Sie sind auf Seite 1von 2

COMPANY : CONTRACTOR: SUB CONTRACTOR:-

ABU DHABI Targe


OIL CO., LTD t Engineering
(JAPAN) Construction Company
TECHNICAS RUINDAS

Document Category Quality Management Procedure Project No: 8598


Project Title:-
Hail Surface Facilities EPS Project

TRAINING RECORD
Training / Seminar Title: Job Skill Date: 11-Dec-2016

Names & Designations of Personnel Trained: (Use additional Sheet if required) No. of Personnel Trained:
- Sohan Lal Sharma , Welder (TW 026) 5 nos
- Muhamed Kalam Azad , Welder (TW 052) Project Site / Venue:
Target Mussafah Workshop
- Ahmed Sadaruddin , Welder (TW 141)
- Mohammad Salim Shah , Welder (TW 665) Total Time Taken:
30 minutes
- Bheema Rao Yarra, Welder (TW 857)

Reason for training:


Welding Quality Awareness & Handling of Portable Ovens

Brief details of topics covered: (Use additional sheets as required)


- Internal Cleanliness of Pipes before Erection & Fabrication.
- Joint Fit-Up Preparation & Tolerance.
- Bevels must be properly cleaned before start welding.
- WPS TR-235,TR-236 & TR-237 Requirements.
- Electrodes after working shift without returning back to store.
- Every 15 Minutes welder to ensure that ovens are Plugged and Temperature is maintained.
- Ovens to be transported in a proper way from the Electrode Store.
- Check for Cable damages.
- Make Sure Quiver Cover is Properly Closing.
- Proper cleaning for joint before start welding.
- Proper Wind protection during welding.
- No using of cold electrodes.

Handouts / Technical Literature given: Yes No

INDUCTION JOB SKILL QUALITY SYSTEM SAFETY SPECIAL APPLICATION

Remarks if any:

Training Conducted By: Signature: Date:


Mannar Muthu
Acknowledgement of Training: Post Training comment on Effectiveness (for External) of Training if any:

Applicable Not Applicable

Note: Effectiveness of External Training to be evaluated between 1 to 3 months of training.

Target Engineering Construction Co.


COMPANY : CONTRACTOR: SUB CONTRACTOR:-

ABU DHABI Targe


OIL CO., LTD t Engineering
(JAPAN) Construction Company
TECHNICAS RUINDAS

Document Category Quality Management Procedure Project No: 8598


Project Title:-
Hail Surface Facilities EPS Project

Form No. CP-116F-01, Rev. 0, Dated: 03.Sept.2014

Target Engineering Construction Co.

Das könnte Ihnen auch gefallen