Document No- TECHNICAL SPECIFICATION FOR FIRE FIGHTING SYSTEM FOR PORT
(A8GA-45300-45-SP-5018, Rev-0)

8
9

10

11

12

13

14

15

16
17
COMPLIANCE SHEET FOR FIRE FIGHTING SY

Comments from PMC dtd 18-04-2017

cument No- TECHNICAL SPECIFICATION FOR FIRE FIGHTING SYSTEM FOR PORT & WHARF
8GA-45300-45-SP-5018, Rev-0)

It seems that not all PMC's comments on Design Basis report and 30%
design review have not been incorporated. Please ensure that the
comments are taken care of.
- SPCPL / TCE has requested PMC to waive off the FM/UL approval. PMC has
requsted to raised the necessary TQ.
- The potable / mobile DCP fire extinguisher will be SPCPL scope in DG area.
- Low liquid level for fire water pump to be selected.
- The vendor specific parameters to be deleted from the design basis.

International Shore Fire Connection TO BE INCORPORATED

environmental design criteria document number A8GA-00000-00-DC-


5000. Please see that this document no. is corrected 41000.

A8GA-00000-00-DC-5000 Environmental Design Criteria . Please see that


this document no. is corrected 41000.

Add ISGOTT to the list

All Annexure missing

Please provide detail on main and jockey pumps at wharf.

There shall be low- low, low and high alarm, Tank shall be
immediately filled at low level alarm
The study should be done by SPC before placing the order

Smoke detectors and fire alarm panel for control rooms


, offices and substations to be included table and same
to be described under section 6.2.1 also.

Port area :- Electrical substation Fire Tender (by company)

Diesel Power Station: Portable / Mobile DCP Fire Extinguishers

Wharf area :- Electrical substation Fire Tender (by company)

No fire protection system is envisaged as the pipeline shall be designed


without any valves or flanges along its route. However TOP shall be
provided for fire water at Diesel Unloading Facility area for further
extension of fire fighting system for diesel unloading facility area.

Plant earthing system is TNS. We believe accordingly PE conductor is


considered

Galvanized steel strip will be used for earthing conductor connections to


main grid.

Please review as per specification requirement


Smoke detectors and fire alarm panel for control rooms , offices and
substations to be included under this header.Also SPCPL shall connect their
fire alarm panels to the main fire alarm panel (supplied by others) located
near CCR .
RE FIGHTING SYSTEM

Response from SPCPL dtd 28-04-2017

M FOR PORT & WHARF AREA

Following Points Incorporated


- FM/UL approved pump has been considered for both Port
and Wharf area . It has been also mentioned in approved
doc.- Design basis of Fire Fighting system.
- In the approved design basis it has been mentioned that
the Potable / mobile DCP fire extinguisher will be provided
by company. However , in this specification the same is
included in SPCPL scope.
- Low- low, low and high alarm has been provided for port
area . The same also included in this specification.
- No vendor specific parameter has been provided in
Technical Specification as well as in Design Basis.

SPCPL will provide only one tapping point for international


shore connection.

Incorporated

Incorporated

The same is already mentioned in the annexure-I of


specification. However, the same is also now incorporated
in Codes & Standard list.

Already attached in the earlier specifcation file . However ,


once again it has been attached.

Already provided in clause no 5.2.3 of Technical


Specification.

Incorporated for port area.


Fire Hazard Assessment study shall be done by successful
vendor.

Smoke detectors and fire alarm panel for control rooms ,


offices and substations is considered in a separate package.
Hence it is not mentioned in this specification. SPCPL shall
connect fire alarm panels to the main fire alarm panel
(supplied by others) located near CCR .

Company means Guinea Alumina Corporation SA and


Others. Also please note that no fire hydrant system has
been envisaged as per scope of work for this area.

In the approved design basis it has been mentioned that


the Potable / mobile DCP fire extinguisher will be provided
by company. However , in this specification the same is
included in SPCPL scope.

Company means Guinea Alumina Corporation SA and


Others. Also please note that no fire hydrant system has
been envisaged as per scope of work for this area.

For Diesel unloading facility , SPCPL will provide only one


tap off point (TOP) of fire water with isolation valve. No
fire fighting system has been considered in SPCPL's scope.

PE conductor is considered.

As per concession request No. A8GA-CR-SPC-0002-R1


Galvanized steel strip will be used as earthing conductor.
Smoke detectors and fire alarm panel for control rooms ,
offices and substations is considered in a separate package.
Hence it is not mentioned in this specification. SPCPL shall
connect fire alarm panels to the main fire alarm panel
(supplied by others) located near CCR .