ISGT LA Tutorial
&
Dr Jairo Quiros-Tortos
jairoquirostortos@ieee.org
Dr Luis(Nando) Ochoa
Senior Lecturer at The University of Manchester
IEEE PES Distinguished Lecturer
IEEE Senior Member
Chair of the IEEE-PES Modern and Future Distribution System Planning WG
Chair of the IEEE-PES Innovative Smart Grid Technologies (ISGT) Europe
Steering Committee
Member of the European Technology Platform SmartGrids WG1
110+ papers top intl journals and conf, 1 patent (Psymetrix)
40+ technical reports
Dr Jairo Quiros-Tortos
Post-Doctoral Research Associate (Since May 2014)
IEEE Member
Vice-Chair of the IEEE-PES UK&RI Chapter
Lecturer at the University of Costa Rica (Aug. 2008 Aug. 2010)
Invited Professor at the University of Costa Rica (May. 2016 )
25+ papers top intl journals and conf, 1 patent (UoM)
5 technical reports
Areas of expertise
Distribution Network Modelling
Distributed Low-Carbon Technologies Modelling
Distribution Network Analysis, Operation and Planning
4
Second Block:
16:15 to 16:45 Stochastic Impact Analysis of Low Carbon Technologies
Low Voltage Network Solutions Project
16:45 to 17:15 Management of Electric Vehicle Charging Points
My Electric Avenue Project
17:15 to 17:25 Break
17:25 to 17:45 Integrated Optimal Volt-Var Control of MV and LV Networks
Smart Street Project
17:45 to 18:00 Wrap up, Conclusions and Q&A
5
14:05 to 14:25
Remarks
7
Distribution Networks
Bulk Generation
Distribution
Transmission
UK Distribution Networks
Traditionally not
monitored and not
controlled
10
Unresponsive, well
known demand Homes, Schools,
Shops, Businesses
11
Hierarchical control
Traditional Modelling
Traditional Modelling
3. Typically deterministic
The uncertainties due to the variability, location, size of common
and future loads as well as renewable generation are neglected
This simplifies the problem but can over or underestimate
problems/benefits
Traditional Modelling
1. Balanced Unbalanced
3. Deterministic Probabilistic
14:25 to 14:40
INTRODUCTION TO OPENDSS
19
Acknowledgement
What is OpenDSS?
Distribution network models
Why was OpenDSS developed?
What are the key features?
Built-in solution modes
Controls
Overall model concept
Models implemented
Input data requirements
Advanced types of data
What can OpenDSS be used for?
User interfaces
Additional Information
21
What is OpenDSS?
What is OpenDSS?
Heritage
Harmonics solvers rather than power flow
Gives OpenDSS extraordinary distribution system modelling
capability
Simpler to solve power flow problem with a harmonics solver than
vice-versa
Supports all rms steady-state (i.e., frequency domain)
analyses commonly performed for utility distribution network
planning
And many new types of analyses
Original purpose: distributed generation (DG) interconnection analysis
23
What is OpenDSS?
What it Isnt
An Electromagnetic transients solver (Time Domain)
It can solve Electromechanical transients
A Power Flow program
It is much more than that
A radial circuit solver
Does meshed networks just as easily
A distribution data management tool
It is a simulation engine designed to work with data extracted from
one or more utility databases
24
MV
Europe
LV
Initially
Support all types of distribution planning for DG
High-level area economics to engineering interconnection issues
Modelling the Time Dimension
Have to capture time value to get the right answer to DG and other
smart grid issues
Key feature of OpenDSS
Enables study of volt-var optimisation and delivery efficiency
Sequential power flow from 1 s to 1 hr
Dynamics ~1 ms
28
Controls
User Interfaces
Additional Information:
Useful Links (Download and Info)
OpenDSS Download
http://sourceforge.net/projects/electricdss/
OpenDSS Wiki
http://sourceforge.net/apps/mediawiki/electricdss/index.php?title=M
ain_Page
Roger Dugan's links for OpenDSS
http://www.rogerdugan.com/OpenDSS
OpenDSS Presentations by EPRI (FTP)
ftp://opendss_2010:OpenDSS_ftp_2010@ftp.epri.com/
OpenDSS Forum
http://sourceforge.net/projects/electricdss/forums/forum/861976
37
Additional Information:
Basic OpenDSS Files
OpenDSS.EXE Standalone EXE
OpenDSSEngine.DLL In-process COM server
KLUSolve.DLL Sparse matrix solver
DSSgraph.DLL DSS graphics output
Additional Information:
Accessing the COM Server
Examples of accessing the COM server in various languages
In MATLAB:
DSSobj = actxserver(OpenDSSEngine.DSS);
In VBA:
Public DSSobj As OpenDSSEngine.DSS
Set DSSobj = New OpenDSSEngine.DSS
In Dephi
{Import Type Library}
DSSObj := coDSS.Create;
In PYTHON:
self.engine = win32com.client.Dispatch("OpenDSSEngine.DSS)
39
Additional Information:
OpenDSS Standalone EXE User Interface
Multiple
script
windows
Additional Information:
Executing Scripts in the Standalone EXE
DSS executes selected line or opens selected file name
Select all or part of a line
14:40 to 15:20
Set DefaultBaseFrequency=50
Clear command
Set your own datapath (to read/write files be organised!)
set datapath=C:\OpenDSS-Training-Material\
New circuit
New circuit.example basekV=132 pu=1.0 angle=0 frequency=50 phases=3
if the slack bus (Grid in the figure and sourcebus for OpenDSS) has a
voltage different from 1.0pu, then change it accordingly (e.g., pu=1.01)
Grid Bus A Bus B
Load
Transformer Line
45
Substation transformer
new transformer.SS phases=3 windings=2 buses=(sourcebus, A) conns=(wye, wye)
kvs=(132, 33) kvas=(30000, 30000) %loadloss=0 xhl=12.5
Lines
Produce linecodes (it is a more organised way)
new linecode.ABC nphases=3 R1=2.13444 X1=1.554003 units=km
Then create the corresponding lines
new line.lineA-B bus1=A bus2=B length=1 phases=3 units=km linecode=ABC
Loads
new load.loadB bus1=B phases=3 kV=33 kW=5000 kvar=1640 model=1
Control modes
set controlmode=static
Ideal for snapshot and hourly time-series analyses
Type of solution
set mode=snapshot
Solve
Write the solve command
Select all the corresponding text and CTRL+D (as before)
Results
Select line, then LineA-B. Click on C, V or P
48
Monitor Vbb
V1 VAngle1 V2 VAngle2 V3 VAngle3
18885.3 -1.34791 18885.3 -121.348 18885.3 118.652
Energy Monitors
Meter "kWh" "kvarh" "Max kW" "Max kVA"
"GRID" 5056 1800 5056 5367
"MLOADB" -5000 -1640 -5000 5262
53
Note
winding specifies the controlled winding. tapwinding specifies the
location of the taps. It has to be written after winding
vreg*ptratio gives the actual target voltage at the winding (line-to-
neutral for Wye connection)
100V is a suggested vreg as the band becomes more intuitive (e.g., for
2V of band, the final voltage will be within 0.99-1.01pu). If the target is
1.03pu, then vreg=103 (1.02-1.04pu for 2V band)
(33000 3 sqrt / 100 /) is RPN for (33000/sqrt(3))/100 = 190.5256
RPN: Reverse Polish Notation
54
Energy Meters 6
7
0
0
0.99375
0.99375
Modelling a generator
new generator.CHP bus1=B phases=3 kV=33 kW=5000 pf=0.95 model=1
Show command
show summary
show voltages
show currents
show deltaV
After solve
61
Plot command
plot profile phases=all
Note that
Requires per unit calculations
Only one energy meter
Typically at the SS
After solve
62
3-wire unigrounded
substations
Three-phase throughout,
including LV
Clear
set datapath=C:\OpenDSS-Training-Material\
New lines
New loads
new load.MPANone bus1=MPANone.1.4 phases=1 kV=(0.4 3 sqrt /) kW=30 pf=0.95
model=1 conn=wye status=fixed
new load.MPANtwo bus1=MPANtwo.2.4 phases=1 kV=(0.4 3 sqrt /) kW=20 pf=0.95
model=1 conn=wye status=fixed
new load.MPANthree bus1=MPANthree.3.4 phases=1 kV=(0.4 3 sqrt /) kW=25 pf=0.95
model=1 conn=wye status=fixed
Be careful with Vmaxpu and Vminpu
and monitors
new monitor.HVside element=transformer.LVSS terminal=1 mode=1 ppolar=no !active
and reactive power
new monitor.busbar element=transformer.LVSS terminal=2 mode=0 !voltages and
currents
new monitor.A_pq element=line.busbar-A terminal=2 mode=1 ppolar=no
66
set controlmode=STATIC
set mode=snapshot
... Plus the typical take for monitors and energy meters, exports,
visualise (if needed), and plot of profiles
67
The neutral has been explicitly modelled (.4 in the load code).
It is possible to place monitors (e.g., for the neutral currents).
This, however, creates another problem: voltages monitored will be
line-to-ground rather than line-to-neutral.
So, unless it is necessary, avoid explicitly defining the neutral.
Note that not defining the neutral does not mean that OpenDSS
does not consider it.
If positive-sequence impedances (derived from four-wire cables) are
provided, OpenDSS then automatically creates the 4x4 matrices
and computes the effects of the neutral.
The phase voltage results will be line-to-neutral voltages (which is
what we want).
70
New loadshapes
new loadshape.demand npts=1440 minterval=1.0 csvfile=house_min_daily.txt
action=normalize
Use normalisation when needed After new circuit and
before the new load
Adding loadshapes to loads
new load... status=variable daily=demand
0
1
41
81
121
161
201
241
281
321
361
401
441
481
521
561
601
641
681
721
761
801
841
881
921
house_min_daily.txt (normalised profile)
961
1001
1041
1081
1121
Test LV Network: Loadshapes
1161
1201
1241
1281
1321
1361
1401
71
72
201
281
361
401
481
561
641
721
761
841
921
161
241
321
441
521
601
681
801
881
961
1
1001
1041
1121
1201
1281
1321
1401
1081
1161
1241
1361
81
41
75
MV Networks
Always set the default base frequency
Be organised data will end in the same folder
Deploy monitoring devices (before solving) when possible
Advise for large networks
Loadshapes are defined after circuit but before solve
LV Networks
The neutral has to be explicitly modelled
Not defining the neutral does not mean that OpenDSS does not
consider it.
The phase voltage results will be line-to-neutral voltages
78
Explore 1/3
After solve
79
Explore 2/3
Explore 3/3
15:20 to 15:45
This Excel file and the associated DSS and txt must be in the
same folder
To be copied in a folder without blank spaces (e.g., C:\UoM\)
Macros must be enabled
The VBA code considers the file name in cell D3
Any changes requires the code to be updated accordingly
1) Starts OpenDSS via VBA
and compile the circuit
This Matlab file and the associated DSS and txt must be in the
same folder GSP A B C
demand_year.txt
0.8
0.6
0.4
1291
1549
2065
2323
2839
3097
3613
3871
4387
4645
5161
5935
6451
6709
7225
7483
7999
8257
1033
1807
2581
3355
4129
4903
5419
5677
6193
6967
7741
8515
87
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Hours
93
Suboption 1
Excel DSSText.Command = "Set Loadmult=" + Trim(Str(demandgrowth))
Matlab DSSText.Command = ['Set Loadmult=' num2str(Dgrowth)];
Suboption 2
Excel DSSSolution.LoadMult = demandgrowth
Matlab DSSSolution.LoadMult = Dgrowth;
94
120
100
Use of Line A-B (%)
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Hours
95
DSSCircuit.Generators.Name = gen1;
DSSCircuit.Generators.kW = DSSCircuit.Generators.kW * Ggrowth
97
120
100
Use of Line A-B (%)
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Hours
98
0.8
0.6
0.4
0.2
0.0
439
658
220
877
1
1315
1534
2191
2410
3067
3286
3943
4162
4819
5038
5695
5914
6571
6790
7447
7666
8104
8323
1096
1753
1972
2629
2848
3505
3724
4381
4600
5257
5476
6133
6352
7009
7228
7885
8542
99
80
60
40
20
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Hours
101
This loop allows us now to do things These changes should lead to the same
after each hour results as previously
103
120
100
Use of Line A-B (%)
80
60
40
20
The actual smart control part comes
from the researcher
0
0 1000 2000 3000 4000 5000 6000 7000 8000
Hours
107
Try it
109
30 min
110
16:15 to 16:45
Remarks
112
Total Cost
US$2.3m
Project run by
Electricity North
West Limited
http://www.enwl.co.uk/lvns
113
3.983
3.9825
3.981
[m]
3.9805
3.98
3.9795
3.979
3.9785
3.863 3.864 3.865 3.866 3.867 3.868 Electric Heat Pumps (EHP)
3.869
[m] 5
x 10
Input data
Load and LCT profiles
Real UK networks (topology and characteristics)
115
238
V
232
230
LCT 228
0
20
Random Time Series 40
60 150
200
250
300
600
109
121
133
145
157
169
181
193
205
217
229
241
253
265
277
1
13
25
37
49
61
73
85
97
Electric Heat Pumps 24 Hours - 5 minutes resolution
10 9 15 1.4
10 15 10 15
Temperature Temperature Temperature
8 Loads
Auxiliary Heater
EHP Consumption 1.2
uCHP
Auxiliary Heater
EHP Consumption
Auxiliary Heater
EHP Consumption
EHP
EHP Production EHP Production EHP Production
7
1
56 10 5 10 5 10
Electricity [kW]
Electricity [kW]
5 0.8
kW
kW
kW
C
C
4
0.6
03 5 0 5 0 5
0.4
0.2
1
-5 0 0 -5 0 0 -5 0
00 5050 100
100 150
150 200
200 250
250 300
300 00 5050 100
100 150
150 200
200 250250 300300 0 50 100 150 200 250 300
24 Hours - 5 min resolution 24 Hours - 5 min resolution 24 Hours - 5 min resolution
117
4-Result Visualization
3.933
[m]
3.9325
are implemented and
studied. 3.932
Example
using PV
3.9315
panels
Voltage reference at the bus 3.8395 3.84 3.8405 3.841 3.8415 3.842 3.8425
3.9335
3.933
[m]
3.9325
3.932
3.9315
2 0.6
0.5
[kW]
[kW]
1.5
0.4
1 0.3
0.2
0.5
0.1
0 0
0 50 100 150 200 250 300 0 50 100 150 200 250 300
24 Hours - 5 min resolution 24 Hours - 5 min resolution
Information sent using This average is calculated among the 100 profiles provided
the command redirect
* I. Richardson, Integrated High-resolution Modelling of Domestic Electricity Demand and Low Voltage Electricity
Distribution Networks, PhD Thesis, University of Loughborough, 2011
121
2.5 2.5
2 2
[kW]
[kW]
1.5 1.5
1 1
0.5 0.5
0 0
0 50 100 150 200 250 300 0 50 100 150 200 250 300
24 Hours - 5 min resolution 24 Hours - 5 min resolution
Information sent using This average is calculated among the 100 profiles provided
the command redirect
* The University of Manchester, The Whitworth Meteorological Observatory.
[Online]. Available: http://www.cas.manchester.ac.uk/restools/whitworth/.
122
11/04 kV
transformer
Load Load
MATLAB randomly selects a domestic
profile for each house and sends it Load Load
through the COM server to OpenDSS + +
Repeated for each house PV PV
MATLAB randomly selects a house to
allocated the LCT, its size, etc., and
sends the corresponding LCT profile
through the COM server to OpenDSS
Repeated for each house with LCT
Random
assignation of
variables
123
11/04 kV
transformer
Time-Series
Unbalanced
Power Flows Load Load
80
70 Load Load
60
+ +
50
PV PV
Current [A]
40 242
241
30
240
20
239
Voltage [V]
10
238 Voltage at the
0
0 50 100 150 200 250 300
237 last customer
24 hours - 5 minutes resolution
236
234
0 50 100 150 200 250 300
24 hours - 5 minutes resolution
124
250
Summer Loads
Load Load
+PVs
200
Load Load
150
+ +
Current [A]
PV PV
100 260
Summer Loads
+PVs
255
50
250
Voltage [V]
0
0 50 100 150 200 250 300
24 hours - 5 minutes resolution
245 Voltage at the
last customer
Current at the head of the feeder 240
235
Assessment
230
Visualization 0 50 100 150 200
24 hours - 5 minutes resolution
250 300
125
PV 25 EHP
50
Customers [%]
Customers [%]
20
40
15
30
10
20
% of Customers 10 5
with Voltage 0
0 10 20 30 40 50 60 70 80 90 100 110
0
0 10 20 30 40 50 60 70 80 90 100 110
50160 3
EV uCHP
2.5
Customers [%]
0.5
0
0 10 20 30 40 50 60 70 80 90 100 110
EV Penetration [%]
126
70
40
30
50
20
10
Utilization Level PV EHP
0 0
of the Head of 0 10 20 30 40 50 60
PV Penetration [%]
70 80 90 100 110 0 10 20 30 40 50 60
EHP Penetration [%]
70 80 90 100 110
the Feeder 45
100
90
40
80
Utilization Level [%]
10
20
5
CHP
10
EV
0 0
0 10 20 30 40 50 60 70 80 90 100 110 0 10 20 30 40 50 60 70 80 90 100 110
uCHP Penetration [%] EV Penetration [%]
127
5
x 10 Substation 16
Multi-Feeder Analysis 5
x 10 Substation 2 x 10
5
Substation 5
3.9835
3.989 3.987
3.983
3.9865
3.988
3.9825
3.986
3.987
3.982 3.9855
[m]
[m]
3.9815 3.986 3.985
3.981 3.9845
[m]
3.985
3.984
3.9805
3.984 3.9835
3.98
3.899 3.9 3.901 3.902 3.903 3.904 3.905 3.906 3.596 3.5965 3.597 3.5975 3.598 3.5985 3.599 3.5995 3.6 3.6005 3.601
3.9795 [m] 5 [m] 5
5
x 10 x 10
x 10 Substation 7 5
x 10 Substation 6
3.9585
3.979 3.9808
3.958 3.9806
3.9785
3.9804
3.9575
3.863 3.864 3.865 3.866 3.867 3.868 3.869
[m] 5 3.9802
x 10
3.957
3.98
[m]
Network Examples
[m]
3.9565 3.9798
3.9796
3.956
3.9794
3.9555 3.9792
5
x 10 Substation 1
3.979
3.955
3.9315
3.9788
3.7995 3.8 3.8005 3.801 3.8015 3.802 3.8025 3.803 3.8035 3.804
5
3.81055 3.811 3.8115 3.812 3.8125 3.813
x 10 [m]
Substation 4 5
x 10 Substation 3
x 10 [m] 5
3.931 x 10
4.0465 4.018
3.9305
4.0175
4.046
3.93
4.017
[m]
4.0455
3.9295
4.0165
3.929 4.045
[m]
[m]
4.016
3.9285 4.0445
4.0155
3.928
4.044 4.015
3.9275
3.905 3.9055 3.906 3.9065 3.907 3.9075 3.908 3.9085 3.909 3.9095 3.91 4.0435 4.0145
[m] 5
x 10
4.014
4.043
3.6245 3.625 3.6255 3.626 3.6265 3.627 3.6275 3.628 3.6285 3.629 3.569 3.57 3.571 3.572 3.573 3.574
[m] 5 [m] 5
x 10 x 10
128
90
60 % of Feeders with Voltage Problems
% of Feeders with Thermal Problems 80
50 70
60
40
[%]
[%]
50
30
40
0 0
PV EHP uCHP EV EV Fast EV Shifted PV EHP uCHP EV EV Fast EV Shifted
16:45 to 17:15
MANAGEMENT OF ELECTRIC
VEHICLE CHARGING POINTS
Remarks
132
Total Cost
US$15m
Project run by
EA Technology
Funding DNO
SSE PD
myelectricavenue.info
133
10
Millions of EVs
6 Clusters Problems
0
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
EV Uptake Scenarios Scenario 1 EV Uptake Scenarios Scenario 2 & 3 EV Uptake Scenarios Scenario 4
* Department of Energy and Climate Change (DECC)
https://www.ofgem.gov.uk/ofgem-publications/56824/ws3-ph2-report.pdf
134
EV Challenges
EV Clusters
Can affect the infrastructure close to customers (LV networks)
Thermal overloads, voltage drops
Control of
EV Charging Points
EV Management
Cost-effective infrastructure
Fair criteria to control EVs
Customer acceptance
135
Aims
To understand charging behaviour of (200+)
EV users
To investigate the impacts of EVs on 9 real
LV networks
To trial a cost-effective and practical
solution to control EV charging points
(ESPRIT Technology*)
109 Technical
Trials
221 in total
137
Infrastructure Overview
Sensors and
Sensors (V, I)
actuators at EV
head of feeders
charging points
Violations in the
Significant
thermal limits
voltage
drops
Transformer State of Charge:
Unknown
11/0.4 kV
PLC-like device
PLC
at substations Power Line
(control hub) Carrier-based
communications
(bi-directional)
Infrastructure Overview
Substation
Transformer
11/0.4 kV
PLC
ROLEC*
charging point
+
EA Technology
Real 500 kVA
Transformer Intelligent
Control Box
* http://www.rolecserv.com/
139
EV Charging Behaviour
SOC = 11 Units
SOC = 6 Units
EV Status
50
20
10
0
1 2 3 4 5 6 7 8 9 10
Number of Connections
141
1
Probability (%)
3
Weekend
2
0
2h 4h 6h 8h 10h 12h 14h 16h 18h 20h 22h 24h
Connection Time - 15 min resolution
142
6
~70% of the charging events
4 occur with 3-9 units
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Number of Units (1-12)
143
20
10
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Number of Units (1-12)
144
3 1.2
EV Demand (kVA)
EV Load 1 1.0
EV Load 2
2 0.8
EV Load 3
0.6
1 0.4
Diversified
0.2
0 0
0h 2h 4h 6h 8h 10h 12h 14h 16h 18h 20h 22h 24h
Time of Day Energy: ~15 kWh
145
Feeder Level
Transformer Level
(per phase per feeder)
Feeder Level
Transformer Level
(per phase per feeder)
More details: J. Quirs-Torts, L. F. Ochoa, S. Alnaser, and T. Butler, "Control of EV charging points for thermal and voltage
management of LV networks," IEEE Transactions on Power Systems, In Press
147
4-Result Visualization
Initialization
(Similar to
COM DSS
the Impact
Assessment) Random assignation Time-Series
of variables Unbalanced
Control
COM DSS
Calculations Every control Time-Series
Control settings cycle Unbalanced
EV Status
more likely it is to be disconnected
COM DSS
Calculations Every Time-Series
Control settings control cycle Unbalanced
151
Reconnection (TX)
Max # to keep TX loading
below a security margin
Transformer
Which ones? 11/0.4 kV
The shorter the charging time, the PLC
more likely it is to be reconnected
Available capacity is given to
An EV will be reconnected if its reconnection EVs with lowest charging time
does not violate feeder constraints
Reconnection (Feeder)
If phase current after reconnection
will be below a security margin
COM DSS
If charging point phase voltages Every
Calculations Time-Series
higher than a security margin Control settings control cycle Unbalanced
ESPRIT-Based Control: Assessment
5
x 10 Low Voltage Network
4.0185
4.018
Feeder 3 Feeder 2
Inputs 4.0175
Feeder 1
Real LV networks 4.017
4.0165
Realistic domestic* and EV load Feeder 5
(m)
4.016
profiles 4.0155
Feeder 4
4.015
4.0145
Feeder 6
400
200
0
Tx Loading
1.05
1.00
(p.u.)
0.95
0.90
0.85
6h 8h 10h 12h 14h 16h 18h 20h 22h 24h 2h 4h 6h
Minimum Voltage
Time of day
1-min control cycle Problems solved! (in theory)
154
Effects on EV Demand
Most EVs are charged
500
before 6am
400
(kVA)
300
200
100
0
Aggregated EV Demand
4
3 17:44h 23:04h
(kVA)
2 19:15h
00:13h
1 20:24h
0
6h 8h 10h 12h 14h 16h 18h 20h 22h 24h 2h 4h 6h
Individual EV Demand Expected time: 160 min( 2:40h)
Time of day Actual time: 389min (6:29h)
Charging Delay: 143.13%
155
30
30% EVs required less than
20 twice the original time
10
0
0 1 2 3 4 5 6 7 8 9
Impact Level
Customer Impact Level 0 1 2 3 4
Additional Charging Time (%) 0 1-25 26-50 51-75 76-100
Customer Impact Level 5 6 7 8 9
Additional Charging Time (%) 101-125 126-150 151-175 176-200 > 200
156
120
1 min 5 min 10 min 30 min
Utilization Factor (%)
110
Thermal Limit
100
90
40 50 60 70 80 90 100
EV Penetration Level (%)
and it improves
customer acceptance
158
ESPRIT-Based EV Management
Actual trial proves the infrastructure works
Studies also show it can solve network problems
159
10 min
160
17:25 to 17:45
Total Cost
US$13.1m
Project run by
Electricity North
West Limited
http://www.enwl.co.uk/smartstreet
Smart Street (aka eta)
6 Primary Substations
11 MV feeders
7 MV capacitors
38 Secondary Substations
163 LV feeders
84 LV capacitors
5 LV OLTCs http://www.kelvatek.com/
80x3 LYNXs
163x3 WEEZAPs
~67.500 customers
Scope
Innovative reconfiguration (including
meshing) of MV and LV networks to
increase the hosting capacity of LCTs
(PV, EVs, EHPs).
Fuse Fuse
Manual Switch
(NOP)
253
V V
216
Effects of LCTs in LV Networks
253
V V
216
LV Active Voltage Control
LYNX
X X
WEEZAP WEEZAP
Cap
253
V V
216
Comms
MV OLTC
HV OLTC
MV Cap
MV Breaker
MV OLTC
WEEZAPs
WEEZAPs
LYNX LYNX
LYNX
X X
WEEZAP WEEZAP
Cap
253
V V
216
NMS
SCADA New set points Interface Set points Optimisation
Control actions Control actions
Engine
Modelling/Simulations
Distribution NMS
congestion issues Nom
DG
Yes
setpoints
Off Nom
issues (Deterministic)
Control Action finds the optimum set
points
OpenDSS-VBA-AIMMS
172
voltage levels?
Communication
networks?
173
17:45 to 18:00
General Conclusions
ISGT LA Tutorial
&