Sie sind auf Seite 1von 12

FINAL MAJOR PROJECT

Original Ideas
By Sam Ellis
Outline
My idea is based around the theme of summer, where a persons
summer has not started to the best start and will show them struggling
to have fun.
As the song progresses, it will show the journey of the person and how
they managed to have a good time in the summer. It will show the
relationship they miss
I am going to use a non-linear narrative, which will link back to
previous thoughts and opinions that the person would have thought
I am also going to use point of view footage, which will make the video
seem more realistic
The idea is going to be as upbeat as possible, and make the audience feel
happy when they watch it.
Target Audience
Teens and Mainly at
Young Adults College
14-25 Students

Social Group Have actors the


C&E same age as TA

Have free time Middle Class


Competitors
Personal Requirements
Travel Expenses: To reach the filming location, I will drive and pick up
my actors. This will mean I will have a travel cost of around 10-20 for
the completely filming duration depending on how many days we need to
film

Food Expenses: Actors will need to bring their own lunch/food when
filming. I will purchase a meal deal from Sainsburys before filming for
3.00. Water will be provided from Sainsburys for 4.00

Accommodation: My actors will not need accommodation, as they can


reach the location every day that is required.

Props: I will not really be using any props in my production; however, I


will be using equipment as the main focal point in my production.
Cast & Crew
Leanne Danbury Main Actor

Chris Bedford Supporting Actor

Sam Ellis Director, Editor and Camera Person


Budget
ITEM COST PER DAY/PER ITEM TOTAL COST
Canon DSLR 700D 40.00 a day Will need for around 2 weeks in
case anything goes wrong
560.00
Manifrotto Fluid Tripod 11.00 a day For 2 weeks
154.00
Actors (Two actors in (Per-Hour) Around 3 hours a day for a week
production) Lead Actor - 35.00 1,260.00
Supporting Actor - 25.00
Location N/A N/A
Travelling Around 10-20 for car journeys
(For 20.00
Accommodation N/A N/A
Food 3.00 a day for my lunch For around a week
(For a Week) 4.00 for water for actors and 49.00
myself
Props N/A N/A

Total Cost = 2,043.00


Project Schedule

Das könnte Ihnen auch gefallen