PROY.

: PROYECTO - EXPEDIENTE TCNIC


INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
01.00.00 OBRAS PROVISIONALES
01.01.00 CARTEL DE IDENTIFICACIN DE OBRA (3.60X4.80 m) und 1.00 100.00% 2,171.71
01.02.00 CASETA PARA GUARDIANA, ALMACN Y RESIDENCIA m2 300.00 100.00% 11,631.00
01.03.00 CERCO PROVISIONALES DE SEGURIDAD DE OBRA m2 970.00 9.32% 1,000.00 27.06% 2,906.05 27.06%
01.04.00 MOV. Y DESMOVILIZACIN DE MAQUINARIAS Y EQUIPO PESADO glb 1.00 100.00% 13,470.50

01.05.00 MOV. Y DESMOVILIZACIN DE EQUIPOS LIVIANOS Y HERRAMIENTAS glb 1.00 100.00% 3,200.00

02.00.00 MURO DE CONTENCIN F'c=210 Kg/cm2


02.01.00 TRABAJOS PRELIMINARES
02.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 1,808.50 100.00% 1,790.42
02.01.02 TRAZO, NIVELES Y REPLANTEO m2 1,808.50 30.89% 1,000.00 50.01% 1,619.00 19.11%
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 CORTE A NIVEL DE SUB RASANTE CON MAQUINARIA m3 13,871.16 19.19% 30,000.00 32.31% 50,511.46 33.26%
02.02.02 CORTE A NIVEL DE SUB RASANTE MANUAL m3 3,467.79 23.25% 40,000.00 15.40% 26,500.00 15.40%
02.02.03 PERFILADO, NIVELACIN Y COMPAC. DE SUB RASANTE MANUAL m2 2,272.00 10.05% 2,015.60 17.94% 3,600.00 27.91%

02.02.04 RELLENO A NIVEL DE SUB RASANTE CON MAT. PROPIO SELECCIONADO m3 10,934.46 23.68% 140,564.00 23.35%
02.02.05 ACARREO DE MAT. EXCED. EN CARRETILLA D=30.00m m3 1,665.17 24.34% 13,500.00 25.24%
02.02.06 ELIMINACIN DE MATERIAL EXCEDENTE CON MAQUINARIA A BOTADERO m3 8,325.83 22.23% 39,896.00 27.24%
02.03.00 CONCRETO SIMPLE
02.03.01 SOLADO CON CONCRETO C/H 1:10, e=0.10 m m2 1,808.50 27.32% 18,200.00 28.83%
02.04.00 CONCRETO ARMADO
PROY.: PROYECTO - EXPEDIENTE TCNIC
INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
02.04.01 ZAPATAS
02.04.01.01 CONCRETO DE F'c = 210 Kg/cm2, PARA ZAPATAS m3 1,576.15 18.90% 132,560.00 23.10%
02.04.01.02 ACERO Fy= 4,200 kg/cm2, PARA ZAPATAS kg 68,356.89 6.60% 25,642.00 19.96% 77,500.00 19.96%
02.04.02 PANTALLA
02.04.02.01 ENCOFRADO Y DESENCOFRADO, PARA PANTALLA m2 5,084.85 16.79% 55,782.00 21.86%
02.04.02.02 CONCRETO DE F'c = 210 Kg/cm2, PARA PANTALLA m3 1,368.83 17.55% 111,650.00 20.68%
02.04.02.03 ACERO Fy= 4,200 kg/cm2, PARA PANTALLA kg 73,428.72 22.15% 95,650.00 21.66%
02.05.00 JUNTAS DE DILATACIN Y OTROS
02.05.01 CURADO DE CONCRETO CON ADITIVO m2 6,893.35 17.98% 4,053.00 21.96%
02.05.02 JUNTAS DE DILATACIN EN MURO m 1,181.00
02.05.03 TUBERA DE DRENAJE PVC SAL 2" m 486.00
PROY.: PROYECTO - EXPEDIENTE TCNIC
INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
03.00.00 CANAL CERRADO DE CONCRETO F'c=175 Kg/cm2
03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO, NIVELES Y REPLANTEO m2 72.00
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 CORTE A NIVEL DE SUB RASANTE MANUAL m3 93.60
03.02.02 PERFILADO, NIVELACIN Y COMPAC. DE SUB RASANTE MANUAL m2 189.00
03.02.03 ACARREO DE MAT. EXCED. EN CARRETILLA D=30.00m m3 121.68
03.02.04 ELIMINACIN DE MATERIAL EXCEDENTE CON MAQUINARIA A BOTADERO m3 121.68
03.03.00 CONCRETO SIMPLE
03.03.01 SOLADO CON CONCRETO C/H 1:10, e=0.10 m m2 72.00
03.04.00 CONCRETO ARMADO
03.04.01 ENCOFRADO Y DESENCOFRADO, EN CANAL m2 243.00
03.04.02 CONCRETO DE F'c = 175 Kg/cm2, EN CANAL m3 43.20
03.04.03 ACERO Fy= 4,200 kg/cm2, EN CANAL kg 2,990.60
03.05.00 REVOQUES, JUNTAS DE DILATACIN Y OTROS
03.05.01 TARRAJEO EN INTERIOR CON IMPERMEABILIZANTE m2 146.48
03.05.02 CURADO DE CONCRETO CON ADITIVO m2 243.00
03.05.03 JUNTAS DE DILATACIN DE 1" EN CANAL m 69.60
03.05.04 REJILLA METLICA (1.60 x 1.00 m) und 2.00
04.00.00 REUBICACION DE PASE AREO TIPO C1 L=40.00 M
04.01.00 TRABAJOS PRELIMINARES
04.01.01 DESBROCE Y LIMPIEZA DE TERRENO m2 33.75
04.01.02 TRAZO, NIVELES Y REPLANTEO m2 70.15
PROY.: PROYECTO - EXPEDIENTE TCNIC
INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
04.01.03 DEMOLICIN DE ESTRUCTURAS EXISTENTES m3 32.02
04.02.00 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACIN PARA ESTRUCTURAS m3 73.14
04.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 36.57
04.02.03 REFINE, NIVELACIN Y COMPACTACIN m2 37.95
04.02.04 ACARREO DE MAT. EXCED. EN CARRETILLA D=30.00m m3 85.73
04.03.00 CONCRETO SIMPLE
04.03.01 SOLADO CON CONCRETO C/H 1:10, e=0.10 m m2 26.75
04.03.02 CONCRETO F'C=140 Kg/cm2+30%PG PARA ANCLAJE m3 12.16
04.04.00 CONCRETO ARMADO
04.04.01 ENCOFRADO Y DESENCOFRADO, EN PASE AREO m2 47.36
04.04.02 CONCRETO DE F'c = 175 Kg/cm2, EN PASE AREO m3 25.55
04.04.03 ACERO Fy= 4,200 kg/cm2, EN PASE ARE kg 1,086.61
04.05.00 REVOQUES, ENLUCIDOS Y MOLDADURAS
04.05.01 TARRAJEO DE EXTERIORES, 1:5, E=1.5 cm. m2 49.28
04.06.00 CABLE, PNDOLAS Y ACCESORIOS
04.06.01 ANCLAJE DE ACERO BOHELER, D 1 1/4" m 4.00
04.06.02 CABLE DE ACERO TIPO BOA D= 3/8" PARA PNDOLAS m 83.81
04.06.03 CABLE DE ACERO TIPO BOA, D=1", PRINCIPAL m 68.20
04.06.04 ACCESORIOS DE FIJACIN Y SOSTENIMIENTO glb 1.00
04.06.05 SUMINST. E INSTAL. DE TUBERA HDPE DIN 8074 PN10 m 52.00
04.06.06 PINTURA CON ESMALTE m2 49.28
04.06.07 CURADO DE CONCRETO CON ADITIVO m2 86.78
05.00.00 LIMPIEZA Y DESCOLMATACION DE CAUCE
05.01.00 TRABAJOS PRELIMINARES
PROY.: PROYECTO - EXPEDIENTE TCNIC
INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
05.01.01 TRAZO, NIVELES Y REPLANTEO m2 13,700.00
05.02.00 MOVIMIENTO DE TIERRAS
05.02.01 DESCOLMATACIN DE CAUCE DE LA QUEBRADA m3 21,849.50
06.00.00 CONTROL DE CALIDAD
06.01.00 CONTROL EN CONCRETO
06.01.01 DISEO DE MEZCLA DE CONCRETO und 2.00 100.00% 700.00
06.01.02 ENSAYO A LA COMPRESIN DE PROBETAS DE CONCRETO und 124.00 18.98% 1,000.00 20.11%
06.02.00 CONTROL EN COMPACTACIN DE SUELOS
06.02.01 ENSAYO DE COMPACTACIN PROCTOR MODIFICADO und 49.00 32.67% 890.02 16.88%
06.02.02 ENSAYO DE COMPACTACIN DENSIDAD DE CAMPO und 49.00 30.42% 635.00 22.82%
07.00.00 MITIGACIN AMBIENTAL
07.01.00 MITIGACIN DE IMPACTO AMBIENTAL glb 1.00 13.43% 2,700.00 13.43% 2,700.00 18.41%
08.00.00 VARIOS
08.01.00 LIMPIEZA GENERAL Y ENTREGA DE OBRA m2 1,976.65
08.02.00 FLETE TERRESTRE Y RURAL glb 1.00 18.28% 16,918.00 21.52% 19,912.00 16.11%

COSTO DIRECTO = 152,239.23 799,628.53 871,033.96


GASTOS GENERALES (11.3633%) = 17,299.40 90,864.19 98,978.20
UTILIDAD (8.00%) = 12,179.14 63,970.28 69,682.72

SUB TOTAL = 181,717.77 954,463.00 1,039,694.88


IGV (18.00%) = 32,709.20 171,803.35 187,145.08

VALOR REFERENCIAL = 214,426.97 1,126,266.35 1,226,839.96


PROY.: PROYECTO - EXPEDIENTE TCNIC
INSTALACIN DE LA DEFENSA RIBEREA EN LA QUEBRADA LA SALADA, DISTRITO DE C
REGION: CAJAMARCA PROVINCIA: CAJAMARCA
PROYECT.: ING. ALDO CSAR MANTILLA GUTIRREZ FECHA: ABRIL DEL 2017

CRONOGRAMA FISICO - FINANC


MES N 01 MES N 02 MES N 03
MET.
ITEM DESCRIPCION UND % COSTO COSTO
TOTAL % AVANC % AVANC
AVANC PROGR. PROGR.
SUPERVISION (3.96%) = 8,425.11 44,252.44 48,204.09
EXPEDIENTE TECNICO (2.8526% CD) = 4,342.84 22,810.53 24,847.47

TOTAL DEL PRESUPUESTO = 227,194.92 1,193,329.32 1,299,891.52

AVANCE PARCIAL MENSUAL : 3.27% 17.19% 18.73%


AVANCE ACUMULADO MENSUAL: 3.27% 20.47% 39.20%
PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
41,211.11 41,211.11
2,171.71 2,171.71
11,631.00 11,631.00
2,906.05 27.06% 2,906.05 9.50% 1,019.75 10,737.90 10,737.90

13,470.50 13,470.50

3,200.00 3,200.00

3,794,494.99 3,794,494.99
5,027.64 5,027.64
1,790.42 1,790.42
618.61 3,237.22 3,237.22
1,176,920.98 1,176,920.98
52,000.00 15.23% 23,816.51 156,327.97 156,327.97
26,500.00 27.03% 46,500.00 18.91% 32,537.06 172,037.06 172,037.06

5,600.00 22.93% 4,600.00 21.17% 4,246.16 20,061.76 20,061.76

138,564.00 25.03% 148,564.00 27.94% 165,830.49 593,522.49 593,522.49

14,000.00 25.15% 13,950.00 25.27% 14,016.81 55,466.81 55,466.81

48,896.00 27.24% 48,896.00 23.30% 41,816.89 179,504.89 179,504.89


66,607.06 66,607.06
19,200.00 21.78% 14,504.08 22.07% 14,702.98 66,607.06 66,607.06
2,489,663.73 2,489,663.73
PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
1,089,590.84 1,089,590.84
162,000.00 23.10% 162,000.00 21.93% 153,809.39 12.97% 90,954.31 701,323.70 701,323.70
77,500.00 19.96% 77,500.00 16.26% 63,135.38 17.25% 66,989.76 388,267.14 388,267.14
1,400,072.89 1,400,072.89
72,625.00 21.86% 72,625.00 21.86% 72,625.00 17.63% 58,587.10 332,244.10 332,244.10
131,564.00 20.68% 131,564.00 20.68% 131,564.00 20.39% 129,725.92 636,067.92 636,067.92
93,502.00 19.34% 83,502.00 19.34% 83,502.00 17.51% 75,604.87 431,760.87 431,760.87
56,275.58 56,275.58
4,950.00 21.96% 4,950.00 21.96% 4,950.00 16.14% 3,638.25 22,541.25 22,541.25
100.00% 25,875.71 25,875.71 25,875.71
100.00% 7,858.62 7,858.62 7,858.62
PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
73,603.15 73,603.15
128.88 128.88
100.00% 128.88 128.88 128.88
12,988.95 12,988.95
100.00% 4,643.50 4,643.50 4,643.50

100.00% 1,668.87 1,668.87 1,668.87

100.00% 4,053.16 4,053.16 4,053.16

100.00% 2,623.42 2,623.42 2,623.42


2,651.76 2,651.76
100.00% 2,651.76 2,651.76 2,651.76
48,496.98 48,496.98
100.00% 11,715.03 11,715.03 11,715.03
100.00% 19,197.22 19,197.22 19,197.22
100.00% 17,584.73 17,584.73 17,584.73
9,336.58 9,336.58
100.00% 5,837.23 5,837.23 5,837.23
100.00% 794.61 794.61 794.61
100.00% 1,955.76 1,955.76 1,955.76
100.00% 748.98 748.98 748.98
65,925.30 65,925.30
7,354.91 7,354.91
100.00% 3.71 3.71 3.71
100.00% 125.57 125.57 125.57
PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
100.00% 7,225.63 7,225.63 7,225.63
8,562.45 8,562.45
100.00% 3,200.61 3,200.61 3,200.61
100.00% 2,284.16 2,284.16 2,284.16
100.00% 222.01 222.01 222.01
100.00% 2,855.67 2,855.67 2,855.67
5,030.22 5,030.22
100.00% 985.20 985.20 985.20
100.00% 4,045.02 4,045.02 4,045.02
19,960.09 19,960.09
100.00% 2,453.25 2,453.25 2,453.25
100.00% 11,117.57 11,117.57 11,117.57
100.00% 6,389.27 6,389.27 6,389.27
1,470.52 1,470.52
100.00% 1,470.52 1,470.52 1,470.52
23,547.11 23,547.11
100.00% 676.32 676.32 676.32
100.00% 1,719.78 1,719.78 1,719.78
100.00% 5,211.84 5,211.84 5,211.84
100.00% 5,313.00 5,313.00 5,313.00
100.00% 9,355.32 9,355.32 9,355.32
100.00% 987.08 987.08 987.08
100.00% 283.77 283.77 283.77
548,911.00 548,911.00
24,523.00 24,523.00
PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
48.27% 11,836.50 51.73% 12,686.50 24,523.00 24,523.00
524,388.00 524,388.00
42.83% 224,611.96 57.17% 299,776.04 524,388.00 524,388.00
10,781.80 10,781.80
5,970.00 5,970.00
700.00 700.00

1,060.00 20.11% 1,060.00 22.78% 1,200.64 18.01% 949.36 5,270.00 5,270.00


4,811.80 4,811.80
460.00 16.88% 460.00 16.88% 460.00 16.68% 454.38 2,724.40 2,724.40
476.30 16.77% 350.00 16.77% 350.00 13.23% 276.10 2,087.40 2,087.40
20,100.00 20,100.00
3,700.00 18.41% 3,700.00 18.41% 3,700.00 11.94% 2,400.00 5.97% 1,200.00 20,100.00 20,100.00
95,422.28 95,422.28
100.00% 2,885.91 2,885.91 2,885.91
14,912.00 16.11% 14,912.00 10.87% 10,058.37 10.71% 9,912.00 6.39% 5,912.00 92,536.37 92,536.37

871,033.96 856,359.64 799,524.92 675,940.51 495,723.23 4,650,449.63 4,650,449.63


98,978.20 97,310.71 90,852.42 76,809.15 56,330.52 528,444.38
69,682.72 68,508.77 63,961.99 54,075.24 39,657.86 372,035.97

1,039,694.88 1,022,179.12 954,339.33 806,824.90 591,711.61 5,550,929.98


187,145.08 183,992.24 171,781.08 145,228.48 106,508.09 999,167.40

1,226,839.96 1,206,171.36 1,126,120.41 952,053.38 698,219.70 6,550,097.38


PEDIENTE TCNICO:
DA, DISTRITO DE CONTUMAZ, PROVINCIA DE CONTUMAZ - CAJAMARCA
DISTRITO: CONTUMAZA LOCALIDAD: C. POBLADO TABACAL
RESPONSABLE: ACEMAGU DURACION : 210 DIAS CALENDARIOS (07 MESES)

FISICO - FINANCIERO MENSUAL


MES N 03 MES N 04 MES N 05 MES N 06 MES N 07
COSTO COSTO COSTO COSTO COSTO PARCIAL SUB TOTAL TOTAL
% AVANC % AVANC % AVANC % AVANC
PROGR. PROGR. PROGR. PROGR. PROGR.
48,204.09 47,391.99 44,246.69 37,407.38 27,410.81 257,361.59
24,847.47 24,428.86 22,807.57 19,282.15 14,141.20 132,660.61

1,299,891.52 1,277,992.21 1,193,174.67 1,008,742.91 739,771.71 6,940,119.58

18.73% 18.41% 17.19% 14.53% 10.66%


100.00%
39.20% 57.61% 74.81% 89.34% 100.00%