Daily Report

Project Name: KBK Project


Project Code: 03 YG 00400 Report Date : 9-May-2017 Tuesday No. of Day 648 Report No. DPR-342
Project Start Date 2015-8-1 Contract Period 458 Calendar Day AM PM Fine
Weather
Estimate Completion Date 2016-10-31 Remain Period (190) Calendar Day 6~8 8~10 10 ~12 13~15 15~17 17~19 Rain
Work Force
M&E Site Surveyo Office Geotec General Crane Crane Steel
Trades PM PE SAE Site Engr QA/QC QS Admin Safety Security Welder
engineer Store r Staff h Workers Operator Helper Worker
Today 1 1 1 1 1 1 2 1 3 5 17
Operator Helper Manson Steel
Trades M&E Manson Carpenter Total
(ACP) (ACP) worker Supervisior
Today 1 2 37
Machine & Equipments onsite
Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
70 Ton Crane 1 1 1 1.5 Hp Submer; pump 4 4 4 19KW Welding Box 6 6 6
Sheet pile machine 0 0 0 1 Hp Motor pump 1 1 1
3"x3" Air Compressor 1 1 1 1.5 Hp Motor pump 1 1 1
165 KVA Generator 1 1 1 2Hp Pressure pump 0 0 0
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
BC-007,008 No 2 2
TB-007,016 No 5 5
B-017,025,029 No 3 3
G-010,011,033,034 No 6 6
ST-003,004 No 2 2

FO-OP-01 REV-00 Page: 1/2


Daily Report

Project Name: KBK Project


QC - Test Sampling
Item Remarks
Test
Sampl
e
Taken

LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT
HSE Conducted By
Safety Officer
Works Carried out Details
Trades Of Work Location Remark
1 Steel column installation work at 6th to 8th Floor At grid (C-D)
2 Steel beam installation work at 6th to 8th Floor At grid (C-D)
3 Fitting bolt and nuts at steel structure installation work At grid (D-E)
4 Housekeeping work
5 165 KVA generator break down (8:30 to present time)

Special Event
Site
Visitors
U Kyi Toe & Group (Steel QC Group) Purpose To check column joint and beam joint Instructio
on site
n
Project Manager Project Engineer Prepare By: Site Engineer
Name U Khin Maung Myint Name Name Aye Wit Yee Soe
Signature Signature Signature

FO-OP-01 REV-00 Page: 2/2


KBK Project
Site Progress Photo
Date: 09.05.2017

Steel column and beam installation work at 6th to 8th layer


KBK Project
Site Progress Photo
Date: 09.05.2017

165 KV generator break down