Sie sind auf Seite 1von 63

SAP Archiving Training

Manual
Ganesan Chidambaram

Company Confidential. 2010 Nokia. 1


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 2


SAP Data Archiving Overview

SAP Data Archiving helps in removing the data which is no more needed from the database
and made available on a later date for any audit and reporting requirements.

SAPs Archive Development Kit (ADK) provides pre-existing programs to remove transactional
and master data from the R/3 system.

ADK retrieval programs and/or third party Document Imaging tools provide the means to display
archived data necessary to fulfill legal and business retention requirements.

Company Confidential. 2010 Nokia 3


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 4


Advantages of Archiving

Improved system performance and response time


Faster backup and recovery time
Reduces time for client copies and refreshes.
Reduced Maintenance and administration cost
Reduced Hardware Costs by Reducing Growth

Company Confidential. 2010 Nokia 5


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 6


Archiving Development Kit
The SAP Data Archiving concept is based on the Archive Development Kit (ADK). ADK, a
service of my SAP Technology, is the software layer that encapsulates the technical aspects of
data archiving programs. ADK provides an application programming interface, that customers
and partners can use to develop their own archiving solutions.

The ADK provides the technical basis for the SAP standard archiving transaction (SARA). If
Archive management is called directly from the application component, application specific
settings (suchas programs and archiving objects) are activated automatically.

The SAP features include:

High level of data protection


No system downtime during archiving
Independence of hardware and archiving software (Supports all third party vendors)
Read access to archived data
Interface to external storage systems

Note: Restore of archived data back to database is not recommended.

Company Confidential. 2010 Nokia 7


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 8


Data archiving

Data archiving involves the physical removal of data from the SAP systems Database tables.
This type of archiving allows information to be moved to a non production environment and
stored on a separate storage device . However, for business and legal reasons, it is likely that
the most of the extracted data must remain accessible.

Company Confidential. 2010 Nokia 9


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 10


Data archiving process

The data archiving process in the SAP system can be divided into the following steps:

Data is written to the archive

The data to be archived is read from the database and written sequentially to newly created archive files.

Data is deleted from the database

The delete program deletes the data from the database after it has been completely written to the archive files. To ensure the integrity of the archived data, the delete session is not started
until the created archive files have been read and confirmed.

Archive files are stored

The archive files that were created during the write phase can be moved to storage systems or to tertiary storage media. Another option would be to start the storage phase before the deletion
phase.

Company Confidential. 2010 Nokia 11


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 12


Transaction and Master data
Master Data:

Master data is data that remains unchanged over a period of time. It contains information that is always needed in the same way. For example Customer master, Vendor Master etc.

Transaction data:

Data relating to the day-to-day transactions. For example Purchase order, Sale order, Billing Document, Material Document etc.

Company Confidential. 2010 Nokia 13


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 14


Analysis
A clear data management approach will help in maintaining a stable system with less performance issues.

Data Prevention

Technically it is possible to deactivate updating for certain types of data. If, from a business point of
view, the data is not required, the updating of the data should be deactivated.

Data Aggregation
In some cases data can be aggregated at a higher level, for e.g. by generating totals. Aggregation should
be implemented, if it provides sufficient level of information that is required for the business process

Data Deletion / House keeping


Many data could be deleted soon after it is created in the system, for e.g. spool data

Data Archiving
Data Archiving should be performed for data which is not required for the live operation of the system.

Company Confidential. 2010 Nokia 15


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 16


Depandancies
Due to the relational nature of the R/3 database, data that is archived and deleted from one area of the system can affect data in other areas. If, for example, Sales Orders are deleted before billing
documents relating to those Sales Orders, data in the database would become corrupted, as the billing documents refer to sales that no longer existed.

SD_VTTK

RV_LIKP

SD_VBRK

SD_VBAK

Company Confidential. 2010 Nokia 17


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 18


Archiving object
Archiving objects are the essential ingredients for archiving SAP data. An archiving object can be defined as a logical unit, which is obtained from SAP data objects. When data objects are combined on the basis
of requirements, a business object is formed, which then can be archived.

Archiving objects instruct the SAP archiving system to get the right tables when archiving specific R/3 business objects. They are defined using transaction AOBJ.

The archiving objects are defined for different modules of a SAP system. For example, financial accounting documents are archived via the archiving object FI_DOCUMNT, which comprises the document
header, company-code-dependent postings, change documents, SAPscript texts and other elements.

Company Confidential. 2010 Nokia 19


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 20


Structure of Archiving object

Company Confidential. 2010 Nokia 21


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 22


Archiving procedure
In T Code SARA select the WRITE Option

In the Variant screen enter the required fields as per your Archiving object & Save it. Below is the example for MM_EBAN.

Company Confidential. 2010 Nokia 23


Archiving procedure

In the variant creation screen, select the Start Date option. Enter the date & time as per your requirement & Continue.

Company Confidential. 2010 Nokia 24


Archiving procedure

Next select the Spool Parameter option. Enter the required fields & Continue.

Company Confidential. 2010 Nokia 25


Archiving procedure

Then Execute the job for your Variants

Company Confidential. 2010 Nokia 26


Archiving procedure

Checking Spool DATA


In the screen menu you will find the job option click on that.

There you will find your job which you have scheduled, select it & Go to Job Logs option.

Company Confidential. 2010 Nokia 27


Archiving procedure

To get more details about you job go back of the screen & select the Spool option.

Click on abap list to get detailed information

Company Confidential. 2010 Nokia 28


Archiving procedure
Graphical display of spool list

Next step is to proceed with deletion run from SARA by clicking the delete button and selecting the archive file and executing the same by maintaining the schedule
parameters and spool parameters

Company Confidential. 2010 Nokia 29


Archiving procedure

From SARA Transaction click on the Delete button

Click on archive selection and you will get a pop up for the selection of file and click the file
check box which needs to be deleted.
Maintain the start date and spool parameteres and then click on execute

Company Confidential. 2010 Nokia 30


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 31


Archiving objects in Scope
The following are the archiving objects in scope
P10:

Idoc archiving is automated and workitem deleted.


P60(GTS):
Archiving Object BusinessArea Object type

SPL_AT Audit logs
BUS2012-Purchase order
BUS2013-Purchase scheduling agreement
BUS2014-Purchase Contract
LIKP-Delivery
BUS2032-Saleorder
CUHD MM BUS2096-Debit Memo

Company Confidential. 2010 Nokia 32


Archiving objects in Scope
PT4(Travel System):
Archiving object Archived

IDOC Message type ACC_EMPLOYEE_EXP & ACC_EMPLOYEE_PAY less than 93 days are archived
WORKITEM work item less than 14 days are archived
US_PASS User data changes less than 731 days are archived
US_AUTH User master change documents less than 731 days archived
US_PROF User master profile changes less than 731 days are archived
US_USER user authorisation changes less than 731 days are archived
CHANGEDOCU PFCG object data less than 731 days are archived
PA_TRAVEL Trip related travel data less than 15 months are archived
YHR_TRVSTA Travel workflow status table data less than 15 months archived

IDOC some message types are deleted


COGRP1,COGRP6,COSMAS,PRCMAS,YINTORDOUT2,YPROJOUT2,EXCHANGE_RATE,YRPRCCC,HRMD_A,USERCLONE

PB2:
IDOC less than 14 days are deleted from the system and not archived.

PSM:
Idoc less than 93 days for message type USERCLONE are deleted in client 005,006 and 007.

Company Confidential. 2010 Nokia 33


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 34


Automated Runs P10 & PB2
Some of the archiving runs are automated and are monitored on daily basis for the completion status and the runs are listed below according to each system.
P10:

PB2:

Company Confidential. 2010 Nokia 35


Automated Runs PT4

Company Confidential. 2010 Nokia 36


Automated Runs PSM

In PSM system client 005,006 and 007 the idoc deletion runs are automated so that all idoc less than 93 days with message types USERCLONE is deleted
automatically

Client Job Name Data Frequency Job Start time

5 BC_ARC_IDOC_005_LESSTHAN_93 DAYS IDOC deletion Weekly Sunday @ 22:00 PM

6 BC_ARC_IDOC_006_LESSTHAN_93 DAYS IDOC deletion Weekly Sunday @ 22:00 PM

7 BC_ARC_IDOC_007_LESSTHAN_93 DAYS IDOC deletion Weekly Sunday @ 22:00 PM

Company Confidential. 2010 Nokia 37


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 38


Templates to be accessed and
Updated
Nokia IT has custom templates which needs to be checked and updated before and after any archiving activities.For instance we may have some company codes to be on hold and same are
updated in ftp under the folder frequently updates filesArchiving on hold list and a check on meeting memo is also advisable so that we dont archive any data which should be in
database.
\R3_Archiving\Archiving\Documentation\Frequently updated files\Archiving hold on list.xls
Also the archiving status needs to be updated in the custom template ARCH_STAT Updated by last onsite person under Frequently updated files.
\R3_Archiving\Archiving\Documentation\Frequently updated files
For FISDMM we also need to track the Archiving % and same need to be updated in the link mentioned below under the file P10 ARCH % FI_ SD_MM.
\R3_Archiving\Archiving\Documentation\Frequently updated files
For archiving periodicty and any changes in archiving related object frequency or retention to be refered and updated in the link mentioned below.
\R3_Archiving\Archiving\Documentation\Retention timesupdated.xlsx
Content repository list needs to be refered and updated if any new content repository created in the link mentioned below. The same can be used for after refresh related activity to send the
certificates.
\R3_Archiving\Archiving\Documentation\Frequently updated files\CONTENT REPOSITORIES.xls

Company Confidential. 2010 Nokia 39


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 40


Other Instructions
For detailed information for some other usefull instructions as listed below refer the attached power point.

Background Job Creation.


Change Content Repository.
Delete scheduler.
Data activation. INSTRUCTIONS
Data deactivation.
Delete all using background user.
FI secondary Index Deletion
File storing to archiving system

Company Confidential. 2010 Nokia 41


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 42


Table analysis (TAANA)

Table analysis helps to analyze how entries for a table have been distributed to selected fields. Table analysis counts the table entries and assigns the number of entries found to the selected
field values (such as organizational units or periods).

TAANA provides generic analysis functionality for all transparent tables of your database (at least it is counting entries on client level). Own variants are also freely configurable (but
must be transported). This makes it to a very powerful tool.

For more information on how to create virtual field and analysis varaint please refer the document attached below.

TAANA

Company Confidential. 2010 Nokia 43


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 44


Period end closing & Global
Maintanence window
Period end closing:
Every month during period end freeze ,there should not be any archiving runs in the P10 system.
The automated runs (IDOC & WORKITEM) should be rescheduled to start after the period end freeze in both P10 & PT4 system.
Exception -The ARFCRSTATE ,change pointer deletion, RL_TA,RL_TB,RL_LUBU runs can go on during the period end freeze in P10.
As there are no archiving run during freeze time we have made catchup runs to start after the freeze period which will help in cleaning the data for that period freeze gap .
Once the catch up runs gets completed, the normal automated runs should be executed as normal agreed frequency.
The IDOC runs which goes in PB2 system can go on
Long Maintanence window:
During long maintanence break (24 hours)ensure to reschedule the IDOC & Workitem run to start after maintanence break.
Short Maintanence window:
During short maintanence break (4 hours)there is no need to reschedule the IDOC & Workitem.

Company Confidential. 2010 Nokia 45


Period end Freeze & Long Maintanence
Break

Company Confidential. 2010 Nokia 46


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 47


System Refresh Activities
New document to be attached soon.This slide will be updated once finalised with new process.

Company Confidential. 2010 Nokia 48


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 49


Print List Archiving
Print list archiving functionality is used to archive statutory reports in electronic format to the print list archive. Statutory reports required by local authorities are stored to the print list
archive according to legal archiving storing requirements.
Normally Business teams are involved in archiving the reports and IT archiving team monitors them and take corrective actions if any problem and also involved in archiving some reports
specific to Data retention tool (DaRT).

With the print list archiving, you can:


Archive SAP R/3 report in electronic format as a print list
Retrieve archived report from print list archive in electronic format, print report from print list archive on paper format and save report from print list archive to local hard drive.
For detailed information please refer the document attached below.

Printlist archiving
user guide

Company Confidential. 2010 Nokia 50


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 51


ITSM & SoX control Points

ITSM is a set of process that details best practices to enable and optimize IT services in order to satisfy business requirements and manage the IT infrastructure both tactically and
strategically.

ITSM ticket queue for our team need to monitored periodically and take corrective action and update the validation points and status of the tickets and take it to closure.

There are some SoX validation points and approvals to be obtained depending on the type of an ITSM ticket.

For detailed information please refer the document Electronic archiving system for SAP minor customizing list.ppt .Path for the same is mentioned below.
\R3_Archiving\Archiving\Documentation\3. ARCHIVING TEAM INSTRUCTIONS\SoX

Company Confidential. 2010 Nokia 52


SoX Control Points
5510 - Approval to start

Approval is the first step before starting any kind of activity in the SAP system according to the incident received.

5550 Business sign off

After the completion User acceptance testing and get the business sign off to move the transports to production.

5560 Audit trial

Onsite coordinator will do the Audit trial.

5570 Implement to production

Whoever releases the transport request to production they need to update the 5570 information.

5580 Validation

Validation required for each and every incident handled by our team. Requestor provides the sign-off after the validation.

Note: IT change control points vary depending on the requests.

Refer the attached Powerpoint and Link for detailed information.


SoX control points

\R3_Archiving\Archiving\Documentation\3. ARCHIVING TEAM INSTRUCTIONS\SOX


Company Confidential. 2010 Nokia 53
Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 54


Data retention tool(DaRT)
DART (Data retention Tool):

DART is a tool used for meeting the legal and auditing requirements of a Company.
Specifications for DART was developed by ASUG Tax user Group and SAP.
In Nokia DART is used for USA,Canada and Germany .Portugal is new country in scope and has not yet been started.

NOTE:

Schedule the extract runs for the weekends.


No corresponding archiving runs should go at the same time when extracts are being run.
Monitor the archiving folder for DART extract and once it reaches 70 % ,store has to be done.
Archiving runs and index deletions should go only after the DART Extracts are done.
Once reports are stored the same need to be checked in OADD transaction for any errors .

For detailed Information refer the instruction documents in the link mentioned below.
\R3_Archiving\Archiving\Documentation\DART\DART instructions_new.doc

Updations to be done in ftp in the link mentione below in the file DART extract status
\R3_Archiving\Archiving\Documentation\Frequently updated files

Company Confidential. 2010 Nokia 55


Data retention tool(DaRT)

IT Archiving team checkes from SAS for Valid company codes before start ing extracts.
SAS team confirms the company codes.
IT archiving team schedules the extracts on week end and complete the reports FTWE & FTWD.
LSAS is responsible for all communication related to tax audit requirements and Communicate IT Archiving team with an ITSM ticket for changes to view file
configuration or new view file customisation.
IT Archiving team Customise the view file according to requiremnt and release the transports to higher level systems after testings ,signoff and approvals.
LSAS creates request IT Archiving team to Import the extracts and completes the tax audit files and are resposible for delivery the files in form of CD s to tax
authorities.

Company Confidential. 2010 Nokia 56


Data retention tool(DaRT)
DaRT Steps for Extract and View Files
Steps Transaction Description

Create Extract
Create Extract FTW1A For creation of extracts
Report execution FTWE Control Total verification
Store extract files FTWD Check Sum
FTWL Export the extract to archive
Define view FTWY Create or change view definition
Create view file FTWH Data extract view
Reports FTWL Deletion of file
Delete view file

For detailed instructions refer the document mentioned below.

DaRT Instructions

Company Confidential. 2010 Nokia 57


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 58


Global Trade Services (GTS)
GTS:

Global trade services is an additional solution for standard SAP to support management of
regulatory compliance for import and export. It provides functionalities not available in standard
SAP in areas of compliance and customs Management.

Data transfers from R3 system to GTS system for sale orders, invoices, outbound delivery
documents, purchase orders and once transferred to GTS system ,all necessary screenings are done and
trade documents, customs declaration, duty calculations are created in GTS system data base size growth
is more and hence we archive this customs documents and display archived reports to customs when required.

CUHD and SPL_AT are the archiving objects in scope for the GTS system and for more information refer the
Powerpoint mentioned below.

GTS Instructions

Also refer to the documents mentioned in the link below for more additional informations.

\R3_Archiving\Archiving\Documentation\4. Projects\GTS
\R3_Archiving\Archiving\Documentation\4. Projects\GTS Upgrade 2010

Company Confidential. 2010 Nokia 59


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 60


Travel Archiving
Archiving of travel data and report files will be done due to legal requirements. Data cleaning is needed in PT4 to avoid performances and disk space problems due to data growth. Data
from SAP Travel Management system (PT4) will be archived into external storage system LEA/Centera. Archiving of data in Travel system PT4 is done by the SAP
Archiving team. Travel Archiving will be done by personnel area. Only completed trips (status transferred to FI) will be archived.

For detailed information refer the document in the link below.

\R3_Archiving\Archiving\Documentation\4. Projects\Travel Management Tool\Concept blueprint training material\Travel Archiving User Guide for IT and SAS.docx

PA_TRAVEL Instructions:
\R3_Archiving\Archiving\Documentation\4. Projects\Travel Management Tool\PA_TRAVEL variant for PU22 and SARA.docx

Company Confidential. 2010 Nokia 61


Agenda
SAP Data Archiving overview
Advantages of Archiving
Archiving development Kit(ADK)
Data Archiving
Data archiving Process
Transaction / Master data
Analysis
Depandancies
Archiving Objects
Structure of archiving object
Archiving procedure
Archiving objects in scope
Automated runs
Templates to be accessed and updated
Other Instructions
Table analysis
Period end closing & Long Maintanence activities.
System Refresh Activitities
Print list Archiving Overview
ITSM & SoX control Points
DaRT
GTS Global Trade services
Travel Archiving
New systems to come

Company Confidential. 2010 Nokia 62


New Systems to Come
SAP Upgrade:

For detailed information related to Upgrade related activities refre the documents as per the link mentioned below.
\R3_Archiving\Archiving\Documentation\4. Projects\SAP 2011 UPGRADE

Customer Relationship Management (CRM):

Archiving related activities is under work for the CRM system.

Company Confidential. 2010 Nokia 63

Das könnte Ihnen auch gefallen