BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN Job Ref.

Project
DHUBRI AND PHULBARI Revision
Part of Calculation
Water Current Forces
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Approved by
Office of Date
Kolkata MM SM NB
Origin
File Path 'file:///var/www/apps/conversion/tmp/scratch_7/355688024.xls'#$sheet 1
CALCULATIONS

Water Current Force Calculation

Maximum Mean Velocity of the water current (U) = 4.500 m/s


Maximum Velocity at the free surface of the river = 6.364 m/s
Angle of inclination of the pier and waterflow = 0
Variation of Angle of flow = 20

Flow component transverse to the direction of the pier = 2.177 m/sec

Pier Co-efficient = 0.660

HFL of Water surface = 30.360


R.L. of Top of Well = 23.000
Thickness of Well Cap = 2.500 m
R.L. of bottom of pier / top of well cap = 25.500
Height of pier submerged in water = 4.860 m

Top of Well Cap = 25.500 m


R.L. of Existing Ground Level = 20.518
Scour Depth from EGL = 8.920 m
Deepest Scour Level = 11.598
Depth of the Well submerged in water = 13.902 m

Forces on pier

Water current pressure at the top of the surface = 1.595 kN/m2


Water velocity at bottom of the pier = 5.478 m/sec
Water current pressure at the bottom of the surface = 1.182 kN/m2
Width of the pier transverse to the direction of water current = 11.500 m
Total Force acting on the pier = 77.601 kN

Force of action from the base of the system = 16.453 m

Forces on Well

Water current pressure at the top of the well = 1.182 kN/m2


Water current pressure at the bottom of the well = 0 kN/m2
Diameter of the Well = 12.00 m
Total Force acting on the well = 98.583 kN

Force action from base of the system = 9.268 m

Net Force Calculation for the pier-well system from the base

Total Force acting on the system = 176.184 kN


Point of application of Force from the base of well = 12.432 m
BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN Job Ref.
Project
DHUBRI AND PHULBARI Revision
Part of Calculation
Water Current Forces
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Approved by
Office of Date
Kolkata MM SM NB
Origin
File Path 'file:///var/www/apps/conversion/tmp/scratch_7/355688024.xls'#$sheet 1
CALCULATIONS

Velocity Dist. (in m/sec) Pressure Dist. (in kN/m2)


6.364 1.60
Pier

4.860

Well Cap
Well
2.500 5.478 1.182

16.453
m

9.268
m
13.902
DELD-15021
R0

5/22/2017

e:///var/www/apps/conversion/tmp/scratch_7/355688024.xls'#$sheet 1
REFERENCES

(Refer Clause
210.5 IRC
6 2014)

(Refer Clause
210.2 IRC
6 2014)
DELD-15021
R0

5/22/2017

e:///var/www/apps/conversion/tmp/scratch_7/355688024.xls'#$sheet 1
REFERENCES
Job Ref. DELD-15021
Project BRIDGE OVER RIVER BRAHMAPUTRA BETWEEN DHUBRI AND PHULBARI
Revision R0
Part of Calculation
Structure Sheet No.
Dwg. Ref. Calculations by Checked By Appvd By
Date 5/22/2017
MM PC NB
Office of Origin: Kolkata
File Name 'file:///var/www/apps/conversion/tmp/scratch_7/355688024.xls'#$Sheet2
CALCULATIONS REFERENCES

Water Current Force Calculation