Sie sind auf Seite 1von 4

MAIN WORKS FOR THE FIFTH PRECINCT STADIUM

DAYWORK SCHEDULE CONTRACTOR PRICING DOCUMENT

Item Description Unit Quantity Unit Rate Amount

SCHEDULE OF DAYWORK RATES

Work executed on a Daywork basis

Labour

The Contractor shall insert comprehensive, all- inclusive


rates required for the following labourers and craftsmen
which shall be deemed to include for all costs associated
with employment and the tenderers overhead and profit

A Labourer - General Hrs

B Labourer - General, semi-skilled Hrs

C Banksman Hrs

D Carpenter - Earthwork Support Hrs

E Driver/Operator - Light Duty Hrs

F Driver/Operator - Heavy Duty Hrs

G Welder Hrs

H Mechanic Hrs

J Mobile crane operator Hrs

K Sheet piling rig operator Hrs

L Mobile crane operator Hrs

M Crawler crane operator Hrs

N Foreman Hrs

P Others, tenderer to list

................................................................................................ Hrs
................................................................................................ Hrs
................................................................................................ Hrs

Tender: TDO-16-TTC-0020 Page 22/2 21-June-2016


T0
MAIN WORKS FOR THE FIFTH PRECINCT STADIUM

DAYWORK SCHEDULE CONTRACTOR PRICING DOCUMENT

Item Description Unit Quantity Unit Rate Amount

Materials

The Contractor shall allow the additional percentage


required to be added to the invoice cost of materials
required, and extended below

Allow the Provisional Sum of QAR XXX- for the


procurement of local and imported
Contractor's percentage allowance for overheads and profit
A %
on imported materials

B Allow for attendance %

Plant

The Contractor shall insert the all inclusive rates


required for the following plant and machinery

C Mobile Crane, 15 Tonnes Hrs

D Crawler Crane, 60 Tonnes and above Hrs

E Crawler Crane, 80 Tonnes and above Hrs

F Tipper truck 18m3 Hrs

G Excavator - 20 tonne tracked Hrs

H Breaker Hrs

Tender: TDO-16-TTC-0020 Page 22/3 21-June-2016


T0
MAIN WORKS FOR THE FIFTH PRECINCT STADIUM

DAYWORK SCHEDULE CONTRACTOR PRICING DOCUMENT

Item Description Unit Quantity Unit Rate Amount

Plant (Cont'd)

The Contractor shall insert the all inclusive rates


required for the following plant and machinery

A Wheeled loader Hrs

B Backhoe loaders Hrs

C Bobcat with backhoe Hrs

D Compressor, 250 cfm Hrs

E Compressor, 750 cfm Hrs

F Compressor, 825 cfm Hrs

G Genset 350 kVA Hrs

H Genset 500 kVA Hrs

J Genset 800 kVA Hrs

K Genset 1250 kVA Hrs

L Pneumatic breaker with hoses and tools Hrs

M Vibrating roller, 2 tonne Hrs

N Vibrating roller, 5 tonne Hrs

Tender: TDO-16-TTC-0020 Page 22/4 21-June-2016


T0
MAIN WORKS FOR THE FIFTH PRECINCT STADIUM

DAYWORK SCHEDULE CONTRACTOR PRICING DOCUMENT

Item Description Unit Quantity Unit Rate Amount

Plant (Cont'd)

The Contractor shall insert the all inclusive rates


required for the following plant and machinery

A Water pump loader 6 to 10 bars Hrs

B Sheet Piling rig Hrs

C Vibroprobe V23 Hrs

D Vibroprobe V48 Hrs

E Grader Hrs

F Piling Rig Hrs

The tenderer shall provide below any other plant which he


intends to use in the course of the works which is not
Hrs
identified in the plant section and extend the rates by the
hourly totals below.

................................................................................................ Hrs

................................................................................................ Hrs

................................................................................................ Hrs

Tender: TDO-16-TTC-0020 Page 22/5 21-June-2016


T0