Sie sind auf Seite 1von 1

NOTE:

SEE DETAILS OF MACHINE FOUNDATIONS ON


SEPARATE SHEET.

1 2 3 4 5 6
C1 C2
SPACED @ 6-50mm O.C.; SPACED @ 4-50mm O.C.;
6-100mm O.C. REST @ 4-100mm O.C. REST @
150mm FROM EACH ENDS 150mm FROM EACH ENDS
FLOOR LEVEL
TO
FOOTING .40m X .40m .30m X .30m
FTB1 FTB2

FTB DETAIL USE 10mm TIES:


SCALE : NTS
SPACED @ 4 - 50mm, 8 - 90mm
C1-F1 FTB1 REST @ 150mm
FTB1 FROM SLAB TO MIDHEIGHT
FTB1
C1-F1 C1-F1
4 FTB1 C1/F1(A&B) C1/F1(A&B)

SWITCH BOARD
FTB1 C1-F1
A C1-F1 C1-F1
UP STEEL 1 to 4 5 to 11

R.O. SYSTEM
W/ 10mm TIES spaced @ FTB1
4-50mm O.C.; 8-90mm O.C. COMPRESSOR FTB1 FTB1
A N D MO T O R TUBE ICE ICE BIN
W250 X 89 W250 X 89
REBARS MODULAR TANK

FTB1
rest @ 150mm FTB1 WF1 MAKER
BOTH WAYS 3 BY OTHERS
WF1
ROOF BEAM
TO
FOUNDATION
C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 FTB1
FTB1 FTB1 FTB1
B 2
WT=89kgs./m WT=89kgs./m

FTB2 FTB2 150mm THK. CONCRETE SLAB W/ FTB2 FTB2 FTB2

BOTH WAYS FOR ENTIRE DRIVEWAY D R I V E W A Y EVAPCO W10 X 22

SUPPORT
PLAN C-F BEAM
C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 C2-F2 &
FTB2 FTB2 FTB2 FTB2 FTB2 FTB2 COLUMN

C 1

COLUMN & FOOTING DETAILS


SCALE : NTS 1 FOUNDATION PLAN COLUMN SCHEDULE
S-1 S-1 SCALE : 1:100MTS
SCALE : NTS

NOTE:
SEE DETAILS OF
TRUSSES (T1 & T2)
SEPARATE SHEET.
ON
1 2 3 4 5 6

SEE EVAPORATIVE CONDENSER SUPPORT

A
B2
B2
B1
B1
4

UP
A B2 B2 B2 B2

B1 B1 B1 B2
OPEN B2
S S S S
B1 B1 B1 B1 B2 B2 B2 B2
3

B1 B1 B1 UP

T1 S S S S

B 2 B1 B1 B2 B2
B1 B2 B3/RB
W14 x 43 W12 x 35 W10 x 22
T1 WT. = 22LBS./FT
FRAMING PLAN OF TWO WAY SLAB FRAMING PLAN OF TWO WAY SLAB PLANTED COLUMN W10 x 22 WT. = 43LBS./FT WT. = 35LBS./FT
SHOWING BOTTOM BAR REINFORCEMENT SHOWING TOP BAR REINFORCEMENT STEEL I-BEAM
T2

STEEL I-BEAM DETAIL


SCALE : NTS

TYPICAL TWO-WAY R.C. SLAB DETAIL C 1

SCALE : NTS

SECOND FLOOR FRAMING PLAN


A

1
S-1 S-1 SCALE : 1:100MTS

OBP
AS-BUILT TUBE ICE PLANT MB HOLDING COMPANY,INC JECG
S-1
1:120M.
JP Rizal St., Cabuyao Laguna President Avenue, BF Homes,Paranaque City

Das könnte Ihnen auch gefallen