Subcontrators Construction Self-check list

SITE ID

Subcontractor team leader :


(Signature+date)

Category Check item


function units (Appearance /Surface) not broken
general nuts inclunding fastening nuts fastened
installation spring washers planished
antenna pole and RRU pole installed vertically
RRU grounded
BBU grounded
all cabinets grounded separately, even higher cabinet and
lower cabinet conected with grounding cable.
Earthing DC power cables grounded before entering shelters or
outdoor cabinets
outdoor or indoor cabinets grounded
all outdoor grounding bars antirust measure done
cabletray grounded

DC power cables grounding clips waterproof measure done

Waterproofing
jumper connectors at both end, antenna and RRU
waterproof measure done
in cabinnets,waterproofing modules be used systematically
and cables to be run in right size holesthe blocks of non-
used holes should not be removed.
all cables must follow the outdoor cabletray or cable racks in
cabinets or designed special routing
cable clips to be used and fastened properly, if its bound to
use.
all cables must be bound with right ties
signal cables and power cables are banded separately
cables between outdoor cabinets must be protected with
pipes

Cable laying
cables must have a waterproof arch or rain shed before
entering
equipment room and the lowest point of bend should be
Cable laying 0~15cm lower than feeder window

Cables to be run on a way allowing cabinets sliding window


be closed properly and Sliding window be closed
power cables and grounding cables should use as per the
proper length.Cut the excess lengths
cables should not be jointed.
labels must be used at the local port and the peer port
hand-written labels not be used
feeder window sealed
1 meter optical fiber cable reserved near to RRU and fixed
For outdoor site excess length of optical fiber cable laid
inside the cable tray between the tower and Cabinet .
Special requests For indoor site excess length of optical fiber cable laid in
side the cable tray before entering to the Indoor cabinet.
affix temperature sensor on the left battery at lowest level
battery in battery cabinet
site cleanedall garbage be removed from site
Cleaning
All garbage be removed from cabinets interior
n Self-check list

SITE TYPE

ZTE supervisor:
( Signature+date)

Self-check result Remarks


PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A
PASS FAIL N/A
PASS FAIL N/A
PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A
PASS FAIL N/A

wanterproof measure means


1+3+3,including one-layer
insulating adhesive tape, three-
PASS FAIL N/A
layer waterproof adhesive tape, and
three-layer ultraviolet-proof
adhesive tape, black ties be used

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A
PASS FAIL N/A
PASS FAIL N/A
PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A

PASS FAIL N/A


PASS FAIL N/A