Sie sind auf Seite 1von 1

Khalifa University Extension Phase 2 - External Roads Improvement at Al Saada Street, Abu Dhabi

INSPECTION AND TEST PLAN


Street Lighting Pole Works DATE: 03.09.2016
INSPECTION BY
REF No SPECS AND OTH ACCEPTANCE CRITERI VERIFYING/ CON GTC/TRV
WORK PHASE FREQUENCY REMARKS
: ER REF: A TROL FORMS
SITE TE
GTC TRV QA/QC
AM
1 PRE CONSTRUCTION

Specification Secti Prior to Commencem Acceptance of rela


1.1 Preparation of method statement and ITP No Objection H R R R
on XVI-4 (160D.2) ent ted Docs.

Prior to Commencem Acceptance of rela


1.2 Approved Shop Drawing / IFC Drawing No Objection H R R R
ent ted Docs.

Prior to Commencem Acceptance of rela


1.3 NOCs/Equipment Calibration Record Certificates No Objection H R R R
ent ted Docs.

2 Material Receiving and Inspection

2.1 Street Light Pole Material Submittal No Objection Each Delivery MIR/Check List R H R R

2.2 Flasher Light Material Submittal No Objection Each Delivery MIR/Check List R H R R

2.3 Street Light Cable Material Submittal No Objection Each Delivery MIR/Check List R H R R

3 CONSTRUCTION
Section 3.1 of Appr
As per Approved Shop D
3.1 Survey/Mark out sections to be removed oved Method State Each Location IR/Checklist H H W W
rawing
ment

Section 3.6 of Appr


As per Approved Shop D
3.2 Installation of Lighting Pole oved Method State Each Location IR/Checklist H H W W
rawing
ment
4 TESTING

4.1 Not Applicable

5 REPORT