Sie sind auf Seite 1von 4

CHECK LIST FOR Proposed Construction Of Super Speciality Hospital & Medical College

In Revenue Estate Of Village Palvali & Badshahpur at Faridabad

SL CHECK LIST (Construction project) HARYANA ANNEXURE NO./ PAGE NO.


No.
1 The PP should submit Form-I, Form-IA and Already submitted along with ToR Application.
Conceptual plan duly filled and signed and
proposed TOR, if applicable.
2 The PP should submit Copy of valid CLU is attached as Annexure -C1
license/CLU/Allotment letter along with self
contained note mentioning name of each
licensee with land share and proper
justification of title of the project. The PP
should also submit the developer agreement
in case of more than one licensee and project
proponent not been licensee.
3 The PP should submit copy of resolution Copy of resolution authorizing/nominating person
authorizing/nominating person to file is attached as AnnexureB3
application. (Some authenticated document
having signatures with names of Directors/
the Director who is authorizing the signatory
of application).
4 The PP should submit copy of resolution for Copy of work order is attached as Annexure B2
engaging services of consultant.
5 The PP should submit copy of accreditation Accreditation Certificate of consultant issued by
certificate of consultant issued by QCI/NABET QCI/NABET is attached as Annexure-B1.
for the specific chapter.
6 The project proponent should submit brief Given in Chapter 2 of EIA report.
description of the project.
LAND ENVIRONMENT
7 The project proponent shall give details of soil Soil Investigation Report is Attached as Annexure-
type, soil analysis (physical and chemical), A 16.
slope analysis, vulnerability to subsidence, and
seismicity and natural drainage near the
project site on contour maps and shall also
give details of the quantities of earthwork
involved and its use. In case of surplus
excavated soil, its disposal to identified site
with permission of mining department for
disposal.
WATER ENVIRONMENT
8 The project proponent shall give the total Water balance chart Attached as Annexure- A5.
quantity of water requirement with the For Sub soil water level Refer soil investigation
breakup of requirements for various uses report (Soil Investigation Report is Attached as
and the sources along with water balance Annexure-A16)
statement and shall provide physical,
chemical, biological characteristics with class
of water quality. The project proponent shall
also submit depth of soil water availability and
its analysis.
9 The project proponent shall give the quantum Detials given in Chapter 2 of the EIA report.
of water requirement to be met from
recycling of wastewater and shall give the
details of quantities, sources and usage.
10 The project proponent shall give the Here is zero exit discharge. All the waste water will
incremental pollution load from wastewater be treated on site STP & ETP.
generated from the proposed project along
with details of the quantities and composition
of wastewater generated from the proposed
activity.
11 Parking provision to be made as per Noted and Parking plan is submitted with the EIA
NBC/DTCP norms whichever is higher with report.
20% extra capacity. It will further comply with
approved zoning plan.
12 The project proponent shall give the impacts Details are given in Chapter 2 of the EIA report.
of the proposal on the ground water and shall
give the details of ground water table,
recharging capacity, and approvals obtained
from competent authority.
13 The project proponent shall submit details of RWH proposal details Attached as Annexure-A6.
rain water precipitation and its harvesting
proposals including ground water recharge.
14 The project proponent shall submit details for Details of the same is given in Annexure A8.
collection, treatment & safe disposal of
sewage by giving treatment capacities with
technology & facilities for recycling and
disposal along with duel plumbing system.
AIR ENVIRONMENT
15 The project proponent shall give details of Details of the same is given is chapter 3 and 4 of
background air quality levels with predicted the EIA report.
values based on dispersion models taking into
account the increased traffic generation as a
result of the proposed constructions.
16 The project proponent shall give details of the For Traffic circulation plan refer ANNEXURE- E 4.
movement patterns with internal roads,
bicycle tracks, pedestrian pathways, footpaths
etc., with areas under each category.
17 The project proponent shall give details of the Given in Chapter 3 of the EIA report.
sources and the measures proposed for
mitigation of traffic noise and vibration.
ENERGY CONSERVATION AND WATER
REDUCTION PLAN
18 The project proponent shall give energy For energy conservation measure attached as
conservation measures in the selection of Annexure E3
building materials and their energy efficiency.
Lighting equipments and appliances and
process and operations.
19 The project proponent shall give details of the Details of the same is given is chapter 2 of EIA
power requirements, source of supply, back report.
up source and distribution system.
20 The project proponent shall give the passive Has already been submitted with Form IA at ToR
solar architectural features being used in the stage of the project
building
21 The project proponent shall give the details of Solar energy will be used only for street Lighting,
use of solar energy devices. emergency lighting purposes. Refer Form-1A Point
no.9.13. Submitted along with ToR application of
the project.
GENERAL SUBMISSION
22 The project proponent shall give precautions Precaution and Safety measures against Fire and
& safety measures proposed against fire electrical Hazards are attached as Annexure-E1.
hazards and shall furnish details of emergency
plans and risk assessment aspects.
23 The project proponent shall submit detailed For Environmental Management Plan and
Environment Management Plan suggesting all Environmental Monitoring Plan is given in Chapter
mitigation and also Environmental Monitoring 9 and 6 of the EIA Report.
plan for compliance of various environmental
regulations, ventilation plan lighting
(illumination) plan.

24 The project proponent shall submit Health safety and welfare plant is attached as
application along with (legible plans on larger annexure E2.
scale), he will also submit health, welfare Electrical Safety Plan-E1.
safety and electrical safety plans. 500 Meter radius map of the project is attached as
(i) Location of project in the sector plan. (ii) Annexure-A 2.
Plan showing surrounding features within 500 Landscape Plan- A9
meters radius. (iii) Green belt development Layout Plan-A8
plan. (iv) Lay out plan/Building plan/Zoning Zoning Plan- C2.
plan. (different colours should be used to Traffic Circulation Plan-A10.
show existing and expansion proposal) (v) Location of STP- A8.
Traffic circulation plan. (vi) Parking plan. (vii)
Location of STP and Rain Water Harvesting
structures on plan. (viii) Prospective view. (ix)
Elevation section plan.
25 NOC from AAI regarding height clearance. Will be submitted shortly
26 Certificate from competent Authority Attached as Annexure-C3.
regarding non applicability of Aravalli
Notification in case of District Gurgaon as on
07-05-1992.
27 Assurance of competent Authority Water assurance letter has been obtained and
(HUDA/Municipal Corporation/Local submitted along with EIA report. No ground water
Authorities) for supply of water/permission of extracted near the project site.
CGWA for withdrawal of ground water, if
proposed.
28 Assurance for supply of power from HBVN. Will be submitted shortly.
29 All the original copies of analytical reports of Attached as Annexure-E5.
soil, water, air and noise conducted and
collected by NABL/MoEF approved
Laboratories.
30 NOC from the concerned Forest Department Attached as Annexure- C3.
regarding non involvement of forest land.
31 The project proponent shall submit an
undertaking stating that
That no construction has been started at the Site photographs are attached as Annexure-A13.,.
site along with latest attested photograph. Affidavit is attached as Annexure D1.
The affidavit shall be by project proponent
/one of its directors duly authorized.
That they will not encroach the revenue rasta Affidavit is attached as Annexure D3.
passing through the project area shown in the
zoning plan and layout plan.
That they will keep the ROW required for HT Affidavit is attached as Annexure D7.
wire passing through the project area as per
Government instruction.
That they will not use ground water for Affidavit is attached as Annexure D 4.
construction and will use treated water
confirming the ISI standards for building
construction.
That they will use ultra low sulphur diesel. Affidavit is attached as Annexure D2.
That provision for Helipad shall be made in NA
case of the building having height more than
60 meter. Provision of atleast one Hydraulic
ladder for high rise building shall also be
made.
The infrastructure will not obstruct or divert Affidavit is attached as Annexure D5.
the natural flow of water covered or open
nallah, drainage of rain water as per natural
flow of water.
32 The document should bear page number with Page numbers are shown on right end corners of
proper index. pages
33 All the pages should bear the complete All the pages are duly signed by authorized
signature of authorized signatory with stamp. signatory with stamp
34 All the declarations/Analysis Noted.
reports/certificates obtained should be
submitted in original.

Das könnte Ihnen auch gefallen