Beruflich Dokumente
Kultur Dokumente
1. AUDITS
The progress status for the Mahikeng internal audits, reports are as follows:
2. Waste Management
Collection
Date Area Type of waste Quantity Service
collected provider
25/03/2015 Main Admin Medical Waste 7 bottles of Barkley Med.
Antiseptic solution
Recycling
Date Area Type of waste Quantity Service
recycled provider
3. EIAA
Findings/Deviation Progress
New petrol/diesel pumps to be designed and In progress, the supply chain and SHE
installed. Acting manager to give recommendation for
Material Safety Data Sheets for petrol and a purchase of a new Tanks.
diesel to be clearly displayed.
Ensure that all the relevant employees are
trained on the Material Safety Data Sheet for
petrol and diesel.
Petrol and diesel tanks to be pressure tested In progress, Pressure test to be
annually. implemented in the meantime as the
Soil surrounding underground tanks to be arrangements of the tanks are in progress.
inspected annually for possible leakages.
Material Safety Data Sheets for all stored Complete, the MSDS have been confirmed
household cleaning chemicals to be to environmentally friendly.
consulted for potential environmental
dangers.
Ensure that no employees burn any tyres Complete, the supply chain management
while on site. (stores) sells the tires to employees for reuse
purposes. And the proof has been filled
Ensure that contaminated sand from the Not Applicable, No possibility of
Sedimentation Tanks is placed in a location contaminated sand on site sedimentation
isolated from the rest of the site's grounds for tanks.
later disposal.
4. Pollution Control (this should also help in environmental incident reporting)
5. HCS Control
All department SHE verification has been conducted from the 2nd to the 6th of Feb
2015 and finding have been sent to the respective departments.
8. Contractor Audit
9. Resource conservation
13. Training