Sie sind auf Seite 1von 2

L = L&T Limited/RFCL

ANNEXURE-A Scope Division Matrix - TS TRANSCO INTERFACES WITH RFCL SWITCHYARD TS = TSTRANSCO

Equipment design Supply Installation & commissioning Remarks

Supervisory
Equipment /
Basic Detail Installation Testing & Commissioning work
Sl.No List of Items Material Remarks
Engineering Engineering work work for installation &
Supply
Commissoining

RFCL feeder differential protection(87) Relays in TS


1 L L L TS* L TS* Note 2&3
TRANSCO C&R panel
Cable from TS Transco CT for differential protection (87F)
2 TS TS TS TS TS TS
to TS Transco C&R panel

Incoming conductor termination upto RFCL incoming


gantry:
3 TS TS TS TS TS TS
Conductor, Tension insulator with hardware, line stringing
& Shield wire with hardware.

Supplying Earth flat(100x 16) ,laying and connection to TS TS


4 L L L L
Transco yard from RFCL yard (for Transco part ) (for Transco part )
Space provision for Transco cables in RFCL part trenches
5 and Interfacing/ joining of cable trenches of Transco yard # # # # # # Note 1& 4
with RFCL yard.
AC & DC supply Feeder provision for TS Transco
equiments such as Lighting and power distribution
6 Note 5&6
board,CRPs,PLCC panels and associated battery /Battery
chargers,Bay marshalling kiosk,Receptacles etc.

Details such as dimensions of all the TS transco


equipment(C&R panel,PLCC panel,Battery,battery TS
7 TS TS TS TS TS TS
charger and the distribution boards) to be installed in
RFCL control room to be provided by TS transco

1 For space provision of TS transco cables in RFCL switchyard trenches,L&T shall provide two layers of cable tray (1 No.600mm&1 No. 300mm) in the RFCL part.
TS* means installation of RFCL feeder differential relays supplied by L&T (87F) for TS transco Relay panel shall be done by TS Transco in their control & relay panel.However Relay model and physical dimension shall be
2
informed by L&T seperately
CT characterstics(Knee point voltage etc ) required for RFCL feeder differential relay (87F) shall be given by L&T based on selected model of the relay. The CT core at RFCL end will be selected by L&T accordingly.TS
3
transco to provide the matching CT core at their end.

L&T shall provide trenches upto the battery limit of RFCL switchyard at joiining of TS transco switchyard .(Cable trench layout to be forwarded seperately) TRANSCO shall match the trenches provided in their yard with the
4#
trenches provided by L&T in RFCL switchyard and same shall be confirmed by TS transco.
Equipment design Supply Installation & commissioning Remarks

Supervisory
Equipment /
Basic Detail Installation Testing & Commissioning work
Sl.No List of Items Material Remarks
Engineering Engineering work work for installation &
Supply
Commissoining

All the requirements of AC (415 V and 230 V )& DC supply feeder with rating shall be provided by TS transco for auxilary power switchboard sizing,
5
Also supply of cables and laying of cables for the above said feeder's including termination at both ends(source end and load end) shall be in TS transco's scope

6 Supply,installation and termination of cables for all equipments in TS transco yard to TS transco CRP/TS Transco equipments in control room shall be in the scope of TS transco.

Das könnte Ihnen auch gefallen