Sie sind auf Seite 1von 4

Manufacturing Status At Bhosari

Material Status Fabrication Status on


Site Name Sr. No Pending Jobs BOM No. / Drawings Nos. Remark Remark
on 26 Oct 2013 13.11.2013

Bag Filter bottom cone


fabrication completed,
stifning flat welding work
under progress.

Middle piece plate


cutting completed,
assembly is in under
progress.
MS Flat 65,
Manufacturing of New All material received at
1 50, 75 not NA
bag filter bhosari factory Top Piece material
available
cutting pending, Top
door and venturi
mounting plate work
completed.

Bag filter structure


fabrication yet not start.

Short Material:
Manufacturing of 800 1) 5 mm THK plate DV Damper and ring
Material not Material
2 DIA Three way Divertor TTJXA004J0601-MEC-2-162 2) Angle 40 X 40 X 5 send to machining, same
available Received
Vlave. THK will get by 17.11.2013
3) 50 mm Round Bar
Short Material:
Manufacturing of 800 1) 5 mm THK plate DV Damper and ring
Material not 2) Angle 40 X 40 X 5 Material
3 DIA Two way Divertor TTJXA004J0601-MEC-2-163 send to machining, same
available THK Received
Vlave. will get by 17.11.2013
3) 50 mm Round Bar
Manufacturing of 800
Material not Short Material: Material
4 DIA Three way Divertor TTJXA004J0601-MEC-2-164 work yet not start
OA-06/1213 available 1) Angle 40 X 40 X 5 Received
Vlave Structure THK
Cheminova
Manufacturing of 800
Material not Short Material: Material
5 DIA Two way Divertor TTJXA004J0601-MEC-2-165 work yet not start
available 1) Angle 40 X 40 X 5 Received
Vlave Structure THK
OA-06/1213 Manufacturing Status At Bhosari
Cheminova
Material Status Fabrication Status on
Site Name Sr. No Pending Jobs BOM No. / Drawings Nos. Remark Remark
on 26 Oct 2013 13.11.2013

shell rolling work


Ducting from DV 3 to Material not Material completed, assembly
6 TTJXA004-M0100-MEC-2-166
Bag filter 2 available Short Material: Received and welding work will
1) 5 mm THK plate start on 18.11.2013

shell rolling work


Ducting from Bag filter 2 Material not Material completed, assembly
7 TTJXA004-M0100-MEC-3-169
to DV 4 available Short Material: Received and welding work will
1) 5 mm THK plate start on 18.11.2014

shell rolling work


Ducting from DV 4 to ID Material not Material completed, assembly
8 TTJXA004-M0100-MEC-2-168
Fan available Short Material: Received and welding work will
1) 5 mm THK plate start on 18.11.2015
2) ISMC 150 X 75

shell rolling work


Ducting from DV 3 to
Material not Material completed, assembly
9 Bag filter 1 & DV 1 to DV TTJXA004-M0100-MEC-3-167
available Received and welding work will
3 Short Material:
start on 18.11.2016
1) 5 mm THK plate

Drawing Not Receive to Mfg, Yesterday


Distance piece & End Material not Short Material:
10 TTJXA004-M0100-MEC-4-170 design department send drawing to
plate available 1) 5 mm THK plate
bhosari for Mfg.
Fabrication Status on Completion Date
25.11.2013 given by Mfg. dept.

10-Dec-13

25-Dec-13

25-Dec-13

25-Dec-13

25-Dec-13
Fabrication Status on Completion Date
25.11.2013 given by Mfg. dept.

25-Dec-13

25-Dec-13

25-Dec-13

25-Dec-13