3 SUNKEN LOAD
Sunken Filling
Total load
4 WALL LOAD
230 MM WALL THICKNESS
150 MM WALL THICKNESS
100 MM WALL THICKNESS
MID-LANDING LOAD 1
MID-LANDING LOAD 2
MID-LANDING LOAD 3
7 STAIRCASE LOAD
Waist slab load
Hand rail
Brick steps
Total dead load
Total normal load
Span
UDL on beam
8 SUMP - 1
SOIL PRESSURE
BRICK WALL
Lift Pressure
LIVE LOADS
load on all floor
load on lobby
load on toilet
load on terrace floor
lift load on lift slabs
load on stircase headroom slabs
6
PUNGATHUR WALL LOADS
230mm wall load
230mm wall load (BRICK LOAD)
7 200mm wall load
150mm wall load
EDITED
230mm wall load LIFT BRICK
230mm wall load (BRICK LOAD)
UNITS
AC UNIT
0.15 25 3.75 kN/Sqm PEDESTAL 1
0.115 10 1.15 kN/Sqm AC UNITS
2.3X1.3X0.15 0 0 0.00 kN/Sqm
4.90 kN/Sqm
4.90 kN/Sqm
THK.
0.15 3.75 19 10.69 kN/Sq.m
KG AREA
2000 1.84 10.66 kN/Sq.m
860 1.19 7.09 kN/Sq.m
940 1.71 5.39 kN/Sq.m
600 3 1.96 kN/Sq.m
2 2 kN/Sq.m LL
3 3 kN/Sq.m 3.00
3 3 kN/Sq.m #REF!
1.5 1.5 kN/Sq.m #REF!
15 15 kN/Sq.m
0.75 0.75 kN/Sq.m
(02/09/14) LL
0.23 3.52 20.00 16.19 kN/m 3.00
0.23 3.52 19.00 15.38 kN/m #REF!
0.2 3.52 20.00 14.08 kN/m #REF!
0.15 3.52 20.00 10.56 kN/m
0.115
25
0.115
10
1
5.025
INSTRUMENT
885
G.F. 0.8
4.1
F.F.
S.F.
0.53
3.43656
785
203.873598369
kN/Sqm
m
kN/m
kN/Sqm
m
kN/m
kN/Sqm
m
kN/m
3.52
3.52
1.57
1.12
kN/Sqm
8.682
2.647
Zone Factor + Zone III Z 0.16
Important I 1
Response R 5
Base shear Vb Ah.w
Ah ZI/(2*R) 0.016
Height of building 12.90 m
Base dimension +x 17.07 m
Base dimension +y 51.64 m
Ta (x+direction)(+0.09*h)/sqrt(d) 0.28
Ta (y+direction) 0.16
TAAMAESEK ENGINEERING CONSORTIUM
3 SUNKEN LOAD
SUNKEN
Sunken Filling 0.35
Total load
4 WALL LOAD
230 MM WALL THICKNESS 0.23
150 MM WALL THICKNESS 0.15
100 MM WALL THICKNESS 0.1
7 STAIRCASE LOAD
Waist slab load
Hand rail
Brick steps
Total dead load
Total normal load
Span
UDL on beam
8 SUMP - 1
Ka
SOIL PRESSURE 0.33
THK.
BRICK WALL 0.15
KG
FIRE PUMP PANEL 2000
MAIN FIRE PUMP ROOM 860
ENGINE PUMP SLAB 940
RO PLANT SLAB 600
Lift Pressure
Ka
Soil pressure arround lift pit 0.33
LIVE LOADS
load on all floor 2
load on lobby 3
load on toilet 3
load on terrace floor 1.5
lift load on lift slabs 15
load on stircase headroom slabs 0.75
6
PUNGATHUR WALL LOADS (02/09/14)
230mm wall load 0.23
230mm wall load (BRICK LOAD) 0.23
7 200mm wall load 0.2
150mm wall load 0.15
EDITED
230mm wall load LIFT BRICK 0.23
230mm wall load (BRICK LOAD) 0.23
WEATHERING COURSE
4 SLAB THICKNESS 0.115
UNIT WT OF CONCRETE 25
WEATHERING COURSE THICKNESS 0.115
UNIT WT OF WEATHERING COURSE 10
FLOOR FINISH 1
TOTAL LOAD
1 Beam no Y4Y5-X10
Geomentrical data
Beam span 4.45
Shorter span (Lx) 6.72
Longer span (Ly) 10.45
Wall Width 0.15
Wall height 2.975
Beam width 0.3
Beam Depth 0.45
Loading data
Slab Load 33.31
Wall Load 8.03
Self Weight of beam 3.38
Total load 44.72
2 Beam no Y5Y8-X10
Geomentrical data
Beam span 6.19
Shorter span (Lx) 6.72
Longer span (Ly) 10.45
Wall Width 0.15
Wall height 2.4
Beam width 0.23
Ass.Beam Depth 0.45
Loading data
Slab Load 43.41
Wall Load 6.48
Self Weight of beam 2.59
Total load 52.48
Point Loaded Beam 162.43
3 Beam no X9X10-Y3
Geomentrical data
Beam span 7.02
Shorter span (Lx) 6.72
Longer span (Ly) 10.45
Wall Width 0.15
Wall height 2.4
Beam width 0.3
Ass.Beam Depth 0.6
Loading data
Slab Load 25.76
Wall Load 6.48
Self Weight of beam 4.50
Total load 36.74
Point Loaded Beam 128.96
JOB NO DATE
27.02.15
DESIGNED CHECKED
DINESH.S
UNITS
UNITS
AC U
0.15 25 3.75 kN/Sqm PEDESTAL 1
0.115 10 1.15 kN/Sqm AC UNITS
0 0 0.00 kN/Sqm
4.90 kN/Sqm
4.90 kN/Sqm
UNIT WT.
10 3.50 kN/Sqm
3.50 kN/Sqm
2 18 8.28 kN/Sqm
1.75 18 7.25 kN/Sqm
1.51 18 6.25 kN/Sqm
AREA
1.84 10.66 kN/Sq.m
1.19 7.09 kN/Sq.m
1.71 5.39 kN/Sq.m
3 1.96 kN/Sq.m
2 kN/Sq.m LL
3 kN/Sq.m 3.00
3 kN/Sq.m #REF!
1.5 kN/Sq.m #REF!
15 kN/Sq.m
0.75 kN/Sq.m
2/09/14) LL
3.52 20.00 16.19 kN/m 3.00
3.52 19.00 15.38 kN/m #REF!
3.52 20.00 14.08 kN/m #REF!
3.52 20.00 10.56 kN/m
5.025
FLOOR HT 3.425
m
"
"
"
"
"
"
kN/m
"
"
"
m
"
"
"
"
"
"
kN/m
"
"
"
kn
m
"
"
"
"
"
"
kN/m
"
"
"
kn
PT LIVE LOAD 5 kN/Sqm
77.28
25.76
INSTRUMENT
885
G.F. 0.8
4.1
F.F.
S.F.
0.53
3.43656
785
203.873598369
kN/Sqm
m
kN/m
kN/Sqm
m
kN/m
kN/Sqm
m
kN/m
3.52
3.52
1.57
1.12
kN/Sqm
8.682
2.647
1 Beam no B.-01
Factored UDL Load on beam 44.72
Span Condition End
Span 5.82
Point Load Condition Mid
Factored point Load on beam 0.00
a or l(Cant. Span) 5.82
b 0.00
End Span
Bending moment 0.08
Bending Moment 126.02
End Support
0.40
MID-SPAN
Total B.M 66.0
Total.shear force 60.00
Size of Beam
b 300
d req 231
d req 223.65
D req 263.5
Dpro 450
d 415
d'/d 0.08
Materials Used
Grade of concrete M25
Grade of steel Fe500
K=Mu/bd^2 1.28
Pt
Percentage of steel 0.316
Ast 393.4
Minimum Ast 276.5
top
Dia(mm)
Reinforcement provided 16
Reinforcement required
Ast(BOTTOM)
Ast(TOP)
Ast ( provide )
Pt ( provide )
Asc ( provide )
Pc ( provide )
SHEAR DESIGN
SF
SHEARING STRESS
PT
Tc
Tv
Tc b d
No of Legs
Asv
Vus
Dia Assumed
Spacing Required
Maximum spacing .75d
Spacing Provided
Deflection check
Ast Require
Ast Provide
fs
pt-Provide
pc-Provide
(l/d)basic
kt
kc
kf
(l/d)max
(l/d)actual
2 Beam no PB-02
Factored UDL Load on beam 52.48
Span Condition Mid
Span 4.64
Point Load Condition Mid
Factored point Load on beam 0.00
a or l(Cant. Span) 4.64
b 0.00
End Span
Bending moment 0.08
Bending Moment 93.96
End Support
0.40
MID-SPAN
Total B.M 170.0
Total.shear force 100.00
Size of Beam
b 300
d req 370
d req 178.27
D req 405.0
Dpro 600
d 565
d'/d 0.06
Materials Used
Grade of concrete M25
Grade of steel Fe500
K=Mu/bd^2 1.78
Pt
Percentage of steel 0.448
Ast 759.4
Minimum Ast 368.7
top
Dia(mm)
Reinforcement provided 20
Reinforcement required
Ast(BOTTOM)
Ast(TOP)
Ast ( provide )
Pt ( provide )
Asc ( provide )
Pc ( provide )
SHEAR DESIGN
SF
SHEARING STRESS
PT
Tc
Tv
Tc b d
No of Legs
Asv
Vus
Dia Assumed
Spacing Required
Maximum spacing .75d
Spacing Provided
Deflection check
Ast Require
Ast Provide
fs
pt-Provide
pc-Provide
(l/d)basic
kt
kc
kf
(l/d)max
(l/d)actual
3 Beam no GB-03
Factored UDL Load on beam 25.76
Span Condition Mid
Span 5.82
Point Load Condition Mid
Factored point Load on beam 0.00
a or l(Cant. Span) 5.82
b 0.00
End Span
Bending moment 0.08
Bending Moment 72.59
End Support
0.40
MID-SPAN
Total B.M 245.0
Total.shear force 145.00
Size of Beam
b 300
d req 444
d req 223.65
D req 479.1
Dpro 800
d 765
d'/d 0.05
Materials Used
Grade of concrete M25
Grade of steel Fe500
K=Mu/bd^2 1.40
Pt
Percentage of steel 0.202
Ast 463.6
Minimum Ast 491.6
top
Dia(mm)
Reinforcement provided 20
Reinforcement required
Ast(BOTTOM)
Ast(TOP)
Ast ( provide )
Pt ( provide )
Asc ( provide )
Pc ( provide )
SHEAR DESIGN
SF
SHEARING STRESS
PT
Tc
Tv
Tc b d
No of Legs
Asv
Vus
Dia Assumed
Spacing Required
Maximum spacing .75d
Spacing Provided
Deflection check
Ast Require
Ast Provide
fs
pt-Provide
pc-Provide
(l/d)basic
kt
kc
kf
(l/d)max
(l/d)actual
4 Beam no GB-04
Factored UDL Load on beam 25.76
Span Condition Mid
Span 4.04
Point Load Condition Mid
Factored point Load on beam 0.00
a or l(Cant. Span) 4.04
b 0.00
Bending Moment ,Shear force Coefficents
IS 456-2000 Table 12- p 36 Span Moment-Mid
End Span
Bending moment 0.08
Bending Moment 35.04
End Support
0.40
MID-SPAN
Total B.M 30.0
Total.shear force 30.00
Size of Beam
b 230
d req 177
d req 155.38
D req 212.5
Dpro 450
d 415
d'/d 0.08
Materials Used
Grade of concrete M25
Grade of steel Fe500
K=Mu/bd^2 0.76
Pt
Percentage of steel 0.182
Ast 173.7
Minimum Ast 212.0
top
Dia(mm)
Reinforcement provided 20
Reinforcement required
Ast(BOTTOM)
Ast(TOP)
Ast ( provide )
Pt ( provide )
Asc ( provide )
Pc ( provide )
SHEAR DESIGN
SF
SHEARING STRESS
PT
Tc
Tv
Tc b d
No of Legs
Asv
Vus
Dia Assumed
Spacing Required
Maximum spacing .75d
Spacing Provided
Deflection check
Ast Require
Ast Provide
fs
pt-Provide
pc-Provide
(l/d)basic
kt
kc
kf
(l/d)max
(l/d)actual
5 Beam no GB-05
Factored UDL Load on beam 25.76
Span Condition Mid
Span 4.04
Point Load Condition Mid
Factored point Load on beam 0.00
a or l(Cant. Span) 4.04
b 0.00
End Support
0.40
MID-SPAN
Total B.M 50.0
Total.shear force 40.00
Size of Beam
b 300
d req 201
d req 155.38
D req 235.6
Dpro 800
d 765
d'/d 0.05
Materials Used
Grade of concrete M25
Grade of steel Fe500
K=Mu/bd^2 0.28
Pt
Percentage of steel 0.202
Ast 463.6
Minimum Ast 491.6
top
Dia(mm)
Reinforcement provided 20
Reinforcement required
Ast(BOTTOM)
Ast(TOP)
Ast ( provide )
Pt ( provide )
Asc ( provide )
Pc ( provide )
SHEAR DESIGN
SF
SHEARING STRESS
PT
Tc
Tv
Tc b d
No of Legs
Asv
Vus
Dia Assumed
Spacing Required
Maximum spacing .75d
Spacing Provided
Deflection check
Ast Require
Ast Provide
fs
pt-Provide
pc-Provide
(l/d)basic
kt
kc
kf
(l/d)max
(l/d)actual
PERFECT FACTORY
B.-01
kN/m
(Mid or End)
m
(Mid or Cant)
kN
M
M
156.03 130.03
Support
151.22
104.02
kNm
kN
MID-SPAN
Total B.M
kN Total.shear force
MM
MM
MM
30
500
Singly reinforced beam
Pc
0
0
top bottom
Nos Dia(mm) Nos
3 16 2
1.96 0.75
= 602.88 Sqmm
= 150.72 Sqmm
= 602.88 Sqmm
= 0.484
= 401.92 Sqmm
= 0.323
= 175.00 kN
= 1.41 N/Sq.mm
= 0.97 %
= 0.651 N/Sq.mm
= 1.41 N/Sq.mm
= 81.07 kN
= 2.00
= 100.480 Sq.mm
= 93928.72 N
8 mm
193.12 mm
= 311.25 mm
180 mm
= 1030.9 Sqmm
= 1205.76 Sqmm
= 247.93
= 0.968
= 0.323
= 26
= 0.92
= 1.23
= 1
= 29.4216
= 14.01
Deflection safe
PB-02
kN/m
(Mid or End)
m
(Mid or Cant)
kN 0.00
M 0
M 0.00
145.95 121.63
Support
93.96
145.95
kNm
kN 0.00
MID-SPAN
Total B.M
kN Total.shear force
MM
MM
MM 813
200.96
803.84
30
500
Singly reinforced beam
Pc
0 490.625
0 1471.875
top bottom
Nos Dia(mm) Nos
3 16 2
2.42 1.17
= 942 Sqmm
= 235.5 Sqmm
= 942 Sqmm
= 0.556
= 401.92 Sqmm
= 0.237
= 305.00 kN
= 1.80 N/Sq.mm
= 1.11 %
= 0.682 N/Sq.mm
= 1.80 N/Sq.mm
= 115.65 kN
= 2.00
= 100.480 Sq.mm
= 189350.00 N
8 mm
130.42 mm
= 423.75 mm
130 mm
= 1203.5 Sqmm
= 1884 Sqmm
= 185.24
= 1.112
= 0.237
= 26
= 1.18
= 1.26
= 1
= 38.6568
= 8.20
Deflection safe
GB-03
kN/m
(Mid or End)
m
(Mid or Cant)
kN 0.00
M 0
M 0.00
89.88 74.90
Support
72.59
89.88
kNm
kN 0.00
MID-SPAN
Total B.M
kN Total.shear force
MM
MM
MM 813
200.96
803.84
30
500
Singly reinforced beam
Pc
0 490.625
0 1471.875
top bottom
Nos Dia(mm) Nos
3 20 2
0.44 0.75
= 942 Sqmm
= 235.5 Sqmm
= 942 Sqmm
= 0.410
= 628 Sqmm
= 0.274
= 370.00 kN
= 1.61 N/Sq.mm
= 0.68 %
= 0.566 N/Sq.mm
= 1.61 N/Sq.mm
= 129.96 kN
= 2.00
= 100.480 Sq.mm
= 240040.00 N
8 mm
139.30 mm
= 573.75 mm
130 mm
= 608.2 Sqmm
= 1570 Sqmm
= 112.34
= 0.684
= 0.274
= 26
= 0.95
= 1.25
= 1
= 30.875
= 7.60
Deflection safe
GB-04
kN/m
(Mid or End)
m
(Mid or Cant)
kN 0.00
M 0
M 0.00
pan Moment-Mid Support Moment
62.44 52.04
Support
35.04
62.44
kNm
kN 0.00
MID-SPAN
Total B.M
kN Total.shear force
MM
MM
MM 813
200.96
803.84
30
500
Singly reinforced beam
Pc
0 490.625
0 1471.875
top bottom
Nos Dia(mm) Nos
3 16 1
0.19 0.75
= 602.88 Sqmm
= 150.72 Sqmm
= 602.88 Sqmm
= 0.632
= 602.88 Sqmm
= 0.632
= 95.00 kN
= 1.00 N/Sq.mm
= 0.63 %
= 0.557 N/Sq.mm
= 1.00 N/Sq.mm
= 53.15 kN
= 2.00
= 100.480 Sq.mm
= 41848.36 N
8 mm
433.45 mm
= 311.25 mm
200 mm
= 267.3 Sqmm
= 602.88 Sqmm
= 128.56
= 0.632
= 0.632
= 26
= 2
= 1.35
= 1
= 70.2
= 9.73
Deflection safe
GB-05
kN/m
(Mid or End)
m
(Mid or Cant)
kN 0.00
M 0
M 0.00
62.44 52.04
Support
35.04
62.44
kNm
kN 0.00
MID-SPAN
Total B.M
kN Total.shear force
MM
MM
MM 813
200.96
803.84
30
500
Singly reinforced beam
Pc
0 490.625
0 1471.875
top bottom
Nos Dia(mm) Nos
3 20 2
0.44 0.75
= 942 Sqmm
= 235.5 Sqmm
= 942 Sqmm
= 0.410
= 628 Sqmm
= 0.274
= 88.00 kN
= 0.38 N/Sq.mm
= 0.68 %
= 0.566 N/Sq.mm
= 0.38 N/Sq.mm
= 129.96 kN
= 2.00
= 100.480 Sq.mm
= -41960.00 N
8 mm
-796.88 mm
= 573.75 mm
130 mm
= 608.2 Sqmm
= 1570 Sqmm
= 112.34
= 0.684
= 0.274
= 26
= 2
= 1.175
= 1
= 61.1
= 5.28
Deflection safe
T FACTORY
SUPPORT
160.0
175.00 kN
300 MM
359
223.6538461538
391.9 2173
450 MM 1774
415 MM 399
0.08
M25 30
Fe500 500
3.10 Singly reinforced beam
Pt Pc
0.828 0.0000
1030.9 0.00
229.5
Bottom Top
Dia(mm) Nos Dia(mm) Nos
16 6 16 2
5.13 1.50
1205.76 Sqmm
301.44 Sqmm
1205.76 Sqmm
0.968
401.92 Sqmm
0.323
INTERPOLATION
Min value 0.75 0.59
Max value 1.00 0.66
-0.28
Required Value 0.968 0.6512
Design shear
SUPPORT
260.0
305.00 kN
300 MM
458
178.2692307692
492.5 2173
600 MM 1774
565 MM 399
0.06
M25 30
Fe500 500
2.71 Singly reinforced beam
Pt Pc
0.710 0.0000
1203.5 0.00
306.0
Bottom Top
Dia(mm) Nos Dia(mm) Nos
20 6 16 2
3.83 2.34
1884 Sqmm
471 Sqmm
1884 Sqmm
1.112
401.92 Sqmm
0.237
INTERPOLATION
Min value 1.00 0.66
Max value 1.25 0.71
-0.2
Required Value 1.112 0.6823
Design shear
SUPPORT
302.0
370.00 kN
12
300 MM 16
493 20
223.6538461538 25
528.1 2173
800 MM 1774
765 MM 399
0.05
M25 30
Fe500 500
1.72 Singly reinforced beam
Pt Pc
0.265 0.0000
608.2 0.00
408.0
Bottom Top
Dia(mm) Nos Dia(mm) Nos
20 5 20 2
0.01 1.07
1343.92 Sqmm
335.98 Sqmm
1570 Sqmm
0.684
628 Sqmm
0.274
INTERPOLATION
Min value 0.50 0.5
Max value 0.75 0.59
-0.36
Required Value 0.684 0.5663
Design shear
SUPPORT
46.0
95.00 kN
12
230 MM 16
220 20
155.3846153846 25
254.8 2173
450 MM 1774
415 MM 399
0.08
M25 30
Fe500 500
1.16 Singly reinforced beam
Pt Pc
0.280 0.0000
267.3 0.00
176.0
Bottom Top
Dia(mm) Nos Dia(mm) Nos
20 5 16 1
0.00 0.75
602.88 Sqmm
150.72 Sqmm
602.88 Sqmm
0.632
200.96 Sqmm
0.211
INTERPOLATION
Min value 0.75 0.59
Max value 1.00 0.66
-0.28
Required Value 0.632 0.5569
Design shear
SUPPORT
113.0
88.00 kN
12
300 MM 16
302 20
155.3846153846 25
336.6 2173
800 MM 1774
765 MM 399
0.05
M25 30
Fe500 500
0.64 Singly reinforced beam
Pt Pc
0.265 0.0000
608.2 0.00
408.0
Bottom Top
Dia(mm) Nos Dia(mm) Nos
20 5 20 2
0.01 1.07
1343.92 Sqmm
335.98 Sqmm
1570 Sqmm
0.684
628 Sqmm
0.274
INTERPOLATION
Min value 0.50 0.5
Max value 0.75 0.59
-0.36
Required Value 0.684 0.5663
MID-SPAN SUPPORT
113.097336 0 0 12 113.097336 0 0
201.06193 0 0 16 201.06193 2 402.1238597
314.159265 3 942.4777961 20 314.159265 3 942.4777961
490.873852 0 0 25 490.873852 0 0
491.6 608.2
-478.9 -736.4
MID-SPAN SUPPORT
113.097336 0 0 12 113.097336 0 0
201.06193 3 603.1857895 16 201.06193 3 603.1857895
314.159265 0 0 20 314.159265 0 0
490.873852 0 0 25 490.873852 0 0
212.0 267.3
-429.5 -335.9
MID-SPAN SUPPORT
113.097336 0 0 12 113.097336 0 0
201.06193 0 0 16 201.06193 2 402.1238597
314.159265 3 942.4777961 20 314.159265 3 942.4777961
490.873852 0 0 25 490.873852 0 0
491.6 608.2
-478.9 -736.4