24 The project proponent shall submit Health safety and welfare plant is attached as
application along with (legible plans on larger annexure E2.
scale), he will also submit health, welfare Electrical Safety Plan-E1.
safety and electrical safety plans. 500 Meter radius map of the project is attached as
(i) Location of project in the sector plan. (ii) Annexure-A 2.
Plan showing surrounding features within 500 Landscape Plan- A9
meters radius. (iii) Green belt development Layout Plan-A8
plan. (iv) Lay out plan/Building plan/Zoning Zoning Plan- C2.
plan. (different colours should be used to Traffic Circulation Plan-A10.
show existing and expansion proposal) (v) Location of STP- A8.
Traffic circulation plan. (vi) Parking plan. (vii)
Location of STP and Rain Water Harvesting
structures on plan. (viii) Prospective view. (ix)
Elevation section plan.
25 NOC from AAI regarding height clearance. Will be submitted shortly
26 Certificate from competent Authority Attached as Annexure-C3.
regarding non applicability of Aravalli
Notification in case of District Gurgaon as on
07-05-1992.
27 Assurance of competent Authority Water assurance letter has been obtained and
(HUDA/Municipal Corporation/Local submitted along with EIA report. No ground water
Authorities) for supply of water/permission of extracted near the project site.
CGWA for withdrawal of ground water, if
proposed.
28 Assurance for supply of power from HBVN. Will be submitted shortly.
29 All the original copies of analytical reports of Attached as Annexure-E5.
soil, water, air and noise conducted and
collected by NABL/MoEF approved
Laboratories.
30 NOC from the concerned Forest Department Attached as Annexure- C3.
regarding non involvement of forest land.
31 The project proponent shall submit an
undertaking stating that
That no construction has been started at the Site photographs are attached as Annexure-A13.,.
site along with latest attested photograph. Affidavit is attached as Annexure D1.
The affidavit shall be by project proponent
/one of its directors duly authorized.
That they will not encroach the revenue rasta Affidavit is attached as Annexure D3.
passing through the project area shown in the
zoning plan and layout plan.
That they will keep the ROW required for HT Affidavit is attached as Annexure D7.
wire passing through the project area as per
Government instruction.
That they will not use ground water for Affidavit is attached as Annexure D 4.
construction and will use treated water
confirming the ISI standards for building
construction.
That they will use ultra low sulphur diesel. Affidavit is attached as Annexure D2.
That provision for Helipad shall be made in NA
case of the building having height more than
60 meter. Provision of atleast one Hydraulic
ladder for high rise building shall also be
made.
The infrastructure will not obstruct or divert Affidavit is attached as Annexure D5.
the natural flow of water covered or open
nallah, drainage of rain water as per natural
flow of water.
32 The document should bear page number with Page numbers are shown on right end corners of
proper index. pages
33 All the pages should bear the complete All the pages are duly signed by authorized
signature of authorized signatory with stamp. signatory with stamp
34 All the declarations/Analysis Noted.
reports/certificates obtained should be
submitted in original.