DAFTAR HARGA SATUAN UPAH DAN BAHAN

KOTA YOGYAKARTA
TAHUN 2017

NO URAIAN SATUAN HARGA SATUAN KET


(Rp)
A. UPAH
1 Tukang hari Rp. 70,000.00
2 Kepala Tukang hari Rp. 75,000.00
3 Pekerja hari Rp. 65,000.00
4 Mandor hari Rp. 80,000.00

B BAHAN
1 Amplas Biasa lembar Rp. 2,000.00
2 Amplas Niken lembar Rp. 3,000.00
3 Batu Bata Lubang bh Rp. 300.00
4 Batu Kali m3 Rp. 136,800.00
5 Besi Beton kg Rp. 5,000.00
6 Bubungan Genteng Beton bh Rp. 3,600.00
7 Baut bh Rp. 5,000.00
8 Begel (type1) bh Rp. 25,000.00
9 Begel (type 2) bh Rp. 25,000.00
10 Cat Dasar kg Rp. 15,000.00
11 Cat Kilat kg Rp. 30,000.00
12 Cat Meni Nippon kg Rp. 5,000.00
13 Cat tembok kg Rp. 5,500.00
14 Engsel Pintu kotak Rp. 15,000.00
15 Genteng Beton Lokal bh Rp. 3,000.00
16 GRC Board m2 Rp. 25,000.00
17 Grendel bh Rp. 18,000.00
18 Kawat Pengikat kg Rp. 7,800.00
19 Kayu Gelam btng Rp. 4,800.00
20 Kayu Klas II m3 Rp. 1,200,000.00
21 Kayu Klas III m3 Rp. 800,000.00
22 Kayu Klas IV m3 Rp. 600,000.00
23 Keramik 30x30 bh Rp. 2,273.00
24 Koral Beton m3 Rp. 80,000.00
25 List Pofil N/K 1 m' Rp. 3,000.00
26 Minyak Cat ltr Rp. 2,000.00
27 Paku Asbes bh Rp. 350.00
28 Paku Bermacammacam ukuran kg Rp. 7,000.00
29 Paku Beton bh Rp. 550.00
30 Paku Biasa kg Rp. 7,000.00
31 Paku Plywood kg Rp. 16,750.00
32 Paku seng kg Rp. 17,400.00
33 Pasir Pasang m3 Rp. 43,000.00
34 Pasir Urug m3 Rp. 43,000.00
35 Perekat/Adukan /spesi m3 Rp. 408,765.00
36 Pipa PVC 3" m Rp. 21,450.00
37 Pipa PVC 4" m Rp. 33,900.00
38 Plamir Kayu kg Rp. 5,000.00
39 Plamir Tembok kg Rp. 4,000.00
40 Plywood 3 mm m2 Rp. 14,000.00
41 Plywood 4mm m2 Rp. 12,153.00
42 Split m3 Rp. 231,000.00
43 Semen Portland (PC) zak Rp. 28,000.00
44 semen Putih zak Rp. 72,000.00
45 Seng Gelombang m2 Rp. 16,500.00
46 Seng Plat m2 Rp. 54,000.00
47 tanah Urug m3 Rp. 24,000.00
48 Ter / Residu ltr Rp. 1,975.00
49 Thiner ltr Rp. 6,600.00
50 Alat Bantu / steiger Ls Rp. 14,000.00
51 Kayu Kasau 5/7 btng Rp. 11,500.00
52 Seng 7 kaki kpg Rp. 7,500.00
53 Tanah Puru m3 Rp. 33,000.00
54 Kusen Type PJ2 unit Rp. 350,000.00
55 Kusen typer P1 unit Rp. 300,000.00
56 Kusen Type J2 unit Rp. 200,000.00
57 Kusen Type J1 unit Rp. 150,000.00
58 Pintu Panil bh Rp. 400,000.00
59 Pintu Double Plywood bh Rp. 150,000.00
60 Pintu Aluminium bh Rp. 250,000.00
61 Jendela 150x100 bh Rp. 200,000.00
62 Jendela 150x80 bh Rp. 175,000.00
63 Ventilasi 80x40 bh Rp. 125,000.00
64 Ventilasi 100x40 bh Rp. 100,000.00
DAFTAR BOBOT
PEMBANGUNAN RUMAH TINGAL TYPE 142

NO UARAIAN PEKERJAAN BOBOT SAT

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 138.105 m2
2 Pasangan bouwplank/ pengukur 2 m'
3 Biaya Air Kerja 1 Ls

II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 0.72 m3
2 Urugan Pasir bawah pondasi 0.072 m3
3 Pasangan Pondasi batu ad. 1:4 0.51 m3
4 Urugan tanah kembali bekas Galian 0.24 m3

III PEK. BETON BERTULANG Ad. 1:2:3


1 Sloff Beton Bangunan 0.033 m3
2 Sloof Beton Pagar - m3
3 Kolom Beton bangunan 0.4158 m3
4 Kolom Beton Pagar - m3
5 Ring Balok Beton Bangunan 0.468 m3
6 Ring Balok Beton pagar - m3

IV PEK. DINDING DAN PLESTRAN


1 Pas. Dinding batu bata Bangunan ad. 1: 4 49.795 m2
2 Pas. Dinding Batu bata Pagar ad. 1:4 m2
3 Plesteran kolom pagar ad. 1:2 m2
4 Plesteran dinding batu bata Bangunan ad. 1:4 19.918 m2
5 Plesteran Dinding batu bata Pagar ad. 1:4 m2
6 Pekerjaan Pasangan Keramik didnidng KM m2

V PEKERJAAN ATAP
1 Luas Atap Baja Ringan 115.60249 m2
2 Atap Gentng beton 115.60249 m2
3 Nok genteng Beton 13.9 m'

VI PEKERJAAN LANTAI
1 Urugan pasir bawah lantai 7.1 m3
2 Floor lantai ad. 1:3:5 8.908 m3
3 Pasangan lantai Granit Pegasus 60x60 109.4 m2
4 Pasangan lantai Keramik 25x25 5.3 m2
5 Pasangan keramik Tekstur kasar 40x40 54.21 m2
6 Keramik tangga 30x30 9.25 m2
5 Rabat Sekeliling Bangunan ad. 1:2:3 4.72 m3

VII PEKERJAAN SALURAN


1 Pekerjaan Saluran Keliling 22.5 m2

VIII PEKERJAAN PINTU DAN JENDELA


1 Kusen Type P.2J.2 2 Unit
2 Kusen typer P1.A 4 Unit
3 Kusen Type PG 1 Unit
4 Kusen Aluminium Type P.2.J.4 1 Unit
5 Kusen PG 2 Unit
6 Pintu Panil 6 Unit
7 Pintu Double Plywood 2 Unit
8 Pintu Aluminium 3 Unit
9 Jendela 150x100 3 Unit
10 Jendela 150x80 4 Unit
11 Ventilasi 80x40 4 Unit
12 Ventilasi 100x40 3 Unit

IX PEKERJAAN PLAFOND DAN RANGKA


1 Pasangan PlafondGypsum Board 4 mm 169.4 m2
2 List Plafond 193.05 m'

X PEKERJAN PENGECATAN
1 Pengecatan dinding dan kolom 753.86 m2
2 Pengecatan Listplank 2.125 m2
3 Pengecatan Plafond luar dan dalam 169.4 m2

XI PEKERJAAN LAIN-LAIN
1 Dokumentasi 1 Ls
2 As built Drawing 1 Ls
3 Pembersihan akhir 320 m2
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL TYPE 142

NO UARAIAN PEKERJAAN BOBOT SAT HARGA SATUAN JUMLAH


(RP)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 138.105 m2 Rp. 5,175.00 Rp. 714,693.38
2 Pasangan bouwplank/ pengukur 2 m' Rp. 13,122.00 Rp. 26,244.00
3 Biaya Air Kerja 1 Ls Rp. 50,000.00 Rp. 50,000.00
Jumlah I Rp. 790,937.38

II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 0.72 m3 Rp. 50,750.00 Rp. 36,540.00
2 Urugan Pasir bawah pondasi 0.072 m3 Rp. 71,900.00 Rp. 5,176.80
3 Pasangan Pondasi batu bata ad. 1:4 0.51 m3 Rp. 541,530.00 Rp. 276,180.30
4 Urugan tanah kembali bekas Galian 0.24 m3 Rp. 50,940.00 Rp. 12,225.60
Jumlah II Rp. 330,122.70

III PEK. BETON BERTULANG Ad. 1:2:3


1 Sloff Beton Bangunan 3.1 m3 Rp. 759,520.00 Rp. 2,354,512.00
2 Sloof Beton Pagar 2.16 m3 Rp. 759,520.00 Rp. 1,640,563.20
3 Kolom Beton bangunan 2.41 m3 Rp. 759,520.00 Rp. 1,830,443.20
4 Kolom Beton Pagar 0.88 m3 Rp. 759,520.00 Rp. 668,377.60
5 Ring Balok Beton Bangunan 3.12 m3 Rp. 759,520.00 Rp. 2,369,702.40
6 Ring Balok Beton pagar 1.08 m3 Rp. 759,520.00 Rp. 820,281.60
Jumlah III Rp. 9,683,880.00

IV PEK. DINDING DAN PLESTRAN


1 Pas. Dinding batu bata Bangunan ad. 1: 4 49.795 m2 Rp. 59,310.00 Rp. 2,953,341.45
2 Pas. Dinding Batu bata Pagar ad. 1:4 m2 Rp. 59,310.00 Rp. 0.00
3 Plesteran kolom pagar ad. 1:2 m2 Rp. 46,838.00 Rp. 0.00
4 Plesteran dinding batu bata Bangunan ad. 1 19.918 m2 Rp. 42,241.90 Rp. 841,374.16
5 Plesteran Dinding batu bata Pagar ad. 1:4 m2 Rp. 42,241.90 Rp. 0.00
Jumlah IV Rp. 3,794,715.61

V PEKERJAAN ATAP
1 Balok Dinding 8/12 kayu klas II m3 Rp. 3,732,000.00 Rp. 0.00
2 Kuda-Kuda kayu klas II m3 Rp. 3,732,000.00 Rp. 0.00
3 Gording 6/10 Kayu Klas II m3 Rp. 3,732,000.00 Rp. 0.00
4 Bumbungan dan Jurai 8/12 kayu klas II m3 Rp. 3,732,000.00 Rp. 0.00
5 Rangka Atap Kayu Klas I m2 Rp. 36,440.00 Rp. 0.00
6 Atap Genteng beton m2 Rp. 69,130.00 Rp. 0.00
7 Nok genteng Beton m' Rp. 106,154.00 Rp. 0.00
8 Baut Konstruksi 12 mm Pek Rp. 795,000.00 Rp. 0.00
9 Listplank 3/30 Kayu Klas II m2 Rp. 108,420.00 Rp. 0.00
Jumlah V Rp. 0.00

VI PEKERJAAN LANTAI
1 Urugan pasir bawah lantai 14.2 m3 Rp. 71,900.00 Rp. 1,020,980.00
2 Floor lantai ad. 1:3:5 7.1 m3 Rp. 705,000.00 Rp. 5,005,500.00
3 Pasangan lantai Keramik 30/30 115 m2 Rp. 102,004.25 Rp. 11,730,488.75
4 Pasangan lantai Keramik 20/20 27 m2 Rp. 75,845.25 Rp. 2,047,821.75
5 Rabat Sekeliling Bangunan ad. 1:2:3 4.72 m3 Rp. #NAME? Rp. #NAME?
Jumlah VI Rp. #NAME?

VII PEKERJAAN SALURAN


1 Pekerjaan Saluran Keliling 22.5 m2 Rp. 59,267.00 Rp. 1,333,507.50

VIII PEKERJAAN PINTU


1 Kusen Type PJ2 2 Unit Rp. 224,040.00 Rp. 448,080.00
2 Kusen typer P1 9 Unit Rp. 112,020.00 Rp. 1,008,180.00
3 Kusen Type J2 3 Unit Rp. 112,020.00 Rp. 336,060.00
4 Kusen Type J1 4 Unit Rp. 448,080.00 Rp. 1,792,320.00
5 Kusen PG 2 Unit Rp. 224,040.00 Rp. 448,080.00
6 Pintu Panil 6 Unit Rp. 672,120.00 Rp. 4,032,720.00
7 Pintu Double Plywood 2 Unit Rp. 224,040.00 Rp. 448,080.00
8 Pintu Aluminium 3 Unit Rp. 112,020.00 Rp. 336,060.00
9 Jendela 150x100 3 Unit Rp. 112,020.00 Rp. 336,060.00
10 Jendela 150x80 4 Unit Rp. 448,080.00 Rp. 1,792,320.00
11 Ventilasi 80x40 4 Unit Rp. 112,020.00 Rp. 448,080.00
12 Ventilasi 100x40 3 Unit Rp. 336,060.00 Rp. 1,008,180.00
Jumlah VIII Rp. 12,434,220.00

IX PEKERJAAN PLAFOND DAN RANGKA


1 Pasangan Plafond GRC 4 mm 173 m2 Rp. 117,787.50 Rp. 20,377,237.50
2 List Plafond 254 m2 Rp. 112,020.00 Rp. 28,453,080.00
Jumlah IX Rp. 48,830,317.50

X PEKERJAN PENGECATAN
1 Pengecatan dinding dan kolom 753.86 m2 Rp. 28,975.00 Rp. 21,843,093.50
2 Pengecatan Listplank 28.58 m2 Rp. 40,737.50 Rp. 1,164,277.75
3 Pengecatan Plafond luar dan dalam 80.173 m2 Rp. 21,465.00 Rp. 1,720,913.45
Jumlah x Rp. 24,728,284.70

XI PEKERJAAN LAIN-LAIN
1 Dokumentasi 1 Ls Rp. 250,000.00 Rp. 250,000.00
2 As built Drawing 1 Ls Rp. 500,000.00 Rp. 500,000.00
3 Pembersihan akhir 320 m2 Rp. 5,175.00 Rp. 1,656,000.00
Jumlah XI Rp. 2,406,000.00
DAFTAR ANALISA PEKERJAAN

I PEKERJAAN PERSIAPAN

1 Analisa 10 m2 Pembersihan Lapangan


0.7500 Pekerja @ Rp. 65,000.00 Rp. 48,750.00
0.0375 Mandor @ Rp. 80,000.00 Rp. 3,000.00
jumlah 1 Rp. 51,750.00
untuk 1m2 = 1/10 Rp. 5,175.00

2 Analisa 10 m' Pasangan Bouwplank


0.0500 m3 Kayu klas IV @ Rp. 600,000.00 Rp. 30,000.00
4.0000 Btg Kayu Gelam @ Rp. 4,800.00 Rp. 19,200.00
0.1000 Kg Paku Biasa @ Rp. 7,000.00 Rp. 700.00
0.8000 Tukang @ Rp. 70,000.00 Rp. 56,000.00
0.0800 Kepala Tukang @ Rp. 75,000.00 Rp. 6,000.00
0.2800 Pekerja @ Rp. 65,000.00 Rp. 18,200.00
0.0140 Mandor @ Rp. 80,000.00 Rp. 1,120.00
jumlah 2 Rp. 131,220.00
untuk 1m' = 1/10 Rp. 13,122.00

3 Analisa Biaya Air Kerja


1 Ls Air Kerja @ Rp. 50,000.00 Rp. 50,000.00
jumlah 3 Rp. 50,000.00

II PEKERJAAN PONDASI

1 Analisa 1 m3 galian Tanah


0.7500 Pekerja @ Rp. 65,000.00 Rp. 48,750.00
0.0250 Mandor @ Rp. 80,000.00 Rp. 2,000.00
jumlah 1 Rp. 50,750.00

2 Analisa 1m3 Urugan Pasir Urug


1.2000 m3 Pasir Urug @ Rp. 43,000.00 Rp. 51,600.00
0.3000 Pekerja @ Rp. 65,000.00 Rp. 19,500.00
0.0100 Mandor @ Rp. 80,000.00 Rp. 800.00
jumlah 2 Rp. 71,900.00

3 Analisa Pasangan Pondasi Batu Bata ad. 1:4


450.0000 bh Batu Bata Lubang @ Rp. 300.00 Rp. 135,000.00
2.0240 Zak semen Portland (PC) @ Rp. 28,000.00 Rp. 56,672.00
0.4060 m3 Pasir Pasang @ Rp. 43,000.00 Rp. 17,458.00
1.2000 Tukang @ Rp. 70,000.00 Rp. 84,000.00
3.6000 Pekerja @ Rp. 65,000.00 Rp. 234,000.00
0.1800 Mandor @ Rp. 80,000.00 Rp. 14,400.00
Jumlah 3 Rp. 541,530.00

4 Analisa Urugan Tanah Urug Biasa


1.2000 m3 Tanah Urug @ Rp. 24,000.00 Rp. 28,800.00
0.3000 Pekerja @ Rp. 65,000.00 Rp. 19,500.00
0.0330 Mandor @ Rp. 80,000.00 Rp. 2,640.00
jumlah 4 Rp. 50,940.00

III PEK. BETON BERTULANG Ad. 1:2:3

1 Analisa 1 m3 Beton ad. 1:2:3


6.4000 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 179,200.00
0.5400 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 23,220.00
0.8200 m3 Koral Beton @ Rp. 80,000.00 Rp. 65,600.00
1.0000 Tukang @ Rp. 70,000.00 Rp. 70,000.00
0.1000 Kepala Tukang @ Rp. 75,000.00 Rp. 7,500.00
6.0000 Pekerja @ Rp. 65,000.00 Rp. 390,000.00
0.3000 Mandor @ Rp. 80,000.00 Rp. 24,000.00
jumat 1 Rp. 759,520.00

2 Analisa Tulang Besi (upah/100kg/m3)


110.0000 Kg Besi Beton @ Rp. 5,000.00 Rp. 550,000.00
2.0000 Kg Kawat Pengikat @ Rp. 7,800.00 Rp. 15,600.00
6.7500 Tukang @ Rp. 70,000.00 Rp. 472,500.00
2.2500 kepala Tukang @ Rp. 75,000.00 Rp. 168,750.00
6.7500 Pekerja @ Rp. 65,000.00 Rp. 438,750.00
jumat 2 Rp. 1,645,600.00

3 Analisa Upah Bkisting (kayu cetakan)/ m3 Balok dan kolom


0.4000 m3 Kayu klas IV @ Rp. 600,000.00 Rp. 240,000.00
4.0000 Kg Paku Biasa @ Rp. 7,000.00 Rp. 28,000.00
5.0000 Tukang @ Rp. 70,000.00 Rp. 350,000.00
0.5000 Kepala Tukang @ Rp. 75,000.00 Rp. 37,500.00
2.0000 Pekerja @ Rp. 65,000.00 Rp. 130,000.00
0.1000 Mandor @ Rp. 80,000.00 Rp. 8,000.00
jumat 3 Rp. 793,500.00

4 Upah Pembongkaran Bekisting


4.0000 Pekerja @ Rp. 65,000.00 260,000.00

Harga 1 m3 Beton Bertulang 1:2:3


1.0000 kl 1 @ Rp. 759,520.00 Rp. 759,520.00
1.0000 kl 2 @ Rp. 1,645,600.00 Rp. 1,645,600.00
0.4000 kl 3 @ Rp. 793,500.00 Rp. 317,400.00
0.4000 kl 4 @ Rp. 260,000.00 Rp. 104,000.00

IV PEKERJAAN DINDING DAN PLESTERAN

1 Analisa 1 m2 Pasangan Dinding Batu bata ad. 1:4


45.0000 Bh Batu Bata Lubang @ Rp. 300.00 Rp. 13,500.00
0.0920 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 2,576.00
0.0130 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 559.00
0.1500 Tukang @ Rp. 70,000.00 Rp. 10,500.00
0.0150 Kepala Tukang @ Rp. 75,000.00 Rp. 1,125.00
0.4500 Pekerja @ Rp. 65,000.00 Rp. 29,250.00
0.0225 Mandor @ Rp. 80,000.00 Rp. 1,800.00
Jumlah 1 Rp. 59,310.00

2 Analisa 1 m3 Plesteran Kolom ad. 1:2


0.1120 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 3,136.00
0.0140 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 602.00
0.2000 Tukang @ Rp. 70,000.00 Rp. 14,000.00
0.0200 Kepala Tukang @ Rp. 75,000.00 Rp. 1,500.00
0.4000 Pekerja @ Rp. 65,000.00 Rp. 26,000.00
0.0200 Mandor @ Rp. 80,000.00 Rp. 1,600.00
jumlah 2 Rp. 46,838.00

3 Analisa 1m2 Plesteran ad. 1:4


0.0864 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 2,419.20
0.0139 m3 Pasir Pasang @ Rp. 43,000.00 Rp. 597.70
0.1500 Tukang @ Rp. 70,000.00 Rp. 10,500.00
0.0150 Kepala Tukang @ Rp. 75,000.00 Rp. 1,125.00
0.4000 Pekerja @ Rp. 65,000.00 Rp. 26,000.00
0.0200 Mandor @ Rp. 80,000.00 Rp. 1,600.00
jumlah 3 Rp. 42,241.90

V PEKERJAAN ATAP

1 Analisa 1 m2 Kuda-kuda/ Gording


1.1000 m3 Kayu Klas II @ Rp. 1,200,000.00 Rp. 1,320,000.00
24.0000 Tukang @ Rp. 70,000.00 Rp. 1,680,000.00
2.4000 Kepala tukang @ Rp. 75,000.00 Rp. 180,000.00
8.0000 Pekerja @ Rp. 65,000.00 Rp. 520,000.00
0.4000 Mandor @ Rp. 80,000.00 Rp. 32,000.00
jumlah 1 Rp. 3,732,000.00
2 Analisa 1 m2 Rangka Atap Kayu
0.0167 m3 Kayu Klas II @ Rp. 1,200,000.00 Rp. 20,040.00
0.2500 kg Paku biasa @ Rp. 7,000.00 Rp. 1,750.00
0.1000 Tukang @ Rp. 70,000.00 Rp. 7,000.00
0.0100 Kepala tukang @ Rp. 75,000.00 Rp. 750.00
0.1000 Pekerja @ Rp. 65,000.00 Rp. 6,500.00
0.0050 Mandor @ Rp. 80,000.00 Rp. 400.00
Jumlah 2 Rp. 36,440.00

3 Analisa 1 m2 Atap Genteng Beton


10.0000 bh Genteng Beton Lokal @ Rp. 3,000.00 Rp. 30,000.00
0.2200 Tukang @ Rp. 70,000.00 Rp. 15,400.00
0.0220 Kepala Tukang @ Rp. 75,000.00 Rp. 1,650.00
0.3200 Pekerja @ Rp. 65,000.00 Rp. 20,800.00
0.0160 Mandor @ Rp. 80,000.00 Rp. 1,280.00
Jumlah 3 Rp. 69,130.00

4 Analisa 1m' Nok Genteng Beton


4.5000 bh Bubungan Genteng Beton @ Rp. 3,600.00 Rp. 16,200.00
0.0880 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 2,464.00
0.0300 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 1,290.00
0.4000 Tukang @ Rp. 70,000.00 Rp. 28,000.00
0.0400 Kepala Tukang @ Rp. 75,000.00 Rp. 3,000.00
0.8000 Pekerja @ Rp. 65,000.00 Rp. 52,000.00
0.0400 Mandor @ Rp. 80,000.00 Rp. 3,200.00
Jumlah 4 Rp. 106,154.00

5 Analisa Baut Konstruksi


1.0000 bh Baut 12mm Pendek @ Rp. 5,000.00 Rp. 5,000.00
1.0000 bh Baut 12mm Panjang @ Rp. 5,000.00 Rp. 5,000.00
1.0000 unit Plat Strip @ Rp. 10,000.00 Rp. 10,000.00
1.0000 unit Begel (type1) @ Rp. 25,000.00 Rp. 25,000.00
1.0000 unit Begel (type 2) @ Rp. 25,000.00 Rp. 25,000.00
1.0000 unit Baut Angkur @ Rp. 15,000.00 Rp. 15,000.00

Harga 24 bh Baut 12mm pendek 24 Rp. 5,000.00


Rp. 120,000.00
Harga 12 bh Baut mm panjang adalah 12 Rp. 5,000.00
Rp. 60,000.00
Harga 24 bh Plat Strip adalah 24 Rp. 10,000.00
Rp. 240,000.00
Harga 6 bh Begel adalah 6 Rp. 25,000.00
Rp. 150,000.00
Harga 3 bh Begel adalah 3 Rp. 25,000.00
Rp. 75,000.00
Harga 10 bh Baut angkur adalah 10 Rp. 15,000.00
Rp. 150,000.00

Harga 1 Pekerjaan Konstruksi adalah Rp. 795,000.00

Jumlah

6 Analisa 1 m2 Listplank Kayu


0.0220 m3 Kayu Klas II @ Rp. 1,200,000.00 Rp. 26,400.00
0.1000 Kg Paku Biasa @ Rp. 7,000.00 Rp. 700.00
0.8000 Tukang @ Rp. 70,000.00 Rp. 56,000.00
0.0800 Kepala Tukang @ Rp. 75,000.00 Rp. 6,000.00
0.2800 Pekerja @ Rp. 65,000.00 Rp. 18,200.00
0.0140 Mandor @ Rp. 80,000.00 Rp. 1,120.00
Jumlah 6 Rp. 108,420.00

VI PEKERJAAN LANTAI

1 Analisa 1 m3 Urugan Pasir Urug


1.2000 m3 Pasir Urug @ Rp. 43,000.00 Rp. 51,600.00
0.3000 Pekerja @ Rp. 65,000.00 Rp. 19,500.00
0.0100 Mandor @ Rp. 80,000.00 Rp. 800.00
Jumlah 1 Rp. 71,900.00

2 Analisa 1 m3 Beton Tumbuk ad. 1:3:5


4.0000 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 112,000.00
0.5000 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 21,500.00
1.0000 m 3
Koral Beton @ Rp. 80,000.00 Rp. 80,000.00
1.0000 Tukang @ Rp. 70,000.00 Rp. 70,000.00
0.1000 Kepala Tukang @ Rp. 75,000.00 Rp. 7,500.00
6.0000 Pekerja @ Rp. 65,000.00 Rp. 390,000.00
0.3000 Mandor @ Rp. 80,000.00 Rp. 24,000.00
Jumlah 2 Rp. 705,000.00

3 Analisa 1 m2 Pasangan Lantai Keramik 30x30


11.0000 bh Keramik 30x30 @ Rp. 2,273.00 Rp. 25,003.00
0.0960 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 2,688.00
0.0500 m3 Perekat @ Rp. 408,765.00 Rp. 20,438.25
0.2500 Tukang @ Rp. 70,000.00 Rp. 17,500.00
0.0250 Kepala Tukang @ Rp. 75,000.00 Rp. 1,875.00
0.5000 Pekerja @ Rp. 65,000.00 Rp. 32,500.00
0.0250 Mandor @ Rp. 80,000.00 Rp. 2,000.00
Jumlah 3 Rp. 102,004.25

4 Analisa 1 m3 Beton ad. 1:2:3


6.4000 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 179,200.00
0.5400 m3 Pasir Pasang @ Rp. 43,000.00 Rp. 23,220.00
0.8200 m3 Koral Beton @ Rp. 80,000.00 Rp. 65,600.00
1.0000 Tukang @ Rp. 70,000.00 Rp. 70,000.00
0.1000 Kepala Tukang @ Rp. 75,000.00 Rp. 7,500.00
6.0000 Pekerja @ Rp. 65,000.00 Rp. 390,000.00
0.3000 Mandor @ Rp. 80,000.00 Rp. 24,000.00
Jumlah 4 Rp. 759,520.00

VII PEKERJAAN SALURAN

1 Analisa 1m2 Pasangan batu bata ad. 1:4


45.0000 Bh Batu bata lubang @ Rp. 300.00 Rp. 13,500.00
0.0920 Zak Semen Portland (PC) @ Rp. 28,000.00 Rp. 2,576.00
0.0120 m 3
Pasir Pasang @ Rp. 43,000.00 Rp. 516.00
0.1500 Tukang @ Rp. 70,000.00 Rp. 10,500.00
0.0150 Kepala Tukang @ Rp. 75,000.00 Rp. 1,125.00
0.4500 Pekerja @ Rp. 65,000.00 Rp. 29,250.00
0.0225 Mandor @ Rp. 80,000.00 Rp. 1,800.00
jumlah 1 Rp. 59,267.00

VIII PEKERJAAN PINTU

1 Analisa 1 m2 Plafond GRC 4mm


1.0000 m2 GRC board 4mm @ Rp. 25,000.00 Rp. 25,000.00
0.0100 m 3
Kayu Klass II @ Rp. 1,200,000.00 Rp. 12,000.00
0.2000 Kg Paku Biasa @ Rp. 7,000.00 Rp. 1,400.00
0.0500 Kg Paku Asbes @ Rp. 350.00 Rp. 17.50
0.8000 Tukang @ Rp. 70,000.00 Rp. 56,000.00
0.0800 Kepala Tukang @ Rp. 75,000.00 Rp. 6,000.00
0.2500 Pekerja @ Rp. 65,000.00 Rp. 16,250.00
0.0140 Mandor @ Rp. 80,000.00 Rp. 1,120.00
Jumlah 1 Rp. 117,787.50

2 Analisa 10 m' List Profil Kayu N/K 1


10.0000 m' Listprofil N/K 1 @ Rp. 3,000.00 Rp. 30,000.00
0.1000 Kg Paku Biasa @ Rp. 7,000.00 Rp. 700.00
0.8000 Tukang @ Rp. 70,000.00 Rp. 56,000.00
0.0800 Kepala Tukang @ Rp. 75,000.00 Rp. 6,000.00
0.2800 Pekerja @ Rp. 65,000.00 Rp. 18,200.00
0.0140 Mandor @ Rp. 80,000.00 Rp. 1,120.00
Jumlah 2 Rp. 112,020.00
X PEKERJAAN PENGECATAN

1 Analisa 10 m2 Pengecatan Tembok 3x sapu


3.5000 Kg Cat Tembok @ Rp. 5,500.00 Rp. 19,250.00
2.0000 Kg Plamir Tembok @ Rp. 4,000.00 Rp. 8,000.00
2.0000 Lbr Amplas Biasa @ Rp. 2,000.00 Rp. 4,000.00
2.0000 Tukang @ Rp. 70,000.00 Rp. 140,000.00
0.2000 Kepala Tukang @ Rp. 75,000.00 Rp. 15,000.00
1.5000 Pekerja @ Rp. 65,000.00 Rp. 97,500.00
0.0750 Mandor @ Rp. 80,000.00 Rp. 6,000.00
Jumlah 1 Rp. 289,750.00
Untuk 1 m2 Rp. 28,975.00

2 Analisa 10 m2 Pengecatan Kayu Mengkilat 3x sapu


2.8400 Kg Cat Kilat @ Rp. 30,000.00 Rp. 85,200.00
1.4200 Kg Cat Dasar @ Rp. 15,000.00 Rp. 21,300.00
2.0000 Ltr Minyak Cat @ Rp. 2,000.00 Rp. 4,000.00
1.2000 Kg Cat Meni Nippon @ Rp. 5,000.00 Rp. 6,000.00
0.8000 Kg Plamir Kayu @ Rp. 5,000.00 Rp. 4,000.00
3.0000 Lbr Amplas Nikken @ Rp. 3,000.00 Rp. 9,000.00
2.2500 Tukang @ Rp. 70,000.00 Rp. 157,500.00
0.2250 Kepala Tukang @ Rp. 75,000.00 Rp. 16,875.00
1.5000 Pekerja @ Rp. 65,000.00 Rp. 97,500.00
0.0750 mandor @ Rp. 80,000.00 Rp. 6,000.00
Jumlah 2 Rp. 407,375.00
Untuk 1m2 Rp. 40,737.50

3 Analsia 10m2 Cat Plafond 3x sapu


2.8000 Kg Cat tembok @ Rp. 5,500.00 Rp. 15,400.00
1.0000 Ls Alat Bantu/ steiger @ Rp. 14,000.00 Rp. 14,000.00
1.5000 Tukang @ Rp. 70,000.00 Rp. 105,000.00
0.1500 Kepala Tukang @ Rp. 75,000.00 Rp. 11,250.00
1.0000 Pekerja @ Rp. 65,000.00 Rp. 65,000.00
0.0500 Mandor @ Rp. 80,000.00 Rp. 4,000.00
Jumlah 3 Rp. 214,650.00
untuk 1 m2 Rp. 21,465.00

XI PEKERJAAN LAIN -LAIN

1 Analisa dokumentasi +laporan


1.0000 Ls Dokumentasi + laporan @ Rp. 250,000.00 Rp. 250,000.00
Jumlah 1 Rp. 250,000.00

2 Analisa As Bulit Drawing


1.0000 Ls As Bulit Drawing @ Rp. 500,000.00 Rp. 500,000.00
Jumlah 2 Rp. 500,000.00

3 Analisa 10m2 Analisa Pembersihan Akhir Lapangan


0.7500 Pekerja @ Rp. 65,000.00 Rp. 48,750.00
0.0375 Mandor @ Rp. 80,000.00 Rp. 3,000.00
Jumlah 3 Rp. 51,750.00
untuk 1m2 Rp. 5,175.00
REKAPITULASI
PEMBANGUNAN RUMAH TINGGAL TYPE 142
DI KOTA YOGYAKARTA

I PEKERJAAN PERSIAPAN Rp. 790,937.38


II PEKERJAAN PONDASI Rp. 330,122.70
III PEK. BETON BERTULANG Ad. 1:2:3 Rp. 9,683,880.00
IV PEKERJAAN DINDING DAN PLESTERAN Rp. 3,794,715.61
V PEKERJAAN ATAP Rp. 0.00
VI PEKERJAAN LANTAI Rp. #NAME?
VII PEKERJAAN SALURAN Rp. 1,333,507.50
VIII PEKERJAAN KUSEN DAN PINTU Rp. 12,434,220.00
IX PEKERJAAN PLAFOND DAN RANGKA Rp. 48,830,317.50
X PEKERJAAN PENGECATAN Rp. 24,728,284.70
XI PEKERJAAN PAGAR Rp.
XII PEKERJAAN LAIN-LAIN Rp. 2,406,000.00
JUMLAH Rp. #NAME?
PPN 10% Rp. #NAME?

TOTAL BIAYA Rp. #NAME?


DAFTAR ANALISA PEKERJAAN

NO
I PEKERJAAN PERSIAPAN
1 Analisa 10 m2 Pembersihan Lapangan
0.7500 Pekerja
0.0375 Mandor

untuk 1m2 =
Harga 320 Pembrsihan Lapangan adalah

2 Analisa 10 m' Pasangan Bouwplank


0.0500 m3 Kayu klas IV
4.0000 Kayu Gelam
0.1000 Paku Biasa
0.8000 Tukang
0.0800 Kepala Tukang
0.2800 Pekerja
0.0140 Mandor

untuk 1m' =
harga 70 m' Pasangan bouwplank adalah

3 Analisa Biaya Air Kerja


1.0000 Ls Air Kerja

II PEKERJAAN PONDASI
1 Analisa 1 m3 galian Tanah
0.7500 Pekerja
0.0250 Mandor

Harga 422.302 m3 Galian Tanah Pondasi adalah

2 Analisa 1m3 Urugan Pasir Urug


1.2000 Pasir Urug
0.3000 Pekerja
0.0100 Mandor

Harga 10.231 m3 Urugan Pasir Bawah Pondasi adalah

3 Analisa Pasangan Pondasi Batu Bata ad. 1:4


450.0000 Batu Bata Lubang
2.0240 semen Portland (PC)
0.4060 Pasir Pasang
1.2000 Tukang
3.6000 Pekerja
0.1800 Mandor

Harga 32.68 m3 Pas. Pondasi Batu Bata ad. 1:4 adalah


4 Analisa Urugan Tanah Urug Biasa
1.2000 Tanah Urug
0.3000 Pekerja
0.0330 Mandor

Harga 105.58 m3 Urugan tanah kembali bekas Galian adalah

III PEK. BETON BERTULANG Ad. 1:2:3


1 Analisa 1 m3 Beton ad. 1:2:3
6.4000 Zak Semen Portland (PC)
0.5400 Pasir Pasang
0.8200 Koral Beton
1.0000 Tukang
0.1000 Kepala Tukang
6.0000 Pekerja
0.3000 Mandor

2 Analisa Tulang Besi (upah/100kg/m3)


110.0000 Besi Beton
2.0000 Kawat Pengikat
67500.0000 Tukang
2.2500 kepala Tukang
6.7500 Pekerja

3 Analisa Upah Bkisting (kayu cetakan)/ m3 Balok dan kolom


0.4000 Kayu klas IV
4.0000 Paku Biasa
5.0000 Tukang
0.5000 Kepala Tukang
2.0000 Pekerja
0.1000 Mandor

4 Upah Pembongkaran Bekisting


4.0000 Pekerja

Harga 1 m3 Beton Bertulang 1:2:3


1.0000 kl a
1.0000 kl b
0.4000 kl c
0.4000 kl d

Harga 1 m3 sloof beton bertulang ad. 1:2:3 adalah


Harga 1 m3 Kolom beton bertulang ad. 1:2:3 adalah
Harga 1 m3 Ring balok beton bertulang ad. 1:2:3 adalah

IV PEKERJAAN DINDING DAN PLESTERAN


1 Analisa 1 m2 Pasangan Dinding Batu bata ad, 1:4
45.0000 Bh Batu Bata Lubang
0.0920 Zak Semen Portland PC)
0.0130 m3 Pasir Pasang
0.1500 Tukang
0.0150 Kepala Tukang
0.4500 Pekerja
0.0225 Mandor

Harga 300.53 m2 Pas. Dinding Batu Bata ad. 1:4 adalah

2 Analisa 1 m3 Plesteran Kolom ad. 1:2


0.1120 Semen Portland (PC)
0.0140 Pasir Pasang
0.2000 Tukang
0.0200 Kepala Tukang
0.4000 Pekerja
0.0200 Mandor

3 Analisa 1m2 Plesteran ad. 1:4


0.0864 Semen Portland (PC)
0.0139 Pasir Pasang
0.1500 Tukang
0.0150 Kepala Tukang
0.4000 Pekerja
0.0200 Mandor

V PEKERJAAN ATAP
1 Analisa 1 m2 Kuda-kuda/ Gording
1.1000 Kayu Klas II
24.0000 Tukang
2.4000 Kepala tukang
8.0000 Pekerja
0.4000 Mandor

2 Analisa 1 m2 Rangka Atap Kayu


0.0167 Kayu Klas II
0.2500 Paku biasa
0.1000 Tukang
0.0100 Kepala tukang
0.1000 Pekerja
0.0050 Mandor

3 Analisa 1 m2 Atap Genteng Beton


10.0000 Genteng Beton Lokal
0.2200 Tukang
0.0220 Kepala Tukang
0.3200 Pekerja
0.0160 Mandor

4 Analisa 1m' Nok Genteng Beton


4.5000 Bubungan Genteng Beton
0.0880 Semen Portland (PC)
0.0300 Pasir Pasang
0.4000 Tukang
0.0400 Kepala Tukang
0.8000 Pekerja
0.0400 Mandor

5 Analisa Baut Konstruksi


1.0000 Baut 12mm Pendek
1.0000 Baut 12mm Panjang
1.0000 Plat Strip
1.0000 Begel (type1)
1.0000 Begel (type 2)
1.0000 Baut Angkur

Harga 24 bh Baut 12mm pendek


Harga 12 bh Baut mm panjang adalah
Harga 24 bh Plat Strip adalah
Harga 6 bh Begel adalah
Harga 3 bh Begel adalah
Harga 1 Pekerjaan Baut konstruksi adalah

6 Analisa 1 m2 Listplank Kayu


0.0220 Kayu Klas II
0.1000 Paku Biasa
0.8000 Tukang
0.0800 Kepala Tukang
0.2800 Pekerja
0.0140 Mandor

VI PEKERJAAN LANTAI
1 Analisa 1 m3 Urugan Pasir Urug
1.2000 Pasir Urug
0.3000 Pekerja
0.0100 Mandor

2 Analisa 1 m3 Beton Tumbuk ad. 1:3:5


4.0000 Semen Portland (PC)
0.5000 Pasir Pasang
1.0000 Koral Beton
1.0000 Tukang
0.1000 Kepala Tukang
6.0000 Pekerja
0.3000 Mandor

3 Analisa 1 m2 Pasangan Lantai Keramik 30x30


11.0000 Keramik 30x30
0.0960 Semen Portland (PC)
0.0500 Perekat
0.2500 Tukang
0.0250 Kepala Tukang
0.5000 Pekerja
0.0250 Mandor

4 Analisa 1 m3 Beton ad. 1:2:3


6.4000 Semen Portland (PC)
0.5400 Pasir Pasang
0.8200 Koral Beton
1.0000 Tukang
0.1000 Kepala Tukang
6.0000 Pekerja
0.3000 Mandor

VII PEKERJAAN SALURAN


1 Analisa 1m2 Pasangan batu bata ad. 1:4
45.0000 Batu bata lubang
0.0920 Semen Portland (PC)
0.0120 Pasir Pasang
0.1500 Tukang
0.0150 Kepala Tukang
0.4500 Pekerja
0.0225 Mandor

VIII PEKERJAAN PINTU


1 Analisa 1 m2 Plafond GRC 4mm
1.0000 GRC board 4mm
0.0100 Kayu Klass II
0.2000 Paku Biasa
0.0500 Paku GRC
0.8000 Tukang
0.0800 Kepala Tukang
0.2500 Pekerja
0.0140 Mandor

2 Analisa 10 m' List Profil Kayu N/K 1


10.0000 Listprofil N/K 1
0.1000 Paku Biasa
0.8000 Tukang
0.0800 Kepala Tukang
0.2800 Pekerja
0.0140 Mandor

X PEKERJAAN PENGECATAN
1 Analisa 10 m2 Pengecatan Tembok 3x sapu
3.5000 Cat Tembok
2.0000 Plamir Tembok
2.0000 Amplas Biasa
2.0000 Tukang
0.2000 Kepala Tukang
1.5000 Pekerja
0.0750 Mandor

Untuk 1 m2

2 Analisa 10 m2 Pengecatan Kayu Mengkilat 3x sapu


2.8400 Cat Kilat
1.4200 Cat Dasar
2.0000 Minyak Cat
1.2000 Cat Meni Nippon
0.8000 Plamir Kayu
3.0000 Amplas Nikken
2.2500 Tukang
0.2250 Kepala Tukang
1.5000 Pekerja
0.0750 mandor

Untuk 1m2

3 Analsia 10m2 Cat Plafond 3x sapu


2.8000 Cat tembok
1.0000 Alat Bantu/ steiger
1.5000 Tukang
0.1500 Kepala Tukang
1.0000 Pekerja
0.0500 Mandor

XI PEKERJAAN LAIN -LAIN

1 Analisa dokumentasi +laporan


1.0000 Dokumentasi + laporan

2 Analisa As Bulit Drawing


1.0000 As Bulit Drawing

3 Analisa 10m2 Analisa Pembersihan Akhir Lapangan


0.7500 Pekerja
0.0375 Mandor

untuk 1M2