NON-CSD
MF_BP_H1ROMGOA NON-CSD
MF_BP_H1U2GUJMAHCHA NON-CSD
MF_BP_H1U2METMP NON-CSD
MF_BP_H2BIH NON-CSD
MF_BP_H2HPCCAL023 NON-CSD
MF_BP_H2HPCCAL024 NON-CSD
MF_BP_H2KMET NON-CSD
MF_BP_H2NCUA NON-CSD
MF_BP_H2ORR NON-CSD
MF_BP_H2U2BENORRNES NON-CSD
MF_BP_H2U2METBIHJHA NON-CSD
MF_BP_H2WB NON-CSD
MF_BP_H3DMET NON-CSD
MF_BP_H3HPCDEL032 NON-CSD
MF_BP_H3PHCJH NON-CSD
Channel
Selection Type
MF_BP_H3RAJ NON-CSD
MF_BP_H3U2DELEUP NON-CSD

Page 11 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

MF_BP_H3U2PUNRAJ NON-CSD
MF_BP_H3UPUTT NON-CSD
MF_BP_H4APAND NON-CSD
MF_BP_H4CHEUNA NON-CSD
MF_BP_H4CMET NON-CSD
MF_BP_H4HPCMDR021 NON-CSD
MF_BP_H4KARN NON-CSD
MF_BP_H4KER NON-CSD
MF_BP_H4TNPON NON-CSD
MF_BP_H4U2KARKER NON-CSD
MF_BP_H4U2TNAP NON-CSD
MF_BRMT_H1MUMUNA MT
MF_BRMT_H2KMET MT
MF_BRMT_H2U2METBIHJHA MT
MF_BRMT_H3DMET MT
MF_BRMT_H4APAND MT
MF_BRMT_H4U2KARKER MT
MF_BRV_*1_DUMMY_CODE NON-CSD
MF_BRV_*1_OLD_CODE NON-CSD
MF_BRV_*2_DUMMY_CODE NON-CSD
MF_BRV_*3_DUMMY_CODE NON-CSD
MF_BRV_*4_DUMMY_CODE NON-CSD
MF_BRV_H1U2METMP NON-CSD
MF_BRV_H2BIH NON-CSD
MF_BRV_H2WB NON-CSD
MF_BRV_H3U2 DELEUP NON-CSD
MF_BRV_H4CHEUNA NON-CSD
MF_BRV_H4U2TNAP NON-CSD
MF_CSD_*2_DUMMY_CODE CSD
MF_CSD_*2_OLD_CODE CSD
MF_CSD_*3_DUMMY_CODE CSD
MF_CSD_*3_OLD_CODE CSD
MF_CSD_H1MMET CSD
MF_CSD_H2KMET CSD
MF_CSD_H3DMET CSD
MF_CSD_H4CMET CSD

Page 12 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

4 Sales History Loading

Sales history loading is done to update latest sales in our system. This sales data is used for
forecasting. Pre requisite for this process is that we have received sales data from IMAGE in flat file
format.

Process Working Steps

Step 1: Enter the transaction code rspc

Step 2: Select the process chain Sales History Load Process Chain- 01 if 1st of month else
Sales History Load Process Chain- 02 if 11th of month else Sales History Load Process
Chain- 03 if 21st of month.

Page 13 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Right-click on the process chain on the start block, then click on Display Variant

Step 4: Here goto edit mode and click on change selection

Page 14 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: IN the Start Time window click on the immediate button, Click on the Check button and
Click on the Save button to start the job immediately. If you want to schedule at some other Date
or Time click on Date/Time to specify that.

If the Job has run successfully then the status will show Finished in Green else if job has failed it will
show Cancelled in Red. To check the Job log, click on the job log.

Page 15 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

As shown below you will be able to see job log entry

Page 16 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Page 17 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

5 Incremental CVC creation for SO to CSO

Step 1: Transaction > /N/SAPAPO/MC62 > Put MPOS ZHLMPOS

Click on Create Characteristics Combinations

Step 2: Select load from: Infoprovider

Infoprovider: ZHLSLCUBN

Page 18 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Version: 000

Select period for which you want to move SO to CSO

Tick on Adjust Time Series and execute

Step 3: It will go to CVC generation screen. Select all and click on generate button

Page 19 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

System will ask for confirmation on adjust time series select YES

Created CVCs will be displayed. (Backup can be taken here for created CVCs)

System will trigger PLOB_DELTA_SYNC_ZHLMPOS job in background

Check this job with /N/SM37 transaction

Page 20 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

6 Copying SO to CSO

6.1.1 Copy SO to CSO


Prerequisite : CSO = 0 For period sales loading period

Step 1: Click on Environment -> Data Administration -> Load Data from InfoCube.

Click on Get Variant & select Variant SO_TO_CSO_HPC For HPC & SO_TO_CSO_FAB for Foods

Here enter the source Infocube, target planning area and also the periods you want load SO to CSO.

For HPC

Source Infocube : ZHLSLCUBN

Target Plannning Area : ZHLHPC1

For Foods

Source Infocube : ZFSLCUBEN

Target Plannning Area : ZFOODS

In selection Condition put One category

Page 21 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: Click on Key Figure Assignment button

Copy key figure 9ADMDP1 (Sales Order) to ZHLCLSLOR (Cleaned Sales Order) For HPC

Copy key figure ZFDMDP1 (Sales Order) to ZFCLSLOR (Cleaned Sales Order) For Foods

Save and check Key Fig status is green now. Then click on the execute button

Page 22 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Program > Execute in Background > Put Output device LP01 > Enter >

Here system will give information message, click check.

Step 4: Click on Immediate. Click Check. Save

Page 23 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Now you can check status of your job in /NSM37 transaction and once job is finished control check
should be done.

Step 9: If the Job has run successfully then the status will show Finished in Green else if job has
failed it will show Cancelled in Red. To check the Job log, click on the job log.

Page 24 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

As shown below you will be able to see job log entry

Complete process for all categories

Control Check: Load category in DPCLEANHISTORY planning book and check SO should be equal
to CSO for the period we have copied SO to CSO.

If Job Fails : Re-Run the job and then take control check.

6.1.2 De-listed Pack deletion


Transaction /N/SAPAPO/MC62

Click on delete from a combination from list

Page 25 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Click on selection condition

Click on Load Selection

Delete CVCs for following selections

Selections for De-listed


Packs
DELISTED_BRV_NATIONAL DELISTED_NATIONAL
DELISTED_CT_MT DELISTED_R3_MT
DELISTED_CT_NON_CSD DELISTED_R3_NC
DELISTED_DEPOT_ABD DELISTED_R4
DELISTED_DEPOT_CUTH DELISTED_REGION2
6.1.3 CSO Realignments
Run CSO realignments as per CSO realignment sheet.

Updated CSO realignment sheet is to be sent to CDP user for confirmation and after confirmation only
run CSO realignments.

Realignment CSO_20 Nov 07.zip

Above is CSO realignment sheet updated as on 18th Dec 07.

7 Back up Adjusted Proportion Factor

The key figure used to take back up of the existing Adjusted Proportional factor is Additional Field 3.

The Additional Field 3 key figure should be initialized before the Adjusted Proportional factor is copied
at the Lowest Level.

The below given steps explains how to take the existing APF backup through Copy Version
Management method.

Page 26 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

7.1 Steps to Backup Adjusted Proportional Factor

Step 1: PLANJOBTDP Planning Book

Select the Planning book DPPLANNINGJOBS and load the category for which the APF
backup has to be taken.

Additional Field 3 The


Keyfigure used to backup
existing APF.

Page 27 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: Initialize Additional Field 3 Keyfigure

a. Select the Additional Field 3 Keyfigure.

b. Click on the Distribute Function Icon.

c. Specify the Start date and End date.

d. Specify the Value as 0 (Zero) and = in the operation field.

e. After entering the required info click on the button to initialize.

f. Check if additional field 3 has been initialized.

Distribute Function

g. After initializing the Additional Field 3 the next step is to copy the existing APF. The below
given steps explains the procedure to copy APF to the Additional Field 3 through copy version
management.

Page 28 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Copy APF to Additional Field 3.

Transaction: RSPC

Go to Forecasting Activities

Double Click on Back up APF to KF3 process chain

Double click on first Process

Page 29 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Details Button

Page 30 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Display Button

Page 31 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Note Macro Name and planning book in this screen.

Go to Macro Workbench

Transaction /N/SAPAPO/ADVM

Page 32 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Double click Planning Book noted earlier (ZBACKGROUNDJOBS)

Page 33 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Select Macro Backup Adjusted Proportion Factor and drag it from Depot to Work Area

Change Period of Macro from Current TDP to Next 64 TDPs for Both the steps.

Page 34 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Page 35 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Save the macro and come out of Macro Work bench.

Now Go back to RSPC screen

Go back from Activity with Green Arrow

Page 36 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Save and go back with Green Arrow

Page 37 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Double click on Start Block

Click on Display<>Change button

Click on Change Selections button

Page 38 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Click on date/time button

Input date and time at which you want to schedule job and save

Save again

Page 39 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Select Start job and click on Schedule

System will ask for Host or Server group, select server group AP1BJOB

Enter

System will ask for Priority. Assign Higher Priority A.

Page 40 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Enter job will get scheduled.

Monitor with SM37

8 Generate Proportional Factor

As a process we use one process chain to Generate Proportion Factor and copy Proportion
Factor to Adjusted Proportion factor which is explained in detail in following section. For better
understanding this section briefly explains how to generate proportional factor for a particular
category.

8.1 Generate Proportional Factor

The Proportional factor is generated by using the last 3 MOC data. i.e, previous 9 TDP Data is
taken in to consideration for all Non-seasonal basepacks.

The Proportional factor for Seasonal packs is generated by using the last 12 MOCs data.

8.2 Steps to Generate Proportional Factor

Step 1: Open Calculate Proportional Factors window from the SAP Menu.

Page 41 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Page 42 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: In the Calculate Proportional Factors window specify the Planning area ZHLHPC1 or select the
same from the list as shown in step 3.

Step 3: Select ZHLHPC1 from the list in the Planning Area field.

Page 43 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 4: Select the Planning Area from the Basis for proportion Calc section and click on the execute
icon.

Page 44 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: In the Basic Settings Tab and Basis for proportion calc section, Select Cleaned Sales Order
Keyfigure.
The Last 9 TDPs Cleaned Sales Order data is used to calculate Proportion factor for the next 64 TDPs
starting from N+2 MOC.

Ex: If the Current MOC is MOC 01, CSO period will be MOC 10, 11 & 12 Transfer horizon will be MOC308
to MOC9 09.

Note: For Generating Proportional factor Seasonal forecast profiles last 36 TDP Cleaned Sales Order data
is used and select Detailed Proportions option from the Proportion calc. type section.

After specifying the details in the Basic settings Tab, select the Other Settings Tab and enter the
details as shown in Step 6.

Step 6: In the Other Settings Tab Restrictions for Data Selection section select the category for which the

Page 45 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Proportion factor has to be generated.

Page 46 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 7: To execute the Job after specifying all the details in the previous steps.
Select the Execute in Background option from the Program Menu.

Step 8: Specify LP01 as the Output Device and click on the continue button to run the Job.

Page 47 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

9 Copy Proportional Factor to Adjusted Proportional Factor

The Proportional Factor is copied to Adjusted Proportional Factor for all categories at the lowest level. The
Adjusted proportional factor is initialized before copying.
The below given steps explains the procedure to copy the PF to APF for one category and the same steps
have to be performed for other categories.

9.1 Steps to Copy PF to APF

9.1.1 Change Demand Planning in Background.


The Change Demand Planning in Background screen is used to change/select the required job.

Step 1: Open the Change Demand Planning in the Background window from the SAP Menu.

Page 48 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: Select the JOB HLCTALL030 from the Job Number field. This Job Initializes the APF Key
figure and copies the Proportional Factor.

Step 3: Click on the execute button .

Step 4: Select the category

Page 49 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Select Category for


which the PF is to be
copied to APF.

Step 5:

Step 6: Click on the Aggregation Level button and check if the selection is in Lowest level (Plan 7).

Page 50 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 6: If the Selection is in lowest level click on the button.

Page 51 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 7: Click on the save button and go back to the SAP main menu.

9.1.2 Schedule Demand Planning in Background.


The Schedule Demand Planning in Background screen is used to run the job which was saved in the
previous steps.

Step 1: Open the Change Demand Planning in the Background window from the SAP Menu.

Page 52 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: The Job Number and Description is displayed which was saved earlier.

Step 3: Click on the execute button to schedule the job.

Step 4: IN the Start Time window click on the immediate button, Click on the Check button and
Click on the Save button to start the job immediately.

Page 53 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 6: Check if the Job has run successfully in the SM37- Job Overview of Demand Planning in the
Background screen.

Step 9: If the Job has run successfully then the status will show Finished in Green else if job has
failed it will show Cancelled in Red. To check the Job log, click on the job log.

As shown below you will be able to see job log entry

Page 54 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Page 55 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 7: Load the category and check if the PF is copied to APF Properly.

Note: Above process of Calculation of PF and Copy of PF to APF is being done with a process chain.

9.2 Process Chain for Calculate Proportion Factor and copy PF to APF

Transaction: RSPC > Go to Forecasting Activities > Double click on Calculate PF & Copy PF to APF

Page 56 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Change dates for all blocks in variants for basis for Calculate proportion factor and macro in PF to
APF job.

Except Summer packs for all Transfer Proportion to Horizon will be next 64 TDPs

For All Categories Basis for PF calculations Last 9 TDPs

For All seasonal Packs Basis for PF calculations Last 36 TDPs

For Winter Packs Basis for PF Calculations Last Winter Season (i.e. 21.08.2006 to 20.01.2007
Once you cross 20.01.2008 change this to 21.08.2007 to 20.01.2008)

For Summer Packs (Talcs)

Transfer Proportion to Horizon Basis for Proportion Calcualtion

MOC 10/07 to MOC 02/08 MOC 10/06 to MOC 02/07


MOC 03/08 to MOC 06/08 MOC 03/07 to MOC 06/07
MOC 07/08 to MOC 09/08 MOC 07/07 to MOC 09/07

Procedure to change variant

Double click on PF calculation box

Page 57 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Change Button

Change dates in Basis for Proportion calc.

Page 58 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

And transfer Proportions to Horizon as per requirement

And Click on SAVE

Page 59 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Again Click on SAVE

System will ask to over right Variant click on YES

Variant will be saved

Page 60 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Go back with Green Arrow

Again Save

Page 61 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Go back with Green Arrow and Change dates in other selection.

Once Completed change in PF calculation dates for all Blocks change macro period for PF to APF for
next 64 TDPs.

PLANNING BOOK: ZBACKGROUNDJOBS

MACRO: COPY ADJUSTED PROPORTION FACTOR

PERIOD TO SET: NEXT 64 TDPs

Page 62 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

9.2.1 APF Realignments


On day to day basis all APF realignments being done are updated in one Excel worksheet, which will
be used as input for APF realignments. As per feedback from CDP team we will delete old steps form
this sheet.

Convert excel file to text file and import to realignment table.

Execute steps with APF key fig.

APF rel -HPC_20_Nov_07.zip

Page 63 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

10 Assign Forecast Profiles

This section explains the procedure to assign a forecast profile to a particular selection for which
dummy profiles have been generated for the new combinations after running the Auto Forecast
Model.

10.1 Assign Forecast Profile to a selection.

The Assign Forecast Profile to a selection screen is used to change the forecast profile for an existing
combination manually.

The following steps are to be followed to change the profile.

Step 1: Open the Assign Forecast Profile to a selection screen from the SAP Menu.

Step 2: Check for the Planning Area and click on the execute button

Page 64 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Select the basepack for which the profile has to be changed using the Filter icon

Page 65 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 4: Select the Forecast profile from the list and click on the enter button .

Page 66 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: Click on the Adopt icon to save the modifications.

10.2 Assign Forecast Profile using LSWM process.

Page 67 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 0 : Prepare LSMW input file in attached format

Ls mw.zip

Step 1: Enter transaction LSMW.

Step 2: Here in project selection enter Forecast and click on the execute button

Page 68 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Select Specify Files and click on the execute button

Page 69 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 4: Here add entry by clicking the circled portion.

Page 70 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: Specify the path to upload the txt file. Then click on check icon.

Page 71 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Check
these

Step 6: Click on Save icon and click on back button

Step 7: Here click on execute button to assign file

Page 72 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 8: Click on back button

Page 73 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 9: Click on execute button to Read Data

Page 74 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 10: Click on execute button

Step 11: Click on back button

Step 12: Click on execute button to Display Read Data


Page 75 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 13: Click on execute button and then the check mark once pop up comes

Step 14: Here you will see imported data. Now click on back button.

Page 76 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 15: Click on execute button to Convert Data

Step 16: Click on execute button

Page 77 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 17: Here you will see no. of entries converted. Click on back button

Step 15: Click on execute button to Display Convert Data

Page 78 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 16: Click on the check mark

Step 17: Here the converted Data is visible in green

Page 79 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 18: Click on execute button to Create Batch Input Session

Page 80 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 19: Click on execute button and then click on check mark.

Page 81 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 20: Click on execute button to Run Batch Input Session

Page 82 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 20: Click on Process icon and run the process in background

Page 83 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Page 84 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

11 Baseline Forecast

The Baseline forecast is generated for the next 12 MOCs by running the Job ZFCTTEST. The data
will be written in to the Proposed Baseline Keyfigure (Addkf 1) which is initialized using a macro
before running the Job.

11.1 Maintain Forecast Profiles

Transaction: /N/SAPAPO/MC96B - Maintain Forecast Profiles

Select Planning Area ZHLHPC1

Select Forecast Profile

Page 85 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Select Forecast model one by one

Remove offset in Forecast and History horizon.

MAINTAIN FORECAST AND HISTORY HORIZON AS PER BELOW TABLE:

Forecasting Model Forecast Horizon History Horizon

Page 86 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

AUTOMODEL 3 100

MOVING AVERAGE 64 9 FOR MA09

CONSTANT 64 54

LR 64 54

SEASONAL 64 72

NOFORECAST 64 54

MANUALFORECAST 64 54

CLICK ON SAVE

MAKE CHANGES IN ALL FORECAST MODELS

11.2 Initialise Proposed Baseline

Go to Process Chain Transaction: RSPC > Forecasting Activities > Double click on Initialise Proposed
Baseline

Page 87 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

PLANNING BOOK: ZBACKGROUNDJOBS

MACRO: INITIALISE PROPOSED BASELINE

PERIOD: Current TDP to Next 64 TDPs

Schedule above process chain.

Control Check: Proposed Baseline should be zero for period mentioned.

11.3 Generate Proposed Baseline

Go to Process Chain Transaction: RSPC > Forecasting Activities > Double click on Generate
Proposed Baseline

Page 88 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

PLANNING BOOK: ZBACKGROUND JOBS

MACRO: COPY BSLINE TO PROPOSED (MANUAL CASES)

PERIOD: CURRENT TDP TO NEXT 64 TDPs

CHECK SELECTIONS IN ALL MANUAL AND SEASONAL JOBS IN PROCESS CHAIN

DO NOT SELECT MORE THAN 40 SELECTIONS IN EACH JOB

11.4 Propose Vs Actual Report

Refresh Proposed Vs Actual Bex reports

Template for Bex Reports

New Template - HPC -FW & HHC - Nov 07.zip

Refresh report for Past 6 MOCs + Next 12 MOCs for which forecasting is being done.

1. MASS_FW + PRE_FW + HHC


Page 89 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

2. BB02 + BB03 + JJ01

3. BB35

4. MASS_PW + PRE_PW + BB01

After Report copy data in excel and paste it to Proposed Vs Actual format.

BB02, BB03 & JJ01 -R2.zip

Change formula:

3 MOC RR : Last 3 MOC average

6 MOC RR : Last 6 MOC average

MOC Prop Vs Actual : Prop Vs Actual for 1st MOC in forecasting Horizon

Year Prop Vs Actual : Prop Vs Actual for 12 MOC in forecasting Horizon

Sent updated reports to

1. MASS_FW + PRE_FW + HHC - Krishnakumar, Rajgopal & Joshi, Manasi

2. BB02 + BB03 + JJ01 - Kadle, Neelesh , Joshi, Manasi & Karmarkar, Amey

3. BB35 - Sehgal, Priti, Patwa, Abhishek & Joshi, Manasi

4. MASS_PW + PRE_PW + BB01 - Kumar, Pitchu, , Manasi & Karmarkar, Amey

Also give report on Region level to All CDP + MT Users for ALL categories.

Prop Vs Act - Reg - R2.zip

12 Correction to Proposed Baseline

Corrections can be made as per comments given by CDP planner for Base pack Channel Type and
state combinations. If feedback is given on Region level, changes to be done for all states in that
region.

For changes following are frequent comments and against each comment action to be taken is
mentioned. There is no standard procedure for changes and can be done as per requirement.

Keep Current / Retain Old / Keep Old Make selection and Run job COPYACT_PR to copy
current baseline to Proposed
No forecast / De-listed Pack Initialise Propose Baseline
Manual Pack - Make selection and Run job COPYACT_PR to copy current baseline to
Proposed
Page 90 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Once Changes are done give feedback to CDP with Changed values.
After all corrections, get confirmation from CDP for movement of baseline.

13 Backup Current Baseline

Transaction: RSPC

Go to Forecasting Activities > Back up Of Current Baseline

Page 91 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

PLANNING BOOK: ZBACKGROUND JOBS

MACRO: BACKUP OF CURRENT BASELINE

PERIOD: CURRENT TDP TO NEXT 64 TDPs

CONTOL CHECK: CURRENT BASELINE = ADDITIONAL KEY FIG 2

14 Backup Demand Drivers

Step 1: Enter transaction code RSPC.

Page 92 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: Click on Backup Demand Drivers (abs) process chain.

Page 93 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: Right-click on the process chain on the start block, then click on Display Variant

Step 4: Here goto edit mode and click on change selection


Page 94 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: IN the Start Time window click on the immediate button, Click on the Check button and
Click on the Save button to start the job immediately. If you want to schedule at some other Date
or Time click on Date/Time to specify that.

Step 6: Check if the Job has run successfully in the SM37- Job Overview of Demand Planning in the
Background screen.

Page 95 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

Step 9: If the Job has run successfully then the status will show Finished in Green else if job has
failed it will show Cancelled in Red. To check the Job log, click on the job log.

Page 96 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

As shown below you will be able to see job log entry

Page 97 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

15 Initialise Current Baseline

Transaction: RSPC > Go to Forecasting Activities > Init_STAT1 for selection

PLANNING BOOK: ZBACKGROUND JOBS

MACRO: INITIALISE ACTUAL BASELINE

PERIOD: FORECAST PERIOD

CONTOL CHECK: CHECK CURRENT BASELINE = 0 FOR FORECAST PERIOD

Page 98 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

16 Movement of Proposed baseline to Current Baseline

Transaction: RSPC > Go to Forecasting Activities > Movement of Baseline from Proposed

PLANNING BOOK: ZBACKGROUND JOBS

MACRO: COPY PROPOSED TO ACTUAL BASELINE

PERIOD: FORECAST PERIOD

CONTOL CHECK: CHECK CURRENT BASELINE = PROPOSED BASELINE FOR FORECAST


PERIOD

Page 99 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

17 Apply Back Demand Drivers Basis New Baseline

Transaction: RSPC > Go to Forecasting Activities > Apply Back Demand Drivers (% remains same)

PLANNING BOOK : DPLANNINGJOBS

DATAVIEW : PLANJOBTDP

MACRO : ABS DD APPLIED BACK BASIS NEW BASELINE

PERIOD : FORECASTING PERIOD

CONTROL CHECK : CHECK % IS EQUAL ON APPLY BACK LEVEL

Page 100 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

18 Backup Forecast profiles

Step 1: Enter transaction code SE16.

Step 2: Extract data from table /SAPAPO/DP_FCST2

Page 101 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 3: In the next screen, set


Width of Output List: 1000
Maximum Number of Hits: 100000
Then execute

Page 102 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 4: Export the contents of screen to excel file.


For this in Main menu go to Edit->Download->Spreadsheet

Page 103 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

19 Roll Back Current Baseline

This section explains in brief about rolling back current baseline from back up.

This activity is done on every alternate month and we do not generate proposed baseline in such
forecasting cycle. We follow other process as it is. After APF realignment we will take backup of
Current baseline and Demand Drivers. Post which we will initialise current baseline for forecasting
period and apply back current baseline so that it gets disaggregated basis latest APF (Calculated on
latest MOC sales).

Step 1: Change Macro Period

PLANNING BOOK: ZBACKGROUND JOBS

MACRO: ROLL BACK CURRENT BASELINE FROM BACKUP

PERIOD: FORECAST PERIOD

Step 2: Change demand planning in background

Page 104 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Check Selection and aggregation level. (Aggregation level same as Forecasting level)

Page 105 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Save.

Step 3: Schedule Job

Put Job Number and click on Schedule

Page 106 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Immediate and Save.

Step 4: Check if the Job has run successfully in the SM37- Job Overview of Demand Planning in the
Background screen.

Page 107 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 5: If the Job has run successfully then the status will show Finished in Green else if job has
failed it will show Cancelled in Red. To check the Job log, click on the job log.

As shown below you will be able to see job log entry

Page 108 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

All job lists is enclosed herewith.

Roll Back Current Bas eline from Backup.zip

Control Check: Current Baseline = Additional Key Fig 2

After control check is over apply back demand drivers.

Page 109 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

20 Forecast Generation for Specific Selection

This section explains in brief about the usage of the Auto Forecast Model. This model checks the
sales data at basepack, channel type and state and creates new combinations wherever the new
sales combinations are there in the sales data.

The Auto forecast model assigns a dummy profile to all the new combinations and later proper
forecast profiles are assigned to these dummy profiles manually or through LSMW transaction.

The steps given below explain the procedure to run the Auto Forecast Model.

Step 1: Select the ZFCSTTEST job from the Change Demand Planning in Background screen.

Page 110 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 2: Select the category.

Step 3: Check for the aggregation level Should be Basepack, Channel Type and State.

Page 111 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 4: Click on the save button and go back to the SAP main menu.

Step 5: Open the Change Demand Planning in the Background window from the SAP Menu.

Step 6: Click on the execute button to schedule the job.

Step 7: IN the Start Time window click on the immediate button, Click on the Check button and
Click on the Save button to start the job immediately.

Page 112 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Step 8: Check if the Job has run successfully in the SM37- Job Overview of Demand Planning in the
Background screen.

Step 9: If the Job has run successfully then the status will show Finished in Green else if job has
failed it will show Cancelled in Red. To check the Job log, click on the job log.

Page 113 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

As shown below you will be able to see job log entry

Page 114 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Page 115 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

21 Seasonal Forecasting

Seasonal forecasting is done interactively and not with background job. Following is the procedure to
complete proposed baseline generation for seasonal packs.

Step 1

Send seasonal base pack list to CDP users and get confirmation. (Latest file enclosed herewith)

C:\Documents and
Settings\J ayant.D\Desktop\All Seasonal & Winter List.xls

Step 2

Transaction: /SAPAPO/SDP94 - Interactive Demand Planning

Go to Planning book: ZT1SEASON TDP VIEW FOR HPC

DPFINTERACTIVEFCST TDPVIEW FOR FOODS

In selection window

Base pack From file one by one base pack to be selected

Page 116 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Channel Type- Choose form available channel types for base pack

National Characteristics ALL INDIA (IF NATIONAL PACK)

Base pack From file one by one base pack to be selected

Channel Type- Choose form available channel types for base pack

Region (Branch) Choose from available regions one by one (If Regional Pack)

Load the selection in planning book .

Go to change mode

Click on interactive forecast button


Page 117 of 123
Hindustan Lever Limited | SAP SCM -Demand Planning

System will ask for model to select

Select ZLRSEASON forecast model and click on Execute

Page 118 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Go to Parameters Tab

Page 119 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Click on INIT button

Click on STAT button

Remove Trend Value and again press STAT button

Page 120 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Save and click on cancel

Page 121 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Check proposed Vs actual and CSO

If forecast is not as per your exceptions you can change

Alpha factor Near to 0 (0.01 to 0.10 )

Beta factor Near to 0 (0.01 to 0.10 )

Gamma factor Above 0.7

Basic Value As per requirement

Seas. Index As per requirement

Page 122 of 123


Hindustan Lever Limited | SAP SCM -Demand Planning

Click on Save and proposed baseline is generated for one combination.