Beruflich Dokumente
Kultur Dokumente
ELECTRICALPOWERENGINEERING
OverheadlinemodelGTU102.2 investigation on the effect of parallel compensation
measurementofthevoltagesinnoloadoperation on the voltage stability at the load and the
conceptofoperatingcapacitance transmissionlossesoftheline
linemodelwithincreasedoperatingcapacitance investigationontheeffectofseriescompensationon
measurement of current and voltage relationship of an thevoltagestabilityattheload
use of measurement techniques to determine the
overheadlineinmatchedloadoperation;interpretationof
the terms: characteristic wave impedance, lagging and zerophasesequenceimpedanceoftheoverheadline
model and comparison of this value with the
leadingoperation,efficiencyandtransmissionlosses
theoreticalone
measurementandinterpretationofthecurrentandvoltage
ratios of a transmission line during a threephase short
circuit SeriesandparallelconnectionofHVlinesGTU102.3
measurementandinterpretationofthecurrentandvoltage measurement of the voltage distribution in the series
ratiosofatransmissionlinewithmixedohmicinductiveand connectionoftwolineswithoutoperatingcapacitances
pureinductiveloads measurement of the voltage distribution in the series
measurementandinterpretationofthecurrentandvoltage connectionoftwolineswithoperatingcapacitances
ratios of a transmission line with mixed ohmiccapacitive measurement of the voltage distribution in the parallel
andpurecapacitiveloads connectionoftwolineswithoutoperatingcapacitances
investigationontheperformanceofatransmissionlinewith measurement of the voltage distribution in the parallel
isolated neutral point connection in the case of a fault to connectionoftwolineswithoperatingcapacitances
earth
measurement of the earthfault current and the voltage BusbarsystemsGTU102.4
riseofthefaultyphases operation of a switching station with two busbars and
determination of the inductance of an earthfault differentvoltages
neutralizerfortheoverheadlinemodel busbar transfer with interruption of the power supply to
investigationontheperformanceofatransmissionline theconsumer
withafaultandcomparisonofthecurrentvalueswith busbar coupling and bus transfer without interruption of
those determined during earthfault with isolated thepowersupplytotheconsumer
neutralpointsystem switching sequence for disconnectors and power circuit
measurement of the fault currents of asymmetrical breakers
shortcircuitsandcomparisonoftheresultswiththose
forathreephasefault
ForCountrieswith3phasemainsdifferentfrom380V:
Threephasetransformer DL2100TT 1 1 1 1 1