Beruflich Dokumente
Kultur Dokumente
(MGDP)
Page 1 of 4
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
Page 2 of 4
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
Continue to sequence 18
16 If the Sand Filter backwash perform by Deep Well Water
Pump (374-P-1001A/B) ensure these valves are opened:
374-XV-1012A/B (374-PID-1001)
374-XV-1017A/B (374-PID-1001)
Page 3 of 4
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
374-XV-1012A/B (374-PID-1001)
374-XV-1014A/B (374-PID-1001)
374-XV-1018A/B (374-PID-1001)
374-XV-1020A/B (374-PID-1001)
23 After 15 minutes of running Deep Well Pump (374-P-
1001A/B) shall stop. Ensure these valve are closed:
374-XV-1018A/B (374-PID-1001)
374-XV-1020A/B (374-PID-1001)
24 Perform carbon filter rinsing by select rinsing sequence at
carbon filter button. Deep Well Pump shall start for 10
minutes.
Page 4 of 4