Page No :1
M.S.P.G.C.L., CHANDRAPUR Doc. No : OPN-5/SM
ISS/REV. NO.: 01/00
Operation Section Manual PCR ISS/REV.DT:01.02.2017/00
#5
#5
2.
Index
3.
Release Authorization
4.
Amendment Sheet
5.
Purpose
6.
IMS Objectives
7.
List of Reports to be submitted
8.
List of activities carried out by the section
9.
Work Instructions/Standard Operating Procedures
10.
Checklists
11.
Safety Instructions
12.
Significant Aspect & Controls Measures
13.
Significant Hazards & Control Measures
14.
Contextual Issues- Risk: Control Measures/Opportunities
15.
Improvement Projects Carried out, in progress and Planned
16.
List of log books at various location in unit-5
17.
List of manuals
18.
List of Files / Registers
#5
#5
3. RELEASE AUTHORISATION
This Sectional Manual is released under the authority of the Sectional Incharge,
Operation, CSTPS, Chandrapur and is a property of CSTPS, Chandrapur.
Signature :
Name :
Designation :
#5
4. Revision /Amendments Record
Amended
Revision Number Reason for Change Approved by
Amendment Section Page by
No. No. No.
Old No. Date New No. Date
#5
5. Purpose
Purpose :
To generate electicity under controlled conditions as per requirement of LD & MERC
Guidelines.
#5
Defects of auxiliaries/ plant are raised by Shift Charge Engineer/ PCR Incharge/
Plant Incharge through computer to respective section. The defects are classified as
Urgent, Emergency, Short shut down, Overhaul, depending upon severity & isolation
of the equipment. The Maintenance staff takes permit from PCR and does the work.
After cancellation of permit & trial of equipment defect is eliminated from the computer
list.
All Operation staff attendance is marked by time Office. If somebody applies leave
timekeeper gives note to a person who is in spare shift. Leave Account, night shift
Account, OT register, attendance registers are maintained by time keeper.
Various training programs are arranged by the Chandrapur Training Center.
Training department maintains register in which names of candidates, which type of
training given is noted. Accordingly S.E. (O) sends names of employees to training
department as per the availability of staff.
OPERATION :
a) SHIFT INCHARGE: - Shift In charge is assisted by P.C.R. In charge
and Assistant Plant In charge and desk operators. All the operations in
P.C.R. and Plant are carried out as directed and sometimes under
intimation to shift in charge
#5
.
TURBINE API coordinates with local & PCR staff. Raises defect cards for the
observed or reported auxillaries and system.He also supervises the turbine &
generator with their auxillaries by taking rounds, informs abnormality to PCR incharge
for corrective action. One technician is also under control of TAPI to monitor TDBFP &
Turbine parameters
BOILER API coordinates with local& PCR staff. Raises defect cards for the observed
#5
or reported auxillaries and system.He also supervises the boiler & its auxillaries by
taking rounds, informs abnormality to PCR incharge for corrective action. All boiler side
staff is uder the control of BOILER API.
#5
along with their lubrication system, Coal mill Reject.
d) Junior Engineer is assisted by technician in every shift who supervises Coal
mills, Primary Air Fans. This system supplies coal air mixture to boiler for
combustion.
e) To monitor Force Draft. Fan which supplies air for combustion.
f) Induced Draft. Fan which evacuates flue Gases and maintains
draft in furnace.
g) To monitor coal mill reject system
h) CMR conveyor belts carries coal mill reject to SILO
4) ESP,AHP & OHP
#5
g) Technician 1 or 2 for Boiler Feed Pump, primary water,,MOT
h) Technician 1 or 2 for Seal Oil, vacuum pump, HPCF for governing
system, condenser, CEP ,TD/MD BFP lub oil system ,ACW
booster pump
i) Technician 1 or 2 for Compressor House
j) Contractor labour for helping staff
k) monitoring of governing system of main turbine, TDBFP and its governing system
l) Technician 1or 2 for main turbine .TDBFP and PRDS system.
Time Office
a) Maintains Attendance of all operation staff.
b) Maintains Leave records.
c) Sends Attendance statement to Administrative office.
d) Keeps Records of Overtime.
e) Sending notes for staff arrangement against leaves and for overtime.
Section is headed by timekeeper and one messenger in every shift.
Ambulance is available for 24 hrs at time office for any casualties during any
shift to move the patient to hospital in the colony.
#5
#5
All processes are carried out in compliance with following process charts.
#5
Input Process Output
Resourses Controls
Resourses Controls
#5
PROCESS OUTPUT
INPUT
combustion of Generation of
Grid
fuel /air heat
requirement
mixture
Resourses Controls
Controls
Resourses
Work instruction:
WATER
OSTIII/1301,1302,1303,1332,13
34,1347,1348,1349,1350,1352,
LDO/HFO
COAL 1353
MANPOWER
DAS
AUX.STEAM
AIR
Aux. power
#5
Process Output
Input
Ash evacuation Generation
Grid of ash slurry
requireme
nt
Resourses Controls
Resourses Controls
#5
Resourses Controls
Resourses Controls
Prepared By
Maintenanc Unit shutdown No Reviewed & Approved by
IG Group Member
e/statutory/ Section In Charge (OPN)
generation
grid of electicity
requiremen
CHANDRAPUR SUPER THERMALPOWER STATION
Page No : 18
M.S.P.G.C.L., CHANDRAPUR Doc. No : OPN-5/SM
ISS/REV. NO.: 01/00
Operation Section Manual PCR ISS/REV.DT:01.02.2017/00
#5
Resourses Controls
Resourses Controls
#5
Resourses Controls
Resourses Controls
#5
6.IMS Objectives
#5
Daily
User222/POG/
ORTData File/ ORT_month/Input
Monthly
1 ORT DATA POG Aux. trial format
( In first week)
register (T/G Desk / PCR
I/C)
Daily plant
Daily DPPR File
2 performance POG PCR I/C
(In night shift) (FF6341)
report
Hourly
Generation &
T/G Desk /
loss Report & Daily DPPR File
3 POG Blr.Desk
Non (In night shift) (FF 6342)
Engineer
availability of
Coal mills
Parameters to
be Monitored Daily Boiler desk
4 POG DPPR File
at Corporate (In night shift) Engineer
Level
Generating
DATA / Partial
DATA ENTRY Daily
5 loss , Tripping SAP DPPR T/G Desk Engineer
IN SAP (In every shift )
details & C/M
outage details
DATA ENTRY
Morning Daily
6 IN SAP SAP DPPR PCR I/C
Report (In Night shift )
A)
#5
Reference Documented Monitoring & Remarks
Information Review (If any)
SN Activities Frequency (SOP/WI/Record-Files ,
Registers, Log books,
Checklist, SAP)
Running of boiler Performance
side aux Review in
1 Daily BHELs Operation Manual Daily Meeting,
In OCM, ORT
meeting
Running of turbine Daily BHELs Operation Manual Performance
Review in
side aux
Daily Meeting,
2
In OCM, ORT
meeting
9)AUXILLARY TRIALS
#5
#5
15 L.O.P OF G/BEARING OF SAH -B 184
12 C.E.P 264
14 MDBFP-C 270
15 MDBFP-D 274
#5
#5
10 OST-III/1310 STARTING OF AIR PRE-HEATER
#5
40 OST-III/1340 PLACING TURBINE ON BARRING GEAR
#5
Check List For Hydrogen Leakages In
1 Generator OPN Check List
#5
S.N Activity Status Desired Action By
. /Executed By
17 Water level in seal trough & bottom Overflow P.I. / Local I/c
ash hopper
18 Manual Auxiliary air dampers all 4 Open > 50% P.I. / Local I/c
corners
1. Use safety equipment/instrument like Safety shoes, Helmet, Goggles, Hand gloves,
Ear Plugs, Nose Mask.
2. Work under skilled labour/trainee.
3. Ensure to follow Permit system.
4. Ensure the work is carried out by Authorized Personnel , wherever applicable.
#5
5. Use safety belt/ body Harness while working on pipes & ducts & where there is no
platform.
6. Use welding mask/goggle during the welding work.
7. Use asbestos hand gloves while working on hot equipment or near steam.
8. Use rubber hand gloves & proper insulated tester like pliers, screw driver etc. while
working on electrical circuits.
9. Use proper approach, suitable platform for attending the problems.
10. Use Headlamps where there is less lighted area and narrow passage.
11. Handle tools & tackles properly (tie them to thread and carry along ones neck).
12. After completion of work, collect all the waste material like, cotton waste, cloth & paper
as well as fastener.
#5
13.Significant Hazards & Control Measures
Ensure Healthiness of
person( Give reference of
any SOP/procedure if
applicable)
Ensure Healthiness of
person( Give reference of any
SOP/procedure if applicable)
Regular safety/Electrical
Inspections
#5
14. Contextual Issues- Risk: Control Measures/Opportunities
Control Measures:
SN Category Risk/Concerns
Action Initiated/to be carried out
Resources:
Miscommunication, errors
4 Incompetent/Inade Adequate Training
in work, repetition of work
quate Manpower
Resources:
Scarcity or not as Hamper the work result in Control over externally provides
5 per specification of delayed and inaccurate services through Supervision and
Material/Instrument work Documented Obligations
s/Consumables
#5
15. Improvement Projects Carried out, in progress and Planned
#5
19
20 CEP log book FF6314/6464 Turbine basement I/C
21 MDBFP 6C & 6D log book FF6320 Turbine basement I/C
22 Station transformer & UAT log book FF6319 Turbine basement I/C
23 CXW log book FF6315 Turbine basement I/C
24 Seal oil rack log book FF6468/6318 Turbine basement I/C
25 GTR RYB Phase/ dry type FF6321/6471 Turbine basement I/C
transformer log book
26 Seal oil system log book FF6323/6473 Turbine basement I/C
27 Vacuum pump A & B log book ------- Turbine basement I/C
28 Air compressor log book FF6317 Compressor room I/C
29 DG Parameter register ----- Compressor room I/C
30 Air compressor permit entry book ------ Compressor room I/C
31 Boiler basement I/C log book FF6311/6461 Boiler basement I/C
32 Bottom ash evacuation log book ----- Boiler basement I/C
33 FD Fan log book FF6333
Boiler basement I/C
34 PA Fan log book FF6482 Boiler basement I/C
35 Coal Mill log book FF6336 Boiler basement I/C
36 ESP I/C Log book FF6312/6462 ESP I/C
37 ESP Field log book FF6338 ESP I/C
38 ID Fan log book FF6334 ESP I/C
39 Fly ash hopper/ ESP AC compressor ------- ESP I/C
40 Firing floor I/C log book FF6331/6481 Firing floor I/C
41 F/Floor General activity register ----- Firing floor I/C
42 Air heater register ------ Firing floor I/C
43 AHP series log book FF6337/6487 AHP I/C
44 ACW / CCW log book FF6327 CCW I/C
45 Transformer reading log book (ACW / FF6330 CCW I/C
CCW)
46 CT fan log book FF6325 CCW I/C
47 CCW General activity register ------ CCW I/C
#5
10 Minor incidence & near miss report F-05 SHIFT I/C CABIN
#5
file
#5
performance evaluation report